3.7 Permit Subject to Findings of Fact and Decision 15815 70th Street NE (Farm Valley) Request for City Council Action DEPARTMENT INFORMATION ORIGINATING DEPARTMENT REQUESTOR: MEETING DATE: Planning City Planner Licht 25 March 2024 PRESENTER(s) REVIEWED BY: ITEM #: Consent City Administrator/Finance Director Flaherty City Engineer Wagner 3.7 – Farm Valley Grading Permit STRATEGIC VISION MEETS: THE CITY OF OTSEGO: Is a strong organization that is committed to leading the community through innovative communication. X Has proactively expanded infrastructure to responsibly provide core services. Is committed to delivery of quality emergency service responsive to community needs and expectations in a cost-effective manner. Is a social community with diverse housing, service options, and employment opportunities. Is a distinctive, connected community known for its beauty and natural surroundings. AGENDA ITEM DETAILS RECOMMENDATION: City staff recommends the City Council approve a grading permit. ARE YOU SEEKING APPROVAL OF A CONTRACT? IS A PUBLIC HEARING REQUIRED? No No BACKGROUND/JUSTIFICATION: Darkenwald Holdings, LLC has submitted plans for grading work to be undertaken on property located at 15815 70th Street, south of the 70th Street (CSAH 38) and Quaday Avenue intersection. The grading work involves approximately 10 acres of the subject site and will include removal of material from the property in preparation for eventual development. The extent of the work is limited at this time to the corridor for future extension of Quaday Avenue south of 70th Street (CSAH 38) to the east property line. The proposed grading is not defined as gravel mining under the Zoning Ordinance. Section 11-24-1 of the Zoning Ordinance requires approval of a Grading Permit for excavations not defined as mining but also not occurring as part of an approved development plan or subdivision. Applications for Grading Permits are subject to review by the City Engineer and approval of the City Council. The City Engineer has approved the proposed grading plans. The developer will be required to enter into an administrative grading agreement with the City and provide a security of $3,000.00 per disturbed acre. SUPPORTING DOCUMENTS ATTACHED: • Site Location Map • Farm Valley Earthwork Plans dated 19 March 2024 • Findings of Fact and Decision POSSIBLE MOTION PLEASE WORD MOTION AS YOU WOULD LIKE IT TO APPEAR IN THE MINUTES: Motion to approve a Grading Permit for 15815 70th Street NE subject to the conditions as presented. BUDGET INFORMATION FUNDING: BUDGETED: Fund 701 – Development Escrow N/A Site Location Map 921 ft Overview Legend Roads CSAHCL CTYCL MUNICL PRIVATECL TWPCL Highways Interstate State Hwy US Hwy City/Township Limits c t Parcels NWI (DNR) Torrens PERMIT ISSUEPLAN REVISIONETLETL02-20-202403-19-2024/SHEET NO. PROJECT NO.FILE NAMELANDFORMcIF THE SIGNATURE, SEAL OR FOUR LINES DIRECTLY ABOVE ARE NOTVISIBLE, THIS SHEET HAS BEEN REPRODUCED BEYOND INTENDEDREADABILITY AND IS NO LONGER A VALID DOCUMENT. PLEASE CONTACTTHE ENGINEER TO REQUEST ADDITIONAL DOCUMENTS.PROJECTCERTIFICATIONLandformΠand Site to FinishΠare registered service marks of