Loading...
5.1 East-West Watermain Connection Project Request for City Council Action DEPARTMENT INFORMATION ORIGINATING DEPARTMENT REQUESTOR: MEETING DATE: Public Works City Engineer Wagner June 12, 2023 PRESENTER(s) REVIEWED BY: ITEM #: City Engineer Wagner City Administrator/Finance Director Flaherty 5.1 – East-West Watermain Connection Project STRATEGIC VISION MEETS: THE CITY OF OTSEGO: Is a strong organization that is committed to leading the community through innovative communication. X Has proactively expanded infrastructure to responsibly provide core services. Is committed to delivery of quality emergency service responsive to community needs and expectations in a cost-effective manner. Is a social community with diverse housing, service options, and employment opportunities. Is a distinctive, connected community known for its beauty and natural surroundings. AGENDA ITEM DETAILS RECOMMENDATION: City staff recommends the City Council adopt a resolution accepting bids and awarding contract for the East-West Watermain Connection Project. ARE YOU SEEKING APPROVAL OF A CONTRACT? IS A PUBLIC HEARING REQUIRED? Yes No BACKGROUND/JUSTIFICATION: Bids were opened for the East-West Watermain Connection Project on June 7, 2023. A total of nine bids were received as shown on the attached Bid Tabulation. The Capital Improvement Plan (CIP) included a budget in the amount of $3,504,134 for this project. The Engineer’s Estimate presented to Council for approval of plans and specifications was $3,360,946 including the booster station portion of the project, and project soft costs for design, engineering, etc. The estimate for the portion of the project included within the bid was $2,729,711. The low bid from Douglas-Kerr Underground, LLC, of Mora Minnesota was $2,414,740.59. Including the booster station portion of the project ($330,967) and project soft costs for design and engineering ($300,268), the current estimated project costs are $3,045,975.59. The costs for temporary and permanent easement acquisition have not yet been finalized; however, the project costs will be within budget barring any unforeseen circumstances that arise during project construction. City staff recommend awarding the contract to the low bidder, Douglas-Kerr Underground, LLC. Douglas- Kerr Underground, LLC has completed multiple similar size projects with similar size municipalities Hakanson Anderson represents. The work was completed to specifications and in a timely manner. SUPPORTING DOCUMENTS ATTACHED: • Bid Tabulation • Resolution 2023-44 POSSIBLE MOTION PLEASE WORD MOTION AS YOU WOULD LIKE IT TO APPEAR IN THE MINUTES: Motion to adopt Resolution 2023-44 accepting bids and awarding contract for the East-West Watermain Connection Project, City Project No. 23-04 to Douglas-Kerr Underground, LLC of Mora, Minnesota in the amount of $2,414,740.59. BUDGET INFORMATION FUNDING: BUDGETED: Fund 601 – Water Utility Yes BID TABULATION CITY OF OTSEGO EAST-WEST WATERMAIN CONNECTION PROJECT Bids were opened June 7, 2023 at 2:00 p.m. A total of