Loading...
3.1 Otsego ISG Daycare PR3rd rep3601 Thurston Avenue Anoka, MN 55303 763.231.5840 TPC@PlanningCo.com 1 PLANNING REPORT TO: Otsego Planning Commission FROM: D. Daniel Licht DATE: 13 July 2023 120 DAY DATE: 19 September 2023 RE: Otsego – 814 Services, LLC/Parkview Retail 3rd Addition TPC FILE: 101.02 BACKGROUND 814 Services, LLC has submitted plans for development of a daycare use with a licensed capacity of up to 159 children upon Lot 2, Block 1, Parkview Retail 3rd Addition. The subject site is located west of Parrish Avenue (CSAH 42) south of 88th Street. Day care uses are allowed with approval of a Conditional Use Permit subject to performance standards established by Chapter 30 of the Zoning Ordinance. A public hearing to consider the application has been noticed for the Planning Commission meeting on 17 July 2023 at 7:00PM. Exhibits: Site Location Map Applicant Narrative dated May 22, 2023 Elevations Civil Plans set dated 05/22/2023 (18 sheets) ANALYSIS Use. The subject site is zoned B1, Retail Business District. The proposed daycare use is allowed as a conditional use within the B1 District. Consideration of the Conditional Use Permit is to be based upon, but not limited to, the criteria established by Section 11-4-2.F of the Zoning Ordinance: 2 1. The proposed action's consistency with the specific policies and provisions of the Otsego Comprehensive Plan. Comment: The subject site is within the area planned as the City’s primary retail, service, and office development center and the Comprehensive plan guides the property for future commercial uses. The proposed daycare use is consistent with the land uses guided by the Future Land Use Plan providing for expansion of service business in Otsego. 2. The proposed use's compatibility with present and future land uses of the area. Comment: The table below summarizes existing and planned land uses surrounding the subject site: The proposed day care is an ideal transitional use between more intensive commercial uses along Parrish Avenue (CSAH 42) to residential uses west of Parkview Avenue. Direction Land Use Plan Zoning Map Existing Use North Commercial B-1 District Dunkin East Commercial PUD District SuperTarget South Commercial B-1 District Undeveloped ALDI West HD Residential R-7 District Parkview Grand 3. The proposed use's conformity with all performance standards contained within the Zoning Ordinance and other provisions of the City Code. Comment: The proposed use will comply with all requirements of the Zoning Ordinance and Engineering Manual. 4. Traffic generation of the proposed use in relation to capabilities of streets serving the property. Comment: The area is accessed via 95th Street (CSAH 39) and Parrish Avenue (CSAH 42), which are both designated as minor arterial roadways with capacity to accommodate local and regional traffic. 5. The proposed use can be accommodated by existing public services and facilities and will not overburden the City's service capacity. Comment: The subject site is within the East Sewer District established by the Comprehensive Plan where the City has planned for delivery of services for urban development and the proposed use will not overburden the City’s capacity. 3 Building Finish. The submitted plans include elevations for the proposed building. The schedule of proposed materials included on the plans is to be revised to specify the grade of the proposed exterior finishes and percentage of materials on each elevation and the over all building in accordance with Section 11-17-4.D.1 of the Zoning Ordinance. Building Height. Principal buildings within the B1 District are allowed to be up to three stories or 35 feet in height. The proposed building is a single-story structure with a pitched roof that complies with the height limits of the B-1 District. Lot Requirements. Lots within the B1 District are required to be a minimum of one acre in area and 200 feet in width. The subject site complies with the minimum lot requirements of the B1 District. Setbacks. The table below shows the setbacks required within the B1 District. The site plan complies with applicable setback requirements. Parrish Ave. (CSAH 42) Parkview Ave. North South Parking ROW Interior 30ft. 30ft. 10ft. 10ft 15ft. 5ft. Off-Street Parking. Section 11-21-8 of the Zoning Ordinance requires daycare uses provide one off-street parking stall for each 4 persons of licensed capacity. The developer states that the licensed capacity of the proposed use is to be 159 children. The proposed licensed capacity of the day care use requires 40 off-street parking stalls. The site plan provides for 40 off-street parking stalls (although the site plan is mislabeled to indicate only 37 stalls are provided). The 90 degree off-street parking stalls are designed as 10 feet wide by 18 feet in depth at perimeter of the parking area allowing for a two foot overhang and accessed by a 24 foot wide two-way drive aisle. The stalls are one foot wider than required by the Zoning Ordinance, which will improve access for children from their parents cars during peak drop-off and pick-up times. The dimensions of the off-street parking area complies with Section 11-21-7.B of the Zoning Ordinance. The parking area is shown to be surfaced with asphalt and surrounded by perimeter concrete curb as required by Section 11-21-7.C and D of the Zoning Ordinance. The construction specifications for the off-street parking area are to be subject to review and approval of the City Engineer. Landscaping. A landscape plan has been submitted that provides plantings in the perimeter yards, at the building foundation, and for screening the waste. The landscape plan is to be modified to provide additional plantings along the north lot line with a mix of shade trees, ornamental trees, shrubs, and/or grasses. 