3.17 West WWTF Change Orders
Request for
City Council Action
DEPARTMENT INFORMATION
ORIGINATING DEPARTMENT REQUESTOR: MEETING DATE:
Utilities Utility Manager Neidermeier January 8, 2024
PRESENTER(s) REVIEWED BY: ITEM #:
Consent City Administrator/Finance Director Flaherty
AE2S Engineer Schaefer
3.17 – West WWTF Change
Orders
STRATEGIC VISION
MEETS: THE CITY OF OTSEGO:
Is a strong organization that is committed to leading the community through innovative communication.
X Has proactively expanded infrastructure to responsibly provide core services.
Is committed to delivery of quality emergency service responsive to community needs and expectations in a
cost-effective manner.
Is a social community with diverse housing, service options, and employment opportunities.
Is a distinctive, connected community known for its beauty and natural surroundings.
AGENDA ITEM DETAILS
RECOMMENDATION:
City Staff is recommending that the Council approve Change Order Proposals from Rice Lake Construction Group for the
West WWTF project.
ARE YOU SEEKING APPROVAL OF A CONTRACT? IS A PUBLIC HEARING REQUIRED?
No No
BACKGROUND/JUSTIFICATION:
A package of Change Order Proposals for the West WWTF project were reviewed with the Public Works Subcommittee
on December 20, 2023. The following table is a summary of the change orders that were recommended to forward for
consideration by the full Council.
The change orders represent various justifications ranging from necessary modifications to complete the project to
optimizing the project for long term cost efficiency.
The proposed net increase in project cost of $303,155.46 represents 0.89% of the bid cost and would bring the total
change order net increase to 1.9% for the project. A contingency amount of 5.0% was included in the project budget and
CPR #Description Amount
CPR 12 Paving and Sidewalk Changes $38,512.00
CPR 19 Instrument Additions $5,123.00
CPR 20 SBT Air Pipe Changes $59,052.00
CPR 22 Eliminating Electrical MH #2 ($8,282.54)
CPR 23 FSB Future Pipe Pit $21,146.00
CPR 25 MCC/Panelboard Escalations $97,229.00
CPR 26 Add Sump to FSB $12,591.00
CPR 27 FO7 MTB Building Changes $24,915.00
CPR 28 MTB-FSB-BB Roofing Escalation $32,490.00
CPR 29 Additional Helical Pile $15,458.00
CPR 30 PTB Basement Pump Demolition $4,922.00
financing package.
SUPPORTING DOCUMENTS ATTACHED:
Note – Due to the number of pages for the attachments, they were not included in paper packets and are viewable in
electronic format only on the City website.
• Change Order Proposal 012 – Paving and Sidewalk Changes
• Change Order Proposal 019 – Instrument Additions
• Change Order Proposal 020 – SBT Air Pipe Changes
• Change Order Proposal 022 – Eliminating Electrical MH #2
• Change Order Proposal 023 – FSB Future Pipe Pit
• Change Order Proposal 025 – MCC/Panelboard Escalations
• Change Order Proposal 026 – Add Sump to FSB
• Change Order Proposal 027 – Field Order 7 – MTB Building Changes
• Change Order Proposal 028 – MTB-FSB-BB Roofing Escalation
• Change Order Proposal 029 – Additional Helical Pile
• Change Order Proposal 030 – PTB Basement Pump Demolition
POSSIBLE MOTION
PLEASE WORD MOTION AS YOU WOULD LIKE IT TO APPEAR IN THE MINUTES:
Motion to approve Change Order Proposals as indicated in the table above in the amount of $303,155.46 to Rice Lake
Construction Group for the West WWTF Project.
BUDGET INFORMATION
FUNDING: BUDGETED:
Fund 602 – Sanitary Sewer Utility
Yes
May 30, 2023
AE2S
6901 East Fish Lake Rd.
Suite 184
Maple Grove, MN 55369-5457
ATTN: Scott Schaefer, PE
Re: Otsego West WWTF Improvements Phase 1
RLCG Project No. 2215
Change Order Proposal #: 012 – Paving and Sidewalk Changes REV2
Scott,
Rice Lake has put together pricing as requested in AE2S’s email dated 7/27/2023 for the
sidewalk and paving modifications. Below are the pricing options:
• Option 1 – Add additional bituminous around the MTB and extend the bituminous along
the entire length of the existing SB building as highlighted in orange in the attachment.
o $16,572.00
• Option 2 – Increase the thickness of the sidewalks to 6”. Sidewalks included are
highlighted in yellow in the attachment.
o $5,102.00
• Option 3 – Keep existing sidewalk, demo Splitter Structure and reroute gas line to ADM
building as shown in the attachment.
o $4,890.00
• Option 4 – Demo sidewalk by PTB and add additional paving by PTB as highlighted in red
in the attachment.
o $11,948.00
Please let me know if you have any questions.
Sincerely,
Rice Lake Construction Group
Matt Perpich
Project Manager
December 14, 2023
2215
Otsego West WWTF Improvements Phasae 1
22360 County Road 12, PO Box 517 12/14/2023
Deerwood, MN 56444 12REV2
HOURS $ RATE TOTAL RATE TOTAL
OPTION 1 - ADD ADDITIONAL
BITUMINOUS/REMOVE CONCRETE
RLCG Labor - Concrete -36.00 HRS -36.00 99.00$ ($3,564.00)-$ $0.00 -$ -$ (3,564.00)$
RLCG Material - Concrete -1.00 LS 99.00$ $0.00 1,062.00$ ($1,062.00)-$ -$ (1,062.00)$
RLCG Labor - Earthwork/Sand 30.00 HRS 30.00 99.00$ $2,970.00 -$ $0.00 -$ -$ 2,970.00$
RLCG Material - Earthwork/Sand 1.00 LS 99.00$ $0.00 2,500.00$ $2,500.00 -$ -$ 2,500.00$
RLCG Equipment - Earthwork/Sand 8.00 HR -$ $0.00 -$ $0.00 -$ 720.00$ 720.00$
Bituminous Roadways 1.00 LS -$ $0.00 -$ $0.00 13,764.04$ -$ 13,764.04$
-$ $0.00 -$ $0.00 -$ -$ -$
-$ $0.00 -$ $0.00 -$ -$ -$
-$ $0.00 -$ $0.00 -$ -$ -$
Misc. Small Tools and Mat'l 5% of Labor 1.00 ea 5.00%($29.70)
Sales Tax 1.00 ea 7.375%$106.05
Totals (6.00)$ (594.00)$ 1,438.00$ 13,764.04$ 720.00$ $15,404.39
Rice Lake Mark-up on Subs (5%)$688.20
Rice Lake Mark-up on Labor, Material, and Equipment (15%)$234.60
Bond Cost (1.5%)$244.91
Total Change Order Proposal Request $16,572.00
Days Requested 0
SUBCONTRACTOR
TOTAL
EQUIPMENT
TOTAL LINE TOTAL
CHANGE ORDER PROPOSAL
RLCG PROJECT #:
PROJECT NAME:
DATE:
COP:
DESCRIPTION QTY UNIT LABOR MATERIAL
2
2215
Otsego West WWTF Improvements Phasae 1
22360 County Road 12, PO Box 517 12/14/2023
Deerwood, MN 56444 12REV2
HOURS $ RATE TOTAL RATE TOTAL
OPTION 2 - THICKEN CONCRETE SIDEWALKS TO 6"
RLCG Labor 18.00 HRS 18.00 99.00$ $1,782.00 -$ $0.00 -$ -$ 1,782.00$
RLCG Material 1.00 LS 99.00$ $0.00 2,360.00$ $2,360.00 -$ -$ 2,360.00$
99.00$ $0.00 -$ $0.00 -$ -$ -$
99.00$ $0.00 -$ $0.00 -$ -$ -$
-$ $0.00 -$ $0.00 -$ -$ -$
-$ $0.00 -$ $0.00 -$ -$ -$
-$ $0.00 -$ $0.00 -$ -$ -$
-$ $0.00 -$ $0.00 -$ -$ -$
-$ $0.00 -$ $0.00 -$ -$ -$
Misc. Small Tools and Mat'l 5% of Labor 1.00 ea 5.00%$89.10
Sales Tax 1.00 ea 7.375%$174.05
Totals 18.00$ 1,782.00$ 2,360.00$ -$ -$ $4,405.15
Rice Lake Mark-up on Subs (5%)$0.00
Rice Lake Mark-up on Labor, Material, and Equipment (15%)$621.30
Bond Cost (1.5%)$75.40
Total Change Order Proposal Request $5,102.00
Days Requested 0
SUBCONTRACTOR
TOTAL
EQUIPMENT
TOTAL LINE TOTAL
CHANGE ORDER PROPOSAL
RLCG PROJECT #:
PROJECT NAME:
DATE:
COP:
DESCRIPTION QTY UNIT LABOR MATERIAL
2215
Otsego West WWTF Improvements Phasae 1
22360 County Road 12, PO Box 517 12/14/2023
Deerwood, MN 56444 12REV2
HOURS $ RATE TOTAL RATE TOTAL
OPTION 3 - Keep Existing Sidewalk
99.00$ $0.00 -$ $0.00 -$ -$ -$
Demo of Sidewalk 1.00 LS -16.00 99.00$ ($1,584.00)-$ $0.00 (720.00)$ (2,304.00)$
Demolish Existing Splitter Structure 1.00 LS 32.00 99.00$ $3,168.00 700.00$ 700.00$ -$ 720.00$ 4,588.00$
Gas main rerouted 1.00 LS 12.00 99.00$ $1,188.00 180.00$ $180.00 -$ 360.00$ 1,728.00$
Streetlight power rerouted & Spare Light Post - No
cost change -$ $0.00 -$ $0.00 -$ -$ -$
-$ $0.00 -$ $0.00 -$ -$ -$
-$ $0.00 -$ $0.00 -$ -$ -$
-$ $0.00 -$ $0.00 -$ -$ -$
-$ $0.00 -$ $0.00 -$ -$ -$
Misc. Small Tools and Mat'l 5% of Labor 1.00 ea 5.00%$138.60
Sales Tax 1.00 ea 7.375%$64.90
Totals 28.00$ 2,772.00$ 880.00$ -$ 360.00$ $4,215.50
Rice Lake Mark-up on Subs (5%)$0.00
Rice Lake Mark-up on Labor, Material, and Equipment (15%)$601.80
Bond Cost (1.5%)$72.26
Total Change Order Proposal Request $4,890.00
Days Requested 0
RLCG PROJECT #:
PROJECT NAME:
DATE:
COP:
CHANGE ORDER PROPOSAL
MATERIAL SUBCONTRACTOR
TOTAL
EQUIPMENT
TOTAL LINE TOTALDESCRIPTIONQTYUNITLABOR
2215
Otsego West WWTF Improvements Phasae 1
22360 County Road 12, PO Box 517 12/14/2023
Deerwood, MN 56444 12REV2
HOURS $ RATE TOTAL RATE TOTAL
OPTION 4 - Demo Sidewalk & Pave by PTB
99.00$ $0.00 -$ $0.00 -$ -$ -$
Demo of Sidewalk 1.00 LS 12.00 99.00$ $1,188.00 -$ $0.00 540.00$ 1,728.00$
Pave additional area by PTB 1.00 LS 99.00$ $0.00 -$ $0.00 8,764.04$ -$ 8,764.04$
Paving Credit from CPR014 1.00 LS 99.00$ $0.00 -$ $0.00 (3,500.00)$ -$ (3,500.00)$
RLCG Labor 16.00 HR 16.00 99.00$ $1,584.00 -$ $0.00 -$ -$ 1,584.00$
RLCG Material 1.00 LS -$ $0.00 1,200.00$ $1,200.00 -$ -$ 1,200.00$
RLCG Earthwork 8.00 HR -$ $0.00 -$ $0.00 -$ 720.00$ 720.00$
-$ $0.00 -$ $0.00 -$ -$ -$
-$ $0.00 -$ $0.00 -$ -$ -$
Misc. Small Tools and Mat'l 5% of Labor 1.00 ea 5.00%$138.60
Sales Tax 1.00 ea 7.375%$88.50
Totals 28.00$ 2,772.00$ 1,200.00$ 5,264.04$ 1,260.00$ $10,723.14
Rice Lake Mark-up on Subs (5%)$263.20
Rice Lake Mark-up on Labor, Material, and Equipment (15%)$784.80
Bond Cost (1.5%)$176.57
Total Change Order Proposal Request $11,948.00
0.766666667
Days Requested 0
DESCRIPTION QTY UNIT LABOR MATERIAL SUBCONTRACTOR
TOTAL
EQUIPMENT
TOTAL LINE TOTAL
CHANGE ORDER PROPOSAL
RLCG PROJECT #:
PROJECT NAME:
DATE:
COP:
1
Matt Perpich
From:John Larkin <John.Larkin@AE2S.com>
Sent:Thursday, July 27, 2023 2:05 PM
To:Matt Perpich
Cc:Matthew Seurer; Michael Benson; Sam Boelter
Subject:RE: Otsego West
Attachments:Otsego West WWTF sidewalk modifications.pdf
Caution: This email originated from outside the organization. Do not click links or open attachments unless you recognize the sender
and know the content is safe.
Matt,
Attached are drawings to catch all of the proposed paving changes and some items impacted from the changes. As
discussed we are removing the additional milling. Please breakdown by the following line items:
1) Additional paving that was previously quoted (Option 2)
2) Increased concrete thickness previously quoted (Option 3)
3) Keeping the sidewalk leading to the existing UV building
a. This includes not demolishing the sidewalk
b. Demolishing the splitter structure as previously discussed.
c. The gas to the admin will have to be rerouted
d. The streetlight power will have to be routed another way. Laying it with the fiber loop to the admin
building seems practical and would be a much simpler install, less gas lines for Killmer to worry about.
e. The light behind the Control Building will not be installed and will be a shelf spare.
4) PTB paving modification
a. Demo remaining PTB sidewalk
b. Pave area as shown in attached drawing.
Thanks
From: Matt Perpich <matt_perpich@ricelake.org>
Sent: Tuesday, May 30, 2023 3:55 PM
To: John Larkin <John.Larkin@AE2S.com>; Scott Schaefer <Scott.Schaefer@AE2S.com>
Cc: Matthew Seurer <matt_seurer@ricelake.org>; Michael Benson <michael_benson@ricelake.org>; Sam Boelter
<sam_boelter@ricelake.org>
Subject: Re: Otsego West
Scott/John,
Attached is pricing for these changes.
Thanks,
Matt
Matt Perpich, P.E.
Mechanical Group Manager
Rice Lake Construction Group
22360 Country Road 12
XXXXXXX
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
UGE
UGE
UGE UGE UGE UGE UGE
UGE UGE
UGE UGEUGEUGEUGEUGEUGE
UGE UGE UGE
UGE
UGE UGEUGEUGEUGEUGE UGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGE
UGE
UGE
UGEUGEUGEUGEUGEUGEUGE
UGE
UGE UGE
UGE
UGE
UGE
UGE
UGE
U
G
EUGEUGEUGE
UG
E
UGEUGEGGGGGGG
G
GGGGGG
G
GGGGGGG G
G G G
G
G
GGGGGGGG G
G
G
G
G
G GGGGGG
G
G
G
T
T
T
T
T
T
T
T
T
T
T
T
T TTTTTT
T
T
7490953.60SIREN7731953.47GV?TSDSDSDSD2108942.80FES INV108045942.00FES BURRIED\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\R25.00'\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\R
2
5
.
0
0
'R25.00'R37.00'R20.00'R25.00'File: C:\Users\PHohn\ACCDocs\AE2S\05409-2017-004 Otsego West WWTF Phase 1 Improvements\Project Files\01-Civil\Plan Sheets\CS-Site_Layout.dwgLast Saved: By: Paul Hohn Date: Thursday, March 24, 2022 11:08:21 AMPlotted: By: Paul Hohn Date: Friday, March 25, 2022 Layout: CS-WWTP
PROJECT NUMBERCHECKED / APPROVEDDATEDRAWING TYPEPREPARED BYDRAWING/FACILITYSYM DATE DESCRIPTION APPRAdvanced Engineering and Environmental Services, LLC l Water Tower Pl Business Ctr 6901 E Fish Lake Rd Ste 184 Maple Grove, MN 55369 l (t) 763-463-5036 l www.ae2s.comOTSEGO WEST WWTF IMPROVEMENTS PHASE 1
CITY OF OTSEGO
OTSEGO, MN
WWTP ENLARGED SITE PLAN CONST.CSDJJJBMAR 202205409-2017-004SWC104HTRON0Scale in Feet20SECONDARY BIOLOGICAL TREATMENT BUILDINGFF = 960.00FINE SCREEN BUILDINGFF = 952.00MEMBRANE TREATMENT BUILDINGFF = 955.00BLOWER BLDGFF = 960.00CONSTRUCTION NOTESINSTALL SIDEWALK - SEE DETAIL 3 / C507INSTALL HEAVY DUTY ASPHALT PAVEMENTSEE DETAIL 2 / C507INSTALL LIGHT DUTY ASPHALT PAVEMENTSEE DETAIL 1 / C507INSTALL SURMOUNTABLE CONCRETE CURB &GUTTER PER OTSEGO STD. PLATE 704 - SEESHEET C506INSTALL STOOP - SEE STRUCTURALINSTALL CONCRETE PAD - SEE DETAIL 3 / C507INSTALL RIBBON CURB - SEE DETAIL 4 / C507123456712.00'24.00'32.00'OD1OD2CBPTBSSTSTB22555551111447
5
.0
0
'SETBACK10.00'4.00'32.00'40.00'24.17'4.00'6.00'34.00'13.00'13.00'11.00'336620.00'
1
3
.
6
7
'618.00'10.00'18.00'74.00'6I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION,
OR REPORT WAS PREPARED BY ME OR UNDER MY
DIRECT SUPERVISION AND THAT I AM A DULY
LICENSED PROFESSIONAL ENGINEER UNDER THE
LAWS OF THE STATE OF MINNESOTA.
SIGNATURE: ____________________________________
TYPED NAME: JOSEPH J. JUREWICZ, P.E.
DATE: 03/28/22 REG. NO. 50396
Page 49CONFORMED6"Bituminous paving 6' wide, bituminousRemove two stoops,bituminousBituminous paving
●●●●●●●●●\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\●●12345689123456\\\\\\\\\\\\\\\\\
\
\
\
\
\
\
\
\
\
\
\\\\\7R25.00'
W
WWWW✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕UGEU
G
E
U
G
E
UGEUGEUGEUGEUGEUGEUGEUGEUGEU
G
E
U
G
E
U
G
E GGGGGGGGGGGG
GG
S
S
S
S
S
SSS SSSSSSSSSSSSSSSSSSSSWWW
W
W SSSSFile: C:\Users\CDunn\ACCDocs\AE2S\05409-2017-004 Otsego West WWTF Phase 1 Improvements\Project Files\01-Civil\Plan Sheets\CS-Site_Layout.dwgLast Saved: By: Carl Dunn Date: Monday, April 11, 2022 8:47:41 AMPlotted: By: Carl Dunn Date: Tuesday, April 12, 2022 Layout: CS-Admin
PROJECT NUMBERCHECKED / APPROVEDDATEDRAWING TYPEPREPARED BYDRAWING/FACILITYSYM DATE DESCRIPTION APPRAdvanced Engineering and Environmental Services, LLC l Water Tower Pl Business Ctr 6901 E Fish Lake Rd Ste 184 Maple Grove, MN 55369 l (t) 763-463-5036 l www.ae2s.com1 4-12-22 ADDENDUM #1 JJ
OTSEGO WEST WWTF IMPROVEMENTS PHASE 1
CITY OF OTSEGO
OTSEGO, MN
ADMIN BUILDING ENLARGED SITE PLAN CONST.CSDJJJBMAR 202205409-2017-004SWC105HTRON0Scale in Feet20FUTURE ACCESS ROAD(BY OTHERS)ADMIN BUILDINGFF = 948.00GARAGETWASCONSTRUCTION NOTESINSTALL SIDEWALK - SEE DETAIL 3 / C507INSTALL HEAVY DUTY ASPHALT PAVEMENTSEE DETAIL 2 / C507NEW RETENTION PONDPARKING STALL DIMENSION 10' X 20' TYPICAL.INSTALL NEW FENCE - SEE DETAIL 1 / C508INSTALL NEW GATE - SEE DETAIL 3 / C508INSTALL ACCESSIBLE PEDESTRIAN RAMP -SEE DETAIL 9 / C507PARKING ACCESS AISLE - SEE DETAIL 9 / C507INSTALL SURMOUNTABLE CURB & STANDARDGUTTER PER OTSEGO STD. PLATE 704 - SEESHEET C506INSTALL SURMOUNTABLE CURB & REVERSESLOPE GUTTER PER OTSEGO STD. PLATE 704 -SEE SHEET C506INSTALL RIBBON CURB - SEE SHEET 4 / C507INSTALL AGGREGATE SURFACE (CLASS 5)REMOVE ASPHALT, INSTALL BITUMINOUSSURFACE ONLY12345678910111213SBFC1FC2CB25.
0
0
'20.00'25.00'10.00'20.00'10.00'20.00'12.00'8.00'222120.00'12.00'99994456575.00'SETBACK338.00'6.00'4" SOLID LINE YELLOW PAINT (TYP.)88713.00' x 20.00' CONCRETE PADCA111010POND 3POND 210.00'12131GENERAL NOTES1.SEE INSET GRADING DETAIL ON SHEETS ASREFERENCED.111SHEET RE-ISSUED BYADDENDUM 111Page 50CONFORMED6" thick6" thick6" thickextend paving to end ofbuilding.20'-0"
W
WW
UGE✕
✕
✕
✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕✕UGEUGEU
G
E
U
G
E
U
G
E
UGE UGEUGE
U
G
E
UGE UGEUGEUGEUGEUGEU
G
E
UGEUGEUG
E
UGE
UGEUGEUGEUGEU
G
EUGEUGE UGEG
GGGGGGGG G
G
GGGGG
G G GGGTTTTTTTTT
SDSDSDSDSSSSSSSSSSSS SS SS SS SSSSSSSSSSSSSSSSSSSSSSSSSSS
SSSSSS
SSS SSS
SSS
WWW
W
W W W W W
WW
W
WWWSSS
S
S
S
SS
S
S
S
S
SS
S
S
S
S
SS
S
S
S
S
S
S
S
S
S
S
S
S
S
SSS
GENERAL NOTES1.PROTECT ALL EXISTING TREES ON SITE NOTSHOWN FOR REMOVAL (TYPICAL). DO NOTEXCAVATE OR FILL IN THE DRIPLINE OF EXISTINGTREES TO REMAIN.2.CONTRACTOR SHALL SAWCUT ALL EDGES OFBITUMINOUS REMOVAL. ALL SAWCUTTING SHALLBE FULL DEPTH OF BITUMINOUS AND SHALL BECONSIDERED INCIDENTAL TO THE PROJECT.3.PIPE REMOVALS ARE NOT SHOWN FOR CLARITYON THIS PLAN. SEE SITE PIPING PLAN ANDPROFILE DRAWINGS FOR SITE PIPING REMOVALS.HTRONScale in Feet050DEMOLITION NOTESREMOVE EXISTING BITUMINOUS PAVEMENTREMOVE EXISTING FENCEREMOVE EXISTING GRAVELEXISTING FENCE TO REMAIN IN PLACE.CONTRACTOR SHALL PROTECT EXISTING FENCEWHERE NOT SHOW FOR REMOVAL.MILL EXISTING BITUMINOUS PAVEMENTREMOVE CONCRETE SIDEWALK AS NEEDED.COORDINATE WITH ENGINEER IN FIELD.MODIFICATION PER SPEC SECTION 43 41 49 -SELECTIVE DEMOLITION FOR DIGESTORS 3-4.1234567312445FACILITY KEYLS3LIFT STATION NO. 3PTBPRE-TREATMENT BUILDINGFSBFINE SCREEN BUILDINGSBTSECONDARY BIOLOGICAL TREATMENTBBBLOWER BUILDINGMTBMEMBRANE TREATMENT BUILDINGSBSTORAGE BUILDINGEAEFFLUENT AERATIONODOXIDATION DITCHABANAEROBIC BASINFCFINAL CLARIFIERCBCONTROL BUILDINGSTBSLUDGE THICKENING BUILDINGADAEROBIC DIGESTERSSTSLUDGE STORAGE TANKADMADMINISTRATION BUILDINGTWASTHICKENED WAS LOADING BAY66SBFC1FC2STBAD3-4AD1-2SSTCBOD2OD1PTBLS31File: C:\Users\CDunn\ACCDocs\AE2S\05409-2017-004 Otsego West WWTF Phase 1 Improvements\Project Files\01-Civil\Plan Sheets\CD-Demolition_Plan.dwgLast Saved: By: Carl Dunn Date: Tuesday, April 12, 2022 7:46:14 AMPlotted: By: Carl Dunn Date: Tuesday, April 12, 2022 Layout: CS-DEMO
PROJECT NUMBERCHECKED / APPROVEDDATEDRAWING TYPEPREPARED BYDRAWING/FACILITYSYM DATE DESCRIPTION APPRAdvanced Engineering and Environmental Services, LLC l Water Tower Pl Business Ctr 6901 E Fish Lake Rd Ste 184 Maple Grove, MN 55369 l (t) 763-463-5036 l www.ae2s.com1 4-12-22 ADDENDUM #1 JJ
OTSEGO WEST WWTF IMPROVEMENTS PHASE 1
CITY OF OTSEGO
OTSEGO, MN
DEMOLITION PLANCONST.CSDJJJBMAR 202205409-2017-004SWC1011SHEET RE-ISSUED BYADDENDUM 1711Page 46CONFORMED40'-0"Do NOT demo this sidewalk.Demo splitter box to below grade, fill andcover with concrete as previously discussed.
