4.1 2023 Street Renewal Project Request for City Council Action DEPARTMENT INFORMATION ORIGINATING DEPARTMENT REQUESTOR: MEETING DATE: Public Works City Engineer Wagner February 13, 2023 PRESENTER(s) REVIEWED BY: ITEM #: City Engineer Wagner City Administrator/Finance Director Flaherty 4.1 – Street Renewal Improvement Hearing STRATEGIC VISION MEETS: THE CITY OF OTSEGO: Is a strong organization that is committed to leading the community through innovative communication. X Has proactively expanded infrastructure to responsibly provide core services. Is committed to delivery of quality emergency service responsive to community needs and expectations in a cost-effective manner. Is a social community with diverse housing, service options, and employment opportunities. Is a distinctive, connected community known for its beauty and natural surroundings. AGENDA ITEM DETAILS RECOMMENDATION: City staff recommends the City Council conduct the Public Improvement Hearing for the 2023 Street Renewal Project and approve a resolution ordering plans and specifications. ARE YOU SEEKING APPROVAL OF A CONTRACT? IS A PUBLIC HEARING REQUIRED? No Yes, to be held on February 13, 2023. BACKGROUND/JUSTIFICATION: Each year the City Engineer and Street Operations Manager review and score the entire existing street infrastructure. Based on this review, the Capital Improvement Plan (CIP) is developed. This plan includes street renewal projects prioritized towards the street infrastructure in the worst condition. The streets within the residential developments of Otsego Acres 1st and 2nd Addition, Vasseur’s Oak Grove Estates 1st and 2nd Addition, Deerfield Acres, and Hidden Valley were paved between 1980 and 1982, all were overlayed in 1999. Based on typical sections at the time of development, the existing roadways consists of approximately 4”-5” of bituminous surface over 6” of aggregate base. Typical paved street widths vary from 21’ – 23’ feet wide. The pavement is experiencing lateral, transverse, and alligator cracking, as well as thermal cracking. In some locations, the street edges are also eroding. The value of existing housing is positively benefitted by accessing a bituminous paved street in good condition. The existing 13 residential street surfaces have PCI (Pavement Condition Index) Ratings between 45 & 48, which is below the average in the City of Otsego. Typically, pavements with PCI Ratings of 50 or less are in their final stages of useful life and will need to be reconstructed or overlaid in the very near future. The proposed improvements will include reclaiming existing streets to a depth of approximately 10”, shaping the reclaim material and placing 3.5” of new pavement. Each street will be rebuilt to a total width of 22 feet to keep them within the existing roadbed and mitigate the need for additional material and grading. Typical street section will be rural, with a 1 ft aggregate shoulder, and ditches/swales to manage stormwater. As part of the project, any existing centerline (crossing) culverts will be replaced and upgraded to concrete. Jansen Ave NE in Otsego Industrial Park was built in 1995 and is scheduled to receive an overlay in 2023 as part of this street renewal project. The City Council authorized the preparation of a Feasibility Study to determine what needs to be completed to remedy the issues, determine a cost estimate, and allocate costs. An open house was held February 8th to provide residents a less formal opportunity to review the project and discuss the project with the design team. The Public Hearing is being held at this meeting to present the study to the residents. The City Council will hear resident’s comments or concerns regarding the possibility of continuing toward a project and with regard to the potential for assessments in accordance with MN State Statue 429 and City Policy. After the public hearing is closed, the City Council will determine whether to move forward with the project by considering approval of a resolution authorizing preparation of plans and specifications. If approved, the plans and specifications will be