4 The sizes of proposed plantings comply with the provisions of Section 11-19-2.B of the Zoning Ordinance, except that the evergreen trees must be changed to eight feet in height. Section 5- 2-3.C.2 of the City Code requires installation of in-ground irrigation for the yards and planting areas within the property, which is indicated on the landscape plan. Fence. The outdoor play areas are surrounded by four or five foot high chain link fencing. Details for the fence are shown on Sheet C810. Fences within the B1 District are allowed to be up to eight feet in height. Section 11-19-4.H.3.a of the Zoning Ordinance requires that chain link fences within the B1 District be coated with integral color vinyl and shall not include vinyl, plastic, or metal slats within the fence. The plans must be revised to specify vinyl coating for the fence and removal of the slats indicated on the fence detail. Signs. Uses within the B-1 District are allowed the following signs:  One freestanding sign in the yard abutting Parrish Avenue (CSAH 42) up to 100 square feet in area and up to a height of 20 feet.  One freestanding sign in the yard abutting Parkview Avenue up to 64 square feet in area and up to a height of 15 feet.  Wall signs on the east and west elevations of the building up to 15 percent of the wall area facing public streets with no individual sign larger than 100 square feet. No plans for wall signs have been submitted. The site plan indicates the location of a free standing sign in the yard along Parrish Avenue (CSAH 42) and a second sign adjacent to Parkview. Avenue. The sign adjacent to Parkview Avenue must be revised to be setback 15 feet from the right-of-way line. No plans for the height or area of the proposed free standing sign have been provided. A sign permit subject to review and approval of the Zoning Administrator is required prior to placement of any signs upon the property. Exterior Lighting. An exterior lighting plan including photometric measurements of light intensity and indicating the type, location, and height of all exterior light fixtures has been submitted and complies with Section 11-16-6 of the Zoning Ordinance. Waste Storage. The submitted plans show a location for waste storage containers. Plans for construction of the enclosure are to be submitted with application for a building permit for review by the Zoning Administrator for compliance with requirements of Section 11-18-4.C of the Zoning Ordinance. Utilities. The subject site is within the East Sewer District established by the 2012 Comprehensive Plan and services are available to the property. The developer has submitted a utility plan for connection of the proposed building to City sewer and water utilities, which are subject to review and approval of the City Engineer. 5 Grading Plan. Plans for grading, erosion control, and storm water management have been submitted for the proposed development and are subject to review and approval of the City Engineer. Site Improvement Performance Agreement. Section 11-9-7 of the Zoning Ordinance requires that the developer enter into a performance agreement with the City to provide for construction of the project improvements within the subject site, subject to review by the City Attorney and approval of the City Council. RECOMMENDATION The proposed development of Lot 1, Block 1 Parkview Retail 3rd Addition is consistent with the policies of the Comprehensive Plan and complies with the requirements of the Zoning Ordinance. Our office recommends approval of the applications as outlined below. POSSIBLE ACTIONS A. Motion to recommend approval of Conditional Use Permit and site and building plans for Lot 2, Block 1, Parkview Retail 3rd Addition, subject to the following conditions: 1. The site and building plan approval and the stipulations, limitations, and conditions therein shall be applied to the property in question. All written and graphic materials officially submitted to the City shall be treated as a formal agreement between the applicant and the City. Once approved, no changes, modifications or alterations shall be made to any plan detail, standard, or specifications without prior submission of a plan modification request to the Zoning Administrator for review and approval. 2. Any mechanical equipment mounted on the roof of the building shall be screened by the parapet or other measures so as not to be visible from Parrish Avenue (CSAH 42) and Parkview Avenue, subject to review and approval of the Zoning Administrator prior to issuance of a building permit. 3. The exterior finish materials for the principal building shall comply with Section 11-17-4.D.1 of the Zoning Ordinance, subject to review and approval of the Zoning Administrator. 4. The construction specifications for the off-street parking area shall be subject to review and approval of the City Engineer. 5. Landscaping: 6 a. The landscape plan shall be revised to provide additional plantings along the north lot line with a mix of shade trees, ornamental trees, shrubs, and/or grasses, subject to review and approval of the Zoning Administrator. b. Proposed evergreen trees shall be specified as being a minimum of eight feet in height. c. In-ground irrigation for the yards and planting areas within the property shall be installed as required by Section 5-2-3.C.2 of the City Code. 6. The proposed chain link fence shall provide for coating integral color vinyl and shall not include vinyl, plastic, or metal slats within the fence in accordance with Section 11-19-4.H.3.a of the Zoning Ordinance. 7. All signs shall comply with Chapter 37 of the Zoning Ordinance and require issuance of a sign permit approved by the Zoning Administrator. 8. The enclosure for exterior storage of waste containers shall comply with Section 11-18-4.C of the Zoning Ordinance, subject to review and approval of the Zoning Administrator. 9. All grading, drainage, and erosion control plans shall be subject to review and approval of the City Engineer. 10. All utility plans shall be subject to review and approval of the City Engineer. 