nine (9) bids were received, as shown herein. Base Bid ITEM NO. Mn/DOT SPEC. NO.ITEM DESCRIPTION UNIT ESTIMATED QUANTITY UNIT PRICE EXTENSION UNIT PRICE EXTENSION UNIT PRICE EXTENSION 1 2021.501 MOBILIZATION LUMP SUM 1 99,700.00$ 99,700.00$ 100,000.00$ 100,000.00$ 82,000.00$ 82,000.00$ 2 2104.502 SALVAGE PIPE APRON EACH 9 143.80$ 1,294.20$ 452.00$ 4,068.00$ 285.00$ 2,565.00$ 3 2104.503 SAWING CONCRETE PAVEMENT - FULL DEPTH LIN FT 29 3.70$ 107.30$ 4.50$ 130.50$ 7.00$ 203.00$ 4 2104.503 SAWING BITUMINOUS PAVEMENT - FULL DEPTH LIN FT 207 3.00$ 621.00$ 3.50$ 724.50$ 4.00$ 828.00$ 5 2104.503 REMOVE CONCRETE CURB LIN FT 98 6.75$ 661.50$ 5.50$ 539.00$ 8.00$ 784.00$ 6 2104.503 SALVAGE CASTING EACH 1 193.00$ 193.00$ 75.00$ 75.00$ 145.00$ 145.00$ 7 2104.503 SALVAGE CONCRETE PIPE LIN FT 88 22.05$ 1,940.40$ 26.00$ 2,288.00$ 31.00$ 2,728.00$ 8 2104.503 SALVAGE HYDRANT AND 6" GATE VALVE EACH 1 1,067.00$ 1,067.00$ 665.00$ 665.00$ 720.00$ 720.00$ 9 2104.504 REMOVE CONCRETE PAVEMENT SQ YD 489 7.90$ 3,863.10$ 7.55$ 3,691.95$ 4.00$ 1,956.00$ 10 2104.504 REMOVE BITUMINOUS PAVEMENT SQ YD 313 3.35$ 1,048.55$ 6.25$ 1,956.25$ 5.00$ 1,565.00$ 11 2211.509 AGGREGATE BASE CLASS 5 TON 203 19.20$ 3,897.60$ 22.00$ 4,466.00$ 29.00$ 5,887.00$ 12 2232.504 MILL BITUMINOUS SURFACE (1.5")SQ YD 403 0.01$ 4.03$ 31.00$ 12,493.00$ 9.00$ 3,627.00$ 13 2301.504 CONCRETE PAVEMENT 6"SQ YD 13.3 150.00$ 1,995.00$ 350.00$ 4,655.00$ 370.00$ 4,921.00$ 14 2357.506 BITUMINOUS MATERIAL FOR TACK COAT GALLON 30 10.00$ 300.00$ 11.00$ 330.00$ 10.50$ 315.00$ 15 2360.509 TYPE SP 9.5 WEARING COURSE MIXTURE (2,C) TON 40 238.45$ 9,538.00$ 273.00$ 10,920.00$ 258.00$ 10,320.00$ 16 2360.509 TYPE SP 12.5 NON WEARING COURSE MIXTURE (2,C) TON 50 229.20$ 11,460.00$ 227.00$ 11,350.00$ 248.00$ 12,400.00$ 17 2503.603 30" STEEL CASING PIPE (JACKED)LIN FT 199 489.60$ 97,430.40$ 545.00$ 108,455.00$ 590.00$ 117,410.00$ 18 2504.602 CONNECT TO EXISTING WATERMAIN EACH 6 3,017.00$ 18,102.00$ 2,000.00$ 12,000.00$ 2,350.00$ 14,100.00$ 19 2504.602 HYDRANT 8' - 6" BURY DEPTH EACH 7 6,310.00$ 44,170.00$ 6,011.00$ 42,077.00$ 7,080.00$ 49,560.00$ 20 2504.602 HYDRANT 9' - 0" BURY DEPTH EACH 7 6,310.00$ 44,170.00$ 6,011.00$ 42,077.00$ 7,285.00$ 50,995.00$ 21 2504.602 6" GATE VALVE AND BOX EACH 14 2,216.00$ 31,024.00$ 1,921.00$ 26,894.00$ 2,370.00$ 33,180.00$ 22 2504.602 12" BUTTERFLY VALVE AND BOX EACH 6 4,555.00$ 27,330.00$ 3,901.00$ 23,406.00$ 3,615.00$ 21,690.00$ 23 2504.602 16" BUTTERFLY VALVE AND BOX EACH 5 5,682.00$ 28,410.00$ 4,975.00$ 24,875.00$ 6,250.00$ 31,250.00$ 24 2504.603 4" DIP WATERMAIN OPEN CUT LIN FT 43 85.80$ 3,689.40$ 72.00$ 3,096.00$ 96.00$ 4,128.00$ 25 2504.603 6" DIP WATERMAIN OPEN CUT LIN FT 83 90.15$ 7,482.45$ 59.00$ 4,897.00$ 64.00$ 5,312.00$ 26 2504.603 12" DIP WATERMAIN OPEN CUT LIN FT 164 134.85$ 22,115.40$ 90.00$ 14,760.00$ 128.00$ 20,992.00$ 27 2504.603 12" WATERMAIN OPEN CUT LIN FT 3230 74.60$ 240,958.00$ 68.00$ 219,640.00$ 83.00$ 268,090.00$ 28 2504.603 12" WATERMAIN DIRECTIONAL DRILL LIN FT 3260 80.00$ 260,800.00$ 82.00$ 267,320.00$ 90.00$ 293,400.00$ 29 