ITEM 5.1 Street improvement project 14-050 otV TY/ F LI MINNESOTA V DEPARTMENT INFORMATION Request for City Council Action ORIGINATING DEPARTMENT: REQUESTOR: MEETING DATE Public Works City Engineer Wagner July 28, 2014 PRESENTER(s). REVIEWED BY: ITEM #: City Engineer Wagner City Administrator Johnson 5.1 AGENDA ITEM DETAILS RECOMMENDATION: Staff recommends approval of Resolution 2014-52 Awarding Contract to Asphalt Surfacing Technologies Corporation for City of Otsego Project #14-05; 2014 Otsego Micro -surfacing Project and approval of Change Order #1. ARE YOU SEEKING APPROVAL OF A CONTRACT? IS A PUBLIC HEARING REQUIRED? Yes No BACKGROUND/JUSTIFICATION: As per the CIP, a micro -surfacing project meeting State Aid requirements and being funded by State Aid was held on July 22"d. Only one bid was secured and was above the budgeted amount and the engineers estimate. Staff contacted the Ione bidder and inquired if the timeline was extended on month if that would change the construction costs. The contractor stated it would reduce the cost approximately $15,000. The CIP has $150,000 budgeted for the work. The bid from Asphalt Surface Technologies is for $165,252.63. With the deduct change order the projected construction cost would be $150,141.63. Other costs which need to be included are approximately $1700 for preparation of plans and specifications and bidding along with another estimated $2000 for observation and contract administration. This would bring the estimated total project costs to approximately $154,000 or $4000 over CIP budget. We recommend completing the entire project and going slightly over budget rather than removing a small portion to stay within budget. The previous micro -surfacing project has performed well and alleviated spalling and rutting issues on other state aid streets. The material is self -leveling, had very good bonding properties and is denser than normal asphalt material. The product does not require compactive effort, is placed at ambient temperature and can be driven on within an hours' time. SUPPORTING DOCUMENTS: X ATTACHED X NONE • Resolution • Plan sheet #2014-05 for 2014 Otsego Micro -surfacing Project (shows location of work) • Bid Tab • Engineers Estimate • Change Order #1 MOTION: (Please word motion as you would like it to appear in the minutes.) Motion to approve Resolution 2014-52 Awarding Contract to Asphalt Surfacing Technologies Corporation for City of Otsego Project #14-05; 2014 Otsego Micro -surfacing Project and approval of Change Order #1 or Motion to approve Resolution 2014-52a Awarding Contract to Asphalt Surfacing Technologies Corporation for City of Otsego Project #14-05; 2014 Otsego Micro -surfacing Project and approval of Change Order #1— with adjusted project to match budget more closely. BUDGET INFORMATION FUNDING: BUDGETED: X YES State Aid NO ACTION TAKEN ❑ APPROVED AS REQUESTED ❑ DENIED ❑ TABLED ❑ OTHER (List changes) COMMENTS: RESOLUTION NO. 2014-52 RESOLUTION ACCEPTING BID WHEREAS, pursuant to an advertisement