considered for approval by the City Council at a future meeting, where staff would be seeking authorization to bid the project. The Capital Improvement Plan (CIP) included a budget in the amount of $1,186,887 for this improvement project. The total estimated project cost is $1,184,053 and will be funded by special assessments in the amount of $193,284, and the remaining balance of the project paid with funds from the City’s Pavement Management Fund. SUPPORTING DOCUMENTS ATTACHED: • Feasibility Report • Pavement Condition Index (PCI) – Rating Map • Resolution 2023-10 POSSIBLE MOTION PLEASE WORD MOTION AS YOU WOULD LIKE IT TO APPEAR IN THE MINUTES: Motion to approve Resolution 2023-10 Ordering Preparation of Plans and Specifications for the 2023 Street Renewal Project. BUDGET INFORMATION FUNDING: BUDGETED: Fund 201 – Pavement Management Yes TABLE OF CONTENTS I. INTRODUCTION ....................................................................................... 1 II. PROPOSED PROJECT ............................................................................ 10 III. INITIATION ................................................................................................ 11 IV. FEASIBILITY ............................................................................................. 11 V. RIGHT-OF-WAY / EASEMENTS ............................................................... 11 VI. PERMITS .................................................................................................. 11 VII. COMPLETION ........................................................................................... 11 VIII. PRELIMINARY PROJECT SCHEDULE .................................................... 11 IX. ESTIMATED PROJECT COST ................................................................. 11 X. PROPOSED FUNDING ............................................................................. 13 XI. ESTIMATED ASSESSMENT ..................................................................... 13 XII. CONCLUSION AND RECOMMENDATION .............................................. 27 EXHIBITS 2023 STREET RENEWAL MAPS ........................................................................ A 2022 CITY PCI RATING MAP ............................................................................. B TYPICAL STREET SECTIONS ............................................................................ C ENGINEER’S ESTIMATE ................................................................................... D BENEFITTING PROPERTY MAPS ...................................................................... E 1 I. INTRODUCTION The purpose of this Feasibility Report is to present the City of Otsego with a preliminary examination of municipal street improvements for the following list of streets within Otsego, Minnesota. This report discusses the proposed scope of improvements, preliminary cost estimates, and a project schedule. For this project, there will be 13 residential streets to be rebuilt via reclamation/repaving, and 1 industrial street to receive an asphalt overlay. Proposed reclaimed streets will mostly be funded by the City with a predetermined assessment cost to the properties along those streets. The overlay street (Jansen Ave NE) will be 100% funded by the City of Otsego. This report has been prepared in compliance with Minnesota State Statutes 429 for projects resulting in special assessments. 1. Jansen Ave NE (C.S.A.H. 37 to Terminus) 2. O’Brian Ave NE (88th St NE to 90th St NE) 3. Ochoa Ave NE (88th St NE to 90th St NE) 4. 88th St NE (O’Brian Ave NE to Ochoa Ave NE) 5. 89th St NE (Ochoa Ave NE to Odean Ave NE) 6. 90th St NE (O’Brian Ave NE to Ochoa Ave NE) 7. Odell Ave NE (83rd St NE to 84th St NE) in VASSEUR’S OAK GROVE ESTATES 8. Ogren Ave NE (78th St NE to 85th St NE) 9. Packard Ave NE (Terminus S of 81st St NE to 85th St NE) 10. 81st St NE (Ogren Ave NE to Packard Ave NE) 11. 83rd St NE (Odean Ave NE to Ogren Ave NE) 12. 84th St NE (Odell Ave NE to Ogren Ave NE) 13. Odell Ave NE (330 ft. N of 77 th St NE to 78th St NE) in DEERFIELD ACRES 14. 