Item 1. 2023 Budget, Tax Levy and Capital Improvement Review Meeting #10 City of Otsego│13400 90th Street NE, Otsego, MN 55330│Tel. (763) 441‐4414 Fax (763) 441‐9163        TO:     Mayor and City Council    FROM:   Adam Flaherty, City Administrator & Finance Director    DATE:    November 28, 2022    SUBJECT:   Budget Meeting #10      On Monday, Council and staff will be reviewing the 2023 Water, Sanitary Sewer, and Storm Water  Utility fund budgets along with their respective 2023‐2032 Capital Improvement Plans.     It should be noted that inclusion of a certain item within the Capital Improvement Plan does not  commit final approval by the City Council. Rather, it directs City staff to plan towards and gather  necessary information for an educated final approval on each respective item. Each individual item  is planned, researched, and brought back to the City Council for final approval when the respective  purchase is ready to move forward. I have developed an outline of discussion topics below.     I have developed an outline of discussion topics below.     Utility Operations Overview  Utility Operations Manager Neidermeier will be present for this portion of the meeting and will  provide an overview of the Utility Department Operations. This will include a review of the budget  narrative and PowerPoint, which will introduce some of the impactful items within the 2023  requested budget.      Materials for Review and Discussion  1) PowerPoint Slides – Budget Narrative & Capital Improvement Plan    Water Utility Fund  City Administrator/Finance Director Flaherty along with Utility Operations Manager Neidermeier  will review the following in detail:      Materials for Review and Discussion  1) Line‐Item Budgets  2) Line‐Item Budgets ‐ Detail  3) Capital Improvement Plan Summary  4) Source & Use Cash Flow Projections  City of Otsego│13400 90th Street NE, Otsego, MN 55330│Tel. (763) 441‐4414 Fax (763) 441‐9163  Sanitary Sewer Utility Fund  City Administrator/Finance Director Flaherty along with Utility Operations Manager Neidermeier  will review the following in detail:      Materials for Review and Discussion  1) Line‐Item Budgets  2) Line‐Item Budgets ‐ Detail  3) Capital Improvement Plan Summary  4) Source & Use Cash Flow Projections    Storm Water Utility Fund  City Administrator/Finance Director Flaherty will review the following in detail:      Materials for Review and Discussion  1) Line‐Item Budgets  2) Source & Use Cash Flow Projections    Utility Rates  Utility rate increases will be effective in March 2023. This allows staff to fully analyze the 2022  revenues before recommending adoption of the rate increases. Staff will bring forward formal  action for Council consideration in February 2023. City staff does not expect that the  recommended rate increases discussed at this meeting will materially change.    General Fund  The City Council was originally presented in August 2022 a draft budget, a balanced budget, with  both revenues and expenditures totaling $7,871,939, which was a 7% increase from the prior year.    Throughout the budget process, City staff continues to review the expenditure budgets that were  presented during earlier budget meetings for any necessary revisions. As of this meeting, the  expenditure budget totals $7,976,649, an increase of $104,710 compared to the original requested  budget. City Administrator/Finance Director Flaherty will provide additional review of the changes  during this meeting to gather feedback and direction from the City Council.    Materials for Review and Discussion  1) Budget Changes Tracking    Property Tax Levy  The City Council approved a preliminary property tax levy of $9,330,023 in September. There have  been no changes to the total property tax levy since that approval. City staff will provide additional  review of the 2023 property tax levy at this meeting.    Materials for Review and Discussion  1) Tax Levy Calculations        City of Otsego│13400 90th Street NE, Otsego, MN 55330│Tel. (763) 441‐4414 Fax (763) 441‐9163  Fund Balance Policy – Calculation of Transfer  The City’s fund balance policy outlines that the ending fund balance in the General Fund should be  45% of the subsequent years budget. The policy further outlines that any balance more than the  defined 45% minimum, can be transferred to a capital reserve fund at the Council’s discretion.    Materials for Review and Discussion  1) Calculation of Fund Balance Policy Transfer    December 12, 2022 Meeting  The City will be holding the required Truth‐in‐Taxation presentation during the Council meeting.  This meeting is an opportunity for the public to ask questions regarding the budget and tax levy.  After the presentation and public input opportunity, the City Council will need to approve several  items including the final property tax levy, operating budgets, and the capital improvement plan.    There are currently no additional meetings scheduled for review of the property tax levy, budgets,  or capital improvement plan. Staff would be seeking direction from the City Council on whether  any additional meetings are necessary, or if the City Council concurs with what has been presented  and reviewed thus far.      11/22/2022 1 2023 Utility Budget Narrative Kurt Neidermeier, Utility Manager November 28, 2022 2 Water & Wastewater Operations •Process monitoring and control •Sampling, testing and interpretation •Equipment operation •Records & Communication •Regulatory Compliance Water & Wastewater Maintenance •Preventative •Corrective •Reponses •Documentation Customer Services •Water Quality •Metering •Curb Stops •Locates Utility Department Overview 1 2 11/22/2022 2 Wastewater Treatment 4 Before After 3 4 11/22/2022 3 5 6 5 6 11/22/2022 4 7 Biosolids Building 8 Class A Exceptional Quality Biosolids (can use in garden) 2021 30 Tons per week 2022 40 Tons per Week 2023 50 Tons per Week 7 8 11/22/2022 5 9 Tanker Truck Material Haul Lift Station Cleaning Manhole Pumping Tank Cleaning Tandem Truck Biosolids Hauling Landfill or Field 10 Manholes ~ 1820 Sanitary Sewer ~ 74 Miles Forcemain ~ 27 miles Collection System 9 10 11/22/2022 6 11 Sanitary Sewer Cleaning 12 11 12 11/22/2022 7 13 Jet Vac Sanitary Sewer Cleaning Lift Station Cleaning Storm Sewer Cleaning Hydro excavating Tank Cleaning Crane Truck Pump pulls Confined Space Heavy Equipment Repairs Storage Access 14 24 Submersible Pumps (5 weighing over 2000 pounds) 10 Lift Stations 13 14 11/22/2022 8 15 Confined Space Entry Water 16 15 16 11/22/2022 9 17 Water Appropriation Allotment = 800 Million gallons (DNR) Hydrants ~ 1,100 Watermain ~ 100 Miles Wells – 9 Valves – 2,300 Max Production Day ~ 6.2 Million Gallons 18 17 18 11/22/2022 10 Strategic Plan Alignment 20 Positioning for Growth Evaluate Capacities Social Community with diverse housing, service opportunities and employment opportunities Committed to delivery of quality emergency services responsive to our community needs. Lift Station Comp Plan Biosolids Building Completion Water Tower 4 Water Appropriation increase complete – 800 Million Gallons per year Well 10 in process – Wells 11+ considerations East West Connection – 2023 West WWTF Capacity Expansion Empowering the Organization Increased Communications Training Opportunities Advance Knowledge & Licensure Staffing – 10+ year Vision Forepersons Vehicle – 10+ year Vision Cross Training Strategic Plan Alignment 19 20 11/22/2022 11 Utility Team REACH FOR THE STARS 22 Operations Team 2022 Austin 2022 Renee 2021 Andy 2018 Robert 2016 Kurt 2013 Nick 2015 Seth 2013 Reese 2015 21 22 11/22/2022 12 23 Specialization & focus progression 2026 20232024 202420292027 20282029 Operations Team Licensure Wastewater •Class A = 1•Class B = 2•Class C = 3•Class D = 2 Type IV •Biosolids = 3 Water•Class B = 4•Class C = 2•Class D = 2 23 24 11/22/2022 13 Operator Hire – (Advertise March, Hire May, June start) Construction – Wells, West WWTF, East West Connection, PSI Control Stations Water Treatment progression Customer Services – Water Quality, Emergency Responses, Locates, Curb Stops Meters – Reads, Inspections, Replacement Material Transport – West TWAS & Class A EQ Infrastructure – Added Assets Cross Training / Legacy Operators and Facility focus Seasonal / Apprenticeship WETT SCTC student Other 2023 Staffing STRIVE FOR GREATNESS 25 26 11/22/2022 14 Regulatory Compliance Customer Satisfaction Proactive Infrastructure Expansion Team Elevation & Succession Technology Advancements Minimize Risk & Improve Resilience Maintain Competitive Customer Rates Non Capital Meter Replacements – 385 residential Rate Evaluation – May - August Staffing - Operator Addition Apprenticeship/Seasonals Capital Vehicle replacement & addition Test W ells & Wells 10, 11 East West Interconnect Booster Station Improvements West WWTF Expansion Water Treatment Progression Budget Highlights 27 28 11/22/2022 15 Thank you 29 11/22/2022 1 2023 Utility Capital Improvement Planning Kurt Neidermeier, Utility Manager November 28, 2022 Wastewater Treatment 1 2 11/22/2022 2 3 4 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 Total RECs current 7,246 7,646 8,046 8,446 8,846 9,246 9,646 10,046 10,446 10,846 Total RECs platted 8,206 8,606 9,006 9,406 9,806 10,206 10,606 11,006 11,406 11,806 RECS CURRENT SEPT 2022      =            2993 3193 3393 3593 3793 3993 4193 4393 4593 4793 4993 RECS PLATTED SEPT 2022   =    3403 3603 3803 4003 4203 4403 4603 4803 5003 5203 5403 West WWTF Expansion ‐ WL1 (8,057 REC Cap)$22,000,000 $9,000,000 $200,000 West WWTF Solids Improvement (In REC Review) West WWTF Expansion ‐ WL2 (15,476 REC Cap) West WWTF Access Road $500,000 $200,000 $1,200,000 WEST WWTF 3 4 11/22/2022 3 5 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 Total RECs current 7,246 7,646 8,046 8,446 8,846 9,246 9,646 10,046 10,446 10,846 Total RECs platted 8,206 8,606 9,006 9,406 9,806 10,206 10,606 11,006 11,406 11,806 Lift Station Addition ‐ Comp Plan Refer $200,000 $1,700,000 $200,000 $2,600,000 Lift Station Equip & Reconditioning (590 R&R)$60,000 $75,000 $75,000 $475,000 $123,000 $135,000 $115,000 $750,000 $100,000 $135,000 LIFT STATIONS Water 6 5 6 11/22/2022 4 Water Tower Reconditioning $27,000 $1,750,000 Water Storage Property  Water Storage Project                                                                WATER STORAGE 2023 2024 2025 2026 2027 2028 2029 East West Connection Phase 1 $3,029,134 Booster Station $475,000 East West Connection Phase 2 $400,000 $2,000,000 $100,000                                                                SYSTEM CONNECTION 2023 2024 2025 2026 2027 2028 2029 Well 10 ‐ Well House 4 $1,093,455 Well 11 ‐ Well House 3  (align w/WH3 Treatment)$150,000 $950,000 $400,000 Well 12 ‐ Well House 2  Well 13‐16 test wells (Phase 1 Central Wellfield)$380,000 Well 17‐18 test wells (Phase 2 Central Wellfield) Well & Equip Inpect w Recond (Water Ref tab) (590 ‐ R&R)$132,000 $125,000 $150,000 $150,000 $170,000 $120,000 $30,000 Water Supply Plan & WHP Plan updates (302 ‐ ENG)$17,000 $27,000 $10,000                                                                 WELLS 7 8 11/22/2022 5 2023 2024 2025 2026 2027 2028 2029 Thank you 9 10 City of OtsegoEnterprise Fund Budget ‐ 2023Department RequestsWater UtilityRequestedActual Actual Year‐to‐Date Budget BudgetFund Department Source Account Description 2020 2021 2022 2022 2023 CommentsRevenues601 49400 37150 WATER SALES 1,484,822$         2,142,158$        2,112,079$        1,661,423$        2,016,135$        Based on Utility Rate Study601 49400 37155 WATER SALES ‐ IRRIGATION 220,266               425,912              455,537             189,000             387,000             Estimated ‐ Represents Average of Actuals for 2020‐2022 (YTD)601 49400 37160 WATER NSF 120                       60                        330                     ‐                          ‐                         601 49400 31900 PENALTIES AND INTEREST 19,757                 43,447                48,874               38,000               48,000               Estimated ‐ Represents Average of Actuals for 2021‐2022 (YTD)TOTAL ‐ OPERATING1,724,966           2,611,577          2,616,820         1,888,423         2,451,135        601 49400 33100 FEDERAL GRANTS AND AIDS 524                       ‐                           ‐                          ‐                          ‐                         601 49400 33422 OTHER STATE AID GRANTS 10,000                 ‐                           10,000               ‐                          ‐                         601 49400 34109 OTHER ADMINISTRATIVE CHARGES 9,675                   8,675                  12,675               ‐                          10,000              601 49400 34302 WATER METERS 149,431               151,886              122,851             93,177               118,104             296 Meters at $399 (Cost of $369 + 1 HR Admin Time $30)601 49400 36100 SPECIAL ASSESSMENTS 89,593                 57,290                28,497               ‐                          ‐                         601 49400 36210 INTEREST EARNINGS 91,440                 63,879                ‐                          ‐                          ‐                         601 49400 36213 NET CHANGE IN INVESTMENT FMV 74,405                 (107,170)            ‐                          ‐                          ‐                         601 49400 36232 CAPITAL CONTRIB. DEVELOPERS 602,128               1,753,646          ‐                          ‐                          ‐                         601 49400 37165 WATERTOWER RENTALS‐ANTENNAS 80,068                83,513               87,215              89,853              93,827              Tower #1 (Sprint/Verizon) and Tower #3 (Nextera)601 49400 37170 DNR FEES FOR STATE39,823                43,896               47,492              49,572              51,516              Estimated 5,300 Accounts at $9.72 (Actual is 5,035 as of 10/25/2022)601 49400 38990 OTHER MISCELLANEOUS1,721                  ‐                          ‐                         ‐                         ‐                         601 49400 38991 REFUNDS & REIMBURSEMENTS3,301                  25,949               11,968              ‐                          10,000              601 49400 39250 TRANSFER IN ‐ CAPITAL ASSETS143,529              871                     ‐                         ‐                         ‐                         601 49400 39300 PROCEEDS ‐ BONDS ISSUED‐                           ‐                          ‐                         ‐                          5,000,000        TOTAL ‐ NON OPERATING1,295,637          2,082,434         320,698           232,602           5,283,447        TOTAL ‐ REVENUES3,020,603          4,694,011         2,937,518        2,121,025        7,734,582        Expenses601 49400 101 FULL‐TIME EMPLOYEES REGULAR95,729                111,068             105,391            135,278            152,149            Includes FT Hire (Based on May 2023 Hiring Timeline)601 49400 102 WAGES ‐ FT OVERTIME4,767                  7,572                 5,738                5,000                5,000                601 49400 104 WAGES ‐ PT EMPLOYEES799                      6,216                 153                    4,550                4,680                 Includes 1 Seasonal Staff (26 Week Position @ 40 Hours)601 49400 121 