Loading...
3.1 Java Companies - Parkview Retail 3rd Addition3601 Thurston Avenue Anoka, MN 55303 763.231.5840 TPC@PlanningCo.com 1 PLANNING REPORT TO: Otsego Planning Commission FROM: D. Daniel Licht REPORT DATE: 31 May 2023 60-DAY DATE: 4 July 2023 RE: Otsego – Java Companies / Parkview Retail 3rd TPC FILE: 101.02 BACKGROUND Java Companies has submitted application to develop Lot 1, Block 1, Parkview Retail 3rd Addition located west of Parrish Avenue (CSAH 42) between 87th Street and 88th Street. The proposed development consists of a 6,062 square foot multiple tenant building, which includes a drive through service window and lane for a bank automated teller machine. The development requires application for a Conditional Use Permit for a convenience food restaurant, site and building plan review, and vacation of an existing drainage and utility easement. A public hearing to consider the application has been noticed for the Planning Commission meeting on 5 June 2023. Exhibits: Site Location Map Final Plat Architectural plans dated 15/4/23 (6 sheets) Civil plans dated 05/03/2023 (14 sheets) Landscape Plan dated 03-24-2023 (2 sheets) Item 3.1 2 ANALYSIS Comprehensive Plan. The 2012 Comprehensive Plan guides the subject site for commercial uses within the City’s primary retail, service, and office district located adjacent to the TH 101 and CSAH 39 interchange. The proposed building is shown to provide space for up to three businesses, including opportunity for a convenience food use with a drive through service window. The proposed land uses are consistent with the Future Land Use Plan and the commercial development goals of the Comprehensive Plan. Zoning. The subject site is zoned B-1, Retail Business District. The B-1 District allows for a range of retail, service, office, and restaurant uses. Convenience food uses are allowed as a conditional use, subject to the performance standards outlined in Section 11-75-6.A of the Zoning Ordinance. The tenant spaces within the proposed building are configured to accommodate the uses allowed within the B-1 District. Surrounding Uses. The subject site is surrounded by the following existing and planned land uses in the area shown in the table below. The development of the subject site provides for a transition between commercial uses along Parrish Avenue (CSAH 42) to residential uses west of Parkview Avenue. The site orientation and landscape plan assist with this transition and the proposed development will be compatible with surrounding uses. Direction Land Use Plan Zoning Map Existing Use North Commercial B-1 District Dunkin Undeveloped East Commercial PUD District SuperTarget South Commercial B-1 District ALDI West HD Residential R-7 District Parkview Grand Lot Requirements. Lots within the B-1 District are required to be a minimum area of 1.0 acres and 200 feet in width. The subject site is 1.29 acres in area. The width of the lot is 210 feet measured along Parkview Avenue. The lot complies with the minimum requirements of the B-1 District. Exterior Materials. The proposed building is designed with four-sided architecture using the same design and materials on all elevations, which is important given the subject site’s visibility from both Parrish Avenue (CSAH 42) and Parkview Avenue. The building is oriented with its front having the tenant entrances facing Parkview Avenue. An orientation with the entrances facing east to Parrish Avenue (CSAH 42) like Dunkin is preferred, or at least south similar to ALDI, to maximize the visibility and provide better aesthetics from the commercial corridor. The Planning Commission should provide direction as to the best layout for the subject site. Section 11-17-4.D.1 of the Zoning Ordinance require the exterior finish of the proposed building to be comprised of a minimum 65 percent Grade A materials, and not more than 35 percent Grade B materials, or not more than 10 percent Grade C materials. The grade of materials is 3 defined by Section 11-17-4.B of the Zoning Ordinance and Grade A materials consist generally of masonry materials, glass walls, windows, and doors. The submitted architectural plans provide a schedule for the exterior elevation materials, which indicates the Grade A materials comprise more than 65 percent of the exterior finish of each elevation and the exterior in total for the proposed building as required by the Zoning Ordinance. Building Height. Principal buildings within the B-1 District are allowed to be up to three stories or 35 feet in height. The proposed building is a single-story structure with a height of 16 feet to the top of the parapet. The proposed building complies with the height limits of the B-1 District. The submitted plans do not indicate the location of building mechanical equipment. If mounted on the roof of the building, the mechanical units must be screened by the parapet or other measures so as not to be visible from Parrish Avenue (CSAH 42) and Parkview Avenue, to be verified by the Zoning Administrator prior to issuance of a building permit. Access. The subject site abuts Parrish Avenue (CSAH 42) and Parkview Avenue. No access is allowed onto Parrish Avenue (CSAH 42) as a minor arterial roadway. One driveway is proposed to Parkview Avenue at the southwest corner of the subject site. Section 11-21-6.B of the Zoning Ordinance requires that the access be setback 90 feet from any street intersection and 100 feet from any other driveways. The location of the driveway is setback more than 90 feet from other streets to the north or south. There is a driveway to the garage of the Parkview Grand apartment building on the west side of Parkview Avenue that is off-set slightly to the south due to lot lines and the stormwater basin within the subject site. The off-set is not so significant so as to cause traffic issues on Parkview Avenue. Pedestrians. There is an existing sidewalk on the east side of Parkview Avenue and a trail on the west side of Parrish Avenue (CSAH 42) abutting the subject site. The site plan provides for a sidewalk connection between the principal building and the sidewalk on Parkview Avenue. A connection from the sidewalk along the south side of the principal building to the trail on Parrish Avenue (CSAH 42) is also to be provided. Off-Street Parking. Section 11-21-8 of the Zoning Ordinance requires that multiple occupancy retail buildings with three or more tenants provide one off-street parking stall per 160 square feet of net building area, with a potential 10 percent reduction approved administratively based on actual tenants. This is a higher requirement than applies to a standalone or two tenant retail building intended to address occupancy by a higher parking demand user such as a convenience food restaurant or coffee shop. The site plan illustrates 32 off-street parking stalls, which exceeds the requirements of the Zoning Ordinance for a retail building, but is two stalls short for a multiple tenant retail building. City staff will evaluate the buildout of the building and tenants at the time a building permit is applied for to determine if the 10 percent reduction in stalls is appropriate based on the type of tenant and occupied spaces. Gross Building Area Net Building Area 1 stall/160sf. 1 stall/200sf. 6,062sf. 5,456sf. 34 stalls 28 stalls 4 The 90 degree off-street parking stalls are designed as nine feet wide by 18 feet in depth abutting the sidewalk or perimeter of the parking area allowing for a two foot overhang and accessed by a 24 foot wide two-way drive aisle. There are angled parking stalls on the south side of the proposed building that are nine feet wide and 21 feet deep accessed an 18 foot wide one-way drive aisle leading into the drive through lane. The dimensions of the off-street parking area complies with Section 11-21-7.B of the Zoning Ordinance. The drive aisle for the drive through service window and ATM located on the north side of the building extends around the east elevation back to the southeast corner of the lot. The drive aisle is 24 feet wide to allow stacking of vehicles and also provides an exit route for the angled parking on the south side of the building. There is sufficient space to stack eight vehicles in line behind the drive through service window. The parking area is shown to be surfaced with asphalt and surrounded by perimeter concrete curb as required by Section 11-21-7.C and D of the Zoning Ordinance. The construction specifications for the off-street parking area are to be subject to review and approval of the City Engineer. Landscaping. A landscape plan has been submitted that provides for a mix of shade trees east and west of the proposed building and along the driveway south of the stormwater basin, with shrubs and grasses used as accents between the deciduous trees, at the building foundation, and for screening the waste enclosure and an electric transformer on site. The site plan is to be modified to provide additional deciduous trees along Parkview Avenue consistent with the ALDI and Dunkin site plans. The sizes of proposed plantings comply with the provisions of Section 11-19-2.B of the Zoning Ordinance. Section 5-2-3.C.2 of the City Code requires installation of in-ground irrigation for the yards and planting areas within the property, which is indicated on the landscape plan. Signs. Uses within the B-1 District are allowed the following signs:  One freestanding sign in the yard abutting Parrish Avenue (CSAH 42) up to 100 square feet in area and up to a height of 20 feet.  One freestanding sign in the yard abutting Parkview Avenue up to 64 square feet in area and up to a height of 15 feet.  Wall signs on the east and west elevations of the building up to 15 percent of the wall area facing public streets with no individual sign larger than 100 square feet. The site plan does not indicate a location for a free standing sign and the architectural plans illustrate wall signs only generally. A sign permit subject to review and approval of the Zoning Administrator is required prior to placement of any signs upon the property. 