78th St NE (Odean Ave NE to Ogren Ave NE) The following maps show which streets (highlighted in red) are proposed to be rebuilt within those subdivisions. Jansen Ave. NE will get a 2” overlay. 2 EXHIBIT A Street Renewal Maps OTSEGO INDUSTRIAL PARK 3 OTSEGO ACRES 1st & 2nd ADDITION 4 VASSEUR’S OAK GROVE ESTATES 1 st & 2nd ADD. DEERFIELD ACRES, HIDDEN VALLEY 5 The following table lists each street, with its respective Pavement Condition Index (PCI) number, build year, and improvement year, if any. Project - Street 2022 PCI Built Overlay Project A1 - Jansen Ave NE 54 1995 Project B2 - O'Brian Ave NE 48 1982 1999 Project B3 - Ochoa Ave NE 48 1982 1999 Project B4 - 88th St NE 48 1982 1999 Project B5 - 89th St NE 48 1982 1999 Project B6 - 90th St NE 48 1982 1999 Project C7 - Odell Ave NE (Vasseur's) 48 1980 1999 Project C8 - Ogren Ave NE 45 1980 1999 Project C9 - Packard Ave NE 48 1980 1999 Project C10 - 81st St NE 48 1980 1999 Project C11 - 83rd St NE 48 1980 1999 Project C12 - 84th St NE 48 1980 1999 Project C13 - Odell Ave NE (Deerfield Ac.) 45 1980 1999 Project C14 - 78th St NE 45 1980 1999 The average PCI rating for the 13 residential streets listed range between 45-48 with an overall average of 47, which is below the average of all streets in the City of Otsego. A PCI rating of less than 50 indicates that structural degradation will accelerate, and thus require more frequent repairs. When repairs of low PCI streets become a substantial annual cost to the City, it is recommended that the street be reconstructed. In this case, all the streets, except for Jansen Ave NE, have had one asphalt overlay applied. Existing street surfaces for all but 1 street are over 40 years old, with overlays more than 20 years old. As shown in the provided photos (pp.6-7), the streets listed for this feasibility report have a very high number of patches and some cases road edge failures. 6 82XX Ogren Ave NE (looking North) 83XX Odell Ave NE (looking South) 7 143XX 88th St NE (looking West) 144XX 89th St NE (looking West) 8 EXHIBIT B PCI Maps OTSEGO INDUSTRIAL PARK OTSEGO ACRES 1st & 2nd ADDITION 9 VASSEUR’S OAK GROVE ESTATES 1 st & 2nd ADD. DEERFIELD ACRES, HIDDEN VALLEY 10 II. PROPOSED PROJECT The 2023 Street Project is scheduled to renew 13 residential streets by reclamation and repaving, and 1 street by overlay. The streets to be rebuilt fall under a typical rural street section (no curb) utilizing ditches and culverts to convey storm water. These streets currently vary in width from 21 to 23 feet. All residential streets, will be rebuilt at 22 ft in width. Typical sections are provided in Exhibit C. In all cases, the road profile elevations will increase about 3.5 to 4 inches for all streets due to the reclamation process, where it will grind, mix, and place the existing asphalt and aggregate to be used as the new road base for asphalt paving. The resulting combined asphalt/aggregate base is thicker and more robust that the original base, thus substantially improving the structural strength of the road. Due to the increased road profile elevation, driveway entrances will be modified to match the road. This will require removal of a portion of the existing entrance (minimum of 5 ft in length) to suitable point where it can be sloped to match the new road. Concrete drives will be sawcut at the nearest expansion joint. All driveway entrances will be rebuilt in-kind. Existing crossing Corrugated Metal Pipe (CMP) culverts are also to be replaced with Reinforced Concrete Pipe (RCP) during the project. This is mainly due to age and corrosion. EXHIBIT C 11 III. INITIATION The feasibility report was initiated by the City Council as the streets were included for the 2023 Capital Improvement Plan. This was due to the PCI ratings being some of the lowest in the city and in accordance with the city’s policy regarding streets renewal program. IV. FEASIBILITY From an engineering standpoint, the project is feasible, and the value of existing housing is positively benefited by accessing a bituminous paved street in good condition. It can be accomplished as proposed, and need not be constructed in conjunction