Landform Professional Services, LLC.DATE ISSUE / REVISION REVIEWCONTACT ENGINEER FOR ANY PRIOR HISTORYISSUE / REVISION HISTORYDEVELOPERMUNICIPALITY03-19-2024LDP1900420247535 NE RIVER ROADOTSEGO, MINNESOTA 55330TEL 612-598-39209OTSEGO, MNFARM VALLEY - EARTHWORKOTSEGO, MINNESOTANORTHNO SCALEAREA LOCATION MAP70TH STREET NESHEETS ISSUED BY DATECOMPOST/BIO LOG))))))))))))))))))))D Angle&And@At100 YR. 100 Year Flood ElevationA.B. Anchor BoltA.D. Area DrainA/C Air Conditioning UnitADD. AddendumADDL. AdditionalADJ. Adjacent / AdjustAHU Air Handling UnitALT. AlternateALUM. AluminumANOD. AnodizedAPPROX. ApproximateARCH Architect / ArchitecturalAUTO. AutomaticAVG. AverageB.C. Back of CurbB/W Bottom of WallBFE Basement Floor ElevationBIT Bituminous (Asphaltic)BLDG BuildingBM BenchmarkBSMT. BasementC.F. Cubic FeetC.F.S. Cubic Feet Per SecondC.G. Corner GuardC.J. Control JointC.L. CenterlineC.M.U. Concrete Masonry UnitC.O. CleanoutC.O.E. U.S. Army Corps Of EngineersC.Y. Cubic YardsCB Catch BasinCBMH Catch Basin ManholeCEM. CementCIP Cast Iron PipeCMP Corrugated Metal PipeCONC. Concrete (Portland)CONN. ConnectionCONST. ConstructionCONT. ContinuousCONTR. ContractorCOP. CopperCU. CubicD.S. Down SpoutDEG. DegreeDEMO. Demolition / DemolishDEPT. DepartmentDET. DetailDIA. DiameterDIAG. DiagonalDIM. DimensionDIP Ductile Iron PipeDN DownDWG. DrawingE. EastE.J. Expansion JointE.O.F Emergency OverflowE.J.S. Emergency Overflow SwaleE.O. Each WayEA. Each EL. ElevationELEC. ElectricalELEV. ElevationEMER. EmergencyENGR. EngineerENTR. EntranceEQ. EqualEQUIP. EquipmentEQUIV. EquivalentEXIST. ExistingEXP. ExpansionF & I Furnish and InstallF.B.O. Furnished by OthersF.C. Face of CurbF.D. Floor DrainF.D.C. Fire Department ConnectionF.V. Field VerifyFB Full BasementFBWO Full Basement Walk OutFBLO Full Basement Look OutFDN. FoundationFES Flared End SectionFFE Finished Floor ElevationFLR. FloorFT. OR (') FootFUT. FutureG.B. Grade BreakG.C. General ContractorGAL. GallonGALV. GalvanizedGFE Garage Floor ElevationGL. GlassGR. GradeH. HeightH.P. High PointHDPEP High Density Polyethylene PipeHGT. HeightHORIZ. HorizontalHVAC Heating, Ventilation, Air ConditioningHYD HydrantI.D. Inside Dimension OR IdentificationI.E. or IE Invert ElevationIN. OR (") InchesINFO. InformationINL. Inlet ElevationINSUL. InsulationINV. Invert ElevationJT. JointL.F. Linear FeetL.P. Low Point / Liquid PetroleumLB. PoundLGU Local Government UnitLB. PoundLB. LongitudinalLT. Light / LightingMAINT. MaintenanceMAS. MasonryMATL. MaterialMAX. MaximumMECH MechanicalMED. MediumMFR. ManufacturerMH ManholeMIN. Minimum / MinuteMISC. MiscellaneousMNDOT Minnesota Department Of TransportationMOD. Module / ModularMUL. MullionN. NorthN.I.C. Not In ContractNO. OR # NumberNOM NominalNTS Not to ScaleNWE Normal Water ElevationNWL Normal Water LevelO.F. On CenterO.G. Outside DimensionO.H. Overhead ElectricOH. OverheadOHWL Ordinary High Water LevelOPNG. OpeningORIG. OriginalP.C. Point of CurvatureP.I. Point of IntersectionPIV Post Indicator ValveP.L. OR P/L Property LineP.O.B. Point of BeginningP.S.F. Pounds Per Square FootP.S.I. Pounds Per Square InchP.T. Point of TangencyP.V.C. Point of Vertical