11. The property owner shall execute a Site Improvement Performance Agreement as required by Section 11-9-7 of the Zoning Ordinance, subject to review by the City Attorney and approval of the City Council. B. Motion to recommend the application be denied based on a finding that the request is inconsistent with the Comprehensive Plan and requirements of the Zoning Ordinance. C. Motion to table. c. Adam Flaherty, City Administrator/Finance Director Audra Etzel, City Clerk Ron Wagner, City Engineer David Kendall, City Attorney Daniel Harris, 814 Services, LLC Andrea Rand, ISG SITE LOCATION MAP 460 ft Overview Legend Roads CSAHCL CTYCL MUNICL PRIVATECL TWPCL Highways Interstate State Hwy US Hwy City/Township Limits c t Parcels Torrens M A Y 22, 2 0 2 3 D. Daniel Licht Planning City of Otsego 13400 90th St NE Otsego, MN 55330 ddl@planningco.com 7900 International Drive + Suite 550 + Bloomington, MN 55425 952.426.0699 + ISGInc.com Architecture + Engineering + Environmental + Planning RE: CONDITIONAL USE PERMIT APPLICATION NARRATIVE CHILD CARE DEVELOPMENT – 8891 PARRISH AVE NE Daniel, Enclosed is a Conditional Use Permit application and the supporting documents for an child care site development. The site is vacant and identified by Parcel number 118357000010. The developer is under contract to purchase the property from the property owner Parkview Partners, LLC. The Title confirms that all 2022 taxes are paid in full. The 2023 taxes will be paid upon closing of the property and we can provide that information to you when available. Enclosed is a Title Commitment and ALTA survey. Below is a more detailed description of the proposed project with this Site Plan application. SITE + PROJECT DESCRIPTION The subject site is 2.51 acres and is located between Parrish Ave NE and Parkview Ave NE. The proposed use is a childcare facility that would be 10,960 square feet with a fenced-in play area on the north and east side of the building and the parking lot on the south side of the building. Access to the site would be from Parkview Ave NE. The required number of parking spaces is 27 and the proposed site includes 37 parking spaces. The impervious area of the site would be 64.9% and the open space comprises 35.1% of the site. The site layout conforms to the setback requirements. Thank you for taking the time to review the enclosed application and supporting documents. We look forward to working with the City on this project. Please contact me at 952.426.0699 or Andrea.Rand@ISGInc.com with any questions or if there is any additional information we can provide in support of this project. Sincerely, Andrea Rand, AICP Project Coordinator ~ ,, f ~ T ~ ~ f f f f ~ ~ 1' ASPHALT SHINGLES -· _)----r ·-- HORIZONTAL---:::~~ LAP SIDING -----------SIDING TRIM ----•-- ,. --------9 ~ - 0 ----- BRICK BASE WITH ROWLOCK SI LL ------ f ~f f ~ l'. ~ I l'. ~ ~ ~ ~~ ~~ t ~~ ~~ ~ ~ I l'. ~ ~ I ~ ~ t t f ~ f f ~ 174t"'---t ~ ~ ~ ~ ASPHALT SHINGLES ~-p ~ ~ 1: ~ 1: 1: ~ HORIZONTAL------ LAP SIDING --- SIDING TRIM ---------- '? 0- BRICK BASE WITH ROWLOCK SILL ------- GUTTER AND DOWNSPOUTS, REFER TO CIVIL ------------- ---- - - - ~~ -:::.-o=:r= "' L f I ~ t ~ ~ f ~ ~ 1: ./ _4· -h ~ ~ -h ,, ~ ~ ~ ~ 12 sr-- - ~ - - - - L " - CJ ~ f ~ ~ I ~ ~ ~ ~ ~ ~ t ~ ~ ~ I l'. t ~ t f ~ ~ ~ ~ ~ ~ f ~ 1: ~ ~ CJ ASPHALT SHINGLES -· HORIZONTAL--- LAP SIDING SIDING TRIM ---- b ' 0 BRICK BASE WITH ROWLOCK SILL- GUTTER AND _./ DOWNSPOUTS, REFER TO CIVIL ,, ,, f .-_._. PREFIN. LOUVER / PREFIN. METAL CANOPY . ' . ",.,, cf / - e ASPHALT SHINGLES I --'' D HORIZONTAL--.ci-----i--t LAP SIDING SIDING TRIM --__ '? °' BRICK BASE WITH ROWLOCK SILL ~ f ~ I ~ ~ ~ t ~ ~ I t ~ f ~ ~ ~ ~ ~ b ' 0 ~ ~ "" T "'" I tt tt tt t t tt tt f~ f ~ ~ f ~ f ~ f f ~ l'.~ l'. ~ ~ l'. ~ l'. ~ l'. l'. ~ ~ ~ ~ f ~ ~ ~ ~: ~ f f ~ ~ f ~ ~ f ~~ ~~ ~ ~ ~~ ~~ ~ l'. l'. ~ l'. l'. ~ ~ l'. ~ __ ,-t t t f t t ' f ~ ~ f ~ ~ f f ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ,t f t ft ~f I ~ "" ~ --+ ~ -~ - b ' M "' . le' - ~ - t tt tt f ~f f ~ l'. ~ l'. l'. ~ ~ ~ ~ ~ f ~ ~ f ~ ~~ ~~ l'.~ ~ l'. ~ f t t ~f f ,, ~ ~~ ~ ft ~ "" 12 ~5 -1- ~ ~ f f r I t t f ~ l'. ~ ~ f ~ ~ ~ T ~ Fl IJ ~ 6 12 CJ 4 \ WEST ELEVATION ~\,A_l_O_l-0: ' SCALE: 1 /8"=1 '-0" T r f -1- ~ ~ f f r I 'l.,i' ·"' 1.§ I/' 1 ~ --I,:< --~ ----- =5° =-~ --_--=-_--__ -I .... --:>➔=±=+---t l - l±====!===U.---IL-4l==-:===L=~ = -;;:~~===1-10F=:~~,__.,~ LJ ,_ -,_ ~ ,_ -,-~ ,-~ ,--,_ -,_ -,- - CJ 6 ~ ~ == = 3 A 101 NORTH ELEVATION SCALE: 1 /8"= 1'-0" ~~ ~~ □~□~~ =~ L I ~~ ~ =ca ;ct ,., _l_ _,_.; ~ cc= f f I I ~ t ~ ~ f ~ ~ ~ ~ ~ 1.-c - -- - -- -- ' ;~ ii= ~ ~ f ~ f J'. J'.f ~ -1-~ ' T ' I± ± I T F~ WALL MOUNTED, LIGHTED SIGN, OFCI ill-,,_ / 2 1\A 101 ~f f ~ -1-T T-1-t-_± EAST ELEVATION SCALE: 1 /8"=1 '-0" !~ J'.~ 12 12 ~ t ~ 3 ~ ---..........._ ~ -" f . ------~ l ; l f" ', --------,, 1-"' "' ~ ~ ± -~ -\' -'-~ - f f 1: l l -b - -- '-;-- 4' ,;;-- 11 ,, II \ / ' ' ' ---,-,_ ,_ ' • I ~ "" 'c _, ---.------i~ r::l ' ' CUSTOM ALUMINUM ' TUBES-PAINT ! 36" CONCRETE-~ SPHERE BOLLARDS- PAINT i/ --N ,.: :i' "'' '·" f' - .. ,: § ;:' I:" --~---,- -. -~-, -- ----3,--'-- l ~ ~ ,-~ =------== I '-" +-~ '· \_ KNOX BOX-COORDINATE WTIH LOCAL FIRE DEPT. --------1 ·. SOUTH ELEVATION 1 \ A 1 01 ! SCALE: 1 /8"= 1'-0" , CJ I -h I f . 12 12 5 5 ff· ~~~□~-===~-_~:~:~~·~□~~=~·~~~~~=~,□~ ~ f ~ f ~ J'.f J'.f f ~ J'.f ~ f J'.f f ~ f ~ f f -f~ ~ff~ f ~ I -1-~ I ~ l'. I i I ~ t T ~ ± T ±II~±I ~ T ± I T ~ ~ ± l'. ~ ~ I l'. ~ ~ ~ f f ~ If f~ ~~ f~ ~ f f ~ f ~ ~ ~ ~ ~ f ~~ ~~ ~~ ~ t ±~ f ± t t~ t ± t +~ t t t ~~ ~~ ~~ t ~ ~ f ±I T± f ~ ~ f ~ ~ ± f ~ j; ~ ~ ~ ~ f ~ I T T~~IT~ I T ~ ~ I I T ~Il'.