with any other project. The City and the persons assessed should review the project for benefit to determine the economic feasibility of the proposed improvements. V. RIGHT-OF-WAY / EASEMENTS The existing residential streets and proposed street improvements are located within the existing 66-foot-wide right-of-way. 84 ft ROW for Jansen Ave NE. VI. PERMITS No permits would be required to accomplish the work. VII. COMPLETION This project is proposed to be completed during the 2023 construction season. VIII. PRELIMINARY PROJECT SCHEDULE The preliminary project schedule for the 2023 Otsego Street Renewal Project has yet to be determined. IX. ESTIMATED PROJECT COST This report includes a detailed estimate of construction costs for all overlay and reclamation street improvements (Exhibit D), and has an estimated total project cost of $1,184,053. Costs are separated for each type of project (overlay or reclamation) and street. The quantities and unit prices herein are estimates only and are not guaranteed. Unit prices were derived from previous similar projects. Contractors will be paid only for work completed. 12 EXHIBIT D Engineers Estimate Bid Schedule "A" - Reclaim Item No. Spec. Ref Description Unit Est. Unit Price Estimated Quantity Total Estimated Extension 1 2021.50 Mobilization LS $28,000 1 $28,000 2 2104.50 Remove Sewer Pipe (Storm) LF $15 380.6 $5,709 3 2104.50 Remove Concrete Pavement (Driveways) SY $18 1,596.0 $28,728 4 2104.51 Sawing Bit Pavement (Full Depth) LF $2 1,425.6 $2,851 5 2104.51 Sawing Concrete Pavement (Full Depth) LF $5 334.4 $1,672 6 2105.61 Haul & Stockpile Excess Material (LV) CY $8 771.2 $6,170 7 2211.51 Aggregate Class 5 Mod (driveway) TON $33 159.4 $5,260 8 2211.51 Aggregate Shoulder (from excess reclaim) CY $20 1,867.8 $37,355 9 2211.51 Bituminous Driveway SY $15 792.0 $11,880 10 2211.51 Concrete Driveway SY $75 185.8 $13,933 11 2215.50 Full Depth Reclamation SY $2 49,417.8 $98,836 12 2232.50 Mill Bituminous Surface (1.5") SY $18 226.8 $4,082 13 2357.51 Bituminous Material For Tack Coat GAL $4 2,655.7 $10,623 14 2360.51 Type SP 9.5 Wearing Course Mixture (3,B) TON $75 4,074.1 $305,557 15 2360.51 Type SP 12.5 Non Wear Course Mixture (3,B) TON $70 5,432.1 $380,249 16 2501.50 15" RC Pipe Culvert LF $80 308.7 $24,696 17 2502.50 24" RC Pipe Culvert LF $90 54.6 $4,914 18 2563.60 Traffic Control LS $7,500 1 $7,500 19 2574.53 Pulverized Topsoil Borrow (LV) CY $55 30.7 $1,690 Bid Schedule "A" - Reclaim $979,705 15% Admin, Legal, & Engineering $146,956 Project Total - Reclaim $1,126,661 Bid Schedule "B" - Overlay Item No. Spec. Ref Description Unit Est. Unit Price Estimated Quantity Total Estimated Extension 1 2021.50 Mobilization LS $3,000 1.0 $3,000 2 2211.51 Bituminous Driveway SY $15 78.2 $1,173 3 2211.51 Concrete Driveway SY $75 9.8 $733 4 2211.51 Aggregate Shoulder (from excess reclaim) TON $40 184.4 $7,378 5 2232.50 Mill Bituminous Surface (1.5") SY $18 22.4 $403 6 2357.51 Bituminous Material For Tack Coat GAL $4 310.9 $1,244 7 2360.51 Type SP 9.5 Wearing Course Mixture (2,B) TON $70 477.0 $33,389 8 2563.60 Traffic Control LS $2,500 1.0 $2,500 9 2574.53 Pulverized Topsoil Borrow (LV) CY $55 1.6 $86 Bid Schedule "B" - Overlay $49,906 15% Admin, Legal, & Engineering $7,486 Project Total - Overlay $57,392 Project Total - Reclaim $1,126,661 Project Total - Overlay $57,392 Project Total $1,184,053 13 X. PROPOSED FUNDING The funding for the CIP street renewal project is expected to be provided by two sources: City of Otsego, and benefitting property owners. Reclaim Projects There are thirteen (13) street reclamation projects that will receive funding from the City and each of the 177 benefitting properties. Overlay Projects Funding for the overlay project on Jansen Ave NE will be covered by the City of Otsego at 100%. XI. ESTIMATED ASSESSMENT Reclaim Projects Estimated total project cost of $1,126,661 to reclaim the thirteen (13) streets will be paid for by the City, and an assessment of $1092 from each of the 177 benefitting properties. The aggregate assessed benefit to the City will be $193,284, with the remaining cost of $933,377 to be covered by the City of Otsego. Overlay Projects Funding for the overlay project on Jansen Ave NE will be covered by the City of Otsego at 100%. Total estimated project cost to the City is $57,392. Total City project costs for all 14 street renewals are estimated to be $990,769. 