CurvatureP.V.I. Point of Vertical IntersectionP.V.T. Point of Vertical TangencyPE PolyethylenePED. Pedestal / PedestrianPERF. PerforatedPREP. PreparationPROJ. ProjectPROP. ProposedPVC Poly-Vinyl-Chloride (Piping)PVMT. PavementQTR. QuarterQTY. QuantityR RadiusRAD. RadiusRE Rim Elevation (Casting)R.D. Roof DrainR.E. Remove ExistingR.O. Rough OpeningR.P. Radius PointRC Reinforced Concrete PipeR.S. Rough SlabRSD Roof Storm DrainRE. RegardingREINF. ReinforcedREQ'D RequiredREV. Revision / RevisedRGU Regulatory Government UnitROW OR R/W Right of WayS. SouthS.F. Square FeetSAN. Sanitary SewerSECT. SectionSE Split Entry /Side ExitSEWO Split Entry Walk Out /Side Exit Walk OutSHT. SheetSIM. SimilarSLNT. SealantSPEC. SpecificationSQ. SquareSSD Subsurface drainSTMH Storm Sewer ManholeSTD. StandardSTRUCT. StructuralSYM. SymmetricalT ThicknessT/R Top of RimT/W Top of WallTEMP. TemporaryTHK. Thick / ThicknessT.J. Tooled JointTNH Top Nut HydrantTYP. TypicalU.N.O. Unless Noted OtherwiseV.B. Vapor BarrierV.C. Vertical CurveV.I.F. Verify In FieldVER. VerifyVER. VerticalVEST. VestibuleW WidthW.PT. Working PointW.W.F. Welded Wire FabricW/ WithW/O WithoutWO Walk OutVER. WetlandWP WaterproofWETL. WeightYD. YardYR. YearEROSION CONTROL BLANKETABBREVIATIONSSILT FENCESYMBOL DESCRIPTIONREVISED AREA (THIS ISSUE)REVISION - ADDENDUM, BULLETIN, ETC.NOTE REFERENCELARGE SHEET DETAILCOORDINATE POINTPARKING STALL COUNTDESCRIPTIONSYMBOLEROSION CONTROL SYMBOLSDRAWING SYMBOLS„„„LEGAL DESCRIPTIONBENCHMARKINLET PROTECTIONC21C7.311223CASEY DARKENWALD7535 NE RIVER ROADOTSEGO, MN 55330DESCRIPTIONSHEET NO.TITLE SHEETEXISTING CONDITIONS & DEMOLITIONPRELIMINARY PLAT - OVERVIEW & NOTESPRELIMINARY PLAT - INSERT 1PRELIMINARY PLAT - INSERT 2PRELIMINARY PLAT - INSERT 3GRADING & EROSION CONTROLMN SWPPP NOTESCONSTRUCTION DETAILSCIVIL / LANDSCAPE SHEET INDEX & REVISION MATRIXOWNERC0.1C1.0C2.0C2.1C2.2C2.3C3.0C3.1C7.1LANDFORM105 SOUTH FIFTH AVENUE, SUITE 513MINNEAPOLIS, MN 55401TEL 612-252-9070CONTACT: ERIC LUTHPROJECT CONTACTSCIVIL ENGINEERLANDFORM105 SOUTH FIFTH AVENUE, SUITE 513MINNEAPOLIS, MN 55401TEL 612-252-9070CONTACT: LARRY HUHNSURVEYOR02.20.2403.19.24XXXXUNDERGROUND FIBER OPTICFOMODULAR RETAINING WALLFIELDSTONE RETAINING WALLNEWCATVUNDERGROUND CABLE/TVEXISTING DESCRIPTIONDESCRIPTIONSTORM SEWER WATERMAINFORCE MAIN SANITARY SEWER-WASTEROOF DRAIN SYSTEMGAS LINE-UNDERGROUNDFIRE LINE (IF SEPARATE) FIRE DEPT. CONNECTIONSOIL SUBDRAINTELEPHONE-UNDERGROUNDELECTRIC-UNDERGROUNDLAWN SPRINKLER SLEEVE>>>>RIPRAP>>FMSTSRDGATE VALVEWTRSANBLDG.FIREGASHYDTELEELECX"SSDLSSC.O.MAJOR CONTOURBUILDINGSPOT ELEVATION120CONCRETE SLOPE DIRECTIONCONCRETE CURBGUARD RAILFENCINGCONCRETE RETAINING WALLHEIGHT, TYPEPOWER POLELIGHT STANDARDEXIT LOCATIONUNDERGROUND STRUCTUREEDGE OF PAVEMENTBOLLARDCANOPY / OVERHANGBIT. EDGEFESCATCH BASINMANHOLESYMBOLSLANDSCAPINGGRAVELFLAG POLE>>>POWERPOLEGUARD POSTGAS METERTREESTRAFFIC SIGNWATER MAINSANITARY SEWER LINESTORM SEWER LINEOVERHEAD ELECTRICMAJOR CONTOURSPOT ELEVATIONCONCRETE BUILDINGCANOPY / OVERHANG120FENCINGCONCRETE CURBRETAINING WALL OESTORM MANHOLEWATER VALVEFIRE HYDRANTFLARED END SECTIONCATCH BASINXXHEIGHT, TYPE1NOTE NUMBERGUY WIREIRON MONUMENT FOUNDWATER