Loading...
Item 4.1 School Knoll Renovation HKGi Presentation2023 School Knoll Park Renovation Otsego, MN School Knoll Park Renovation February Park Commission - Bid Package Review 2023 School Knoll Park Renovation Otsego, MN Agenda Park Improvements • Trail Reroute • Playground Renovation • Bball Renovation / Tennis Alt. • Replace Site Amenities • Tree Relocation • Parking Improvements • New Lights (E.R.M.U) Next Steps • Park Commission Review & Recommendation • City Council Authorization to Bid TENNIS BID ALTERNATE 2023 School Knoll Park Renovation Otsego, MN Design Considerations • $425,000 total project budget • Re-use and bidding strategies to reduce/manage project costs »Reuse Basketball hoops & sub-base aggregate »Reuse Tennis sub-base aggregate, fence cannot be salvaged with soil correction »Reuse 2-5 play structure and relocate swing »Bid tennis court as add alternate • Basketball reconstruction a priority (pavement failing due to poor soils) »Playground and other improvements receives remaining budget • Failing/aging irrigation system »Abandon in place, City to cap system at source, Irrigation non-typical for neighborhood park • Parking lot drainage and access issues • Visibility into park problematic 2023 School Knoll Park Renovation Otsego, MN Site Plan TENNIS BID ALTERNATE 2023 School Knoll Park Renovation Otsego, MN Trail Re-route »A trail reroute better separates shelter and playground users from trail traffic. »Frees up internal space between shelters for lawn games and picnicking. 2023 School Knoll Park Renovation Otsego, MN Playground Renovation »New perimeter sidewalk with shaded seating »New 5-12 main play feature w/ new swing »Reuse of existing 2-5 play feature in place and relocation of swings »90% wood fiber / 10% poured in place safety surface strategy to maximize access »Boulders as play and seating »Transplanted trees for instant shade »Berms and trees for trail separation and added natural interest »$75k equipment budget 2023 School Knoll Park Renovation Otsego, MN Early Exploration of Play Equipment Options Cost Range (equipment + installation): $100K - $110K 2023 School Knoll Park Renovation Otsego, MN Early Exploration of Play Equipment Options Cost Range (equipment + installation): $70K - $80K 2023 School Knoll Park Renovation Otsego, MN RECOMMENDED BURKE + REUSE OPTION Cost Range (equipment + installation): +/-$80K NEW 5-12 PLAY FEATURE REUSE EXISTING SWING NEW 4 SEAT SWING REUSE 2-5 PLAY FEATURE 2023 School Knoll Park Renovation Otsego, MN Basketball Renovation and Tennis Alternate »New path connections »Retain existing evergreens in place for screening »Buffer different court user groups »Reuse existing basketball hoops »Maintenance strip around tennis for ease of mowing »12” sand base layer with drain tile and geo-textile fabric to extend pavement life »Tennis replacement cost much higher due to cost of new fence, nets, and larger pavement area as compared to basketball replacement. 2023 School Knoll Park Renovation Otsego, MN Site Amenities »New benches »New picnic tables »New concrete pads for rolling trash bins »New bike racks (3) »Relocate existing interpretive signage »Reuse existing water fountain »Reuse existing dog waste station »Replace lighting (E.R.M.U) 2023 School Knoll Park Renovation Otsego, MN Tree Relocation »Opens views for public safety from street into center of park »1/3 the cost of a new 2.5” cal. tree »Trees 5-8” in diameter »High success rate with proper care, timing, and watering »Ideally a spring time project (dormancy) »Instant shade in critical seating areas 2023 School Knoll Park Renovation Otsego, MN Parking Improvements »Centralizes ADA parking to more park amenities »Corrects drainage routing issue »Terminates on the Park’s interpretive sign to provide users with a proper introduction to the renovated park »Hammerhead cut-out provides space for south parking spots to back out »Does not include cost for repaving entire parking lot Existing ramp not ADA compliant, does not allow water to drain to catch basin 2023 School Knoll Park Renovation Otsego, MN Other Improvements/Considerations »New lawn area between picnic shelters »Reduce landscaping / more turf »Landscape area for new park sign »Abandon irrigation Concept renderings of sign location LOOKING SOUTH LOOKING EAST 2023 School Knoll Park Renovation Otsego, MN Cost Estimate CATEGORY ESTIMATED COST Site Prep / Survey / Erosion Control $69,500 Site Work / Pavement / Parking Lot Improvements $43,500 Playground / Picnic Area Renovation $191,500 Tennis Court*$101,500 Basketball Courts $40,000 Hard Cost Subtotal $446,000 Mobilization $35,500 Total Construction Cost $481,500 Recommended 15% Contingency for Unanticipated /Unforeseen Construction Costs $72,500 Estimate of Probable Construction Cost $554,000 2023 School Knoll Park Renovation Otsego, MN Project Schedule DATE ITEM February 21 Park Commission review and recommendation February 27 City Council authorize to bid Early March Bid notice Late March Bid opening Late March Award bid Close of School Year - Summer 2023 Project construction 2023 School Knoll Park Renovation Otsego, MN THANK YOU!