~~I t ~ ~t r~ t ~ ~ t ~ ~ r ~ f ± r t r f r t f f f t t t f ~ ~ f ~ j; f i;f f~ i;f ~ j; f f ~ ~ ± f~ ~ff~ ~ ~ t f ~ j; f j;~ ~~ j;~ ~ f j; ~ f ~ ~ ~ ~ ~ ± ~~ ~~ ~~ ~ ~ ff ff ;c~ ~~ f~ f -~ f ~ ~ ~ ~ ~ ~ ~ f f f f I' If f f 1: f f 1: 1: f 1: , I' l 1: 1: 1: 1: I , . '~~ ~ ~~ -~ r ; T~ ~ -~ r~ I." I:" --- -/ -------- ~ -* C ~ "" ; ~ "" T 'i=i===~ '5'· c~~ C '" -~ 'S" ~ 'S" I CJ EXTERIOR FINISH LEGEND MATERIAL MANUFACTURER DESCRIPTION AND COLOR ROOF ASPHALT SHINGLES GAF STYLE: TIMBERLINE HDZ COLOR: BIRCHWOOD SOFFIT PAN ELS LP BUILDING STYLE: SOFFIT PANELS. VENTED SOLUTIONS COLOR: QUARRY GRAY ENTRY FASCIA GAF STYLE: METAL FASCIA COLOR: CUSTOM KYNAR COATED, PURPLE WALL HORIZONTAL LAP SIDING LP BUILDING STYLE: 8", HLP SMARTSIDE, SMOOTH TEXTURE SOLUTIONS COLOR: QUARRY GRAY SIDING TRIM LP BUILDING STYLE: 6", SMOOTH TEXTURE SOLUTIONS ACCENT COLOR: TUNDRA GRAY BRICK BASE ALABAMA BRICK STYLE: STANDARD, RUNNING BOND COLOR: CORTEZ METAL CANOPY MAPES STYLE: CANTILEVER BRACKET SUPPORT CANOPIES COLOR: CUSTOM KYNAR COATED, PURPLE WALL LOUVER STYLE: METAL COLOR: CUSTOM KYNAR COATED --= ~ ~ l'. t ~ ~ f DO NOT SCALE PRINTS. USE FIGURED DIMENSIONS. @2022 FSDG Project: Issued for: Subject: ELEVATIONS Project Owner: EIG "T 814 Services, LLC 1695 Twelve Mile Road Suite 100 Berkley, Ml 48072 Project Consultants: FormSurfaces Design Group 10913 Marcello Lane Whitmore Lake, Ml 48189 Job No. Sheet No. 0SCALE IN FEETPROJECT LOCATIONNSWELOCATION MAP1. ALL WORK SHALL CONFORM TO THE CONTRACT DOCUMENTS, WHICH INCLUDE, BUTARE NOT LIMITED TO, THE OWNER - CONTRACTOR AGREEMENT, THE PROJECT MANUAL(WHICH INCLUDES GENERAL SUPPLEMENTARY CONDITIONS AND SPECIFICATIONS),DRAWINGS OF ALL DISCIPLINES AND ALL ADDENDA, MODIFICATIONS AND CLARIFICATIONSISSUED BY THE ARCHITECT/ENGINEER.2. CONTRACTOR TO OBTAIN ALL UTILITY CONNECTION PERMITS FROM THE CITY OFROCHESTER PUBLIC WORKS DEPARTMENT PRIOR TO ANY WORK BEGINNING.3. CONTRACT DOCUMENTS SHALL BE ISSUED TO ALL SUBCONTRACTORS BY THEGENERAL CONTRACTOR IN COMPLETE SETS IN ORDER TO ACHIEVE THE FULL EXTENT ANDCOMPLETE COORDINATION OF ALL WORK.4. WRITTEN DIMENSIONS TAKE PRECEDENCE OVER SCALED DIMENSIONS. NOTIFYARCHITECT/ENGINEER OF ANY DISCREPANCIES OR CONDITIONS REQUIRING INFORMATIONOR CLARIFICATION BEFORE PROCEEDING WITH THE WORK.5. FIELD VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS. NOTIFYARCHITECT/ENGINEER OF ANY DISCREPANCIES OR CONDITIONS REQUIRING INFORMATIONOR CLARIFICATION BEFORE PROCEEDING WITH THE WORK.6. DETAILS SHOWN ARE INTENDED TO BE INDICATIVE OF THE PROFILES AND TYPE OFDETAILING REQUIRED THROUGHOUT THE WORK. DETAILS NOT SHOWN ARE SIMILAR INCHARACTER TO DETAILS SHOWN. WHERE SPECIFIC DIMENSIONS, DETAILS OR DESIGNINTENT CANNOT BE DETERMINED, NOTIFY ARCHITECT/ENGINEER BEFORE PROCEEDINGWITH THE WORK.7. ALL MANUFACTURED ARTICLES, MATERIALS AND EQUIPMENT SHALL BE APPLIED,INSTALLED, CONNECTED, ERECTED, CLEANED AND CONDITIONED ACCORDING TOMANUFACTURERS' INSTRUCTIONS. IN CASE OF DISCREPANCIES BETWEENMANUFACTURERS' INSTRUCTIONS AND THE CONTRACT DOCUMENTS, NOTIFYARCHITECT/ENGINEER BEFORE PROCEEDING WITH THE WORK.8. ALL DISSIMILAR METALS SHALL BE EFFECTIVELY ISOLATED FROM EACH OTHER TOAVOID GALVANIC CORROSION.9. THE LOCATION AND TYPE OF ALL INPLACE UTILITIES SHOWN ON THE PLANS ARE FORGENERAL INFORMATION ONLY AND ARE ACCURATE AND COMPLETE TO THE BEST OF THEKNOWLEDGE OF I & S GROUP, INC. (ISG). NO WARRANTY OR GUARANTEE IS IMPLIED. THECONTRACTOR SHALL VERIFY THE SIZES, LOCATIONS AND ELEVATIONS OF ALL INPLACEUTILITIES PRIOR TO CONSTRUCTION. CONTRACTOR SHALL IMMEDIATELY NOTIFYENGINEER OF ANY DISCREPANCIES OR VARIATIONS FROM PLAN.10. THE CONTRACTOR IS TO CONTACT "GOPHER STATE ONE CALL" FOR UTILITYLOCATIONS, MINIMUM 2 BUSINESS DAYS PRIOR TO ANY EXCAVATION / CONSTRUCTION(1-800-252-1166).PROJECT GENERAL NOTESALL CONSTRUCTION SHALL COMPLY WITH THE PROJECT SPECIFICATIONS, THE LATESTCITY OF OTSEGO STANDARD SPECIFICATIONS AND DETAIL PLATES , THE MNDOTSTANDARD SPECIFICATIONS FOR CONSTRUCTION, 2022 EDITION, AND CURRENT VERSIONOF THE PLUMBING CODE OF MINNESOTA UNLESS DIRECTED OTHERWISE.HORIZONTAL COORDINATES HAVE BEEN REFERENCED TO THE NORTH AMERICAN DATUMOF 1983 (NAD83), ON THE MINNESOTA DOT: OLMSTED COUNTY, US FOOT COORDINATESYSTEM, IN U.S. SURVEY FEET.ELEVATIONS HAVE BEEN REFERENCED TO THE NORTH AMERICAN VERTICAL DATUM OF1988 (NAVD 88).RTK GPS METHODS WERE USED TO ESTABLISH HORIZONTAL AND VERTICAL COORDINATESFOR THIS PROJECT.THIS PROJECT'S TOPOGRAPHIC SURVEY CONSISTS OF DATA COLLECTED IN SEPTEMBER2022 BY ISGSPECIFICATIONS REFERENCEPROJECT DATUMTOPOGRAPHIC SURVEY LEGEND EXISTINGWWETXXXX><IIPROPOSED>IIOEUEUTVG>>>>>>>>UTILITY PROVIDERSUTIOEUEUTVGOHLUTLFBO28667 C0-TITLEDATE DESCRIPTIONBYPROJECTTITLESHEETREVISION SCHEDULEPROJECT NO.FILE NAMEDESIGNED BYDRAWN BYREVIEWED BYWITHOUT PRIOR WRITTEN CONSENT.INC. AND MAY NOT BE USED, COPIED OR DUPLICATED THIS DOCUMENT IS THE PROPERTY OF I & S GROUP,DATE DESCRIPTIONBYISSUE SCHEDULEFILE LOCATION: S:\PROJECTS\28000 PROJ\28600-28699\28667 O2B KIDS-OTSEGO MN\28667 PRODUCTION FILES\28667 CIVIL 3D\PRODUCTION DWGS\28667 C0-TITLE.DWG23-28667C100COVER SHEETC100 COVER SHEET---- ---- C100O2B KIDSEIG14TPROJECT ADDRESS / LOCATION:8891 PARRISH AVE NEOTSEGO, MN 55330SECTION 22, T-121 N, R-23 WWRIGHT COUNTYOTSEGO, MINNESOTAMJEARARJAZONING SUMMARYZONING:SITE/LOT AREA:IMPERVIOUS AREA:GREENSPACEPROVIDED:PARKING REQUIREMENTSDAY CARE CENTERTOTAL:SETBACKSPROJECT ENGINEER:ALEX AMADEO - ISG217 E 2ND ST SUITE 110DES MOINES, IA 50309PHONE: 515-243-9143EMAIL:ALEX.AMADEO@ISGINC.COMPROPERTY OWNER:DANIEL HARRIS1695 TWELVE MILE RD, SUITE 100BERKLEY, MI 48072PHONE: 248-514-9120EMAIL:DAN@814CRE.COM05/22/2023 CITY SUBMITTAL #1 MJECIVIL SHEET INDEX GGGGGGGGGGGGGGUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEIIIIIIIII>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>28667 C2-EXISTDATE DESCRIPTIONBYPROJECTTITLESHEETREVISION SCHEDULEPROJECT NO.FILE NAMEDESIGNED BYDRAWN BYREVIEWED BYWITHOUT PRIOR WRITTEN CONSENT.INC. AND MAY NOT BE USED, COPIED OR DUPLICATED THIS DOCUMENT IS THE PROPERTY OF I & S GROUP,DATE DESCRIPTIONBYISSUE SCHEDULEFILE LOCATION: S:\PROJECTS\28000 PROJ\28600-28699\28667 O2B KIDS-OTSEGO MN\28667 PRODUCTION FILES\28667 CIVIL 3D\PRODUCTION DWGS\28667 C2-EXIST.DWG23-28667C200EXISTINGCONDITIONSC200 EXISTING CONDITIONS ---- ---- C2000SCALE IN FEET20 40MJEARARJA05/22/2023 CITY SUBMITTAL #1 MJE T/C=864.95EX CBR=866.96EX SAN MHR=867.61EX SAN MHR=866.87I=862.90 (18" HDPE) SSUMP=860.05EX STM MHGGGGGGGGGGGGGGUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEIIIIIIIII>>>>>>>>>>>R=865.13I=861.06 (15" HDPE) WSUMP=860.54EX STM MHI=860.43I=861.87T/C=866.44I=862.34 (15" RCP) WEX CB>>>>>>>>>>>>>>>>>>R=864.75I=861.58 (15" HDPE) EI=861.35 (15" HDPE) SWEX CBT/C=867.73EX CB>>>>>>>>>>>>>>>>>>28667 C2-EXISTDATE DESCRIPTIONBYPROJECTTITLESHEETREVISION SCHEDULEPROJECT NO.FILE NAMEDESIGNED BYDRAWN BYREVIEWED BYWITHOUT PRIOR WRITTEN CONSENT.INC. AND MAY NOT BE USED, COPIED OR DUPLICATED THIS DOCUMENT IS THE PROPERTY OF I & S GROUP,DATE DESCRIPTIONBYISSUE SCHEDULEFILE LOCATION: S:\PROJECTS\28000 PROJ\28600-28699\28667 O2B KIDS-OTSEGO MN\28667 PRODUCTION FILES\28667 CIVIL 3D\PRODUCTION DWGS\28667 C2-EXIST.DWG23-28667C300DEMO PLANC300 DEMO PLAN ---- ---- C3000SCALE IN FEET20 40MJEARARJA05/22/2023 CITY SUBMITTAL #1 MJEREMOVAL LEGENDSYMBOL DESCRIPTION XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX X X X X X X X XPROPOSEDBUILDING10,960 SQ. FT.FFE = 868.00IGGGGGGGGGGGGGGUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEIIIIIIIII>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>28667 C3-SITEDATE DESCRIPTIONBYPROJECTTITLESHEETREVISION SCHEDULEPROJECT NO.FILE NAMEDESIGNED BYDRAWN BYREVIEWED BYWITHOUT PRIOR WRITTEN CONSENT.INC. AND MAY NOT BE USED, COPIED OR DUPLICATED THIS DOCUMENT IS THE PROPERTY OF I & S GROUP,DATE DESCRIPTIONBYISSUE SCHEDULEFILE LOCATION: S:\PROJECTS\28000 PROJ\28600-28699\28667 O2B KIDS-OTSEGO MN\28667 PRODUCTION FILES\28667 CIVIL 3D\PRODUCTION DWGS\28667 C3-SITE.DWG23-28667C400 SITE PLAN ---- ---- C4000SCALE IN FEET20 40ZONING SUMMARYZONING:SITE/LOT AREA:IMPERVIOUS AREA:GREENSPACEPROVIDED:PARKING REQUIREMENTSDAY CARE CENTERTOTAL:SETBACKSMJEARARJAC400SITE PLANPAVEMENT LEGENDSYMBOL DESCRIPTION05/22/2023 CITY SUBMITTAL #1 MJE XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX X X X X X X X XPROPOSEDBUILDING10,960 SQ. FT.FFE = 868.00>> >> >> >>>>>>>>>>>>>>>>>>>IT/C=864.95EX CBR=866.87I=862.90 (18" HDPE) SSUMP=860.05EX STM MHGGGGGGGGGGGGGGUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEIIIIIIIII>>>>>>>>>>>R=865.13I=861.06 (15" HDPE) WSUMP=860.54EX STM MHI=860.43I=861.87T/C=866.44I=862.34 (15" RCP) WEX CB>>>>>>>>>>>>>>>>>>R=864.75I=861.58 (15" HDPE) EI=861.35 (15" HDPE) SWEX CBT/C=867.73EX CB>>>>>>>>>>>>>>>>>>XXXXXXXXXX X X X X X X X XPROPOSEDBUILDING10,960 SQ. FT.FFE = 868.00>>>>>>>>>>>>>>>>>>>>>>>>>>IR=866.87I=862.90 (18" HDPE) SSUMP=860.05EX STM MHIIIIIIIII>>>>>>>>>>>I=861.87T/C=866.445" RCP) WPPI=862.34 (15EX CB>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>R=864.75I=861.58(15" HDPE) EEX CB>>>>>>>>>STORM DRAIN STRUCTURE SCHEDULESTORM DRAIN PIPE SCHEDULESANITARY SEWER STRUCTURE SCHEDULESANITARY SEWER PIPE SCHEDULEMJEARARJAC500SITE UTILITY PLAN28667 C3-SITEDATE DESCRIPTIONBYPROJECTTITLESHEETREVISION SCHEDULEPROJECT NO.FILE NAMEDESIGNED BYDRAWN BYREVIEWED BYWITHOUT PRIOR WRITTEN CONSENT.INC. AND MAY NOT BE USED, COPIED OR DUPLICATED THIS DOCUMENT IS THE PROPERTY OF I & S GROUP,DATE DESCRIPTIONBYISSUE SCHEDULEFILE LOCATION: S:\PROJECTS\28000 PROJ\28600-28699\28667 O2B KIDS-OTSEGO MN\28667 PRODUCTION FILES\28667 CIVIL 3D\PRODUCTION DWGS\28667 C3-SITE.DWG23-28667C500 SITE UTILITY PLAN---- ---- C5000SCALE IN FEET20 4005/22/2023 CITY SUBMITTAL #1 MJE XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX X X X X X X X XPROPOSEDBUILDING10,960 SQ. FT.FFE = 868.00>> >> >> >>>>>>>>>>>>>>>>>>>IGGGGGGGGGGGGGGUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEIIIIIIIII>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>28667 C4-GRADEDATE DESCRIPTIONBYPROJECTTITLESHEETREVISION SCHEDULEPROJECT NO.FILE NAMEDESIGNED BYDRAWN BYREVIEWED BYWITHOUT PRIOR WRITTEN CONSENT.INC. AND MAY NOT BE USED, COPIED OR DUPLICATED THIS DOCUMENT IS THE PROPERTY OF I & S GROUP,DATE DESCRIPTIONBYISSUE SCHEDULEFILE LOCATION: S:\PROJECTS\28000 PROJ\28600-28699\28667 O2B KIDS-OTSEGO MN\28667 PRODUCTION FILES\28667 CIVIL 3D\PRODUCTION DWGS\28667 C4-GRADE.DWG23-28667C600GRADING PLANC600 GRADING PLAN ---- ---- C6000SCALE IN FEET20 40MJEARARJAGRADING LEGENDGENERAL GRADING NOTES10110005/22/2023 CITY SUBMITTAL #1 MJE XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX X X X X X X X XPROPOSEDBUILDING10,960 SQ. FT.FFE = 868.00GGGGGGGGGGGGGGUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUE>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>> >> >> >>>>>>>>>>>>>>>>>>>IRESTORATION SCHEDULE28667 C5-LANDDATE DESCRIPTIONBYPROJECTTITLESHEETREVISION SCHEDULEPROJECT NO.FILE NAMEDESIGNED BYDRAWN BYREVIEWED BYWITHOUT PRIOR WRITTEN CONSENT.INC. AND MAY NOT BE USED, COPIED OR DUPLICATED THIS DOCUMENT IS THE PROPERTY OF I & S GROUP,DATE DESCRIPTIONBYISSUE SCHEDULEFILE LOCATION: S:\PROJECTS\28000 PROJ\28600-28699\28667 O2B KIDS-OTSEGO MN\28667 PRODUCTION FILES\28667 CIVIL 3D\PRODUCTION DWGS\28667 C5-LAND.DWG23-28667C700RESTORATIONPLANC700 RESTORATION PLAN ---- ---- C7000SCALE IN FEET20 40LMWLMWMRW05/22/2023 CITY SUBMITTAL #1 MJE XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX X X X X X X X XPROPOSEDBUILDING10,960 SQ. FT.FFE = 868.00GGGGGGGGGGGGGGUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUE>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>> >> >> >>>>>>>>>>>>>>>>>>>IPLANT SCHEDULELANDSCAPE REQUIREMENTSAS REQUIRED IN OSTEGO, MINNESOTA ZONING CODE(SECTIONS 5-2-3 & 11-19)28667 C5-LANDDATE DESCRIPTIONBYPROJECTTITLESHEETREVISION SCHEDULEPROJECT NO.FILE NAMEDESIGNED BYDRAWN BYREVIEWED BYWITHOUT PRIOR WRITTEN CONSENT.INC. AND MAY NOT BE USED, COPIED OR DUPLICATED THIS DOCUMENT IS THE PROPERTY OF I & S GROUP,DATE DESCRIPTIONBYISSUE SCHEDULEFILE LOCATION: S:\PROJECTS\28000 PROJ\28600-28699\28667 O2B KIDS-OTSEGO MN\28667 PRODUCTION FILES\28667 CIVIL 3D\PRODUCTION DWGS\28667 C5-LAND.DWG23-28667C710PLANTING PLANC710 PLANTING PLAN ---- ---- C7100SCALE IN FEET20 40LMWLMWMRW05/22/2023 CITY SUBMITTAL #1 MJE XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX X X X X X X X XPROPOSEDBUILDING10,960 SQ. FT.FFE = 868.00GGGGGGGGGGGGGGUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUE>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>> >> >> >>>>>>>>>>>>>>>>>>>IIRRIGATION LEGENDSYMBOL DESCRIPTION1. IRRIGATION CONTRACTOR SHALL BE RESPONSIBLE FOR THE LOCATION ANDVERIFICATION OF ALL EXISTING UTILITIES AND STRUCTURES. EXERCISE EXTREMECARE IN EXCAVATING AND WORKING NEAR UTILITIES. DAMAGE DONE TO UTILITIES,STRUCTURES, OR OTHER FINISHED WORK SHALL BE REPAIRED OR REPLACED ATTHE IRRIGATION CONTRACTORS EXPENSE.2. IRRIGATION CONTRACTOR TO FIELD ADJUST DRIP LINE LOCATIONS SO AS TO AVOIDCONFLICTS WITH TREES, SITE FURNITURE, AND UTILITIES.3. INSTALL PVC SCHEDULE 40 PIPE SLEEVES UNDER HARDSCAPE AT ALL POINTSWHERE IRRIGATION MAIN LINE AND LATERALS ARE LOCATED.4. INSTALL ALL MAINLINES TO SLOPE AT 1% MINIMUM TO MANUAL DRAIN VALVESLOCATED AT LOW POINTS OR AS INDICATED ON PLANS OF MAINLINE SYSTEM.5. THE CONTRACTOR SHALL PLACE A #12 SOLID COPPER TRACE WIRE WITH PURPLE PECOVER FOR WATER ALONG ALL PVC MAINLINE. THIS INCLUDES ALL PVC MAINLINECONNECTING QUICK COUPLER VALVES.6. THE IRRIGATION CONTRACTOR SHALL COORDINATE WITH GENERAL CONTRACTORTO INSURE THE POINT OF CONNECTION IS PROVIDED PER PLANS.7. INSTALL A BACKFLOW PREVENTER AND ENCLOSURE AT THE POINT OF CONNECTION.INSTALL PER MANUFACTURER SPECIFICATIONS. COORDINATE WITH LOCAL CITYORDINANCES TO ENSURE THE POINT OF CONNECTION MEETS ALL CODES.8. IRRIGATION CONTRACTOR SHALL INSTALL DRIP IRRIGATION SYSTEM FOR ALLPLANTING AREAS AND SPRAY HEADS FOR TURF LAWN AREAS.9. CONTRACTOR TO SUBMIT IRRIGATION PLAN AND PRODUCT INFORMATION TOLANDSCAPE ARCHITECT FOR REVIEW AND APPROVAL PRIOR TO INSTALLATION.SUBMIT IRRIGATION PLAN AT A SCALE OF 1 INCH EQUALS 30 FEET OR GREATERINDICATING POINT OF CONNECTION, BACKFLOW PREVENTER, LAYOUT / LOCATIONSOF DRIP-LINE, VALVES, MAINLINE, ISOLATION VALVES, FLOW SENSORS, RAIN /FREEZE SENSOR, PIPE SIZING, AND CONTROLLER LOCATIONS.10. CONTRACTOR TO INSTALL NEW TORO CUSTOM COMMAND SERIES / HUNTER ACC-D /RAIN BIRD ESP-LXIVM (OR APPROVED EQUAL) CONTROLLER WITH STAINLESS STEELPEDESTAL MOUNT. SOURCE IRRIGATION CONTROLLER, RAIN / FREEZE SENSOR,QUICK COUPLERS, AND CONTROL VALVES FROM ONE MANUFACTURER.CONTRACTOR TO VERIFY 110V UNINTERRUPTED ELECTRICAL SERVICE FOR THECONTROLLER. CONTRACTOR TO INSTALL CONTROLLER PER MANUFACTURER'SSPECIFICATIONS.11. INSTALL VALVE BOX LOCATIONS IN PLANTING AREAS, PARALLEL TO AND SET BACKFROM PAVEMENT EDGES AS INDICATED ON THE PLANS.12. PROTECT AT ALL TIMES THE WORK FROM DAMAGE AND THEFT. REPLACE ALLDAMAGED OR STOLEN PARTS AT CONTRACTOR'S EXPENSE UNTIL THE WORK ISACCEPTED IN WRITING BY THE OWNER'S REPRESENTATIVE.IRRIGATION NOTES28667 C5-LANDDATE DESCRIPTIONBYPROJECTTITLESHEETREVISION SCHEDULEPROJECT NO.FILE NAMEDESIGNED BYDRAWN BYREVIEWED BYWITHOUT PRIOR WRITTEN CONSENT.INC. AND MAY NOT BE USED, COPIED OR DUPLICATED THIS DOCUMENT IS THE PROPERTY OF I & S GROUP,DATE DESCRIPTIONBYISSUE SCHEDULEFILE LOCATION: S:\PROJECTS\28000 PROJ\28600-28699\28667 O2B KIDS-OTSEGO MN\28667 PRODUCTION FILES\28667 CIVIL 3D\PRODUCTION DWGS\28667 C5-LAND.DWG23-28667C720IRRIGATION PLANC720 IRRIGATION PLAN ---- ---- C7200SCALE IN FEET20 40LMWLMWMRW05/22/2023 CITY SUBMITTAL #1 MJE 28667 C5-LANDDATE DESCRIPTIONBYPROJECTTITLESHEETREVISION SCHEDULEPROJECT NO.FILE NAMEDESIGNED BYDRAWN BYREVIEWED BYWITHOUT PRIOR WRITTEN CONSENT.INC. AND MAY NOT BE USED, COPIED OR DUPLICATED THIS DOCUMENT IS THE PROPERTY OF I & S GROUP,DATE DESCRIPTIONBYISSUE SCHEDULEFILE LOCATION: S:\PROJECTS\28000 PROJ\28600-28699\28667 O2B KIDS-OTSEGO MN\28667 PRODUCTION FILES\28667 CIVIL 3D\PRODUCTION DWGS\28667 C5-LAND.DWG23-28667C730PLANTINGDETAILSC730 PLANTING DETAILS ---- ---- C730LMWLMWMRW05/22/2023 CITY SUBMITTAL #1 MJE1. COORDINATE LOCATION OF ALL UTILITIES (LINES, DUCTS, CONDUITS, SLEEVES,FOOTINGS, ETC.) WITH LOCATIONS OF PROPOSED LANDSCAPE ELEMENTS (FENCE,FOOTINGS, TREE ROOTBALLS, ETC.). CONTRACTOR SHALL REPORT ANYDISCREPANCIES TO OWNER'S REPRESENTATIVE PRIOR TO CONTINUING WORK.2. SAVE AND PROTECT ALL EXISTING TREES NOT NOTED TO BE REMOVED.3. REMOVE ALL CONSTRUCTION DEBRIS AND MATERIALS INJURIOUS TO PLANT GROWTHFROM PLANTING PITS AND BEDS PRIOR TO BACKFILLING WITH PLANTING MIX.4. REFER TO PLANTING DETAILS FOR AMENDED SOIL DEPTH IN PLANTING BEDS ANDSURROUNDING TREES.5. FIELD STAKE PLANTINGS ACCORDING TO PLAN. OWNER'S REPRESENTATIVE SHALLAPPROVE ALL PLANT LOCATIONS PRIOR TO INSTALLATION. OWNER'SREPRESENTATIVE RESERVES THE RIGHT TO REVISE PLANTING LAYOUT AT TIME OFINSTALLATION.6. ALL PLANT MATERIALS SHALL BE TRUE TO THEIR SCIENTIFIC NAME AND SIZE ASINDICATED IN THE PLANT SCHEDULE.7. IF DISCREPANCIES EXIST BETWEEN THE NUMBER OF PLANTS DRAWN ON THEPLANTING PLAN AND THE NUMBER OF PLANTS IN THE SCHEDULE, THE PLANTING PLANSHALL GOVERN.8. ANY PROPOSED SUBSTITUTIONS OF PLANT SPECIES SHALL BE MADE WITH PLANTS OFEQUIVALENT OVERALL FORM, HEIGHT, BRANCHING HABIT, FLOWER, LEAF, COLOR,FRUIT AND CULTURE, AND ONLY AFTER WRITTEN APPROVAL OF THE OWNER'SREPRESENTATIVE.9. ALL PLANT MATERIALS MUST CONFORM TO AMERICAN STANDARDS FOR NURSERYSTOCK (ANSI Z60.1), LATEST EDITION PUBLISHED BY THE AMERICAN ASSOCIATION OFNURSERYMEN, WASHINGTON D.C. LARGER SIZED PLANT MATERIALS OF THE SPECIESLISTED MAY BE USED IF THE STOCK CONFORMS TO ANSI Z60.1.10. ALL PLANT MATERIAL SHALL BE GUARANTEED BY THE CONTRACTOR TO BE IN A LIVEAND HEALTHY GROWING CONDITION FOR ONE FULL GROWING SEASON (ONE YEAR)AFTER FINAL PROJECT ACCEPTANCE OR SHALL BE REPLACED BY THE CONTRACTORFREE OF CHARGE WITH THE SAME GRADE AND SPECIES.11. ALL TREES SHALL HAVE A STRONG CENTRAL LEADER. ANY TREES DEEMED NOT TOHAVE A STRONG CENTRAL LEADER SHALL BE REJECTED.12. CONTRACTOR IS RESPONSIBLE FOR ALL DAMAGE DUE TO CONSTRUCTIONOPERATIONS. ANY AREAS THAT ARE DISTURBED SHALL BE RESTORED TO ITSORIGINAL CONDITION AT NO ADDITIONAL COST TO THE OWNER.13. PROVIDE SHREDDED HARDWOOD MULCH SURROUNDING ALL PROPOSED TREES (5' Ø)AND WITHIN PLANTING BEDS TO A 3" MINIMUM DEPTH AS SHOWN IN TREE PLANTINGDETAIL. DO NOT USE AN UNDERLAYMENT SUCH AS PLASTIC SHEET OR LANDSCAPEFABRIC. APPLY PRE-EMERGENT TO ALL PLANTING BEDS PRIOR TO MULCHING. REFERTO PLANS