Loading...
ITEM 3.6A Jalger Avenue Improvement Project 14-03A Ot�c TY OF ero MINNESOTA DEPARTMENT INFORMATION Request for City Council Action ORIGINATING DEPARTMENT: REQUESTOR: MEETING DATE: Public Works City Engineer Wagner August 25, 2014 PRESENTER(s): REVIEWED BY: ITEM #: Consent Agenda City Administrator Johnson 3.6 a AGENDA ITEM DETAILS RECOMMENDATION: City Staff Recommends approval of payment in the amount of $109,533.66, for the Jalger Avenue Improvement project, City of Otsego Project #14-03, to Knife River, Inc. ARE YOU SEEKING APPROVAL OF A CONTRACT? I IS A PUBLIC HEARING REQUIRED? No I No BACKGROUND/JUSTIFICATION: Knife River has completed the project and we are holding 5% retainage to ensure the grass establishes in along the shoulders and other disturbed areas. The project went very well and several of the residents called and thanked us for a project well done. The only issue that occurred was in one area the street surface narrowed from the 22' plan to 21'. 1 met with the contractor and discussed a deduction rather than trying to patch the small triangle pieces missing which would have marred the final appearance of the street. We agreed on a $1500 deduct or $100 per property assessed. The error is unnoticeable but was discovered by our observer. The council will be requested to adopt the assessment roll at the 2nd council meeting in September. SUPPORTING DOCUMENTS: POSSIBLE MOTION ® ATTACHED ❑ NONE Pay Estimate No. 1 Please word motion as you would like it to appear in the minutes. Motion to approve payment to Knife River, Inc. in the amount of $109,533.66 for the Jalger Avenue Improvement Project, City Project No. 14-03. BUDGET INFORMATION FUNDING: BUDGETED: X YES Assessment ❑ NO ACTION TAKEN ❑ APPROVED AS REQUESTED ❑ DENIED ❑ TABLED ❑ OTHER (List changes) COMMENTS: PAY ESTIMATE #1 CITY OF OTSEGO Jalger Avenue and 100th Street Improvements, Improvement Project 14-03 August 19, 0214 Honorable Mayor & City Council City of Otsego 13400 90th Street Otsego, MN 55330 RE: Jalger Avenue and 100th Street Improvements, Improvement Project 14-03 Contractor: Knife River Corporation Contract Amount: $121,343.50 Award Date: June 11, 2014 Completion Date: August 15, 2014 Dear Honorable Mayor and Council Members: The following work has been completed on the above -referenced project by Knife River Corporation. ENGINEER ITEM NO. I ITEM DESCRIPTION ESTIMATED QUANTITY UNIT CONTRACT UNIT PRICE CONTRACT AMOUNT USED TO DATE EXTENSION 1 MOBILIZATION 1.0 LUMP SUM $5,000.00 $ 5,000.00 1 $ 5,000.00 2 CLEAR AND GRUB TREES 1.0 LUMP SUM $500.00 $ 500.00 0 $ 3 SALVAGED TOPSOIL 20.0 CU YD $20.00 $ 400.00 0 $ 4 REMOVE METAL CULVERTS 32.0 LIN FT $5.00 $ 160.00 32 $ 160.00 5 REMOVE BITUMINOUS PAVEMENT 93.0 SQ YD $5.00 $ 465.00 93 $ 465.00 6 MILL BITUMINOUS 1.5' DEEP 6.0 SQ YD $41.00 $ 246.00 6 $ 246.00 7 SAWING BITUMINOUS PAVEMENT FULL DEPTH 60.0 LIN FT $2.50 $ 150.00 60 $ 150.00 8 SALVAGE AND REINSTALL MAIL BOXAND