2504.603 16" DIP WATERMAIN OPEN CUT LIN FT 44 177.85$ 7,825.40$ 105.00$ 4,620.00$ 210.00$ 9,240.00$ 30 2504.603 16" WATERMAIN OPEN CUT LIN FT 3831 115.15$ 441,139.65$ 112.00$ 429,072.00$ 112.50$ 430,987.50$ 31 2504.603 16" WATERMAIN DIRCTIONAL DRILL LIN FT 2527 154.00$ 389,158.00$ 161.00$ 406,847.00$ 174.00$ 439,698.00$ 32 2504.603 16" WATERMAIN CARRIER PIPE LIN FT 204 112.50$ 22,950.00$ 105.00$ 21,420.00$ 117.00$ 23,868.00$ 33 2504.603 PRESSURE REDUCING VALVE LUMP SUM 1 155,278.00$ 155,278.00$ 148,000.00$ 148,000.00$ 187,200.00$ 187,200.00$ 34 2504.603 TOWER FILL CONTROL VALVE LUMP SUM 1 199,298.00$ 199,298.00$ 275,000.00$ 275,000.00$ 215,400.00$ 215,400.00$ 35 2504.604 4" POLYSTYRENE INSULATION SQ YD 7.2 49.30$ 354.96$ 65.00$ 468.00$ 75.00$ 540.00$ 36 2504.608 DUCTILE IRON FITTINGS POUND 9665 10.90$ 105,348.50$ 10.75$ 103,898.75$ 11.40$ 110,181.00$ 37 2504.608 HYDRANT RISER LIN FT 14 1,289.00$ 18,046.00$ 1,775.00$ 24,850.00$ 1,350.00$ 18,900.00$ 38 2506.502 INSTALL CASTING EACH 1 2,215.00$ 2,215.00$ 715.00$ 715.00$ 870.00$ 870.00$ 39 2511.507 RANDOM RIPRAP CLASS III CU YD 25 126.55$ 3,163.75$ 130.00$ 3,250.00$ 112.00$ 2,800.00$ 40 2521.518 4" CONCRETE WALK SQ FT 335 12.00$ 4,020.00$ 17.50$ 5,862.50$ 19.00$ 6,365.00$ 41 2521.518 6" CONCRETE WALK SQ FT 125 15.00$ 1,875.00$ 21.50$ 2,687.50$ 23.00$ 2,875.00$ 42 2531.503 CONCRETE CURB AND GUTTER DESIGN SPECIAL LIN FT 98 45.00$ 4,410.00$ 69.00$ 6,762.00$ 75.00$ 7,350.00$ 43 2533.503 PORTABLE PRECAST CONCRETE BARRIER DESIGN 8337 LIN FT 410 14.50$ 5,945.00$ 14.50$ 5,945.00$ 15.00$ 6,150.00$ 44 2533.503 RELOCATE PORTABLE PRECAST CONCRETE BARRIER DESIGN 8337 LIN FT 360 5.00$ 1,800.00$ 5.00$ 1,800.00$ 5.20$ 1,872.00$ Douglas-Kerr Underground, LLC S R Weidema, Incorporated LaTour Construction, Inc. Page 1 of 6 BID TABULATION CITY OF OTSEGO EAST-WEST WATERMAIN CONNECTION PROJECT Base Bid ITEM NO. Mn/DOT SPEC. NO.ITEM DESCRIPTION UNIT ESTIMATED QUANTITY UNIT PRICE EXTENSION UNIT PRICE EXTENSION UNIT PRICE EXTENSION Douglas-Kerr Underground, LLC S R Weidema, Incorporated LaTour Construction, Inc. 45 2554.615 IMPACT ATTENUATOR ASSEMBLY 4 2,500.00$ 10,000.00$ 2,500.00$ 10,000.00$ 2,600.00$ 10,400.00$ 46 2554.615 RELOCATE IMPACT ATTENUATOR ASSEMBLY 4 600.00$ 2,400.00$ 600.00$ 2,400.00$ 620.00$ 2,480.00$ 47 2563.601 TRAFFIC CONTROL SUPERVISOR LUMP SUM 1 1,021.00$ 1,021.00$ 500.00$ 500.00$ 2,800.00$ 2,800.00$ 48 2563.601 TRAFFIC CONTROL LUMP SUM 1 6,000.00$ 6,000.00$ 8,000.00$ 8,000.00$ 6,240.00$ 6,240.00$ 49 2573.501 STABILIZED CONSTRUCTION EXIT LUMP SUM 2 1,031.00$ 2,062.00$ 2,800.00$ 5,600.00$ 1,450.00$ 2,900.00$ 50 2573.501 EROSION CONTROL SUPERVISOR LUMP SUM 1 1,021.00$ 1,021.00$ 1,000.00$ 1,000.00$ 2,945.00$ 2,945.00$ 51 2573.502 EROSION CONTROL INLET PROTECTION EACH 4 158.00$ 632.00$ 395.00$ 1,580.00$ 350.00$ 1,400.00$ 52 2573.503 SILT FENCE TYPE; MS LIN FT 7219 1.85$ 13,355.15$ 1.90$ 13,716.10$ 1.90$ 13,716.10$ 53 2574.508 FERTILIZER TYPE 1 POUND 1716 0.85$ 1,458.60$ 0.90$ 1,544.40$ 0.90$ 1,544.40$ 54 2575.504 ROLLED EROSION PREVENTION CATEGORY 25 SQ YD 28285 