PROJECT NUMBER
CHECKED / APPROVED
DATE
DRAWING TYPE
PREPARED BY
/Layout: 22x34DRAWING
FACILITYI HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA.SIGNATURE:___________________________________________________TYPED NAME: ZACHARY C. THOMPSONMARCH 28, 2022 REG. NO. #57835Advanced Engineering and Environmental Services, LLC Water Tower Pl Business Ctr 6901 E Fish Lake Rd Ste 184 Maple Grove, MN 55369 (t) 763-463-5036 (f) 763-463-5037 www.ae2s.com
SWBIM 360://05409-2017-004 Otsego West WWTF Phase 1 Improvements/05409-2017-004-Otsego_West_GEN-SD-M_v20.rvt3/25/2022 8:38:55 AMMAR 2022
05409-2017-004
ZCT ZCT
JLS
CONSTRUCT MECHANICAL SITE PLANOTSEGO, MNCITY OF OTSEGOOTSEGO WEST WWTF PHASE 1 IMPROVEMENTSM101
0 40'80'20'12" = 1'-0"M101
1 MECHANICAL SITE PLAN SYMDATEDESCRIPTIONAPPRPage 93
CONFORMED
Reroute admin gas
this side of clarifiers
July 26th, 2023
AE2S
6901 East Fish Lake Rd.
Suite 184
Maple Grove, MN 55369-5457
ATTN: Scott Schaefer, PE
Re: Otsego West WWTF Improvements Phase 1
RLCG Project No. 2215
Change Order Proposal #: 019 – Instrument Additions
Scott,
The City of Otsego has requested to add and modify a few instruments throughout the plant. Please see
the attached breakout of costs for the four different options.
• Option 1 – Adding level transmitters on Digesters and credit to reuse existing conduit.
o $9,108.00
• Option 2 – Add flood sensor in main level of PTB.
o $2,346.00
• Option 3 – Add flood sensor to lower-level MTB area.
o $2,348.00
• Option 4 – Removal of Analytical Instruments in SBT
o -$8,679.00
The total cost to proceed with all the above changes is $5,123.00.
Please let me know if you have any questions.
Sincerely,
Rice Lake Construction Group
Michael Benson
Assistant Project Manager
2215
Otsego West WWTP
22360 County Road 12, PO Box 517 7/26/2023
Deerwood, MN 56444 019
HOURS $ RATE TOTAL RATE TOTAL
Killmer Electric 1.00 LS -$ $0.00 -$ $0.00 8,545.74$ -$ $8,545.74
-$ $0.00 -$ $0.00 -$ -$ -$
-$ $0.00 -$ $0.00 -$ -$ -$
-$ $0.00 -$ $0.00 -$ -$ -$
-$ $0.00 -$ $0.00 -$ -$ -$
-$ $0.00 -$ $0.00 -$ -$ -$
Misc. Small Tools and Mat'l 5% of Labor 1.00 ea 5.00%-$
Sales Tax 1.00 ea -$
Totals -$ -$ -$ 8,545.74$ -$ 8,545.74$
Rice Lake Mark-up on Subs (5%)427.29$
Rice Lake Mark-up on Labor, Material, and Equipment (15%)-$
Bond Cost (1.5%)134.60$
Total Change Order Proposal Request 9,108.00$
RLCG PROJECT #:
PROJECT NAME:
DATE:
COP:
CHANGE ORDER PROPOSAL
MATERIAL SUBCONTRACTOR TOTAL EQUIPMENT
TOTAL LINE TOTALDESCRIPTIONQTYUNITLABOR
Option 1 - Adding level transmitters on Digesters
and credit to reuse existing conduit
2215
Otsego West WWTP
22360 County Road 12, PO Box 517 7/26/2023
Deerwood, MN 56444 019
HOURS $ RATE TOTAL RATE TOTAL
Killmer Electric 1.00 LS -$ $0.00 -$ $0.00 2,201.50$ -$ $2,201.50
-$ $0.00 -$ $0.00 -$ -$ -$
-$ $0.00 -$ $0.00 -$ -$ -$
-$ $0.00 -$ $0.00 -$ -$ -$
-$ $0.00 -$ $0.00 -$ -$ -$
-$ $0.00 -$ $0.00 -$ -$ -$
Misc. Small Tools and Mat'l 5% of Labor 1.00 ea 5.00%-$
Sales Tax 1.00 ea -$
Totals -$ -$ -$ 2,201.50$ -$ 2,201.50$
Rice Lake Mark-up on Subs (5%)110.08$
Rice Lake Mark-up on Labor, Material, and Equipment (15%)-$
Bond Cost (1.5%)34.67$
Total Change Order Proposal Request 2,346.00$
MATERIAL SUBCONTRACTOR TOTAL EQUIPMENT
TOTAL LINE TOTALDESCRIPTIONQTYUNITLABOR
RLCG PROJECT #:
PROJECT NAME:
DATE:
COP:
CHANGE ORDER PROPOSAL
Option 3 - Add flood sensor to PTB Main Level
2215
Otsego West WWTP
22360 County Road 12, PO Box 517 7/26/2023
Deerwood, MN 56444 019
HOURS $ RATE TOTAL RATE TOTAL
Killmer Electric 1.00 LS -$ $0.00 -$ $0.00 2,203.45$ -$ $2,203.45
-$ $0.00 -$ $0.00 -$ -$ -$
-$ $0.00 -$ $0.00 -$ -$ -$
-$ $0.00 -$ $0.00 -$ -$ -$
-$ $0.00 -$ $0.00 -$ -$ -$
-$ $0.00 -$ $0.00 -$ -$ -$
Misc. Small Tools and Mat'l 5% of Labor 1.00 ea 5.00%-$
Sales Tax 1.00 ea -$
Totals -$ -$ -$ 2,203.45$ -$ 2,203.45$
Rice Lake Mark-up on Subs (5%)110.17$
Rice Lake Mark-up on Labor, Material, and Equipment (15%)-$
Bond Cost (1.5%)34.70$
Total Change Order Proposal Request 2,348.00$
RLCG PROJECT #:
PROJECT NAME:
DATE:
COP:
CHANGE ORDER PROPOSAL
MATERIAL SUBCONTRACTOR TOTAL EQUIPMENT
TOTAL LINE TOTALDESCRIPTIONQTYUNITLABOR
Option 3 - Add flood sensor to lower-level MTB
area
An Equal Opportunity Employer
July 24, 2023
Mr. Matt Perpich
Rice Lake Construction Group
Re: Otsego West WWTP
Dear Matt,
Killmer Electric Company proposes to the following change to our contract for the
subject project:
Change Request – Misc Instrument Additions
Cost proposals below are per requests as noted:
Level Transmitters on Digesters, Credit to reuse Existing Conduit
QTY Mat unit Mat total Labor unit Total labor
Level Transmitters 1 6677.9 $6,677.90 4 4
2/C #16 250 0.55 $137.50 0.012 3
3/4" Sch 80 -120 2.5 -$300.00 0.045 -5.4
SCP terms 1 38 $38.00 2 2
Totals $6,553.40 3.6
Tax $481.67 110 / hour $396.00
$7,035.07 $396.00 $7,431.07
15.00% $1,114.66
$8,545.74
PTB Building Add to Main Level
QTY Mat unit Mat total Labor unit Total labor
Flood Switches 1 610.31 $610.31 2 2
#14 THHN 150 0.16 $24.00 0.0055 0.825
Wall penetration 1 14 $14.00 2 2
3/4" Rigid 40 3.28 $131.20 0.065 2.6
SCP terms 1 38 $38.00 2 2
Totals $817.51 9.425
Tax $60.09 110 / hour $1,036.75
$877.60 $1,036.75 $1,914.35
15.00% $287.15
$2,201.50
MTB Add flood switch lower Level
QTY Mat unit Mat total Labor unit Total labor
Flood Switch 1 610.31 $610.31 2 2
#14 THHN 180 0.16 $28.80 0.0055 0.99
3/4" Rigid 60 3.28 $196.80 0.065 3.9
SCP terms 1 38 $38.00 2 2
Totals $873.91 8.89
Tax $64.23 110 / hour $977.90
$938.14 $977.90 $1,916.04
15.00% $287.41
$2,203.45
Total Cost Add: $12,950.69
Please call with any questions or comments.
Regards,
Matthew Pettit
Project Manager
An Equal Opportunity Employer
July 24, 2023
Mr. Matt Perpich
Rice Lake Construction Group
Re: Otsego West WWTP
Dear Matt,
Killmer Electric Company proposes to the following change to our contract for the
subject project:
Change Request – Analytical Instruments Removal
Cost Deduct proposal to remove the following instruments from the scope of supply
• SBT-ANA3-AE1
• SBT-AER3-AE1
• SBT-AER3-AE2
• SBT-AER3-AE3
Total Cost Deduct: $8,679.83
Please call with any questions or comments.
Regards,
Matthew Pettit
Project Manager
OWNER:
PROJECT:
ENGINEER:
CONTRACTOR:
Type No.Description Qty Unit Unit Cost Total
LABOR CO-R0020 Labor - Project Management 2 Hour 150.00$ 300.00$
LABOR CO-R0030 Labor - Engineering Hour 150.00$ -$
LABOR CO-R0060 Labor - AutoCAD Hour 95.00$ -$
LABOR CO-R0080 Labor - Field Serv StartUp Tech -1 Hour 125.00$ (125.00)$
LABOR CO-R0090 Labor - Electrical Labor Hour 95.00$ -$
LABOR CO-R0100 Labor - Media 1 Hour 60.00$ 60.00$
TOTAL LABOR 235.00$
MISC Mileage Mile 0.65$ -$
MISC Hotel and Per Diem (Based on 8 Hour Day)Day 220.00$ -$
MISC Shipping LS -$ -$
MISC Vehicle Rental LS -$ -$
TOTAL TRAVEL -$
LABOR CO-R1000 Labor - Subcontractor LS -$ -$
LABOR CO-R1000 Material - Subcontractor LS -$ -$
MARKUP 10%Subcontractor 10% Markup -$
TOTAL SUBCONTRACTOR -$
ITEM SBT-ANA3-AE1 ORP Probe -1 Each 377.77$ (377.77)$
ITEM SBT-AER3-AE1 DO Probe -1 Each 1,544.96$ (1,544.96)$
ITEM SBT-AER3-AE2 Ammonia Probe -1 Each 4,957.41$ (4,957.41)$
ITEM SBT-AER3-AE3 DO Probe -1 Each 1,544.96$ (1,544.96)$
ITEM SALES OR USE TAX Sales Tax to be Listed on this Line Use tax in Pricing Above -0.0735 6,663.00$ (489.73)$
(8,914.83)$
MARKUP 15%Material 15% Markup
TOTAL MATERIAL (8,914.83)$
235.00$
-$
-$
(8,914.83)$
(8,679.83)$
Estimated Change in Contract Price:
Increase (8,679.83)$ Increase Days
Decrease Decrease Days
Integrated Process Solutions, Inc. is pleased to provide the following change order for Removing the AE Probes from project Scope.
Estimate Change in Contract Times: TBD
Labor from Above
Total
Subcontractor from Above
Material from Above
Material Subtotal
Travel from Above
Otsego West WWTF Improvements Phase 1
Kilmer Electric
Nero Engineering and AE2S
City of Otsego
Change Order
IPS Job #J002183
CO #2
5/10/2023
OWNER:
PROJECT:
ENGINEER:
CONTRACTOR:
Type No. Description Qty Unit Unit Cost Total
LABOR CO‐R0020 Labor ‐ Project Management 1.5 Hour 150.00$ 225.00$
LABOR CO‐R0100 Labor ‐ Media 1 Hour 60.00$ 60.00$
LABOR CO‐R0940 Labor ‐ Materials Procurement 0.5 Hour 85.00$ 42.50$
LABOR CO‐R0940 Labor ‐ Material Packaging & Handling for Shipping 1 Hour 85.00$ 85.00$
LABOR CO‐R0060 Labor CAD 1 Hour 105.00$ 105.00$
TOTAL LABOR 517.50$
MISC Mileage Mile 0.65$ ‐$
MISC Hotel and Per Diem (Based on 8 Hour Day) Day 220.00$ ‐$
MISC Shipping LS ‐$ ‐$
MISC Vehicle Rental LS ‐$ ‐$
TOTAL TRAVEL ‐$
LABOR CO‐R1000 Labor ‐ Subcontractor LS ‐$ ‐$
LABOR CO‐R1000 Material ‐ Subcontractor LS ‐$ ‐$
MARKUP 10% Subcontractor 10% Markup ‐$
TOTAL SUBCONTRACTOR ‐$
ITEM FMR50‐AAACCDBMRGF+NFZ1 Non‐contacting radar level sensor 2 Each 2,653.00$ 5,306.00$
ITEM Each ‐$
ITEM Each ‐$
ITEM Each ‐$
ITEM SALES OR USE TAX Sales Tax to be Listed on this Line Use tax in Pricing Above 0.0735 5,306.00$ 389.99$
5,695.99$
MARKUP 15% Material 15% Markup 854.40$
TOTAL MATERIAL 6,550.39$
517.50$
‐$
‐$
6,550.39$
7,067.89$
Estimated Change in Contract Price:
Increase 7,067.89$ Increase Days
Decrease Decrease Days
City of Otsego
Change Order
IPS Job #J002183
CO #5
6/19/2023
Otsego West WWTF Improvements Phase 1
Kilmer Electric
Nero Engineering and AE2S
Integrated Process Solutions, Inc. is pleased to provide the following change order for: Providing 2 additional radar level sensors for AD1‐LIT1
& AD2‐LIT1 in the digester area.
Estimate Change in Contract Times: TBD
Labor from Above
Total
Subcontractor from Above
Material from Above
Material Subtotal
Travel from Above
OWNER:
PROJECT:
ENGINEER:
CONTRACTOR:
Type No. Description Qty Unit Unit Cost Total
LABOR CO‐R0020 Labor ‐ Project Management 1 Hour 150.00$ 150.00$
LABOR CO‐R0100 Labor ‐ Media 0.5 Hour 60.00$ 30.00$
LABOR CO‐R0940 Labor ‐ Materials Procurement 0.5 Hour 85.00$ 42.50$
LABOR CO‐R0940 Labor ‐ Material Packaging & Handling for Shipping 1 Hour 85.00$ 85.00$
LABOR CO‐R0060 Labor CAD 1 Hour 105.00$ 105.00$
TOTAL LABOR 412.50$
MISC Mileage Mile 0.65$ ‐$
MISC Hotel and Per Diem (Based on 8 Hour Day) Day 220.00$ ‐$
MISC Shipping LS ‐$ ‐$
MISC Vehicle Rental LS ‐$ ‐$
TOTAL TRAVEL ‐$
LABOR CO‐R1000 Labor ‐ Subcontractor LS ‐$ ‐$
LABOR CO‐R1000 Material ‐ Subcontractor LS ‐$ ‐$
MARKUP 10% Subcontractor 10% Markup ‐$
TOTAL SUBCONTRACTOR ‐$
ITEM LS‐270 43760 Flood Switch 316SS SPST 20VA NC 2 Each 252.20$ 504.40$
ITEM Each ‐$
ITEM Each ‐$
ITEM Each ‐$
ITEM SALES OR USE TAX Sales Tax to be Listed on this Line Use tax in Pricing Above 0.0735 504.40$ 37.07$
541.47$
MARKUP 15% Material 15% Markup 81.22$
TOTAL MATERIAL 622.69$
412.50$
‐$
‐$
622.69$
1,035.19$
Estimated Change in Contract Price:
Increase 1,035.19$ Increase Days
Decrease Decrease Days
Integrated Process Solutions, Inc. is pleased to provide the following change order for: Replace flood sensor in basement and add a flood sensor for
the main level.
Estimate Change in Contract Times: TBD
Labor from Above
Total
Subcontractor from Above
Material from Above
Material Subtotal
Travel from Above
Otsego West WWTF Improvements Phase 1
Kilmer Electric
Nero Engineering and AE2S
City of Otsego
Change Order
IPS Job #J002183
CO #6
6/19/2023
OWNER:
PROJECT:
ENGINEER:
CONTRACTOR:
Type No. Description Qty Unit Unit Cost Total
LABOR CO‐R0020 Labor ‐ Project Management 1 Hour 150.00$ 150.00$
LABOR CO‐R0100 Labor ‐ Media 0.5 Hour 60.00$ 30.00$
LABOR CO‐R0940 Labor ‐ Materials Procurement 0.5 Hour 85.00$ 42.50$
LABOR CO‐R0940 Labor ‐ Material Packaging & Handling for Shipping 0.5 Hour 85.00$ 42.50$
LABOR CO‐R0060 Labor CAD 0.5 Hour 105.00$ 52.50$
TOTAL LABOR 317.50$
MISC Mileage Mile 0.65$ ‐$
MISC Hotel and Per Diem (Based on 8 Hour Day) Day 220.00$ ‐$
MISC Shipping LS ‐$ ‐$
MISC Vehicle Rental LS ‐$ ‐$
TOTAL TRAVEL ‐$
LABOR CO‐R1000 Labor ‐ Subcontractor LS ‐$ ‐$
LABOR CO‐R1000 Material ‐ Subcontractor LS ‐$ ‐$
MARKUP 10% Subcontractor 10% Markup ‐$
TOTAL SUBCONTRACTOR ‐$
ITEM LS‐270 43760 Flood Switch 316SS SPST 20VA NC 1 Each 252.20$ 252.20$
ITEM Each ‐$
ITEM Each ‐$
ITEM Each ‐$
ITEM SALES OR USE TAX Sales Tax to be Listed on this Line Use tax in Pricing Above 0.0735 252.20$ 18.54$
270.74$
MARKUP 15% Material 15% Markup 40.61$
TOTAL MATERIAL 311.35$
317.50$
‐$
‐$
311.35$
628.85$
Estimated Change in Contract Price:
Increase 628.85$ Increase Days
Decrease Decrease Days
City of Otsego
Change Order
IPS Job #J002183
CO #7
6/19/2023
Otsego West WWTF Improvements Phase 1
Kilmer Electric
Nero Engineering and AE2S
Integrated Process Solutions, Inc. is pleased to provide the following change order for: Add flood sensor from note #21.
Estimate Change in Contract Times: TBD
Labor from Above
Total
Subcontractor from Above
Material from Above
Material Subtotal
Travel from Above
August 9, 2023
AE2S
6901 East Fish Lake Rd.
Suite 184
Maple Grove, MN 55369-5457
ATTN: Scott Schaefer, PE
Re: Otsego West WWTF Improvements Phase 1
RLCG Project No. 2215
Change Order Proposal #: 020 – SBT Air Piping Changes
Scott,
Changes were requested to be made to the air piping at the SBT tank. Changes include:
- Modifying the steel supports and adding additional supports due to expansion joint
placement, and ductbank/air piping conflict.
- Adding swing gates to allow for access into the basins (9 total)
- Adding fixed pipe supports, sliding pipe supports and couplings to allow for thermal
expansion of the pipe.
o Fixed supports to be a U-bolt
o Sliding supports to be Slidex 1, 2 and 3 supports
o Couplings to be Smith-Blair 411’s
- Eliminating the duplicate butterfly valve on all of the air drops (9 total)
The total cost to make the changes above is $59,052.00. Attached is a breakout of the costs.
Please let me know if you have any questions.
Sincerely,
Rice Lake Construction Group
Matt Perpich
Project Manager
2215
Otsego West WWTP
22360 County Road 12, PO Box 517 8/9/2023
Deerwood, MN 56444 020
HOURS $ RATE TOTAL RATE TOTAL
Additional Electrical Tray & Pipe Supports 1.00 LS 72.00 99.00$ $7,128.00 27,324.00$ $27,324.00 -$ -$ 34,452.00$
Additional Access Gates 1.00 LS 9.00 99.00$ $891.00 8,100.00$ $8,100.00 -$ -$ 8,991.00$
Blower Piping Supports/Couplings 1.00 LS -$ $0.00 24,151.56$ $24,151.56 -$ -$ 24,151.56$
Eliminating Duplicate BFV on Drops 1.00 LS -18.00 99.00$ ($1,782.00)(18,150.00)$ ($18,150.00)-$ -$ (19,932.00)$
99.00$ $0.00 $0.00 -$ -$ -$
-$ $0.00 $0.00 -$ -$ -$
-$ $0.00 $0.00 -$ -$ -$
-$ $0.00 $0.00 -$ -$ -$
-$ $0.00 -$ $0.00 -$ -$ -$
Misc. Small Tools and Mat'l 5% of Labor 1.00 ea 5.00%311.85$
Sales Tax 1.00 ea 7.375%3,055.14$
Totals 63.00$ 6,237.00$ 41,425.56$ -$ -$ 51,029.55$
Rice Lake Mark-up on Subs (5%)-$
Rice Lake Mark-up on Labor, Material, and Equipment (15%)7,149.38$
Bond Cost (1.5%)872.68$
Total Change Order Proposal Request 59,052$
RLCG PROJECT #:
PROJECT NAME:
DATE:
COP:
CHANGE ORDER PROPOSAL
MATERIAL SUBCONTRACTOR TOTAL EQUIPMENT
TOTAL LINE TOTALDESCRIPTIONQTYUNITLABOR
#1693
From:Gary Dewing Date:7/12/2023
Project: Otsego West WWTF Improvements Erection:
Erection IS NOT included in base bid.
Location:Otsego, MN To:Rice Lake (Michael Benson , Matt Perpich)
Inclusions:See Below
055000 - Metal Fabrications
Secondary Biological Treatment (SBT)
P407 Redesign (25) Air Pipe Supports for Cable Tray Support (added m aterial)
Includes:
Additional Materials
Updated Shop Drawings
P407 Added (6) Pipe Supports, original had 34, updated qty is 40
Exclusions:Price (ADD): $27,324
(tax included)
Best Regards,
Gary Dewing
Change Order Proposal
METRO MANUFACTURING INC.
& METRO ERECTORS INC. (WBE)
465 Kenny Road
Saint Paul, MN 55130
PH: 651-776-5455
Fax: 651-776-2095
#1693
From:Gary Dewing Date:7/31/2023
Project: Otsego West WWTF Improvements Erection:
Erection IS NOT included in base bid.
Location:Otsego, MN To:Rice Lake (Michael Benson , Matt Perpich)
Inclusions:See Below
055000 - Metal Fabrications
Secondary Biological Treatment (SBT)
P102 Provide (9) Self-Closing Gates @ Catwalks without Aeration Equipment
Exclusions:Price (ADD): $8,100
(tax included)
Best Regards,
Gary Dewing
Change Order Proposal
METRO MANUFACTURING INC.
& METRO ERECTORS INC. (WBE)
465 Kenny Road
Saint Paul, MN 55130
PH: 651-776-5455
Fax: 651-776-2095
QUOTATIONStayflow
REMIT TO ADDRESS: 16847 Collections Center Drive Chicago IL 60693
SHIP TO ADDRESS: 2315 W. Hubbard Street Chicago IL 60612
103495
EMAIL: sales@stayflowproducts.com -www.stayflowproducts.com
Phone: (312) 428-4750 - Fax: (312) 421-6327
IN ALL COMMUNICATIONS, INDICATE ABOVE NUMBER
TG05/25/2023
Date of Quotation:
Fabricated items are not cancelable or returnable.
Stocked items can be returned within one month of sale for a
35% restocking fee, if in resellable condition.
Quote valid for 30 days.
ProjectMETT PERPICH
QUANTITY
EP-
PHONE:
FAX:
EMAIL:
UNIT PRICE DESCRIPTION OF GOODS TOTAL PRICEITEM
(218) 546-1915
matt_perpich@ricelake.org
346823RICE LAKE CONSTRUCTION
DEERWOOD MN 56444
USA
PLEASE REFERENCE THE ABOVE QUOTE NUMBER
WHEN PLACING AN ORDER.