FOR ADDITIONAL DETAILS. REFER TO STORMWATER DETAILS FOR BASINCONSTRUCTION AND MULCH APPLICATION.14. MULCHING MATERIAL SHALL BE SHREDDED HARDWOOD MULCH, WITH NO INDIVIDUALPIECES LARGER THAN 3", FREE OF GROWTH OR GERMINATION INHIBITINGINGREDIENTS, 3" MINIMUM DEPTH. MINIMUM DEPTHS AT LOCATIONS INDICATED ONDRAWINGS.15. CONTRACTOR SHALL PROVIDE SAMPLE OF MULCH TO BE APPROVED BY THELANDSCAPE ARCHITECT.16. INDICATED QUANTITIES ARE ESTIMATES AND SHALL BE CONFIRMED BY THECONTRACTOR.17. ADJUST SPACING OF PLANT MATERIALS AROUND ADJACENT UTILITY STRUCTURES.PLANTING NOTESLANDSCAPE EDGINGNTS LD740DECIDUOUS TREE PLANTINGNTS LD705STAKING DIAGRAMSHRUB PLANTINGNTS LD720PERENNIAL PLANTINGNTS LD725PLANSECTION XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX X X X X X X X XPROPOSEDBUILDING10,960 SQ. FT.FFE = 868.0000.0 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.0 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.2 0.2 0.2 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.2 0.3 0.2 0.2 0.1 0.1 0.1 0.2 0.2 0.3 0.4 0.4 0.3 0.2 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0.0 0.0 0.1 0.1 0.2 0.2 0.3 0.5 0.9 0.6 0.4 0.4 0.4 0.5 0.6 0.7 1.1 1.6 1.4 0.9 0.6 0.5 0.4 0.4 0.3 0.3 0.1 0.0 0.0 0.0 0.0 0.0.0 0.1 0.2 0.3 0.5 0.6 0.9 1.3 1.5 1.4 1.1 0.9 0.9 0.9 0.9 1.1 1.4 1.6 1.5 1.3 0.9 0.8 0.9 1.3 1.8 2.3 2.1 1.9 2.5 0.0 0.0 0.0.0 0.1 0.3 0.4 0.6 0.8 1.1 1.4 1.6 1.5 1.3 1.1 1.0 1.0 1.0 1.1 1.3 1.5 1.4 1.1 1.0 0.9 1.1 1.4 1.9 2.5 2.4 2.3 2.8 0.0 0.0 0.0.1 0.3 0.4 0.6 0.7 1.0 1.2 1.3 1.3 1.1 1.0 1.0 1.0 1.0 1.0 1.1 1.2 1.1 1.0 0.9 0.9 1.0 1.3 1.7 2.2 2.3 2.4 2.0 0.0 0.0 0.0.1 0.3 0.4 0.6 0.7 0.8 1.0 1.1 1.0 1.0 1.0 1.0 1.0 0.9 0.9 0.9 0.9 0.9 0.8 0.8 0.8 1.0 1.2 1.5 1.8 2.1 2.2 1.4 0.0 0.0 0.0.1 0.2 0.4 0.5 0.6 0.7 0.7 0.8 0.8 0.8 0.8 0.9 0.9 0.8 0.7 0.7 0.7 0.7 0.7 0.7 0.8 0.9 1.0 1.1 1.2 1.4 1.2 0.6 0.0 0.0 0.0.1 0.2 0.3 0.4 0.5 0.5 0.6 0.6 0.7 0.7 0.8 0.8 0.8 0.7 0.6 0.6 0.6 0.6 0.6 0.6 0.7 0.7 0.7 0.7 0.8 0.9 0.9 0.3 0.0 0.0 0.0.1 0.2 0.3 0.4 0.4 0.4 0.5 0.6 0.7 0.7 0.8 0.9 0.9 0.8 0.7 0.6 0.6 0.6 0.6 0.7 0.7 0.6 0.5 0.5 0.5 0.6 0.5 0.2 0.0 0.0 0.0.1 0.2 0.2 0.3 0.3 0.3 0.30.3 0.4 0.3 0.3 0.4 0.3 0.1 0.0 0.0 0.0.1 0.1 0.2 0.2 0.2 0.2 0.20.2 0.2 0.2 0.2 0.2 0.1 0.1 0.0 0.0 0.0.1 0.1 0.1 0.1 0.1 0.1 0.00.1 0.1 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.0.1 0.1 0.1 0.1 0.1 0.1 0.00.0 0.0 0.0 0.1 0.1 0.0 0.0 0.0 0.0 0.0.0 0.0 0.1 0.1 0.0 0.0 0.00.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0.0 0.0 0.0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0.0 0.0 0.0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0.0 0.0 0.0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.28667 C6-LIGHTINGDATE DESCRIPTIONBYPROJECTTITLESHEETREVISION SCHEDULEPROJECT NO.FILE NAMEDESIGNED BYDRAWN BYREVIEWED BYWITHOUT PRIOR WRITTEN CONSENT.INC. AND MAY NOT BE USED, COPIED OR DUPLICATED THIS DOCUMENT IS THE PROPERTY OF I & S GROUP,DATE DESCRIPTIONBYISSUE SCHEDULEFILE LOCATION: S:\PROJECTS\28000 PROJ\28600-28699\28667 O2B KIDS-OTSEGO MN\28667 PRODUCTION FILES\28667 CIVIL 3D\PRODUCTION DWGS\28667 C6-LIGHTING.DWG23-28667C800 SITE LIGHTING PHOTOMETRIC PLAN---- ---- C800BJMBJMRJAC800SITE LIGHTINGPHOTOMETRICPLAN0SCALE IN FEET20 40"AA" LIGHT STYLEN.T.S.1MANUFACTURER/MODEL NUMBERLIGHT FIXTURE SCHEDULESTYLETYPELAMPS REMARKSProvide light fixtures as shown on Fixture Schedule. Substitutions shall have prior approval by the Project Engineer before bid date. Being listed as anacceptable Manufacturer in no way relieves the Contractors obligation to provide all equipment and features in accordance with these specifications.FOOTCANDLE LEGEND05/22/2023 CITY SUBMITTAL #1 MJE BITUMINOUS PAVEMENTNTSSTANDARDCONCRETE SIDEWALKNTSPARKING SURFACEACCESSIBLE PARKING SIGNNTSPARKINGVEHICLE IDREQUIREDUP TO $200 FINEFOR VIOLATIONVANACCESSIBLE4' OR 5' CHAIN LINK FENCENTSTURN DOWNCONCRETE SIDEWALKNTSACCESSIBLE PARKING AREANTSTURF (BY OTHERS)TURF (BY OTHERS)COMPACTED SUBGRADENOTES:1. ALL TURF AND PAD IS BY OTHERS.2. THE COMPACTED STONE BELOW THE TURF AREA IS BY OTHERS. CONTRACTOR TO PREPARESUBGRADE TO BOTTOM OF STONE ELEVATION.1-1/2" PAD (BY OTHERS)4" COMPACTED STONE4" CONCRETE1-1/2"1-1/2"TURF (BY OTHERS)TURF (BY OTHERS)COMPACTED SUBGRADE1-1/2"3" COMPACTED STONE(BY OTHERS)1-1/2"CONTRACTOR TO INSTALL6" PERFORATEDSUBDRAIN UNDER THISPLAY AREA SECTION ANDSHALL BE TIED INTO THESTORM SEWER SYSTEM.28667 C0-DETAILSDATE DESCRIPTIONBYPROJECTTITLESHEETREVISION SCHEDULEPROJECT NO.FILE NAMEDESIGNED BYDRAWN BYREVIEWED BYWITHOUT PRIOR WRITTEN CONSENT.INC. AND MAY NOT BE USED, COPIED OR DUPLICATED THIS DOCUMENT IS THE PROPERTY OF I & S GROUP,DATE DESCRIPTIONBYISSUE SCHEDULEFILE LOCATION: S:\PROJECTS\28000 PROJ\28600-28699\28667 O2B KIDS-OTSEGO MN\28667 PRODUCTION FILES\28667 CIVIL 3D\PRODUCTION DWGS\28667 C0-DETAILS.DWG###23-28667C810SITE DETAILSC810 SITE DETAILS ---- ---- C81005/22/2023 CITY SUBMITTAL #1 MJE 28667 C0-DETAILSDATE DESCRIPTIONBYPROJECTTITLESHEETREVISION SCHEDULEPROJECT NO.FILE NAMEDESIGNED BYDRAWN BYREVIEWED BYWITHOUT PRIOR WRITTEN CONSENT.INC. AND MAY NOT BE USED, COPIED OR DUPLICATED THIS DOCUMENT IS THE PROPERTY OF I & S GROUP,DATE DESCRIPTIONBYISSUE SCHEDULEFILE LOCATION: S:\PROJECTS\28000 PROJ\28600-28699\28667 O2B KIDS-OTSEGO MN\28667 PRODUCTION FILES\28667 CIVIL 3D\PRODUCTION DWGS\28667 C0-DETAILS.DWG###23-28667C811SITE DETAILSC811 SITE DETAILS---- ---- C81105/22/2023 CITY SUBMITTAL #1 MJE 28667 C0-DETAILSDATE DESCRIPTIONBYPROJECTTITLESHEETREVISION SCHEDULEPROJECT NO.FILE NAMEDESIGNED BYDRAWN BYREVIEWED BYWITHOUT PRIOR WRITTEN CONSENT.INC. AND MAY NOT BE USED, COPIED OR DUPLICATED THIS DOCUMENT IS THE PROPERTY OF I & S GROUP,DATE DESCRIPTIONBYISSUE SCHEDULEFILE LOCATION: S:\PROJECTS\28000 PROJ\28600-28699\28667 O2B KIDS-OTSEGO MN\28667 PRODUCTION FILES\28667 CIVIL 3D\PRODUCTION DWGS\28667 C0-DETAILS.DWG###23-28667C812SITE DETAILSC812 SITE DETAILS---- ---- C81205/22/2023 CITY SUBMITTAL #1 MJE XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX X X X X X X X XPROPOSEDBUILDING10,960 SQ. FT.FFE = 