1.65$ 46,670.25$ 1.70$ 48,084.50$ 1.75$ 49,498.75$ 55 2575.505 SEEDING ACRE 5.2 150.00$ 780.00$ 154.00$ 800.80$ 160.00$ 832.00$ 56 2575.508 SEED, MIXTURE 25-121 POUND 698 4.50$ 3,141.00$ 4.60$ 3,210.80$ 4.70$ 3,280.60$ Total Base Bid 2,414,740.59$ 2,485,483.55$ 2,603,404.35$ Page 2 of 6 BID TABULATION CITY OF OTSEGO EAST-WEST WATERMAIN CONNECTION PROJECT Bids were opened June 7, 2023 at 2:00 p.m. A total of nine (9) bids were received, as shown herein. Base Bid ITEM NO. Mn/DOT SPEC. NO.ITEM DESCRIPTION UNIT ESTIMATED QUANTITY 1 2021.501 MOBILIZATION LUMP SUM 1 2 2104.502 SALVAGE PIPE APRON EACH 9 3 2104.503 SAWING CONCRETE PAVEMENT - FULL DEPTH LIN FT 29 4 2104.503 SAWING BITUMINOUS PAVEMENT - FULL DEPTH LIN FT 207 5 2104.503 REMOVE CONCRETE CURB LIN FT 98 6 2104.503 SALVAGE CASTING EACH 1 7 2104.503 SALVAGE CONCRETE PIPE LIN FT 88 8 2104.503 SALVAGE HYDRANT AND 6" GATE VALVE EACH 1 9 2104.504 REMOVE CONCRETE PAVEMENT SQ YD 489 10 2104.504 REMOVE BITUMINOUS PAVEMENT SQ YD 313 11 2211.509 AGGREGATE BASE CLASS 5 TON 203 12 2232.504 MILL BITUMINOUS SURFACE (1.5")SQ YD 403 13 2301.504 CONCRETE PAVEMENT 6"SQ YD 13.3 14 2357.506 BITUMINOUS MATERIAL FOR TACK COAT GALLON 30 15 2360.509 TYPE SP 9.5 WEARING COURSE MIXTURE (2,C) TON 40 16 2360.509 TYPE SP 12.5 NON WEARING COURSE MIXTURE (2,C) TON 50 17 2503.603 30" STEEL CASING PIPE (JACKED)LIN FT 199 18 2504.602 CONNECT TO EXISTING WATERMAIN EACH 6 19 2504.602 HYDRANT 8' - 6" BURY DEPTH EACH 7 20 2504.602 HYDRANT 9' - 0" BURY DEPTH EACH 7 21 2504.602 6" GATE VALVE AND BOX EACH 14 22 2504.602 12" BUTTERFLY VALVE AND BOX EACH 6 23 2504.602 16" BUTTERFLY VALVE AND BOX EACH 5 24 2504.603 4" DIP WATERMAIN OPEN CUT LIN FT 43 25 2504.603 6" DIP WATERMAIN OPEN CUT LIN FT 83 26 2504.603 12" DIP WATERMAIN OPEN CUT LIN FT 164 27 2504.603 12" WATERMAIN OPEN CUT LIN FT 3230 28 2504.603 12" WATERMAIN DIRECTIONAL DRILL LIN FT 3260 29 2504.603 16" DIP WATERMAIN OPEN CUT LIN FT 44 30 2504.603 16" WATERMAIN OPEN CUT LIN FT 3831 31 2504.603 16" WATERMAIN DIRCTIONAL DRILL LIN FT 2527 32 2504.603 16" WATERMAIN CARRIER PIPE LIN FT 204 33 2504.603 PRESSURE REDUCING VALVE LUMP SUM 1 34 2504.603 TOWER FILL CONTROL VALVE LUMP SUM 1 35 2504.604 4" POLYSTYRENE INSULATION SQ YD 7.2 36 2504.608 DUCTILE IRON FITTINGS POUND 9665 37 2504.608 HYDRANT RISER LIN FT 14 38 2506.502 INSTALL CASTING EACH 1 39 2511.507 RANDOM RIPRAP CLASS III CU YD 25 40 2521.518 4" CONCRETE WALK SQ FT 335 41 2521.518 6" CONCRETE WALK SQ FT 125 42 2531.503 CONCRETE CURB AND GUTTER DESIGN SPECIAL LIN FT 98 43 2533.503 PORTABLE PRECAST CONCRETE BARRIER DESIGN 8337 LIN FT 410 44 2533.503 RELOCATE PORTABLE PRECAST CONCRETE BARRIER DESIGN 8337 LIN FT 360 UNIT PRICE EXTENSION UNIT PRICE EXTENSION UNIT PRICE EXTENSION 43,200.00$ 43,200.00$ 40,000.00$ 40,000.00$ 100,000.00$ 100,000.00$ 450.00$ 4,050.00$ 250.00$ 2,250.00$ 700.00$ 6,300.00$ 10.00$ 290.00$ 10.00$ 290.00$ 15.00$ 435.00$ 5.00$ 1,035.00$ 3.00$ 621.00$ 4.00$ 828.00$ 8.00$ 784.00$ 10.00$ 980.00$ 15.00$ 1,470.00$ 250.00$ 250.00$ 250.00$ 250.00$ 600.00$ 600.00$ 30.00$ 