3.9 PRINT East-West Watermain Connection Project - Plans and Specifications and Ordering Advertisement for Bids Request for City Council Action DEPARTMENT INFORMATION ORIGINATING DEPARTMENT REQUESTOR: MEETING DATE: Public Works City Engineer Wagner May 8, 2023 PRESENTER(s) REVIEWED BY: ITEM #: Consent City Administrator/Finance Director Flaherty 3.9 – East-West Watermain Connection Project STRATEGIC VISION MEETS: THE CITY OF OTSEGO: Is a strong organization that is committed to leading the community through innovative communication. X Has proactively expanded infrastructure to responsibly provide core services. X Is committed to delivery of quality emergency service responsive to community needs and expectations in a cost-effective manner. Is a social community with diverse housing, service options, and employment opportunities. Is a distinctive, connected community known for its beauty and natural surroundings. AGENDA ITEM DETAILS RECOMMENDATION: City staff is recommending the City Council adopt a resolution approving plans and specifications and ordering advertisement for bids. ARE YOU SEEKING APPROVAL OF A CONTRACT? IS A PUBLIC HEARING REQUIRED? No No BACKGROUND/JUSTIFICATION: Plans and specifications have been prepared for the East-West Watermain Connection Project. The project will entail connecting the City’s east and west watermain systems to increase redundancy of the water system, improve water quality and water pressure, and be able to fill both west water towers to maximum capacity. The Bid Opening is proposed for June 7 with potential award on June 12. Contractors have stated obtaining pipe and vaults is approximately two months out once the contract is awarded. It would be mid-August at the earliest that construction would start. The specifications published will note that the Contractor cannot start work on portions of the project that easements are not yet obtained. The substantial completion for the project is proposed for November 30, 2023. The Capital Improvement Plan (CIP) included a budget in the amount of $3,504,134 for this project. The current Engineer’s Estimate for the total project cost is $3,360,946, which includes booster station quotes of $330,967, interconnect construction cost estimate of $2,729,711, and design, construction observation, and contract admin cost of $300,268. The easement total is yet to be determined. SUPPORTING DOCUMENTS ATTACHED: • Plans and Specifications (Cover Sheet Only) o Full plans and specifications are available in the electronic packet on City website. • Engineer’s Estimate • Resolution 2023-32 POSSIBLE MOTION PLEASE WORD MOTION AS YOU WOULD LIKE IT TO APPEAR IN THE MINUTES: Motion to adopt Resolution 2023-32 Approving Plans and Specifications and Ordering Advertisement for Bids for the East-West Watermain Connection Project, City Project No. 23-04. BUDGET INFORMATION FUNDING: BUDGETED: Fund 601 – Water Utility Yes DRAINAGE& UTILITY EASEMENTD R A I N A G E U T I L I T YE A S E M E N TDRAINAGE & UTILITY EASEMENTAND ESTIMATED QUANTITY EXTENSION ESTIMATED QUANTITY EXTENSION ESTIMATED QUANTITY EXTENSION 1 2021.501 MOBILIZATION LUMP SUM $130,000.00 0.75 $97,500 