for bids for the construction of City of Otsego, 2014 Micro -surfacing Project, bids were received, opened and tabulated according to law, and the following bids were received complying with the advertisement: Total Base Bid Asphalt Surface Technologies, Inc. $165,252.63 AND WHEREAS, it appears that Asphalt Surface Technologies, Inc. of St. Cloud, Minnesota is the lowest responsible bidder, NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF OTSEGO MINNESOTA: 1. The mayor and clerk are hereby authorized and directed to enter into a contract with Asphalt Surface Technologies, Inc. of St. Cloud, Minnesota in the name of the City of Otsego for the 2014 Micro -surfacing Project, according to the plans and specifications therefore approved by the city council and on file in the office of the City Clerk. 2. The City Clerk is hereby authorized to retain the bid bond of the successful bidder until a contract has been signed. Adopted by the city council this 28th day of July, 2014. Motioned By: Seconded By: All in Favor: Those Opposed: Vern Heidner, Acting Mayor Tami Loff, Clerk RES 14-52 OT387ResACCEPT BID RESOLUTION NO. 2014-52a RESOLUTION ACCEPTING BID WHEREAS, pursuant to an advertisement for bids for the construction of City of Otsego, 2014 Micro -surfacing Project, bids were received, opened and tabulated according to law, and the following bids were received complying with the advertisement: Total Base Bid Asphalt Surface Technologies, Inc. $165,252.63 AND WHEREAS, it appears that Asphalt Surface Technologies, Inc. of St. Cloud, Minnesota is the lowest responsible bidder, NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF OTSEGO MINNESOTA: 1. The mayor and clerk are hereby authorized and directed to enter into a contract with Asphalt Surface Technologies, Inc. of St. Cloud, Minnesota in the name of the City of Otsego for the 2014 Micro -surfacing Project, according to the plans and specifications therefore approved by the city council and on file in the office of the City Clerk. 2. The City Clerk is hereby authorized to retain the bid bond of the successful bidder until a contract has been signed. 3. The City Engineer is hereby authorized to eliminate portions of the project as allowed within the contract to an amount within the budget as proposed in the CIP. Adopted by the city council this 28th day of July, 2014. Motioned By: Seconded By: All in Favor: Those Opposed: Vern Heidner, Acting Mayor Tami Loff, Clerk RES 14-52a OT387ResACCEPT BID a MINNESOTA DEPARTMENT OF TRANSPORTATION 2014 OTSEGO MICRO -SURFACING CONSTRUCTION PLANS S.A.P. 217-101-002, 217-102-007, & 217-108-003 CITY PROJECT #2014-05 CITY OF OTSEGO LOCATED ON NASHUA AVENUE N.E.FROM 83RD STREET N.E. TO 95TH STREET N.E. AND ON 85th AVENUE N.E. FROM NASHUA AVENUE N.E. TO 700' EAST OF NASHUA AVENUE N.E. AND ON 85th AVENUE N.E. FROM 75+0' WEST OF ODEAN AVENUE N.E. TO 750' EAST OF ODEAN AVENUE N.E. AND ON 75TH STREET N.E. FROM OHLAND AVNEUE N.E. TO PAGE AVENUE AVENUE N.E. SECTIONS 4 & 5, TOWNSHIP 33, RANGE 23 SECTION 33, TOWNSHIP 34. RANGE 23 NASHUA AVENUE N.E. LOCATION STA 0+00 Hakanson Anderson Ch -41 Eng;n nd tend S. -,Y*" 59at Th ... 