2,640.00$ 50.00$ 4,400.00$ 171.60$ 15,100.80$ 750.00$ 750.00$ 1,000.00$ 1,000.00$ 350.00$ 350.00$ 15.00$ 7,335.00$ 10.00$ 4,890.00$ 20.00$ 9,780.00$ 15.00$ 4,695.00$ 10.00$ 3,130.00$ 8.00$ 2,504.00$ 50.00$ 10,150.00$ 40.00$ 8,120.00$ 50.00$ 10,150.00$ 35.00$ 14,105.00$ 40.00$ 16,120.00$ 32.50$ 13,097.50$ 380.00$ 5,054.00$ 375.00$ 4,987.50$ 200.00$ 2,660.00$ 12.00$ 360.00$ 10.00$ 300.00$ 12.00$ 360.00$ 300.00$ 12,000.00$ 250.00$ 10,000.00$ 290.00$ 11,600.00$ 260.00$ 13,000.00$ 240.00$ 12,000.00$ 240.00$ 12,000.00$ 607.00$ 120,793.00$ 1,100.00$ 218,900.00$ 880.00$ 175,120.00$ 2,200.00$ 13,200.00$ 2,200.00$ 13,200.00$ 3,580.00$ 21,480.00$ 7,000.00$ 49,000.00$ 7,000.00$ 49,000.00$ 7,030.00$ 49,210.00$ 7,200.00$ 50,400.00$ 7,000.00$ 49,000.00$ 7,189.00$ 50,323.00$ 2,900.00$ 40,600.00$ 2,400.00$ 33,600.00$ 2,843.00$ 39,802.00$ 4,700.00$ 28,200.00$ 4,600.00$ 27,600.00$ 3,955.00$ 23,730.00$ 7,500.00$ 37,500.00$ 6,000.00$ 30,000.00$ 6,573.00$ 32,865.00$ 124.00$ 5,332.00$ 130.00$ 5,590.00$ 109.00$ 4,687.00$ 145.00$ 12,035.00$ 115.00$ 9,545.00$ 101.00$ 8,383.00$ 147.00$ 24,108.00$ 155.00$ 25,420.00$ 164.00$ 26,896.00$ 91.00$ 293,930.00$ 66.00$ 213,180.00$ 100.00$ 323,000.00$ 85.00$ 277,100.00$ 107.00$ 348,820.00$ 112.00$ 365,120.00$ 210.00$ 9,240.00$ 220.00$ 9,680.00$ 242.00$ 10,648.00$ 128.00$ 490,368.00$ 99.00$ 379,269.00$ 126.00$ 482,706.00$ 173.00$ 437,171.00$ 211.00$ 533,197.00$ 195.00$ 492,765.00$ 200.00$ 40,800.00$ 142.00$ 28,968.00$ 100.00$ 20,400.00$ 202,000.00$ 202,000.00$ 190,000.00$ 190,000.00$ 175,000.00$ 175,000.00$ 210,000.00$ 210,000.00$ 365,000.00$ 365,000.00$ 285,000.00$ 285,000.00$ 90.00$ 648.00$ 80.00$ 576.00$ 96.00$ 691.20$ 14.00$ 135,310.00$ 10.00$ 96,650.00$ 12.00$ 115,980.00$ 1,575.00$ 22,050.00$ 1,350.00$ 18,900.00$ 1,766.00$ 24,724.00$ 550.00$ 550.00$ 1,000.00$ 1,000.00$ 650.00$ 650.00$ 100.00$ 2,500.00$ 100.00$ 2,500.00$ 164.00$ 4,100.00$ 17.50$ 5,862.50$ 18.00$ 6,030.00$ 16.00$ 5,360.00$ 22.00$ 2,750.00$ 22.00$ 2,750.00$ 20.00$ 2,500.00$ 75.00$ 7,350.00$ 71.00$ 6,958.00$ 48.00$ 4,704.00$ 16.50$ 6,765.00$ 16.00$ 6,560.00$ 16.00$ 6,560.00$ 6.00$ 2,160.00$ 5.50$ 1,980.00$ 5.50$ 1,980.00$ J.R. Ferche, Inc.C&L Excavating, Inc RL Larson Excavating Inc. Page 3 of 6 BID TABULATION CITY OF OTSEGO EAST-WEST WATERMAIN CONNECTION PROJECT Base Bid ITEM NO. Mn/DOT SPEC. NO.ITEM DESCRIPTION UNIT ESTIMATED QUANTITY 1 2021.501 MOBILIZATION LUMP SUM 1452554.615 IMPACT ATTENUATOR ASSEMBLY 4 46 2554.615 RELOCATE IMPACT ATTENUATOR ASSEMBLY 4 47 2563.601 TRAFFIC CONTROL SUPERVISOR LUMP SUM 1 48 2563.601 TRAFFIC CONTROL LUMP SUM 1 49 2573.501 STABILIZED CONSTRUCTION EXIT LUMP SUM 2 50 2573.501 EROSION CONTROL SUPERVISOR LUMP SUM 1 51 2573.502 EROSION CONTROL INLET PROTECTION EACH 4 52 2573.503 SILT FENCE TYPE; MS LIN FT 7219 53 2574.508 FERTILIZER TYPE 1 POUND 1716 54 2575.504 ROLLED EROSION PREVENTION CATEGORY 25 SQ YD 28285 55 2575.505 SEEDING ACRE 5.2 56 2575.508 SEED, MIXTURE 25-121 POUND 698 Total Base Bid UNIT PRICE EXTENSION UNIT PRICE EXTENSION UNIT PRICE EXTENSION J.R. Ferche, Inc.C&L Excavating, Inc