SUPPORT 3.0 EA $150.00 $ 450.00 3 $ 450.00 9 COMMON EXCAVATION P 170.0 CY $20.00 $ 3,400.00 170 $ 3,400.00 10 TOPSOIL BORROW LV 400.0 CU YD $18.50 $ 7,400.00 400 $ 7,400.00 11 GRANULAR BORROW MnDOT3149.2B1 L 110.0 CU YD $18.00 $ 1,980.00 110 $ 1,980.00 12 SUBGRADE PREPARATION 16.8 ROAD STA $100.00 $ 1,680.00 16.80 $ 1,680.00 13 AGGREGATE BASE CLASS 5 645.0 TON $15.50 $ 9,997.50 505.47 $ 7,834.79 14 TYPE LV4 WEARING COURSE MIXTURE B 440.0 TON $66.00 $ 29,040.00 452.40 $ 29,858.40 15 TYPE LV3 NON WEARING COURSE MIXTURE B 586.0 TON $65.00 $ 38,090.00 575 $ 37,375.00 16 BITUMINOUS MATERIAL FOR TACK COAT 250.0 GALLONS $2.50 $ 625.00 250 $ 625.00 17 SEEDING 0.5 ACRE $2,000.00 $ 1,000.00 0.50 $ 1,000.00 18 SEED MIXTURE 270 60.0 LBS $2.00 $ 120.00 60 $ 120.00 19 SILT FENCE, TYPE MACHINE SLICED 1,100.0 LIN FT $2.00 $ 2,200.00 798 $ 1,596.00 20 BIO -ROLL 312.0 LIN FT $3.00 $ 936.00 176 $ 528.00 21 1 EROSION CONTROL BLANKET CATEGORY 1 2,400.0 SY $1.65 $ 3,960.00 1,680 $ 2,772.00 22 IFERTILIZER TYPE 3 150.0 LBS $0.80 $ 120.00 1 150 $ 120.00 Total Bid Schedule "A" $ 107,919.50 $ 102,760.19 MA P - ct....,, co..... c....�f.,.�s.,., ITEM NO. ITEM DESCRIPTION ESTIMATED QUANTITY UNIT CONTRACT UNIT PRICE CONTRACT AMOUNT USED TO DATE EXTENSION 23 REMOVE METAL CULVERTS 32.0 LIN FT $5.00 $ 160.00 32 $ 160.00 24 15' RC PIPE CULVERT DESIGN 3006 CLASS V 136 LIN FT $35.00 $ 4,760.00 136 $ 4,760.00 25 15"RCAPRON 2 EACH $800.00 $ 1,600.00 2 $ 1,600.00 26 INSTALL TYPE N STRUCTURE 2 EA$950.001 $ 1,900.00 2 $ 1,900.00 27 CASTING ASSEMBLY NEENAH R-4342 2 EA $350.001s 700.00 2 $ 700.00 28 STORM WATER ENERGY DISIPATOR 1 EACH $1,000.00 $ 1,000.00 1 $ 1,000.00 29 PERFORATED DRAINTILE 62 LF $17.00 $ 1,054.00 62 $ 1,054.00 30 ARTICULATED BLOCK MAT 150 SF $15.00 $ 2,250.00 1 150 $ 2,250.00 Total Bid Schedule "B" $ 13,424.00 $ 13,424.00 Minor Work Orders/Deducts TEM ESTIMATED CONTRACT UNIT CONTRACT USED TO NO. ITEM DESCRIPTION QUANTITY UNIT PRICE AMOUNT DATE EXTENSION 31 Class 2 Aggregate (100% Crushed Granite) TON $30.00 $ 20.48 $ 614.41 32 Deduct- Variance in Street Width LUMP SUM 1 -$1,500.001$ _ 1 1 1 $ (1,500.0( Minor Work Orders/Deducts S:\MunicipaRAOTSEGO\390\Pay Estimates\OT390 PE.xlsx PE - 1 PAY ESTIMATE #1 CITY OF OTSEGO Jalger Avenue and 100th Street Improvements, Improvement Project 14-03 Bid Schedule "A" Bid Schedule "B" Minor Work Orders/Deducts TOTAL Total Work Completed to Date LESS 5% RETAINAGE: WE RECOMMEND PAYMENT OF: APPROVALS: ENGINEER $ 107,919.50 $ 102,760.19 $ 13,424.00 $ 13,424.00 $ - $ (885.60) $ 115,298.59 $ 115,298.59 $ 5,764.93 CONTRACTOR: KNIFE RIVER CORPORATION Certification by Contractor: I certify that all items and amounts are correct for the work completed to date. Title: Date ENGINEER: HAKANSON ANDERSON Certification by Engineer: We recommend payment for work and quantities as shown. Signed: Date OWNER: CITY OF OTSEGO Title: Date SAMunicipaRAOTSEG0\390Tay Estimates\OT390 PE.xlsx . PE -2 $ 109,533.66