10 Aw_ A—kc, Mlnaaeo}o 54303 783-427-5960 FA% 703-427-0520 END S.A.P. 217-102-007 85TH STREET N.E. STA 135+90 A.P. 217-108-003 5TREET/78TH STREET N. 31+15 �._v.,. S.A,P. 217-108--003 75TH STREET/78TH STREET N.E. CTA 1 Ar1_jLX1 all r I yr V 1 Or_Uv WRIGHT COUNTY, MINNESOTA DISTRICT: 3 THE SUBSURFACE UTILITY INFORMATION IN THIS PLAN 15 UTILITY QUALITY LEVEL, D, THIS QUALITY LEVEL WAS DETERMINED ACCORDING TO TI4E GUIDELINES OF CI/ASCE 38-02, ENTITLED "STANDARD GUIDELINES FOR THE COLLECTION AND DEPICTION OF EXISTING SUBSURFACE UTILITY DATA." SEE PRO4ECT MANUAL. S70PPIRC 510147 D€STANCE BASED ON: 3.5 FT -- HEIGHT OF EYE 2.0 FT - HEIGHT OF 081ECT 1000 8 1006 22M SCALE 3N FEr GOVERNING SPECIFICATIONS THE 2014 EDITION OF THE MINNESOTA DEPARTMENT OF TRANSPORTATION 'STANDARD SPECIFICATIONS FOR CONSTRUCTION" AND THE 2014 EDITION OF THE "MARTERIALS LAB SUPPLEMENTAL SPECIFICATIONS FOR CONSTRUCTION' SHALL GOVERN. ALL FEDERAL, STATE AND LOCAL CANIS, REGULATIONS. AND ORDINANCES SHALL DE COMPLIED WITH IN THE CONSTRUCTION OF THIS PROJECT. ALL TRAFFIC CONTROL DEVICES AND SIGNING SHALL CONFORM TO THE 2014 EDITION OF MINNESOTA MANUAL ON UNIFORM TRAFFIC CONTROL DEVISES, INCLUDING THE 2014 EDITION FIELD MANUAL FOR TEMPORARY TRAFFIC CONTROL ZONE LAYOUTS. ALL REQUIREMENTS OF THE PROJECT MANUAL FOR THE 2014 OTSEGO MICRO -SURFACING PROJECT, S.A.P. 217-101-002. 217-102--007, & 217-108-003 AND CITY PROJECT #2014-05. SHEET INDEX THIS PLAN CONTAINS 12 SHEETS SHEET NQ_ DESCRIPTION 1 TITLE SHEET 2 SUMMARY OF QUANTITIES AND DETAILS 3 STRIPING TABULATION AND DETAILS 4-7 STREET CONSTRUCTION PLANS 8-f2 STRIPING PLANS € hereby certify that this plan, apaolfication, or repart was prepared by me or under my direct suparvialon and that I am o duly Licensed Prafesslona nglnesr tinder the laws of the State of Mthnasofa. 45850 DATE 5/21/2014 �RRENT LARSON, LIC. NO. HAKANSON ANDSPSON DESIGN ENGINEER APPROVED 25052 DATE 5/21/2014 ROIAAILC J. AG ER. P.E. LIC. NO. HAKANSOPt, AtiVERSON CITY OF VTKGO ENGINEER f.4:. t.a #7# t. DATE DI ATE Ain ENGINEE : REVIEWED FDR COMPLIANCE WITH S --.A-E AID RUUS/MUCY .-% DATE TATE, An Zrl�NFER:D APPROVED FOR STATE AID FUND€NC F DATE REVISION YLSIa�Y. F _. S.Q.P. 217-101-002 S.A.P. 217-102-007 S.A.P. 217-108-003 CIT PROJECT #2014-45 SHEET 1 OF 12 SHEETS OT387-2014(MS) GROSS NET NET SHOULDER DESIGN LANE PROJEOT STA. TO STA. LENGTH (FEET) LENGTH (FEET) LENGTH {MlLE5) ADT (2012) WIDTH (FEET) SPEED (MPH) NUMBER OF LANES WIDTH {FEET) NUMBER OF PARKING LANES FUNCTBONAL CLASSIFICATION S.A.P. UA AY 101-007 NASHUA AYE NE 0+00 TO 71+07 71107 7,107 1.346 800 0 OR 4 40 2 12 0 MINOR ARTERIAL S_A.P. 2t7-102-007 85TH ST NE 75+12 TO 135+90 6.078 2,200 0.417 13..00 8 40 2 f 2 0 MINOR ARTERIAL S.A.P. 217-408-003 75TH/78TH ST NE .140+31 TO t6f+15 2,0842.0&4 0.395 2200 3 40 2 12 0 MINOR ARTERIAL 2.0 FT - HEIGHT OF 081ECT 1000 8 1006 22M SCALE 3N FEr GOVERNING SPECIFICATIONS