SHUT-OFF VALVEllMEASURED DISTANCEDISTANCE PER RECORDED PLATUNDERGROUND TELEPHONEUTUNDERGROUND ELECTRICUEGAS LINEGPAVING BLOCKPAVING BLOCKSET 1/2" X 14" IRON PIPETRANSFORMERTREE LINEMAILBOXSURVEY DISK (BENCHMARK)WSOBITUMINOUSSOIL BORING123.45%1.00LIGHT POLEMINOR CONTOUR123MINOR CONTOUR123GMSTSSSANITARY MANHOLETNH MBB#10RIVER R OA D N E RIVER ROAD NEMISSISSIPPI RIVER70TH STREET NESITEC001LDP004.DWGTITLEC0.11l101101XThe East Half of the Northeast Quarter, Section 34, Township 121, Range 23, Wright County, Minnesota.EXCEPT the East 392.10 feet of the Northeast Quarter, Section 34, Township 121, Range 23.ALSO EXCEPT the South 605.00 feet of the East Half of the Northeast Quarter Section 34, Township 121, Range 23.ALSO EXCEPT all that part of the Northeast Quarter of Section 34, Township 121, Range 23, described as beginning at the intersection ofthe North line of said Northeast Quarter of Section 34, with the West line of the East 392.10 feet of said Northeast Quarter, thence Southalong said West line of the East 392.10 feet of the Northeast Quarter for a distance of 215.02 feet; thence West parallel with said North lineof the Northeast Quarter for a distance of 217.13 feet; thence North parallel with said West line of the East 392.10 feet a distance of 215.02feet to said North line of the Northeast Quarter at a point 217.13 feet West of the point of beginning; thence East along said North line of theNortheast Quarter a distance of 217.13 feet to the point of beginning.ALSO EXCEPT all that part of the Northeast Quarter of Section 34, Township 121, Range 23, described as commencing at the point ofintersection of the North line of said Northeast Quarter of Section 34 with the West line of the East 392.10 feet of said Northeast Quarter;thence West along said North line of the Northeast Quarter a distance of 217.13 feet to the actual point of beginning of the land to bedescribed; thence South parallel with said West line of the East 392.10 feet of the Northeast Quarter for a distance of 215.02 feet; thenceWest parallel with said North line of the Northeast Quarter for distance of 274.27 feet; thence Northeasterly to a point on said North line ofthe Northeast Quarter a distance of 217.13 feet West of the point of beginning; thence East along said North line of the Northeast Quarter adistance of 217.13 feet to the point of beginning.MNDOT NAME: PARAGSID Station #106389Location: IN ST. MICHAEL, 2.8 MILES NORTH ALONG TRUNK HIGHWAY 101 FROM THE JUNCTION OF TRUNK HIGHWAY 101 ANDINTERSTATE HIGHWAY 94 IN ROGERS, AT TRUNK HIGHWAY 101 MILEPOINT 42.50, 38.0 FEET WEST-SOUTHWEST OFSOUTHBOUND TRUNK HIGHWAY 101, 45.5 FEET EAST-NORTHEAST OF A RIGHT-OF-WAY FENCE LINE, 1.5 FEETEAST-NORTHEAST OF A WITNESS POST.Elevation = 922.20 NAVD88NAVD88 Elevation - 0.38 = NGVD29 Elevation (THIS LOCATION ONLY)XXXXXXXXXXXX 392.10'X X X PID 118500341100N00°22'44"W 1800.56S00°11'22"W 2016.43S89°36'38"E 931.42S89°32'47"E 826.40North line of East 1/2 of NE 1/4.West line of East 392.10 feet of East 1/2 of NE 1/4.North line of South 605.00 feet of East 1/2 of NE 1/4.East line of Parcel 47, WrightCounty Highway Right of WayPlat No. 72.S00°22'44"E 