RL Larson Excavating Inc. 3,000.00$ 12,000.00$ 3,000.00$ 12,000.00$ 2,650.00$ 10,600.00$ 700.00$ 2,800.00$ 525.00$ 2,100.00$ 625.00$ 2,500.00$ 2,500.00$ 2,500.00$ 4,000.00$ 4,000.00$ 2,500.00$ 2,500.00$ 12,000.00$ 12,000.00$ 7,000.00$ 7,000.00$ 6,500.00$ 6,500.00$ 2,200.00$ 4,400.00$ 500.00$ 1,000.00$ 2,500.00$ 5,000.00$ 5,000.00$ 5,000.00$ 2,500.00$ 2,500.00$ 2,000.00$ 2,000.00$ 250.00$ 1,000.00$ 150.00$ 600.00$ 300.00$ 1,200.00$ 2.15$ 15,520.85$ 2.25$ 16,242.75$ 2.00$ 14,438.00$ 1.00$ 1,716.00$ 0.75$ 1,287.00$ 0.90$ 1,544.40$ 2.00$ 56,570.00$ 1.60$ 45,256.00$ 1.80$ 50,913.00$ 175.00$ 910.00$ 725.00$ 3,770.00$ 160.00$ 832.00$ 5.00$ 3,490.00$ 5.00$ 3,490.00$ 4.75$ 3,315.50$ 2,765,327.35$ 2,882,457.25$ 3,042,962.40$ Page 4 of 6 BID TABULATION CITY OF OTSEGO EAST-WEST WATERMAIN CONNECTION PROJECT Bids were opened June 7, 2023 at 2:00 p.m. A total of nine (9) bids were received, as shown herein. Base Bid ITEM NO. Mn/DOT SPEC. NO.ITEM DESCRIPTION UNIT ESTIMATED QUANTITY 1 2021.501 MOBILIZATION LUMP SUM 1 2 2104.502 SALVAGE PIPE APRON EACH 9 3 2104.503 SAWING CONCRETE PAVEMENT - FULL DEPTH LIN FT 29 4 2104.503 SAWING BITUMINOUS PAVEMENT - FULL DEPTH LIN FT 207 5 2104.503 REMOVE CONCRETE CURB LIN FT 98 6 2104.503 SALVAGE CASTING EACH 1 7 2104.503 SALVAGE CONCRETE PIPE LIN FT 88 8 2104.503 SALVAGE HYDRANT AND 6" GATE VALVE EACH 1 9 2104.504 REMOVE CONCRETE PAVEMENT SQ YD 489 10 2104.504 REMOVE BITUMINOUS PAVEMENT SQ YD 313 11 2211.509 AGGREGATE BASE CLASS 5 TON 203 12 2232.504 MILL BITUMINOUS SURFACE (1.5")SQ YD 403 13 2301.504 CONCRETE PAVEMENT 6"SQ YD 13.3 14 2357.506 BITUMINOUS MATERIAL FOR TACK COAT GALLON 30 15 2360.509 TYPE SP 9.5 WEARING COURSE MIXTURE (2,C) TON 40 16 2360.509 TYPE SP 12.5 NON WEARING COURSE MIXTURE (2,C) TON 50 17 2503.603 30" STEEL CASING PIPE (JACKED)LIN FT 199 18 2504.602 CONNECT TO EXISTING WATERMAIN EACH 6 19 2504.602 HYDRANT 8' - 6" BURY DEPTH EACH 7 20 2504.602 HYDRANT 9' - 0" BURY DEPTH EACH 7 21 2504.602 6" GATE VALVE AND BOX EACH 14 22 2504.602 12" BUTTERFLY VALVE AND BOX EACH 6 23 2504.602 16" BUTTERFLY VALVE AND BOX EACH 5 24 2504.603 4" DIP WATERMAIN OPEN CUT LIN FT 43 25 2504.603 6" DIP WATERMAIN OPEN CUT LIN FT 83 26 2504.603 12" DIP WATERMAIN OPEN CUT LIN FT 164 27 2504.603 12" WATERMAIN OPEN CUT LIN FT 3230 28 2504.603 12" WATERMAIN DIRECTIONAL DRILL LIN FT 3260 29 2504.603 16" DIP WATERMAIN OPEN CUT LIN FT 44 30 2504.603 16" WATERMAIN OPEN CUT LIN FT 3831 31 2504.603 16" WATERMAIN DIRCTIONAL DRILL LIN FT 2527 32 2504.603 16" WATERMAIN CARRIER PIPE LIN FT 204 33 2504.603 PRESSURE REDUCING VALVE LUMP SUM 1 34 2504.603 TOWER FILL CONTROL VALVE LUMP SUM 1 35 2504.604 4" POLYSTYRENE INSULATION SQ YD 7.2 36 2504.608 DUCTILE IRON FITTINGS POUND 9665 37 2504.608 HYDRANT RISER LIN FT 14 38 2506.502 INSTALL CASTING EACH 1 39 2511.507 RANDOM RIPRAP CLASS III CU YD 25 40 2521.518 4" CONCRETE WALK SQ FT 335 41 2521.518 6" CONCRETE WALK SQ FT 125 42 2531.503 CONCRETE CURB AND GUTTER DESIGN SPECIAL LIN FT 98 43 2533.503 PORTABLE PRECAST CONCRETE BARRIER DESIGN 8337 LIN FT 410 44 