THE 2014 EDITION OF THE MINNESOTA DEPARTMENT OF TRANSPORTATION 'STANDARD SPECIFICATIONS FOR CONSTRUCTION" AND THE 2014 EDITION OF THE "MARTERIALS LAB SUPPLEMENTAL SPECIFICATIONS FOR CONSTRUCTION' SHALL GOVERN. ALL FEDERAL, STATE AND LOCAL CANIS, REGULATIONS. AND ORDINANCES SHALL DE COMPLIED WITH IN THE CONSTRUCTION OF THIS PROJECT. ALL TRAFFIC CONTROL DEVICES AND SIGNING SHALL CONFORM TO THE 2014 EDITION OF MINNESOTA MANUAL ON UNIFORM TRAFFIC CONTROL DEVISES, INCLUDING THE 2014 EDITION FIELD MANUAL FOR TEMPORARY TRAFFIC CONTROL ZONE LAYOUTS. ALL REQUIREMENTS OF THE PROJECT MANUAL FOR THE 2014 OTSEGO MICRO -SURFACING PROJECT, S.A.P. 217-101-002. 217-102--007, & 217-108-003 AND CITY PROJECT #2014-05. SHEET INDEX THIS PLAN CONTAINS 12 SHEETS SHEET NQ_ DESCRIPTION 1 TITLE SHEET 2 SUMMARY OF QUANTITIES AND DETAILS 3 STRIPING TABULATION AND DETAILS 4-7 STREET CONSTRUCTION PLANS 8-f2 STRIPING PLANS € hereby certify that this plan, apaolfication, or repart was prepared by me or under my direct suparvialon and that I am o duly Licensed Prafesslona nglnesr tinder the laws of the State of Mthnasofa. 45850 DATE 5/21/2014 �RRENT LARSON, LIC. NO. HAKANSON ANDSPSON DESIGN ENGINEER APPROVED 25052 DATE 5/21/2014 ROIAAILC J. AG ER. P.E. LIC. NO. HAKANSOPt, AtiVERSON CITY OF VTKGO ENGINEER f.4:. t.a #7# t. DATE DI ATE Ain ENGINEE : REVIEWED FDR COMPLIANCE WITH S --.A-E AID RUUS/MUCY .-% DATE TATE, An Zrl�NFER:D APPROVED FOR STATE AID FUND€NC F DATE REVISION YLSIa�Y. F _. S.Q.P. 217-101-002 S.A.P. 217-102-007 S.A.P. 217-108-003 CIT PROJECT #2014-45 SHEET 1 OF 12 SHEETS OT387-2014(MS) BID TABULATION CITY OF OTSEGO 2014 Otsego Micro Surfacing Project Bids opened 1:00 p.m., Tuesday, July 22, 2014. There was 1 bid received, as shown herein. Bid Schedule A - Micro -Surfacing and Fog Seal Ashaplt Surface Technologies Corp. ITEM NO. ITEM DESCRIPTION ESTIMATED QUANTITY UNIT PRICE EXTENSION 1 BITUMINOUS MATERIAL FOR MICRO SURFACING 15,500 GAL $3.90 $60,450.00 2 MICRO SURFACING SCRATCH COURSE -TYPE 2AGGREGATE 251 TON $180.00 $45,180.00 3 MICRO SURFACING SURFACE COURSE -TYPE 2 AGGREGATE 251 TON $180.00 $45,180.00 4 BITUMINOUS MATERIAL FOR FOG SEAL - CSS -1 H DILUTED 920 GAL $3.00 $2,760.00 5 TRAFFIC CONTROL 1 LS $5,000.00 $5,000.00 Total Bid Schedule A $158,570.00 Bid Schedule B - Striping Ashaplt Surface Technologies Corp. ITEM NO, ITEM DESCRIPTION ESTIMATED QUANTITY UNIT PRICE EXTENSION 6 PAVEMENT MESSAGE(ARROW) - PAINT 14 EACH $50.00 $700.00 7 4" DOUBLE SOLID LINE YELLOW - PAINT 10,324 LF $0.16 $1,651.84 8 4" SOLID LINE YELLOW - PAINT 1,120 LF $0.10 $112.00 9 4" SOLID LINE WHITE - PAINT 21,589 LF $0.11 $2,374.79 10 12" SOLID UNE WHITE - PAINT 50 LF $4.40 $220.00 11 24"SOLID LINE WHITE- PAINT 62 LF $5.50 $341.00 12 24" SOLID LINE YELLOW - PAINT 50 LF $5.50 $275.00 13 CROSSWALK MARKING 3'X6' BLOCKS - PAINT 504 SF $2.00 $1,008.00 Total Bid Schedule B SUMMARY OF BIDDING: Total Bid Schedule A through B OT387-2014 - MS - bid tabBID TABULATION BT- 1 OF 1 $6,682.63 Ashaplt Surface Technologies