PERA7,402                  8,757                 8,334                10,521              11,786              601 49400 122 FICA AND MEDICARE7,226                  9,078                 8,163                11,079              12,380              601 49400 130 OTHER EMPLOYER PAID INS13,679                14,133               15,765              20,231              25,564              601 49400 150 WORKERS COMPENSATION4,183                  4,963                 7,642                5,215                5,263                Based on Actual 2022‐2023 Premiums + 3% Inflation601 49400 191 GERF PENSION EXPENSE4,748                  3,938                 ‐                         ‐                         ‐                         TOTAL ‐ PERSONAL SERVICES138,532             165,725            151,186           191,874           216,822           601 49400 201 OFFICE SUPPLIES AND EXPENSES5,821                  8,353                 5,508                6,000                7,000                 Estimated ‐ Represents Average of Actuals for 2020‐2022 (YTD)601 49400 202 FUEL2,061                  3,408                 ‐                         3,348                6,310                 Allocated 25% of 5,609 Gallons (2021 Actual) at $4.50 (Same Rate as Fleet)601 49400 206 POSTAGE10,383                9,219                 7,007                15,300              15,900              Allocated 50% of Monthly Bill Mailings (5,300 Accounts  at $0.50)601 49400 210 OPERATING SUPPLIES2,892                  5,826                 2,058                7,000                7,000                 Operational & Preventative Maintenance Items601 49400 216 CHEMICAL SUPPLIES100,154              141,419             154,216            124,200            142,800            See Detailed Attachment601 49400 220 REPAIRS/MAINT SUPPLIES14,814                4,835                 22,608              15,000              16,500              See Detailed Attachment601 49400 225 UNIFORMS/CLOTHING ALLOWANCE1,461                  2,219                 1,329                2,350                3,025                 See Detailed Attachment601 49400 227 SAFETY SUPPLIES455                      592                     50                      1,800                1,500                601 49400 228 UTILITY SYSTEM SUPPLIES102,012              382,834             381,643            348,870            304,000            See Detailed Attachment601 49400 240 SMALL TOOLS/EQUIPMENT3,748                  16,604               1,057                5,000                7,500                601 49400 298 W/S FLEET EXPENSES4,578                  2,570                 ‐                         5,000                5,000                TOTAL ‐ SUPPLIES248,378             577,880            575,474           533,868           516,535           49400 ‐ Water Utility FundAccount NumberY:\Budget\2023\Utility Funds\2023 UTILITY BUDGETS INPUTWater FundWATER UTILITY FUND - BUDGET PACKET - 1 City of OtsegoEnterprise Fund Budget ‐ 2023Department RequestsWater UtilityRequestedActual Actual Year‐to‐Date Budget BudgetFund Department Source Account Description 2020 2021 2022 2022 2023 Comments49400 ‐ Water Utility FundAccount Number601 49400 301 LEGAL SERVICES6,459                  4,915                 2,132                2,000                5,000                 Estimated ‐ Represents Average of Actuals for 2020‐2022 (YTD)601 49400 302 ENGINEERING FEES262,206              122,231             138,363            28,200              39,200              See Detailed Attachment601 49400 303 PLANNING FEES1,413                  175                     725                    500                    750                    601 49400 306 PERMITS & FEES53,850                60,772               37,022              65,000              73,000              See Detailed Attachment601 49400 309 SOFTWARE & SUPPORT‐                           1,700                 ‐                         ‐                         ‐                         601 49400 315 GIS SERVICES412                      300                     245                    3,000                1,000                601 49400 320 TELEPHONE3,712                  4,334                 7,054                7,495                13,900              See Detailed Attachment601 49400 321 MILEAGE/TRAVEL137                      ‐                          188                    400                    400                    601 49400 322 UTILITIES98,075                135,904             122,291            103,000            125,000            Estimated ‐ Represents Average of Actuals for 2020‐2022 (YTD)601 49400 350 PRINT & PUBLISHING232                      94                       1,030                300                    300                     Statutory Publish Requirements (Budget & Financial Statements)601 49400 355 DUES & MEMBERSHIPS549                      424                     425                    365                    365                     See Detailed Attachment601 49400 360 EDUCATION/TRAINING/CONFERENCES1,179                  1,633                 2,072                5,100                5,350                 See Detailed Attachment601 49400 361 LIABILITY AND PROPERTY INSURAN10,514                11,602               29,265              13,022              21,167              Based on Actual 2022‐2023 Premiums + 5% Inflation601 49400 390 CONTRACTED SERVICES107,285              105,348             107,531            153,400            178,400            See Detailed Attachment601 49400 402 REPAIRS/MAINT BUILDINGS‐                           ‐                           29,379              40,000              10,000              601 49400 410 RENTALS2,016                  3,578                 1,099                2,465                2,465                Folding & Envelope Stuffing Machine ‐ Lease Payments & R/M Allowance601 49400 437 BANK SERVICE CHARGES10,011                13,751               12,916              11,550              13,650              Estimated ‐ Represents Average of Actuals for 2020‐2022 (YTD) + 5%601 49400 441 LICENSES, TAXES & FEES‐                           100                     1,094                ‐                         ‐                         TOTAL ‐ SERVICES & OTHER CHARGES558,049             466,860            492,830           435,797           489,947           601 49400 500 CAPITAL OUTLAY (GENERAL)1,739                  ‐                          224                    ‐                         1,000                 IT Equipment ‐ Computer Additions and Replacements601 49400 501 EQUIPMENT‐                           3,941                 299                    ‐                         5,000                 Lab Equipment (25% Allocation)601 49400 510 LAND ACQUISITIONS/EASEMENTS57,522                ‐                           36,276              ‐                         ‐                         601 49400 525 BUILDING IMPROVEMENTS‐                           ‐                           12,563              30,000              15,000              See Detailed Attachment601 49400 530 IMPROVEMENTS OTHER THAN BLDG2,363,797          3,478,225         618,128            2,775,375        5,114,777        See Detailed Attachment601 49400 550 MOTOR VEHICLES10,892                8,872                 ‐                         ‐                          103,500            See Detailed Attachment601 49400 590 REHABILITATION & REPLACEMENT‐                           ‐                          ‐                          50,000              50,000              Ongoing investment for costs of R&R ‐ Water Master Plan601 49400 599 CAPITALIZED ASSET OFFSET(2,718,008)         (3,550,653)        ‐                         ‐                         ‐                         TOTAL ‐ CAPITAL OUTLAY(284,059)            (59,615)             667,489           2,855,375        5,289,277        601 49400 420 DEPRECIATION628,728              703,828             ‐                          875,778            1,067,049        Based on Utility Rate Study601 49400 601 BOND PRINCIPAL‐                           ‐                          ‐                         ‐                         215,000            Debt Service ‐ 2021A601 49400 602 BOND INTEREST‐                            23,448               78,159              78,159              88,130              Debt Service ‐ 2021A601 49400 620 FISCAL AGENT FEES‐                            92,521               495                    450                    500                    601 49400 650 DEBT SERVICE AMORTIZATION'S‐                           ‐                          ‐                         ‐                          (14,772)             Amortization of Bond Premium601 49400 720 OPERATING TRANSFERS110,786              111,535             73,375              73,375              117,414            Administrative Contribution to General Fund + Fleet Replacement ReserveTOTAL ‐ OTHER739,513             931,332            152,029           1,027,762        1,473,322        TOTAL ‐ EXPENSES1,400,413          2,082,182         2,039,009        5,044,676        7,985,903        NET INCOME / (LOSS)1,620,190$        2,611,829$       898,509$          (2,923,651)$     (251,321)$         Y:\Budget\2023\Utility Funds\2023 UTILITY BUDGETS INPUTWater FundWATER UTILITY FUND - BUDGET PACKET - 2 City of OtsegoEnterprise Fund Budget ‐ 2023Detail of Line Item RequestsWater UtilityRequestedBudget Budget2022 2023 Item Detail / Description Comment8,505$                 9,781$                 Fluoride102,060               117,369               Polyphosphate13,608                15,649                 Chlorine27                        1                          Rounding124,200              142,800              15,000$              16,500$              Corrective Maintenance Items (Ex. Chemical Pumps, Valves, Hydrant Parts, Repairs)‐                           ‐                           ‐                           ‐                           ‐                           ‐                           ‐                           ‐                           15,000                16,500                1,600$                1,900$                Clothing Allowance = $400 x 8 Operators & $600 x 1 New Hire (50% Allocation)600                      675                      Boot Allowance = $150 x 9 Operators (50% Allocation)75                        225                       Clothing Allowance = $150 x 3 Seasonal Operators (50% Allocation)75                        225                      Boot Allowance = $150 x 3 Seasonal Operators (50% Allocation)2,350                  3,025                  348,870$           ‐$                         Prior Year Total ‐ Lump Sum‐                           147,852              New Residential Meters & Horns‐                           132,530               Replacement Meters ‐ 5/8" Residential Meters‐                           2,250                   Replacement Meters ‐ 1" Meters‐                           14,400                 Replacement Meters ‐ 1.50" Meters‐                           6,900                   Replacement Meters ‐ 2" Meters‐                           68                         Rounding‐                           ‐                           348,870              304,000              20,000$              20,000$               General Water Engineering (Regulatory, Distribution System, Consultation)5,000                  16,000                 AE2S ‐ Instrumentation Services & Staffing Plan Tech Memo3,200                  ‐                            KLM ‐ Water Tower #2 Warranty Inspection Services‐                           3,200                   KLM ‐ Water Tower #1 Inspection Services‐                           ‐                           28,200                39,200                49,572$              51,516$              Minnesota Department of Health Testing ($9.72 at 5,300 Accounts)15,000                21,000                DNR ‐ Water Usage400                      400                       Tier II Permits (4 @ $100)28                        84                         Rounding‐                           ‐                           65,000                73,000                1,080$                1,715$                Employee Cell Phones ($45 x 9) + Replacement Phones ($2,000) ‐ Allocated 25%960                      960                      CenturyLink Alarm Phone Lines at Facilities ($80 Per Month)780                      780                       Answering Service ($65 Monthly)420                      420                       Land Line Telephone Service ($35 Monthly)240                      240                       Tablet's Data Plan ($40 x 2) ‐ Allocated 25%175                      1,080                   WIN‐911 Remote Monitoring Mobile Application ‐ Allocated 50%3,840                  8,640                   Charter Communications ‐ Internet Services for Security Systems ‐ (~$90 Per Month)‐                           65                        Rounding7,495                  13,900                601‐49400‐306PERMITS & FEESR/M SUPPLIES601‐49400‐225UNIFORMS/CLOTHING ALLOWANCE601‐49400‐302ENGINEERING FEES601‐49400‐228A meter order was placed in June of 2022 and is expected to arrive in the spring of 2023.UTILITY SYSTEM SUPPLIESAccount No. & Description601‐49400‐216Supply inflation 15‐30%.CHEMICAL SUPPLIES601‐49400‐320TELEPHONE601‐49400‐220Repair and maintenance related to aging equipment and infrastucture. Larger equipment maintenance items are budgeted specifically, or now accounted for in Object #590 as Replacement and Rehabilitation costs.Y:\Budget\2023\Utility Funds\2023 UTILITY BUDGETS INPUT601-DetailWATER UTILITY FUND - BUDGET PACKET - 3 City of OtsegoEnterprise Fund Budget ‐ 2023Detail of Line Item RequestsWater UtilityRequestedBudget Budget2022 2023 Item Detail / Description CommentAccount No. & Description300$                    300$                   Minnesota Rural Water Association65                         65                        Suburban Utility Superintendent's Association ‐ Allocated 50%‐                           ‐                           365                      365                      800$                   700$                   Citywide Safety Program Training2,800                  3,150                  Operator Certification Licensing and Training ($350 x 9 Operators)1,500                  1,500                   Leadership & Supervisory Training‐                           ‐                           5,100                  5,350                  52,032$              54,983$               Locates (Hakanson) ‐ Based on 2020 ‐ 2022 YTD Monthly Average + 5%3,628                  3,868                   Locates (Gopher One) ‐ Based on 2020 ‐ 2022 YTD Monthly Average + 5%12,000                15,000                 Electrical Maintenance3,500                  3,500                   Neptune Service Agreement4,290                  5,220                   Aveva WonderWare Customer Support Agreement ‐ 50% Allocation750                      750                       OpWorks Software Agreement ‐ 50% Allocation5,000                  3,840                   W/H Security Monitoring @ $40 per month/per site (4 Water Towers + 4 Well Houses)2,000                  3,600                   Lab Testing5,000                  