5 Hours. Convenience food uses within the B-1 District are allowed 24 hour operation unless limited by the City Council as part of the Conditional Use Permit. City staff is not recommending any limitation on the allowed hours of operation for the proposed development. Waste Storage. The submitted plans show a location for waste storage containers west of the proposed building on the north side of the driveway to Parkview Avenue. The proposed location of the waste storage enclosure is within a drainage and utility easement dedicated with the Parkview Retail 3rd Addition final plat for the stormwater basin within the subject site. The drainage and utility easement underlying the proposed waste storage enclosure is to be vacated without effecting the functionality of the stormwater basin. The plans for construction of the enclosure are to be submitted with application for a building permit for review by the Zoning Administrator for compliance with requirements of Section 11-18-4.C of the Zoning Ordinance. Exterior Lighting. Section 11-16-6 of the Zoning Ordinance establishes performance standards for exterior lighting. An exterior lighting plan including photometric measurements of light intensity and indicating the type, location, and height of all exterior light fixtures has been submitted. All exterior light fixtures are to have a 90 degree horizontal cut-off and not cast more than 0.4 foot-candles of light at the property lines. A photometric lighting plan must be submitted with application for a building permit and is to be subject to review and approval of the Zoning Administrator. Grading Plan. Plans for grading, erosion control, and storm water management have been submitted for the proposed development. All grading, drainage, and erosion control plans are subject to review and approval of the City Engineer. Utilities. The subject site is within the East Sewer District established by the 2012 Comprehensive Plan and services are available to the property. The developer has submitted a utility plan for connection of the proposed building to City sewer and water utilities. The developer will pay Utility Connection Charges at the time a building permit is issued for build out of the tenant spaces within the building based on the proposed occupancy and Fee Schedule in effect at that time. All utility plans are subject to review and approval of the City Engineer. Site Improvement Performance Agreement. Section 11-9-7 of the Zoning Ordinance requires that the developer enter into a performance agreement with the City to provide for construction of the project improvements within the subject site. The City Attorney will draft a Site Improvement Performance Agreement for development of the subject site for approval by resolution of the City Council concurrent with consideration of the development application. 6 RECOMMENDATION The proposed development of Lot 1, Block 1 Parkview Retail 3rd Addition is consistent with the policies of the Comprehensive Plan and complies with the requirements of the Zoning Ordinance. Our office recommends approval of the applications as outlined below. POSSIBLE ACTIONS A. Motion to recommend approval of Conditional Use Permit, site and building plans, and vacation of drainage and utility easements for Lot 1, Block 1, Parkview Retail 3rd Addition, subject to the following conditions: 1. The site and building plan approval and the stipulations, limitations, and conditions therein shall be applied to the property in question. All written and graphic materials officially submitted to the City shall be treated as a formal agreement between the applicant and the City. Once approved, no changes, modifications or alterations shall be made to any plan detail, standard, or specifications without prior submission of a plan modification request to the Zoning Administrator for review and approval. 2. Any mechanical equipment mounted on the roof of the building shall be screened by the parapet or other measures so as not to be visible from Parrish Avenue (CSAH 42) and Parkview Avenue, subject to review and approval of the Zoning Administrator prior to issuance of a building permit. 3. The number of off-street parking stalls required shall be subject to review and approval by the Zoning Administrator based on occupancy and floor area for individual tenants in accordance with Section 11-21-8 of the Zoning Ordinance. 4. The construction specifications for the off-street parking area shall be subject to review and approval of the City Engineer. 5. The site plan shall be revised to provide for a pedestrian connection between the sidewalk along the south line of the principal building to the trail on Parrish Avenue (CSAH 42). 6. Landscaping: a. The landscape plan shall be revised to provide for planting of deciduous trees in the yard along Parkview Avenue. b. In-ground irrigation for the yards and planting areas within the property shall be installed as required by Section 5-2-3.C.2 of the City Code. 7 7. All grading, drainage, and erosion control plans shall be subject to review and approval of the City Engineer. 8. All utility plans shall be subject to review and approval of the City Engineer. 9. The developer shall pay Utility Connection Charges at the time a building permit is issued for buildout of the tenant spaces based on the user and Fee Schedule then in effect. 10. All drainage and utility easements shall be subject to review and approval of the City Engineer. 11. The property owner shall execute a Site Improvement Performance Agreement as required by Section 11-9-7 of the Zoning Ordinance, subject to review by the City Attorney and approval of the City Council. B. Motion to recommend the application be denied based on a finding that the request is inconsistent with the Comprehensive Plan and intent of the Zoning Ordinance. C. Motion to table. c. Adam Flaherty, City Administrator/Finance Director Audra Etzel, City Clerk Ron Wagner, City Engineer David Kendall, City Attorney Site Location Map Java Companies - Parkview Retail 461 ft Overview Legend Roads CSAHCL CTYCL MUNICL PRIVATECL TWPCL Highways Interstate State Hwy US Hwy City/Township Limits c t Parcels PARKVIEW RETAIL 3RD ADDITIONFOUND MONUMENTTHE EAST LINE OF THE NORTHWEST QUARTER OF THE NORTHEASTQUARTER OF SECTION 22, TOWNSHIP 121, RANGE 23IS ASSUMED TO BEAR N00°17'07"W0'40 80 120SCALE IN FEET1 INCH = 40 FEETGOVERNMENT CORNERSITEVICINITY MAP (NOT TO SCALE)SECTION 22, TOWNSHIP 121, RANGE 23NE 1/4NW 1/4SW 1/4SE 1/4SURVEYORS CERTIFICATEI, Christopher R. Foley, do hereby certify that this plat was prepared by me or under my direct supervision; that I am a duly Licensed Land Surveyor in the State of Minnesota; thatthis plat is a correct representation of the boundary survey; that all mathematical data and labels are correctly designated on this plat; that all monuments depicted on this plathave been, or will be correctly set within one year; that all water boundaries and wet lands, as defined in Minnesota Statutes, Section 505.01, Subd. 3, as of the date of thiscertificate are shown and labeled on this plat; and all public ways are shown and labeled on this plat.Dated this day of , 20 .Christopher R. Foley, Licensed Land SurveyorMinnesota License No. 55343STATE OF COUNTY OF The foregoing Surveyor's Certificate was acknowledged before me this day of , 20 , by Christopher R. Foley, Land Surveyor, MinnesotaLicense No. 55343. (Notary Signature)(Notary Name Printed)Notary Public, County, MinnesotaMy Commission Expires CITY COUNCIL, CITY OF OTSEGO, MINNESOTAThis plat of PARKVIEW RETAIL 3RD ADDITION was approved and accepted by the City Council of the City of Otsego, Minnesota, at a regular meeting thereof held this dayof , 20 , and said plat is in compliance with the provisions of Minnesota Statutes, Section 505.03, Subd. 2. Mayor City ClerkWRIGHT COUNTY SURVEYORI hereby certify that in accordance with Minnesota Statutes, Section 505.021, Subd. 11, this plat has been reviewed and approved this dayof , 20.Wright County SurveyorWRIGHT COUNTY HIGHWAY ENGINEERThis plat was reviewed and recommended for approval this day of , 20.Wright County EngineerWRIGHT COUNTY LAND RECORDSPursuant to Minnesota Statutes, Section 505.021, Subd. 9, taxes payable for the year 20 on the land hereinbefore described have been paid. Also, pursuant to MinnesotaStatutes, Section 272.12, there are no delinquent taxes and transfer entered this day of , 20 .Wright County Land Records AdministratorWRIGHT COUNTY RECORDERI hereby certify that this instrument was filed in the office of the County Recorder for record on this day of , 20, at o'clock.M., and was duly recorded in Cabinet No. , Sleeve, as Document Number .Wright County RecorderKNOW ALL PERSONS BY THESE PRESENTS: That Parkview Partners, LLC, a Minnesota limited liability company, owner of the following described property situated in the County ofWright, State of Minnesota, to wit:OUTLOT A, PARKVIEW RETAIL 2ND ADDITION, Wright County, Minnesota.Has caused the same to be surveyed and platted as PARKVIEW RETAIL 3RD ADDITION and does hereby dedicate to the public for public use the drainage and utility easements as createdby this plat.In witness whereof said Parkview Partners, LLC, a Minnesota limited liability company, has caused these presents to be signed by its proper officer this dayof , 20 .Parkview Partners, LLCBy Christopher J. Rice, Chief ManagerSTATE OF COUNTY OF This instrument was acknowledged before me this day of , 20 , by Christopher J. Rice, Chief Manager of Parkview Partners, LLC, a Minnesota limitedliability company, on behalf of said company. (Notary Signature)(Notary Name Printed)Notary Public, County, MinnesotaMy Commission Expires SET 1/2" BY 14" IRON PIPE MARKED BY LICENSE NO. 55343 THIS DRAWING AND THE INFORMATION THEREIN ISTHE PROPERTY