Corp. $165,252.63 ice+ d 0 L IZ. m C E v O R W c N �F+ dy O Im O U a m W N O v r O C4 to 4 OO O O O O H O O O Lu ti h h 0 (V N N a m N Q w y W O 1- z 0 Fn z Lu L Ll n O 2 ¢¢ Lu 0 F? W O LO (ro v ro m » ry � m OR v 6v m cri m v as p o� m o CO n V 0 rn m o z E° O L7 o N r p V o V o J X J J (rQ O O O O V Or 7 i ¢ 0 0 o ti ❑ Z O m Q r 0 J O W CS Lu O Z 0 V r (00 0 J w W 1 fl W A i }aw� �¢z ❑ z m m m M o oF - cn? u O O �Wd O O d O pl o f N 0 0 N O p f r N N o N: f f C U O U t J f (D 0 E i f° = H f7 W O p , u N N rn t 0 r ¢Lu f ( ( � Q O ❑ w O N � O N � N J i O F- 0 m o t W C N m N N fn i .Q J n h y m Z M °1 ❑ o 0 c� o c) = ° U m L L w Z o O O T O m r O N O O C n c U � EI IIQ O , U O U E 3 U N J m F z Lon voi Lq uoi N C N NN M N M N N M N N M N N N J = Z o! C d M v o v Cq .6 E° W y o o 0 0 0 o ti m o o m o m Lu O F - Z m N p u O O O O O O O Lu u w C 0 C 0 r ¢Lu � Q O O O N � O N � o � O O F- 0 W Z w Z o O O T O m r O N O O ui J e3 e3 Lu J J J Q❑ W F- fA 00 o O Z O O a r O M O o m O F D w f Y Z p o o op m o 0 0 m z o O 0 O o O m m 0M0 o0 o N o 1 W O O O V m O m m � W 1 i I ❑ W ❑ Z 'T 7 V N O M M 0<< c co w w U o 0 0 6 o o O n N lc� 'E o6 i» 2 2 .Q U o U U J J J J J J V) o E � W 0 'V V V' MO r N h cNo N OW N z a a a a F ' o � z 0 0? of [If Q UO .a '� Q 2 F --Z E- F- z m ❑ �, J ¢ F z z z Q a io x LLI } a a a a D m a Z ~ O a a Q F =_ Y V) W V) W 'o W ❑. W = ? >- Q S` p' V) W w Z Z z y Z J Z J J J J Q w w w ITI ❑ ❑ w w w 0 0 0 0 0 0 V) U a d d V V' 7 .N- N N U Z d ci Vpi v N Ll� N w N N N � N N N N d d (q m N N m N N m N N m N N m N N m N N m N N m N N m N N m N N E- .. Z._ N h m D) O N M V N m 0 p W tC C' M v o v Cq .6 ud t fQ) � to 0 U a W W V N N n W W O L4 Mn/DOT TP -2460-0112-10 SHEET 1 OF 1 SHEETS State of Minnesota - Department of Transportation CHANGE ORDER # 1 Contractor: Asphalt Surface Technologies Corp. State Aid Project No.: 217-101-002 Address: P.O. Box 1025 217-102-007 St. Cloud, MN 56302 217-108-003 Location: Otsego Micro Surfacing Construction Plans In accordance with the terms of this Contract, you are hereby authorized and instructed to perform the Work as altered by the following provisions. The Contract Time will be altered from August 15, 2014 to September 15, 2014. Fog Seal ITEM NO. Mn/DOT SPEC. NO. ITEM DESCRIPTION ESTIMATED QUANTITY UNIT BID UNIT CHANGE EXTENDED 1 2356.606 Bituminous Material for Micro Surfacing 15,500 GAL $-0.23 $-3,565.00 2 2356.609 Micro Surfacing Scratch Course - Type 2 Aggregate 251 TON $-23.00 $-5,773.00 3 2356.609 Micro Surfacing Surface Course - Type 2 Aggregate 251 TON $-23.00 $-5,773.00 Total Deduct $-15,111.00 Signature Date Project Engineer/Supervisor Contractor Authorized Representative *Local Agency **Consultant Contract Administrator * Required if work funded wholly or in part by a Local Agency * * Recommendation for Approval Original to Project File Copy to Contractor, Construction and Innovative Contracting (submit with Final) Copy to Local Agency and MN/DOT Municipal Agreement Unit if funded wholly or in part by Local Agency Funds