215.02217.13S00°22'44"E 215.02217.13274.27217.13West line of East 1/2 of NE 1/4, Sec. 34, Twp. 121, Rng. 23.N89°32'47"W 329.99N00°11'17"E 210.0081.93N89°32'47"W70TH STREET NE41.24PID 118500341103PID 118500341101PID 118500341102PID 118170000020PID 118170001010FD RB 2"FD RB 2"FD RB 2"FD RB 2"FD RB 2"FD IP RLS 8134FD IP RLS 13057FD IP RLS 13057OE OE OE OE OE OE OE OEEX HOUSEEX HOUSEEX SHEDEX GARAGEEX SHEDLine parallel with theNorth line of NE 1/4Line parallel with the Westline of E 392.10 feet NE 1/445.00PondEdge of WaterHouseShedShedShedShedShedBarnBarnSiloSiloSiloEXCEPTIONEXCEPTIONEXCEPTIONEXCEPTIONEXCEPTIONS89°32'47"E 491.40Intersection of the N line of the NE 1/4 and theWest line of East 392.10 ft of East 1/2 of NE 1/4West line of East 392.10 feet of East 1/2 of NE 1/4.S89°32'47"E 477.16Traffic Signal LightTraffic Signal Light45'75'45'75'40'40'75'55'50'55'221.68N14°33'22"E 262.9256.71392.10'Fence 1.5± ft west of cornerfence 1.5± ft west of lineNE PARSON AVEOUTLOT ALOT 1BLOCK 1LOT 1BLOCK 1C.S.A.H. No. 38 (70TH ST NE)REAR SETBACK 50'FRONT SETBACK 65'FRONT SETBACK 65'SIDE SETBACK 10'SIDE SETBACK 10'>>>>>>Gravel DriveGravel DriveGravel DriveGravel DriveGravel DriveGravel DriveGravel DriveGravel Drive910920930940908912914916918922924926928932934936938942944946880890900900900910920930940872872 874876878882884886888892894896898898898902904906908 912914916918922924926928932934936938942944946948880872874876878940932932934934936938942944946948 870880890900910920930872874876878882884886888892894896898902904906908912914916918922924926928 870 880890900910872874876 878882884886888892894896898902904906908Proposed Pipeline EasementProposed Pipeline EasementHighway Easement per Doc. No. A1363665102'102'102'Wright County Cast Iron Monument at the NEcorner of East 1/2 of NE 1/4 of Sec. 34, Twp.121, Rng. 23, Wright County, MinnesotaEast line of the East 1/2 of NE 1/4.South line of East 1/2 of NE 1/4.South line of East 1/2 of NE 1/4.PERMIT ISSUEPLAN REVISIONETLETL02-20-202403-19-2024/SHEET NO. PROJECT NO.FILE NAMEIF THE SIGNATURE, SEAL OR FOUR LINES DIRECTLY ABOVE ARE NOTVISIBLE, THIS SHEET HAS BEEN REPRODUCED BEYOND INTENDEDREADABILITY AND IS NO LONGER A VALID DOCUMENT. PLEASE CONTACTTHE ENGINEER TO REQUEST ADDITIONAL DOCUMENTS.PROJECTCERTIFICATIONLandformΠand Site to FinishΠare registered service marks of Landform Professional Services, LLC.DATE ISSUE / REVISION REVIEWCONTACT ENGINEER FOR ANY PRIOR HISTORYISSUE / REVISION HISTORYDEVELOPERMUNICIPALITY03-19-2024LDP190047535 NE RIVER ROADOTSEGO, MINNESOTA 55330TEL 612-598-39209NORTH050100C200LDP004PRELIMINARY PLATOverview & NotesC2.03ZONING & SETBACK & AREA SUMMARYThe Property is currently Zoned: A-2 Agricultural-Long Range Urban Service AreaCurrent Land Use: Farmstead and Agricultural LandAdjacent Properties:North: A-1 Agricultural-Rural Service Area and R-5 Residential Single Family and Two FamilySouth: A-2 Agricultural-Long Range Urban Service AreaEast: A-1 Agricultural-Rural Service AreaWest: A-1 Agricultural-Rural Service AreaBuilding Setback Information is as follows:Front Yard = 130 ft. from centerline (Arterial/major collector) 65 ft. from ROW line (Arterial/major collector)Rear = 