OF DESIGN TREE ENGINEERING INC.USE BY THE HOLDER OR DISCLOSURE TO OTHERSWITHOUT THE PERMISSION OF DESIGN TREEENGINEERING INC. IS PROHIBITED. IT CONTAINSPROPRIETARY AND CONFIDENTIAL INFORMATION OFDESIGN TREE ENGINEERING INC. REPRODUCTION OFTHE MATERIAL HEREIN WITHOUT WRITTENERMISSION OF DESIGN TREE ENGINEERING INC.VIOLATES THE COPYRIGHT LAWS OF THE UNITEDSTATES AND WILL SUBJECT THE VIOLATORS TOLEGAL PROSECUTION.COPYRIGHT @ 2023 BY DESIGN TREE ENGINEERINGI HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION,OR REPORT WAS PREPARED BY ME OR UNDER MYDIRECT SUPERVISION AND THAT I AM A DULYLICENSED PROFESSIONAL ENGINEER UNDER THELAWS OF THE STATE OF MINNESOTA.DRAWING NO.DRAWN BY:CHECKED BY:PROJECT NO.:NO.DATE DESCRIPTIONDATE:LICENSE #:PRINTED NAME:F:\DESIGN TREE ENGINEERING\PROJECTS\109 - JAVA PROPERTIES\10923002 - OTSEGO RETAIL - OTSEGO, MN\CONSTRUCTS\CIVIL\10923002-C-DETAILS.DWG #### 5/3/2023MICHAEL J. GERBER5665310923002OTSEGO RETAILOTSEGO, MN05/03/2023NPKJEASITE PLAN REVIEW05/03/20231JAVA PROPERTIESOTSEGO RETAILOSTEGO, MN 55330INDEX OF SHEETS:C001 COVER SHEETC101 EXISTING CONDITIONS & REMOVALSC201 SITE PLAN C301 GRADING PLANC401 UTILITY PLAN C501 EROSION CONTROL PLANC601 CIVIL DETAILSC602 CIVIL DETAILSC603 CIVIL DETAILSC604 EROSION CONTROL DETAILSC605 SWPPP NARRATIVEC606 CIVIL SITE SPECIFICATIONSC607 CIVIL SITE SPECIFICATIONSC608 CIVIL UTILITY SPECIFICATIONSGENERAL NOTES:1. TOPOGRAPHIC SURVEY, INCLUDING PROPERTY LINES, LEGAL DESCRIPTION, EXISTING UTILITIES,TOPOGRAPHY WITH SPOT ELEVATIONS AND PHYSICAL FEATURES WAS PROVIDED BY:DESIGN TREE ENGINEERING & LAND SURVEYING120 17TH AVENUE WESTALEXANDRIA, MN 563082. CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO AVOID PROPERTY DAMAGE TOADJACENT PROPERTIES DURING THE CONSTRUCTION OF THIS PROJECTOWNERJAVA PROPERTIESMARK KROGH879 SCHEFFER AVEST. PAUL, MN 5510288TH STPARKVIEW AVE NEPARRISH AVE NEPROPERTYLOCATIONPROJECT CONTACTSCIVIL ENGINEERDESIGN TREE ENGINEERING AND LAND SURVEYINGMICHAEL J. GERBER3339 W ST. GERMAINSUITE 250TEL:(320) 227-0203EMAIL: MJG@dte-ls.comCOVER SHEETC001BENCHMARK INFORMATION:BENCHMARK: TOP NUT HYDRANT LOCATED ON THE WEST SIDE OF PROPERTY.ELEV: 871.57 (NAVD 88) GASGASGASGASGASGASGASGASGASGASGASGASGASUGEUGEUGEUGEUGEUGEl l l l l l lTHIS DRAWING AND THE INFORMATION THEREIN ISTHE PROPERTY OF DESIGN TREE ENGINEERING INC.USE BY THE HOLDER OR DISCLOSURE TO OTHERSWITHOUT THE PERMISSION OF DESIGN TREEENGINEERING INC. IS PROHIBITED. IT CONTAINSPROPRIETARY AND CONFIDENTIAL INFORMATION OFDESIGN TREE ENGINEERING INC. REPRODUCTION OFTHE MATERIAL HEREIN WITHOUT WRITTENERMISSION OF DESIGN TREE ENGINEERING INC.VIOLATES THE COPYRIGHT LAWS OF THE UNITEDSTATES AND WILL SUBJECT THE VIOLATORS TOLEGAL PROSECUTION.COPYRIGHT @ 2023 BY DESIGN TREE ENGINEERINGI HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION,OR REPORT WAS PREPARED BY ME OR UNDER MYDIRECT SUPERVISION AND THAT I AM A DULYLICENSED PROFESSIONAL ENGINEER UNDER THELAWS OF THE STATE OF MINNESOTA.DRAWING NO.DRAWN BY:CHECKED BY:PROJECT NO.:NO.DATE DESCRIPTIONDATE:LICENSE #:PRINTED NAME:F:\DESIGN TREE ENGINEERING\PROJECTS\109 - JAVA PROPERTIES\10923002 - OTSEGO RETAIL - OTSEGO, MN\CONSTRUCTS\CIVIL\10923002-C-BASE-PROPOSED.DWG #### 5/3/2023MICHAEL J. GERBER5665310923002OTSEGO RETAILOTSEGO, MN05/03/2023NPKJEASITE PLAN REVIEW05/03/20231LEGENDHYDRANTSANITARY MANHOLEGATE VALVEPOWER POLELIGHT POLECATCH BASINSIGNPEDESTALPOWER BOXELECTRIC METERMONITORING WELLSANITARY SEWER CLEANOUTSANITARY SEWER LINEWATERMAINUNDERGROUND GAS LINECONCRETE PAVEMENTBITUMINOUS PAVEMENTGASlW0'20' 40'NOTES:1. EXISTING CONDITIONS & TOPOGRAPHIC INFORMATION PROVIDED BY:DESIGN TREE ENGINEERING & LAND SURVEYING120 17TH AVENUE WALEXANDRIA, MN 563082. CONTRACTOR SHALL FIELD VERIFY ALL BUILDING DIMENSIONS AND REMOVALLIMITS PRIOR TO ANY CONSTRUCTION.3. SAWCUT CURB AND GUTTER AND SIDEWALK, OR REMOVE AT NEARESTEXPANSION JOINTS.4. SAWCUT BITUMINOUS PAVEMENT FULL DEPTH AT ALL TIE-IN LOCATIONS.5. CONTRACTOR SHALL PLACE ALL NECESSARY EROSION CONTROL MEASURESREQUIRED TO MAINTAIN SITE STABILITY PRIOR TO EXECUTING ANY SITEREMOVALS.6. CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATION WITH UTILITYPROVIDERS FOR REMOVAL AND/OR RELOCATION OF EXISTING UTILITIESAFFECTED BY SITE DEVELOPMENT. ALL PERMITS, APPLICATIONS, AND FEES ARETHE RESPONSIBILITY OF THE CONTRACTOR.7. ALL EXCESS OR WASTE MATERIAL GENERATED AS PART OF CONSTRUCTIONSHALL BE REMOVED FROM THE SITE AND DISPOSED OF IN ACCORDANCE WITHSTATE AND LOCAL REQUIREMENTS.8. CONTRACTOR SHALL MAINTAIN FULL ACCESS TO ADJACENT PROPERTIES DURINGCONSTRUCTION AND TAKE ALL PRECAUTIONS NECESSARY TO AVOID PROPERTYDAMAGE TO ADJACENT PROPERTIES.9. THE LOCATIONS AND ELEVATIONS OF THE EXISTING UTILITIES SHOWN HEREINARE APPROXIMATE. THEY HAVE BEEN PLOTTED FROM AVAILABLE SURVEYS AND/OR RECORDS. THE CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFYINGLOCATION AND ELEVATION TO ENSURE THAT ANY EXISTING UTILITIES (SHOWNOR NOT SHOWN) ARE NOT DAMAGED DURING CONSTRUCTION.10. CONTRACTOR SHALL PROVIDE A TEMPORARY PEDESTRIAN ACCESS ROUTE PLANFOR ANY WORK PERFORMED WITHIN THE PUBLIC RIGHT-OF-WAY.11. CONTRACTOR SHALL PROVIDE A TEMPORARY TRAFFIC CONTROL PLAN FOR ANYWORK PERFORMED WITHIN THE PUBLIC RIGHT-OF-WAY.12. GOPHER STATE ONE CALL DAMAGE PREVENTION SYSTEM FOR BURIED UTILITIES.1-800-252-1166. CONTRACTOR SHALL HIRE A PRIVATE UTILITY LOCATOR TOASSIST WITH PRIVATE UTILITY LOCATES.13. UTILITY INFORMATION DENOTED WITH AN ASTERISK (*) IS INFORMATION FROMAVAILABLE RECORD DRAWINGS, FIELD VERIFY.REMOVALS LEGEND= CURB REMOVAL= BITUMINOUS PAVEMENT REMOVAL= CONCRETE REMOVALEXISTINGCONDITIONS &REMOVALSC101PARKVIEW AVE NEPARRISH AVE NE12SAWCUT & REMOVE EXISTING BITUMINOUS PAVEMENTSAWCUT EXISTING CURB & GUTTER OR REMOVE AT NEAREST EXPANSION JOINTSAWCUT EXISTING CONCRETE OR REMOVE AT NEAREST EXPANSION JOINTREMOVE EXISTING BITUMINOUS PAVEMENTREMOVE EXISTING CURB AND GUTTERREMOVE EXISTING CONCRETE SIDEWALKREMOVE & SALVAGE EXISTING UTILITY PEDESTAL (COORDINATE WITH LOCALUTILITY OWNER FOR RELOCATION)REMOVE EXISTING STORM SEWER MANHOLE3KEY NOTES:1122743356745688BENCHMARK TOP NUT HYDRANTELEV:871.57BENCHMARK INFORMATION:BENCHMARK: TOP NUT HYDRANT LOCATED ON THE WEST SIDE OF PROPERTY.ELEV: 871.57 (NAVD 88) UGEUGEUGEUGEUGEUGEl l l l l l l DO NOT ENTER DRIVE THRUATMTHIS DRAWING AND THE INFORMATION THEREIN ISTHE PROPERTY OF DESIGN TREE ENGINEERING INC.USE BY THE HOLDER OR DISCLOSURE TO OTHERSWITHOUT THE PERMISSION OF DESIGN TREEENGINEERING INC. IS PROHIBITED. IT CONTAINSPROPRIETARY AND CONFIDENTIAL INFORMATION OFDESIGN TREE ENGINEERING INC. REPRODUCTION OFTHE MATERIAL HEREIN WITHOUT WRITTENERMISSION OF DESIGN TREE ENGINEERING INC.VIOLATES THE COPYRIGHT LAWS OF THE UNITEDSTATES AND WILL SUBJECT THE VIOLATORS TOLEGAL PROSECUTION.COPYRIGHT @ 2023 BY DESIGN TREE ENGINEERINGI HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION,OR REPORT WAS PREPARED BY ME OR UNDER MYDIRECT SUPERVISION AND THAT I AM A DULYLICENSED PROFESSIONAL ENGINEER UNDER THELAWS OF THE STATE OF MINNESOTA.DRAWING NO.DRAWN BY:CHECKED BY:PROJECT NO.:NO.DATE DESCRIPTIONDATE:LICENSE #:PRINTED NAME:F:\DESIGN TREE ENGINEERING\PROJECTS\109 - JAVA PROPERTIES\10923002 - OTSEGO RETAIL - OTSEGO, MN\CONSTRUCTS\CIVIL\10923002-C-BASE-PROPOSED.DWG #### 5/3/2023MICHAEL J. GERBER5665310923002OTSEGO RETAILOTSEGO, MN05/03/2023NPKJEASITE PLAN REVIEW05/03/20231PARKING INFORMATIONPARKING STALLS 30 STALLSACCESSIBLE STALLS 2 STALLSTOTAL STALLS 32 STALLSPROPERTY INFORMATIONTOTAL PROPERTY AREA 1.28 ACDISTURBED AREA 1.1 ±ACEXISTING IMPERVIOUS AREA 0.00 ACPROPOSED IMPERVIOUS AREA 0.73 ACPROPOSED SITE LEGENDLIGHT DUTY BITUMINOUS PAVEMENTHEAVY DUTY BITUMINOUS PAVEMENTCONCRETE PAVEMENTCONCRETE SIDEWALKCURB AND GUTTERTIPPED CURB AND GUTTERTRAFFIC CONTROL SIGNAGEPAINTED DIRECTIONAL ARROWPAINTED ACCESSIBLE PARKING SYMBOL0'20' 40'NOTES:1. ALL DIMENSIONS SHOWN ARE TO FLOW LINE, CENTERLINE OF FENCE,EDGE OF PAVEMENT, OR EXTERIOR FACE OF BUILDING, UNLESSOTHERWISE NOTED.2. CONTRACTOR SHALL VERIFY ALL PLAN AND DETAIL DIMENSIONS PRIORTO CONSTRUCTION.3. ALL CROSSWALK STRIPING SHALL BE WHITE IN COLOR.4. ALL INTERIOR PARKING STALL STRIPING SHALL BE 4" AND YELLOW INCOLOR.5. ACCESSIBLE PARKING STALL STRIPING, ACCESS AISLE, SYMBOL, ANDSIGNAGE SHALL BE IN ACCORDANCE WITH LOCAL AUTHORITYREQUIREMENTS.6. CONTRACTOR SHALL MAINTAIN FULL ACCESS TO ADJACENT PROPERTIESDURING CONSTRUCTION AND TAKE ALL PRECAUTIONS NECESSARY TOAVOID PROPERTY DAMAGE TO ADJACENT PROPERTIES.7. ALL SITE WORK SHALL BE PERFORMED IN ACCORDANCE WITH THERECOMMENDATIONS OF THE GEOTECHNICAL ENGINEER.8. CONTRACTOR SHALL PROVIDE A TEMPORARY PEDESTRIAN ACCESS ROUTEPLAN FOR ANY WORK PERFORMED WITHIN THE PUBLIC RIGHT-OF-WAY.9. CONTRACTOR SHALL PROVIDE A TEMPORARY TRAFFIC CONTROL PLANFOR ANY WORK PERFORMED WITHIN THE PUBLIC RIGHT-OF-WAY.10. GOPHER STATE ONE CALL DAMAGE PREVENTION SYSTEM FOR BURIEDUTILITIES. 