Loading...
3.6 Well 5 Maintenance Project Quotes and Authorize Request for City Council Action DEPARTMENT INFORMATION ORIGINATING DEPARTMENT REQUESTOR: MEETING DATE: Utilities Utility Manager Neidermeier February 26, 2024 PRESENTER(s) REVIEWED BY: ITEM #: Consent City Administrator/Finance Director Flaherty City Engineer Wagner 3.6 – Well 5 Maintenance STRATEGIC VISION MEETS: THE CITY OF OTSEGO: Is a strong organization that is committed to leading the community through innovative communication. X Has proactively expanded infrastructure to responsibly provide core services. X Is committed to delivery of quality emergency service responsive to community needs and expectations in a cost-effective manner. Is a social community with diverse housing, service options, and employment opportunities. Is a distinctive, connected community known for its beauty and natural surroundings. AGENDA ITEM DETAILS RECOMMENDATION: City staff recommends the City Council accept quotes and authorize a well reconditioning project. ARE YOU SEEKING APPROVAL OF A CONTRACT? IS A PUBLIC HEARING REQUIRED? No No BACKGROUND/JUSTIFICATION: The 2024 Utility Budget includes funding for municipal well inspections and reconditioning maintenance. Well 5 located within the west water district was drilled in 2003 and was scheduled as a priority for maintenance. The water source is from the Mt. Simon Aquifer, providing excellent water quality and capacity benefits for the public water system. Quotes were sought and received from three professional well contractors ranging from $138,320.00 to $171,775.00. The low quote was provided by EH Renner and Sons who is a competent contractor for this service with staff supporting recommendation of authorization. The amount budgeted for 2024 is $150,000 which provides funds for well development, sand removal, a variety of equipment replacements and test pumping. Cost variations are expected and will be assessed at the time of inspection and accounted within requested quotes. The Public Works Subcommittee was presented with this information at their February 21, 2024, meeting and provided direction for City Council consideration of approval. SUPPORTING DOCUMENTS ATTACHED: • Quote – EH Renner and Sons • Quote – Traut Companies • Quote – Keys Well Drilling POSSIBLE MOTION PLEASE WORD MOTION AS YOU WOULD LIKE IT TO APPEAR IN THE MINUTES: Motion to accept quotes and authorize EH Renner and Sons to complete the Well 5 reconditioning and equipment improvements up to $138,320.00. BUDGET INFORMATION FUNDING: BUDGETED: Fund 601 – Water Utility Yes City of Otsego ------ Well 5 #00696889 Submersible Pump: Franklin 8STS1000-2A (2017) Boring record & pump asbuilt/profile attached Submersible Motor: 480V 3PH Franklin 100HP (2017) Tower elevation HWL = 1120 Check Valve (Drop Pipe): Flowmatic (2017) Whitewater Pitless (2003)Wire 2/O / 3 (2017) Quote provided by:_____________________________________ Date:_________________________ Units Qty Unit Price Total Price 1 Mobilization/Demobilization - 2 Trips LS 1 $4,200.00 $4,200.00 2 Labor pull pump, motor etc. & Reinstall LS 1 $5,600.00 $5,600.00 3 Shop time for examining bowl assembly & providing condition report - if directed (unlikely due to replacements)HR 1 $125.00 $125.00 4 Scrap & transport removed components - City likely to save wire & pipe; potentially save pump or motor based on inspection findings LS 1 $250.00 $250.00 5 Television inspection of well - flash drive or cloud with index EA 1 $1,800.00 $1,800.00 6 Start up and Bac t LS 1 $550.00 $550.00 7 Digital O&M specific to equip & updated asbuilt of pump assemby LS 1 $150.00 $150.00 8 Updated pump profile with drawing depictions including:LS 1 $150.00 $150.00 pitless height, critical depths, discharge pipe size & centerline well casing start/stop depths & sizes pump start/stop elevations & make/model/size motor lowest set elevation make/model/size transducer set elevation Units Qty Unit Price Total Price Contractor acknowledges that estimated quantities are not guaranteed, and are solely for the purpose of comparison, final payment for all unit price bid items will be based on actual quantities provided, determined as provided in the Purchase order documents. IMPROVEMENTS WELL EQUIPMENT INSPECTION ITEMS Traut Companies - Joe Traut 2-7-24 6 Furnish new Baker Pitless 9PS1418WBWE08F8E LS 1 $45,600.00 $45,600.00 7 Excavate existing well, remove pitless, install Baker & backfill to rough grade LS 1 $6,000.00 $6,000.00 8 Furnish & install new Franklin motor - 125HP -- pending field observations LS 1 $25,700.00 $25,700.00 9 Furnish & install a new Grundfos 1100S1250-3A -- pending field observations LS 1 $6,200.00 $6,200.00 city to preprocure & installed new vfd & filter 12 Furnish & install new check valve in drop pipe - Flowmatic DI VFD LS 1 $2,700.00 $2,700.00 13 Total Freight Estimates LS 1 $650.00 $650.00 14 Install new or replace existing water level monitor tube 1-1/4"LS 1 $600.00 $600.00 15 Replace transducer - KPSI 320 3/4"LS 1 $2,500.00 $2,500.00 16 Bail loosen sand rock from bottom of well if directed CY 80 $250.00 $20,000.00 17 Mobilization/Demobilization equipment to remove debris LS 1 $9,800.00 $9,800.00 18 Sand export - if directed (may be able to use on site)CY 80 $45.00 $3,600.00 19 Install Test Pump that can pump 1100 gpm and remove LS 1 $14,000.00 $14,000.00 20 Test Pump well at 1100 gpm until sand free Hr 4 $350.00 $1,400.00 21 8" x 20' threaded drop pipe Sch 40 black steel EA 5 $1,600.00 $8,000.00 22 8" Coupling Sch 40 black steel EA 1 $200.00 $200.00 23 8" x 10' threaded drop pipe Sch 40 black steel EA 1 $1,000.00 $1,000.00 Total $171,775.00 10 Furnish & install new power cable from pump motor to existing control box & splice kit - identify size LS 1 $9,500.00 $9,500.00 $1,500.00 $1,500.0011Furnish & install new power cable from well head to control panel - identify size LS 1