1 9 139.23 1,253.07SLDX1WS
SLIDEX1 SLIDE GUIDE WELD DOWN SHORT
2 2 159.10 318.20SLDX2WS
SLIDEX2 SLIDE GUIDE WELD DOWN SHORT
3 9 203.46 1,831.14SLDX3WS
SLIDEX3 SLIDE GUIDE WELD DOWN SHORT
Will AdviseSHIP VIA:
FREIGHT TERMS:PREPAID & ADD
3,402.41TOTAL NET
FREIGHT OUT 0.00
TOTAL TAXES 0.00
QUOTE TOTAL US Dollar 3,402.41
Lead Time By:
Stayflow
CREDIT CARD
Terms of Sale:Shipping Point
* 2 WEEKS ARO *Emily Pinson
F.O.B.
Point
This quotation is subject to Stayflow Terms of Sale effective on the date the Offer is sent, which are incorporated in full by this reference. Stayflow Terms of Sale are available at http://www.stayflowproducts.com/terms.html and
also will be sent by mail or facsimile to you, the purchaser upon request. Stayflow limits acceptance to Stayflow Terms of Sale, and objects to any additional or different terms in your purchase order or acceptance.
Quote #: B36195501 CUSTOMER: RICE LAKE OTSEGO AIS-B PROJECT
VENDOR: PLANT & FLANGED EQUIPMENT
COMPANY Location: BLAINE, MN 55449-5227
Please refer to the cover page and the end of this document for Terms and Conditions.
Page 2 of 5
Line Part/Customer Reference Qty Unit Price
0 PRICING VOLATILITY WARNING
DUE TO EXTREME MARKET VOLATILITY - PRICING AND MATERIAL
AVAILABLITY IS SUBJECT TO CHANGE. VERIFY PRICING PRIOR TO ORDERING
PAST QUOTE EXPIRATION DATE. AVAILABILITY OF NON-STOCKING ITEMS
SUBJECT TO AVAILABILITY AT TIME OF ORDER.
1 X411
STEEL COUPLING, 8.63" OD, 1/4" X 7" SLV, HIGH TEMP COATING, EPDM
GASKETS, DOMESTIC 304SS BOLTS/NUTS, A.I.S. COMPLIANT, F/BLOWER AIR
@300°F
1 $695.00
2 X411
STEEL COUPLING, 12.75" OD, 1/4" X 7" SLV, HIGH TEMP COATING, EPDM
GASKETS, DOMESTIC 304SS BOLTS/NUTS, A.I.S. COMPLIANT, F/BLOWER AIR
@300°F
1 $976.00
3 X411
STEEL COUPLING, 18.00" OD, 1/4" X 7" SLV, HIGH TEMP COATING, EPDM
GASKETS, DOMESTIC 304SS BOLTS/NUTS, A.I.S. COMPLIANT, F/BLOWER AIR
@300°F
1 $996.00
4 X411
STEEL COUPLING, 24.00" OD, 1/4" X 7" SLV, HIGH TEMP COATING, EPDM
GASKETS, DOMESTIC 304SS BOLTS/NUTS, A.I.S. COMPLIANT, F/BLOWER AIR
@300°F
1 $1192.00
5 X913
STEEL FLANGE CPLG ADAPTER, 8.63" OD, DOMESTIC 8" AWWA-D FLG, HIGH
TEMP COATING, EPDM GASKET, DOMESTIC 304SS BOLTS/NUTS, A.I.S.
COMPLIANT, F/BLOWER AIR @ 300°F
1 $1040.00
6 X913
STEEL FLANGE CPLG ADAPTER, 12.75" OD, DOMESTIC 12" AWWA-D FLG, HIGH
TEMP COATING, EPDM GASKET, DOMESTIC 304SS BOLTS/NUTS, A.I.S.
COMPLIANT, F/BLOWER AIR @ 300°F
1 $1477.00
7 X913
STEEL FLANGE CPLG ADAPTER, 18.00" OD, DOMESTIC 18" AWWA-D FLG, HIGH
TEMP COATING, EPDM GASKET, DOMESTIC 304SS BOLTS/NUTS, A.I.S.
COMPLIANT, F/BLOWER AIR @ 300°F
1 $2305.00
8 X913
STEEL FLANGE CPLG ADAPTER, 24.00" OD, DOMESTIC 24" AWWA-D FLG, HIGH
TEMP COATING, EPDM GASKET, DOMESTIC 304SS BOLTS/NUTS, A.I.S.
COMPLIANT, F/BLOWER AIR @ 300°F
1 $3380.00
FOB FACTORY, PLUS FREIGHT, PLUS TAX
Sold To:Ship To:Shipping Branch:
CP Order No.Customer PO No.Related Order Print Date Time
Payment Terms Tax Status Order Date Requested Ship Date Originator
Ordered By MTR Status Carrier
QUOTE
ACKNOWLEDGEMENT
188751 306170 2000
Rice Lake Construction Group
PO BOX 517
Deerwood, MN 56444
Rice Lake Construction Group
Rice Lake Construction Group
Otsego - 2215
7551 Lancaster Avenue NE
Otsego, MN 55301
Columbia Pipe
920 Apollo Rd Suite 100
Eagan, MN 55121
Phone (651) 454-3880
Fax (651) 454-5896
1324828 SQ U BOLTS 6/13/2023 09:27:31
1.0% 10TH PROX N/25TH (AR)S 06/13/23 06/13/23 Jerod Engblom
MATT BLANK - No MTR Required
Line#QTY
ORD
Part No. Ours
Yours
Description Promise
Date
Unit
Price
Ext AmtBOUMQTY
SHIP
1.000 2 065-020 2" IPS U BOLT 304SS 06/13/23 24.7612.37802
AIS COMPLIANT
EA
2.000 2 065-020 2-1/2" IPS U BOLT 304SS 06/13/23 50.4425.21952
AIS COMPLIANT
EA
3.000 5 065-020 3" IPS U BOLT 304SS 06/13/23 149.8229.96345
AIS COMPLIANT
EA
4.000 2 065-020 4" IPS U BOLTS 304SS 06/13/23 102.5151.25612
AIS COMPLIANT
EA
5.000 2 065-020 8" IPS U BOLT 304SS 06/13/23 169.7184.85372
AIS COMPLIANT
EA
6.000 6 065-020 12" IPS U BOLT 304SS 06/13/23 1,835.93305.98786
AIS COMPLIANT
EA
7.000 3 065-020 18" IPS U BOLT 304SS 06/13/23 1,141.46380.48783
AIS COMPLIANT
EA
8.000 2 065-020 24" IPS U BOLT 304SS 06/13/23 817.07408.53662
AIS COMPLIANT
EA
9.000 8 065-018 MTR PAPERWORK CHARGE 06/13/23 222.2227.77788EA
Page 1 of 2
Sold To:Ship To:Shipping Branch:
CP Order No.Customer PO No.Related Order Print Date Time
Payment Terms Tax Status Order Date Requested Ship Date Originator
Ordered By MTR Status Carrier
QUOTE
ACKNOWLEDGEMENT
188751 306170 2000
Rice Lake Construction Group
PO BOX 517
Deerwood, MN 56444
Rice Lake Construction Group
Rice Lake Construction Group
Otsego - 2215
7551 Lancaster Avenue NE
Otsego, MN 55301
Columbia Pipe
920 Apollo Rd Suite 100
Eagan, MN 55121
Phone (651) 454-3880
Fax (651) 454-5896
1324828 SQ U BOLTS 6/13/2023 09:27:31
1.0% 10TH PROX N/25TH (AR)S 06/13/23 06/13/23 Jerod Engblom
MATT BLANK - No MTR Required
Line#QTY
ORD
Part No. Ours
Yours
Description Promise
Date
Unit
Price
Ext AmtBOUMQTY
SHIP
Subtotal 4,513.92
Tax
Total 4,513.92
Any material requested for return may be subject to a restocking fee.
No warranties other than those offered by the manufacturers are included.
Due to the current market conditions, price and availability are subject to the terms and conditions of the manufacturer(s) at the time of shipment.
Please visit our Website at www.columbiapipe.com for our Terms and Conditions.
Thank You
Market Condition Alert:
Due to volatile market conditions: All Quotes for carbon steel, stainless steel, copper tube and fittings, plastic pipe and fittings, are valid for
acceptance within 24 hours from the original quote date unless otherwise stated on the quote.
All new sales orders must be accepted for immediate shipment and are subject to the price in effect at the time of shipment unless stated
otherwise.
All material is subject to prior sale.
Comments or Special Instructions:
MATT
Page 2 of 2
PROJECT NUMBER
CHECKED / APPROVED
DATE
DRAWING TYPE
PREPARED BY
/Layout: 22x34DRAWING
FACILITYI HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA.SIGNATURE:_________________________________________________TYPED NAME: SCOTT HENRY SCHAEFERMARCH 28, 2022 REG. NO. #48660Advanced Engineering and Environmental Services, LLC Water Tower Pl Business Ctr 6901 E Fish Lake Rd Ste 184 Maple Grove, MN 55369 (t) 763-463-5036 (f) 763-463-5037 www.ae2s.comBIM 360://05409-2017-004 Otsego West WWTF Phase 1 Improvements/05409-2017-004-Otsego_West_SBT-P_v20.rvt3/27/2022 10:12:52 AMMAR 2022
05409-2017-004
SJ SHS
PWH
CONST.3D VIEWOTSEGO, MNCITY OF OTSEGOOTSEGO WEST WWTF IMPROVEMENTS PHASE 1SBT
P001
1. ALL TAGS ON THIS SHEET TO BE PROCEEDED BY
"SBT-" UNLESS OTHERWISE DENOTED WITH AN
ASTRISK (*).
GENERAL NOTES
IMPROVEMENTS
1 30" DI FL X TC X PE WALL PIPE, SEE DETAIL 6/SD/P501
2 30" BLIND FLANGE
3 24" X 18" BW SS SCH 10 CONCENTRIC REDUCER
4 24" X 12" BW SS SCH 10 CONCENTRIC REDUCER
5 24" MJ X PE DI WALL PIPE, SEE DETAIL 8/SD/P501
6 24" MJ DI 90° BEND
7 24" FL X PE DI WALL PIPE, SEE DETAIL 6/SD/P501
8 24" FL X MJ DI WALL PIPE, SEE DETAIL 7/SD/501
9 24" FL X FL DI WALL PIPE, SEE DETAIL 5/SD/P501
10 24" DI BLIND FLANGE
11 24" BW SS SCH 10 TEE
12 18" X 12" BW SS SCH 10 CONCENTRIC REDUCER
13 18" BW SS SCH 10 TEE
14 18" BW SS SCH 10 CAP
15 16" SS BW SCH 10 WALL PENETRATION, SEE DETAIL
3/SD/P501
16 12" X 8" BW SS SCH 10 CONCENTRIC REDUCER
17 12" X 6" BW SS SCH 10 CONCENTRIC REDUCER
18 12" X 4" BW SS SCH 10 CONCENTRIC REDUCER
19 12" BW SS SCH 10 CROSS
20 12" BW SS SCH 10 CAP
21 10" FL DI TEE
22 10" FL DI 90° BEND
23 10" DI WALL PIPE (FL X PE), SEE DETAIL 6/SD/P501
24 10" DI BLIND FLANGE
25 9" DISC AIR DIFFUSER, SEE MANUFACTURERS
DOCUMENTATION FOR INSTALLATION REQUIREMENTS
26 8" X 6" BW SS SCH 10 CONCENTRIC REDUCER
27 8" X 3" BW SS SCH 10 REDUCING TEE
28 8" MJ DI TEE
29 8" MJ DI CROSS
30 8" MJ DI 90° BEND
31 8" FL X MJ DI WALL PIPE, SEE DETAIL 7/SD/501
32 8" DIA DOUBLE SS FORMING PLATE, SEE
MANUFACTURERS DOCUMENTATION FOR INSTALLATION
REQUIREMENTS
33 8" BW SS SCH 10 TEE
34 8" BW SS SCH 10 CAP
35 8" BW SS SCH 10 90° BEND
36 8" BW SS SCH 10 45° BEND
37 6" X 3" BW SS SCH 10 REDUCING TEE
38 6" BW SS SCH 10 90° BEND
39 6" BW SS SCH 10 45° BEND
40 4" FL X MJ DI WALL SLEEVE, SEE DETAIL 7/SD/P501
41 4" FL X FL DI WALL SLEEVE, SEE DETAIL 5/SD/P501
42 4" FL DI TEE
43 4" FL DI 90° BEND
44 4" BW SS SCH 10 TEE
45 4" BW SS SCH 10 CAP
46 4" BW SS SCH 10 90° BEND
47 3" X 3/4" SS REDUCER (BW X THD)
48 3" BW SS SCH 10 TEE
49 2" SS MIXING PIPING WALL PENETRATION, SEE DETAIL
3/SD/P501
50 2" SS MIXING PIPING FLOOR PENETRATION, SEE DETAIL
3/SD/P501
51 2" BW SS SCH 5 CAP
52 CAST IN PLACE VALVE FLOOR BOX, SEE DETAIL
11/SD/P501
53 COARSE AIR DIFFUSER, SEE MANUFACTURERS
DOCUMENTATION FOR INSTALLATION REQUIREMENTS
54 COMPRESSED GAS MIXING VALVE CONTROL MODUAL (6
VALVE)
55 COMPRESSED GAS MIXING VALVE CONTROL MODUAL (8
VALVE)
56 DAVIT CRANE, SEE DETAIL 5/SD/P505
57 HANGING PIPE SUPPORT, SEE DETAIL 5/SD/P504
58 MUD VALVE KEY EXTENSION
59 PIPE SUPPORT, SEE DETAIL 5/SD/P502, AND GENERAL
NOTE 11 ON SHEET GEN/P001
60 PUMP GUIDE RAILS
61 VALVE KEY EXTENSION
SBT PROCESS DRAWING LIST
DWG DESCRIPTION
P001 3D VIEW
P101 OVERALL UNDER SLAB PIPING PLAN
P102 OVERALL SLAB LEVEL PIPING PLAN
P103 OVERALL MAIN LEVEL PIPING PLAN
P104 OVERALL UPPER LEVEL PIPING PLAN
P201 OVERALL PROCESS PIPING SECTIONS
P202 OVERALL PROCESS PIPING SECTIONS
P203 OVERALL PROCESS PIPING SECTIONS
P301 PROCESS PIPING ENLARGED SECTIONS
P302 PROCESS PIPING ENLARGED SECTIONS
P303 PROCESS PIPING ENLARGED SECTIONS
P304 PROCESS PIPING BASIN SECTIONS
P305 PROCESS PIPING BASIN SECTIONS
P306 PROCESS PIPING BASIN SECTIONS
P307 PROCESS PIPING BASIN SECTIONS
P308 PROCESS PIPING SECTIONS
P309 PROCESS PIPING SECTIONS
P310 AERATION PIPING SECTIONS
P311 AERATION PIPING SECTIONS
P401 ENLARGED LOWER LEVEL BASIN PIPING PLANS
P402 ENLARGED LOWER LEVEL BASIN PIPING PLANS
P403 DEOXIDATION BASIN PIPING PLAN
P404 ENLARGED MAIN LEVEL BASIN PIPING PLANS
P405 ENLARGED MAIN LEVEL BASIN PIPING PLAN
P406 ENLARGED UPPER LEVEL BASIN PIPING PLANS
P407 ENLARGED UPPER LEVEL BASIN PIPING PLANS
P601 SCHEDULES
P001
1 SECONDARY BIOLOGICAL TREATMENT SYMDATEDESCRIPTIONAPPRPage 233
1
P201
_______
2
P201
_______
1
P202
_______
1
P306
_______
2
P202
_______
1
P307
_______2
P306
_______2
P305
_______
2
P308
_______
1
P203
_______
2
P307
_______
E E
D D
C C
B B
A A
5
5
4
4
3
3
2
2
1
1
1
P308
_______
4.5
4.5
AER-BFV2
AER-BFV1
PANX2-BFV1
PANX1-BFV1 AER1-BFV5
AER2-BFV5 AER2-BFV3
AER1-BFV3 AER1-BFV1
AER2-BFV1
19
17
38
17
17
17
19
38
38
35
16
19
16
35
35
16
19
16
35 16
33
38
2' - 0"5' - 3"1' - 11"15' - 10"1' - 9"21' - 2 1/2"13' - 2 1/2"7' - 11"6' - 1"10' - 4"
2
P303
_______
2
P203
_______
34
33
20
16
26
3535
26
19
2020
19
17
38
20
19
17
38
12
14
13
AER-BFV3
PANX3-BFV1 AER3-BFV5 AER3-BFV3 AER3-BFV1
AER3-FE3 AER3-FE2 AER3-FE1
6"2
4
18
18
46 46
56
34
3418" AIR12" AIR 12" AIR 12" AIR 8" AIR
8" AIR12" AIR12" AIR12" AIR
3" MIXING AIR
3" MIXING AIR3" MIXING AIR
3" MIXING AIR
3" MIXING AIRCGM-VCM4
AER3-WG1
AER3-AE1
(DO)
AER3-AE2
(AMM)
AER3-AE3
(DO)
AER2-AE3
(DO)
AER2-AE2
(AMM)
AER2-AE1
(DO)
AER1-WG1
AER2-WG1
AER1-AE1
(DO)
AER1-AE2
(AMM)
AER1-AE3
(DO)
2
MFC1-BFV1
SCC1-BFV1
A
2
B
2
2
A A
B B
11
3
4
46
PROJECT NUMBER
CHECKED / APPROVED
DATE
DRAWING TYPE
PREPARED BY
/Layout: 22x34DRAWING
FACILITYI HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA.SIGNATURE:_________________________________________________TYPED NAME: SCOTT HENRY SCHAEFERMARCH 28, 2022 REG. NO. #48660Advanced Engineering and Environmental Services, LLC Water Tower Pl Business Ctr 6901 E Fish Lake Rd Ste 184 Maple Grove, MN 55369 (t) 763-463-5036 (f) 763-463-5037 www.ae2s.comBIM 360://05409-2017-004 Otsego West WWTF Phase 1 Improvements/05409-2017-004-Otsego_West_SBT-P_v20.rvt4/13/2023 8:07:12 AMMAR 2022
05409-2017-004
SJ SHS
PWH
CONST.ENLARGED UPPER LEVEL BASIN PIPING PLANSOTSEGO, MNCITY OF OTSEGOOTSEGO WEST WWTF IMPROVEMENTS PHASE 1SBT
P407P407
1 ENLARGED UPPER LEVEL PIPING PLAN
0 2'4'6'8'10'12'14'
1. ALL TAGS ON THIS SHEET TO BE PROCEEDED BY
"SBT-" UNLESS OTHERWISE DENOTED WITH AN
ASTRISK (*).
GENERAL NOTES
IMPROVEMENTS
3 24" X 18" BW SS SCH 10 CONCENTRIC REDUCER
11 24" BW SS SCH 10 TEE
12 18" X 12" BW SS SCH 10 CONCENTRIC REDUCER
13 18" BW SS SCH 10 TEE
14 18" BW SS SCH 10 CAP
16 12" X 8" BW SS SCH 10 CONCENTRIC REDUCER
17 12" X 6" BW SS SCH 10 CONCENTRIC REDUCER
18 12" X 4" BW SS SCH 10 CONCENTRIC REDUCER
19 12" BW SS SCH 10 CROSS
20 12" BW SS SCH 10 CAP
26 8" X 6" BW SS SCH 10 CONCENTRIC REDUCER
33 8" BW SS SCH 10 TEE
34 8" BW SS SCH 10 CAP
35 8" BW SS SCH 10 90° BEND
38 6" BW SS SCH 10 90° BEND
46 4" BW SS SCH 10 90° BEND
56 DAVIT CRANE, SEE DETAIL 5/SD/P505 SYMDATEDESCRIPTIONAPPR304/11/2023FO #6CONSTRUCTION NOTES
2 STAINLESS STEEL MIXING AIR SUPPLY PIPING.
4 VALVE CONTROL MODULE (VCM), 2" SS HEADER
PIPING FROM VCM TO NOZZLE GRIDS, AND NOZZLE
GRIDS SUPPLIED BY MANUFACTURER. INSTALL IN
ACCORDANCE WITH MANUFACTURER
RECOMMENDATIONS
3
1
P201
_______
2
P201
_______
1
P202
_______
1
P306
_______
2
P202
_______
1
P307
_______2
P306
_______INFLUENT SPLITTER BOXANAEROBIC BASIN NO.1ANOXIC BASIN NO.1AERATION BASIN NO.1POST ANOXIC BASIN NO.1
ANAEROBIC BASIN NO.2ANOXIC BASIN NO.2AERATION BASIN NO.2POST ANOXIC BASIN NO.2
ANAEROBIC BASIN NO.3ANOXIC BASIN NO.3AERATION BASIN NO.3POST ANOXIC BASIN NO.3
2
P305
_______
1
P305
_______
2
P308
_______
1
P203
_______
2
P304
_______
2
P309
_______
1
P309
_______
3' - 0"
2' - 0"
3' - 0"
2
P307
_______
1
P304
_______
E E
D D
C C
B B
A A
8.5
8.5
8
8
7
7
6
6
5
5
4
4
3
3
2
2
1
1
P407
1
P406
1
1
P308
_______
SCUM
PIT
VALVE
VAULT SCUM CHANNELMTB FEED CHANNEL
8" AIR12" AIR12" AIR24" AIR
7.5
7.5
6.5
6.5
5.6
5.6
5.2
5.2
4.5
4.5
1
P303
_______
2
P303
_______
2
P302
_______
2
P203
_______
*CGM-COMPR1
*CGM-COMPR2
*CGM-CAT1
2
4 4 4
4
2
2 2 2
2
*CGM-MCP1
3" MIXING AIR 3" MIXING AIR18" AIR3" MIXING AIR 2 1/2" MIXING AIR 2" MIXING AIR
12" AIR 8" AIR
PROJECT NUMBER
CHECKED / APPROVED
DATE
DRAWING TYPE
PREPARED BY
/Layout: 22x34DRAWING
FACILITYI HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA.SIGNATURE:_________________________________________________TYPED NAME: SCOTT HENRY SCHAEFERMARCH 28, 2022 REG. NO. #48660Advanced Engineering and Environmental Services, LLC Water Tower Pl Business Ctr 6901 E Fish Lake Rd Ste 184 Maple Grove, MN 55369 (t) 763-463-5036 (f) 763-463-5037 www.ae2s.comBIM 360://05409-2017-004 Otsego West WWTF Phase 1 Improvements/05409-2017-004-Otsego_West_SBT-P_v20.rvt3/27/2022 10:13:15 AMMAR 2022
05409-2017-004
SJ SHS
PWH
CONST.OVERALL UPPER LEVEL PIPING PLANOTSEGO, MNCITY OF OTSEGOOTSEGO WEST WWTF IMPROVEMENTS PHASE 1SBT
P104
P104
1 OVERALL UPPER LEVEL PIPING PLAN
0 4'8'12'16'20'
1. ALL TAGS ON THIS SHEET TO BE PROCEEDED BY
"SBT-" UNLESS OTHERWISE DENOTED WITH AN
ASTRISK (*).