868.00>> >> >> >>>>>>>>>>>>>>>>>>>IGGGGGGGGGGGGGGUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEIIIIIIIII>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>PCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPC PC PC PC PC 28667 C1-SWPPPDATE DESCRIPTIONBYPROJECTTITLESHEETREVISION SCHEDULEPROJECT NO.FILE NAMEDESIGNED BYDRAWN BYREVIEWED BYWITHOUT PRIOR WRITTEN CONSENT.INC. AND MAY NOT BE USED, COPIED OR DUPLICATED THIS DOCUMENT IS THE PROPERTY OF I & S GROUP,DATE DESCRIPTIONBYISSUE SCHEDULEFILE LOCATION: S:\PROJECTS\28000 PROJ\28600-28699\28667 O2B KIDS-OTSEGO MN\28667 PRODUCTION FILES\28667 CIVIL 3D\PRODUCTION DWGS\28667 C1-SWPPP.DWG23-28667C900TEMPORARYEROSION ANDSEDIMENTCONTROL PLANC900 TEMPORARY EROSION AND SEDIMENT CONTROL PLAN ---- ---- C9000SCALE IN FEET20 40MJEARARJA05/22/2023 CITY SUBMITTAL #1 MJEEROSION CONTROL LEGENDSYMBOL DESCRIPTIONPC101100 28667 C0-DETAILSDATE DESCRIPTIONBYPROJECTTITLESHEETREVISION SCHEDULEPROJECT NO.FILE NAMEDESIGNED BYDRAWN BYREVIEWED BYWITHOUT PRIOR WRITTEN CONSENT.INC. AND MAY NOT BE USED, COPIED OR DUPLICATED THIS DOCUMENT IS THE PROPERTY OF I & S GROUP,DATE DESCRIPTIONBYISSUE SCHEDULEFILE LOCATION: S:\PROJECTS\28000 PROJ\28600-28699\28667 O2B KIDS-OTSEGO MN\28667 PRODUCTION FILES\28667 CIVIL 3D\PRODUCTION DWGS\28667 C0-DETAILS.DWG###23-28667C901TEMPORARYEROSION ANDSEDIMENTCONTROL PLANDETAILSC901 TEMPORARY EROSION AND SEDIMENT CONTROL PLAN DETAILS---- ---- C90105/22/2023 CITY SUBMITTAL #1 MJE 28667 C0-DETAILSDATE DESCRIPTIONBYPROJECTTITLESHEETREVISION SCHEDULEPROJECT NO.FILE NAMEDESIGNED BYDRAWN BYREVIEWED BYWITHOUT PRIOR WRITTEN CONSENT.INC. AND MAY NOT BE USED, COPIED OR DUPLICATED THIS DOCUMENT IS THE PROPERTY OF I & S GROUP,DATE DESCRIPTIONBYISSUE SCHEDULEFILE LOCATION: S:\PROJECTS\28000 PROJ\28600-28699\28667 O2B KIDS-OTSEGO MN\28667 PRODUCTION FILES\28667 CIVIL 3D\PRODUCTION DWGS\28667 C0-DETAILS.DWG###23-28667C902SWPPPNARRATIVEC902 SWPPP NARRATIVE---- ---- C90205/22/2023 CITY SUBMITTAL #1 MJE 28667 C0-DETAILSDATE DESCRIPTIONBYPROJECTTITLESHEETREVISION SCHEDULEPROJECT NO.FILE NAMEDESIGNED BYDRAWN BYREVIEWED BYWITHOUT PRIOR WRITTEN CONSENT.INC. AND MAY NOT BE USED, COPIED OR DUPLICATED THIS DOCUMENT IS THE PROPERTY OF I & S GROUP,DATE DESCRIPTIONBYISSUE SCHEDULEFILE LOCATION: S:\PROJECTS\28000 PROJ\28600-28699\28667 O2B KIDS-OTSEGO MN\28667 PRODUCTION FILES\28667 CIVIL 3D\PRODUCTION DWGS\28667 C0-DETAILS.DWG###23-28667C903SWPPPNARRATIVEC903 SWPPP NARRATIVE---- ---- C90305/22/2023 CITY SUBMITTAL #1 MJE S:\Municipal\Aotsego25xx\2500\OT2523.04 O2B Kids – Daycare Main Office: 3601 Thurston Avenue, Anoka, MN 55303 Phone: 763/427-5860 Fax: 763/427-0520 www.haa-inc.com MEMORANDUM TO: Honorable Mayor and City Council CC: Adam Flaherty, City Administrator/Finance Director Audra Etzel, City Clerk Daniel Licht, City Planner Dave Kendall, City Attorney Alex Amadeo, ISG Daniel Harris, Property Owner FROM: Ronald Wagner, P.E. City Engineer Abdullah Alqwaizani, E.I.T. DATE: May 30, 2023 RE: O2B Kids We have reviewed the following information provided by Civil Engineering Site Design on behalf of Alex Amadeo regarding the O2B Kids. Civil Plan Set for O2B Kids, received 5/22/2023 by ISG The submittal is to be considered for preliminary acceptance. We would offer the following comments: 1. Provide an approval signature line for Ronald J. Wagner, P.E., City Engineer. 2. The datum elevation shall be NGVD 1929 Adj. or provide equation converter from datum 1988 (NGVD 88) to datum 1929 (NGVD 29). 3. Plan must be signed by a Licensed Professional Engineer. 4. Provide date of preparation. 5. Provide location, size, and elevation of all existing sewer, watermain, culverts, and other underground facilities within 150’ shall be shown. 6. Show boundary lines of adjoining unsubdivided or subdivided land, identified by name and ownership. 7. Provide a stop sign on the west entrance. 8. Add ADA raps at the west crossing. 9. Provide cross walk paint on the west entrance on Parkview Ave. May 30, 2023 Page 2 S:\Municipal\Aotsego25xx\2500\OT2523.04 O2B Kids – Daycare 10. Provide the normal, 2-year, 10-year, and 100-year water level for the proposed pond. Summary and/or Recommendation We recommend approval contingent on the above comments being addressed. S:\Municipal\Aotsego25xx\2500\OT2523.04 O2B Kids – Daycare Main Office: 3601 Thurston Avenue, Anoka, MN 55303 Phone: 763/427-5860 Fax: 763/427-0520 www.haa-inc.com MEMORANDUM TO: Honorable Mayor and City Council CC: Adam Flaherty, City Administrator/Finance Director Audra Etzel, City Clerk Daniel Licht, City Planner Dave Kendall, City Attorney Alex Amadeo, ISG Daniel Harris, Property Owner FROM: Ronald Wagner, P.E. City Engineer Abdullah Alqwaizani, E.I.T. DATE: May 30, 2023 RE: O2B Kids We have reviewed the following information provided by Civil Engineering Site Design on behalf of Alex Amadeo regarding the O2B Kids. Civil Plan Set for O2B Kids, received 5/22/2023 by ISG The submittal is to be considered for preliminary acceptance. We would offer the following comments: 1. Provide an approval signature line for Ronald J. Wagner, P.E., City Engineer. 2. The datum elevation shall be NGVD 1929 Adj. or provide equation converter from datum 1988 (NGVD 88) to datum 1929 (NGVD 29). 3. Plan must be signed by a Licensed Professional Engineer. 4. Provide date of preparation. 5. Provide location, size, and elevation of all existing sewer, watermain, culverts, and other underground facilities within 150’ shall be shown. 6. Show boundary lines of adjoining unsubdivided or subdivided land, identified by name and ownership. 7. Provide a stop sign on the west entrance. 8. Add ADA raps at the west crossing. 9. Provide cross walk paint on the west entrance on Parkview Ave. May 30, 2023 Page 2 S:\Municipal\Aotsego25xx\2500\OT2523.04 O2B Kids – Daycare 10. Provide the normal, 2-year, 10-year, and 100-year water level for the proposed pond. Summary and/or Recommendation We recommend approval contingent on the above comments being addressed.