2533.503 RELOCATE PORTABLE PRECAST CONCRETE BARRIER DESIGN 8337 LIN FT 360 UNIT PRICE EXTENSION UNIT PRICE EXTENSION UNIT PRICE EXTENSION 150,000.00$ 150,000.00$ 165,582.07$ 165,582.07$ 100,000.00$ 100,000.00$ 500.00$ 4,500.00$ 303.87$ 2,734.83$ 200.00$ 1,800.00$ 6.00$ 174.00$ 7.82$ 226.78$ 10.00$ 290.00$ 4.00$ 828.00$ 4.93$ 1,020.51$ 10.00$ 2,070.00$ 10.00$ 980.00$ 5.97$ 585.06$ 10.00$ 980.00$ 150.00$ 150.00$ 88.18$ 88.18$ 250.00$ 250.00$ 20.00$ 1,760.00$ 21.68$ 1,907.84$ 20.00$ 1,760.00$ 1,500.00$ 1,500.00$ 1,521.12$ 1,521.12$ 1,000.00$ 1,000.00$ 12.00$ 5,868.00$ 9.56$ 4,674.84$ 10.00$ 4,890.00$ 5.00$ 1,565.00$ 6.11$ 1,912.43$ 8.00$ 2,504.00$ 20.00$ 4,060.00$ 63.71$ 12,933.13$ 20.00$ 4,060.00$ 10.00$ 4,030.00$ 31.00$ 12,493.00$ 10.00$ 4,030.00$ 155.00$ 2,061.50$ 150.00$ 1,995.00$ 150.00$ 1,995.00$ 10.00$ 300.00$ 11.00$ 330.00$ 10.00$ 300.00$ 240.00$ 9,600.00$ 272.73$ 10,909.20$ 239.00$ 9,560.00$ 231.00$ 11,550.00$ 226.09$ 11,304.50$ 230.00$ 11,500.00$ 1,000.00$ 199,000.00$ 699.27$ 139,154.73$ 550.00$ 109,450.00$ 4,000.00$ 24,000.00$ 1,116.81$ 6,700.86$ 5,000.00$ 30,000.00$ 6,500.00$ 45,500.00$ 7,659.94$ 53,619.58$ 7,000.00$ 49,000.00$ 6,700.00$ 46,900.00$ 8,329.64$ 58,307.48$ 7,350.00$ 51,450.00$ 3,000.00$ 42,000.00$ 2,613.77$ 36,592.78$ 3,000.00$ 42,000.00$ 4,100.00$ 24,600.00$ 5,260.67$ 31,564.02$ 4,500.00$ 27,000.00$ 6,300.00$ 31,500.00$ 6,816.49$ 34,082.45$ 7,000.00$ 35,000.00$ 85.00$ 3,655.00$ 109.25$ 4,697.75$ 100.00$ 4,300.00$ 75.00$ 6,225.00$ 92.90$ 7,710.70$ 95.00$ 7,885.00$ 150.00$ 24,600.00$ 134.49$ 22,056.36$ 120.00$ 19,680.00$ 115.00$ 371,450.00$ 86.59$ 279,685.70$ 85.00$ 274,550.00$ 130.00$ 423,800.00$ 115.48$ 376,464.80$ 165.00$ 537,900.00$ 247.00$ 10,868.00$ 221.25$ 9,735.00$ 250.00$ 11,000.00$ 130.00$ 498,030.00$ 137.54$ 526,915.74$ 120.00$ 459,720.00$ 170.00$ 429,590.00$ 208.54$ 526,980.58$ 300.00$ 758,100.00$ 150.00$ 30,600.00$ 177.29$ 36,167.16$ 200.00$ 40,800.00$ 183,000.00$ 183,000.00$ 204,448.25$ 204,448.25$ 250,000.00$ 250,000.00$ 257,000.00$ 257,000.00$ 344,824.38$ 344,824.38$ 300,000.00$ 300,000.00$ 200.00$ 1,440.00$ 71.30$ 513.36$ 60.00$ 432.00$ 10.00$ 96,650.00$ 18.00$ 173,970.00$ 11.00$ 106,315.00$ 1,200.00$ 16,800.00$ 764.58$ 10,704.12$ 1,000.00$ 14,000.00$ 600.00$ 600.00$ 357.46$ 357.46$ 1,000.00$ 1,000.00$ 100.00$ 2,500.00$ 243.69$ 6,092.25$ 85.00$ 2,125.00$ 13.00$ 4,355.00$ 12.00$ 4,020.00$ 12.00$ 4,020.00$ 16.00$ 2,000.00$ 15.00$ 1,875.00$ 15.00$ 1,875.00$ 50.00$ 4,900.00$ 48.71$ 4,773.58$ 45.00$ 4,410.00$ 15.00$ 6,150.00$ 14.50$ 5,945.00$ 14.50$ 5,945.00$ 5.00$ 1,800.00$ 5.00$ 1,800.00$ 5.00$ 1,800.00$ Meyer Contracting Inc. Ryan Contracting Co.Geislinger & Sons Page 5 of 6 BID TABULATION CITY OF OTSEGO EAST-WEST WATERMAIN CONNECTION PROJECT Base Bid ITEM NO. Mn/DOT SPEC. NO.ITEM DESCRIPTION UNIT ESTIMATED QUANTITY 1 2021.501 MOBILIZATION LUMP SUM 1452554.615 IMPACT ATTENUATOR ASSEMBLY 4 46 2554.615 RELOCATE IMPACT ATTENUATOR ASSEMBLY 4 47 2563.601 TRAFFIC CONTROL SUPERVISOR LUMP SUM 1 48 2563.601 TRAFFIC CONTROL LUMP SUM 1 49 2573.501 STABILIZED CONSTRUCTION EXIT