0.12 $15,600 0.13 $16,900 1.00 $130,000 2 2104.502 SALVAGE PIPE APRON EACH $400.00 9 $3,600 9.00 $3,600 3 2104.503 SAWING CONCRETE PAVEMENT - FULL DEPTH LIN FT $6.00 5 $30 24.00 $144 29.00 $174 4 2104.503 SAWING BITUMINOUS PAVEMENT - FULL DEPTH LIN FT $5.00 133.00 $665 133.00 $665 5 2104.503 REMOVE CONCRETE CURB LIN FT $20.00 98.00 $1,960 98.00 $1,960 6 2104.503 SALVAGE CASTING EACH $200.00 1.00 $200 1.00 $200 7 2104.503 SALVAGE CONCRETE PIPE LIN FT $40.00 88 $3,520 88.00 $3,520 8 2104.503 SALVAGE HYDRANT AND 6" GATE VALVE EACH $500.00 1 $500 1.00 $500 9 2104.504 REMOVE CONCRETE PAVEMENT SQ YD $5.00 9 $45 480.00 $2,400 489.00 $2,445 10 2104.504 REMOVE BITUMINOUS PAVEMENT SQ YD $3.00 228.00 $684 228.00 $684 11 2211.509 AGGREGATE BASE CLASS 5 TON $38.00 40 $1,520 119.00 $4,522 159.00 $6,042 12 2232.504 MILL BITUMINOUS SURFACE (1.5")SQ YD $7.00 385.80 $2,701 385.80 $2,701 13 2301.504 CONCRETE PAVEMENT 6"SQ YD $120.00 13.3 $1,596 13.30 $1,596 14 2357.506 BITUMINOUS MATERIAL FOR TACK COAT GALLON $8.00 25.00 $200 25.00 $200 15 2360.509 TYPE SP 9.5 WEARING COURSE MIXTURE (2,C) TON $110.00 37.00 $4,070 37.00 $4,070 16 2360.509 TYPE SP 12.5 NON WEARING COURSE MIXTURE (2,C) TON $700.00 29.00 $20,300 29.00 $20,300 17 2503.603 30" STEEL CASING PIPE (JACKED)LIN FT $106.00 199 $21,094 199.00 $21,094 18 2504.602 CONNECT TO EXISTING WATERMAIN EACH $2,500.00 2 $5,000 2.00 $5,000 2.00 $5,000 6.00 $15,000 19 2504.602 HYDRANT EACH $6,000.00 14 $84,000 14.00 $84,000 20 2504.602 6" GATE VALVE AND BOX EACH $1,900.00 14 $26,600 14.00 $26,600 21 2504.602 12" BUTTERFLY VALVE AND BOX EACH $3,500.00 5 $17,500 5.00 $17,500 22 2504.602 16" BUTTERFLY VALVE AND BOX EACH $5,000.00 5 $25,000 1.00 $5,000 6.00 $30,000 23 2504.603 4" DIP WATERMAIN OPEN CUT LIN FT $60.00 43.00 $2,580 43.00 $2,580 24 2504.603 6" DIP WATERMAIN OPEN CUT LIN FT $70.00 83 $5,810 83.00 $5,810 25 2504.603 12" DIP WATERMAIN OPEN CUT LIN FT $90.00 164.00 $14,760 164.00 $14,760 26 2504.603 12" WATERMAIN OPEN CUT LIN FT $87.00 3230 $281,010 3230.00 $281,010 27 2504.603 12" WATERMAIN DIRECTIONAL DRILL LIN FT $120.00 3260 $391,200 3260.00 $391,200 28 2504.603 16" DIP WATERMAIN OPEN CUT LIN FT $100.00 44.00 $4,400 44.00 $4,400 29 2504.603 16" WATERMAIN OPEN CUT LIN FT $125.00 3436 $429,500 3436.00 $429,500 30 2504.603 16" WATERMAIN DIRCTIONAL DRILL LIN FT $150.00 2922 $438,300 2922.00 $438,300 31 2504.603 16" WATERMAIN CARRIER PIPE LIN FT $100.00 204 $20,400 204.00 $20,400 32 2504.603 PRESSURE REDUCING VALVE LUMP SUM $240,000.00 1 $240,000 1.00 $240,000 33 2504.603 TOWER FILL CONTROL VALVE LUMP SUM $320,000.00 1 $320,000 1.00 $320,000 34 2504.604 4" POLYSTYRENE INSULATION SQ YD $40.00 7.2 $288 7.20 $288 35 2504.608 DUCTILE IRON FITTINGS POUND $5.43 6579 $35,724 1188.00 $6,451 1490.00 $8,091 9257.00 $50,266 36 2506.502 INSTALL CASTING EACH $200.00 1.00 $200 1.00 $200 37 2511.507 RANDOM RIPRAP CLASS III CU YD $155.00 25 $3,875 25.00 $3,875 38 2521.518 4" CONCRETE WALK SQ FT $7.00 335.00 $2,345 335.00 $2,345 39 2521.518 6" CONCRETE WALK SQ FT $10.00 125.00 $1,250 125.00 $1,250 40 2531.503 CONCRETE CURB AND GUTTER DESIGN SPECIAL LIN FT $30.00 98.00 $2,940 98.00 $2,940 41 2533.503 PORTABLE