5,000                   Equipment Inspections & Testing ‐ Generator/ Meters/RPZ15,000                15,000                 Distribution Repairs / Watermain Leaks1,200                  1,500                   Mechanical ‐ Heating & Air Conditioning1,800                  1,800                   VFD Inspections & Preventative Maintenance400                      400                       800Mhz Infrastructure fees ($100 per radio) Wright County41,250                30,800                 Water Meter Change‐Out Project (385 Meters at $80 per meter)5,500                  7,500                   Fire Hydrant Painting (100 Hydrants)‐                           8,000                   Water Tower Exterior Cleaning ‐ Water Tower 1 & 3‐                           1,080                   Win911 Subscription ‐ 3yr renewal (2160) ‐ 50% Allocation‐                           16,500                 Rate Study (50% Allocation)51                        59                         Rounding Contingency + Inflationary Factor‐                           ‐                           153,400              178,400              15,000$              ‐$                          Water Tower #1 ‐ Interior Building15,000                ‐                            Well House #3 ‐ Well Meter Replacement‐                           15,000                 Water Tower Security Improvements‐                           ‐                           30,000                15,000                2,000,000$        ‐$                         Water Tower #4 ‐ CIP Amount85,000                ‐                           Water Tower #4 ‐ Engineering (KLM + Hakanson Anderson)220,000              ‐                            Well Field Hydrogeologic Study200,000              3,504,134           East & West Water System Connection and Booster Station Improvements60,000                132,000               Annual Well Equipment Inspection and Reconditioning (2023 is for Wells #5 and #6)130,000              1,093,455           Well #1080,375                40,188                 CSAH 38 & CSAH 19 Local Share‐                           150,000               Well #11 ‐ Project Initiation, Test Well & Project Design‐                           70,000                 Water Treatment at Wellhouse 4 ‐ Pilot Testing‐                           125,000               Central Wellfield ‐ Project Initiation, Phasing Plan & Site Selection‐                           ‐                           2,775,375          5,114,777          ‐$                         69,000$              Portable Generator Trailer (50% Allocation)‐                           14,500                3/4 Ton Extended Cab Pickup + Plow Equipment (25% Allocation)‐                           20,000                 1 Ton Extended Cab Utility Body Pickup + Tool Box (25% Allocation)‐                           ‐                           ‐                           103,500              601‐49400‐550MOTOR VEHICLES601‐49400‐530IMPROVEMENTS OTHER THAN BUILDINGS601‐49400‐355DUES & MEMBERSHIPS601‐49400‐525BUILDING IMPROVEMENTSCONTRACTED SERVICES601‐49400‐390601‐49400‐360EDUCATION / TRAINING / CONFERENCEY:\Budget\2023\Utility Funds\2023 UTILITY BUDGETS INPUT601-DetailWATER UTILITY FUND - BUDGET PACKET - 4 Capital Improvement PlanCity of Otsego, MinnesotaPROJECTS BY FUNDING SOURCE2023 2032thruTotal2023 2024 2025 2026 2027Source2028 2029 2030 2031 2032 #601 - Water Utility40,18840,188CSAH 38 & CSAH 19 - Local ShareCSAH-2020-0414,50014,5003/4 Ton Extended Cab PickupFLEET-23-0820,00020,0001 Ton Utility Body TruckFLEET-23-0969,00069,000Portable Generator TrailerFLEET-23-101,093,4551,093,455Well #10 - New Municipal WellWATER-23-013,504,1343,504,134East & West Connection - Phase 1WATER-23-0240,00040,000Well #5 ImprovementsWATER-23-0392,00092,000Well #6 ImprovementsWATER-23-04125,000125,000Central Wellfield - Project Phasing & LocatingWATER-23-051,500,000150,000 950,000 400,000Well #11 - New Municipal WellWATER-24-011,074,000142,000 177,000 160,000 170,000 120,000 30,000 80,000 80,000115,000Annual Well & Equipment Inspection and ReconditionWATER-24-324,250,00070,000 500,000 3,200,000 480,000Water Treatment - Well House #4WATER-25-014,250,00070,000 500,000 3,200,000 480,000Water Treatment - Well House #3WATER-26-015,380,000380,000 500,000 4,000,000 500,000Central Wellfield - Well Drilling & PipingWATER-26-022,500,000400,000 2,000,000 100,000East & West Connection - Phase 2WATER-27-0121,100,000100,000 1,000,000 15,000,000 5,000,000Central Wellfield - Building ConstructionWATER-27-021,777,00027,000 1,750,000Water Tower #3 ReconditioningWATER-28-01601 - Water Utility Total46,829,2775,218,277 2,042,000 4,877,000 9,240,000 18,177,000 6,970,000 30,000 80,000 80,000 115,0005,218,277 2,042,000 4,877,000 9,240,000 18,177,00046,829,277GRAND TOTAL6,970,000 30,000 80,000 80,000 115,000WATER UTILITY FUND - BUDGET PACKET - 5 City of OtsegoWater Utility FundCash Flow SummaryRevised: November 22, 2022Rate Increase6.00% 6.00% 6.00% 6.00% 6.00% 6.00% 6.00% 6.00% 6.00% 6.00% 6.00% Based on Ehlers Utility Rate StudyNew Connections296                        296                        260                        260                        260                       260                      260                      260                      260                      260                       260                        2023 = 7 Year Avg. / Remaining = 10 Year Avg.Forecast Budget20222023202420252026202720282029203020312032CommentsWater FundWater Sales2,140,740$          2,016,135$          2,154,129$          2,302,842$          2,457,911$         2,624,213$         2,802,580$         2,993,539$         3,170,822$         3,361,071$         3,562,736$          2022 Forecasted / 2023‐2030 Rate Study / 2031‐2032 = 6% Water Sales ‐ Irrigation455,537                387,000                387,000               387,000                387,000               387,000              387,000              387,000              387,000              387,000              387,000                2023 Budget ‐ Then StagnantPenalties and Interest48,874                   48,000                   48,000                   48,000                   48,000                  48,000                 48,000                 48,000                 48,000                 48,000                 48,000                   2023 Budget ‐ Then StagnantMeter Sales122,851                118,104                118,104               118,104                118,104               118,104              118,104              118,104              118,104              118,104              118,104                2023 Budget ‐ Then StagnantAntenna Rentals89,853                  93,827                  93,827                  93,827                  93,827                 93,827                93,827                93,827                93,827                93,827                93,827                   2023 Budget ‐ Then StagnantMiscellaneous49,572                  71,516                  71,516                  71,516                  71,516                 71,516                71,516                71,516                71,516                71,516                71,516                   DNR Testing Fees ‐ 2023 Budget ‐ Then StagnantBond Proceeds‐                              5,000,000             ‐                              4,250,000             9,630,000            23,600,000         ‐                            ‐                            ‐                            ‐                             ‐                              Projected Bond IssuancesWAC FundConnection Fees1,555,191            842,688                773,640               781,200                789,120               797,040              804,960              812,880              821,160              829,440              837,720                Assumes Rate Adjustments (1% Annually)Special Assessments62,439                   99,962                   87,137                   84,723                   68,920                  65,738                 32,754                 31,502                 ‐                            ‐                             ‐                              Current Levied WAC AssessmentsTotal4,525,057            8,677,232            3,733,353            8,137,212            13,664,398         27,805,438        4,358,741          4,556,368          4,710,429          4,908,958          5,118,903            ExpensesPersonal Servcies191,874                216,822                263,327               291,226                319,963               349,562              380,049              431,450              464,394              478,326              512,676                2023 Budget ‐ Additions Per Staff Plan ‐ Then 3% InflationSupplies533,868                516,535                526,866               537,403                548,151               559,114              570,296              581,702              593,336              605,203              617,307                2023 Budget ‐ Then 2% InflationInsurance13,022                  21,167                  21,590                  22,022                  22,463                 22,912                23,370                23,837                24,314                24,801                25,297                   2023 Budget ‐ Then 2% InflationUtilities103,000                125,000                128,750               132,613                136,591               140,689              144,909              149,257              153,734              158,346              163,097                2023 Budget ‐ Then 3% InflationServices & Other Charges319,775                 343,780                 354,093                364,716                 375,658                386,927               398,535               410,491               422,806               435,490               448,555                 2023 Budget ‐ Then 3% InflationDepreciation875,778                1,067,049            1,083,070            1,106,414            1,154,249           1,171,539          1,623,514          2,030,152          2,227,197          2,294,013          2,362,833            Based on Ehlers Utility Rate StudyDebt Service ‐ Principal835,200                ‐                             ‐                             ‐                             ‐                            ‐                           ‐                           ‐                           ‐                           ‐                            ‐                              ActualsDebt Service ‐ Interest287,065                 ‐                              ‐                              ‐                              ‐                             ‐                            ‐                            ‐                            ‐                            ‐                             ‐                              ActualsDebt Service ‐ Fiscal Agent Fees851                        ‐                              ‐                              ‐                              ‐                             ‐                            ‐                            ‐                            ‐                            ‐                             ‐                              ActualsCapital Outlay13,086                  ‐                             ‐                             ‐                             ‐                            ‐                           ‐                           ‐                           ‐                           ‐                            ‐                              ActualsCapital Outlay (General)‐                             21,000                  ‐                             ‐                             ‐                            ‐                           ‐                           ‐                           ‐                           ‐                            ‐                              2023 BudgetCapital Outlay (Fleet Additions)‐                              103,500                20,500                  24,500                  40,000                 ‐                           22,500                ‐                           31,000                ‐                            ‐                              2023‐2032 CIP (ALLOCATED 25%)Capital Outlay (CIP)2,775,375            5,114,777            2,042,000            4,877,000            9,240,000           18,177,000        6,970,000          30,000                80,000                80,000                115,000                2023‐2032 CIPCapital Outlay (Distribution)‐                              168,538                154,728               156,240                157,824               159,408              160,992              162,576              164,232              165,888              167,544                Assumed at 20% of WAC RevenueCapital Outlay (R & R Plan)‐                             50,000                  50,000                  50,000                  50,000                 50,000                50,000                50,000                50,000                50,000                50,000                   Based on Master PlanDebt Service (2019A)‐                             50,760                  270,360               556,776                555,984               ‐                           ‐                           ‐                           ‐                           ‐                            ‐                              Principal & Interest per Amortization ScheduleDebt Service (2021A)‐                              303,130                331,155               333,505                330,630               332,530              334,130              330,505              334,655              336,630              333,504                Principal & Interest per Amortization ScheduleDebt Service (2021B)‐                              1,002,060            576,720               206,370                206,010               ‐                           ‐                           ‐                           ‐                           ‐                            ‐                              Principal & Interest per Amortization ScheduleDebt Service (Projected)‐                             ‐                              384,381               384,381                711,104               1,451,422          3,265,699           3,265,699           3,265,699           3,265,699           3,265,699             Estimated Debt Service on Projected Bond IssuesTransfers Out ‐ General Fund73,375                  80,150                  82,555                  85,031                  87,582                 90,210                92,916                95,703                98,574                101,532              104,578                General Fund ‐ Administrative Functions (Inflates 3%)Transfers Out ‐ Fleet Replacements‐                              37,264                   44,142                   49,213                   52,253                  64,077                 67,398                 71,938                 71,938                 76,280                 77,072                   2023‐2032 CIP (ALLOCATED 25%)Total 6,022,269             9,221,532             6,334,237             9,177,410             13,988,462          22,955,390         14,104,309         7,633,311           7,981,880           