1-800-252-1166. CONTRACTOR SHALL HIRE A PRIVATEUTILITY LOCATOR TO ASSIST WITH PRIVATE UTILITY LOCATES.12B612 CURB AND GUTTERDRIVE THRU EQUIPMENT (SEE ARCHITECTURAL)4' CURB CUTADA PEDESTRIAN RAMP (SEE DETAILS)PARKING STRIPING"ASSESSIBLE PARKING" SIGN & POSTATM (SEE ARCHITECTURAL)PAINTED PAVEMENT MESSAGE AND DIRECTIONAL ARROWSCROSSWALK STRIPINGTRASH ENCLOSURE (SEE ARCHITECTURAL)ELECTRICAL TRANSFORMER (SEE ELECTRICAL)TRUNCATED DOMES (PER MNDOT STANDARD PLANS 5-297.250)D412 CURB AND GUTTERCURB TRANSITION"NO PARKING" SIGN AND POSTDRIVEWAY PER CITY OF OTSEGO STD PLATE NO. 702BITUMINOUS STREET REPAIRCONCRETE SIDEWALK"DO NOT ENTER" SIGN AND POSTB612 DRIVEWAY CURB (SEE DETAIL)345KEY NOTES:678910SITE PLANC2015.03 5.07 5.63 5.003.5048.3348.3324.00 6.00 R20.00R3.08R3.67R5.00R2.00R3.50R2.67R2.67R20.009.00 (TYP) 8.00 8.00 9.00 (TYP)18.00(TYP)PROPOSED BUILDING8.6718.00(TYP)111145524.00PARKVIEW AVE NEPARRISH AVE NE8888109768824.002311R20.00R18.00R20.0012119.00(TYP)18.00(TYP)644R20.00884444512125.33 11.00 11.00 6.6713141516171819811914141933.72 48.72 6.17 15181320.74 181617201414201598 GASGASGASGASGASGASGASGASGASGASGASGASGASUGEUGEUGEUGEUGEUGEl l l l l l l DO NOT ENTER 866865866 865866870866866 867868 869866866867 868 DRIVE THRUATM>>>>l lllllllllllll868.96869.83869.04869.95865.59866.21866.29866.22865.91865.36865.86866.07866.48866.11865.93866.45866.67866.73866.50866.62866.81866.81866.60866.60867.00866.60866.84866.60866.50866.58866.82866.89866.81866.67866.54866.61866.52866.58865.95866.81865.97866.08866.11866.22866.81866.81866.50866.50867.00866.68866.46866.25865.85866.89868.94866.14866.83869.29865.65865.45866.50867.00866.63866.54870.50868.74869.66THIS DRAWING AND THE INFORMATION THEREIN ISTHE PROPERTY OF DESIGN TREE ENGINEERING INC.USE BY THE HOLDER OR DISCLOSURE TO OTHERSWITHOUT THE PERMISSION OF DESIGN TREEENGINEERING INC. IS PROHIBITED. IT CONTAINSPROPRIETARY AND CONFIDENTIAL INFORMATION OFDESIGN TREE ENGINEERING INC. REPRODUCTION OFTHE MATERIAL HEREIN WITHOUT WRITTENERMISSION OF DESIGN TREE ENGINEERING INC.VIOLATES THE COPYRIGHT LAWS OF THE UNITEDSTATES AND WILL SUBJECT THE VIOLATORS TOLEGAL PROSECUTION.COPYRIGHT @ 2023 BY DESIGN TREE ENGINEERINGI HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION,OR REPORT WAS PREPARED BY ME OR UNDER MYDIRECT SUPERVISION AND THAT I AM A DULYLICENSED PROFESSIONAL ENGINEER UNDER THELAWS OF THE STATE OF MINNESOTA.DRAWING NO.DRAWN BY:CHECKED BY:PROJECT NO.:NO.DATE DESCRIPTIONDATE:LICENSE #:PRINTED NAME:F:\DESIGN TREE ENGINEERING\PROJECTS\109 - JAVA PROPERTIES\10923002 - OTSEGO RETAIL - OTSEGO, MN\CONSTRUCTS\CIVIL\10923002-C-BASE-PROPOSED.DWG #### 5/3/2023MICHAEL J. GERBER5665310923002OTSEGO RETAILOTSEGO, MN05/03/2023NPKJEASITE PLAN REVIEW05/03/202310'20' 40'NOTES:1. THE LOCATIONS AND ELEVATIONS OF THE EXISTING UTILITIES SHOWNHEREIN ARE APPROXIMATE. THEY HAVE BEEN PLOTTED FROM AVAILABLESURVEYS AND/ OR RECORDS. THE CONTRACTOR IS RESPONSIBLE FORFIELD VERIFYING LOCATION AND ELEVATION TO ENSURE THAT ANYEXISTING UTILITIES (SHOWN OR NOT SHOWN) ARE NOT DAMAGED DURINGCONSTRUCTION.2. SIDEWALKS SHALL MEET ADA REQUIREMENTS, AND SHALL NOT EXCEED2.00% CROSS SLOPE, OR 5.00% LONGITUDINAL SLOPE.3. CONCRETE ENTRANCES AND APPROACHES SHALL NOT EXCEED 2.00%CROSS SLOPE IN SIDEWALK AREAS.4. ACCESSIBLE PARKING STALLS SHALL MEET ADA REQUIREMENTS, ANDSHALL NOT EXCEED 2.00% CROSS SLOPE IN ALL DIRECTIONS.5. PEDESTRIAN RAMPS SHALL MEET ADA REQUIREMENTS.6. ALL EXCESS OR WASTE MATERIAL GENERATED AS PART OF CONSTRUCTIONSHALL BE REMOVED FROM THE SITE AND DISPOSED OF IN ACCORDANCEWITH STATE AND LOCAL REQUIREMENTS.7. ALL EXCAVATION SHALL BE IN ACCORDANCE WITH THE CURRENT EDITIONOF "STANDARD SPECIFICATIONS FOR TRENCH EXCAVATION ANDBACKFILL/SURFACE RESTORATION" AS PREPARED BY THE CITY ENGINEERSASSOCIATION OF MINNESOTA.8. ALL SITE WORK SHALL BE PERFORMED IN ACCORDANCE WITH THERECOMMENDATIONS OF THE GEOTECHNICAL ENGINEER.9. SPOT ELEVATIONS SHOWN INDICATE FINISHED PAVEMENT ELEVATIONS &GUTTER FLOW LINE UNLESS OTHERWISE NOTED. PROPOSED CONTOURSARE TO FINISHED SURFACE GRADE.10. GOPHER STATE ONE CALL DAMAGE PREVENTION SYSTEM FOR BURIEDUTILITIES. 1-800-252-1166. CONTRACTOR SHALL HIRE A PRIVATE UTILITYLOCATOR TO ASSIST WITH PRIVATE UTILITY LOCATES.12MATCH INTO EXISTING BITUMINOUS PAVEMENTMATCH INTO EXISTING CURB & GUTTERGRADE BREAKADA PEDESTRIAN RAMP (SEE DETAILS)MATCH INTO EXISTING CONCRETE34KEY NOTES:GRADING PLANC301PARKVIEW AVE NEPARRISH AVE NEPROPOSED BUILDINGFFE 867.50BENCHMARK TOP NUT HYDRANTELEV:871.571223333334155544GRADING LEGEND= EXISTING MAJOR CONTOUR= EXISTING MINOR CONTOUR= EXISTING CONTOUR LABEL= PROPOSED MAJOR CONTOUR= PROPOSED MINOR CONTOUR= PROPOSED CONTOUR LABEL= EXISTING SPOT ELEVATION*= PROPOSED SPOT ELEVATION*= PROPOSED SURFACE FLOW DIRECTION*SPOT ELEVATIONS ALONG CURB & GUTTER AND OTHERREVEALS ARE TO FLOWLINE, UNLESS OTHERWISE NOTED.100XX.XX44344EMERGENCYOVERFLOWSWALE=864.75BENCHMARK INFORMATION:BENCHMARK: TOP NUT HYDRANT LOCATED ON THE WEST SIDE OF PROPERTY.ELEV: 871.57 (NAVD 88)TOP EL:865.00BOTTOM EL:860.50100-YR HWL:864.73 GASGASGASGASGASGASGASGASGASGASGASGASGASUGEUGEUGEUGEUGEUGEl l l l l l l DO NOT ENTER DRIVE THRUATM>>>>l lllllllllllllTHIS DRAWING AND THE INFORMATION THEREIN ISTHE PROPERTY OF DESIGN TREE ENGINEERING INC.USE BY THE HOLDER OR DISCLOSURE TO OTHERSWITHOUT THE PERMISSION OF DESIGN TREEENGINEERING INC. IS PROHIBITED. IT CONTAINSPROPRIETARY AND CONFIDENTIAL INFORMATION OFDESIGN TREE ENGINEERING INC. REPRODUCTION OFTHE MATERIAL HEREIN WITHOUT WRITTENERMISSION OF DESIGN TREE ENGINEERING INC.VIOLATES THE COPYRIGHT LAWS OF THE UNITEDSTATES AND WILL SUBJECT THE VIOLATORS TOLEGAL PROSECUTION.COPYRIGHT @ 2023 BY DESIGN TREE ENGINEERINGI HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION,OR REPORT WAS PREPARED BY ME OR UNDER MYDIRECT SUPERVISION AND THAT I AM A DULYLICENSED PROFESSIONAL ENGINEER UNDER THELAWS OF THE STATE OF MINNESOTA.DRAWING NO.DRAWN BY:CHECKED BY:PROJECT NO.:NO.DATE DESCRIPTIONDATE:LICENSE #:PRINTED NAME:F:\DESIGN TREE ENGINEERING\PROJECTS\109 - JAVA PROPERTIES\10923002 - OTSEGO RETAIL - OTSEGO, MN\CONSTRUCTS\CIVIL\10923002-C-BASE-PROPOSED.DWG #### 5/3/2023MICHAEL J. GERBER5665310923002OTSEGO RETAILOTSEGO, MN05/03/2023NPKJEASITE PLAN REVIEW05/03/20231= PROPOSED HYDRANT= PROPOSED CURB STOP= PROPOSED GATE VALVE= PROPOSED SANITARY MANHOLE= PROPOSED CLEANOUT= PROPOSED STORM MANHOLE= PROPOSED CATCH BASIN= PROPOSED CULVERT APRON= PROPOSED WATER LINE= PROPOSED SANITARY LINE= PROPOSED STORM LINEl>0'20' 40'NOTES:1. THE LOCATIONS AND ELEVATIONS OF THE EXISTING UTILITIES SHOWN HEREIN AREAPPROXIMATE. THEY HAVE BEEN PLOTTED FROM AVAILABLE SURVEYS AND/ ORRECORDS. THE CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFYING LOCATION ANDELEVATION TO ENSURE THAT ANY EXISTING UTILITIES (SHOWN OR NOT SHOWN)ARE NOT DAMAGED DURING CONSTRUCTION.2. CONTRACTOR SHALL VERIFY AND COORDINATE BUILDING UTILITY CONNECTIONSIZES, LOCATIONS, AND ELEVATIONS WITH PLUMBING, MECHANICAL, ANDELECTRICAL CONTRACTORS.3. ALL EXCAVATION SHALL BE IN ACCORDANCE WITH THE CURRENT EDITION OF"STANDARD SPECIFICATIONS FOR TRENCH EXCAVATION AND BACKFILL/SURFACERESTORATION" AS PREPARED BY THE CITY ENGINEERS ASSOCIATION OF MINNESOTA.4. ALL WATER PIPING SHALL BE BURIED A MINIMUM OF 8'.5. SEE WATER DETAILS FOR ADDITIONAL INFORMATION.6. A MINIMUM VERTICAL SEPARATION OF 18 INCHES IS REQUIRED AT ALL WATER LINECROSSINGS WITH SANITARY SEWER OR STORM SEWER. THE WATER LINE SHALL NOTHAVE JOINTS OR CONNECTIONS WITHIN 10 FEET OF THE CROSSING. INSULATECROSSINGS WITH STORM SEWER.7. SANITARY SEWER CLEANOUTS SHALL BE PROVIDED WITHIN 5' OF THE BUILDING FORUNIT'S CONNECTION.8. SANITARY SEWER CLEANOUT SPACING SHALL NOT EXCEED 90'.9. SANITARY SEWER SERVICES SHALL HAVE A MINIMUM OF 2.00% GRADE.10. SEE SANITARY SEWER DETAILS FOR ADDITIONAL INFORMATION.11. ALL NONCONDUCTIVE PIPE SHALL BE INSTALLED WITH A LOCATE (TRACER) WIRE PERMINNESOTA RULES, PART 7560.015012. ALL CONSTRUCTION AND MATERIALS SHALL BE IN ACCORDANCE WITH THEMINNESOTA STATE PLUMBING CODE.13. ALL PIPING SHALL BE TESTED IN ACCORDANCE WITH THE MINNESOTA STATEPLUMBING CODE.14. CONTRACTOR SHALL COORDINATE UTILITY INSPECTIONS WITH LOCAL AUTHORITIESHAVING JURISDICTION.15. GOPHER STATE ONE CALL DAMAGE PREVENTION SYSTEM FOR BURIED UTILITIES.1-800-252-1166. CONTRACTOR SHALL HIRE A PRIVATE UTILITY LOCATOR TO ASSISTWITH PRIVATE UTILITY LOCATES.16. UTILITY INFORMATION DENOTED WITH AN ASTERISK (*) IS INFORMATION FROMAVAILABLE RECORD DRAWINGS, FIELD VERIFYUTILITY PLANC401CATCH BASIN-4RIM:865.86INV:862.86CATCH BASIN-3RIM:865.36INV:862.12SUMP:859.1215" RCP APRONINV:862.0015" RCP APRONINV:861.75CATCH BASIN-1RIM:865.59INV:861.99SUMP:858.99CATCH BASIN-2RIM:865.93INV:862.9348 LF - 12" SCH 40 PVC@ 0.50%188 LF - 12" HDPE@ 0.50%24 LF - 15"HDPE @ 0.50%148 LF - 12"HDPE @ 0.50%PROPOSED BUILDINGFFE 867.50357 - LF 6" PVC C900@ 8' MIN. BURY6" GATE VALVE6" WET TAP EXISTING WATERMAIN(FIELD VERIFY LOCATION,ELEVATION, SIZE & MATERIAL)(2) 6" 45° BENDS6" 22.5° BENDEMERGENCYOVERFLOWSWALE=864.75COORDINATE UTILITYCONNECTIONS AT BUILDINDW/ MECHINCAL & PLUMBING6" HYDRANTASSEMBLYCONNECT TO EXISTING 8" SERVICE STUB8"x6" REDUCER6" CLEANOUTINV:856.80*6" CLEANOUT WITHIN5' OF BUILDING6"x6" WYE6" CLEANOUT230 - LF 6" SCH 40PVC @ 2.00% MIN.INSULATE SANITARY SERVICEUNDER INFILTRATION BASIN AREA6"x6" TEE= EXISTING HYDRANT= EXISTING CURB STOP= EXISTING GATE VALVE= EXISTING SANITARY MANHOLE= EXISTING CLEANOUT= EXISTING STORM MANHOLE= EXISTING CATCH BASIN= EXISTING CULVERT APRON= EXISTING WATER LINE= EXISTING SANITARY LINE= EXISTING STORM LINEUTILITY LEGENDlDSTORM MANHOLE-1RIM:865.50INV:861.256" WEIR WALL INV:862.30CONNECT TO EXISTING STORM LINE6"x6" WYE6" CLEANOUT6"x6" WYE6" 45° BEND6" CLEANOUTCOORDINATE UTILITYCONNECTIONS AT BUILDINDW/ MECHINCAL & PLUMBING6" 11.25° BENDBENCHMARK TOP NUT HYDRANTELEV:871.57BENCHMARK INFORMATION:BENCHMARK: TOP NUT HYDRANT LOCATED ON THE WEST SIDE OF PROPERTY.ELEV: 871.57 (NAVD 88)TOP EL:865.00BOTTOM EL:860.50100-YR HWL:864.736"x6" WYE6" CLEANOUT GASGASGASGASGASGASGASGASGASGASGASGASGASUGEUGEUGEUGEUGEUGEl l l l l l l DO NOT ENTER ===============================================DRIVE THRUATM>>>>l lllllllllllllTHIS DRAWING AND THE INFORMATION THEREIN ISTHE PROPERTY OF DESIGN TREE ENGINEERING INC.USE BY THE HOLDER OR DISCLOSURE TO OTHERSWITHOUT THE PERMISSION OF DESIGN TREEENGINEERING INC. IS PROHIBITED. IT CONTAINSPROPRIETARY AND CONFIDENTIAL INFORMATION OFDESIGN TREE ENGINEERING INC. REPRODUCTION OFTHE MATERIAL HEREIN WITHOUT WRITTENERMISSION OF DESIGN TREE ENGINEERING INC.VIOLATES THE COPYRIGHT LAWS OF THE UNITEDSTATES AND WILL SUBJECT THE VIOLATORS TOLEGAL PROSECUTION.COPYRIGHT @ 2023 BY DESIGN TREE ENGINEERINGI HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION,OR REPORT WAS PREPARED BY ME OR UNDER MYDIRECT SUPERVISION AND THAT I AM A DULYLICENSED PROFESSIONAL ENGINEER UNDER THELAWS OF THE STATE OF MINNESOTA.DRAWING NO.DRAWN BY:CHECKED BY:PROJECT NO.:NO.DATE DESCRIPTIONDATE:LICENSE #:PRINTED NAME:F:\DESIGN TREE ENGINEERING\PROJECTS\109 - JAVA PROPERTIES\10923002 - OTSEGO RETAIL - OTSEGO, MN\CONSTRUCTS\CIVIL\10923002-C-BASE-PROPOSED.DWG #### 5/3/2023MICHAEL J. GERBER5665310923002OTSEGO RETAILOTSEGO, MN05/03/2023NPKJEASITE PLAN REVIEW05/03/202310'20' 40'NOTES:1. ALL DISTURBED AREAS SHALL BE FINAL GRADED AND PERMANENTLY STABILIZEDWITH THE SEED MIX IDENTIFIED ON PLANS.2. THE SITE MUST BE STABILIZED PER THE REQUIREMENTS OF THE MPCA, NPDES,MNDOT, AND CITY.3. INLET PROTECTION SHALL BE PROVIDED ON ALL CATCH BASINS AND INLETS DOWNGRADIENT OF CONSTRUCTION ACTIVITY.4. PROVIDE SILT FENCE PERIMETER CONTROL DOWN GRADIENT OF ALL CONSTRUCTIONACTIVITY AND TEMPORARY STOCKPILES.5. TEMPORARY STABILIZED CONSTRUCTION EXITS SHALL BE INSTALLED ANDMAINTAINED THROUGHOUT THE DURATION OF CONSTRUCTION.6. NO OFFSITE VEHICLE TRACKING IS PERMITTED. STREETS SHALL BE CLEANED ANDSWEPT WHENEVER TRACKING OF SEDIMENTS OCCURS AND BEFORE SITES ARE LEFTIDLE FOR WEEKENDS AND HOLIDAYS.7. REFER TO THE SWPPP AND CITY OF OTSEGO EROSION CONTROL REQUIREMENTS FORFURTHER EROSION CONTROL SEQUENCING.8. GOPHER STATE ONE CALL DAMAGE PREVENTION SYSTEM FOR BURIED UTILITIES.1-800-252-1166. CONTRACTOR SHALL HIRE A PRIVATE UTILITY LOCATOR TO ASSISTWITH PRIVATE UTILITY LOCATES. EROSION CONTROL QUANTITIES:STABILIZED CONSTRUCTION EXIT (1 EA)SILT FENCE (1235 LF)MNDOT SEED MIX 25-151 (HYDROSEED OR SOD) (0.50 AC)CLASS III RIPRAP (32 SY) SEE DETAILCATEGORY 10 ROLLED EROSION PREVENTION PRODUCT (975 SY)INLET PROTECTION (8 EA)NOTE: QUANTITIES SHOWN ARE FOR SWPPP PLAN, AND ARE NOT FOR BIDDING PURPOSES.