Item 4.1 ALDI Engineering Review part two
S:\Municipal\Aotsego25xx\2500\OT2522.09 Aldi
Main Office:
3601 Thurston Avenue, Anoka, MN 55303
Phone: 763/427-5860 Fax: 763/427-0520
www.haa-inc.com
MEMORANDUM
TO: Honorable Mayor and City Council
CC: Adam Flaherty, City Administrator
Audra Etzel, City Clerk
Daniel Licht, City Planner
Dave Kendall, City Attorney
Dan Willenbring, Tamarck Land – Parrish Meadows LLC
Ryan Anderson, ISG
FROM: Ronald Wagner, P.E. City Engineer
Abdullah Alqwaizani, E.I.T.
DATE: October 7, 2022
RE: Aldi Otsego
We have reviewed the following information provided by Civil Engineering Site Design on behalf of
Ryan Anderson regarding the Aldi Otsego.
Civil Plan Set for Aldi Otsego, received 10/3/2022 by Aldi Otsego
The submittal is to be considered for preliminary acceptance. We would offer the following
comments:
Site Date Sheet
1. The datum elevation shall be NGVD 1929 Adj. or provide equation converter from datum
1988 (NGVD 88) to datum 1929 (NGVD 29).
2. Please show date on the plan.
Site Details
3. Provide standard plate no. 702 instead of commercial driveway entrance detail.
4. Provide standard plate no. 500 instead of riprap at RCP outlet detail.
5. Provide standard plate no. 300 instead of typical sanitary manhole detail.
6. The following Otsego Standard Plates shall be provided:
a. 402, 403, and 404
October 7, 2022
Page 2
S:\Municipal\Aotsego25xx\2500\OT2522.04 Due North car wash
Site Pylon Sign Detail
7. No comments.
SWPPP Notes
8. No comments.
Site Erosion Control Plan
9. Missing flared end for the north west pond.
10. Provide inlet protection for the flared end in south west pond.
11. Verify the inlet protection is needed around the outlet structures
Existing Site and Removal Plan
12. No comments.
Site Plan
13. Please mark catch basin around the site.
14. Please show the existing utilities on site plan sheet.
Utility Plan
15. Utilities shall be covered by a minimum 20’ wide easement.
16. Hydrant coverage is insufficient for the building. A maximum spacing of 150’ is required.
Existing Site and Removal Plan
17. Provide emergency overflow (EOF) elevation for all ponds and catch basin.
18. Provide normal, 2-yr, 10-yr, and 100-yr water level elevation shall be shown for all ponds.
Building Grading Plan
19. No comments.
Site Restoration Plan
20. No comments.
October 7, 2022
Page 3
S:\Municipal\Aotsego25xx\2500\OT2522.04 Due North car wash
Site Planting Plan
21. No comments.
Planting Details and Notes
22. No comments.
Site lighting Plan
23. No comments.
Other Consideration
24. A geotechnical report shall be provided.
25. A stormwater management plan shall be provided.
Summary and/or Recommendation
We recommend approval contingent on the above comments being addressed.