8,072,207           8,243,161            Cash Balance ‐ Beginning11,515,562           10,894,128           11,416,877           9,899,064             9,965,279            10,795,465         16,817,052         8,694,998           7,648,207           6,603,953           5,734,717            Balance Sheet EffectsRevenues 4,525,057             8,677,232             3,733,353             8,137,212             13,664,398          27,805,438         4,358,741           4,556,368           4,710,429           4,908,958           5,118,903            Expenditures(6,022,269)           (9,221,532)           (6,334,237)           (9,177,410)           (13,988,462)         (22,955,390)       (14,104,309)       (7,633,311)         (7,981,880)         (8,072,207)         (8,243,161)           Noncash ‐ Depreciation875,778                1,067,049            1,083,070            1,106,414            1,154,249           1,171,539          1,623,514          2,030,152          2,227,197          2,294,013          2,362,833            Cash Balance ‐ Ending10,894,128$        11,416,877$        9,899,064$          9,965,279$          10,795,465$       16,817,052$       8,694,998$         7,648,207$         6,603,953$         5,734,717$         4,973,292$          Cash Balance ReserveOperating (100% of Next Year)2,370,503$          2,460,251$          2,539,425$          2,644,657$          2,720,953$         3,233,590$         3,722,593$         3,984,356$         4,097,710$         4,234,342$         Debt Service (100% of Next Year)1,355,950            1,562,616            1,481,032            1,803,728            1,783,952           3,599,829          3,596,204          3,600,354          3,602,329          3,599,203          Total Cash Reserve Recommendation3,726,453            4,022,867            4,020,457            4,448,385            4,504,905           6,833,419          7,318,797          7,584,710          7,700,039          7,833,545          Percentage of Cash Reserve on Hand292.35% 283.80% 246.22% 224.02% 239.64% 246.10% 118.80% 100.84%85.77% 73.21%ProjectedY:\Budget\2023\Cash Flows\Utility FundsCombined Water (601+360)WATER UTILITY FUND - BUDGET PACKET - 6 City of OtsegoDebt Service Fund Budget ‐ 2023Fund 360 ‐ G.O. Revenue Refunding Bonds, Series 2019A & Series 2021BWater & Sanitary Sewer Infrastructure + BuildingsRequestedActual Actual Year‐to‐Date Budget BudgetFund Department Object Account Description 2020 2021 2022 2022 2023Revenues360 47000 34406 WATER AVAILABILITY + CONNECTION CHARGES 1,634,683$        1,665,297$       1,555,191$       727,054$           842,688$          360 47000 36100 SPECIAL ASSESSMENTS 222,960              7,961                48,439              62,419              99,962             360 47000 36210 INVESTMENT EARNINGS 58,128               54,370              ‐                         ‐                         ‐                        360 47000 36213 INVESTMENT FAIR MARKET VALUE ADJUSTMENT 47,299               (91,218)             ‐                         ‐                         ‐                        360 47000 39200 TRANSFERS IN 48,222               50,760              ‐                         ‐                         ‐                        TOTAL 2,011,292          1,687,170        1,603,631        789,473            942,650           Expenditures360 47000 601 PRINCIPAL ‐                          ‐                         835,200            835,200            910,800           360 47000 602 INTEREST 208,580              210,540            208,906            208,906            142,020           360 47000 620 FISCAL AGENT FEE'S 609                     24,329              356                    750                    750                   360 47000 650 DEBT SERVICE AMORTIZATION'S (55,299)              (55,300)             ‐                         (55,300)             (101,632)          TOTAL 153,890              179,569            1,044,462        989,556            951,938           EXCESS (DEFICIENCY) OF REVENUESOVER (UNDER) EXPENDITURES1,857,402$        1,507,601$       559,168$           (200,083)$         (9,288)$             Fund 360 ‐ G.O. Revenue Refunding Bonds, Series 2019A & 2021BAccount NumberWATER UTILITY FUND - BUDGET PACKET - 7 City of OtsegoWater Access Charge FundCash Flow SummaryRevised: November 22, 2022Rate Increase9.22% 5.68% 1.00% 1.00% 1.00% 1.00% 1.00% 1.00% 1.00% 1.00% 1.00%Availability Charge2,014.00$             2,128.00$             2,149.00$             2,170.00$             2,192.00$            2,214.00$            2,236.00$            2,258.00$            2,281.00$            2,304.00$             2,327.00$            Projected Final Plats100                        100                        100                        100                        100                       100                      100                      100                      100                      100                       100                       Connection Charge2,014.00$             2,128.00$             2,149.00$             2,170.00$             2,192.00$            2,214.00$            2,236.00$            2,258.00$            2,281.00$            2,304.00$             2,327.00$            Projected Building Permits296                        296                        260                        260                        260                       260                      260                      260                      260                      260                       260                       Forecast Budget2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 CommentsRevenuesWAC Fee 1,555,191$          842,688$              773,640$              781,200$              789,120$             797,040$             804,960$             812,880$             821,160$             829,440$              837,720$              2023 = 7 Year Avg. / Remaining = 10 Year Avg.Special Assessments (Levied) 62,439                  99,962                  87,137                  84,723                  68,920                 65,738                32,754                31,502                ‐                           ‐                            ‐                             Current Levied WAC Assessments OnlyTotal 1,617,630             942,650                860,777                865,923                858,040               862,778              837,714              844,382              821,160              829,440               837,720               ExpensesDebt Service ‐ Principal 835,200                ‐                             ‐                             ‐                            ‐                           ‐                          ‐                           ‐                           ‐                           ‐                            ‐                             ActualsDebt Service ‐ Interest 208,906                ‐                             ‐                             ‐                             ‐                            ‐                           ‐                           ‐                           ‐                           ‐                            ‐                             ActualsDebt Service ‐ Fiscal Agent Fees 356                        ‐                             ‐                             ‐                             ‐                            ‐                           ‐                           ‐                           ‐                           ‐                            ‐                             ActualsDebt Principal (2019A) ‐                             ‐                             219,600                514,800                534,600               ‐                           ‐                           ‐                           ‐                           ‐                            ‐                             36% of Total Debt Service per AmortizationDebt Interest (2019A)‐                             50,760                 50,760                 41,976                 21,384                ‐                          ‐                          ‐                          ‐                          ‐                           ‐                             36% of Total Debt Service per AmortizationDebt Principal (2021A)‐                             215,000               250,000               260,000               265,000              275,000             285,000             290,000             300,000             305,000              305,000               Principal & Interest per Amortization ScheduleDebt Interest (2021A)‐                             88,130                 81,155                 73,505                 65,630                57,530               49,130               40,505               34,655               31,630                28,504                  Principal & Interest per Amortization ScheduleDebt Principal (2021B)‐                             910,800               531,000               187,200               196,200              ‐                          ‐                          ‐                          ‐                          ‐                           ‐                             36% of Total Debt Service per AmortizationDebt Interest (2021B)‐                             91,260                 45,720                 19,170                 9,810                   ‐                          ‐                          ‐                          ‐                          ‐                           ‐                             36% of Total Debt Service per AmortizationDebt Service (Projected)‐                            ‐                             384,381               384,381               711,104              1,451,422          3,265,699          3,265,699          3,265,699          3,265,699           3,265,699            Estimated Debt Service on Projected Bond IssuesTotal1,044,462            1,355,950            1,562,616            1,481,032            1,803,728           1,783,952          3,599,829          3,596,204          3,600,354          3,602,329           3,599,203            Cash Balance ‐ Beginning4,030,954            4,604,122            4,190,822            3,488,983            2,873,874           1,928,186          1,007,012          (1,755,103)        (4,506,925)        (7,286,119)        (10,059,008)        Balance Sheet EffectsRevenues1,617,630            942,650               860,777               865,923               858,040              862,778             837,714             844,382             821,160             829,440              837,720               Expenditures(1,044,462)          (1,355,950)          (1,562,616)          (1,481,032)          (1,803,728)         (1,783,952)        (3,599,829)        (3,596,204)        (3,600,354)        (3,602,329)        (3,599,203)          Cash Balance ‐ Ending4,604,122$         4,190,822$         3,488,983$         2,873,874$         1,928,186$        1,007,012$        (1,755,103)$       (4,506,925)$       (7,286,119)$       (10,059,008)$    (12,820,491)$     WAC Fees alone do not cover Future ProjectsProjectedY:\Budget\2023\Cash Flows\Utility Funds360-WACWATER UTILITY FUND - BUDGET PACKET - 8 City of OtsegoEnterprise Fund Budget ‐ 2023Department RequestsSanitary Sewer UtilityRequestedActual Actual Year‐to‐Date Budget BudgetFund Department Source Account Description 2020 2021 2022 2022 2023 CommentsRevenues602 49450 37200 SEWER SALES 2,434,760$        2,975,880$       3,140,627$       3,008,688$       3,438,000$       Based on Utility Rate Study602 49450 31900 PENALTIES AND INTEREST 34,594                53,059              62,626              60,000              60,000              Estimated ‐ Represents Average of Actuals for 2021‐2022 (YTD)TOTAL ‐ OPERATING2,469,354          3,028,939        3,203,254        3,068,688        3,498,000       602 49450 33100 FEDERAL GRANTS AND AIDS 1,633                  ‐                         ‐                         ‐                         ‐                        602 49450 36210 INTEREST EARNINGS 20,127                19,260              ‐                         ‐                         ‐                        602 49450 36213 NEY CHANGE IN INVESTMENT FMV 16,377                (32,312)             ‐                         ‐                         ‐                        602 49450 36232 CAPITAL CONTRIB. DEVELOPERS 729,598              1,580,765         ‐                         ‐                         ‐                        602 49450 38991 REFUNDS & REIMBURSEMENTS 4,319                  19,768              2,883                ‐                         ‐                        602 49450 39250 TRANSFER IN ‐ CAPITAL ASSETS 100,745              611                    ‐                         ‐                         ‐                        602 49450 39300 PROCEEDS ‐ BONDS ISSUED (0)                        (0)                       650,646            15,500,000      5,245,000        TOTAL ‐ NON OPERATING872,798              1,588,092        653,528            15,500,000      5,245,000       TOTAL ‐ REVENUES 3,342,153          4,617,031        3,856,782        18,568,688      8,743,000       Expenses602 49450 101 FULL‐TIME EMPLOYEES REGULAR 287,186              333,204            316,172            405,835            456,446            Includes FT Hire (Based on May 2023 Hiring Timeline)602 49450 102 WAGES ‐ FT OVERTIME 14,302                22,715              17,213              15,000              15,000             602 49450 104 WAGES ‐ PT EMPOYEES 2,396                  18,648              459                    13,650             14,040             Includes 1 Seasonal Staff (26 Week Position @ 40 Hours)602 49450 121 PERA22,182               26,272             25,004             31,562             35,359             602 49450 122 FICA AND MEDICARE21,678               27,234             24,490             33,238             37,140             602 49450 130 OTHER EMPLOYER PAID INS41,037               42,397             47,295             60,694             76,691             602 49450 150 WORKERS COMPENSATION12,545               14,891             22,922             15,644             15,788             Based on Actual 2022‐2023 Premiums + 3% Inflation602 49450 191 GERF PENSION EXPENSE14,014               12,038             ‐                        ‐                        ‐                        TOTAL ‐ PERSONAL SERVICES415,339             497,399           453,555           575,623           650,464           602 49450 201 OFFICE SUPPLIES AND EXPENSES6,680                 6,699               7,212               6,000               7,000                Estimated ‐ Represents Average of Actuals for 2020‐2022 (YTD)602 49450 202 FUEL8,741                 14,618             6,358               10,044             18,930             Allocated 75% of 5,609 Gallons (2021 Actual) at $4.50 (Same Rate as Fleet)602 49450 206 POSTAGE9,930                 9,263               6,934               15,300             15,900             Allocated 50% of Monthly Bill Mailings (5,300 Accounts  at $0.50)602 49450 210 OPERATING SUPPLIES19,361               27,848             24,033             25,000             26,500             See Detailed Attachment602 49450 216 CHEMICAL SUPPLIES31,825               87,645             144,886           140,800           