=EROSIONCONTROL PLANC501STABILIZED CONSTRUCTION EXITINLET PROTECTIONINLET PROTECTIONINLET PROTECTIONINLET PROTECTIONSILT FENCESILT FENCESILT FENCEPROPOSED BUILDINGMNDOT SEED MIX 25-151(HYDROSEED)MNDOT SEED MIX 25-151(HYDROSEED)CATEGORY 10 ROLLED ERSOIONPREVENTION PRODUCTCATEGORY 10 ROLLED EROSIONPREVENTION PRODUCTSILT FENCECLASS IIIRIPRAPCONCRETE WASHOUTCLASS III RIPRAPDISTURBANCE ON NEIGHBORS PROPERTYCATEGORY 10 ROLLED EROSIONPREVENTION PRODUCTCURB CUTPROTECTIONINLET PROTECTIONINLET PROTECTIONINLET PROTECTION VARIESVARIABLEWIDTH2% MAX.CROSS SLOPE1/2" EXPANSION JOINTS ATADJACENT WALK OR STRUCTUREMN/DOT 3702CONCRETE SIDEWALKMN/DOT SPEC. 2521,MIX NO. 3F52CONTRACTION JOINTS PERMN/DOT SPEC. 25211/2" EXPANSION JOINTCOMPACTED GRANULAR MATERIAL6"4"CURB AND GUTTERMATCH EXISTING2" SPWEB340B WEAR COURSE OR MATCHTHICKNESS WHICHEVER IS GREATER2" SPNWB330B NON-WEAR COURSE ORMATCH THICKNESS WHICHEVER ISGREATER2357 TACK COAT BETWEEN LIFTSCOMPACTED CLASS 5 AGGREGATE BASE(MATCH EXISTING THICKNESS)MATCH ROAD SLOPESAW CUTEXISTING BITUMINOUSSURFACETYPICAL SIDEWALK DETAILBITUMINOUS STREET REPAIR, CURB & GUTTER INSTALLATION DETAILCURB & GUTTER DETAILSLIGHT DUTY BITUMINOUS PAVEMENT SECTIONCOMPACTED SUBGRADE-NOTIFY ENGINEER PRIOR TO PLACINGAGGREGATE BASE IF ORGANICMATERIAL IS ENCOUNTERED INSUBGRADE8" CLASS 5 AGGREGATE BASE2" NON-WEARING COURSE(SPNWB330B)TACK COAT1-1/2" WEARING COURSE(SPWEA340B)NOTES:1. ALL ORGANIC OR OTHER UNSUITABLE MATERIALSHALL BE REMOVED FROM BENEATH THEROADWAY.SIGN PANELS AS SPECIFIED OR AS SHOWNON THE PLANS OR SIGN LEGENDSTREET SIGNS1. SHALL BE V.I.P. (VISUAL IMPACT PERFORMANCE)REFLECTIVE SHEETING PER MNDOT 3352.2A.2.2. ATTACH TO SIGN POST WITH 38" DRIVE RIVET AND NYLONWASHER3. INSTALL SO BOTTOM OF SIGN PANEL IS 7' FROM FINISHGRADESIGN POSTS1. 1-3/4" SQUARE2. 14 GAUGE WITH PUNCHED HOLES.3. MINIMUM 8 FEET, MAXIMUM 12 FEET LONG. (LENGTHREQUIRED TO BE DETERMINED BY THE SIZE OF THE SIGNPANEL).4. ATTACHED TO ANCHOR SYSTEM WITH 5/16" BY 2-1/2"GALVANIZED BOLT WITH WASHER AND NUT.5. SIGN POSTS TO BE LOCATED WITHIN CONCRETE ASDIRECTED BY ENGINEER.ANCHOR SYSTEM IF IN CONCRETE1. 2" SQUARE2. 12 GAUGE.3. 3 FEET LONG.4. ANCHOR SLEEVEa. 2-1/4" SQUARE.b. 12 GAUGE.c. 18 INCHES LONG.5. ANCHOR POST AND ANCHOR SLEEVE TO BE INSTALLEDPRIOR TO PLACING CONCRETE MEDIAN WITH TWO BOLTHOLES COMPLETELY EXPOSED AND ACCESSIBLE ABOVEMEDIAN GRADE.NOTES:1. ALL POSTS, HARDWARE, AND ANCHOR SYSTEMSSHALL BE TELESPAR SQUARE TUBE SYSTEMS ASDISTRIBUTED BY UNISTRUT CORPORATION, OREQUAL.TYPICAL SIGN INSTALLATION DETAILCONCRETE OR EXISTING GROUND2'-0"8'-0"8'-0"SEE PLANS45°SIGNAGE:INSTALL ON POST WITHIN 2'MIN AND 8' MAX FROM HEADOF STALLNO PARKING STRIPING:PAINT ACCESS AISLE AND AREABEHIND PARKING SPACE ADJACENT TOBUILDING ENTRY SIDEWALK WITHANGLED STRIPING AS INDICATED;VERIFY REQUIREMENTS INCLUDINGFOREGROUND/BACKGROUND COLORSWITH LOCAL AUTHORITYUNIVERSAL DISABLED SYMBOL:VERIFY REQUIREMENTSINCLUDING COLORS WITH LOCALAUTHORITYACCESSIBLE PARKING LAYOUTFILTER BLANKETRIPRAP1.5'RIPRAP SECTIONNOTES:1. FILTER BLANKET REQUIRED UNDER RIPRAP OR 2LAYERS OF 500X "MIRAFI" FABRIC OR EQUAL2. RIPRAP SHALL EXTEND TO BOTTOM OF SLOPE OR ASSHOWN ON PLANS.3. CURB TAPERS SHALL BE 3 FT.*CLASS III RIPRAP, D50= 9 IN. (MNDOT SPEC 3601)TOP OF CURBEXPANSIONJOINTEXPANSIONJOINTDESIGN GUTTERLINE GRADESECTION A-AAA4'-0"FLOWFLOWEXPANSIONJOINTISOMETRIC2 - #4 REBARS2 - #4 REBARSEXPANSIONJOINT4'-0" CURB CUT 41EXTEND RIPRAP TOTOP OF CURB TAPEREXTEND RIPRAP TOTOP OF CURB TAPER 41TAPER OUT RIPRAPCURB CUT W/ RIPRAP DETAIL516"13-1/2"13SLOPE" PER FT1/2" R6"3" R1/2" R7"8"VARIESSEE PLAN1/2" R1/2" RVARIESSEE PLAN8"9-1/2"1-1/2"7"4"31SLOPE" PER FT1/2" R1/2" R7"VARIESSEE PLAN12"TIPPED GUTTERTIPPED GUTTER11 3/4"SLOPE" PER FTTIPPED GUTTERB6 CURBB6 CURB ATDRIVEWAYD4 CURBCOMPACTED SUBGRADE-NOTIFY ENGINEER PRIOR TOPLACING AGGREGATE BASE IFORGANIC MATERIAL IS ENCOUNTEREDIN SUBGRADE12" CLASS 5 AGGREGATE BASE2-1/2" NON-WEARINGCOURSE (SPNWB330B)TACK COAT2" WEARING COURSE(SPWEB340B)HEAVY DUTY BITUMINOUS PAVEMENT SECTIONNOTES:1. ALL ORGANIC OR OTHER UNSUITABLE MATERIALSHALL BE REMOVED FROM BENEATH THEROADWAY.THIS DRAWING AND THE INFORMATION THEREIN ISTHE PROPERTY OF DESIGN TREE ENGINEERING INC.USE BY THE HOLDER OR DISCLOSURE TO OTHERSWITHOUT THE PERMISSION OF DESIGN TREEENGINEERING INC. IS PROHIBITED. IT CONTAINSPROPRIETARY AND CONFIDENTIAL INFORMATION OFDESIGN TREE ENGINEERING INC. REPRODUCTION OFTHE MATERIAL HEREIN WITHOUT WRITTENERMISSION OF DESIGN TREE ENGINEERING INC.VIOLATES THE COPYRIGHT LAWS OF THE UNITEDSTATES AND WILL SUBJECT THE VIOLATORS TOLEGAL PROSECUTION.COPYRIGHT @ 2023 BY DESIGN TREE ENGINEERINGI HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION,OR REPORT WAS PREPARED BY ME OR UNDER MYDIRECT SUPERVISION AND THAT I AM A DULYLICENSED PROFESSIONAL ENGINEER UNDER THELAWS OF THE STATE OF MINNESOTA.DRAWING NO.DRAWN BY:CHECKED BY:PROJECT NO.:NO.DATE DESCRIPTIONDATE:LICENSE #:PRINTED NAME:F:\DESIGN TREE ENGINEERING\PROJECTS\109 - JAVA PROPERTIES\10923002 - OTSEGO RETAIL - OTSEGO, MN\CONSTRUCTS\CIVIL\10923002-C-DETAILS.DWG #### 5/3/2023MICHAEL J. GERBER5665310923002OTSEGO RETAILOTSEGO, MN05/03/2023NPKJEASITE PLAN REVIEW05/03/20231CIVIL DETAILSC601 MAXIMUM SPACING 90'CASTING REQUIRED ON CLEANOUT INPAVEMENT OR UNDEVELOPED AREA. CASTINGSHALL BE NEENAH R-1970 SERIES PER TABLEBELOW, OR ACCEPTED EQUAL.PVC THREADED PLUG3" BELOW CASTINGRISERLONG SWEEP BENDCOMBINATION WYEEND OF LINECLEANOUTIN LINECLEANOUTSEWER CLEANOUT CASTING DETAILNOTES:1 FOUNDATION MATERIAL - NATURAL OR CRUSHED 1 1/2" ROCK ON ALLWYES AND SERVICE RISER CLEANOUTS.2 IN WET OR UNSUITABLE MATERIAL, BED ENTIRE SERVICE IN 1-1/2" NATURAL OR CRUSHED ROCK.1FOUNDATIONMATERIAL(SEE NOTES)CO ØCASTING #4"R-19706" R-1973-A8" R-19764"(B)211. 0-12" DEPTH TRENCHSLOPE DEPENDS ON SOIL TYPE.2. 12-20' DEPTH TRENCHSLOPE DEPENDS ON SOIL TYPE.3. 0-20' DEPTH TRENCHSUPPORT OR SHIELD SYSTEM CAN BE UTILIZED TO REDUCETRENCH WIDTH.4. 20' OR GREATER DEPTH TRENCHEXCAVATION MUST BE DESIGNED BY A LICENSED PROFESSIONALENGINEER. CONTRACTOR SHALL HAVE THE DESIGN COMPLETEDAT HIS EXPENSE AND PROVIDE A COPY TO THE OWNER AND THEPROJECT ENGINEER.(A) MINIMUM TRENCH WIDTH SHALL ALLOW FOR SIX INCHES OFCLEARANCE ON EACH SIDE OF PIPE JOINT HUB.(B) THE TRENCH MAY BE OVEREXCAVATED A MIN. OF 6" &BACKFILLED WITH COMPACTED GRANULAR MATERIALS WHENROCK, INCOMPRESSIBLE MATERIALS, OR UNSTABLE SOILS ARE ENCOUNTERED.(C) COMPACTED GRANULAR ENCASEMENT MATERIAL SHALL COVERTHE TOP OF PIPE BY AT LEAST 12" AND EXTEND THE FULL WIDTH OFTHE TRENCH OR AT LEAST 2 1/2" TIMES THE PIPE DIAMETER ONEACH SIDE OF THE PIPE.(D) BEDDING AND HAUNCHING MATERIAL SHALL BE PLACED ANDCOMPACTED TO PROVIDE FULL SUPPORT FOR THE LENGTH OF THEPIPE.NOTES:1. THIS DETAIL APPLIES TO SANITARY SEWER, STORM SEWER,WATERMAIN, AND ALL SERVICE PIPES.PIPE WIDTH(A)COMPACTED GRANULARENCASEMENT MATERIALGRANULAR BEDDING MATERIAL12"(C)3.5' MAX.1/2 PIPE DIA.(D)PIPETYPICAL PIPE BEDDING DETAIL2' 41 41BBAASLOPE VARIESRIPRAPFILTER BLANKETFILTER BLANKETRIPRAPD2'2'RIPRAP5 X DIAMETEROR SPANGEOTEXTILE FILTER BLANKETSHALL EXTEND UNDER APRON1'1.5'1'SEC. B-BPLANSEC. A-ANOTES:1. FILTER BLANKET REQUIRED UNDERRIPRAP OR 2 LAYERS OF 500X "MIRAFI"FABRIC OR EQUAL*CLASS III RIPRAP, D50= 9 IN. (MNDOT SPEC3601)CLASS III RIPRAP AT OUTLETSCLASS III RIPRAP REQUIREMENTS12" 4.4 CUBIC YARDS15" 4.8 CUBIC YARDS18" 6.4 CUBIC YARDS21" 7.1 CUBIC YARDS24" 9.2 CUBIC YARDS27" 9.9 CUBIC YARDS30" 12.3 CUBIC YARDS36" 15.8 CUBIC YARDS42" 18.7 CUBIC YARDS48" 22.2 CUBIC YARDS(ONE CUBIC YARD IS APPROX. 