Loading...
3.4 Submersible Pump for Lift Station No. 1 Request for City Council Action DEPARTMENT INFORMATION ORIGINATING DEPARTMENT REQUESTOR: MEETING DATE: Utilities Utility Manager, Neidermeier February 12, 2024 PRESENTER(s) REVIEWED BY: ITEM #: Consent City Administrator/Finance Director Flaherty 3.4 – Lift Station Pump STRATEGIC VISION MEETS: THE CITY OF OTSEGO: Is a strong organization that is committed to leading the community through innovative communication. Has proactively expanded infrastructure to responsibly provide core services. X Is committed to delivery of quality emergency service responsive to community needs and expectations in a cost-effective manner. Is a social community with diverse housing, service options, and employment opportunities. Is a distinctive, connected community known for its beauty and natural surroundings. AGENDA ITEM DETAILS RECOMMENDATION: City staff recommends the City Council authorize purchase of lift station pump replacement. ARE YOU SEEKING APPROVAL OF A CONTRACT? IS A PUBLIC HEARING REQUIRED? No No BACKGROUND/JUSTIFICATION: Lift Station 1 is the main conveyer of wastewater for the East collection district located at Quaday Avenue. The site is a triplex station housing three submersible pumps: two 50hp pumps and one 40hp pump. The smaller pump needs significant repairs and timed for replacement, recommending upsizing to match design criteria consistent with existing 50hp pumps and their successful performances. Quotes for a replacement pump matching the existing 50hp pumps were provided by the pump representative. The replacement pump; Fairbanks model 4”5433MV Submersible sewage pump is $29,908 excluding freight and $1,880 for installation and startup services. The pump has been authorized through emergency procurement due to its critical infrastructure needs with expected lead time of 12 weeks. This replacement aligns with budgeted lift station repairs defined for 2024 and within the $40,000 budgeted. The electronic drive (VFD) is being evaluated for replacement as part of the improvement. SUPPORTING DOCUMENTS ATTACHED: • Quote – WW Goetsch Associates, Inc. POSSIBLE MOTION PLEASE WORD MOTION AS YOU WOULD LIKE IT TO APPEAR IN THE MINUTES: Motion to authorize purchase of lift station 1 replacement pump and included startup services totaling $31,788.00 + freight. BUDGET INFORMATION FUNDING: BUDGETED: Fund 602 – Sanitary Sewer Utility Yes 800-831-7914 5250 WEST 74TH STREET MINNEAPOLIS, MN 55439-2226 952-831-4340/FAX: 952-831-2357 7674 COLLEGE ROAD SUITE 105 BAXTER, MN 56425-7865 218-829-6890/FAX: 218-829-6972 JANUARY 30, 2024 CITY OF OTSEGO ATTN: SETH WILKES – UTILITY FOREPERSON SUBJECT: MAIN LIFT STATION PUMP WE RESPECTFULLY SUBMIT OUR QUOTATION ON THE FOLLOWING FAIRBANKS PUMPING EQUIPMENT. 1 - FAIRBANKS MODEL 4”5433MV SUBMERSIBLE SEWAGE PUMP SIZED FOR THE DESIGN CONDITION OF (800 GPM @ 123’ TDH) WITH 50HP, 1775 RPM, 3/60/460 VOLT MOTOR WITH 75’ POWER CORD. YOUR COST F.O.B. FACTORY WITH FREIGHT PREPAID AND ALLOWED TO OTSEGO, MN $29,908.00 ADD TO ABOVE PRICE FOR INSTALLATION & START-UP OF NEW PUMP $1880 *WE HAVE NOT INCLUDED ANY CONTROLS OR ANY OTHER MATERIALS NOT MENTIONED ABOVE. WE HAVE NOT INCLUDED ANY APPLICABLE TAXES. PRICES ARE FIRM FOR 60 DAYS. TERMS ARE NET 30 DAYS AFTER SHIPMENT. SHIPMENT CAN BE MADE APPPROXIMTELY 10-12 RECEIPT OF YOUR ORDER. THANK YOU FOR YOUR CONSIDERATION OF OUR EQUIPMENT AND SERVICES. SINCERELY, BRYAN GOEHRING