227,800           See Detailed Attachment602 49450 220 REPAIRS/MAINT SUPPLIES74,826               78,409             55,912             50,000             63,000             See Detailed Attachment602 49450 225 UNIFORMS/CLOTHING ALLOWANCE2,713                 3,210               1,948               2,350               3,025                See Detailed Attachment602 49450 227 SAFETY SUPPLIES483                    10,025             10,165             2,500               7,500               602 49450 240 SMALL TOOLS/EQUIPMENT4,876                 15,468             15,046             5,000               12,000             602 49450 298 W/S FLEET EXPENSES13,733               7,711               140                   26,000             20,000             TOTAL ‐ SUPPLIES173,167             260,897           272,633           282,994           401,655           49450 ‐ Sanitary Sewer Utility FundAccount NumberY:\Budget\2023\Utility Funds\2023 UTILITY BUDGETS INPUTSewer FundSEWER UTILITY - BUDGET PACKET - 1 City of OtsegoEnterprise Fund Budget ‐ 2023Department RequestsSanitary Sewer UtilityRequestedActual Actual Year‐to‐Date Budget BudgetFund Department Source Account Description 2020 2021 2022 2022 2023 Comments49450 ‐ Sanitary Sewer Utility FundAccount Number602 49450 301 LEGAL SERVICES2,364                 11,197             4,355               2,000               7,000                Estimated ‐ Represents Average of Actuals for 2020‐2022 (YTD)602 49450 302 ENGINEERING FEES804,174             2,060,306        47,626             45,000             51,000             See Detailed Attachment602 49450 303 PLANNING FEES2,000                 2,375               3,025               1,000               3,000                Estimated ‐ Represents Average of Actuals for 2020‐2022 (YTD)602 49450 306 PERMIT & FEES7,350                 18,200             10,200             7,350               11,800             See Detailed Attachment602 49450 309 SOFTWARE & SUPPORT‐                         1,700               194                   ‐                        ‐                        602 49450 315 GIS SERVICES1,279                 7,310               1,630               5,000               5,000               602 49450 320 TELEPHONE6,109                 8,068               9,157               8,865               13,500             See Detailed Attachment602 49450 321 MILEAGE/TRAVEL167                    376                   617                   400                   500                   602 49450 322 UTILITIES221,114             296,494           288,889           226,000           285,000           Estimated ‐ Represents Average of Actuals for 2020‐2022 (YTD)602 49450 325 GARBAGE SERVICE23,037               27,603             24,096             29,260             26,000             Estimated ‐ Represents Average of Actuals for 2020‐2022 (YTD)602 49450 350 PRINT & PUBLISHING128                    190                   112                   300                   300                    Statutory Publish Requirements (Budget & Financial Statements)602 49450 355 DUES & MEMBERSHIPS372                    372                   ‐                        65                     65                      Suburban Utility Superintendent's Association ‐ Allocated 50%602 49450 360 EDUCATION/TRAINING/CONFERENCES2,908                 5,761               3,502               6,300               6,650                See Detailed Attachment602 49450 361 LIABILITY AND PROPERTY INSURAN35,245               40,588             98,838             50,113             66,985             Based on Actual 2022‐2023 Premiums + 5% Inflation602 49450 390 CONTRACTED SERVICES193,755             167,635           139,650           152,800           180,500           See Detailed Attachment602 49450 402 REPAIRS/MAINT BUILDINGS‐                         ‐                        ‐                        10,000             10,000             East WWTF Security Improvements602 49450 410 RENTALS2,176                 3,578               1,099               2,465               2,465                Folding & Envelope Stuffing Machine ‐ Lease Payments & R/M Allowance602 49450 419 BIOSOLIDS HAULING276,772             266,404           82,134             48,700             24,960             See Detailed Attachment602 49450 437 BANK SERVICE CHARGES30,032               41,252             38,748             34,650             40,950             Estimated ‐ Represents Average of Actuals for 2020‐2022 (YTD) + 5%TOTAL ‐ SERVICES & OTHER CHARGES1,608,981         2,959,408       753,872           630,268           735,675           602 49450 500 CAPITAL OUTLAY (GENERAL)6,072                 ‐                        671                   ‐                        1,000                IT Equipment ‐ Computer Additions and Replacements602 49450 501 EQUIPMENT87,150               18,336             898                   ‐                         15,000             Lab Equipment (75% Allocation)602 49450 530 IMPROVEMENTS OTHER THAN BLDG8,067,201          6,235,804        2,898,849        16,120,000     22,560,000     See Detailed Attachment602 49450 550 MOTOR VEHICLES32,675               26,615             85,404             325,000           172,500           See Detailed Attachment602 49450 590 REHABILITATION & REPLACEMENT‐                          18,718             38,582             250,000           275,000           See Detailed Attachment602 49450 599 CAPITALIZED ASSET OFFSET(9,001,936)        (8,298,294)      ‐                        ‐                        ‐                        TOTAL ‐ CAPITAL OUTLAY(808,837)           (1,998,820)      3,024,405       16,695,000     23,023,500     602 49450 420 DEPRECIATION1,026,089          1,066,215        ‐                         1,877,356        2,402,810        Based on Utility Rate Study602 49450 601 BOND PRINCIPAL‐                         ‐                         808,000           808,000           817,000           Debt Service ‐ 2020 PFA602 49450 602 BOND INTEREST33,327               153,044           185,150           187,625           988,652           Debt Service ‐ 2020 PFA & 2022A602 49450 620 FISCAL AGENT FEES17,500               ‐                         15,000             ‐                        ‐                        602 49450 720 OPERATING TRANSFERS249,795             272,565           220,125           220,125           352,243           Administrative Contribution to General Fund + Fleet Replacement ReserveTOTAL ‐ OTHER1,326,712         1,491,824       1,228,275       3,093,106       4,560,705       TOTAL ‐ EXPENSES2,715,362         3,210,708       5,732,740       21,276,991     29,371,999     NET INCOME / (LOSS)626,791$           1,406,324$      (1,875,958)$     (2,708,303)$     (20,628,999)$   Y:\Budget\2023\Utility Funds\2023 UTILITY BUDGETS INPUTSewer FundSEWER UTILITY - BUDGET PACKET - 2 City of OtsegoEnterprise Fund Budget ‐ 2023Detail of Line Item RequestsSanitary Sewer UtilityRequestedBudgetBudget20222023Item Detail / DescriptionComments24,000$             24,000$              Facility Operations & Preventative Maintenance Supplies1,000                  2,500                   Collection System / Lift Stations Operations & Maintenance Supplies‐                          ‐                          25,000               26,500               33,000$             64,700$              Ferric Chloride ‐ Phosphorous Removal 15,000               18,500                Polymer ‐ Belt Thickening Process50,400               66,242                Lime ‐ Solids Processing42,000               76,790                Polymer ‐ Solids Processing400                     685                      Sulfamic Acid ‐ Solids Processing‐                          883                      Freight and Rounding140,800             227,800             15,000$             15,000$              East Wastewater Treatment Faciltiy Corrective Maintenance15,000               15,000                West Wastewater Treatment Facility Corrective Maintenance8,000                  8,000                   Lift Stations Corrective Maintenance12,000               15,000                Collection System Corrective Maintenance (Ex. Chimney Replacements)‐                          10,000                Disinfection Process Maintenance‐                          ‐                          50,000               63,000               1,600$               1,900$               Clothing Allowance = $400 x 8 Operators & $600 x 1 New Hire (50% Allocation)600                     675                     Boot Allowance = $150 x 9 Operators (50% Allocation)75                       225                      Clothing Allowance = $150 x 3 Seasonal Operators (50% Allocation)75                       225                      Boot Allowance = $150 x 3 Seasonal Operators (50% Allocation)‐                          ‐                          2,350                 3,025                 30,000$             30,000$              General Sewer Engineering (Regulatory, Collection System, Consultation)15,000               21,000                AE2S ‐ Instrumentation Services & Staffing Tech Memo‐                          ‐                          45,000               51,000               5,900$               5,900$                MPCA ‐ Municipal Permit Annual Fee ‐ East WWTF1,450                  5,900                   MPCA ‐ Municipal Permit Annual Fee ‐ West WWTF‐                          ‐                          7,350                 11,800               3,240$               5,145$               Employee Cell Phones ($45 x 9) + Replacement Phones ($2,000) ‐ Allocated 75%960                     960                     CenturyLink Alarm Phone Lines at Facilities ($80 Per Month)780                     780                      Answering Service ($65 Monthly)1,200                  1,200                   Land Line Telephone Service ($100 Monthly)810                     720                      Tablet's Data Plan ($40 x 2) ‐ Allocated 75%525                     1,080                   WIN‐911 Remote Monitoring Mobile Application ‐ Allocated 50%1,350                  3,600                   Charter Communications ‐ Internet Services for WWTF ‐ (~$300 Per Month)‐                          15                       Rounding8,865                 13,500               2,000$               2,000$               Citywide Safety Program Training & LMC Learn2,800                  3,150                  Operator Certification Licensing and Training ($350 x 9 Operators)1,500                  1,500                   Leadership & Supervisory Training‐                          ‐                          6,300                 6,650                 Supply inflation of 20‐30% YOY with full year productionRepair and maintenance related to aging equipment and infrastucture.602‐49450‐225UNIFORMS/CLOTHING ALLOWANCE602‐49450‐306602‐49450‐220Account No. & Description602‐49450‐210OPERATING SUPPLIES602‐49450‐216CHEMICAL SUPPLIESR/M SUPPLIES602‐49450‐302602‐49450‐360EDUCATION / TRAINING / CONFERENCEENGINEERING FEES602‐49450‐320TELEPHONEPERMITS & FEESY:\Budget\2023\Utility Funds\2023 UTILITY BUDGETS INPUT602-DetailSEWER UTILITY - BUDGET PACKET - 3 City of OtsegoEnterprise Fund Budget ‐ 2023Detail of Line Item RequestsSanitary Sewer UtilityRequestedBudgetBudget20222023Item Detail / DescriptionCommentsAccount No. & Description47,000$              50,000$              East & West WWTF Permit Required Certified Lab Analysis52,032                54,983                Locates (Hakanson) ‐ Based on 2020 ‐ 2022 YTD Monthly Average + 5%3,628                   3,868                   Locates (Gopher One) ‐ Based on 2020 ‐ 2022 YTD Monthly Average + 5%                12,000                  12,000 Electrical6,000                  6,000                   Security Monitoring & Fire Monitoring                  2,200                    2,200 Lawn Services ‐ Spraying                  4,500                    4,500  Equipment inspections / Testing ‐ Generators                   5,000                  10,000  Collection System Repairs                  7,000                    7,000  Mechanical ‐ Heating & Air Conditioning                      400                        400  800Mhz Infrastructure fees ($100 per radio) Wright County1,000                  1,000                   Video Camera Services ‐ Inspect Sewer Lines for Grease2,000                  2,000                   Meter Calibrations5,000                  3,000                   VFD Inspections & Preventative Maintenance4,290                  5,220                   Aveva WonderWare Customer Support Agreement ‐ 50% Allocation750                     750                      OpWorks Software Agreement ‐ 50% Allocation‐                          1,080                   Win911 Subscription ‐ 3yr renewal (2160) ‐ 50% Allocation‐                          16,500                Rate Study (50% Allocation)1                         (1)                         Rounding Contingency + Inflationary Factor‐                          ‐                          152,800             180,500             11,700$             ‐$                        Class B Biosolids Land Application4,400                  ‐                          Material Transport ‐ West Digester Material to East WWTF20,000               3,600                   Landfill Disposal ‐ East WWTF Biosolids Material12,600               21,360                Contracted Transportation of Rolloff Containers‐                          ‐                          48,700               24,960               500,000$           ‐$                        East WWTF Biosolids ‐ CIP Amount15,000,000        22,000,000        West WWT Liquids Capacity Expansion ‐ CIP Amount500,000             500,000              West WWTF Access Road120,000             60,000               Annual Lift Station Equipment Inspection and Reconditioning‐                          ‐                          16,120,000        22,560,000        ‐$                        69,000$             Portable Generator Trailer (50% Allocation)‐                          43,500               3/4 Ton Extended Cab Pickup + Plow Equipment (75% Allocation)‐                          60,000                1 Ton Extended Cab Utility Body Pickup + Tool Box (75% Allocation)‐                          ‐                          ‐                          172,500             250,000$           75,000$              Ongoing investment for costs of R&R as identified in Wastewater Treatment Master Plan.