GENERAL NOTES
SEE BB DRAWINGS FOR CONTINUATIONSYMDATEDESCRIPTIONAPPRCONSTRUCTION NOTES
2 STAINLESS STEEL MIXING AIR SUPPLY PIPING.
4 VALVE CONTROL MODULE (VCM), 2" SS HEADER
PIPING FROM VCM TO NOZZLE GRIDS, AND NOZZLE
GRIDS SUPPLIED BY MANUFACTURER. INSTALL IN
ACCORDANCE WITH MANUFACTURER
RECOMMENDATIONS
Page 237
1
P201
_______
2
P201
_______
1
P202
_______
1
P306
_______
2
P202
_______
1
P307
_______2
P306
_______INFLUENT SPLITTER BOXANAEROBIC BASIN NO.1ANOXIC BASIN NO.1AERATION BASIN NO.1POST ANOXIC BASIN NO.1
ANAEROBIC BASIN NO.2ANOXIC BASIN NO.2AERATION BASIN NO.2POST ANOXIC BASIN NO.2
ANAEROBIC BASIN NO.3ANOXIC BASIN NO.3AERATION BASIN NO.3POST ANOXIC BASIN NO.3
2
P305
_______
1
P305
_______
2
P308
_______
1
P203
_______
2
P304
_______
2
P309
_______
1
P309
_______
3' - 0"
2' - 0"
3' - 0"
2
P307
_______
1
P304
_______
E E
D D
C C
B B
A A
8.5
8.5
8
8
7
7
6
6
5
5
4
4
3
3
2
2
1
1
P407
1
P406
1
1
P308
_______
SCUM
PIT
VALVE
VAULT SCUM CHANNELMTB FEED CHANNEL
8" AIR12" AIR12" AIR24" AIR
7.5
7.5
6.5
6.5
5.6
5.6
5.2
5.2
4.5
4.5
1
P303
_______
2
P303
_______
2
P302
_______
2
P203
_______
*CGM-COMPR1
*CGM-COMPR2
*CGM-CAT1
2
4 4 4
4
2
2 2 2
2
*CGM-MCP1
3" MIXING AIR 3" MIXING AIR18" AIR3" MIXING AIR 2 1/2" MIXING AIR 2" MIXING AIR
12" AIR 8" AIR
PROJECT NUMBER
CHECKED / APPROVED
DATE
DRAWING TYPE
PREPARED BY
/Layout: 22x34DRAWING
FACILITYI HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA.SIGNATURE:_________________________________________________TYPED NAME: SCOTT HENRY SCHAEFERMARCH 28, 2022 REG. NO. #48660Advanced Engineering and Environmental Services, LLC Water Tower Pl Business Ctr 6901 E Fish Lake Rd Ste 184 Maple Grove, MN 55369 (t) 763-463-5036 (f) 763-463-5037 www.ae2s.comBIM 360://05409-2017-004 Otsego West WWTF Phase 1 Improvements/05409-2017-004-Otsego_West_SBT-P_v20.rvt3/27/2022 10:13:15 AMMAR 2022
05409-2017-004
SJ SHS
PWH
CONST.OVERALL UPPER LEVEL PIPING PLANOTSEGO, MNCITY OF OTSEGOOTSEGO WEST WWTF IMPROVEMENTS PHASE 1SBT
P104
P104
1 OVERALL UPPER LEVEL PIPING PLAN
0 4'8'12'16'20'
1. ALL TAGS ON THIS SHEET TO BE PROCEEDED BY
"SBT-" UNLESS OTHERWISE DENOTED WITH AN
ASTRISK (*).
GENERAL NOTES
SEE BB DRAWINGS FOR CONTINUATIONSYMDATEDESCRIPTIONAPPRCONSTRUCTION NOTES
2 STAINLESS STEEL MIXING AIR SUPPLY PIPING.
4 VALVE CONTROL MODULE (VCM), 2" SS HEADER
PIPING FROM VCM TO NOZZLE GRIDS, AND NOZZLE
GRIDS SUPPLIED BY MANUFACTURER. INSTALL IN
ACCORDANCE WITH MANUFACTURER
RECOMMENDATIONS
Page 237
September 18, 2023
AE2S
6901 East Fish Lake Rd.
Suite 184
Maple Grove, MN 55369-5457
ATTN: Scott Schaefer, PE
Re: Otsego West WWTF Improvements Phase 1
RLCG Project No. 2215
Change Order Proposal #: 022 – Eliminating Electrical Manhole #2
Scott,
A credit was requested to eliminate electrical manhole #2 from the project. The total credit for
eliminating this work is -$8,282.54.
Please let me know if you have any questions.
Sincerely,
Rice Lake Construction Group
Matt Perpich
Project Manager
An Equal Opportunity Employer
September 15, 2023
Mr. Matt Perpich
Rice Lake Construction Group
Re: Otsego West WWTP
Dear Matt,
Killmer Electric Company proposes to the following change to our contract for the
subject project:
Change Offer – Manhole 2 Removal
Cost proposal below is to provided as credit to not provide and install (1) of the (2)
manholes on the project in the route to FSB.
CO Offer Remove Manhole 2 to FSB
QTY Mat unit Mat total Labor unit
Total
labor
6x6x6 Manhole and Duct terminators -1 6466.11
-
$6,466.11 8 -8
Fiber strut -15 11.7 -$175.50 0.33 -4.95
Duct sealing (per lbs) -4 18 -$72.00 1 -4
Freight Adder 1 735 $735.00 0
Totals
-
$5,978.61 -16.95
Tax -$439.43
110 /
hour -
$1,864.50
-
$6,418.04 -
$1,864.50 -$8,282.54
Total Cost Deduct: $8,282.54
Please call with any questions or comments.
Regards,
Matthew Pettit
Project Manager
October 9, 2023
AE2S
6901 East Fish Lake Rd.
Suite 184
Maple Grove, MN 55369-5457
ATTN: Scott Schaefer, PE
Re: Otsego West WWTF Improvements Phase 1
RLCG Project No. 2215
Change Order Proposal #: 023 – FSB Future Pipe Pit (FO 08)
Scott,
Pricing was requested to eliminate the RAS/RAW future piping in the FSB and construct a sump
pit in its place as shown in Field Order 08. The total cost to make the changes shown is
$21,146.00. Attached is a breakout of the costs.
Please let me know if you have any questions.
Sincerely,
Rice Lake Construction Group
Matt Perpich
Project Manager
2215
Otsego West WWTF Improvements Phasae 1
22360 County Road 12, PO Box 517 10/9/2023
Deerwood, MN 56444 23
HOURS $ RATE TOTAL RATE TOTAL
RLCG Labor - Concrete Work 149.00 HR 149.00 99.00$ $14,751.00 -$ $0.00 -$ -$ 14,751.00$
RLCG Material - Concrete Work 1.00 LS -$ $0.00 7,652.80$ $7,652.80 -$ -$ 7,652.80$
RLCG Labor - Pipe Work Deduct -24.00 HR -24.00 99.00$ ($2,376.00)$0.00 $0.00 -$ -$ (2,376.00)$
RLCG Material - Pipe Work Deduct 1.00 LS ($15,103.48)($15,103.48)-$ -$ (15,103.48)$
Rebarfab 1.00 LS 99.00$ $0.00 $8,192.00 $8,192.00 -$ -$ 8,192.00$
Sowles Steel Erectors 1.00 LS 99.00$ $0.00 $0.00 2,993.05$ -$ 2,993.05$
Steel Plates to Cover Future Pipe Openings (2EA)1.00 LS 4.00 99.00$ $396.00 2,500.00$ $2,500.00 -$ 2,896.00$
-$ $0.00 $0.00 -$
-$ $0.00 -$ $0.00 -$ -$ -$
Misc. Small Tools and Mat'l 5% of Labor 1.00 ea 5.00%638.55$
Sales Tax 1.00 ea 7.375%239.05$
Totals 129.00 12,771.00$ 3,241.32$ 2,993.05$ -$ 19,882.97$
Rice Lake Mark-up on Subs (5%)149.65$
Rice Lake Mark-up on Labor, Material, and Equipment (5%)800.62$
Bond Cost (1.5%)312.50$
Total Change Order Proposal Request 21,146.00$
Days Requested 0
RLCG PROJECT #:
PROJECT NAME:
DATE:
COP:
CHANGE ORDER PROPOSAL
MATERIAL SUBCONTRACTOR
TOTAL
EQUIPMENT
TOTAL LINE TOTALDESCRIPTIONQTYUNITLABOR
Phone: (651) 633-3337 Shipping: 720 First St. S.W.
Fax: (651) 633-2332 Mailing: P.O. Box 120267
E-mail: nickw@rebarfabinc.com New Brighton, MN 55112
Date: September 15, 2023
To: Rice Lake Construction
Attn: Matt Perpich
Project: Otsego WWTF Improvements
Rebarfab, Inc. Job #22152
Change Order: #7
Control Code-Release #N/A
DESCRIPTION OF CHANGES IN THIS CONTRACT:
FSB changes per FO #8 drawings dated 8/17/23
Weight Added: 10,407 lbs $8,540.00 Black ☒ Epoxy ☐
Time Added: 14 hours $1,400.00
Misc. Added: None
Freight Added: $300.00
Total Cost This Change: $10,240.00 ** Tax excluded. Add applicable taxes.
ALL PRICES ARE PLUS TAX UNLESS NOTED OTHERWISE.
UPON SIGNATURE, CONTRACTOR IS TAKING FULL RESPONSIBILITY.
ALL OTHER TERMS AND CONDITIONS OF THE CONTRACT REMAIN THE SAME.
SIGNED COPY RETURNED VIA FAX REQUIRED PRIOR TO FABRICATION.
Rebarfab, Inc.
Approved by: _____________________ Approved by: _____________________
Nick Watercott
2
S303
1
S303
2
S302
1
S301
3
S302TFE 942.50'TFE 948.00'TFE 942.50'TFE 944.00'TFE 946.00'TFE 948.00'Step
SEE SBT DRAWINGS FOR
ADDITIONAL
INFORMATION
1
S302
1'-0"11'-9"1'-0"11'-7"1'-4"8'-11"1'-4"17'-1"1'-0"1'-0"31'-4"1'-0"35'-8"1'-0"9'-1"7'-2"6'-3"70'-0"21 3
D D
A A
TFE 948.00'
2
S301
55'-0"
Step Step
Step Step
6'-6"4'-0"5'-9"
WF3.0WF3.0
WF3.0
WF3.0 WF3.5WF3.5WF4.0WF4.6WF3.5WF3.0 WF3.5TFE 948.00'
TFE 948.00'TFE 948.00'TFE 948.00'
TFE 948.00'
TFE 948.00'
TFE 948.00'
TFE 948.00'
FFE 936.00'TFE 948.00'WF3.0TFE 948.00'TFE 946.00'
TFE 948.00'1'-4"34'-5"8'-11"TFE 948.00'5
S312 SIM
6
S312
5'-0"4'-0"
4'-0"5'-0"5'-0"4'-0"8"8"15'-3" VERIFY11'-3" VERIFY
2
1
1
1
1
1
32'-0"10'-5"1'-4"1'-3"1'-4"5'-0"1'-6"1'-3"
4
FFE 942.50'
Step
TFE 944.00'
TFE 946.00'
TFE 946.00'14'-0"TFE 944.00'5
5
5
5
1
1
CONSTRUCTION NOTES
WALL PIPE PENETRATION- SEE PROCESS DRAWINGS -SEE
STANDARD DETAILS FOR ADDITIONAL REINFORCING.
ODOR CONTROL FOUNDATION- SEE PROCESS - VERIFY SIZE W/
MANUFACTURE REQUIREMENTS - SEE DETAIL
PROVIDE OPENING IN CONCRETE WALL FOR CONDUIT -
COORDINATE SIZE,QUANTITY, AND LOCATION W/ ELECTRICAL -
SEE STANDARD DETAIL FOR ADDITIONAL REINFORCING
18" CONCRETE MAT SLAB REINFORCED WITH #5 @ 12" O/C EACH
WAY TOP AND BOTTOM
CONCRETE WALL AT LOWER LEVEL- REINFORCE W/ #6 @ 9" o/c
EACH WAY-EACH FACE.
2
/ 5 S312
3
4
5
0 2'4'6'8'10'12'14'
PROJECT NUMBER
CHECKED / APPROVED
DATE
DRAWING TYPE
PREPARED BY
/Layout: 22x34DRAWING
FACILITY
Advanced Engineering and Environmental Services, LLC. Water Tower Pl Business Ctr 6901 E Fish Lake Rd Ste 184 Maple Grove, MN 55369 (t) 763-463-5036 (f) 763-463-5037 www.ae2s.com I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA.SIGNATURE:___________________________________________________TYPED NAME: _KIRK DANIEL EHLKE_MARCH 28, 2022 REG. NO. #60003BIM 360://05409-2017-004 Otsego West WWTF Phase 1 Improvements/05409-2017-004-Otsego_West_FSB-S_v20.rvt8/17/2023 9:54:39 AMMAR 2022
05409-2017-004
KDE KDE
KDE
CONST.FOUNDATION PLANOTSEGO, MNCITY OF OTSEGOOTSEGO WEST WWTF PHASE 1 IMPROVEMENTSFSB
S101
N
O
R
T
H
S101
1 FOUNDATION PLAN
CONTINUOUS FOOTING SCHEDULE
MARK WIDTH THICKNESS BOTTOM LONGIT REINFORCING BOTTOM TRANSV REINFORCING
WF3.0 3'-0" 12" (3) #5 CONT #4 @ 24" o/c
WF3.5 3'-6" 12" (3) #5 CONT #4 @ 24" o/c
WF4.0 4'-0" 12" (4) #5 CONT #4 @ 16" o/c
WF4.6 4'-6" 12" (5) #5 CONT #5 @ 18" o/c SYM DATE DESCRIPTION APPR1 08/17/23 FO #8 KDE
T
1'-4"11'-4"1'-4"5'-0"1'-4"
2
S303
1
S303
2
S302
1
S301
3
S302
1
S302
FFE 952.00'
1'-0"8'-7"1'-0"25'-0"1'-4"1'-2"10"10'-5"1'-4"5'-0"1'-4"34'-1"1'-4"13'-6"1'-0"1'-0"5'-4"1'-6"17'-6"1'-4"8'-11"1'-4"18'-1"
21 3
D
A
FFE 952.00'
1
2
S301
10"3'-0"6'-10"3'-0"6'-10"3'-0"1'-6"
1S01 1S02 1S03
1S01 1S02 1
1
FFE 952.00'
FFE 960.00'
1S01 1S02
1S01 1S02
2
2
33
3
3
5
5
5
2
S312
FFE 960.00'
SEE SBT DRAWINGS FOR
ADDITIONAL
INFORMATION
5 1'-4"1'-4"6
1'-10"3'-0"6'-10"3'-0"6'-10"3'-0"2'-10"
1'-0"4'-8"5'-0"5'-0"5'-0"4'-8"2'-0"6'-5"3'-4"5'-7"1'-3"8'-4"10"15'-4"10"3'-0"5'-4"6
1S03
7
36'-3"8"18'-1"
33
8 5
S312 SIM
9
9
9
43'-0"3'-0"FD
6 6 70'-0"24'-9"7'-7"1'-0"55'-0"
55'-0"
1
1
1
CONSTRUCTION NOTES
6" THICK SLAB ON GRADE REINFORCED WITH #5 @ 16" o/c EACH
WAY CENTERED OVER 6" GRANULAR BASE
METAL STAIR- SEE ARCH
SLOPING CONCRETE TOPPING SLAB OVER STRUCTAL SLAB -SEE
SPEC -COORDINATE W/ PROCESS AND SCREEN MANUFACTURE
TRENCH DRAIN- SEE MECHANICAL FOR ADDITIONAL
INFORMATION -SEE DETAIL
FLOOR PIPE PENETRATION- SEE PROCESS DRAWINGS -SEE
STANDARD DETAILS FOR ADDITIONAL REINFORCING.
12" THICK CONCRETE WALL REINFORCED W/ #4 @ 12" o/c VERT
AND #4 @ 9" HORIZONTAL EACH FACE
CONCRETE APRON -SEE STANDARD DETAIL
ODOR CONTROL FOUNDATION- SEE PROCESS - VERIFY SIZE W/
MANUFACTURE REQUIREMENTS - SEE DETAIL
CONCRETE STOOP- SEE STANDARD DETAIL SD-10/701. VERIFY
SIZE W/ CIVIL AND OWNER.
2
3
4
5
6
7
8
/ 5 S312
9
/ 8 S501
PLAN NOTES
1. VERIFY FINAL CHANNEL LAYOUT WITH SELECTED
PROCESS EQUIPMENT.
2. FD-INDICATE FLOOR DRAIN -SEE STANDARD FLOOR DRAIN
DETAIL -VERIFY LOCATION AND SLOPING W/ MECHANICAL
3. CONTRACTOR HAS OPTION TO CONTINUE SLAB
REINFORCEMENT - NOT REQUIRED TO SPLICE
PROJECT NUMBER
CHECKED / APPROVED
DATE
DRAWING TYPE
PREPARED BY
/Layout: 22x34DRAWING
FACILITY
Advanced Engineering and Environmental Services, LLC. Water Tower Pl Business Ctr 6901 E Fish Lake Rd Ste 184 Maple Grove, MN 55369 (t) 763-463-5036 (f) 763-463-5037 www.ae2s.com I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA.SIGNATURE:___________________________________________________TYPED NAME: _KIRK DANIEL EHLKE_MARCH 28, 2022 REG. NO. #60003BIM 360://05409-2017-004 Otsego West WWTF Phase 1 Improvements/05409-2017-004-Otsego_West_FSB-S_v20.rvt8/17/2023 9:54:41 AMMAR 2022
05409-2017-004
KDE KDE
KDE
CONST.CHANNEL LEVEL PLANOTSEGO, MNCITY OF OTSEGOOTSEGO WEST WWTF PHASE 1 IMPROVEMENTSFSB
S102S102
1 CHANNEL LEVEL PLAN
0 2'4'6'8'10'12'14'
N
O
R
T
H
CONCRETE SLAB SCHEDULE
MARK SLAB TYPE
THICKNESS
(INCHES)TOP (S OR W) TOP (N OR E)
TOP
COVER
TOP TEMP
REINFORCING
BOTTOM
REINFORCING
BOTTOM
COVER
BOTTOM TEMP
REINFORCING REMARKS
1S01 IA 14" #5 @ 12" O/C #5 @ 6" O/C 2" #5 @ 12" O/C #6 @ 9" O/C 2" #5 @ 12" O/C
1S02 IIA 14" SEE 1S01 #5 @ 6" O/C 2" #5 @ 12" O/C #6 @ 9" O/C 2" #5 @ 12" O/C
1S03 IA 14" SEE 1S02 #5 @ 12" O/C 2" #5 @ 12" O/C #6 @ 9" O/C 2" #5 @ 12" O/C SYM DATE DESCRIPTION APPR1 08/17/23 FO #8 KDE
5'-0"
2
S303
1
S303
2
S302
1
S301
3
S302
1
S302
FFE 966.00'
FFE 966.00'
21 3
D D
A A
36'-3"18'-9"
55'-0"70'-0"1
1
9
9
2
2
S301
9
6
FFE 966.00'
FFE 966.00'
FFE 966.00'
FFE 966.00'
FFE 966.00'FFE 966.00'
2
1
8'-1"9'-0"
4
4
413'-0"8'-11"
3 15'-9"5
5
EQUIPMENT9'-6" VERIFY W/FFE 966.00'
FFE 966.00'
FFE 966.00'
7
6
8 8 8
888
8
8
8
8
8
8 16'-7"FD
W14X30
9
9
S501
10
S501
5
52'-0"11'-9"5'-0"35'-5"52'-2"10
10
10
10
1
1
CONSTRUCTION NOTES
4" TOPPING SLAB REINFORCED WITH #3 @ 16" o/c OVER 8"
HOLLOW CORE
5" CONCRETE OVER 2C20 METAL DECK (7" TOTAL THICKNESS)
R/W #4 @ 12" o/c EACH WAY CENTERED
CONCRETE FLOOR PENETRATION-SEE STANDARD DETAIL FOR
ADDITIONAL REINFORCING
PRECAST NON LOAD BEARING WALL-SEE STANDARD DETAIL
FOR BASE CONNECTION -SEE ARCH
FRP COVER SYSTEM -CONNECTIONS AND ADDITIONAL FRAMING
BY SUPPLIER-SEE SPEC
FLOOR PENETRATION THROUGH HOLLOWCORE- COORDINATE
WITH HOLLOW CORE SUPPLIER TO AVOID CUTTING THROUGH
TENDONS. -SEE PROCESS AND MECHANICAL DRAWINGS FOR
LOCATIONS
APPROXIMATE OUTLINE OF 1,700 LB MECHANICAL EQUIPMENT-
SEE MECHANICAL DRAWINGS.
BREAK/OPENING IN COVER SYSTEM (NOTE 5)- COORDINATE
SIZE W/ PROCESS AND MECHANICAL DRAWINGS
7" CONCRETE REINFORCED WITH #4 @ 15" o/c EACH WAY
CENTERED OVER STRUCTURAL GEOFOAM - MIN EPS15 (3.6 PSI
BEARING CAPACITY)
12" INSULATED HOLLOWCORE WALL PANEL- SEE ARCHITECT
2
3
4
5
6
7
8
9
10
PLAN NOTES
1. VERIFY FINAL CHANNEL LAYOUT WITH SELECTED
PROCESS EQUIPMENT.