2,800LBS)CASTING ASSEMBLY TABLESTRUCTURE TYPELOCATION FRAMECOVER/GRATECURB BOXSTMH PAVEMENT 700-4 716 STAMPED "STORM SEWER"STMHGREENSPACE700-4 716 STAMPED "STORM SEWER"CB/CBMHB-STYLE CURB LINE802A816 OR 814A (BIKE FRIENDLY)823ACB/CBMHD-STYLE CURB LINE805816 OR 814A (BIKE FRIENDLY)CB/CBMHPAVEMENT 700-4 720CB/CBMHGREENSPACE700-4 731CB/CBMHVALLEY GUTTER805 814ACB/CBMHADA SEE ABOVE 817THIS DRAWING AND THE INFORMATION THEREIN ISTHE PROPERTY OF DESIGN TREE ENGINEERING INC.USE BY THE HOLDER OR DISCLOSURE TO OTHERSWITHOUT THE PERMISSION OF DESIGN TREEENGINEERING INC. IS PROHIBITED. IT CONTAINSPROPRIETARY AND CONFIDENTIAL INFORMATION OFDESIGN TREE ENGINEERING INC. REPRODUCTION OFTHE MATERIAL HEREIN WITHOUT WRITTENERMISSION OF DESIGN TREE ENGINEERING INC.VIOLATES THE COPYRIGHT LAWS OF THE UNITEDSTATES AND WILL SUBJECT THE VIOLATORS TOLEGAL PROSECUTION.COPYRIGHT @ 2023 BY DESIGN TREE ENGINEERINGI HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION,OR REPORT WAS PREPARED BY ME OR UNDER MYDIRECT SUPERVISION AND THAT I AM A DULYLICENSED PROFESSIONAL ENGINEER UNDER THELAWS OF THE STATE OF MINNESOTA.DRAWING NO.DRAWN BY:CHECKED BY:PROJECT NO.:NO.DATE DESCRIPTIONDATE:LICENSE #:PRINTED NAME:F:\DESIGN TREE ENGINEERING\PROJECTS\109 - JAVA PROPERTIES\10923002 - OTSEGO RETAIL - OTSEGO, MN\CONSTRUCTS\CIVIL\10923002-C-DETAILS.DWG #### 5/3/2023MICHAEL J. GERBER5665310923002OTSEGO RETAILOTSEGO, MN05/03/2023NPKJEASITE PLAN REVIEW05/03/20231CIVIL DETAILSC602 THIS DRAWING AND THE INFORMATION THEREIN ISTHE PROPERTY OF DESIGN TREE ENGINEERING INC.USE BY THE HOLDER OR DISCLOSURE TO OTHERSWITHOUT THE PERMISSION OF DESIGN TREEENGINEERING INC. IS PROHIBITED. IT CONTAINSPROPRIETARY AND CONFIDENTIAL INFORMATION OFDESIGN TREE ENGINEERING INC. REPRODUCTION OFTHE MATERIAL HEREIN WITHOUT WRITTENERMISSION OF DESIGN TREE ENGINEERING INC.VIOLATES THE COPYRIGHT LAWS OF THE UNITEDSTATES AND WILL SUBJECT THE VIOLATORS TOLEGAL PROSECUTION.COPYRIGHT @ 2023 BY DESIGN TREE ENGINEERINGI HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION,OR REPORT WAS PREPARED BY ME OR UNDER MYDIRECT SUPERVISION AND THAT I AM A DULYLICENSED PROFESSIONAL ENGINEER UNDER THELAWS OF THE STATE OF MINNESOTA.DRAWING NO.DRAWN BY:CHECKED BY:PROJECT NO.:NO.DATE DESCRIPTIONDATE:LICENSE #:PRINTED NAME:F:\DESIGN TREE ENGINEERING\PROJECTS\109 - JAVA PROPERTIES\10923002 - OTSEGO RETAIL - OTSEGO, MN\CONSTRUCTS\CIVIL\10923002-C-DETAILS.DWG #### 5/3/2023MICHAEL J. GERBER5665310923002OTSEGO RETAILOTSEGO, MN05/03/2023NPKJEASITE PLAN REVIEW05/03/20231CIVIL DETAILSC603 AAPLANSECTION A-AEXCAVATED WASHOUT STRUCTUREPLANSECTION B-BBBSTAPLE DETAILWASHOUT STRUCTURE WITH STRAW BALESNOTE:CAN BE TWO STACKED BALES OR PARTIALLY EXCAVATED TO REACH 3 FT DEPTHBBPLANSECTION B-BWASHOUT STRUCTURE WITH WOOD PLANKSCONSTRUCTION SPECIFICATIONS1. LOCATE WASHOUT STRUCTURE A MINIMUM OF 50 FEET AWAY FROM OPEN CHANNELS, STORM DRAIN INLETS, SENSITIVE AREAS,WETLANDS, BUFFERS AND WATER COURSES AND AWAY FROM CONSTRUCTION TRAFFIC.2. SIZE WASHOUT STRUCTURE FOR VOLUME NECESSARY TO CONTAIN WASH WATER AND SOLIDS AND MAINTAIN AT LEAST 4 INCHES OFFREEBOARD. TYPICAL DIMENSIONS ARE 10 FEET X 10 FEET X 3 FEET DEEP.3. PREPARE SOIL BASE FREE OF ROCKS OR OTHER DEBRIS THAT MAY CAUSE TEARS OR HOLES IN THE LINER. FOR LINER, USE 10 MIL ORTHICKER UV RESISTANT, IMPERMEABLE SHEETING, FREE OF HOLES AND TEARS OR OTHER DEFECTS THAT COMPROMISEIMPERMEABILITY OF THE MATERIAL.4. PROVIDE A SIGN FOR THE WASHOUT IN CLOSE PROXIMITY TO THE FACILITY.5. KEEP CONCRETE WASHOUT STRUCTURE WATER TIGHT. REPLACE IMPERMEABLE LINER IF DAMAGED (E.G., RIPPED OR PUNCTURED).EMPTY OR REPLACE WASHOUT STRUCTURE THAT IS 75 PERCENT FULL, AND DISPOSE OF ACCUMULATED MATERIAL PROPERLY. DONOT REUSE PLASTIC LINER. WET-VACUUM STORED LIQUIDS THAT HAVE NOT EVAPORATED AND DISPOSE OF IN AN APPROVEDMANNER. PRIOR TO FORECASTED RAINSTORMS, REMOVE LIQUIDS OR COVER STRUCTURE TO PREVENT OVERFLOWS. REMOVEHARDENED SOLIDS, WHOLE OR BROKEN UP, FOR DISPOSAL OR RECYCLING. MAINTAIN RUNOFF DIVERSION AROUND EXCAVATEDWASHOUT STRUCTURE UNTIL STRUCTURE IS REMOVED.WOOD FRAMEIMPERMEABLESHEETINGIMPERMEABLESHEETINGWOOD FRAME SECURELYFASTENED AROUNDENTIRE PERIMETER WITHTWO STAKESSTAKE(TYP.)STAKE(TYP.)IMPERMEABLESHEETINGSTRAW BALE(TYP.)STAPLES(2 PER BALE)BINDING WIRESTRAW BALE(TYP.)IMPERMEABLESHEETING1/8" DIA.STEEL WIREWOOD ORMETAL STAKES(2 PER BALE)SANDBAGIMPERMEABLE SHEETINGIMPERMEABLESHEETING1:1 OR FLATTERSIDE SLOPESANDBAGOR EQUIVALENT10' TYP.10' TYP.3' TYP.10' TYP.2"4"3' TYP.10' TYP.10' TYP.3' TYP.10' TYP.10' TYP.CONCRETE WASHOUT DETAILSTHIS DRAWING AND THE INFORMATION THEREIN ISTHE PROPERTY OF DESIGN TREE ENGINEERING INC.USE BY THE HOLDER OR DISCLOSURE TO OTHERSWITHOUT THE PERMISSION OF DESIGN TREEENGINEERING INC. IS PROHIBITED. IT CONTAINSPROPRIETARY AND CONFIDENTIAL INFORMATION OFDESIGN TREE ENGINEERING INC. REPRODUCTION OFTHE MATERIAL HEREIN WITHOUT WRITTENERMISSION OF DESIGN TREE ENGINEERING INC.VIOLATES THE COPYRIGHT LAWS OF THE UNITEDSTATES AND WILL SUBJECT THE VIOLATORS TOLEGAL PROSECUTION.COPYRIGHT @ 2023 BY DESIGN TREE ENGINEERINGI HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION,OR REPORT WAS PREPARED BY ME OR UNDER MYDIRECT SUPERVISION AND THAT I AM A DULYLICENSED PROFESSIONAL ENGINEER UNDER THELAWS OF THE STATE OF MINNESOTA.DRAWING NO.DRAWN BY:CHECKED BY:PROJECT NO.:NO.DATE DESCRIPTIONDATE:LICENSE #:PRINTED NAME:F:\DESIGN TREE ENGINEERING\PROJECTS\109 - JAVA PROPERTIES\10923002 - OTSEGO RETAIL - OTSEGO, MN\CONSTRUCTS\CIVIL\10923002-C-DETAILS.DWG #### 5/3/2023MICHAEL J. GERBER5665310923002OTSEGO RETAILOTSEGO, MN05/03/2023NPKJEASITE PLAN REVIEW05/03/20231EROSIONCONTROL DETAILSC604 THIS DRAWING AND THE INFORMATION THEREIN ISTHE PROPERTY OF DESIGN TREE ENGINEERING INC.USE BY THE HOLDER OR DISCLOSURE TO OTHERSWITHOUT THE PERMISSION OF DESIGN TREEENGINEERING INC. IS PROHIBITED. IT CONTAINSPROPRIETARY AND CONFIDENTIAL INFORMATION OFDESIGN TREE ENGINEERING INC. REPRODUCTION OFTHE MATERIAL HEREIN WITHOUT WRITTENERMISSION OF DESIGN TREE ENGINEERING INC.VIOLATES THE COPYRIGHT LAWS OF THE UNITEDSTATES AND WILL SUBJECT THE VIOLATORS TOLEGAL PROSECUTION.COPYRIGHT @ 2023 BY DESIGN TREE ENGINEERINGI HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION,OR REPORT WAS PREPARED BY ME OR UNDER MYDIRECT SUPERVISION AND THAT I AM A DULYLICENSED PROFESSIONAL ENGINEER UNDER THELAWS OF THE STATE OF MINNESOTA.DRAWING NO.DRAWN BY:CHECKED BY:PROJECT NO.:NO.DATE DESCRIPTIONDATE:LICENSE #:PRINTED NAME:F:\DESIGN TREE ENGINEERING\PROJECTS\109 - JAVA PROPERTIES\10923002 - OTSEGO RETAIL - OTSEGO, MN\CONSTRUCTS\CIVIL\10923002-C-DETAILS.DWG #### 5/3/2023MICHAEL J. GERBER5665310923002OTSEGO RETAILOTSEGO, MN05/03/2023NPKJEASITE PLAN REVIEW05/03/20231SWPPP NARRATIVEC605Project Description:The work on the project includes constructing a new retail building, parking areas, and drive thru lanes. The project includes the construction of a new building, concrete sidewalks, bituminous parking lot, sanitary service extension,water service extension, and the installation of storm sewer piping and structures that outlet to an existing infiltration basin. The project is located in the Parkview Retail development in Otsego, MN. The majority of the underlying soilson the property are in Hydrologic Soil Group "A" and have high infiltration rates when thoroughly wet.Receiving Waters:Existing stormwater runoff from the development drains to the east and into the city's storm sewer system located within the Parrish Ave right-of-way. Proposed stormwater runoff will be direceted to a newly constructed storm sewersystem that discharges into the existing infiltration basin that was constructed to serve the development. The existing infiltration basin maintains the existing drainage pattern by discharging into the City's storm sewer located in theParrish Ave right-of-way via an existing storm sewer connection.Responsible Parties:The Owner and the Contractor are responsible co-permittees for the implementation of the SWPPP. The Contractor and Owner shall apply for the NPDES/SDS Construction Permit within 24 hours of award of Contract. The completeapplication must be submitted prior to start of construction activity. The Contractor is responsible for installation, inspection, maintenance, and repair of all erosion prevention and sediment control BMPs before, during, and after activeconstruction. The Contractor shall amend the SWPPP before beginning construction to include the chain of responsibility of all operators on the site, or if not known, the title or position of the responsible party. The Contractor isresponsible for identifying a trained person (as specified in the NPDES/SDS Contruction Permit) knowledgeable and experienced in the application of erosion prevention and sediment control BMPs who will oversee the implementation ofthe SWPPP before and during construction until the construction project is complete, the entire site has undergone final stabilization, and a Notice of Termination(NOT)/Permit Modification form has been submitted to the MPCA. TheOwner must identify who will be responsible for the long-term operation and maintenance of all permanent stormwater management systems. The Contractor is liable until final stabilization of all disturbed areas is achieved and theNotice of Termination (NOT)/Permit Modification form is submitted to the MPCA (as specified in the NPDES/SDS Construction Permit). Once the identity of Responsible Parties is known, the SWPPP must be amended to include thisinformation in the area below.Project Contacts:Project EngineerOwnerContractorMichael Gerber Java Companies TBDDesign Tree Engineering & Land Surveying 879 Scheffer Ave3339 W. St. Germain, Suite 250 St. Paul, MN 55102St. Cloud, MN 56301(320) 227-0203mjg@dte-ls.comSWPPP Amendments:The Owner or Contractor must amend the SWPPP as necessary to include additional requirements, such as additional or modified BMPs that are designed to correct problems identified or address situations whenever:1. There is a change in design, construction, operation, maintenance, weather or seasonal conditions that has a significant effect on the discharge of pollutants to surface water or underground waters.2. Inspections or investigations by site owner or operators, USEPA or MPCA officials indicate the SWPPP is not effective in eliminating or significantly minimizing the discharge of pollutants to surface waters or undergroundwaters or that the discharges are causing water quality standard exceedances.3. The SWPPP is not achieving the general objectives of minimizing pollutants in stormwater discharges associated with construction activity, or the SWPPP is not consistent with the terms and conditions of this permit.4. At any time after the permit coverage is effective, the MPCA deems necessary.Construction Notes:Construction shall be governed by the MnDOT Standard Specifications for Construction, latest edition, City of Otsego's Specifications, special provisions, amendments, and the project specifications and details. Permits and maps relatingto this project's SWPPP can be found in the Project Documents. The Contractor shall keep inspection