14 Exhibit E Maps and Tables of Assessed Benefitting Properties OTSEGO ACRES 1ST AND 2ND ADDITION A total of 53 properties within Otsego Acres 1st & 2nd Add. will be included in the 2023 Street Renewal Project. Only those properties addressed, or with direct access to the 5 streets within Otsego Acres will be assessed. 15 OTSEGO ACRES 1ST AND 2ND ADDITION ASSESSED PROPERTIES REF # PROPERTY ADDRESS OWNER/TAX PAYER TAX PAYER ADDRESS ASSESSMENT 1 14150 90TH ST NE KENNETH J & MARGARET JUSTEN $1,092 2 14200 90TH ST NE DARREN L & KELLY E JACKSON $1,092 3 14428 89TH ST NE MICHAEL KANGAS $1,092 4 14400 89TH ST NE CHARLES & RACHEL LANDON $1,092 5 14370 89TH ST NE ETHAN NELSON $1,092 6 14340 89TH ST NE MICHAEL A &MICHELLE L SONDERUP $1,092 7 14308 89TH ST NE DONNA L KNOTT $1,092 8 8980 OCHOA AVE NE KEITH D EULL $1,092 9 14461 89TH ST NE TREVOR KNOX $1,092 10 14462 88TH ST NE ROBYN CROSTHWAITE $1,092 11 14428 88TH ST NE JUSTIN W & SHERYL A BAUER 31913 64TH AVE, CANNON FALLS, MN 55009 $1,092 12 14400 88TH ST NE DEBRA J COKLAS $1,092 13 14370 88TH ST NE LEON A & JOANN EBNER $1,092 14 14340 88TH ST NE CHAD R & TANYA J BROWN $1,092 15 14308 88TH ST NE CHARLES G SCHMIDT JR $1,092 16 8812 OCHOA AVE NE BENJAMIN R HUBBARD & JESSICA M HUBBARD $1,092 17 14279 89TH ST NE ALICE I ROE $1,092 18 14307 89TH ST NE HPA II BORROWER 2021-1 LLC 120 S RIVERSIDE PLZ STE 2000, CHICAGO, IL 60606 $1,092 19 14339 89TH ST NE BRYAN KUNTZ & TRACY L KUNTZ $1,092 20 14369 89TH ST NE JUSTIN WILTSCHECK $1,092 16 REF # PROPERTY ADDRESS OWNER/TAX PAYER TAX PAYER ADDRESS ASSESSMENT 21 14399 89TH ST NE ANTHONY B LAU $1,092 22 14427 89TH ST NE DAVID J JOHNSON $1,092 23 14449 88TH ST NE HEIDI BJORKLUND $1,092 24 14421 88TH ST NE KRISTIAN BRIGHT & NICOLE JURIK $1,092 25 14395 88TH ST NE BARBARA J LUTGEN $1,092 26 14363 88TH ST NE DION W BROWN & DAUN M BROWN 13995 88TH ST NE, OTSEGO, MN 55330 $1,092 27 14331 88TH ST NE JAMES RUCKS $1,092 28 14299 88TH ST NE ANDY KRABBENHOFT & AMANDA WENZEL $1,092 29 14259 88TH ST NE MICHAEL BRINGGOLD $1,092 30 14237 88TH ST NE DEBBIE A WILMOT $1,092 31 14209 88TH ST NE PETER M JAPS $1,092 32 14183 88TH ST NE MICHAEL J & MEGGAN M BAADE $1,092 33 14155 88TH ST NE JACOB M ZALLAR $1,092 34 14123 88TH ST NE LARRY S & SHARON L GRABILL 1307 SE 11TH AVE, CAPE CORAL, FL 33990 $1,092 35 8768 O'BRIAN AVE NE ASHLEY LEWIS & BRIAN LEWIS $1,092 36 14238 88TH ST NE CHIPPER D & JULIE MCDOWELL $1,092 37 14210 88TH ST NE SHANNON LARSON $1,092 38 14184 88TH ST NE KAYLI HERMANSON & JOSHUA LYNCH $1,092 39 14156 88TH ST NE GARRED C BECKER $1,092 40 14124 88TH ST NE OLEKSANDR BAK & INNA BAK 8415 OAKWOOD AVE NE, OTSEGO, MN 55330 $1,092 17 REF # PROPERTY ADDRESS OWNER/TAX PAYER TAX PAYER ADDRESS ASSESSMENT 41 14098 88TH ST NE JOYCE F RAYMOND $1,092 42 8879 OBRIAN AVE NE CHRISTINA E ANDERSON $1,092 43 8841 O'BRIAN AVE NE TERRANCE & JUDY WOOD $1,092 44 8821 O'BRIAN AVE NE GREGORY R & CARRIE L DUNGAN $1,092 45 8791 OBRIAN AVE NE TANYA JANE LOTTS $1,092 46 14155 90TH ST NE HUGH D CAMPBELL $1,092 47 14123 90TH ST NE SUSAN K SMREKAR $1,092 48 8916 OBRIAN AVE NE MITCHELL BRADY & ANNABELLE BRADY $1,092 49 8886 O'BRIAN AVE NE YURIY I & OLGA V PILIPCHUK $1,092 50 8937 OBRIAN AVE NE JORDAN V NGUYEN & AMANDA K VAN LITH NGUYEN $1,092 51 8907 O'BRIAN AVE NE EDDIE D & MICHELLE M RICHMOND $1,092 52 14237 90TH ST NE TODD C & TAMMY J SCHWERIN $1,092 53 8821 OCHOA AVE NE THOMAS M & TERRYL L CORDER $1,092 18 VASSEUR’S OAK GROVE ESTATES 1ST & 2ND ADDITION A total of 89 properties within Vasseur’s Oak Grove Estates 1st & 2nd Add. will be included in the 2023 Street Renewal Project. Only those properties addressed to the 6 streets within Vasseur’s Oak Grove Estates will be assessed. List of property owners provided on the following pages. 