PRECAST CONCRETE BARRIER DESIGN 8337 LIN FT $50.00 50.00 $2,500 50.00 $2,500 42 2563.601 TRAFFIC CONTROL SUPERVISOR LUMP SUM $5,000.00 0.75 $3,750 0.12 $600 0.13 $650 1.00 $5,000 43 2563.601 TRAFFIC CONTROL LUMP SUM $35,000.00 0.75 $26,250 0.12 $4,200 0.13 $4,550 1.00 $35,000 44 2573.501 STABILIZED CONSTRUCTION EXIT LUMP SUM $1,500.00 1.00 $1,500 1.00 $1,500 2.00 $3,000 45 2573.501 EROSION CONTROL SUPERVISOR LUMP SUM $4,500.00 0.75 $3,375 0.12 $540 0.13 $585 1.00 $4,500 46 2573.502 EROSION CONTROL INLET PROTECTION EACH $250.00 4.00 $1,000 4.00 $1,000 47 2573.503 SILT FENCE TYPE; MS LIN FT $3.00 7000 $21,000 119.00 $357 100.00 $300 7219.00 $21,657 48 2574.508 FERTILIZER TYPE 1 POUND $2.00 1551 $3,102 99.00 $198 66.00 $132 1716.00 $3,432 49 2575.504 ROLLED EROSION PREVENTION CATEGORY 25 SQ YD $2.25 25623 $57,652 1597.00 $3,593 1065.00 $2,396 28285.00 $63,641 50 2575.505 SEEDING ACRE $600.00 4.7 $2,820 0.30 $180 0.20 $120 5.20 $3,120 51 2575.508 SEED, MIXTURE 25-121 POUND $7.00 631 $4,417 40.00 $280 27.00 $189 698.00 $4,886 $2,729,711 TOTAL ESTIMATED QUANTITY ENGINEER'S ESTIMATE EAST-WEST WATERMAIN CONNECTION PROJECT CITY OF OTSEGO TOTAL ESTIMATED COST ITEM NO. SPEC. REF.DESCRIPTION UNIT UNIT COST WATERMAIN TRUNK PRV SITE TOWER FCV SITE K:\MUNICIPAL\OT538\EXCEL\OT538_Schedules 5-3-2023 1 of 1 1 CITY OF OTSEGO COUNTY OF WRIGHT STATE OF MINNESOTA RESOLUTION NO: 2023-32 APPROVING PLANS AND SPECIFICATIONS AND ORDERING ADVERTISEMENT FOR BIDS WHEREAS, Hakanson Anderson Associates, Inc. has prepared plans and specifications for the East-West Watermain Connection Project; and WHEREAS, the plans and specifications have been presented to the City Council for approval. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF OTSEGO, MINNESOTA THAT: 1. Such plans and specifications, a copy of which is attached hereto and made a part hereof, are hereby approved. 2. The City Clerk shall prepare and cause to be published on the City website and QuestCDN an advertisement for bids upon the making of such improvement under such approved plans and specifications. The advertisement shall be published for 21 days, shall specify the work to be done, shall state the bids will be received by Hakanson Anderson Associates, Inc. until 2:00 PM on June 7, 2023, at which time they will be publicly opened by the Finance Director and Hakanson Anderson Associates, Inc., will then be tabulated, and will be considered by the City Council at 7:00 PM on June 12, 2023 in the Council Chambers (8899 Nashua Avenue NE). Any bidder whose responsibility is questioned during consideration of the bid will be given an opportunity to address the City Council on the issue of responsibility. No bids will be considered unless sealed and filed with the City Clerk and accompanied by a cash deposit, cashier’s check, bid bond or certified check payable to the City Clerk for five percent of the amount of such bid. 2 ADOPTED by the City Council of the City of Otsego this 8th day of May, 2023. MOTION BY: SECONDED BY: IN FAVOR: OPPOSED: CITY OF OTSEGO __________________________________ Jessica L. Stockamp, Mayor ATTEST: __________________________________ Audra Etzel, City Clerk