2. FD-INDICATE FLOOR DRAIN -SEE STANDARD FLOOR DRAIN
DETAIL -VERIFY LOCATION AND SLOPING W/ MECHANICAL
3. GALVANIZED STEEL MEMEBERS AND PAINT PER
SPECIFICATION
PROJECT NUMBER
CHECKED / APPROVED
DATE
DRAWING TYPE
PREPARED BY
/Layout: 22x34DRAWING
FACILITY
Advanced Engineering and Environmental Services, LLC. Water Tower Pl Business Ctr 6901 E Fish Lake Rd Ste 184 Maple Grove, MN 55369 (t) 763-463-5036 (f) 763-463-5037 www.ae2s.com I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA.SIGNATURE:___________________________________________________TYPED NAME: _KIRK DANIEL EHLKE_MARCH 28, 2022 REG. NO. #60003BIM 360://05409-2017-004 Otsego West WWTF Phase 1 Improvements/05409-2017-004-Otsego_West_FSB-S_v20.rvt8/17/2023 9:54:43 AMMAR 2022
05409-2017-004
KDE KDE
KDE
CONST.MAIN LEVEL PLANOTSEGO, MNCITY OF OTSEGOOTSEGO WEST WWTF PHASE 1 IMPROVEMENTSFSB
S103S103
1 MAIN LEVEL PLAN
0 2'4'6'8'10'12'14'
N
O
R
T
H SYM DATE DESCRIPTION APPR1 08/17/23 FO #8 KDE
966.00'
FFE
980.00'
TDT
960.00'
CHANNEL
952.00'
LFE
948.00'
TFE
2
S303
1
S303
3
S302
21 3
S311
2S311
1
S311
4
S311
3
S312
6
S501
5
S501
1
S501
1
OPP
OPP
966.00'
FFE
960.00'
CHANNEL
952.00'
LFE
948.00'
TFE
2
S303
1
S303
3
S302
21 3
S501
5
S501
1
S501
1
S311
4
S313
1
OPP
S312
1
SIM
S311
3
SIM
S312
4
FLOWFILL
1
966.00'
FFE
952.00'
LFE
948.00'
TFE
2
S302
1
S301
1
S302
DA
2
S301
S501
11
S501
2
S501
4
S501
5
S312
6
S312
6
S501
8
S501
6
S311
3
SIM
S501
7
OPP OPP
PROJECT NUMBER
CHECKED / APPROVED
DATE
DRAWING TYPE
PREPARED BY
/Layout: 22x34DRAWING
FACILITY
Advanced Engineering and Environmental Services, LLC. Water Tower Pl Business Ctr 6901 E Fish Lake Rd Ste 184 Maple Grove, MN 55369 (t) 763-463-5036 (f) 763-463-5037 www.ae2s.com I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA.SIGNATURE:___________________________________________________TYPED NAME: _KIRK DANIEL EHLKE_MARCH 28, 2022 REG. NO. #60003BIM 360://05409-2017-004 Otsego West WWTF Phase 1 Improvements/05409-2017-004-Otsego_West_FSB-S_v20.rvt8/17/2023 9:54:46 AMMAR 2022
05409-2017-004
KDE KDE
KDE
CONST.FULL BUILDING SECTIONSOTSEGO, MNCITY OF OTSEGOOTSEGO WEST WWTF PHASE 1 IMPROVEMENTSFSB
S302S302
1 FULL BUILDING SECTION
S302
2 FULL BUILDING SECTION
0 2'4'6'8'10'12'14'0 2'4'6'8'10'12'14'
S302
3 FULL BUILDING SECTION
0 2'4'6'8'10'12'14'SYM DATE DESCRIPTION APPR1 08/17/23 FO #8 KDE
966.00'
FFE
960.00'
CHANNEL
D
10"2"
BENT PLATE W/ SEALANT
#5 @ 12" o/c HORIZ
WALL PANEL AND
FOUNDATION CONN'S
DESIGNED AND SUPPLIED
BY PC FABRICATOR -
INSTALL BY CONTRACTOR
PRECAST WALL
PANEL-SEE ARCH
PLAN AND SPECS
FRP COVER SYSTEM-
CONNECTION BY SUPPLIER
4" PVC WATERSTOP
SEE DETAIL
FOR REINFORCEMENT
INFORMATION
/ 1 S313
DOWELS-SEE STANDARD
WALL DOWEL DETAIL
966.00'
FFE
960.00'
CHANNEL
#4 @ 12" o/c VERT W/ ACI 90
DEG HOOK INTO SLAB
#4 @ 9" o/c HORIZ -
EACH FACE
SEE PLAN
CONCRETE SLAB -
SEE PLAN
FRP COVER SYSTEM-
CONNECTION BY SUPPLIER
CONCRETE SLAB SEE PLAN
2" CLR
4" PVC WATERSTOP
SEE SPEC
PROCESS GROUTING
SOME LOCATIONS-
SEE PLAN
STRUCTURAL GEOFOAM -
MIN EPS15 (3.6 PSI
BEARING CAPACITY)-OMIT
AT SIM/SLAB ON DECK
HYDROPHILIC
WATERSTOP
952.00'
LFE
ODOR CONTROL
UNIT -SEE PROCESS
#5 @ 18" o/c HORIZ
#5 @ 18" o/c VERTS W/
ACI 90 DEG HOOK INTO
FDN
#5 @ 12" o/c EACH
WAY -INSTALL SHORT
SPAN W/ 2" CLR
4" VOID FORM WALL DOWEL SEE
STANDARD DETAIL
TFE
947.33'(2) #5 CONT
2'-0"
EQUIP REQ
5 1/2" VERIFY W/8"8"1'-0"952.00'
LFE
948.00'
TFE
3
CONCRETE SLAB ON
GRADE -SEE PLAN
#5 @ 16" o/c VERTS
W/ ACI 90 DEG
HOOK INTO FDN-
EACH FACE
#5 HORIZ @ 12" o/c
EACH FACE
WALL PANEL AND
FOUNDATION CONN'S
DESIGNED AND SUPPLIED
BY PC FABRICATOR -
INSTALL BY CONTRACTOR
3" CLRFOOTING-SEE PLAN
PRECAST WALL
PANEL-SEE ARCH
PLAN AND SPECS
1'-0"GRADE -SEE CIVIL
966.00'
FFE
960.00'
CHANNEL
SEE DETAIL
FOR REINFORCEMENT
INFORMATION
/ 1 S311
WALL PANEL AND
FOUNDATION CONN'S
DESIGNED AND SUPPLIED
BY PC FABRICATOR -
INSTALL BY CONTRACTOR
PRECAST WALL
PANEL-SEE ARCH
PLAN AND SPECS
STRUCTURAL SLAB
SEE PLAN
CONCRETE SLAB SEE PLAN
STRUCTURAL GEOFOAM -
MIN EPS15 (3.6 PSI
BEARING CAPACITY)
Grid
966.00'
FFE
SEE DETAIL
FOR WALL
REINFORING
/ 2 S311
CONCRETE SLAB
OVER GEOFOAM -
SEE PLAN DOWELS-SEE
STANDARD WALL
DOWEL DETAIL
WALL PANEL AND FOUNDATION
CONN'S DESIGNED AND SUPPLIED
BY PC FABRICATOR -INSTALL BY
CONTRACTOR
RAILING -SEE
ARCH
NON LOAD BRG
PRECAST WALL
PANEL -SEE ARCH
PROJECT NUMBER
CHECKED / APPROVED
DATE
DRAWING TYPE
PREPARED BY
/Layout: 22x34DRAWING
FACILITY
Advanced Engineering and Environmental Services, LLC. Water Tower Pl Business Ctr 6901 E Fish Lake Rd Ste 184 Maple Grove, MN 55369 (t) 763-463-5036 (f) 763-463-5037 www.ae2s.com I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA.SIGNATURE:___________________________________________________TYPED NAME: _KIRK DANIEL EHLKE_MARCH 28, 2022 REG. NO. #60003BIM 360://05409-2017-004 Otsego West WWTF Phase 1 Improvements/05409-2017-004-Otsego_West_FSB-S_v20.rvt8/17/2023 9:54:53 AMMAR 2022
05409-2017-004
KDE KDE
KDE
CONST.WALL SECTIONSOTSEGO, MNCITY OF OTSEGOOTSEGO WEST WWTF PHASE 1 IMPROVEMENTSFSB
S312
S312
1 WALL SECTION
S312
3 WALL SECTION AT CHANNEL
S312
5 ODOR CONTROL FOUNDATION
S312
6 FOUNDATION WALL SECTION
S312
2 WALL SECTION
S312
4 WALL SECTION
12"6"0 1'2'3'SYM DATE DESCRIPTION APPR1 08/17/23 FO #8 KDE
1
966.00'
FFE
1
#6 @ 9" O/C HORIZ
EACH FACE
#6 @ 9" O/C VERT
EACH FACE
WALL DOWEL SEE
STANDARD DETAIL
MAT SLAB
SEE PLAN
CONCRETE WALL
SEE PLAN
COVER SYSTEM -
SEE PLAN
SUPPORT BY
COVER SUPPLIER
WATER STOP
SEE PLAN
WALL PENETRATION -
SEE PROCESS
SEE PLAN
1
PROJECT NUMBER
CHECKED / APPROVED
DATE
DRAWING TYPE
PREPARED BY
/Layout: 22x34DRAWING
FACILITY
Advanced Engineering and Environmental Services, LLC. Water Tower Pl Business Ctr 6901 E Fish Lake Rd Ste 184 Maple Grove, MN 55369 (t) 763-463-5036 (f) 763-463-5037 www.ae2s.com I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA.SIGNATURE:___________________________________________________TYPED NAME: _KIRK DANIEL EHLKE_MARCH 28, 2022 REG. NO. #60003BIM 360://05409-2017-004 Otsego West WWTF Phase 1 Improvements/05409-2017-004-Otsego_West_FSB-S_v20.rvt8/17/2023 9:54:54 AMMAR 2022
05409-2017-004
Checker Approver
Author
CONST.WALL SECTIONSOTSEGO, MNCITY OF OTSEGOOTSEGO WEST WWTF PHASE 1 IMPROVEMENTSFSB
S313 SYM DATE DESCRIPTION APPR1 08/17/23 FO #8 KDE
S313
1 WALL SECTION
TOTAL LOADING
AT CONNECTION:
VERTICAL= 4.2K
LATERAL =+/- 1K
4"
SEE PLAN SEE PLAN
1" +/-TEE SUPPLIER8 1/2" VERIFY W/TEE SUPPLIER4" VERIFY W/L4x3x3/8 x 0'-6" BOTH
SIDES OF WEB -TYP
2 -3/4" DIA A-325 BOLTS @
3" o/c THRU STD AISC
SHORT-SLOTTED HOLES IN
ANGLES ONLY (TYP)
2 -1" DIA A325 BOLTS
[9 1/2" GAGE] THRU SLEEVE
IN TEE STEM BY TEE
SUPPLIER (SIZE SLEEVE
FOR SNUG FIT TO BOLT)
8" x 5/8" x 1'-0 1/2" PLATE
FIELD MEASURE HOLE
LOCNS IN TEE STEM &
FIELD DRILL HOLES IN
PLATE TO MATCH
PLATE WASHER
L4x4x1/4x0'-6" W/ (2) 1/2"
BOLTS INTO FLANGE @
EACH END OF BEAM
6"
1/4" WEB STIFFS FULL HT
BOTH SIDES OF WEB
STEEL BEAMS -SEE PLAN -
BY STEEL SUPPLIER
(2) L3x3x1/4 DOUBLE
ANGLE HANGER
PL 1/2 x 6" x 8" MINIMUM
GUSSET PLATE -TYP
(2) L3x3x1/4 DOUBLE ANGLE
DIAGONAL MEMBER
4"1/4
4"1/4
TYP STEEL MONORAIL -
SEE PLAN
PRECAST DT CONN TO
WALL PANEL DESIGNED
& SUPPLIED BY
PRECAST SUPPLIER
Grid
PRECAST WALL PANEL
SEE ARCH & SPECS
BEARING INSERTS IN
WALL PANEL DESIGNED
BY PRECAST SUPPLIER
SLOT PRECAST WALL
PANELS FOR TEE INSTALL
SEE ARCH FOR INFILL
PRECAST DOUBLE TEE SEE
PLAN AND SPECS
1'-0"
TDT
SEE PLAN
TOW
SEE ARCH
PRECAST DT CONN TO WALL
PANEL DESIGNED &
SUPPLIED BY PRECAST
SUPPLIED FOR LOADS
NOTED ON PLAN
Grid
PRECAST WALL PANEL
SEE PLAN & SPECS
BEARING INSERTS IN WALL
PANEL DESIGNED BY
PRECAST SUPPLIER
TDT
SEE PLAN
TOW
SEE ARCH
PRECAST DOUBLE TEE SEE
PLAN AND SPECS
1'-0"
Grid
PRECAST WALL PANEL
SEE PLANS & SPECS
HOLLOW CORE PLANK
SEE PLAN & SPECS
HC PLANK CONNECTION TO
WALL PANELS DESIGNED
BY PRECAST WALL PANEL
SUPPLIER -COORDINATE
DESIGN W/ PLANK
SUPPLIER
INSERT PLATES IN
WALL PANEL & PLANK
BY PRECAST SUPPLIER
1'-0"
1" MAX
FFE
SEE PLAN
CONCRETE SLAB -SEE
PLAN CONCRETE TOPPING
SLAB SEE PLAN
Grid
PRECAST WALL PANEL
SEE PLANS & SPECS
HOLLOW CORE PLANK
SEE PLAN
1" MAX
FFE
SEE PLAN
PRECAST WALL HAUNCH
BY PRECAST SUPPLIER
TO RESIST PLANK HORIZ
& VERT LOADS
INSERT PLATES IN
WALL PANEL & PLANK
BY PRECAST SUPPLIER
HOLLOW CORE TO
WALL CONN BY
PRECAST SUPPLIER VINYL BRG PADS CONT
1'-0"
FFE
SEE MECH VARIFY6"CONCRETE SLAB
SEE PLAN
PREFAB POLYMER
DRAIN W/ FRAME &
GRATE -SEE MECH
#4 x @ 12" o/c
DOWEL ALL ARND
4 -#4 LONGIT
#4 U-BAR @ 12" o/c
SEALANT &
BACKER ROD
SEE PLAN6"
SPECS
SEE 6"
8
24
Grid
EMBEDDED
L4x3x1/4x8"
BY PC SUPP
KALWALL
TRANSLUSCENT
PANEL SYSTEM
3/4" PLYWOODEMBEDDED 8"x10"
PLATES BY PC
SUPP @ 48" o/c
COORDINATE
LOC'S w/
CONTRACTOR
INFILL BETWEEN
HSS W/ 362S162-43
METAL STUD
FRAMING AT 16" o/c
CLIP TO FRAMING BY
KALWALL SUPP -CLIP
TO ALLOW 2" OF
VERTICAL DEFLECTION
C8x11.5 x3'-0"
@ 4'-0" o/c
HSS 4x4x1/4 @ 4'-0" o/c
3/16
3/4" PLYWOOD
CONT. PL 1/2" x 12"
WIND LOAD (STRENGTH)
500 LB
1000 LB
WIND LOAD (STRENGTH)
500 LB
1000 LB
966.00'
FFE
CONCRETE WALL SEE
DETAIL FOR
REINFORCEMENT
EXPANSION MATERIAL
AND JOIST SEALANT -SEE
SPEC
HOLLOW CORE PLANK
AND TOPPING SLAB SEE PLAN
W/ PC SUPPLIER1" MIN COORD/ 3 S311
1'-0"
2" CLR
CONC WALL, FLOOR
SLAB OR BEAM -SEE
PLAN
1/2" x 8" WIDE x BEAM
DEPTH EMBED PLATE
W/ 3/4" x 6" HEADED
ANCHORS @ 4" o/c
(5" GAGE)
STEEL BEAM
SEE PLAN
1/2" +/-
CONNECTION TO
EMBED PLATE BY
STEEL FABRICATOR
TOS
SEE PLAN
STEEL BEAM -SEE PLAN
FFE
SEE PLAN
INSERTS IN WALL
PANEL DESIGNED BY
PRECAST SUPPLIER
PRECAST WALL
PANEL SEE PLAN
CONNECTION TO INSERT
BY STEEL FABRICATOR
HOLLOW CORE PLANK
AND TOPPING SLAB-
SEE PLAN
966.00'
FFE
GALVANIZED
STEEL BEAM
HOLLOW CORE PLANK
AND TOPPING SLAB-
SEE PLAN
CONNECTION TO
STEEL BEAM BY
PRECAST SUPPLIER
1" MIN
BENT BAR GROUTED
INTO KEYWAY
PROJECT NUMBER
CHECKED / APPROVED
DATE
DRAWING TYPE
PREPARED BY
/Layout: 22x34DRAWING
FACILITY
Advanced Engineering and Environmental Services, LLC. Water Tower Pl Business Ctr 6901 E Fish Lake Rd Ste 184 Maple Grove, MN 55369 (t) 763-463-5036 (f) 763-463-5037 www.ae2s.com I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA.SIGNATURE:___________________________________________________TYPED NAME: _KIRK DANIEL EHLKE_MARCH 28, 2022 REG. NO. #60003BIM 360://05409-2017-004 Otsego West WWTF Phase 1 Improvements/05409-2017-004-Otsego_West_FSB-S_v20.rvt8/17/2023 9:54:55 AMMAR 2022
05409-2017-004
KDE KDE
KDE
CONST.FRAMING DETAILSOTSEGO, MNCITY OF OTSEGOOTSEGO WEST WWTF PHASE 1 IMPROVEMENTSFSB
S501
NO SCALES501
3 CRANE SUPPORT DETAIL
NO SCALES501
1 DBL TEE BEARING @ WALL PANEL
NO SCALES501
2 DBL TEE FLANGE CONN @ WALL PANEL
NO SCALES501
4 HC FLOOR PLANK CONN @ WALL PANEL
NO SCALES501
5 HC PLANK BEARING @ WALL PANEL
NO SCALES501
8 TRENCH DRAIN SECTION
NO SCALES501
7 SECTION AT TRANSLUSENT PANEL
NO SCALES501
6 HOLOWCORE OVER NON LOAD BRG WALL
NO SCALES501
9 STEEL BEAM CONN @ CONCRETE WALL
NO SCALES501
10 STEEL BEAM CONN @ PRECAST WALL
NO SCALES501
11 HC CHANGE DIRECTION SECTION SYM DATE DESCRIPTION APPR1 08/17/23 FO #8 KDE
1
November 14, 2023
AE2S
6901 East Fish Lake Rd.
Suite 184
Maple Grove, MN 55369-5457
ATTN: Scott Schaefer, PE
Re: Otsego West WWTF Improvements Phase 1
RLCG Project No. 2215
Change Order Proposal #: 025 – MCC/Panelboard Escalations
Scott,
When the MCCs and Panelboards were released for production after submittal approval, the
manufacturer came back with escalation costs. As noted in the addendum, Rice Lake and our
vendors were to not carry the escalation risk in our bid as the City would be taking that on. The
total escalation on the electrical gear is $97,229.00. Attached is a breakout of the costs.
Please let me know if you have any questions.
Sincerely,
Rice Lake Construction Group
Matt Perpich
Project Manager
2215
Otsego West WWTF Improvements Phasae 1
22360 County Road 12, PO Box 517 11/14/2023
Deerwood, MN 56444 25
HOURS $ RATE TOTAL RATE TOTAL
RLCG Labor 0.00 HR 0.00 99.00$ $0.00 -$ $0.00 -$ -$ -$
RLCG Material 0.00 LS -$ $0.00 $0.00 -$ -$ -$
$0.00 $0.00 -$ -$ -$
Killmer 1.00 LS $0.00 $0.00 95,792.57$ -$ 95,792.57$
$0.00 $0.00 -$ -$ -$
$0.00 $0.00 -$ -$ -$
$0.00 $0.00 -$ -$ -$
-$ $0.00 $0.00 -$ -$ -$
-$ $0.00 -$ $0.00 -$ -$ -$
Misc. Small Tools and Mat'l 5% of Labor 1.00 ea 5.00%-$
Sales Tax 1.00 ea 7.375%-$
Totals - -$ -$ 95,792.57$ -$ 95,792.57$
Rice Lake Mark-up on Subs (5%)-$
Rice Lake Mark-up on Labor, Material, and Equipment (15%)-$
Bond Cost (1.5%)1,436.89$
Total Change Order Proposal Request 97,229.00$
Days Requested 0
MATERIAL SUBCONTRACTOR
TOTAL
EQUIPMENT
TOTAL LINE TOTALDESCRIPTIONQTYUNITLABOR
RLCG PROJECT #:
PROJECT NAME:
DATE:
COP:
CHANGE ORDER PROPOSAL
An Equal Opportunity Employer
November 6, 2023
Mr. Matt Perpich
Rice Lake Construction Group
Re: Otsego West WWTP
Dear Matt,
Killmer Electric Company proposes to the following change to our contract for the
subject project:
Change Request – Panelboard and MCC Escalation Costs
Change Request is based upon Equipment suppliers escalation cost adders. All has
been released per approved submittals to avoid additional escalation costs month after
month. Following page has breakout of additional costs related to each piece of
equipment.
Panelboard and Motor Control Centers Cost Escalations
QTY Mat unit Mat total Labor unit Total labor
MCC Cost Adder 1 59147.31 $59,147.31
Panelboard Cost adder 1 21955.51 $21,955.51 0
Totals $81,102.82 0
Tax $5,981.33 110 / hour $0.00
$87,084.15 $0.00 $87,084.15
10.00% $8,708.42
$95,792.57
Total Cost Add: $95,792.57
Please call with any questions or comments.
Regards,
Matthew Pettit
Project Manager
OWNER:
PROJECT:
ENGINEER:
CONTRACTOR:
Type No.Description Qty Unit Unit Cost Total
ITEM CO-T001 FSB-DP1 1 Each 1,358.32$ 1,358.32$
ITEM CO-T002 FSB-EDP1 1 Each 707.42$ 707.42$
ITEM CO-T004 FSB-L1 1 Each 1,131.04$ 1,131.04$
ITEM CO-T004 MTB-DP1 1 Each 2,214.33$ 2,214.33$
ITEM CO-T005 MTB-EDP1 1 Each 897.24$ 897.24$
ITEM CO-T006 MTB-DP2 1 Each 1,959.94$ 1,959.94$
ITEM CO-T007 MTB-L1 1 Each 1,210.49$ 1,210.49$
ITEM CO-T008 MTB-EL1 1 Each 481.39$ 481.39$
ITEM CO-T009 MTB-L2 1 Each 1,130.16$ 1,130.16$
ITEM CO-T010 BB-L1 1 Each 1,130.16$ 1,130.16$
ITEM CO-T011 ADM-DP1 1 Each 2,357.54$ 2,357.54$
ITEM CO-T012 ADM-DP1A 1 Each 1,945.88$ 1,945.88$
ITEM CO-T013 ADM-DP2 1 Each 1,239.89$ 1,239.89$
ITEM CO-T014 ADM-EDP1 1 Each 507.99$ 507.99$
ITEM CO-T015 ADM-L1 1 Each 1,227.57$ 1,227.57$
ITEM CO-T016 ADM-L2 1 Each 605.83$ 605.83$
ITEM CO-T017 ADM-L3 1 Each 1,300.92$ 1,300.92$
ITEM CO-T018 ADM-EL1 1 Each 549.40$ 549.40$
ITEM CO-T019 FSB-MCC1 1 Each 14,694.06$ 14,694.06$
ITEM CO-T020 MTB-MCC1 1 Each 15,946.87$ 15,946.87$
ITEM CO-T021 MTB-MCC2 1 Each 14,981.65$ 14,981.65$
ITEM CO-T022 BB-MCC1 1 Each 13,524.73$ 13,524.73$
81,102.82$
MARKUP 0%Material 0% Markup -$
TOTAL MATERIAL 81,102.82$
81,102.82$
5,981.33$
87,084.15$
Estimated Change in Contract Price:
Increase 87,084.15$ Increase Days
Decrease Decrease Days
Integrated Process Solutions, Inc. is pleased to provide the following Escalation Cost associated with CO#8 REVB. Please see the below escalation costs. These
escalation cost are due to escalation price increase from our distrubitor that have occurred from 4/28/2022 to 11/8/2023 for panelboards and 4/28/2022 to
6/29/2023 for the MCC escalation cost.
Estimate Change in Contract Times:
Total from Above
Total
Material Subtotal
Sales Tax
Otsego West WWTF Improvements Phase 1
Killmer Electric
Nero Engineering and AE2S
City of Otsego
Change Order
IPS Job #J002183
ESCALATION COST
11/8/2023
To: Integrated Process Solutions, Inc.
Attention: Walter Pelowski
RE: Otsego West WWTF Improvements Phase 1
Following is a summary of the change orders from review comments and escalation cost due to delays in
releasing the equipment to manufacturing and the increased cost of material incurred by our supplier
for the period from 7/23/22 - 11/29/23.
Panelboards
Change Order Cost Escalation Cost
FSB-DP1 1358.32
FSB-EDP1 707.42
FSB-L1 400 1131.04
MTB-DP1 1800 2214.33
MTB-EDP1 897.24
MTB-DP2 400 1959.94
MTB-L1 1210.49
MTB-EL1 400 481.39
MTB-L2 1400 1130.16
BB-L1 600 1130.16
ADM-DP1 2357.54
ADM-DP1A 900 1945.88
ADM-DP2 600 1239.89
ADM-EDP1 507.99
ADM-L1 1227.57
ADM-L2 1300 605.83
ADM-L3 1300.92
ADM-EL1 549.40
Total Change Order $7,800.00 Total 21955.51
Total Additional Cost $29,755.51
Motor Control Centers
Tag Name Escalation
FSB-MCC1 14694.06
MTB-MCC1 15946.87
MTB-MCC2 14981.65
BB-MCC1 13524.73
Total for 4 MCCs 59147.31
Escalation price increase for the period from 7/23/22 - 07/29/23
for increased material cost and increased labor cost incurred by our
supplier
www.malloyelectric.com
November 14, 2023
AE2S
6901 East Fish Lake Rd.
Suite 184
Maple Grove, MN 55369-5457
ATTN: Scott Schaefer, PE
Re: Otsego West WWTF Improvements Phase 1
RLCG Project No. 2215
Change Order Proposal #: 026 – Add Sump to FSB
Scott,
It was requested in the revised drawings for the FSB to add a sump around the 24” RAW pipe
that goes to the SBT Tank. The total cost to add this concrete sump is $12,591.00. Attached is a
breakout of the costs.
Please let me know if you have any questions.
Sincerely,
Rice Lake Construction Group
Matt Perpich
Project Manager
2215
Otsego West WWTF Improvements Phasae 1
22360 County Road 12, PO Box 517 10/9/2023
Deerwood, MN 56444 26
HOURS $ RATE TOTAL RATE TOTAL
RLCG Labor - Concrete Work 57.00 HR 57.00 99.00$ $5,643.00 -$ $0.00 -$ -$ 5,643.00$
RLCG Material - Concrete Work 1.00 LS -$ $0.00 1,913.20$ $1,913.20 -$ -$ 1,913.20$
-$ $0.00 $0.00 -$ -$ -$
-$ $0.00 $0.00 -$ -$ -$
-$ $0.00 $0.00 -$ -$ -$
Rebarfab 1.00 LS -$ $0.00 $2,048.00 $2,048.00 -$ -$ 2,048.00$
Sowles Steel Erectors 1.00 LS -$ $0.00 $0.00 748.26$ -$ 748.26$
-$ $0.00 $0.00 -$ -$
-$ $0.00 $0.00 -$ -$
-$ $0.00 -$ $0.00 -$ -$ -$
Misc. Small Tools and Mat'l 5% of Labor 1.00 ea 5.00%282.15$
Sales Tax 1.00 ea 7.375%292.14$
Totals 57.00 5,643.00$ 3,961.20$ 748.26$ -$ 10,926.75$
Rice Lake Mark-up on Subs (5%)37.41$
Rice Lake Mark-up on Labor, Material, and Equipment (15%)1,440.63$
Bond Cost (1.5%)186.07$
Total Change Order Proposal Request 12,591.00$
Days Requested 0
RLCG PROJECT #:
PROJECT NAME:
DATE:
COP:
CHANGE ORDER PROPOSAL
MATERIAL SUBCONTRACTOR
TOTAL
EQUIPMENT
TOTAL LINE TOTALDESCRIPTIONQTYUNITLABOR
Phone: (651) 633-3337 Shipping: 720 First St. S.W.
Fax: (651) 633-2332 Mailing: P.O. Box 120267
E-mail: nickw@rebarfabinc.com New Brighton, MN 55112
Date: September 15, 2023
To: Rice Lake Construction
Attn: Matt Perpich
Project: Otsego WWTF Improvements
Rebarfab, Inc. Job #22152
Change Order: #7
Control Code-Release #N/A
DESCRIPTION OF CHANGES IN THIS CONTRACT:
FSB changes per FO #8 drawings dated 8/17/23
Weight Added: 10,407 lbs $8,540.00 Black ☒ Epoxy ☐
Time Added: 14 hours $1,400.00
Misc. Added: None
Freight Added: $300.00
Total Cost This Change: $10,240.00 ** Tax excluded. Add applicable taxes.
ALL PRICES ARE PLUS TAX UNLESS NOTED OTHERWISE.
UPON SIGNATURE, CONTRACTOR IS TAKING FULL RESPONSIBILITY.
ALL OTHER TERMS AND CONDITIONS OF THE CONTRACT REMAIN THE SAME.