19 REF # PROPERTY ADDRESS OWNER/TAX PAYER TAX PAYER ADDRESS ASSESSMENT 1 8480 PACKARD AVE NE DOREEN M NELSON REV FAMILY TR $1,092 2 8440 PACKARD AVE NE MARGARET C REMARCIK $1,092 3 8420 PACKARD AVE NE ALEXANDER STEVEN NELSON & ALEXANDRA E ROMAN NELSON $1,092 4 8392 PACKARD AVE NE MARTHA ADOLFO RUIZ & JHONY SOTO CARRILLO $1,092 5 8362 PACKARD AVE NE LUCAS GARCIA & KAYLOR CAZETT $1,092 6 8334 PACKARD AVE NE BRENDA LEE ISAACSON $1,092 7 8306 PACKARD AVE NE JACKSON BOEHMER $1,092 8 8276 PACKARD AVE NE AARON M TOPPER $1,092 9 8246 PACKARD AVE NE DOMINIC PALMER $1,092 10 8218 PACKARD AVE NE ERIC W & SANDRA J BORDERS 300 EVANS AVE NW #408, ELK RIVER, MN 55330 $1,092 11 8190 PACKARD AVE NE SHARI L NORDQUIST $1,092 12 8160 PACKARD AVE NE MARK & THERESA LEMKE $1,092 13 8132 PACKARD AVE NE VINCENT P BLAEDE $1,092 14 8104 PACKARD AVE NE MIKE VASSEUR & EDITH I LUNDHOLM $1,092 15 8076 PACKARD AVE NE VICKI STRINGER $1,092 16 8038 PACKARD AVE NE TIMOTHY A LINDHOLM & HOPE D LINDHOLM 225 COUNTY ROAD 81, OSSEO, MN 55369 $1,092 17 8477 PACKARD AVE NE FRANK & COLLEEN BECKER $1,092 18 8439 PACKARD AVE NE TERRI RUSCHMEIER $1,092 19 8419 PACKARD AVE NE WESLEY C JR & BARBARA L KING $1,092 20 8391 PACKARD AVE NE LAWRENCE & JILLIAN KLINGENBERG $1,092 20 REF # PROPERTY ADDRESS OWNER/TAX PAYER TAX PAYER ADDRESS ASSESSMENT 21 8361 PACKARD AVE NE RICHARD L SHAW $1,092 22 8333 PACKARD AVE NE KIM D YUNGNER $1,092 23 8305 PACKARD AVE NE JAMES M & DEBORAH J BERG $1,092 24 8275 PACKARD AVE NE ANDREW BANGEN & ALLISON BANGEN $1,092 25 8245 PACKARD AVE NE JERRY J & REBECCA CALHOUN $1,092 26 8217 PACKARD AVE NE DALTON J VETSCH 11403 54TH ST NE, OTSEGO, MN 55301 $1,092 27 8189 PACKARD AVE NE CHARLES & ROSEMARIE CASSADY TR $1,092 28 8159 PACKARD AVE NE RONALD P HOFFMAN $1,092 29 8131 PACKARD AVE NE LOUISE OCHOCKI 15463 89TH ST NE, OTSEGO, MN 55330 $1,092 30 8103 PACKARD AVE NE LUCY UECKER $1,092 31 14834 81ST NE JOSEPH JAMES MURPHY & MINDY NOELANI MURPHY $1,092 32 8132 OGREN AVE NE DAVID J & BETTY S ERWIN $1,092 33 8160 OGREN AVE NE JOHN D WORNSON $1,092 34 8190 OGREN AVE NE CHARLEY W & KATHY S SMITH 20685 CONCORD ST NW, ELK RIVER, MN 55330 $1,092 35 8218 OGREN AVE NE JOHN S & JEAN T KASPER $1,092 36 8246 OGREN AVE NE LOGAN J FAGERBERG & STEPHANIE M FAGERBERG $1,092 37 8276 OGREN AVE NE RICHARD L DAHLIN & BONNIE KRANK $1,092 38 8306 OGREN AVE NE JULIANA M RANDALL & PHYLLIP BONER SR $1,092 39 8334 OGREN AVE NE NICHOLAS P HOPPE JR $1,092 40 8362 OGREN AVE NE RICHARD M & JANICE TVEITBAKK 24475 140TH CT, PO BOX 422, ZIMMERMAN, MN 55398 $1,092 21 REF # PROPERTY ADDRESS OWNER/TAX PAYER TAX PAYER ADDRESS ASSESSMENT 41 8392 OGREN AVE NE RODNEY & MAVIS ZETTERGREN $1,092 42 8420 OGREN AVE NE JESSE G BECKER $1,092 43 8440 OGREN AVE NE NICK C SAUER $1,092 44 8057 PACKARD AVE NE WAYNE E & LINDA L EHLEBRACHT $1,092 45 14889 81ST ST NE JEFFERY V PEDERSEN $1,092 46 14861 81ST ST NE TAB J & CAROL L DULSKI $1,092 47 8038 OGREN AVE NE MICHAEL & SARAH SCHERMEISTER $1,092 48 8439 OGREN AVE NE GREGORY AMUNDSON & KATIE AMUNDSON 15495 83RD ST NE, OTSEGO, MN 55330 $1,092 49 14766 84TH ST NE HOME LIQUIDATORS LLC % BEN DANIELS PO BOX 46092, PLYMOUTH, MN 55446 $1,092 50 14738 84TH ST NE CHESTER R HOLM $1,092 51 14710 84TH ST NE CHRISTOPHER GOEBEL $1,092 52 14682 84TH ST NE MARK A & DEBORAH A MAROS $1,092 53 14656 84TH ST NE TOMMY W & CAROL M LLOYD $1,092 54 14626 84TH ST NE DUANE & JOYCE BOESE FAMILY TR $1,092 55 14598 84TH ST NE CHRISTOPHER P MOONEY & BRITTANY N MOONEY $1,092 56 14576 84TH ST NE PATRICK L & CAROLYN L JANSEN $1,092 57 8419 O'DELL AVE NE PAUL M & MARY E SCHMITZ $1,092 58 8389 O'DELL AVE NE GERALD K & JOANNE A GORDON $1,092 59 8357 O'DELL AVE NE EMILEE ZIMDARS 106 CAMEO LN, MADISON, WI 53714 $1,092 60 8393 OGREN AVE NE MARIANA R YEPEZ 109 FRONT ST NW, ST. MICHAEL, MN 55376 $1,092 22 REF # PROPERTY ADDRESS OWNER/TAX PAYER TAX PAYER ADDRESS ASSESSMENT 61 14765 84TH ST NE JENNIFER A BERGMAN 14766 83RD ST NE, OTSEGO, MN 55330 $1,092 62 14737 84TH ST NE KYLE BROWN $1,092 63 14709 84TH ST NE KELLY L BOCHENSKI $1,092 64 14681 84TH ST NE SCOTT WILLIS $1,092 65 14655 84TH ST NE SARAH E D PERRON 20856 IRAN AVE, LAKEVILLE, MN 55044 $1,092 66 14625 84TH ST NE STEVE DE LOS REYES $1,092 67 14599 