Loading...
5.1 TH 101 Ramps Signals Project Change Order Request for City Council Action DEPARTMENT INFORMATION ORIGINATING DEPARTMENT REQUESTOR: MEETING DATE: Public Works City Engineer Wagner January 9, 2023 PRESENTER(s) REVIEWED BY: ITEM #: City Engineer Wagner City Administrator/Finance Director Flaherty 5.1 – Project Change Order STRATEGIC VISION MEETS: THE CITY OF OTSEGO: Is a strong organization that is committed to leading the community through innovative communication. X Has proactively expanded infrastructure to responsibly provide core services. Is committed to delivery of quality emergency service responsive to community needs and expectations in a cost-effective manner. Is a social community with diverse housing, service options, and employment opportunities. Is a distinctive, connected community known for its beauty and natural surroundings. AGENDA ITEM DETAILS RECOMMENDATION: City staff recommends the City Council approve a change order. ARE YOU SEEKING APPROVAL OF A CONTRACT? IS A PUBLIC HEARING REQUIRED? No No BACKGROUND/JUSTIFICATION: The Signal System F upgrade was determined by MnDOT to need an additional pedestal, base, signal head, and associated materials to meet the requirements of MnDOT and MN Uniform Traffic Control Devices. The Contractor’s quote was $9,229.36 and determined to be acceptable for the extra work. The portion the City would pay is 25%, which is $2,307.34. SUPPORTING DOCUMENTS ATTACHED: • Change Order No. 1 • Quote: Granite Ledge Electrical Contractors Inc. POSSIBLE MOTION PLEASE WORD MOTION AS YOU WOULD LIKE IT TO APPEAR IN THE MINUTES: Motion to approve Change Order No. 1 in the amount of $9,229.36 for the TH101 Ramps Signals Improvement Project, City Project No. 22-09. BUDGET INFORMATION FUNDING: BUDGETED: Fund 414 – Capital Improvement Revolving Yes (5/18) STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION Supp. To Contract No. CHANGE ORDER NO. 1 LEVEL 2 Page 1 of 2 eDOCS 19720000 CONTRACTOR: Granite Ledge Electrical Contractors, Inc. FEDERAL PROJECT NO. STATE PROJECT NO. SP 8608-35 ADDRESS: 15436 130th St Foreston MN 56330 LOCATION OF WORK TH101 Signal Ramps (CSAH 36, CSAH 38, & CSAH 42) Otsego, MN This Contract uses MnDOT Standard Specifications for Construction 2020 Edition This Contract is between the State of Minnesota, acting through its Commissioner of Transportation, and Contractor as follows: Issue: Signal System F upgrade was determined to need an additional pedestal, base, signal head and associated materials to meet the requirements of MnDOT and MN Uniform Traffic Control Devices. The Engineer has determined the Contract needs to be revised in accordance with specification 1402.5 Extra Work. Resolution: 1. The Contractor shall furnish and install the required materials per the provided plan sheet. 2. Payment for this work will be at Negotiated Unit Prices, as shown in the estimate of cost. a. Cost was approved by the Engineer. 3. Due to forecasted signal system material delays, a time extension, per specification 1806 Determination and Extension of Contract Time, may be required and will be determined at a later date. ESTIMATE OF COST ITEM NO. ITEM UNIT UNIT PRICE QUANTITY AMOUNT CAT/ PROJ 1402.601 Extra Work REVISE SIGNAL SYSTEM F Lump Sum (LS) $9,229.36 1.0 $9,229.36 Total Increase $9,229.36 12/13/22 Tim Paul Digitally signed by Tim Paul Date: 2022.12.19 20:55:56 -06'00' QUOTE Project: CO #1 Add Ped Pole and Signal Heads Bid Date: Item No.Contract Item Unit Bid Qty Unit Price Total 1 Mobilization Ls 1 $1,350.00 $1,350.00 2 2" NMC Sch 80 LF 20 $17.45 $349.00 3 14-6 TSC Signal cable LF 507 $3.28 $1,662.96 4 #6 XHHW LF 40 $2.21 $88.40 5 Precast Ped Foundation Ea 1 $1,318.00 $1,318.00 6 Pedestrial Pole, base, windcollar,cap & anchor bolts Ea 1 $2,061.00 $2,061.00 7 3-section head with bracketing Ea 2 $1,200.00 $2,400.00 $9,229.36 Includes: 1-13' ped pole with wind collar and cap 1- Precast pedestal foundation with 2" NMC 2- 3 section signal heads with plumbrizer mount on head 8-2 1- strap on adapter All Conduit and wire 1- Demo Signal Head Mobilization Jeff Brown 320-294-5557 TOTAL BID Otsego TH 101 Ramp Signal Improvements PO Box 8, 15436 130th Street, Foreston MN 56330 Office: 320-294-5557 Fax: 320-294-5997