SIGNED COPY RETURNED VIA FAX REQUIRED PRIOR TO FABRICATION.
Rebarfab, Inc.
Approved by: _____________________ Approved by: _____________________
Nick Watercott
2
S303
1
S303
2
S302
1
S301
3
S302TFE 942.50'TFE 948.00'TFE 942.50'TFE 944.00'TFE 946.00'TFE 948.00'Step
SEE SBT DRAWINGS FOR
ADDITIONAL
INFORMATION
1
S302
1'-0"11'-9"1'-0"11'-7"1'-4"8'-11"1'-4"17'-1"1'-0"1'-0"31'-4"1'-0"35'-8"1'-0"9'-1"7'-2"6'-3"70'-0"21 3
D D
A A
TFE 948.00'
2
S301
55'-0"
Step Step
Step Step
6'-6"4'-0"5'-9"
WF3.0WF3.0
WF3.0
WF3.0 WF3.5WF3.5WF4.0WF4.6WF3.5WF3.0 WF3.5TFE 948.00'
TFE 948.00'TFE 948.00'TFE 948.00'
TFE 948.00'
TFE 948.00'
TFE 948.00'
TFE 948.00'
FFE 936.00'TFE 948.00'WF3.0TFE 948.00'TFE 946.00'
TFE 948.00'1'-4"34'-5"8'-11"TFE 948.00'5
S312 SIM
6
S312
5'-0"4'-0"
4'-0"5'-0"5'-0"4'-0"8"8"15'-3" VERIFY11'-3" VERIFY
2
1
1
1
1
1
32'-0"10'-5"1'-4"1'-3"1'-4"5'-0"1'-6"1'-3"
4
FFE 942.50'
Step
TFE 944.00'
TFE 946.00'
TFE 946.00'14'-0"TFE 944.00'5
5
5
5
1
6
6
2
S314
1
S314
1
CONSTRUCTION NOTES
WALL PIPE PENETRATION- SEE PROCESS DRAWINGS -SEE
STANDARD DETAILS FOR ADDITIONAL REINFORCING.
ODOR CONTROL FOUNDATION- SEE PROCESS - VERIFY SIZE W/
MANUFACTURE REQUIREMENTS - SEE DETAIL
PROVIDE OPENING IN CONCRETE WALL FOR CONDUIT -
COORDINATE SIZE,QUANTITY, AND LOCATION W/ ELECTRICAL -
SEE STANDARD DETAIL FOR ADDITIONAL REINFORCING
18" CONCRETE MAT SLAB REINFORCED WITH #5 @ 12" O/C EACH
WAY TOP AND BOTTOM
CONCRETE WALL AT LOWER LEVEL- REINFORCE W/ #6 @ 9" o/c
EACH WAY-EACH FACE.
PROVIDE FULL DEPTH POCKET TO ELEVATION 952.67 IN
FOUNDATION WALL FOR SLAB AND SUMP LEVEL
2
/ 5 S312
3
4
5
6
0 2'4'6'8'10'12'14'
PROJECT NUMBER
CHECKED / APPROVED
DATE
DRAWING TYPE
PREPARED BY
/Layout: 22x34DRAWING
FACILITY
Advanced Engineering and Environmental Services, LLC. Water Tower Pl Business Ctr 6901 E Fish Lake Rd Ste 184 Maple Grove, MN 55369 (t) 763-463-5036 (f) 763-463-5037 www.ae2s.com I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA.SIGNATURE:___________________________________________________TYPED NAME: _KIRK DANIEL EHLKE_MARCH 28, 2022 REG. NO. #60003BIM 360://05409-2017-004 Otsego West WWTF Phase 1 Improvements/05409-2017-004-Otsego_West_FSB-S_v20.rvt9/12/2023 10:08:25 AMMAR 2022
05409-2017-004
KDE KDE
KDE
CONST.FOUNDATION PLANOTSEGO, MNCITY OF OTSEGOOTSEGO WEST WWTF PHASE 1 IMPROVEMENTSFSB
S101
N
O
R
T
H
S101
1 FOUNDATION PLAN
CONTINUOUS FOOTING SCHEDULE
MARK WIDTH THICKNESS BOTTOM LONGIT REINFORCING BOTTOM TRANSV REINFORCING
WF3.0 3'-0" 12" (3) #5 CONT #4 @ 24" o/c
WF3.5 3'-6" 12" (3) #5 CONT #4 @ 24" o/c
WF4.0 4'-0" 12" (4) #5 CONT #4 @ 16" o/c
WF4.6 4'-6" 12" (5) #5 CONT #5 @ 18" o/c SYMDATEDESCRIPTIONAPPR108/17/23FO #8KDE
T
1'-4"11'-4"1'-4"5'-0"1'-4"
2
S303
1
S303
2
S302
1
S301
3
S302
2
S314
1
S302
FFE 952.00'
1'-0"8'-7"1'-0"25'-0"1'-4"1'-2"10"10'-5"1'-4"5'-0"1'-4"34'-1"1'-4"13'-6"1'-0"1'-0"5'-4"1'-6"17'-6"1'-4"8'-11"1'-4"18'-1"
21 3
D
A
FFE 952.00'
1
2
S301
10"3'-0"6'-10"3'-0"6'-10"3'-0"1'-6"
1S01 1S02 1S03
1S01 1S02 1
1
FFE 952.00'
FFE 960.00'
1S01 1S02
1S01 1S02
2
2
33
3
3
5
5
5
2
S312
FFE 960.00'
SEE SBT DRAWINGS FOR
ADDITIONAL
INFORMATION
5 1'-4"1'-4"6
1'-10"3'-0"6'-10"3'-0"6'-10"3'-0"2'-10"
1'-0"4'-8"5'-0"5'-0"5'-0"4'-8"2'-0"6'-5"3'-4"5'-7"1'-3"8'-4"10"15'-4"10"3'-0"5'-4"6
1S03
7
36'-3"8"18'-1"
33
8 5
S312 SIM
9
9
9
43'-0"3'-0"FD
6 6 70'-0"24'-9"7'-7"1'-0"55'-0"
55'-0"
1
1
1S01
FFE 954.00'
FFE 960.00'
FFE 960.00'
101'-0"7'-0"1'-0"1S04
1
S314
1
CONSTRUCTION NOTES
6" THICK SLAB ON GRADE REINFORCED WITH #5 @ 16" o/c EACH
WAY CENTERED OVER 6" GRANULAR BASE
METAL STAIR- SEE ARCH
SLOPING CONCRETE TOPPING SLAB OVER STRUCTAL SLAB -SEE
SPEC -COORDINATE W/ PROCESS AND SCREEN MANUFACTURE
TRENCH DRAIN- SEE MECHANICAL FOR ADDITIONAL
INFORMATION -SEE DETAIL
FLOOR PIPE PENETRATION- SEE PROCESS DRAWINGS -SEE
STANDARD DETAILS FOR ADDITIONAL REINFORCING.
12" THICK CONCRETE WALL REINFORCED W/ #4 @ 12" o/c VERT
AND #4 @ 9" HORIZONTAL EACH FACE
CONCRETE APRON -SEE STANDARD DETAIL
ODOR CONTROL FOUNDATION- SEE PROCESS - VERIFY SIZE W/
MANUFACTURE REQUIREMENTS - SEE DETAIL
CONCRETE STOOP- SEE STANDARD DETAIL SD-10/701. VERIFY
SIZE W/ CIVIL AND OWNER.
16" THICK CONCRETE SLAB SPANNING BETWEEN FOUDATION
WALLS- SEE SLAB 1S04 FOR REINFORCING -PROVIDE 4" PVC
WATERSTOPS AT WALLS
2
3
4
5
6
7
8
/ 5 S312
9
/ 8 S501
10
PLAN NOTES
1. VERIFY FINAL CHANNEL LAYOUT WITH SELECTED
PROCESS EQUIPMENT.
2. FD-INDICATE FLOOR DRAIN -SEE STANDARD FLOOR DRAIN
DETAIL -VERIFY LOCATION AND SLOPING W/ MECHANICAL
3. CONTRACTOR HAS OPTION TO CONTINUE SLAB
REINFORCEMENT - NOT REQUIRED TO SPLICE
PROJECT NUMBER
CHECKED / APPROVED
DATE
DRAWING TYPE
PREPARED BY
/Layout: 22x34DRAWING
FACILITY
Advanced Engineering and Environmental Services, LLC. Water Tower Pl Business Ctr 6901 E Fish Lake Rd Ste 184 Maple Grove, MN 55369 (t) 763-463-5036 (f) 763-463-5037 www.ae2s.com I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA.SIGNATURE:___________________________________________________TYPED NAME: _KIRK DANIEL EHLKE_MARCH 28, 2022 REG. NO. #60003BIM 360://05409-2017-004 Otsego West WWTF Phase 1 Improvements/05409-2017-004-Otsego_West_FSB-S_v20.rvt9/12/2023 10:08:28 AMMAR 2022
05409-2017-004
KDE KDE
KDE
CONST.CHANNEL LEVEL PLANOTSEGO, MNCITY OF OTSEGOOTSEGO WEST WWTF PHASE 1 IMPROVEMENTSFSB
S102S102
1 CHANNEL LEVEL PLAN
0 2'4'6'8'10'12'14'
N
O
R
T
H
CONCRETE SLAB SCHEDULE
MARK SLAB TYPE
THICKNESS
(INCHES)TOP (S OR W) TOP (N OR E)
TOP
COVER
TOP TEMP
REINFORCING
BOTTOM
REINFORCING
BOTTOM
COVER
BOTTOM TEMP
REINFORCING REMARKS
1S01 IA 14" #5 @ 12" O/C #5 @ 6" O/C 2" #5 @ 12" O/C #6 @ 9" O/C 2" #5 @ 12" O/C
1S02 IIA 14" SEE 1S01 #5 @ 6" O/C 2" #5 @ 12" O/C #6 @ 9" O/C 2" #5 @ 12" O/C
1S03 IA 14" SEE 1S02 #5 @ 12" O/C 2" #5 @ 12" O/C #6 @ 9" O/C 2" #5 @ 12" O/C
1S04 IA 16" #5 @ 12" O/C #5 @ 12" O/C 2" #5 @ 12" O/C #6 @ 6" O/C 2" #5 @ 12" O/C SYMDATEDESCRIPTIONAPPR108/17/23FO #8KDE
966.00'
FFE
980.00'
TDT
960.00'
CHANNEL
2
S302
1
S301
2
S314
1
S302
DA
2
S301
S312
1
VERIFY W/
PROCESS
S312
5
S501
2
COMPACTED
GRANULAR FILL PER
GEOTECH REPORT
NATIVE SOIL
S311
1
SIM
S501
7
1
1
1'-0"7'-0"1'-0"
FFE 954.00'
S314
1
966.00'
FFE
980.00'
TDT
960.00'
CHANNEL
948.00'
TFE
2
S302
1
S301
1
S302
C DA
2
S301
S312
2
S501
2 S501
7
S311
1
SIM
S501
3
S501
3
PROJECT NUMBER
CHECKED / APPROVED
DATE
DRAWING TYPE
PREPARED BY
/Layout: 22x34DRAWING
FACILITY
Advanced Engineering and Environmental Services, LLC. Water Tower Pl Business Ctr 6901 E Fish Lake Rd Ste 184 Maple Grove, MN 55369 (t) 763-463-5036 (f) 763-463-5037 www.ae2s.com I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA.SIGNATURE:___________________________________________________TYPED NAME: _KIRK DANIEL EHLKE_MARCH 28, 2022 REG. NO. #60003BIM 360://05409-2017-004 Otsego West WWTF Phase 1 Improvements/05409-2017-004-Otsego_West_FSB-S_v20.rvt9/12/2023 10:08:32 AMMAR 2022
05409-2017-004
KDE KDE
KDE
CONST.FULL BUILDING SECTIONSOTSEGO, MNCITY OF OTSEGOOTSEGO WEST WWTF PHASE 1 IMPROVEMENTSFSB
S303
S303
2 FULL BUILDING SECTION
S303
1 FULL BUILDING SECTION
0 2'4'6'8'10'12'14'SYMDATEDESCRIPTIONAPPR108/17/23FO #8KDE
960.00'
CHANNEL
2
S314
4" PVC WATERSTOP
4" PVC WATERSTOP
DOWEL-SEE STD DETAIL
#5 @ 12" o/c VERT
EACH FACE
#5 @ 12" o/c HORIZ
EACH FACE
PROCESS GROUT
COORDINATE SLOPE
W/ FIELD ENGINEER
CONCRETE SLAB-SEE
OTHER DETAILS AND
SCHEDULE
PROCESS GATE
CONCRETE SLAB-SEE
OTHER DETAILS AND
SCHEDULE
PROCESS PIPE
OPENING-PROVIDE
ADDITIONAL FRAMING
PER STANDARD
DETAIL
CONCRETE WALL
BEYOND. PROVIDE (2)
ADDITIONAL #4 x 8'-0"
AT CORNER EACH
FACE
WALLS EXTEND THE
WIDTH OF CHANNEL
966.00'
FFE
960.00'
CHANNEL
2
S303
1
FFE 954.00'
CONCRETE SLAB -
SEE PLAN
TOPPING SLAB-
COORDINATE W/
FIELD ENGINEER
4" PVC WATERSTOP
2" CLR2" CLRBACKFILL AS
REQUIRED
EXTEND TYPICAL
WALL REINFORCING
THROUGH SLAB
EXTEND TYPICAL
WALL REINFORCING
THROUGH SLAB
1'-0"5'-4"1'-4"5'-1"1'-0"
FOUNDATION WALL
AND FOOTING -SEE
OTHER DETAILS
HYDROPHILIC
WATERSTOP
S312
3
#4 @ 12" o/c VERT W/ ACI 90
DEG HOOK INTO SLAB
#4 @ 9" o/c HORIZ -
EACH FACE
#5 @ 6" O/C VERTS
INSIDE FACE AT
SUMP LEVEL -
EXTEND ADDITIONAL
BARS 4'-0" MINIMUM
INTO LOWER WALL -
(#5 @ 12" TYPICAL)
#5 @ 12" O/C VERTS
#5 @ 12" O/C HORIZ -
EACH FACE
GRADE SEE CIVIL
1
S314
PROVIDE WATERSTOP
AT ALL WATER
BEARING JOINTS
WALL DOWELS
NOTE-NOT ALL
REINFORCING
SHOWN-SEE
OTHER DETAILS
CONCRETE PRECAST
WALL PANEL
CONCRETE SLAB-SEE
PLAN AND SCHEDULES
4" PVC WATERSTOP
ADDITIONAL BARS AT
CORNERS
CONCRETE SLAB BEYOND
SHEET
PROJECT NUMBER
CHECKED / APPROVED
DATE
DRAWING TYPE
PREPARED BY
/Layout: 22x34DRAWINGPRELIMINARY
Advanced Engineering and Environmental Services, LLC Water Tower Pl Business Ctr 6901 E Fish Lake Rd Ste 184 Maple Grove, MN 55369 (t) 763-463-5036 (f) 763-463-5037 www.ae2s.com NOT FOR CONSTRUCTIONMILESTONEBIM 360://05409-2017-004 Otsego West WWTF Phase 1 Improvements/05409-2017-004-Otsego_West_FSB-S_v20.rvt9/12/2023 10:08:33 AMMAR 2022
05409-2017-004
KDE KDE
KDE
CONST.WALL SECTIONS AT RAW SUMPOTSEGO, MNCITY OF OTSEGOOTSEGO WEST WWTF PHASE 1 IMPROVEMENTSS314
S314
1 SECTION AT RAW SUMP
S314
2 SECTION AT RAW SUMP
12"6"0 1'2'3'12"6"0 1'2'3'
November 15, 2023
AE2S
6901 East Fish Lake Rd.
Suite 184
Maple Grove, MN 55369-5457
ATTN: Scott Schaefer, PE
Re: Otsego West WWTF Improvements Phase 1
RLCG Project No. 2215
Change Order Proposal #: 027 – Field Order 7, MTB Bldg Changes
Scott,
The total cost to make the changes shown in the attached Field Order 7 is $24,915.00. Attached
is a breakout of the costs.
Please let me know if you have any questions.
Sincerely,
Rice Lake Construction Group
Matt Perpich
Project Manager
2215
Otsego West WWTF Improvements Phasae 1
22360 County Road 12, PO Box 517 11/15/2023
Deerwood, MN 56444 27
HOURS $ RATE TOTAL RATE TOTAL
RLCG Labor 22.00 HR 22.00 99.00$ $2,178.00 -$ $0.00 -$ -$ 2,178.00$
RLCG Material 1.00 LS -$ $0.00 $0.00 -$ -$ -$
-$ $0.00 $0.00 -$ -$ -$
Chappell 1.00 LS -$ $0.00 $0.00 13,701.00$ -$ 13,701.00$
Metro Manufacturing 1.00 LS -$ $0.00 $3,394.00 $3,394.00 -$ -$ 3,394.00$
Roof Tech 1.00 LS -$ $0.00 $0.00 3,232.00$ -$ 3,232.00$
-$ $0.00 $0.00 -$ -$ -$
-$ $0.00 $0.00 -$ -$ -$
-$ $0.00 $0.00 -$ -$ -$
-$ $0.00 -$ $0.00 -$ -$ -$
Misc. Small Tools and Mat'l 5% of Labor 1.00 ea 5.00%108.90$
Sales Tax 1.00 ea 7.375%250.31$
Totals 22.00 2,178.00$ 3,394.00$ 16,933.00$ -$ 22,864.21$
Rice Lake Mark-up on Subs (5%)846.65$
Rice Lake Mark-up on Labor, Material, and Equipment (15%)835.80$
Bond Cost (1.5%)368.20$
Total Change Order Proposal Request 24,915.00$
Days Requested 0
MATERIAL SUBCONTRACTOR
TOTAL
EQUIPMENT
TOTAL LINE TOTALDESCRIPTIONQTYUNITLABOR
RLCG PROJECT #:
PROJECT NAME:
DATE:
COP:
CHANGE ORDER PROPOSAL
WE’RE ON TOP OF
October 20, 2023
Mr. Matt Perpich
Rice Lake Contracting
22360 Co Rd 12
Deerwood, MN 56444
Re: Otsego WWTF – Field Order No. 7
Otsego, MN
Mr. Perpich,
We have reviewed Field Order number 7 for the above project and found the following changes:
- Flashing in 3 Sets Ea – 4’ long sleepers with Crickets on the high side and Galvanized sheet metal caps
(Supplied and installed By Others)
Materials: $1,803.10
Labor: $ 868.00
Total Material and Labor: $2,671.10
10% Overhead: $ 267.11
Subtotal: $2,938.21
10% Profit: $ 293.82
Total Add Amount F.O. #7: $3,232.00
Please feel free to contact us with any questions that you may have.
Sincerely,
Brian D. Brezinka
Vice President
#1693
From:Gary Dewing Date:10/24/2023
Project: Otsego West WWTF Improvements Erection:
Erection IS NOT included in base bid.
Location:Otsego, MN To:Rice Lake (Michael Benson , Matt Perpich)
Inclusions:Field Order 7, dated 10/13/2023
055000 - Metal Fabrications
Membrane Treatment Building (MTB)
A420 Stair 108, Layout Revision from Straight-Run to 90 degree Stair
Added Shop Labor/Materials for Wall Rail TO Guardrailing (1) @ 15'
Revise Shop Drawings already detailed
Exclusions:Price (ADD): $3,394
(tax included)
Best Regards,
Gary Dewing
Change Order Proposal
METRO MANUFACTURING INC.
& METRO ERECTORS INC. (WBE)
465 Kenny Road
Saint Paul, MN 55130
PH: 651-776-5455
Fax: 651-776-2095
Otsego West WWTF Liquids Phase 1 March 2022
Otsego, Minnesota 00 63 36 - 1 Field Order
FIELD ORDER NO.: 7
Owner: City of Otsego Owner’s Project No.: 4202302
Engineer: AE2S Engineer’s Project No.: P05409-2017-004
Contractor: Rice Lake Construction Group Contractor’s Project No.:
Project: Otsego West WWTF Phase 1 Improvements
Contract Name: Contract No. 1
Date Issued: 10/13/2023 Effective Date of Field Order: 10/13/2023
Contractor is hereby directed to promptly perform the Work described in this Field Order, issued in
accordance with Paragraph 11.04 of the General Conditions, for minor changes in the Work without
changes in Contract Price or Contract Times. If Contractor considers that a change in Contract Price or
Contract Times is required, submit a Change Proposal before proceeding with this Work.
Reference:
Specification Section(s): NA
Drawing(s) / Details (s): MTB A010, MTB A201, MTB A401, MTB A420, MTB M105, MTB M106
Description:
Changes to the Membrane Treatment Building due to conflicts.
- Lower level stairs rotated clockwise 90° to allow for more headroom with electrical duct banks.
- Condensing units moved to roof.
Attachments:
MTB A010, MTB A201, MTB A401, MTB A420, MTB M105, MTB M106
Issued by Engineer
By: Scott Schaefer
Title: Project Manager
Date: 10/13/2023
UP
UP
UP
NUMBER
WIDTH
CAPACITY
LOAD
FACTOR
EGRESS LOAD
EGRESS WIDTH
EGRESS FACTOR
EGRESS CAPACITY
ELEMENT ID NUMBER
FIRE WALLS AND FIRE BARRIERS HAVING A REQUIRED
FIRE-RESISTANCE RATING GREATER THAN 1 HOUR
4 HOUR RATED WALL
ENCLOSURES FOR SHAFTS, INTERIOR EXIT STAIRWAYS AND
INTERIOR EXIT RAMPS
HORIZONTAL EXITS IN FIRE WALLS
FIRE BARRIERS HAVING A REQUIRED FIRE-RESISTANCE RATING
OF 1 HOUR - ENCLOSURES FOR SHAFTS, EXIT ACCESS
STAIRWAYS, EXIT ACCESS RAMPS, INTERIOR EXIT STAIRWAYS
AND INTERIOR EXIT RAMPS; AND EXIT PASSAGEWAY WALLS
OTHER FIRE BARRIERS
FIRE PARTITIONS - CORRIDOR WALLS
OTHER FIRE PARTITIONS
EXTERIOR WALLS
SMOKE BARRIERS
2 HOUR RATED WALL
3 HOUR RATED WALL
1.5 HOUR RATED WALL
2 HOUR RATED WALL
2 HOUR RATED WALL
1 HOUR RATED WALL
1 HOUR RATED WALL
1 HOUR RATED PARTITION
1 HOUR RATED WALL
1 HOUR RATED WALL
4 HOUR RATED WALL
3 HOUR RATED WALL
1 HOUR RATED PARTITION
0.5 HOUR RATED PARTITION
0.5 HOUR RATED PARTITION
3 HOUR RATED WALL
3898.84 SF
UPPER LEVEL
101
01
02
04
34
170
101
23
0.2
34
170
109A
21
0.2
34
170
108
37
0.2
68
340
106B
15
0.2
68
340
104B
0
0.2
05
03
344.38 SF
NaClO TANKS
102
109
108
827.57 SF
MECHANICAL
103
795.48 SF
ELECTRICAL
104
01
01
01
36
0.3
120
37
36
0.3
120
21
4111.83 SF
LOWER LEVEL
001
05
01
04
BUILDING STATISTICS:
BUILDING FOOTPRINT: 6,000 SF
LOWER LEVEL: 4,227 SF
UPPER LEVEL: 4,789 SF
MEZZANINE: 728 SF
BUILDING HEIGHT: 22'
APPLICABLE CODES:
2018 INTERNATIONAL BUILDING CODE
MINNESOTA STATE BUILDING CODE, MINNESOTA STATUTES, 16B.59 TO 16B.75
2020 MINNESOTA MECHANICAL AND FUEL GAS CODE
2020 INTERNATIONAL FIRE CODE
2015 MINNESOTA PLUMBING CODE
2020 NATIONAL ELECTRICAL CODE
2018 INTERNATIONAL ENERGY CONSERVATION CODE
2009 ANSI A117.4 AND 2010 ADA
NFPA 820 LIFE SAFETY CODE
BUILDING CLASSIFICATION AND LIMITATIONS
OCCUPANCY TYPE: F-1, H-4
OCCUPANCY SEPARATIONS: 2 HR: F-1/H-4
INCIDENTAL USE AREAS: MECHANICAL, ELECTRICAL
AUTOMATIC SPRINKLER SYSTEM: SPRINKLERED ONLY IN H-4 SPACES
CONSTRUCTION TYPE: II-B
ALLOWABLE AREA: 15,500 SF
ALLOWABLE BUILDING HEIGHT: 55'; 2 STORIES
EGRESS:
EGRESS BASED ON OCCUANT LOAD: 2 EXITS REQUIRED
COMMON PATH OF TRAVEL: 75'
EXIT ACCESS TRAVEL DISTANCE: 200'
CORRIDORS: 1 HR RATED
677.67 SF
MEZANNINE
201
PROJECT NUMBER
CHECKED / APPROVED
DATE
DRAWING TYPE
PREPARED BY
/Layout: 22x34DRAWING
FACILITYI HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA.SIGNATURE:___________________________________________________TYPED NAME: ADAM D. BARNETTMARCH 25, 2022 REG. NO. #50657Advanced Engineering and Environmental Services, LLC Water Tower Pl Business Ctr 6901 E Fish Lake Rd Ste 184 Maple Grove, MN 55369 (t) 763-463-5036 (f) 763-463-5037 www.ae2s.com JLG PROJ. NO.: 20164BIM 360://05409-2017-004 Otsego West WWTF Phase 1 Improvements/05409-2017-004_Otsego West WWTF_MTB_A_v20.rvt8/15/2023 10:36:58 AMMAR 2022
20164
----
JLG
CONST.LIFE SAFETY PLANSOTSEGO, MNCITY OF OTSEGOOTSEGO WEST WWTF PHASE 1 IMPROVEMENTSMTB
A010
FLOOR AREA SCHEDULE
NUMBER NAME AREA
OCCUPANCY CLASSIFICATION (IBC
CHAPTER 3)
IBC CHAPTER 10
REMARKS LevelFUNCTION OF SPACE
FLOOR AREA PER
OCCUPANT
SF PER OCC.