‐                          26,000                Odor Control Media Changeout‐                          14,000                WW Flow Meter‐                          15,000                Disinfection Process related‐                          15,000                Forcemain repair‐                          15,000                Aeration Equipment‐                          70,000                Lift Station Equipment & Reconditioning ‐ CIP identified‐                          15,000                EWWTF Pretreatment Equipment‐                          15,000                Thickening Equipment‐                          15,000                Communication Equipment‐                          ‐                          250,000             275,000             602‐49450‐419BIOSOLIDS HAULING/DISPOSAL602‐49450‐550MOTOR VEHICLES602‐49450‐530IMPROVEMENTS OTHER THAN BUILDINGS602‐49450‐590REHABILITATION & REPLACEMENT602‐49450‐390CONTRACTED SERVICESY:\Budget\2023\Utility Funds\2023 UTILITY BUDGETS INPUT602-DetailSEWER UTILITY - BUDGET PACKET - 4 Capital Improvement PlanCity of Otsego, MinnesotaPROJECTS BY FUNDING SOURCE2023 2032thruTotal2023 2024 2025 2026 2027Source2028 2029 2030 2031 2032 #602 - Sanitary Sewer Utility43,50043,5003/4 Ton Extended Cab PickupFLEET-23-0860,00060,0001 Ton Utility Body TruckFLEET-23-0969,00069,000Portable Generator TrailerFLEET-23-1031,200,00022,000,000 9,000,000 200,000West WWTF Liquids Capacity ExpansionSEWER-23-0160,00060,000Lift Station #3 ImprovementsSEWER-23-021,983,00075,000 75,000 475,000 123,000 135,000 115,000 750,000 100,000135,000Lift Station Equipment & ReconditioningSEWER-24-321,900,000500,000 200,000 1,200,000West WWTF - Access RoadSEWER-26-011,900,000200,000 1,700,000Lift Station - New Municipal Sanitary Lift StationSEWER-27-015,450,000200,000 1,000,000 4,000,000 250,000East WWTF - EL1 ExpansionSEWER-30-012,800,000200,0002,600,000New Lift StationSEWER-32-01602 - Sanitary Sewer Utility Total45,465,50022,732,500 9,075,000 475,000 1,875,000 1,823,000 335,000 1,115,000 4,750,000 550,000 2,735,00022,732,500 9,075,000 475,000 1,875,000 1,823,00045,465,500GRAND TOTAL335,000 1,115,000 4,750,000 550,000 2,735,000SEWER UTILITY - BUDGET PACKET - 5 City of OtsegoSewer Utility FundCash Flow SummaryRevised: November 22, 2022Rate Increase10.00% 10.00% 10.00% 10.00% 10.00% 5.00% 5.00% 5.00% 5.00% 2.00% 2.00% Based on Ehlers Utility Rate StudyNew Connections296                        296                        260                        260                        260                       260                      260                      260                      260                      260                      260                        2023 = 7 Year Avg. / Remaining = 10 Year Avg.Forecast Forecast20222023202420252026202720282029203020312032CommentsSanitary Sewer FundUser Charges3,466,572$         3,438,000$         3,840,599$         4,292,745$         4,797,234$         5,119,699$        5,462,517$        5,826,341$        6,162,040$        6,285,281$        6,410,986$         2022 Forecasted / 2023‐2030 Rate Study / 2031‐2032 =  2% Penalties55,584                 60,000                 59,000                 59,000                 59,000                59,000               59,000               59,000               59,000               59,000               59,000                  2023 Budget ‐ Then StagnantBond Proceeds26,000,000         5,245,000            9,000,000            200,000               ‐                           ‐                          ‐                          ‐                           5,450,000          ‐                          ‐                             Assumes $40.445M PFA Note and $5.450 GO BondSAC FundConnection Fees4,320,593            3,012,412            2,709,780            2,736,800            2,764,080            2,791,620          2,819,520          2,847,680          2,876,100          2,904,880          2,933,920            Assumes Rate Adjustments (1% Annually)Special Assessments193,812               289,711               252,699               245,999               217,679               208,580             84,020               80,765               ‐                          ‐                          ‐                             Current Levied SAC AssessmentsTotal34,036,561         12,045,123         15,862,078         7,534,544            7,837,993            8,178,899          8,425,057          8,813,786          14,547,140       9,249,161          9,403,906            ExpensesPersonal Servcies575,623               650,464               789,978               873,677               959,888               1,048,684          1,140,145          1,294,349          1,393,180          1,434,975          1,538,024            2023 Budget ‐ Additions Per Staff Plan ‐ Then 3% InflationSupplies282,994               401,655               409,688               417,882               426,239               434,764             443,460             452,329             461,375             470,603             480,015               2023 Budget ‐ Then 2% InflationInsurance50,113                 66,985                 68,325                 69,691                 71,085                72,507               73,957               75,436               76,945               78,484               80,053                  2023 Budget ‐ Then 2% InflationUtilities226,000               285,000               293,550               302,357               311,427               320,770             330,393             340,305             350,514             361,029             371,860               2023 Budget ‐ Then 3% InflationServices & Other Charges354,155               383,690               395,201               407,057               419,268               431,846             444,802             458,146             471,890             486,047             500,628               2023 Budget ‐ Then 3% InflationDepreciation1,877,356            2,402,810            2,490,188            2,520,694            2,567,586            2,606,195          2,667,941          2,709,602          2,765,274          2,820,579          2,876,991            2023‐2030 Per Rate Study / 2031‐2032 =  2% Debt Service ‐ Principal2,292,800            ‐                            ‐                            ‐                            ‐                           ‐                          ‐                          ‐                          ‐                          ‐                          ActualsDebt Service ‐ Interest556,538               ‐                            ‐                            ‐                            ‐                           ‐                          ‐                          ‐                          ‐                          ‐                          ActualsDebt Service ‐ Fiscal Agent Fees15,634                 ‐                            ‐                            ‐                            ‐                           ‐                          ‐                          ‐                          ‐                          ‐                          ActualsCapital Outlay (General)‐                             16,000                 ‐                            ‐                            ‐                           ‐                          ‐                          ‐                          ‐                          ‐                          ‐                             2023 BudgetCapital Outlay (Fleet Additions)325,000               172,500               61,500                 73,500                 120,000               ‐                          67,500               ‐                          93,000               ‐                          ‐                             2023‐2032 CIP ADDITIONS (ALLOCATED 75%)Capital Outlay (Current CIP)16,120,000         22,560,000         9,075,000            475,000               1,875,000            1,823,000          335,000             1,115,000          4,750,000          550,000             2,735,000            2023‐2032 CIPCapital Outlay (Collection)‐                             1,204,965            1,083,912            1,094,720            1,105,632            1,116,648          1,127,808          1,139,072          1,150,440          1,161,952          1,173,568            Assumed at 40% of SAC RevenueCapital Outlay (R & R Plan)250,000               275,000               300,000               325,000               350,000               375,000             400,000             425,000             450,000             450,000             450,000               Based on Master PlanDebt Service (2019A)‐                             90,240                 480,640               989,824               988,416               ‐                          ‐                          ‐                          ‐                          ‐                          ‐                             Principal & Interest per Amortization ScheduleDebt Service (2020 PFA)‐                             1,002,362            1,006,305            1,006,703            1,005,986            1,006,164          1,006,226          1,006,171          1,006,001          1,006,715          1,006,300            Based on Preliminary Amortization (7‐28‐2022)Debt Service (2021B)‐                             1,781,440            1,025,280            366,880               366,240               ‐                          ‐                          ‐                          ‐                          ‐                          ‐                             Principal & Interest per Amortization ScheduleDebt Service (2022A)‐                             803,290               819,219               ‐                            ‐                           ‐                          ‐                          ‐                          ‐                          ‐                          ‐                             Interest per Amortization Schedule (Principal Paid by PFA)Debt Service (Projected / PFA)‐                            ‐                            ‐                             2,298,073            2,298,073            2,298,073          2,298,073          2,298,073          2,298,073          2,298,073          2,298,073            Estimated PFA Amortization ($40.445 M)Debt Service (Projected / GO)‐                            ‐                            ‐                            ‐                            ‐                           ‐                          ‐                          ‐                          ‐                           418,975             418,975               Estimated Debt Service on Projected Bond IssuesTransfers Out ‐ General Fund220,125               240,450               247,664               255,093               262,746               270,629             278,747             287,110             295,723             304,595             313,733               General Fund ‐ Administrative Functions (Inflates 3%)Transfers Out ‐ Fleet Replacements‐                             111,793               132,425               147,640               156,758               192,230             202,195             215,814             215,814             228,841             231,215               2023‐2032 CIP (ALLOCATED 75%)Total23,146,338         32,448,644         18,678,874         11,623,791         13,284,345         11,996,510       10,816,247       11,816,407       15,778,229       12,070,868       14,474,436         Cash Balance ‐ Beginning16,800,793         29,568,372         11,567,661         11,241,053         9,672,500            6,793,734          5,582,318          5,859,070          5,566,051          7,100,236          7,099,108            Balance Sheet EffectsRevenues34,036,561         12,045,123         15,862,078         7,534,544            7,837,993            8,178,899          8,425,057          8,813,786          14,547,140       9,249,161          9,403,906            Expenditures(23,146,338)        (32,448,644)        (18,678,874)        (11,623,791)        (13,284,345)        (11,996,510)      (10,816,247)      (11,816,407)      (15,778,229)      (12,070,868)      (14,474,436)        Noncash ‐ Depreciation1,877,356            2,402,810            2,490,188            2,520,694            2,567,586            2,606,195          2,667,941          2,709,602          2,765,274          2,820,579          2,876,991            Cash Balance ‐ Ending29,568,372$       11,567,661$       11,241,053$       9,672,500$         6,793,734$         5,582,318$        5,859,070$        5,566,051$        7,100,236$        7,099,108$        4,905,570$         Cash Balance ReserveOperating (100% of Next Year)4,431,054$         4,694,593$         4,846,451$         5,018,240$         5,185,395$         5,379,445$        5,617,277$        5,814,901$        5,956,312$        6,161,305$        Debt Service (100% of Next Year)3,677,332            3,331,444            4,661,480            4,658,715            3,304,237            3,304,299          3,304,244          3,304,074          3,723,763          3,723,348          Total Cash Reserve Recommendation8,108,386            8,026,037            9,507,931            9,676,955            8,489,632            8,683,744          8,921,521          9,118,975          9,680,075          9,884,653          Percentage of Cash Reserve on Hand364.66% 144.13% 118.23%99.95% 80.02% 64.28% 65.67% 61.04% 73.35% 71.82%ProjectedY:\Budget\2023\Cash Flows\Utility FundsCombined Sewer (602+361)SEWER UTILITY - BUDGET PACKET - 6 City of OtsegoDebt Service Fund Budget ‐ 2023Fund 361 ‐ G.O. Revenue Refunding Bonds, Series 2019A & Series 2021BWater & Sanitary Sewer Infrastructure + BuildingsRequestedActual Actual Year‐to‐Date Budget BudgetFund Department Object Account Description 2020 2021 2022 2022 2023Revenues361 47000 34407 SEWER AVAILABILITY + CONNECTION CHARGES 4,728,563$        4,681,816$       4,320,593$       2,547,455$       3,012,412$      361 47000 36100 SPECIAL ASSESSMENTS 841,972              25,104              79,687              193,832            333,449           361 47000 36210 INVESTMENT EARNINGS 202,736              189,253            ‐                         ‐                         ‐                        361 47000 36213 INVESTMENT FAIR MARKET VALUE ADJUSTMENT 164,967              (317,514)           ‐                         ‐                         ‐                        361 47000 39200 TRANSFERS IN 85,728               90,240              ‐                         ‐                         ‐                        TOTAL 6,023,965          4,668,899        4,400,280        2,741,287        3,345,861       Expenditures361 47000 601 PRINCIPAL ‐                          ‐                         1,484,800         1,484,800         1,619,200        361 47000 602 INTEREST 370,808              374,294            371,388            371,388            252,480           361 47000 620 FISCAL AGENT FEE'S 1,453                 43,136              634                    1,500                1,500               361 47000 650 DEBT SERVICE AMORTIZATION'S (98,310)              (98,311)             ‐                         (98,311)             (180,679)          TOTAL 273,951              319,119            1,856,822        1,759,377        1,692,501       EXCESS (DEFICIENCY) OF REVENUESOVER (UNDER) EXPENDITURES5,750,015$        4,349,779$       2,543,458$       981,910$           1,653,360$      Fund 361 ‐ G.O. Revenue Refunding Bonds, Series 2019A & 2021BAccount NumberSEWER UTILITY - BUDGET PACKET - 7 City of OtsegoSewer Access Charge FundCash Flow SummaryRevised: November 22, 2022Rate Increase9.22% 5.68% 1.00% 1.00% 1.00% 1.00% 1.00% 1.00% 1.00% 1.00% 1.00%Availability Charge2,885.00$             3,049.00$             3,079.00$             3,110.00$             3,141.00$            3,172.00$            3,204.00$            3,236.00$            3,268.00$            3,301.00$             3,334.00$            Projected Final Plats100                        100                        100                        100                        100                       