84TH ST NE FORREST S & NANCY J KARLS $1,092 68 8352 O'DELL AVE NE THOMAS A & ANNA M CHUBB $1,092 69 14626 83RD ST NE MICHAEL J & CHRISTINE M ROGERS $1,092 70 14682 83RD ST NE JACOLYN M STELLMACH & BRIAN STELLMACH $1,092 71 14710 83RD ST NE MICHAEL NEIBER $1,092 72 14738 83RD ST NE FELIPE MONTES LAZARIN & GILBERTO MONTES LAZARIN $1,092 73 14766 83RD ST NE JOHN & JENNIFER BERGMAN $1,092 74 8337 OGREN AVE NE PATRICK A BURDA & EVANGELINE SAN PEDRO BURDA $1,092 75 14545 83RD ST NE TERRY A & LINDA J LEMKE $1,092 76 14599 83RD ST NE JOSHUA & JENNY WHITE $1,092 77 14631 83RD ST NE KRIS MOEN $1,092 78 14699 83RD ST NE KERRY J & CYNTHIA L SAMUELSON $1,092 79 14731 83RD ST NE DENNIS N & CAROL SIEBEN $1,092 80 14779 83RD ST NE MICHAEL GRAZIANO $1,092 23 REF # PROPERTY ADDRESS OWNER/TAX PAYER TAX PAYER ADDRESS ASSESSMENT 81 8245 OGREN AVE NE IVAN & NICOLE GREENLUND $1,092 82 8217 OGREN AVE NE BRIAN J TABAKO $1,092 83 8189 OGREN AVE NE AARON GREENLUND $1,092 84 8159 OGREN AVE NE TRAVIS MCSHANE $1,092 85 8131 OGREN AVE NE EDWARD A KOEHLER 7625 96TH ST SW, MOTLEY, MN 56466 $1,092 86 8103 OGREN AVE NE ELIZABETH A GERESZEK $1,092 87 8075 OGREN AVE NE ELLEN ANNE JAGODZINSKI $1,092 88 8045 OGREN AVE NE KURTIS E & DELPHIA D HINTON $1,092 89 8013 OGREN AVE NE JAMES O & LYNN S NELSON $1,092 24 DEERFIELD ACRES & HIDDEN VALLEY A total of 35 properties within the Deerfield Acres and Hidden Valley subdivisions will be included in the 2023 Street Renewal Project. List of property owners provided on the following pages. 25 REF # PROPERTY ADDRESS OWNER/TAX PAYER TAX PAYER ADDRESS ASSESSMENT 1 14528 78TH ST NE PHILLIP L DAHLHEIMER SR & STEFANIE DAHLHEIMER $1,092 2 14556 78TH ST NE KATHLEEN M LANG $1,092 3 14584 78TH ST NE ERIC L & LARAE M SCHWAB $1,092 4 14624 78TH ST NE JAMIE L HARFF $1,092 5 14656 78TH ST NE ANTHONY W HOOPER & KRISTI J HOOPER $1,092 6 14521 78TH ST NE JONATHAN M WEGNER $1,092 7 14567 78TH ST NE MANUEL & DEBORAH A CORTEZ $1,092 8 7800 O'DELL AVE NE RYAN WEBBER $1,092 9 7824 O'DELL AVE NE BRIAN A SCHULTZ $1,092 10 14661 78TH AVE NE TREVOR E DAHL $1,092 11 7792 O'DELL AVE NE CRAIG A & CHRISTI A KINGREN $1,092 12 7981 OGREN AVE NE MICHAEL ROBISON $1,092 13 7931 OGREN AVE NE DREW D ASPINWALL & SARAH A MILLS $1,092 14 7899 OGREN AVE NE DANIEL G MOSS $1,092 15 7869 OGREN AVE NE KAITLIN E SCHULTZ $1,092 16 14814 78TH ST NE SUE M KROLL $1,092 17 14800 78TH ST NE PAUL BONGIOVANNI $1,092 18 14766 78TH ST NE ALAN D & NANCY A SKOGMAN $1,092 19 14702 78TH ST NE DANIEL D KIRK $1,092 20 7994 OGREN AVE NE PETERSON LIVING TRUST $1,092 26 REF # PROPERTY ADDRESS OWNER/TAX PAYER TAX PAYER ADDRESS ASSESSMENT 21 7960 OGREN AVE NE TIMOTHY J & SHARON BOURGEOIS $1,092 22 7938 OGREN AVE NE GARY M & JEANETTE JOHNSON $1,092 23 7904 OGREN AVE NE TYLER J & LAUREL M PUTMAN $1,092 24 7860 OGREN AVE NE JEDIDIAH J FIELD & NISSA INSELMAN-FIELD $1,092 25 7850 OGREN AVE NE JOSHUA J EMILO CASTILLO STACEY 530 POWELL ST N, BIG LAKE, MN 55309 $1,092 26 7828 OGREN AVE NE BRUCE & JANE M LEVASSEUR $1,092 27 14831 78TH ST NE ANTHONY J FAUST & ANGELA C PHILLIPS-FAUST $1,092 28 14811 78TH ST NE CHAD M & CYNTHIA L WENUM $1,092 29 14781 78TH ST NE BRIAN E ROGERS & MICHELLE A FULAYTER $1,092 30 14751 78TH ST NE ANGELICA M PETERSON $1,092 31 14725 78TH ST NE LEON F & THERESA K SCHMIDT $1,092 32 14705 78TH ST NE CORY BARBER & TARYN KIENLEN $1,092 33 14680 78TH ST NE CURTIS R & LINDA E RIECK $1,092 34 7769 O'DELL AVE NE TODD K NORDSTROM $1,092 35 7764 ODELL AVE NE MASON REED JOHNSON $1,092 27 XII. CONCLUSION AND RECOMMENDATION This report analyzed the feasibility of improving streets. The proposed improvements are necessary, cost effective, and feasible from a technical and engineering standpoint, and also benefit the assessed properties proposed as shown in the tables and maps provided in Exhibit D. XIII. ASSESSMENT The assessment value of $1092 is a pre-determined cost established by policy. Assessments can be paid in full or partially prepaid once the assessment roll has been adopted by the City Council after all costs are determined. Any unpaid portion of the assessment will be added to the property tax of