MEASUREMENT
OCCUPANT LOAD
FIXED
SEATS
MAX. ALLOWABLE
OCCUPANT LOAD
001 LOWER LEVEL 4,112 SF F-1 INDUSTRIAL AREA 100 GROSS 0 42 TFE
101 UPPER LEVEL 3,899 SF F-1 INDUSTRIAL AREA 100 GROSS 0 39 FFE
102 NaClO TANKS 344 SF H-4 ACCESSORY STORAGE, MECH
EQUIPMENT ROOM
300 GROSS 0 2 FFE
103 MECHANICAL 828 SF F-1 ACCESSORY STORAGE, MECH
EQUIPMENT ROOM
300 GROSS 0 3 FFE
104 ELECTRICAL 795 SF F-1 ACCESSORY STORAGE, MECH
EQUIPMENT ROOM
300 GROSS 0 3 FFE
201 MEZANNINE 678 SF UNOCCUPIED UNOCCUPIED SPACE 0 MEZZANINE IS UNCONDITIONED, EXTERIOR
SPACE TO PROVIDE ACCESS TO
PROCESS/MECHANICAL EQUIPMENT.
MEZZANINE
10,656 SF 0 89
TRAVEL DISTANCE
Travel Distance Path ID Level
98'-0" 01
56'-5" 02
40'-2" 03
84'-2" 04
82'-3" 05
LIFE SAFETY LEGEND
0 16'32'
NO SCALEA010
1 UPPER LEVEL LIFE SAFETY PLAN
NO SCALEA010
2 LOWER LEVEL LIFE SAFETY PLAN
BUILDING CODE INFORMATION
0 16'32'0 16'32'
NO SCALEA010
3 MEZZANINE
LIFE SAFETY KEYNOTES
KEYNOTE DESCRIPTION
01 FIRE EXTINGUISHER SYMDATEDESCRIPTIONAPPR108/15/23FO #7AB1
1
T
T
TT
T
T
T
UP
UP
UP
FLOOR PLAN GENERAL NOTES
A. COORDINATE PARTITION FIRE RATED REQUIREMENTS AS INDICATED ON LIFE SAFETY
PLANS
B. TYPICALLY INSTALL SOAP DISPENSERS AND PAPER TOWEL DISPENSER AT ALL SINKS
UNLESS NOTED OTHERWISE.
C. COORDINATE DIMENSIONS W/ ASTERISK (IE - *X'-X") W/ EQUIPMENT VENDOR.
D. PROVIDE BULLNOSE ON ALL CMU OUTSIDE CORNERS - TYPICAL.
E. FOR INTERIOR METAL STUD CONSTRUCTION ALL DIMENSIONS ARE TO FACE OF
METAL STUDS UNLESS NOTED OTHERWISE.
F. ALL DIMENSIONS INDICATED AS 'CLEAR' ARE TO FACE OF FINISH (GYPSUM, TILE,
ETC.).
G. ALL MASONRY DIMENSIONS ARE TO FACE OF MASONRY UNLESS NOTED
OTHERWISE.
H. ALL EXTERIOR OPENING DIMENSIONS ARE ROUGH OPENINGS.
I. COORDINATE ALL FLOOR OPENING DIMENSIONS AND CLEARANCES FOR DUCTWORK
W/ MECHANICAL CONTRACTOR - TYPICAL.
J. COORDINATE AND/OR CONFIRM ANY DIMENSIONAL DISCREPENCIES WITH
ARCHITECT PRIOR TO INSTALLATION.
4
AA
2
A401
1
A401
A301 2
A301
4
A3013
A301
1
80'-0"6'-0"10'-8"5'-4"5'-4"15'-4"40'-0 1/2"12'-0"12'-0"13'-4"6'-4"6'-4"12'-4"4'-4"4'-4"
3'-0" 8'-0" 3'-0" 1'-4" 10'-8" 8'-0"
1'-4"
36'-0"
XC20
XC20
XC21
AC8.1
AC8.1
AC8.1
AC8.2
AC8.1
PUMP ROOM
101
EQUIPMENT
104
INDUSTRIAL AREA
103
CHEMICAL FEED
102
MECHANICAL
105
STAIR
108
ELECTRICAL
106
101
102A103
104A
106A
108109A
OH102B
105
STAIR
109
104B
106B
OH101
AC8.1
CORRIDOR
107
3
A401
AC8.2
01
CC
DD
4.5 5 5.2 65.6 6.5 7 7.5 8 8.5
14'-0" 10'-4" 4'-10" 15'-2" 6'-0" 10'-0" 10'-9" 3'-9" 1'-4"3'-10"
______
A420
6
______
A420
4
4
A501
3
A501
2
A501
1
A501
109B
______
A220
5
03
04
04
05
06
07
07
07
07
AC8.2
08
08
5.3
09
BB
A
B
107AC8.1
14'-0" 10'-4" 4'-10" 5'-4" 9'-10" 6'-0" 10'-0" 10'-9" 3'-9"
1'-4"
3'-10"
80'-0"5"3'-0"10'-10"3'-0"3'-0" 4'-7"
11'-6 1/4" 6'-6"4'-6"5'-9"7'-7 3/4"7'-8 1/4"AC8.2
M836'-2"17'-4"16'-2"5'-4"5'-9 1/2"73'-8"12
12
12
12
12
12
12
13
13
13
XC20
______
A005
15
TYP.
05
A201 4
______
A421
4
Sim
XC21
5
A501
6
A501
______
A203
2
______
A203
2
4'-4 1/4"
15
A007
HM1
13'-4"8"
4
AA
2
A401
1
A401
3
A401
PUMP ROOM
001
CC
DD
4.5 5 5.2 65.6 6.5 7 7.5 8 8.5
FILTRATE STORAGE TANK
002
WAS STORAGE TANK
003
MEMBRANE TANK
DISTRIBUTION CHANNEL
004
MEMBRANE TANK NO. 1
005
MEMBRANE TANK NO. 2
006
MEMBRANE TANK NO. 3
007
______
A420
5
______
A420
3
4
A501
3
A501
2
A501
1
A501
02
5.3
09
10
80'-2"
BB
A
B
1'-3"2'-0"14'-0" 10'-4" 4'-10" 5'-4" 9'-10" 6'-0" 10'-0" 10'-9" 3'-9"
1'-4"
3'-10"4'-1"CLEAR18'-0"CLEAR
17'-2"
CLEAR
13'-4"
4'-0" 3'-2"
CLEAR
13'-6"
CLEAR
13'-6"
CLEAR
13'-6"4'-4"19'-4"VIF20'-8"VIF5'-8"VIF3'-8"4'-5 1/2"75'-0"36'-2"17'-4"16'-2"5'-4"ELEV. = 939.00'
XC10
XC10
FL1.0
5
A501
6
A501
2
4 3
A401
DD
4.5 5 5.2 5.3
14'-0" 3'-4"
SERVICE MEZZANINE
201 20111
11
11
______
A421
4
8
A421
4'-4 1/4"
AC8.1
AC8.1
XC20
XC21
35'-4"14'-2"4'-10"FL1.0
ELEV. = 969.50'
955.00'
FFE2'-10"<EPXY CTOP-1>
<LAB CASE-1>
B2:30 BS1:30 B2:30B2:21 B2:30 B2:15F F
CHASE WALLS
10' HEIGHT
PROJECT NUMBER
CHECKED / APPROVED
DATE
DRAWING TYPE
PREPARED BY
/Layout: 22x34DRAWING
FACILITYI HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA.SIGNATURE:___________________________________________________TYPED NAME: ADAM D. BARNETTMARCH 25, 2022 REG. NO. #50657Advanced Engineering and Environmental Services, LLC Water Tower Pl Business Ctr 6901 E Fish Lake Rd Ste 184 Maple Grove, MN 55369 (t) 763-463-5036 (f) 763-463-5037 www.ae2s.com JLG PROJ. NO.: 20164BIM 360://05409-2017-004 Otsego West WWTF Phase 1 Improvements/05409-2017-004_Otsego West WWTF_MTB_A_v20.rvt8/15/2023 10:37:07 AMMAR 2022
20164
-- --
JLG
CONST.FLOOR PLANSOTSEGO, MNCITY OF OTSEGOOTSEGO WEST WWTF PHASE 1 IMPROVEMENTSMTB
A201
SHEET MATERIAL ID LIST
MATERIAL ID SPEC SECTION & DESCRIPTION
EPXY CTOP-1 12 3600 - EPOXY RESIN COUNTERTOP
LAB CASE-1 12 3553.19 - WOOD LABORATORY CASEWORK
FLOOR PLAN KEYNOTES
KEYNOTE DESCRIPTION
01 SEE STRUCTURAL FOR FLOOR CONSTRUCTION
02 PERIMETER DRAIN TILE
03 OVERFLOW SCUPPER AT GRADE; PROVIDE CONCRETE SPLASH BLOCK PER
GENERAL NOTE
04 42" HIGH REMOVABLE ALUMINUM PIPE GUARDRAIL
05 WALL, T.O. WALL 30" A.F.F.
06 WALL, T.O. WALL 96" A.F.F.
07 <MTL FAB-2>: PIPE BOLLARD, SEE SPEC.
08 STAINLESS MUD VALVES IN CONTAINMENT AREAS
09 MOP SINK, REF. TO PLUMBING DRAWINGS
10 UTILITY SINK, REF. TO PLUMBING DRAWINGS
11 INSTALL <INSUL-26>, 2" THICK, Z-FURRINGS AND <CEMENT BD-1> UP TO ROOF
DECK ABOVE. TAPE AND MUD FINISH
12 STOOP OR DOOR APRON, SEE STRUCTURAL
13 TANK ACCESS HATCH, SEE PROCESS
XX
NO SCALEA201
1 UPPER LEVEL PLAN
NO SCALEA201
2 LOWER LEVEL PLAN
0 4'8'12'16'20'
NO SCALEA201
3 MEZZANINE
NO SCALEA201
4 PUMP ROOM CASEWORK
R
O
N
T
H
CONSTR ACTUAL
R
O
N
T
H
CONSTR ACTUAL SYMDATEDESCRIPTIONAPPR108/03/22FO #1AB208/15/23FO #7AB1
955.00'
FFE
AA
983.00'
PARAPET
1
A401
977.75'
HIGH ROOF
CC DD
976.00'
LOW ROOF
960.00'
NORTH PRECAST
969.50'
MEZZANINE
BB A B
XC20
RA1
XC20
PUMP ROOM
101
PUMP ROOM
101
PUMP ROOM
001
PUMP ROOM
101
FILTRATE STORAGE TANK
002
FL1.0______
A006
16
______
A005
6SIM.______
A005
6SIM.
955.00'
FFE
4
2
A401
983.00'
PARAPET
3
A401
977.75'
HIGH ROOF
4.5 5 5.2 65.6 6.5 7 7.5 8 8.5
976.00'
LOW ROOF
960.00'
NORTH PRECAST
5.3
969.50'
MEZZANINE
PUMP ROOM
001
CORRIDOR
107
PUMP ROOM
101
ELECTRICAL
106
STAIR
109
XC20
XC20
RA1
FL1.0
______
A005
6SIM.______
A005
6 SIM.
______
A006
16SIM.
______
A006
16SIM.7
A420
955.00'
FFE
AA
983.00'
PARAPET
1
A401
977.75'
HIGH ROOF
CCDD
976.00'
LOW ROOF
960.00'
NORTH PRECAST
969.50'
MEZZANINE
BBAB
XC20
PUMP ROOM
101
SERVICE MEZZANINE
201
EQUIPMENT
104
ELECTRICAL
106
STAIR
108
PUMP ROOM
001
MEMBRANE TANK
DISTRIBUTION CHANNEL
004
XC20
RA1
MEMBRANE TANK NO. 3
007
FL1.0
______
A501
5
Sim
______
A401
4
______
A005
6 SIM.
______
A006
16 SIM.SEE STRUCT.2"2"CONCRETE TOPPING
HIGH COMPRESSION RIGID INSULATION
HOLLOW CORE SLAB
5/8" CEMENT BOARD
<INSUL-26>
<FUR-2>
WALL, SEE PLAN
SHEET RE-ISSUED BY
ADDENDUM NO. 3
PROJECT NUMBER
CHECKED / APPROVED
DATE
DRAWING TYPE
PREPARED BY
/Layout: 22x34DRAWING
FACILITYI HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA.SIGNATURE:___________________________________________________TYPED NAME: ADAM D. BARNETTMARCH 25, 2022 REG. NO. #50657 Advanced Engineering and Environmental Services, LLC Water Tower Pl Business Ctr 6901 E Fish Lake Rd Ste 184 Maple Grove, MN 55369 (t) 763-463-5036 (f) 763-463-5037 www.ae2s.com JLG PROJ. NO.: 20164BIM 360://05409-2017-004 Otsego West WWTF Phase 1 Improvements/05409-2017-004_Otsego West WWTF_MTB_A_v20.rvt8/15/2023 10:37:11 AMMAR 2022
20164
-- --
JLG
CONST.BUILDING SECTIONSOTSEGO, MNCITY OF OTSEGOOTSEGO WEST WWTF PHASE 1 IMPROVEMENTSMTB
A401
SHEET MATERIAL ID LIST
MATERIAL ID SPEC SECTION & DESCRIPTION
FUR-2 09 2116 -ZEE FURRING
INSUL-26 07 2100 - MINERAL FIBER BOARD INSULATION
NO SCALEA401
2 BUILDING SECTION
NO SCALEA401
1 BUILDING SECTION
NO SCALEA401
3 BUILDING SECTION
0 4'8'12'16'20'
0 4'8'12'16'20'0 4'8'12'16'20'
NO SCALEA401
4 SERVICE MEZZANINE FLOOR
1
1
1 SYMDATEDESCRIPTIONAPPR104/21/22ADDENDUM #3AB208/15/23FO #7AB2
UP
UP
AA
CC
7.5 8 8.5
STAIR
109
2
A420
4'-8"
BB
CLEAR
3'-0"
7
A421
Typ
109A109BLANDING3'-0"13 T.R. @ 11" EA.11'-0"6'-0"AA
5 5.2
STAIR
108
1
A420
5.3
BB
7
A421
Typ
CC
7.5 8 8.5
2
A420
BB 13 TR. @ 11" EA.11'-0"LANDING3'-0"15 TR. @ 11" EA.13'-9"27'-9"CLEAR
3'-0"
7
A421
TypAA
1
A401
4.5 5 5.2
1
A420
5.3
BB 11 TR. @ 11" EA.10'-1"LANDING3'-0"2"7
A421
Typ
CLEAR
3'-0"
17 TR. @ 11" EA.
15'-7"
1'-0"1'-0"
1'-0"
7
A420
3"1'-0"1'-0"9"
955.00'
FFE
AA CC DDBB
13 TR. @ 11" EA.
11'-0"
LANDING
3'-0"
15 TR. @ 11" EA.
13'-9"13 RISERS @ 6.855" EA.7'-5 1/4"15 RISERS @ 6.855" EA.8'-6 3/4"______
A421
2
Typ
6
A421
TYP
______
A421
5
______
A421
3
Typ
955.00'
FFE
4 4.5 5 5.2 5.3
17 TR. @ 11" EA.
15'-7"17 RISERS @ 6.855" EA.9'-8 1/2"11 RISERS @ 6.855" EA.6'-3 1/2"______
A421
2
Typ
______
A421
5
6
A421
TYP
7
A420
Sim
A. ALL RAILINGS SHALL BE OF PIPE AND TUBE CONSTRUCTION; 1-1/4" I.D. PIPE, U.N.O.
B. ALL STAIRS AND RAILINGS SHALL BE GALVANIZED STEEL PAN W/ CONCRETE FILLED TREADS U.N.O.
C. GRIND AND SMOOTH ALL RAILING WELDS TO TYPE 1 FINISH.
D. SEE SHEET 6/A551 FOR ALL GUARDRAIL SUPPORTS U.N.O.
E. SEE SHEET A006 FOR ALL ACCESSORY MOUNTING HEIGHTS AND RAILING EXTENSION.
F. GUARDRAILS SHALL BE HELD 3" FROM AJOINING PERPENDICULAR WALL FACES U.N.O.
G. ALL STAIR TREADS SHALL HAVE A CLEAR WIDTH OF 3' MIN. U.N.O.
VERTICAL CIRCULATION
GENERAL NOTES
955.00'
FFE
AA
939.00'
TFE
1
A401
1
A420
BB
______
A421
3
Typ ______
A421
2
TypSim
______
A421
7
Typ
6
A421
TYP
PROJECT NUMBER
CHECKED / APPROVED
DATE
DRAWING TYPE
PREPARED BY
/Layout: 22x34DRAWING
FACILITYI HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA.SIGNATURE:___________________________________________________TYPED NAME: ADAM D. BARNETTMARCH 25, 2022 REG. NO. #50657Advanced Engineering and Environmental Services, LLC Water Tower Pl Business Ctr 6901 E Fish Lake Rd Ste 184 Maple Grove, MN 55369 (t) 763-463-5036 (f) 763-463-5037 www.ae2s.com JLG PROJ. NO.: 20164BIM 360://05409-2017-004 Otsego West WWTF Phase 1 Improvements/05409-2017-004_Otsego West WWTF_MTB_A_v20.rvt10/12/2023 12:16:01 PMMAR 2022
20164
----
JLG
CONST.VERTICAL CIRCULATIONOTSEGO, MNCITY OF OTSEGOOTSEGO WEST WWTF PHASE 1 IMPROVEMENTSMTB
A420NO SCALEA420
6 STAIR 109 UPPER LEVEL
NO SCALEA420
4 STAIR 108 UPPER LEVEL PLAN
NO SCALEA420
5 STAIR 109 LOWER LEVEL
NO SCALEA420
3 STAIR 108 LOWER LEVEL PLAN
NO SCALEA420
2 STAIR 109 SECTIONNO SCALEA420
1 STAIR 108 SECTION
SHEET MATERIAL ID LIST
MATERIAL ID SPEC SECTION & DESCRIPTION
0 1'12"6"SYMDATEDESCRIPTIONAPPR108/15/23FO #7AB1
NO SCALEA420
7 STAIR 108 SECTION 2
1
1
1
T
T
TT
T
T
T
2
M105
OA
EAFA
RA
WL-2-
MOUNT BOTTOM
@ 9'-4" A.F.F.
EF-1
MOUNT
@ 9'-4" A.F.F.
EF-2
MOUNT
@ 9'-4" A.F.F.
32x1432x14
32x14 OA (STACKED)
ERV-1
MOUNT BOTTOM
@ 12'-4" A.F.F.
ERV-2
MOUNT
BOTTOM @
8'-8" A.F.F.
32x14 RA
B.O.D. (10' -2")
FIRE DAMPER
FIRE DAMPER
FIRE DAMPER
FIRE DAMPER
MAU-3
MAU-2
ON 3" CONCRETE
PAD
ON 3" CONCRETE
PAD24x18 SAB.O.D. (14' -0")36x24 WG
36x24 WG
16x8 SR-2
600 CFM
(TYP OF 6)
24x1224x18
24x18 24x18
WL-3-
MOUNT BOTTOM
@ 8'-0" A.F.F.
10x10 UP TO
EF-4 ON ROOF.
PROVIDE 12x12 x 2"
HIGH WATERTIGHT
DRIP PAN LOCATED
12" BELOW OPENING.
MD-5
16x16 FROM 8" BELOW
CEILING UP TO
EF-4 ON ROOF.
PROVIDE 18x18 x 2"
HIGH WATERTIGHT
DRIP PAN LOCATED
12" BELOW OPENING.
WL-4-
AIR FILTER AF-1.
PROVIDE FILTER
PULL SPACE
MOUNT BOTTOM
@ 7'-6" A.F.F.
GUH-1
MOUNT
BOTTOM
@ 10'-0" A.F.F.
3" DIA GAS VENT/COMB.
AIR UP TO ROOF TERMINATION.
TERMINATE AT 31' ABOVE GRADE.
EH-11
EH-12
EH-13
EH-14
GUH-2
GUH-3
MOUNT
BOTTOM
@ 8'-0" A.F.F.
MOUNT
BOTTOM
@ 8'-0" A.F.F.
3" DIA GAS VENT/COMB.
AIR UP TO ROOF TERMINATION.
TERMINATE AT 31' ABOVE GRADE.
ACU-2
ACU-4
ACU-3
ROUTE REFRIGERANT PIPING
TO/FROM ACU & CU. SIZE PER
MANUFACTURER'S RECOMMENDATIONS.
SEAL WALL PENETRATIONS.
ROUTE REFRIGERANT PIPING
TO/FROM ACU & CU. SIZE PER
MANUFACTURER'S RECOMMENDATIONS.
SEAL WALL PENETRATIONS.
ROUTE REFRIGERANT PIPING
TO/FROM ACU & CU. SIZE PER
MANUFACTURER'S
RECOMMENDATIONS.
SEAL WALL PENETRATIONS.
MD-1MD-3
MD-2
MD-4
MD-6
BRIDGE CRANE COVERAGE
FIRE DAMPER
24/18 DOWN
EH-20
32x14 RA
B.O.D. (15' -9")
32x24
32x14
32x14
32x14
ACU-4
CORRIDOR
107
EQUIPMENT
104
ELECTRICAL
106
CHEMICAL FEED
102
INDUSTRIAL
AREA
103
PUMP ROOM
101
EH-21 EDH-1
12x6 SR-1
320 CFM
SUPPORT FROM
STRUCTURE AT
13'-6" A.F.F.
SUPPORT FROM
STRUCTURE AT
11'-0" A.F.F.
SUPPORT FROM
STRUCTURE AT
11'-0" A.F.F.
EF-4
3
M10524x18 SAB.O.D. (10' -0")A.P.
A.P.
A.P.
A.P.
A.P.18x1818x18PUMP ROOM
101
F.F.E. = 955.00
A
4 5 6 7 84.5 5.2 5.6 6.5 7.5 8.5
EDH-2
SECURELY HANG
FROM STRUCTURE
@ 10'-0" A.F.F.
8x8 SR
8x8
6Ø
WALL
CAP
SERVICE MEZZANINE ABOVE.
SEE SHEET M106 FOR MORE
WORK.
MAU CONTROL PANEL
4
FD
36x24 WG
14x32
32x14
24x32
24x18
MAU-2
MAU-3
ERV-1
ERV-2
72x40
14x32 (STACKED)
14x32
14x32
14x32MD-3
MD-1
24x32
18x24
FD
FD
0 4'8'2'
M105
1 UPPER LEVEL HVAC PLAN
PROJECT NUMBER
CHECKED / APPROVED
DATE
DRAWING TYPE
PREPARED BY
/Layout: 22x34DRAWING
FACILITYI HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA.SIGNATURE:___________________________________________________TYPED NAME: ZACHARY C. THOMPSONMARCH 28, 2022 REG. NO. #57835 Advanced Engineering and Environmental Services, LLC Water Tower Pl Business Ctr 6901 E Fish Lake Rd Ste 184 Maple Grove, MN 55369 (t) 763-463-5036 (f) 763-463-5037 www.ae2s.comBIM 360://05409-2017-004 Otsego West WWTF Phase 1 Improvements/05409-2017-004-Otsego_West_MTB-M_v20.rvt8/28/2023 11:07:41 AMMAR 2022
05409-2017-004
DAS ZCT
SRS
CONSTRUCT UPPER LEVEL HVAC PLANOTSEGO, MNCITY OF OTSEGOOTSEGO WEST WWTF PHASE 1 IMPROVEMENTSMTB
M105
GENERAL NOTES:
1. SEAL ALL PENETRATIONS OF MECHANICAL AND
ELECTRICAL ROOM WALLS.