100                      100                      100                      100                      100                       100                       Connection Charge8,655.00$             9,147.00$             9,238.00$             9,330.00$             9,423.00$            9,517.00$            9,612.00$            9,708.00$            9,805.00$            9,903.00$             10,002.00$         Projected Building Permits296                        296                        260                        260                        260                       260                      260                      260                      260                      260                       260                       Forecast Budget2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 CommentsRevenuesSAC Fee 4,320,593$          3,012,412$          2,709,780$          2,736,800$          2,764,080$         2,791,620$         2,819,520$         2,847,680$         2,876,100$         2,904,880$         2,933,920$          2023 = 7 Year Avg. / Remaining = 10 Year Avg.Special Assessments (Levied) 193,812                333,449                295,069                287,003                257,316               246,850              120,924              116,301              ‐                           ‐                            ‐                             Current Levied SAC Assessments OnlyTotal 4,514,405             3,345,861             3,004,849             3,023,803             3,021,396            3,038,470           2,940,444           2,963,981           2,876,100           2,904,880           2,933,920            ExpensesDebt Service ‐ Principal 1,484,800             ‐                             ‐                             ‐                            ‐                           ‐                          ‐                           ‐                           ‐                           ‐                            ‐                             ActualsDebt Service ‐ Interest 371,388                ‐                             ‐                             ‐                             ‐                            ‐                           ‐                           ‐                           ‐                           ‐                            ‐                             ActualsDebt Service ‐ Fiscal Agent Fee's 634                        ‐                             ‐                             ‐                             ‐                            ‐                           ‐                           ‐                           ‐                           ‐                            ‐                             ActualsDebt Principal (2019A) ‐                             ‐                             390,400                915,200                950,400               ‐                           ‐                           ‐                           ‐                           ‐                            ‐                             64% of Total Debt Service per AmortizationDebt Interest (2019A)‐                             90,240                 90,240                 74,624                 38,016                ‐                          ‐                          ‐                          ‐                          ‐                           ‐                             64% of Total Debt Service per AmortizationDebt Service (2020PFA)‐                             1,002,362            1,006,305            1,006,703            1,005,986           1,006,164          1,006,226          1,006,171          1,006,001          1,006,715          1,006,300            Based on Preliminary Amortization (7‐28‐2022)Debt Principal (2021B)‐                             1,619,200            944,000               332,800               348,800              ‐                          ‐                          ‐                          ‐                          ‐                           ‐                             64% of Total Debt Service per AmortizationDebt Interest (2021B)‐                             162,240               81,280                 34,080                 17,440                ‐                          ‐                          ‐                          ‐                          ‐                           ‐                             64% of Total Debt Service per AmortizationDebt Interest (2022A)‐                             803,290               819,219               ‐                            ‐                           ‐                          ‐                           ‐                           ‐                           ‐                            ‐                             Interest per Amortization Schedule (Principal Will Fund bDebt Service (Projected / PFA)‐                            ‐                            ‐                             2,298,073            2,298,073           2,298,073          2,298,073          2,298,073          2,298,073          2,298,073          2,298,073            Estimated PFA Amortization ($40.445 M)Debt Service (Projected / GO)‐                            ‐                            ‐                            ‐                            ‐                           ‐                          ‐                          ‐                          ‐                           418,975              418,975               Estimated Debt Service on Projected Bond IssuesTotal1,856,822            3,677,332            3,331,444            4,661,480            4,658,715           3,304,237          3,304,299          3,304,244          3,304,074          3,723,763          3,723,348            Cash Balance ‐ Beginning15,421,308         18,078,891         17,747,420         17,420,825         15,783,148         14,145,829       13,880,062       13,516,207       13,175,944       12,747,970       11,929,087         Balance Sheet EffectsRevenues4,514,405            3,345,861            3,004,849            3,023,803            3,021,396           3,038,470          2,940,444          2,963,981          2,876,100          2,904,880          2,933,920            Expenditures(1,856,822)          (3,677,332)          (3,331,444)          (4,661,480)          (4,658,715)          (3,304,237)        (3,304,299)        (3,304,244)        (3,304,074)        (3,723,763)        (3,723,348)          Cash Balance ‐ Ending18,078,891$       17,747,420$       17,420,825$       15,783,148$       14,145,829$       13,880,062$      13,516,207$      13,175,944$      12,747,970$      11,929,087$      11,139,659$       SAC Fees reasonably cover Future ProjectsProjectedY:\Budget\2023\Cash Flows\Utility Funds361-SACSEWER UTILITY - BUDGET PACKET - 8 City of OtsegoStorm Water Utility Fund Budget ‐ 2023Department RequestsRequestedActual Actual Year‐to‐Date Budget BudgetFund Department Source Account Description 2020 2021 2022 2022 2023 CommentsRevenues220 49490 31010 CURRENT AD VALOREM TAXES32,000$            34,000$            18,000$            36,000$            38,000$            TOTAL ‐ OPERATING32,000              34,000             18,000             36,000             38,000             220 49490 36210 INTEREST EARNINGS689                    835                   ‐                        ‐                        ‐                        220 49490 36213 NET CHANGE IN INVESTMENT FMV560                    (1,400)              ‐                        ‐                        ‐                        TOTAL ‐ NON OPERATING1,249                (565)                 ‐                        ‐                        ‐                        TOTAL ‐ REVENUES33,249              33,435             18,000             36,000             38,000             Expenses220 49490 292 CULVERTS‐                         2,530               6,999               21,000             21,000             Lump Sum ‐ Replacement of Storm Water CulvertsTOTAL ‐ SUPPLIES685                   2,530               6,999               21,000             21,000             220 49490 301 LEGAL SERVICES‐                         ‐                        ‐                        500                   500                   220 49490 302 ENGINEERING FEES‐                         ‐                        ‐                        6,000               6,000                25% of Culvert Costs ‐ Engineering OversightTOTAL ‐ SERVICES & OTHER CHARGES‐                          ‐                         ‐                         6,500                6,500               TOTAL ‐ EXPENSES685                   2,530               6,999               27,500             27,500             NET INCOME / (LOSS)32,564$            30,905$            11,001$            8,500$              10,500$            Change ($)2,000              Change (%)23.53%49490 ‐ Storm Water Utility Fund (Out‐of‐District)Account NumberSTORM WATER UTILITY - BUDGET PACKET - 1 City of OtsegoStorm Water Utility Fund (Out District)Cash Flow SummaryRevised: November 22, 20225.88% 5.56% 5.26% 5.00% 4.76% 4.55% 4.35% 4.17% 4.00% 3.85% 3.70%Forecast Budget2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 CommentsRevenuesProperty Taxes 36,000$                38,000$                40,000$                42,000$                44,000$               46,000$               48,000$               50,000$               52,000$               54,000$                56,000$                Annual Increase of $2,000Total 36,000                  38,000                  40,000                  42,000                  44,000                 46,000                48,000                50,000                52,000                54,000                 56,000                 ExpensesSupplies 6,999                     21,000                  21,500                  22,000                  22,500                 23,000                23,500                24,000                24,500                25,000                 25,500                 Engineering ‐                             6,000                     6,500                     7,000                     7,500                    8,000                   8,500                   9,000                   9,500                   10,000                 10,500                 Other Charges & Services ‐                             500                        500                        500                        500                       500                      500                      500                      500                      500                       500                       Total 6,999                     27,500                  28,500                  29,500                  30,500                 31,500                32,500                33,500                34,500                35,500                 36,500                 Cash Balance ‐ Beginning88,841                  117,842                128,342                139,842                152,342               165,842              180,342              195,842              212,342              229,842               248,342               Balance Sheet EffectsRevenues 36,000                  38,000                  40,000                  42,000                  44,000                 46,000                48,000                50,000               52,000               54,000                56,000                 Expenditures(6,999)                  (27,500)                (28,500)                (29,500)                (30,500)               (31,500)              (32,500)              (33,500)              (34,500)              (35,500)               (36,500)                Cash Balance ‐ Ending117,842$             128,342$             139,842$             152,342$             165,842$            180,342$            195,842$            212,342$            229,842$            248,342$             267,842$             ProjectedY:\Budget\2023\Cash Flows\Utility Funds220-Storm(Out)STORM WATER UTILITY - BUDGET PACKET - 2 City of OtsegoStorm Water Utility Fund Budget ‐ 2023Department RequestsRequestedActual Actual Year‐to‐Date Budget BudgetFund Department Source Account Description 2020 2021 2022 2022 2023 CommentsRevenues222 49490 37500 STORMWATER UTILITY CHARGES85,983$            90,601$            99,857$            89,986$            105,095$          Assumes 2% Customer Growth222 49490 31900 PENALTIES AND INTEREST737                    (1,542)              1,589               ‐                        ‐                        TOTAL ‐ OPERATING86,720              89,059             101,446           89,986             105,095           222 49490 36100 SPECIAL ASSESSMENTS33,859              33,141             18,002             32,331             31,986             Assessment Roll to Wright County222 49490 36210 INTEREST EARNINGS6,342                4,850               ‐                        ‐                        ‐                        222 49490 36213 NET CHANGE IN INVESTMENT FMV5,161                (8,137)              ‐                        ‐                        ‐                        222 49490 36232 CAPITAL CONTRIB. DEVELOPERS454,473             1,351,740        ‐                        ‐                        ‐                        222 49490 39250 TRANSFER IN ‐ CAPITAL ASSETS166,048             895                   ‐                        ‐                        ‐                        TOTAL ‐ NON OPERATING665,883             1,382,489       18,002             32,331             31,986             TOTAL ‐ REVENUES752,603             1,471,548       119,448           122,317           137,081           Expenses222 49490 119 PAYROLL ALLOCATION12,945              13,626             ‐                         10,000             12,000             Reimbursement Allocation to Streets DepartmentTOTAL ‐ PERSONAL SERVICES12,945               13,626              ‐                         10,000              12,000             222 49490 220 REPAIRS/MAINT SUPPLIES 3,245                 449                    4,801                2,500                5,000                Rip‐Rap‐Rock / FabricTOTAL ‐ SUPPLIES3,245                 449                   4,801                2,500                5,000               222 49490 301 LEGAL SERVICES ‐                          ‐                         ‐                         500                    500                   222 49490 302 ENGINEERING FEES 23,329               28,252              9,129                20,000              20,000              Annual Costs ‐ Stormwater Pollution Prevention Plan (SWPPP)222 49490 303 PLANNING FEES350                    50                     100                   ‐                        500                   222 49490 315 GIS SERVICES‐                         ‐                        ‐                        1,000               1,000               222 49490 355 DUES & MEMBERSHIPS780                    780                   780                   800                   800                    LMC ‐ Annual Stormwater Coalition Contribution222 49490 360 EDUCATION/TRANING/CONFERENCE‐                         375                   ‐                        1,000               1,000               222 49490 390 CONTRACTED SERVICES‐                         3,166               1,041               2,500               2,500                Animal Trapping222 49490 