each property payable starting in 2024. The length of assessment and the interest rate are determined by the City Council and typically correlates with the city bond length and rate which the city receives. ¯ 456738456738 456738 456742 456742 456742 456742 456736 456739 456739456739 456719 456719 §¨¦9 4 456737 456718 EF137 EF137 10195TH 60TH 85TH 94 70TH 80TH KADLERO DEANRIV E RPAGEPARRISHMACIVER83RDNASHUA 53RDLABEAUX65THQUEENSJABER75TH 78THMASON 77THQUAM91ST PARKMCALLISTER90TH QUADAYJALGERPACKARDMARLOWE96TH89TH OHLANDOGRENJASON O BRIAN10 1S T 61ST 88TH 87TH RAWLINGS7 2 N D73RD KALDERNABERQUIN82ND 74TH 71ST 81ST OAKWOOD92ND PARELL54TH 58TH 59THKAGAN76TH JANDELJAMES LANDER62ND 84TH NEEDHAMRAMIERKAHLER93RD 105TH67TH 94TH QUALEPALMGREN63RDLARGE103RD OGDEN51ST97TH RANDOLPHMARTIN FARMSODELLKITTREDGE O DAY SERVICE LYDIAMARSHALL99TH OCHOA6 9 T H NELMARKQUI GLEY68TH 56 TH 52NDQ UIL L E YKALLANDMARXPADGETTNAPIERNADALANASONKALENDA79TH L A M B E R T LANNONMACKENZIEKAEDI NG57THLAMONTLASALLER A DF OR D75TH LACHMAN64THJANSEN RATHBUN55THPARKINGTON66TH M A C L Y N N QUAKERMARQUETTENAUGHTOR PARQUETO DELLPARSONOR G E N MACKENIZIE MARTINKAHL88TH PARISODAYLANDAULANGLEYPINNACLELARABEE Q U A N T R E L L E QUARRYQUAIL QUENROERASPBERRYPALISADESMACLARENR A M S L U N DMANCHESTERO'DELLPADREKAISERKEADING77TH 77TH PARELLNASHUAO DAY87TH OGRENO DELLLAMBERT ODAYO C H O AKAISERK A G A N MARX PALI SADES6 5 T H 7 2 N D 56THQUADAYOGDEN65TH 74TH 62ND 74TH OAKWOODPAGEKAHLER JABER66TH 90TH 78TH 77THO DAYQUAM87TH 59TH 58TH 62ND 85TH MARLOWE79TH PARKPACKARD83RD PARELLJALGERNABERRAMIER74TH 73RD 67TH 9 6 T H 88TH 79TH 5 7 T H 71 ST 84TH88TH 7 3 R D 71ST83RD 71ST 81ST 69TH O DELL75TH KALLAND72ND74TH 75TH78TH 73RDLANDAU 76TH SERVICE62ND PACKARD92ND PARSON67TH OCHOA71ST71ST PARRISHOAKWOOD77TH JANSEN OGR E N96TH 77TH PACKARD85TH OH L A N DLANDERPARK 73 RD75THMARLOWE QUILLEYO DAY7 2 N D 80TH 81ST 9 2 N D93RD 95TH 78TH 73RD MA R LO W E 62ND 85TH 62ND 78THO BRIAN93RD 79TH JAMES ODELL54TH87TH 75TH 77TH 72ND76 TH75TH 7 7 T H 91ST 90TH 9 2 N D MASON90THLARGE O BRIAN56TH PADGETT 71ST 88TH 71ST70TH 94 81ST 76THPALMGREN89TH L A RGE 76TH 95TH 78TH 77TH P AR E L L 74TH OCHOA87TH ODELL93RD LANGLEY93RD 62NDPARQUET81ST70TH 94TH M A S O N 83RD 76TH 82ND 96TH 87TH 67TH 76TH 71 ST 81ST QUEENS89TH SERVICE 79TH KALLAND59THQUADAY60THPARKINGTON 54TH 9 2 N D 82ND 72ND89TH83RD91ST 72ND88TH 92ND 75TH 71ST 65TH71ST67TH96TH 84TH KAHLER 89TH 10191ST MACKENZIE QUADAYRIVER78TH 73RD 60TH 72 N D 83RD 75TH 72ND OCHOA 90TH 96TH 76TH 87TH 97TH 78TH SERVICE PCI RATING MAP-2022 K:\GIS\Projects\Municipal\OTSEGO\OT387 (Streets)\2022\OT387-2022 PCI Rating Map.mxd Legend NO RATING 33 - 40 41 - 50 51 - 60 61 - 70 71 - 80 81 - 83 84 - 87 88 - 91 92 - 95 96 - 100 1 CITY OF OTSEGO COUNTY OF WRIGHT STATE OF MINNESOTA RESOLUTION NO: 2023-10 ORDERING PREPARATION OF PLANS AND SPECIFICATIONS FOR THE 2023 STREET RENEWAL PROJECT WHEREAS, a resolution of the City Council adopted the 23rd day of January 2023, fixed a date for a Council Hearing on the proposed improvement of streets within the Vasseur’s Oak Grove Estates 1st and 2nd Additions, Otsego Acres 1st and 2nd Additions, Hidden Valley, Deer Field Acres, and Otsego Industrial Park subdivisions; and, WHEREAS, ten days mailed noticed and two weeks’ published notice of the hearing was given and the hearing was held thereon on the 13th day of February, 2023, at which all persons desiring to be heard were given an opportunity to be heard thereon. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF OTSEGO, MINNESOTA: 1. Such improvement is necessary, cost-effective, and feasible as detailed in the feasibility report. 2. Such improvement is hereby ordered. 3. Hakanson Anderson is hereby designated as the engineer for this improvement and are hereby directed and authorized to prepare plans and specifications for the making of such improvements. 2 ADOPTED by the Otsego City Council this 13th day of February 2023. MOTION BY: SECONDED BY: IN FAVOR: OPPOSED: CITY OF OTSEGO __________________________________ Jessica L. Stockamp, Mayor ATTEST: __________________________________ Audra Etzel, City Clerk