4.1 2023 Street Renewal Project PowerPoint2023 Street Renewal Project
Otsego Acres 1st & 2nd Addition
Vasseur’s Oak Grove Estates 1st & 2nd Addition
Deerfield Acres, Hidden Valley
Otsego Industrial Park
IMPROVEMENT HEARING
FEBRUARY 13, 2023
Proposed Location
OTSEGO ACRES 1st & 2nd ADDITION
53 BENEFITTING PARCELS
PROPOSED RENEWED STREETS
Note:
Only improved parcels will be assessed. Parcels shown
as exempt are not assessed since they cannot be
improved due to wetland coverage, or zoning
constraints.
Other parcels not included are not addressed to any of
the streets shown to be renewed. These parcels have
been or will be assessed for street improvements for
which that parcel is addressed.
4
VASSUER’S OAK GROVE ESTATES 1st & 2nd ADDITION
89 BENEFITTING PARCELS
PROPOSED RENEWED STREETS
Note:
Only improved parcels will be assessed.
Parcels shown as exempt are not assessed
since they cannot be improved due to wetland
coverage, or zoning constraints.
Other parcels not included are not addressed to
any of the streets shown to be renewed. These
parcels have been or will be assessed for street
improvements for which that parcel is
addressed.
5
DEERFIELD ACRES & HIDDEN VALLEY
35 BENEFITTING PARCELS
PROPOSED RENEWED STREETS
Note: Only improved parcels will be assessed.
Parcel shown as exempt is not improved due
to zoning constraints with respect to Parcel 33.
Proactive Maintenance Plan
•CRACK FILL EVERY TWO OR THREE YEARS
•LOCAL STREET HAS FOG SEAL THE 2ND YEAR OF NEW PAVEMENT. SEAL COAT
APPROXIMATELY YEAR 7 AND MICRO-SURFACING IN YEAR 17.
Proactive Maintenance Plan
•2023 RECONSTRUCT
•2025 FOG SEAL
•2030 SEAL COAT
•2040 MICRO-SURFACE
Existing Conditions
•ORIGINALLY PAVED IN 1982 (41 YEARS AGO)
•3.5” asphalt over 6” Class 5
•OVERLAID IN 1999 (24 YEARS AGO)
•1.5” asphalt overlay
•~21-23’ WIDE WITH DITCHES AND CULVERTS
•PAVEMENT CONDITION INDEX OF 48 OUT OF 100
•BLOCK, THERMAL, AND ALLIGATOR CRACKING
Existing Conditions
Otsego Acres 1st & 2nd Addition
•ORIGINALLY PAVED IN 1980 (43 YEARS AGO)
•3.5” asphalt over 6” Class 5
•OVERLAID IN 1999 (24 YEARS AGO)
•1.5” asphalt overlay
•~21-23’ WIDE WITH DITCHES AND CULVERTS
•PAVEMENT CONDITION INDEX OF 45 -48 OUT OF 100
•BLOCK, THERMAL, AND ALLIGATOR CRACKING
Existing Conditions
Vasseur’s Oak Grove Estates 1st & 2nd Add.
Deerfield Acres, Hidden Valley
82XX Ogren Ave NE (looking North)
83XX Odell Ave NE (looking South)
143XX 88th St NE (looking West)
144XX 89th St NE (looking West)
Proposed Improvements
16
•FULL DEPTH RECLAMATION
•22 ft wide street with 1 ft gravel shoulders
•REPLACE CENTER LINE CULVERTS AS NEEDED
•PLACEMENT OF 3.5” OF BITUMINOUS IN 2 LIFTS
•PLACE GRAVEL SHOULDERING USING RECLAIMED MATERIAL
•ELEVATION OF STREET WILL BE 3.5” –4.0” HIGHER
•DRIVEWAY APPROACHES
•Bituminous drives will be milled a minimum 5 ft from the edge of the road then re-paved to match
the street.
•Concrete drives will be sawcut at the nearest joint and re-poured to match the street.
•LANDSCAPING WILL BE RESTORED IN THE DISTURBED AREAS, INCLUDING PREMIUM
TOPSOIL, SEED, AND HYDRO-MULCH
Proposed Improvements
17
Existing Typical Section –All Streets
*Gravel Equivalent (G.E.) = 12
*Does not include overlay material
18
Proposed Typical Sections –All Streets
G.E. = 18
50% increase in strength from existing streets
Project Schedule
20
•JANUARY 23
•Council Received Feasibility Report
•Scheduled a Public Improvement Hearing
•FEBRUARY 8
•Public Open House
•FEBRUARY 13
•Hold Public Hearing
•Authorize Plans and Specifications
•APRIL 16
•Approve Plans and Specifications
•Authorize Advertisement for Bids
•MAY 3
•Open Bids
•MAY 8
•Award Contract
•JUNE
•Construction Starts
•AUGUST 18
•Project Completion
•SEPTEMBER
•Hold Assessment Hearing
Project Schedule
Assessment Policy
22
•ESTIMATED TOTAL PROJECT COST = $1,184,053
•Reclaim Project = $1,126,661 (Assessment Portion)
•Overlay Project = $57,392 (No Assessments for Overlay)
•ASSESSMENT SHALL BE 20% OF TOTAL PROJECT COSTS, WITH A
MAXIMUM ASSESSMENT OF $1,092 PER LOT FOR RECONSTRUCT OR
RECLAIM PROJECTS
•177 PROPERTIES @ $1,092 PER PROPERTY = $193,284
•10 Year Amortization with Interest (Rate TBD)
•PAVEMENT MANAGEMENT FUND PROVIDES BALANCE OF FUNDING
Assessment Policy
Preliminary Cost Estimate