441 LICENSES, TAXES & FEES581                    2                       5,884               3,000               3,000               TOTAL ‐ SERVICES & OTHER CHARGES25,040               32,625              16,933              28,800              29,300             222 49490 500 CAPITAL OUTLAY (GENERAL) ‐                          2,697                32,200              40,000              ‐                        222 49490 510 LAND ACQUSITION/EASEMENTS 1,500                 ‐                         ‐                         ‐                         ‐                        TOTAL ‐ CAPITAL OUTLAY1,500                 2,697                32,200              40,000              ‐                        222 49490 420 DEPRECIATION 95,570               136,318            ‐                         120,000            160,000           222 49490 720 OPERATING TRANSFERS 35,738               ‐                         ‐                         ‐                         ‐                        TOTAL ‐ OTHER131,308              136,318            ‐                         120,000            160,000           TOTAL ‐ EXPENSES174,037             185,715           53,934             201,300           206,300           NET INCOME / (LOSS)578,565$           1,285,833$      65,514$            (78,983)$          (69,219)$          Change ($)9,764              Change (%)‐12.36%49490 ‐ Storm Water Utility Fund (In‐District)Account NumberSTORM WATER UTILITY - BUDGET PACKET - 3 City of OtsegoStorm Water Utility Fund (In District)Cash Flow SummaryRevised: November 22, 2022Forecast Budget2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 CommentsRevenuesCharges for Services 103,034$              105,095$              107,197$              109,341$              111,527$             113,758$             116,033$             118,354$             120,721$             123,135$              125,598$              Assumes 2% Customer GrowthSpecial Assessments 32,331                  31,986                  31,986                  31,986                  31,986                 31,986                31,986                31,986                31,986                31,986                 31,986                  2023 Budget ‐ Then StagnantTotal 135,365                137,081                139,183                141,327                143,513               145,744              148,019              150,340              152,707              155,121               157,584               ExpensesPersonal Services 10,000                  12,000                  12,240                  12,485                  12,734                 12,989                13,249                13,514                13,784                14,060                 14,341                  2023 Budget ‐ Then 2% InflationSupplies 2,500                     5,000                     5,100                     5,202                     5,306                    5,412                   5,520                   5,631                   5,743                   5,858                    5,975                     2023 Budget ‐ Then 2% InflationEngineering 20,000                  20,000                  20,400                  20,808                  21,224                 21,649                22,082                22,523                22,974                23,433                 23,902                  2023 Budget ‐ Then 2% InflationOther Charges & Services 8,800                     9,300                     9,486                     9,676                     9,869                    10,067                10,268                10,473                10,683                10,896                 11,114                  2023 Budget ‐ Then 2% InflationDepreciation 120,000                160,000                160,000                160,000                160,000               160,000              160,000              160,000              160,000              160,000              160,000               2023 Budget ‐ Then FlatCapital Outlay40,000                 ‐                            ‐                            ‐                            ‐                           ‐                          ‐                          ‐                          ‐                          ‐                           ‐                           Total201,300               206,300               207,226               208,171               209,134              210,117             211,119             212,141             213,184             214,248              215,333               Cash Balance ‐ Beginning450,096               504,161               594,942               686,898               780,054              874,434             970,061             1,066,961          1,165,159          1,264,682           1,365,555            Balance Sheet EffectsRevenues135,365               137,081               139,183               141,327               143,513              145,744             148,019             150,340             152,707             155,121              157,584               Expenditures(201,300)              (206,300)              (207,226)              (208,171)              (209,134)             (210,117)            (211,119)            (212,141)            (213,184)            (214,248)             (215,333)              Noncash ‐ Depreciation120,000               160,000               160,000               160,000               160,000              160,000             160,000             160,000             160,000             160,000              160,000               Cash Balance ‐ Ending504,161$             594,942$             686,898$             780,054$             874,434$            970,061$            1,066,961$         1,165,159$         1,264,682$         1,365,555$          1,467,806$          ProjectedY:\Budget\2023\Cash Flows\Utility Funds222-Storm(In)STORM WATER UTILITY - BUDGET PACKET - 4 City of Otsego General Fund Budget ‐ 2023 Budget Changes Tracking Total Expenditures ‐ Draft Budget Binder (August 5) 7,871,939$        Remove Community Survey City Council (20,000)               Remove/Modify Advisory Commissioner Training Public Safety Commission (1,500)                 Heritage Preservation Commission (1,000)                 Parks and Recreation Commission (1,500)                 Planning Commission (1,500)                 Increase Contracted Hours from 48 to 50 Police Services 63,328                Total Expenditures ‐ Preliminary Levy (September 26) 7,909,767           Contracted Fire Protection Services Albertville Fire Department ‐ Increased Budget for Wages & Insurance 10,306                Elk River Fire Department ‐ Budget Changes from Preliminary to Final 130                      Miscellaneous Line Item Adjustments Postage ‐ Reduced to Better Reflect 2023 Estimates (2,200)                 Wages & Benefits ‐ Insurance Rates Finalized City Administrator 143                      Administration (282)                    Finance (7,679)                 Human Resources 28                       Building Safety (29)                       Streets Maintenance 727                      Fleet Management (6,511)                 Parks Maintenance 3,409                  Recreation (4,192)                 Property & Liability Insurance Rates Finalized City Council (390)                    City Administrator (45)                       Administration (122)                    Finance 117                      Information Technology 4,586                  Human Resources 16                       Prairie Center 1,511                  City Hall & Public Works Building (2,151)                 Building Safety (2)                        Streets Maintenance (231)                    Fleet Management (23)                       Parks Maintenance (26,126)               Recreation (57)                       Contracted Services ‐ Based on 2020/2021 Actuals & 2022 YTD Legal (3,600)                 Engineering (3,600)                 Emergency Services Director Position Fire Protection 103,149              Total Expenditures ‐ Final Budget  (December 12th) 7,976,649           Increase or (Decrease) Compared to Draft Budget Book 104,710              Y:\Budget\2023\General Fund\3.0 - 2023 FINAL BUDGETS INPUT City of Otsego Property Tax Levy Calculations Payable 2023 Revised: November 23, 2022 $% $% 2021 2022 2023 Change Change 2023 Change Change Comment General Revenues 4,671,000        5,009,000        5,309,000        300,000          5.99% 5,366,000      357,000          7.13%UPDATED ‐ Due to Expenditure Changes Tax Abatements 45,874              40,228              87,744              47,516            118.12% 74,668            34,440            85.61%UPDATED ‐ Due to TNT Tax Rate Decrease Debt Service Series 2010B 460,000            ‐                         ‐                         ‐                       ‐                       ‐                       Series 2018A 94,551              97,187              94,416              (2,771)             94,416            (2,771)             Series 2020A 195,000            450,000            450,000            ‐                       450,000          ‐                       **NEW** ‐                         ‐                         ‐                         ‐                       ‐                       ‐                       Sub‐total 749,551            547,187            544,416            (2,771)             ‐0.51% 544,416          (2,771)             ‐0.51% Capital Reserves Pavement Management 1,050,000        1,100,000        1,100,000        ‐                       1,100,000      ‐                       Trails Management 40,000              63,000              65,000              2,000              65,000            2,000              Parks Equipment 62,000              64,000              70,000              6,000              70,000            6,000              Capital Equipment Revolving 300,000            320,000            480,346            160,346          477,325          157,325          Fire Reserve 190,000            200,000            210,000            10,000            210,000          10,000            Storm Water 34,000              36,000              38,000              2,000              38,000            2,000              Capital Improvements 661,000            1,175,590        1,390,517        214,927          1,349,614      174,024         UPDATED ‐ Reduced to Maintain Total Levy City Buildings & Property 25,000              30,000              35,000              5,000              35,000            5,000              Sub‐total 2,362,000        2,988,590        3,388,863        400,273          13.39% 3,344,939      356,349          11.92% Tax Rate Management (Flexibility) ‐                         ‐                       Grand Total 7,828,425        8,585,005        9,330,023        745,018          8.68% 9,330,023      745,018          8.68% Growth (%) 8.82% 9.66% Tax Capacity 22,876,221      25,254,743      31,574,313      31,574,313   Provided by Wright County (9/8/2022) Growth (%) 10.29% 10.40% 25.02% 25.02% Net Tax Capacity 22,591,258      24,852,871      31,071,879      31,071,879   98% of Tax Capacity (Based on 2022) Growth (%) 10.22% 10.01% 25.02% 25.02% Tax Rate 34.653              34.545              30.027              29.397           UPDATED ‐ Provided by Wright County Population 18,130              19,966              21,289              21,289            Source = MN State Demographer Tax Levy Per Capita 432                   430                   438                   438                 Taxing 2021 2022 2023 2023 Authority Final Tax Rate Final Tax Rate Estimate Change TNT Tax Rate Change City of Otsego 34.653              34.545              30.027              ‐13.08% 29.397            ‐14.90% Wright County 43.719              43.751              37.700              ‐13.83% 37.778            ‐13.65% School District 31.717              30.889              30.889              0.00% 26.483            ‐14.26% School District ‐ RMV 30.598              28.698              28.698              0.00% 23.956            ‐16.52% Description 2021 2022 2023 Change 2023 Change Median Appraised Value 258,455            290,081            328,710            13.32% 328,710          13.32% Less: MV Exclusion (13,979)            (11,133)            (7,656)               (7,656)             Taxable Market Value 244,476            278,948            321,054            15.09% 321,054          15.09% Tax Capacity 2,445                2,789                3,211                3,211              2021 2022 2023 2023 Taxing Estimated Estimated Estimated Estimated Authority Tax Tax Tax Change Tax Change City of Otsego 847                   964                   964                   0.00% 944                 ‐2.07% Wright County 1,069                1,220                1,210                ‐0.82% 1,213              ‐0.57% School District 775                   862                   992                   15.08% 850                 ‐1.39% School District ‐ RMV 791                   832                   943                   13.34% 787                 ‐5.41% Total 3,482                3,878                4,109                5.96% 3,794              ‐2.17% Annual Increase 231                   (84)                  Levy Description The City rate is calculated by the Finance  Director. County and School District tax rates  were obtained from Wright County, and  represent the tax rate from their respective  preliminary levies and are NOT FINAL. Source = Wright County Assessor These are best estimates calculated by the  Finance Director based upon information  available at the time of presentation. These  should only be considered as estimates, and  should NOT be considered final. Preliminary Tax Levy (9‐26‐2022)Budget Meeting (11‐28‐2022) Y:\Budget\2023\Property Taxes\Tax Levy Calculations (2023)11‐28 City of OtsegoFund Balance Policy General Fund Transfer2022Calculation Comments2022 General Fund Budget 7,347,416             Resolution 2021‐100Minimum Fund Balance 3,306,337             The City's Fund Balance states that the minimum General Fund Balance should be 45% of the subsequent year budget.2021 Ending Fund Balance 5,199,901             Per Audited Financial Statements(245,758)              Less: Fund Balance from Insurance Reserve Fund (#204) ‐ Grouped with General for Financial Reporting(27,043)                 Less: Fund Balance from Educational Programming Fund (#215) ‐ Grouped with General for Financial Reporting(152,273)              Less: Nonspendable Fund Balance ‐ Financial Reporting Requirement ‐ Funds actually have alredy been expended.(202,200)              Less: Nonspendable Fund Balance ‐ Financial Reporting Requirement ‐ Future funds from land for resale proceeds.4,572,627             Fund Balance Available (Unassigned)Transfer (2022 Budget) 1,266,290             DRAFT ‐ Presented to City Council on Month XX, 20222023 General Fund Budget 7,976,649             As of November 28, 2022Minimum Fund Balance 3,589,492             The City's Fund Balance states that the minimum General Fund Balance should be 45% of the subsequent year budget.Transfer (2023 Budget) 983,135                DRAFT ‐ Presented to City Council on Month XX, 2022Y:\Budget\2023\Calculation of Fund Balance Policy Transfers2022