LUMP SUM 2 50 2573.501 EROSION CONTROL SUPERVISOR LUMP SUM 1 51 2573.502 EROSION CONTROL INLET PROTECTION EACH 4 52 2573.503 SILT FENCE TYPE; MS LIN FT 7219 53 2574.508 FERTILIZER TYPE 1 POUND 1716 54 2575.504 ROLLED EROSION PREVENTION CATEGORY 25 SQ YD 28285 55 2575.505 SEEDING ACRE 5.2 56 2575.508 SEED, MIXTURE 25-121 POUND 698 Total Base Bid UNIT PRICE EXTENSION UNIT PRICE EXTENSION UNIT PRICE EXTENSION Meyer Contracting Inc. Ryan Contracting Co.Geislinger & Sons 3,000.00$ 12,000.00$ 2,500.00$ 10,000.00$ 2,500.00$ 10,000.00$ 500.00$ 2,000.00$ 600.00$ 2,400.00$ 600.00$ 2,400.00$ 500.00$ 500.00$ 10,000.00$ 10,000.00$ 2,500.00$ 2,500.00$ 11,000.00$ 11,000.00$ 6,000.00$ 6,000.00$ 15,000.00$ 15,000.00$ 1,500.00$ 3,000.00$ 1,000.00$ 2,000.00$ 500.00$ 1,000.00$ 3,000.00$ 3,000.00$ 50,000.00$ 50,000.00$ 1,000.00$ 1,000.00$ 160.00$ 640.00$ 150.00$ 600.00$ 200.00$ 800.00$ 2.00$ 14,438.00$ 2.53$ 18,264.07$ 1.85$ 13,355.15$ 1.00$ 1,716.00$ 0.87$ 1,492.92$ 0.85$ 1,458.60$ 2.00$ 56,570.00$ 1.70$ 48,084.50$ 1.67$ 47,235.95$ 155.00$ 806.00$ 5,000.00$ 26,000.00$ 150.00$ 780.00$ 5.00$ 3,490.00$ 4.60$ 3,210.80$ 4.51$ 3,147.98$ 3,097,599.50$ 3,318,029.87$ 3,395,423.68$ Page 6 of 6 1 CITY OF OTSEGO COUNTY OF WRIGHT STATE OF MINNESOTA RESOLUTION NO: 2023-44 ACCEPTING BIDS AND AWARDING CONTRACT FOR THE EAST-WEST WATERMAIN CONNECTION PROJECT WHEREAS, pursuant to an advertisement for bids for the construction of East-West Watermain Connection Project, City Project No. 23-04, bids were received, opened on June 7, 2023, and tabulated according to law, and the following bids were received complying with the advertisement; and Base Bid 1. Douglas-Kerr Underground, LLC $2,414,740.59 2. S R Weidema, Incorporated $2,485,483.55 3. LaTour Construction, Inc. $2,603,404.35 4. J.R. Ferche, Inc. $2,765,327.35 5. C&L Excavating, Inc $2,882,457.25 6. RL Larson Excavating Inc. $3,042,962.40 7. Geislinger & Sons $3,097,599.50 8. Meyer Contracting Inc. $3,318,029.87 9. Ryan Contracting Co. $3,395,423.68 WHEREAS, it appears that Douglas-Kerr Underground, LLC of Mora, Minnesota is the lowest responsible bidder. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF OTSEGO, MINNESOTA: 1. The Mayor and City Clerk are hereby authorized and directed to enter into a contract with Douglas- Kerr Underground, LLC of Mora, Minnesota in the name of the City of Otsego for the East-West Watermain Connection Project, City Project No. 23-04, according to the plans and specifications therefore approved by the City Council and on file in the office of the City Clerk. 2. The City Clerk is hereby authorized and directed to return forthwith to all bidders the bid bond made with their bids, except that the bid bond of the successful bidder and the next lowest bidder shall be retained until a contract has been signed. 2 ADOPTED by the Otsego City Council this 12th day of June, 2023. MOTION BY: SECONDED BY: IN FAVOR: OPPOSED: CITY OF OTSEGO __________________________________ Jessica L. Stockamp, Mayor ATTEST: __________________________________ Audra Etzel, City Clerk