2. MAINTAIN REQUIRED CLEARANCES IN FRONT OF
AND DIRECTLY OVER ALL ELECRICAL PANELS IN
ELECTRICAL ROOM. COORDINATE WITH
DIVISION 26.
3. REFER TO ELECTRICAL PLANS FOR NEC SPACE
RATINGS.
4. COORDINATE DUCT ROUTING WITH OVERHEAD
DOOR AND BRIDGE CRANE LOCATIONS.
8'16'4'0
M105
2 MAU-2 SECTION
8'16'4'0
M105
3 MAU-3 SECTION SYMDATEDESCRIPTIONAPPR28/15/22FO #2ZCT48/28/23FO #7ZCT
6" ROOF DRAIN
2846 SQ. FT.
6" OVERFLOW
ROOF DRAIN 6" OVERFLOW
ROOF DRAIN
6" ROOF DRAIN
2846 SQ. FT.
EF-4
EF-3
CU-4
CU-3 CU-2
MOUNT TO
ROOF RAILS.MOUNT TO
ROOF RAILS.
MOUNT TO
ROOF RAILS.
4
2' - 0"2' - 0"
SERVICE
MEZZANINE
201
F.F.E. = 969.5
WL-5-
AIR FILTER AF-2.
PROVIDE FILTER
PULL SPACE
MOUNT BOTTOM
@ 4'-0" A.F.F.
BACKDRAFT
DAMPER
MD-7
16x16 FROM BELOW
UP TO EF-4 ON ROOF.
3" DIA GAS VENT/COMB.
AIR FROM BELOW UP
TO ROOF TERMINATION.
TERMINATE AT 31' ABOVE GRADE.
24x18
8'16'4'0
M106
1 ROOF MECHANICAL PLAN PROJECT NUMBER
CHECKED / APPROVED
DATE
DRAWING TYPE
PREPARED BY
/Layout: 22x34DRAWING
FACILITYI HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA.SIGNATURE:___________________________________________________TYPED NAME: ZACHARY C. THOMPSONMARCH 28, 2022 REG. NO. #57835 Advanced Engineering and Environmental Services, LLC Water Tower Pl Business Ctr 6901 E Fish Lake Rd Ste 184 Maple Grove, MN 55369 (t) 763-463-5036 (f) 763-463-5037 www.ae2s.comBIM 360://05409-2017-004 Otsego West WWTF Phase 1 Improvements/05409-2017-004-Otsego_West_MTB-M_v20.rvt10/11/2023 11:10:56 AMMAR 2022
05409-2017-004
DAS ZCT
SRS
CONSTRUCT ROOF AND MEZZANINE MECHANICAL PLANOTSEGO, MNCITY OF OTSEGOOTSEGO WEST WWTF PHASE 1 IMPROVEMENTSMTB
M106
0 4'8'2'
M106
2 MEZZANINE HVAC PLAN SYMDATEDESCRIPTIONAPPR28/15/22FO #2ZCT48/28/23FO #7ZCTGENERAL NOTES:
1. MAINTAIN MINIMUM 10' SEPARATION BETWEEN
MECHANICAL EQUIPMENT AND ROOF EDGE.
4
November 20, 2023
AE2S
6901 East Fish Lake Rd.
Suite 184
Maple Grove, MN 55369-5457
ATTN: Scott Schaefer, PE
Re: Otsego West WWTF Improvements Phase 1
RLCG Project No. 2215
Change Order Proposal #: 028 – MTB, FSB and BB Roofing Material Escalation
Scott,
As noted in the addendum, Rice Lake and our vendors were to not carry the escalation risk in
our bid as the City would be taking that on. The total escalation on the roofing material for the
MTB, FSB and BB roofs is $32,490.00. Attached is a breakout of the costs.
Please note that the escalation costs for the ADM and PTB roofs are not included in this
proposal, and they will be submitted at a later date. The roofs for these two buildings are still
6+ months out and pricing could change by then. So, to avoid multiple escalation proposals for
the same material, we will provide one proposal for those roofs as we get closer to the work
happening.
Please let me know if you have any questions.
Sincerely,
Rice Lake Construction Group
Matt Perpich
Project Manager
2215
Otsego West WWTF Improvements Phasae 1
22360 County Road 12, PO Box 517 11/20/2023
Deerwood, MN 56444 28
HOURS $ RATE TOTAL RATE TOTAL
RLCG Labor 0.00 HR 0.00 99.00$ $0.00 -$ $0.00 -$ -$ -$
RLCG Material 0.00 LS -$ $0.00 $0.00 -$ -$ -$
-$ $0.00 $0.00 -$ -$ -$
-$ $0.00 $0.00 -$ -$ -$
-$ $0.00 $0.00 -$ -$ -$
Roof Tech 1.00 LS -$ $0.00 $0.00 32,010.00$ -$ 32,010.00$
-$ $0.00 $0.00 -$ -$ -$
-$ $0.00 $0.00 -$ -$ -$
-$ $0.00 $0.00 -$ -$ -$
-$ $0.00 -$ $0.00 -$ -$ -$
Misc. Small Tools and Mat'l 5% of Labor 1.00 ea 5.00%-$
Sales Tax 1.00 ea 7.375%-$
Totals - -$ -$ 32,010.00$ -$ 32,010.00$
Rice Lake Mark-up on Subs (5%)-$
Rice Lake Mark-up on Labor, Material, and Equipment (15%)-$
Bond Cost (1.5%)480.15$
Total Change Order Proposal Request 32,490.00$
Days Requested 0
RLCG PROJECT #:
PROJECT NAME:
DATE:
COP:
CHANGE ORDER PROPOSAL
MATERIAL SUBCONTRACTOR
TOTAL
EQUIPMENT
TOTAL LINE TOTALDESCRIPTIONQTYUNITLABOR
WE’RE ON TOP OF
November 30, 2022 Updated Pricing: 10-25-2023 and Additional Notes
Mr. Matt Perpich
Rice Lake Contracting
22360 Co Rd 12
Deerwood, MN 56444
Re: Otsego WWTF
Otsego, MN
Mr. Perpich,
Our bid confirmation and scope description for the above referenced project, is as follows . . .
Section 07 31 13: Asphalt Shingles
Section 07 53 00: Elastomeric Membrane Roofing
Section 07 62 00: Sheet Metal Flashing and Trim (Roof Related Only)
Section 07 72 00: Roof Accessories (Roof Hatch)
Updated Bid Amount: $615,485.00
The above pricing INCLUDES the following:
Firestone Non-Reinforced 60 mil Adhered EPDM roofing system
Manufactures 20 Yr Warranty
Flat Roof Decks - ¼” per foot Tapered Polyisocyanurate insulation – 6 ½” Min
Struct Sloped Roof Decks – 2 layers of 3” Polyisocyanurate Insulation with Crickets to direct the water to
the drains/scuppers
½” Dens Deck Thermal Barrier at Steel Roof Decks only
Firestone V-Force Vapor Barrier
.032 Prefinished Aluminum in a standard, non-metallic color. This will include the coping cap, counter
flashing, scuppers and down spouts
Flashing in the following items:
o Three (3) roof curbs
o Six (6) sleepers
o Fourteen (14) Pipe penetrations
2 Ea – Roof Hatches – 3’1”x4’11” with a safety rail
GAF Cool Series Shingles
Union Labor
Roof Tech Standard Insurance
Addenda 1 - 4 have been reviewed
All necessary Sales Taxes
Above pricing based on the drawings dated – Construction Set – March 2022
The above pricing EXCLUDES the following:
Any work on the existing buildings
Any additional sheet metal not noted above
Flashing in any additional curbs or pipes other than noted above
Page 1 of 2
WE’RE ON TOP OF
Premium or Custom Color Sheet Metal
Wood Blocking, and insulation within or behind the wood blocking
Walkway pads
Snow/Ice/Water Removal
Premium for a bond
Breakout By Building:
Building Name: Original Price: 10-25-23 Updated Price: Increase Amount:
Blower Building $46,600.00 $51,380.00 $4,780.00 (10%)
Fine Screen Bldg $97,300.00 $111,420.00 $14,120.00 (14%)
Admin Building $242,945.00 $276,670.00 $33,725.00 (13%)
Memb Treatment $107,000.00 $120,110.00 $13,110.00 (12%)
Building
Pretreatment Bldg $26,135.00 $55,905.00 $29,770.00 (113%)
Totals: $519,980.00 $615,485.00 $95,505.00 (18%)
OPTION FOR PRETREATMENT BUILDING:
Change the Shingles to a GAF Timberline HDZ Shingle – All Other Components will remain as
originally proposed.
Add Amount to our Original Price: $2,600.00
LEAD TIMES:
Shop Drawings: 5 Weeks
Polyisocyanurate Insulation: See Below
EPDM Membrane and Accessories: See Below
Dens Deck Boards: 3-4 Weeks
Vapor Retarder: See Below
**If awarded the project, a Force Majeure clause must be added to the contact.
**Final Contact amount will be determined by viewing the additional plans as they are available and the
Price of the insulation at the delivery date to the site.
**For any Additional price increases announced after today’s date, will require us to revise our
proposal/contact amount to include these price escalations.
Page 2 of 3
WE’RE ON TOP OF
Current lead times are as follows:
EPDM – 1-2 weeks
EPDM Accessories most at 1-2 weeks
ISO – 1-2 weeks
TPO – 1-2 weeks
TPO Accessories most at 3-4 weeks -some at 6-8 weeks
PVC – 6-8 weeks
PVC Accessories most at 6-8 weeks (NA)
Fasteners and Plates – 2 weeks as allowed by Managed Availability or as provided on short notice.
Metal
Flat Sheet – 3-4 days
Coil and Cut Sheet – 4-5 days
Standing Seam Panels – 13-14 days
Delta Panels – 22-25 days
Custom Colors – 6-8 weeks
**** The Cool Series Shingles are no longer a locally stocked item. They are Manufactured in Shafter, CA
and now have a Full Pallet (16 Sq) minimum order. There is a 4 pallet minimum LTL pick up from Shafter,
CA plant. So the minimum order is now 64 Sq for a 7 Sq project and have a 6-8 week lead time.
NOTE:
1) Our Bid proposal will only be honored for 30 days.
2) Pricing subject to change as we are in a volatile market.
Please feel free to contact us with any questions that you may have.
Sincerely,
Brian D. Brezinka
Vice President
December 4, 2023
AE2S
6901 East Fish Lake Rd.
Suite 184
Maple Grove, MN 55369-5457
ATTN: Scott Schaefer, PE
Re: Otsego West WWTF Improvements Phase 1
RLCG Project No. 2215
Change Order Proposal #: 029 – Helical Piers at Blower Building
Scott,
During the installation of the helical piers at the Blower Building, it was found that the piers
needed to be drilled deeper than planned to obtain the correct torsional resistance. The total
cost to install the deeper piers is $15,458.00. Attached is a breakout of the costs.
Please let me know if you have any questions.
Sincerely,
Rice Lake Construction Group
Matt Perpich
Project Manager
2215
Otsego West WWTF Improvements Phasae 1
22360 County Road 12, PO Box 517 12/4/2023
Deerwood, MN 56444 29
HOURS $ RATE TOTAL RATE TOTAL
RLCG Labor HR 0.00 99.00$ $0.00 -$ $0.00 -$ -$ -$
RLCG Material LS -$ $0.00 $0.00 -$ -$ -$
-$ $0.00 $0.00 -$ -$ -$
LS -$ $0.00 $0.00 -$ -$ -$
LS -$ $0.00 $0.00 -$ -$ -$
Atlas Foundations 1.00 LS -$ $0.00 $0.00 14,504.00$ -$ 14,504.00$
-$ $0.00 $0.00 -$ -$ -$
-$ $0.00 $0.00 -$ -$ -$
-$ $0.00 $0.00 -$ -$ -$
-$ $0.00 -$ $0.00 -$ -$ -$
Misc. Small Tools and Mat'l 5% of Labor 1.00 ea 5.00%-$
Sales Tax 1.00 ea 7.375%-$
Totals - -$ -$ 14,504.00$ -$ 14,504.00$
Rice Lake Mark-up on Subs (5%)725.20$
Rice Lake Mark-up on Labor, Material, and Equipment (15%)-$
Bond Cost (1.5%)228.44$
Total Change Order Proposal Request 15,458.00$
Days Requested 0
RLCG PROJECT #:
PROJECT NAME:
DATE:
COP:
CHANGE ORDER PROPOSAL
MATERIAL SUBCONTRACTOR
TOTAL
EQUIPMENT
TOTAL LINE TOTALDESCRIPTIONQTYUNITLABOR
Project: 22146 Customer:Rice Lake Construction Group
7551 Lancaster Ave NE Start Date: Foreman: Nicholas
Otsego, MN 55301 Finish Date: Estimator: Jamie
Base Length (ft) = 11.0
No. Size 5 10'
1 2 7/8 1 3 4 2,100 6800 46.0 0.0 46.0 64.6 32.3
2 2 7/8 1 3 4 2,100 6800 46.0 0.0 46.0 64.6 32.3
3 2 7/8 1 3 4 2,100 6800 46.0 0.0 46.0 64.6 32.3
4 2 7/8 1 3 4 2,100 6800 46.0 0.0 46.0 64.6 32.3
5 2 7/8 1 3 4 2,100 6800 46.0 0.0 46.0 64.6 32.3
6 2 7/8 1 3 4 2,100 6800 46.0 0.0 46.0 64.6 32.3
7 2 7/8 1 3 4 2,100 6800 46.0 0.0 46.0 64.6 32.3
8 2 7/8 1 3 4 2,100 6800 46.0 0.0 46.0 64.6 32.3
9 2 7/8 1 3 4 2,100 6800 46.0 0.0 46.0 64.6 32.3
10 2 7/8 1 3 4 2,100 6800 46.0 0.0 46.0 64.6 32.3
11 2 7/8 1 3 4 2,100 6800 46.0 0.0 46.0 64.6 32.3
12 2 7/8 1 3 4 2,100 6800 46.0 0.0 46.0 64.6 32.3
13 2 7/8 1 3 4 2,100 6800 46.0 0.0 46.0 64.6 32.3
14 2 7/8 1 3 4 2,100 6800 46.0 0.0 46.0 64.6 32.3
15 2 7/8 1 3 4 2,100 6800 46.0 0.0 46.0 64.6 32.3
16 2 7/8 1 3 4 2,100 6800 46.0 0.0 46.0 64.6 32.3
17 2 7/8 1 3 4 2,300 7700 46.0 0.0 46.0 73.2 36.0
18 2 7/8 1 3 4 2,300 7700 46.0 0.0 46.0 73.2 36.0
19 2 7/8 1 3 4 2,100 6800 46.0 0.0 46.0 64.6 32.3
20 2 7/8 1 3 4 2,100 6800 46.0 0.0 46.0 64.6 32.3
21 2 7/8 1 3 4 2,100 6800 46.0 0.0 46.0 64.6 32.3
22 2 7/8 1 3 4 2,100 6800 46.0 0.0 46.0 64.6 32.3
23 2 7/8 2 4 2,300 7700 31.0 0.0 31.0 73.2 36.0
24 2 7/8 1 2 4 2,300 7700 36.0 5.4 30.6 73.2 36.0
25 2 7/8 2 4 2,300 7700 31.0 3.0 28.0 73.2 36.0
26 2 7/8 2 4 2,300 7700 31.0 1.2 29.8 73.2 36.0
27 2 7/8 1 3 4 2,100 6800 46.0 0.0 46.0 64.6 32.3
28 2 7/8 1 3 4 2,100 6800 46.0 0.0 46.0 64.6 32.3
Helical Pier No. of
Helix
Ultimate
Capacity
(kips)
Allowable
Capacity
(kips)
Final PSI
Final 3'
Torque
(ft-lbs)
Total
Length
(ft)
Cut Off
(ft)
Final
Length
(ft)
Installation Information: All foundations are CHANCE® SS150 1½” - RS2875.276 2 7/8"
Combination Helical Piers. Lead section helix configurations are 8"-10"-12"-14" diameter,
with a 10' nominal base length. All foundations were installed using a 9,000 ft-lb torque
head. All material is galvanized per ASTM A153. Previous testing and factory
recommendations assume a ratio of ultimate capacity to torque of 9.5:1. All foundations
are terminated with bolt on 6"x6"x1/2" bearing plates.
Extensions
Certified Helical Pier
Installation Contractor
11/27/23
11/29/23
11730 Brockton Lane N. • Osseo, MN 55369
(763) 428-2261 • Fax: (763) 428-4754 • www.atlasfoundation.com
1 of 2
No. Size 5 10'
Helical Pier No. of
Helix
Ultimate
Capacity
(kips)
Allowable
Capacity
(kips)
Final PSI
Final 3'
Torque
(ft-lbs)
Total
Length
(ft)
Cut Off
(ft)
Final
Length
(ft)
Extensions
29 2 7/8 1 3 4 2,100 6800 46.0 0.0 46.0 64.6 32.3
30 2 7/8 1 3 4 2,100 6800 46.0 0.0 46.0 64.6 32.3
31 2 7/8 2 4 2,300 7700 31.0 3.3 27.7 73.2 36.0
32 2 7/8 2 4 2,300 7700 31.0 3.3 27.8 73.2 36.0
33 2 7/8 2 4 2,300 7700 31.0 3.5 27.5 73.2 36.0
34 2 7/8 1 3 4 2,100 6800 46.0 0.0 46.0 64.6 32.3
35 2 7/8 1 3 4 2,100 6800 46.0 3.8 42.3 64.6 32.3
36 2 7/8 1 3 4 2,100 6800 46.0 0.0 46.0 64.6 32.3
Summary:
Qty Size 5' 10'
36 2 7/8 30 101
36 Total 30 101
1532.6
1,556.0
43.2 1,556.0
Average
Length (ft)
1,532.643.2
Total
Length (ft)
Final
Length (ft)
2 of 2
1
Matt Perpich
From:Jamie Krueger <Jamie.Krueger@atlasfoundation.com>
Sent:Monday, December 4, 2023 9:08 AM
To:Matt Perpich
Cc:Sam Boelter; Michael Benson
Subject:RE: Otsego WWTF Load Test Results
Attachments:Anchor Log 22146.pdf
Caution: This email originated from outside the organization. Do not click links or open attachments unless you recognize the sender
and know the content is safe.
Good morning Matt, sorry for the delay. attached is the helical pier log for the Otsego WWTF. There was 296’ of over
run which equals $14,504.00, some of the piers went shallower than the first ones we installed. Would you like me to
create a change order or just add the over run to the billing?
Thank you.
Jamie Krueger
Es1ma1ng & Project Management
Atlas Foundation Co., LLC
11730 Brockton Lane North l Osseo, MN 55369
Main: 763.428.2261 l Cell: 612.919.7512 l Fax: 763.428.4754
E-mail: Jamie.krueger@atlasfoundaon.com l www.atlasfoundaon.com
Atlas Foundaon Brochure
The content of this e-mail (including any a?achments) is strictly confiden1al and may be commercially sensi1ve. If you are not, or believe you may not be, the
intended recipient, please advise the sender immediately by return e-mail, delete this e-mail and destroy any copies.
From: Matt Perpich <matt_perpich@ricelake.org>
Sent: Thursday, November 30, 2023 8:52 AM
To: Jamie Krueger <Jamie.Krueger@atlasfoundation.com>
Cc: Sam Boelter <sam_boelter@ricelake.org>; Michael Benson <michael_benson@ricelake.org>
Subject: Re: Otsego WWTF Load Test Results
Do you have an installation log showing the depths of all the piles that you could send us too?
Matt Perpich, P.E.
Mechanical Group Manager
Rice Lake Construction Group
December 5, 2023
AE2S
6901 East Fish Lake Rd.
Suite 184
Maple Grove, MN 55369-5457
ATTN: Scott Schaefer, PE
Re: Otsego West WWTF Improvements Phase 1
RLCG Project No. 2215
Change Order Proposal #: 030 – PTB Basement Pump Demo
Scott,
Pricing was requested for removing a pump and related piping from the basement of the PTB.
The total cost to complete this work is $4,922.00. Attached is a breakout of the costs.
Please let me know if you have any questions.
Sincerely,
Rice Lake Construction Group
Matt Perpich
Project Manager
2215
Otsego West WWTF Improvements Phasae 1
22360 County Road 12, PO Box 517 12/5/2023
Deerwood, MN 56444 30
HOURS $ RATE TOTAL RATE TOTAL
RLCG Labor 24.00 HR 24.00 99.00$ $2,376.00 -$ $0.00 -$ -$ 2,376.00$
RLCG Material 1.00 LS -$ $0.00 500.00$ $500.00 -$ -$ 500.00$
-$ $0.00 $0.00 -$ -$ -$
LS -$ $0.00 $0.00 -$ -$ -$
LS -$ $0.00 $0.00 -$ -$ -$
Killmer 1.00 LS -$ $0.00 $0.00 1,320.00$ -$ 1,320.00$
-$ $0.00 $0.00 -$ -$ -$
-$ $0.00 $0.00 -$ -$ -$
-$ $0.00 $0.00 -$ -$ -$
-$ $0.00 -$ $0.00 -$ -$ -$
Misc. Small Tools and Mat'l 5% of Labor 1.00 ea 5.00%118.80$
Sales Tax 1.00 ea 7.375%36.88$
Totals 24.00 2,376.00$ 500.00$ 1,320.00$ -$ 4,351.68$
Rice Lake Mark-up on Subs (5%)66.00$
Rice Lake Mark-up on Labor, Material, and Equipment (15%)431.40$
Bond Cost (1.5%)72.74$
Total Change Order Proposal Request 4,922.00$
Days Requested 0
MATERIAL SUBCONTRACTOR
TOTAL
EQUIPMENT
TOTAL LINE TOTALDESCRIPTIONQTYUNITLABOR
RLCG PROJECT #:
PROJECT NAME:
DATE:
COP:
CHANGE ORDER PROPOSAL
2
1
Matt Perpich
From:Matthew Pettit <mpettit@killmerelectric.com>
Sent:Saturday, December 2, 2023 11:18 AM
To:Matt Perpich
Cc:Michael Benson
Subject:RE: Otsego West PTB basement demo
Caution: This email originated from outside the organization. Do not click links or open attachments unless you recognize the sender
and know the content is safe.
Matt,
To remove conduit to Wall/floor, Grount opening as needed, wire removed back to source, Disconnect any controls at
MCC starter and label starter as Spare: $1,320.00
Thanks, Matt
Ma) Pe+t
Killmer Electric Co, Inc.
612-363-3120
From: Matt Perpich <matt_perpich@ricelake.org>
Sent: Thursday, November 30, 2023 10:40 AM
To: Matthew Pettit <mpettit@killmerelectric.com>
Cc: Michael Benson <michael_benson@ricelake.org>
Subject: Fw: Otsego West PTB basement demo
Can you price up the electrical demo for this?
Matt Perpich, P.E.
Mechanical Group Manager
Rice Lake Construction Group
22360 Country Road 12
Deerwood, MN 56444
218-546-1915 Direct Number
218-821-9003 Cell Number
http://www.ricelake.org
A Water Resources Group Company
www.wrgroup.us
2
From: John Larkin <John.Larkin@AE2S.com>
Sent: Thursday, August 10, 2023 2:19 PM
To: Matt Perpich <matt_perpich@ricelake.org>; Sam Boelter <sam_boelter@ricelake.org>; Michael Benson
<michael_benson@ricelake.org>
Cc: Scott Schaefer <Scott.Schaefer@AE2S.com>
Subject: Otsego West PTB basement demo
Caution: This email originated from outside the organization. Do not click links or open attachments unless you recognize the sender
and know the content is safe.
Matt,
The City would like to explore demoing the rest of the pump and pipe in the PTB basement.
This was originally left so they could use the clarifiers and pump from them. Please put together an estimate for the
demolition shown above.
Thanks,
John
John Larkin
Engineer-in-Training
Advanced Engineering and
3
Environmental Services, Inc. (AE2S)
6901 East Fish Lake Road, Suite 184
Water Tower Place Business Center
Maple Grove, MN 55369-5457
John.Larkin@AE2S.com
www.ae2s.com
Voice: 763.463.5036
Cell: 763.355.8901
AE2S is an Equal Opportunity / Affirmative Action Employer
This e-mail message and any documents included hereto may contain confidential information for the sole use of the intended
recipient(s). If the reader of this message is not the intended recipient (or a delegate authorized to receive for the recipient), you are
hereby notified that any review, retaining, dissemination, copying, or use of content by you or others is strictly prohibited. Please
immediately notify the sender and delete this message if you have received it in error.