and maintenance logs and NPDES/SDS Construction Permit on-site at all times during active construction. Please refer to the plansand specifications for additional SWPPP information.Soil Compaction should be minimized and topsoil should be preserved whenever and wherever possible during constructionAll soil stockpiling shall include sediment control devices and shall be placed in areas away from surface waters or natural buffers.Special Waters, Impaired Waters, & TMDL Implementation Plans:The site is located within 1 mile of a special water or an impaired water as identified by the MPCA. The site is located within 1 mile of the Mississippi River. This river segment is considered a Scenic or Recreational River Segment andRestricted Water as described in the NPDES/SDS permit for construction. Projects discharging to these waters must incorporate the additional best management practices (BMPs) found in items 23.9, 23.10 and 23.11 of the permit if theproject has a discharge point on the project within 1 mile (aerial radius measurement) of, and flows to the Scenic or Recreational River segment.This river segment also has an EPA-approved impairment for: Fecal coliform; Mercury in fish tissue; PCBs in fish tissue. These impairments are considered non-construction related and do not require any additional best managementpractices (BMPs) or plan review for compliance with the NPDES/SDS construction permit.All disturbed areas not actively being worked must be stabilized within 7 days. The Owner is responsible for the long term maintenance of all stormwater treatment facilities and private storm sewer systems. Inlet protection, silt fence,final stabilization, and other BMPs must be implemented prior to allowing any water runoff from being discharged off-site.Calculations:Disturbed Area 1.1 ACPre-Construction Impervious Area 0.00 ACPost-Construction Impervious Area 0.73 ACNet Increase in Impervious Area 0.73 ACSequence of Construction:The Contractor shall verify that all applicable permits have been obtained and the NPDES/SDS Construction Permit has been submitted to the MPCA prior to the start of construction.1. The Contractor must plan for and implement appropriate construction phasing, vegetated buffer strips, horizontal slope grading, and other construction practices that minimize erosion. The location of areas not to bedisturbed are shown on the plans.2. The Contractor shall be responsible for full implementation and maintenance required by the SWPPP untill the Notice of Termination (NOT) is approved by the MPCA.3. The Contractor shall construct erosion and sediment control BMPs in the following construction sequence:a. Install rock construction entrances where indicated in the plans.b. Install silt fence and inlet protection where indicated in the plans.c. Install silt fence around existing infiltration basin.d. Locate portable toilets on flat surfaces away from drainage paths. Position portable toilets so they are secure and will not tip or be knocked over.e. Construct concrete washout area and provide signage.f. Establish waste control areas.g. Rough grade site.h. Leave disturbed area of site in a roughened condition to limit erosion. Temporarily stabilize areas that will be inactive for a period of 7 days.i. Install storm drainage system and place inlet protection as each inlet is installed. Energy dissipation devices shall be installed and functional within 24 hours of connecting pip outlets to surface waters.j. Protect and repair BMPs, as necessary.k. Perform street sweeping as needed.l. Temporarily stabilize areas not actively being worked.m. Site construction (Utilities, paving, buildings, etc...)n. Final grading.o. Final stabilization (seeding, planting). Stabilized soil with the seed mix indicated on the plans.p. Construct stormwater infiltration basins and bioretention basins only when contributing drainage area has been constructed and fully stabilized.q. Remove erosion control devices upon site establishment in accordance with the NPDES/SDS Notice of Termination (NOT) requirements.Final Stabilization:Final stabilization is not met until all of the following are completed:1. Stabilization by uniform perennial vegetative cover (70% density of it's expected final growth). The seed mix indicated on the plan or sod shall be used for final stabilization.2. Permanent stormwater management system is constructed, meets all requirements, and is operational.3. Drainage ditches are fully stabilized.4. All temporary synthetic and structural BMPs are removed.5. Sediment from conveyance systems and sedimentation basins are cleaned out (returned to design capacity).6. Notice of Termination (NOT) is submitted to the MPCA.Erosion Control Maintenance and Inspection: BMP inspection and maintenance Responsible Party: 1. Inspect erosion control devices and provide routine maintenance as follows:a. Inspect erosion control a minimum of once per week and within 24 hours of a rainfall event greater than 0.5" in 24 hours.b. Records of each inspection and maintenance activity shall include:xDate and time of inspections.xName of person(s) conducting inspection.xAccurate findings of inspection, including the specific location where corrective actions are needed.xCorrective actions taken (including dates, times, and party completing maintenance activities).xDate and amount of all rainfall events greater than 0.5" in 24 hours, and the amount of rainfall for each event. Rainfall amounts must be obtained by either a properly maintained rain gauge installed onsite, aweather station that is within 1 mile of the site, or a weather reporting system that provides site specific rainfall data from radar summaries.xIf discharge is observed during the inspection, the inspector must record and should photograph and describe the location of the discharge (i.e. color, odor, settled or suspended solids, oil sheen, and other obviousindicators of pollutants).xDocumentation of amendments to the SWPPP proposed as a result of the inspection as required by the NPDES/SDS Construction Permit.c. Inspections may be suspended where construction activity has been suspended due to frozen ground conditions. Inspections must resume within 24 hours of runoff occurring, or upon resuming construction, whichevercomes first.2. Provide maintenance for all devices as follows:a. Silt fences and erosion control devices at storm sewer inlets shall be inspected for depth of sediment, tears, to see if fabric is securely attached to support posts or structure, and to see that posts and devices are securelyin place.b. Silt fence, inlet protection at storm sewer inlets, and other erosion control devices shall be cleaned when sediment reaches 1/3 of the height of the erosion control device.c. Rock construction entrances shall be inspected for clogging of rock. Rock that has become clogged with sediment shall be removed and replaced with clean rock.d. Repairs or replacement of all erosion control devices shall occur within 24 hours of discovery.e. Temporary sediment basins shall be cleaned when sediment reaches 1/2 of the outlet's height or 1/2 of the basins storage volume. The basin shall be drained and sediment removed within 72 hours.f. Temporary diversion berms shall be inspected and any breaches shall be promptly repaired.g. Tracked sediment from construction vehicles onto public streets and paved areas (including paved areas on the construction site) shall be removed within 24 hours of discovery.h. The bottom and side slopes of the proposed stormwater treatment basins shall be stabilized within 200 feet of the property lines or point of discharge to any surface water, including curb and gutter, pavement, stormsewer, swales, or other similar stormwater conveyance devices.i. Removal of all deltas and sediment deposited in surface waters and re-stabilization of exposed soils shall be accomplished within 7 days of discovery.Pollution Prevention Management Measures:1. Storage, handling, and disposal of construction products, materials and wastes:a. The Contractor shall comply with the following to minimize the exposure to stormwater (any of the products, materials, or wastes/products which are either not a source of contamination to strormwater or are designed tobe exposed to stormwater are not held to this requirement):xBuilding products that have the potential to leach pollutants must be under cover (e.g. plastic sheeting or temporary roofs) to prevent the discharge of pollutants or be protected by a similarly effective meansdesigned to prevent contact with stormwater.xPesticides, herbicides, insecticides, fertilizers, treatment chemicals, and landscape materials must be under cover (e.g. plastic sheeting or temporary roofs) to prevent the discharge of pollutants or protected bysimilarly effective means designed to prevent contact with stormwater.xHazardous materials, toxic wastes (including oil, diesel fuel, gasoline., hydraulic fluids, paint solvents, petroleum-based products, wood preservatives, additives, curing compounds, and acids), must be properly storedin sealed containers to prevent spills, leaks, or other discharge.xRestricted access storage areas must be provided to prevent vandalism. Storage and disposal of hazardous waste or hazardous materials must be in compliance with Minn. R. ch. 7045 including secondarycontainment as applicable.xSolid wastes must be stored, collected, and disposed of properly in compliance with Minn. R. ch. 7035.xPortable toilets must be positioned so that they are secure and will not be tipped or knocked over. Sanitary waste must be disposed of properly in accordance with Minn. R. ch. 7041.2. Fueling and maintenance of equipment or vehicles; spill prevention and response:a. The Contractor shall take reasonable steps to prevent the discharge of spilled or leaked chemicals, including fuel, from any areas where chemicals or fuel will be loaded or unloaded including the use of drip pans orabsorbents unless infeasible.b. The Contractor must conduct fueling in a contained area unless infeasible.c. The Contractor must ensure adequate supplies are available at all times to clean up discharged materials and that an appropriate disposal method is available for recovered spilled materials.d. The Contractor must report and clean up spills immediately as required by Minn. Stat. 115.061, using dry clean up measures where possible.3. Vehicle and equipment washing:a. If the Contractor washes the exterior of vehicles or equipment on the project site, washing must be limited to a defined area of the site.b. Runoff from the washing area must be contained in a sediment basin or other similarly effective controls and waste from the washing activity must be properly disposed of.4. The Contractor must properly use and store soaps, detergents, and solvents.5. No engine degreasing is allowed on site.6. Concrete and other washout waste:a. The Contractor must provide effective containment for all liquid and solid wastes generated by washout operations (concrete, stucco, paint, form release oils, curing compounds, and other construction materials) related tothe construction activity.b. The liquid and solid waste must not contact the ground, and the containments must be designed so that it does not result in runoff from the washout operations or areas.c. Liquid and solid wastes must be disposed of properly and in compliance with MPCA rules.d. A sign must be installed adjacent to each washout facility that requires site personnel to utilize the proper facilities for disposal of concrete and other washout wastes.Dewatering and Basin Draining:Dewatering or basin draining that may have turbid or sediment laden discharge water must be discharged to a temporary or permanent sedimentation basin on the project site whenever possible. Discharge from the temporary orpermanent sedimentation basin must be visually checked to ensure adequate treatment is obtained in the basin and nuisance conditions, impacts to wetlands, and erosion in receiving channels or on down gradient properties will notresult from the discharge. Adequate sedimentation control measures are required for discharge water that contains suspended solids.If using using filters with backwash water, either haul the backwash water away for disposal and return the backwash water to the beginning of the treatment process, or incorporate the backwash water into the site in a manner thatdoes not cause erosion.Timing of BMP Installation:The erosion and sediment control BMPs shall be installed as necessary to minimize erosion from disturbed surfaces and capture sediment on site and shall meet the NPDES/SDS Construction Permit part VII requirements. Perimetercontrols shall be placed prior to the start of any construction. All disturbed areas not actively being worked must be stabilized within 7 days.Storm Water Pollution Prevention Plan:The Permitees must implement the entire SWPPP and the requirement of the NPDES/SDS Construction Permit. The BMPs identified in the SWPPP and in the permit must be selected, installed, and maintained in an appropriate andfunctional manner that is in accordance with manufacturer specifications and accepted engineering practices.Temporary Sediment Basins:Project is not required to provide temporary sediment basin for construction.Future Operation and Maintenance (O&M):The Owner or its maintenance staff shall be responsible for performing future operations and maintenance of the permanent stormwater management systems on the property.CONTACTSAGENCY NAME PHONE NUMBERWright CountyWright County Soil & WaterConservation District(763) 682-1970DNR WatersJanell Miersch(218) 739-7576 ext. 232ACOESt. Paul Office(651) 290-5375State Duty OfficerMPCA(800) 422-0798SWPPP DesignerMichael Geber, PE(320) 227-0203Erosion Control ReviewMichael Gerber, PE(320) 227-0203Erosion Control SupervisorTBDLOCATION OF SWPPP REQUIREMENTSDESCRIPTION TITLE SHEET # OR SPECIFICATION SECTIONReceiving Surface Water City of Otsego Storm Sewer C101, C301Final Stabilization Erosion Control PlanC501Drainage Plans Site Grading & Utility PlanC301-401Drainage DetailsDetailsC601-603Erosion Control Sheets Erosion Control PlanC501Erosion Control Details DetailsC604Erosion & Sediment Control QuantitiesErosion Control PlanC501Existing & Proposed Drainage Maps Final Stormwater Management Plan Project Manual THIS DRAWING AND THE INFORMATION THEREIN ISTHE PROPERTY OF DESIGN TREE ENGINEERING INC.USE BY THE HOLDER OR DISCLOSURE TO OTHERSWITHOUT THE PERMISSION OF DESIGN TREEENGINEERING INC. IS PROHIBITED. IT CONTAINSPROPRIETARY AND CONFIDENTIAL INFORMATION OFDESIGN TREE ENGINEERING INC. REPRODUCTION OFTHE MATERIAL HEREIN WITHOUT WRITTENERMISSION OF DESIGN TREE ENGINEERING INC.VIOLATES THE COPYRIGHT LAWS OF THE UNITEDSTATES AND WILL SUBJECT THE VIOLATORS TOLEGAL PROSECUTION.COPYRIGHT @ 2023 BY DESIGN TREE ENGINEERINGI HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION,OR REPORT WAS PREPARED BY ME OR UNDER MYDIRECT SUPERVISION AND THAT I AM A DULYLICENSED PROFESSIONAL ENGINEER UNDER THELAWS OF THE STATE OF MINNESOTA.DRAWING NO.DRAWN BY:CHECKED BY:PROJECT NO.:NO.DATE DESCRIPTIONDATE:LICENSE #:PRINTED NAME:F:\DESIGN TREE ENGINEERING\PROJECTS\109 - JAVA PROPERTIES\10923002 - OTSEGO RETAIL - OTSEGO, MN\CONSTRUCTS\CIVIL\10923002-C-DETAILS.DWG #### 5/3/2023MICHAEL J. GERBER5665310923002OTSEGO RETAILOTSEGO, MN05/03/2023NPKJEASITE PLAN REVIEW05/03/20231CIVIL SITESPECIFICATIONSC606 THIS DRAWING AND THE INFORMATION THEREIN ISTHE PROPERTY OF DESIGN TREE ENGINEERING INC.USE BY THE HOLDER OR DISCLOSURE TO OTHERSWITHOUT THE PERMISSION OF DESIGN TREEENGINEERING INC. IS PROHIBITED. IT CONTAINSPROPRIETARY AND CONFIDENTIAL INFORMATION OFDESIGN TREE ENGINEERING INC. REPRODUCTION OFTHE MATERIAL HEREIN WITHOUT WRITTENERMISSION OF DESIGN TREE ENGINEERING INC.VIOLATES THE COPYRIGHT LAWS OF THE UNITEDSTATES AND WILL SUBJECT THE VIOLATORS TOLEGAL PROSECUTION.COPYRIGHT @ 2023 BY DESIGN TREE ENGINEERINGI HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION,OR REPORT WAS PREPARED BY ME OR UNDER MYDIRECT SUPERVISION AND THAT I AM A DULYLICENSED PROFESSIONAL ENGINEER UNDER THELAWS OF THE STATE OF MINNESOTA.DRAWING NO.DRAWN BY:CHECKED BY:PROJECT NO.:NO.DATE DESCRIPTIONDATE:LICENSE #:PRINTED NAME:F:\DESIGN TREE ENGINEERING\PROJECTS\109 - JAVA PROPERTIES\10923002 - OTSEGO RETAIL - OTSEGO, MN\CONSTRUCTS\CIVIL\10923002-C-DETAILS.DWG #### 5/3/2023MICHAEL J. GERBER5665310923002OTSEGO RETAILOTSEGO, MN05/03/2023NPKJEASITE PLAN REVIEW05/03/20231CIVIL SITESPECIFICATIONSC607 THIS DRAWING AND THE INFORMATION THEREIN ISTHE PROPERTY OF DESIGN TREE ENGINEERING INC.USE BY THE HOLDER OR DISCLOSURE TO OTHERSWITHOUT THE PERMISSION OF DESIGN TREEENGINEERING INC. IS PROHIBITED. IT CONTAINSPROPRIETARY AND CONFIDENTIAL INFORMATION OFDESIGN TREE ENGINEERING INC. REPRODUCTION OFTHE MATERIAL HEREIN WITHOUT WRITTENERMISSION OF DESIGN TREE ENGINEERING INC.VIOLATES THE COPYRIGHT LAWS OF THE UNITEDSTATES AND WILL SUBJECT THE VIOLATORS TOLEGAL PROSECUTION.COPYRIGHT @ 2023 BY DESIGN TREE ENGINEERINGI HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION,OR REPORT WAS PREPARED BY ME OR UNDER MYDIRECT SUPERVISION AND THAT I AM A DULYLICENSED PROFESSIONAL ENGINEER UNDER THELAWS OF THE STATE OF MINNESOTA.DRAWING NO.DRAWN BY:CHECKED BY:PROJECT NO.:NO.DATE DESCRIPTIONDATE:LICENSE #:PRINTED NAME:F:\DESIGN TREE ENGINEERING\PROJECTS\109 - JAVA PROPERTIES\10923002 - OTSEGO RETAIL - OTSEGO, MN\CONSTRUCTS\CIVIL\10923002-C-DETAILS.DWG #### 5/3/2023MICHAEL J. GERBER5665310923002OTSEGO RETAILOTSEGO, MN05/03/2023NPKJEASITE PLAN REVIEW05/03/20231CIVIL UTILITYSPECIFICATIONSC608 S:\Municipal\Aotsego25xx\2500\OT2523.02 Java Properties – Otsego Retail Main Office: 3601 Thurston Avenue, Anoka, MN 55303 Phone: 763/427-5860 Fax: 763/427-0520 www.haa-inc.com MEMORANDUM TO: Honorable Mayor and City Council CC: Adam Flaherty, City Administrator/Finance Director Audra Etzel, City Clerk Daniel Licht, City Planner Dave Kendall, City Attorney Michael Gerber, Design Tree Mark Krogh, Java Property FROM: Ronald Wagner, P.E. City Engineer Abdullah Alqwaizani, E.I.T. DATE: May 31, 2023 RE: Java Properties – Otsego Retail We have reviewed the following information provided by Civil Engineering Site Design on behalf of Michael Gerber regarding the Java Properties – Otsego Retail. Civil Plan Set for Java Properties – Otsego Retail, dated 5/3/2023 by Design Tree The submittal is to be considered for preliminary acceptance. We would offer the following comments: 1. Provide an approval signature line for Ronald J. Wagner, P.E., City Engineer. 2. The datum elevation shall be NGVD 1929 Adj. or provide equation converter from datum 1988 (NGVD 88) to datum 1929 (NGVD 29). 3. Provide location, size, and elevation of all existing sewer, watermain, culverts, and other underground facilities within 150’ shall be shown. 4. Verify why is it necessary for storm manhole to be removed. 5. Use provided sewer and watermain stubs. 6. Show boundary lines of adjoining unsubdivided or subdivided land, identified by name and ownership. 7. Provide the normal, 2-year, 10-year, and 100-year water level for the pond on all sheets. 8. Verify the proposed sanitary line has enough coverage. 9. Remove key note 4 on page C101. Bituminous shall not be removed. May 31, 2023 Page 2 S:\Municipal\Aotsego25xx\2500\OT2523.02 Java Properties – Otsego Retail 10. Must use the existing watermain service in the northwest side to connect watermain line. Not allowed to remove bituminous pavement in Parkview Ave to connect watermain. 11. Provide details of the pedestrian ramps showing proposed spot elevations and grades meeting ADA requirements. 12. Remove the Otsego Standard Plate No. 701. Current MnDOT Standard Plate shall be used instead. 13. Provide a public construction cost for Financial Summary development agreement. Summary and/or Recommendation We recommend approval contingent on the above comments being addressed.