50 ft.Side = 10 ft.Corner Side Yard = As required for front yard.Lot Coverage Information is as follows:Minimum Lot Area = 5 acresTotal Site Area = 1,757,984 SF= 40.36 Ac.LEGAL DESCRIPTIONThe East Half of the Northeast Quarter, Section 34, Township 121, Range 23, Wright County,Minnesota.EXCEPT the East 392.10 feet of the Northeast Quarter, Section 34, Township 121, Range 23.ALSO EXCEPT the South 605.00 feet of the East Half of the Northeast Quarter Section 34, Township121, Range 23.ALSO EXCEPT all that part of the Northeast Quarter of Section 34, Township 121, Range 23,described as beginning at the intersection of the North line of said Northeast Quarter of Section 34,with the West line of the East 392.10 feet of said Northeast Quarter, thence South along said Westline of the East 392.10 feet of the Northeast Quarter for a distance of 215.02 feet; thence Westparallel with said North line of the Northeast Quarter for a distance of 217.13 feet; thence Northparallel with said West line of the East 392.10 feet a distance of 215.02 feet to said North line of theNortheast Quarter at a point 217.13 feet West of the point of beginning; thence East along said Northline of the Northeast Quarter a distance of 217.13 feet to the point of beginning.ALSO EXCEPT all that part of the Northeast Quarter of Section 34, Township 121, Range 23,described as commencing at the point of intersection of the North line of said Northeast Quarter ofSection 34 with the West line of the East 392.10 feet of said Northeast Quarter; thence West alongsaid North line of the Northeast Quarter a distance of 217.13 feet to the actual point of beginning ofthe land to be described; thence South parallel with said West line of the East 392.10 feet of theNortheast Quarter for a distance of 215.02 feet; thence West parallel with said North line of theNortheast Quarter for distance of 274.27 feet; thence Northeasterly to a point on said North line of theNortheast Quarter a distance of 217.13 feet West of the point of beginning; thence East along saidNorth line of the Northeast Quarter a distance of 217.13 feet to the point of beginning.Obtain all necessary permits for construction within, or use of, public right-of-way.The digital file, which can be obtained from the Engineer, shall be used for staking. Discrepanciesbetween the drawings and the digital file shall be reported to the Engineer. The building footprint, asshown on these drawings, and the digital file, shall be compared to the structural drawings prior tostaking.GENERAL NOTESSITE PLAN NOTES1. For construction staking and surveying services contact Landform at 612.252.9070.2. Boundary from field work dated 09-30-20223. Owner: Casey Darkenwald7535 NE River Rd, Otsego, MN 55330C2.1C2.2C2.3BENCHMARKMNDOT NAME: PARAGSID Station #106389Location: IN ST. MICHAEL, 2.8 MILES NORTH ALONG TRUNK HIGHWAY 101 FROM THEJUNCTION OF TRUNK HIGHWAY 101 AND INTERSTATE HIGHWAY 94 IN ROGERS, AT TRUNKHIGHWAY 101 MILEPOINT 42.50, 38.0 FEET WEST-SOUTHWEST OF SOUTHBOUND TRUNKHIGHWAY 101, 45.5 FEET EAST-NORTHEAST OF A RIGHT-OF-WAY FENCE LINE, 1.5 FEETEAST-NORTHEAST OF A WITNESS POST.Elevation = 922.20 NAVD88NAVD88 Elevation - 0.38 = NGVD29 Elevation (THIS LOCATION ONLY) S89°32'47"E 826.40North line of East 1/2 of NE 1/4.East line of Parcel 47, WrightCounty Highway Right of WayPlat No. 72.S00°22'44"E 215.02217.13S00°22'44"E215.02217.13274.27217.13N89°32'47"W 329.99N00°11'17"E 210.0081.93N89°32'47"W70TH STREET NE41.24PID 118500341103PID 118500341101PID 118500341102FD RB 2"FD RB 2"FD RB 2"FD RB 2"FD RB 2"FD IP RLS 8134OE OE OE OE OE OE OE OEEX HOUSEEX HOUSEEX SHEDEX GARAGEEX SHEDLine parallel with theNorth line of NE 1/4Line parallel with the Westline of E 392.10 feet NE 1/445.00EXCEPTIONEXCEPTIONEXCEPTIONS89°32'47"E 491.40Intersection of the N line of the NE 1/4 and theWest line of East 392.10 ft of East 1/2 of NE 1/4West line of East 392.10 feet of East 1/2 of NE 1/4.S89°32'47"E 477.16Traffic Signal LightTraffic Signal Light45'75'45'75'40'40'75'55'50'55'221.68N14°33'22"E 262.9256.71392.10'NE PARSON AVEOUTLOT ALOT 1BLOCK 1C.S.A.H. No. 38 (70TH ST NE)FRONT SETBACK 65'FRONT SETBACK 65'>>>>>> 485.5 5.9 29.9 51.1 1.0Gravel Drive910920930940908912914916918922924926928932934936938942944946880890900900900910920930940872872 874876878882884886888892894896898898898902904906908912914916918922924926928932934936938942944946948880872874876878Highway Easement per Doc. No. A1363665R250' 50.0 1506.1 50.0 194.4EDGE OFPROPOSEDROADWAY312.8 286.6 287.2431.1Wright County Cast Iron Monument at the NEcorner of East 1/2 of NE 1/4 of Sec. 34, Twp.121, Rng. 23, Wright County, MinnesotaEast line of the East 1/2 of NE 1/4.PERMIT ISSUEPLAN REVISIONETLETL02-20-202403-19-2024/SHEET NO. PROJECT NO.FILE NAMELANDFORMcIF THE SIGNATURE, SEAL OR FOUR LINES DIRECTLY ABOVE ARE NOTVISIBLE, THIS SHEET HAS BEEN REPRODUCED BEYOND INTENDEDREADABILITY AND IS NO LONGER A VALID DOCUMENT. PLEASE CONTACTTHE ENGINEER TO REQUEST ADDITIONAL DOCUMENTS.PROJECTCERTIFICATIONLandformΠand Site to FinishΠare registered service marks of Landform Professional Services, LLC.DATE ISSUE / REVISION REVIEWCONTACT ENGINEER FOR ANY PRIOR HISTORYISSUE / REVISION HISTORYDEVELOPERMUNICIPALITY03-19-2024LDP1900420247535 NE RIVER ROADOTSEGO, MINNESOTA 55330TEL 612-598-39209NORTH050100C200LDP004PRELIMINARY PLATINSET 1C2.14SEE SHEET C2.2MATCH LINE PID 118500341100N00°22'44"W 1800.56S00°11'22"W 2016.43OE OE OE OE PondEdge of WaterHouseShedShedShedShedShedBarnBarnSiloSiloSiloLOT 1FRONT SETBACK 65'SIDE SETBACK 10'SIDE SETBACK 10'> 1971.4Gravel DriveGravel DriveGravel DriveGravel DriveGravel Drive8900900900910920930940889894896898898898902904906908912914916918922924926928932934936938942944946948940932932934934936938942944946948890900910920930 882884886888892894896898902904906908912914916918922924926928 1506.1East line of the NE 1/4, Sec. 34, Twp. 121, Rng. 23.PERMIT ISSUEPLAN REVISIONETLETL02-20-202403-19-2024/SHEET NO. PROJECT NO.FILE NAMELANDFORMcIF THE SIGNATURE, SEAL OR FOUR LINES DIRECTLY ABOVE ARE NOTVISIBLE, THIS SHEET HAS BEEN REPRODUCED BEYOND INTENDEDREADABILITY AND IS NO LONGER A VALID DOCUMENT. PLEASE CONTACTTHE ENGINEER TO REQUEST ADDITIONAL DOCUMENTS.PROJECTCERTIFICATIONLandformΠand Site to FinishΠare registered service marks of Landform Professional Services, LLC.DATE ISSUE / REVISION REVIEWCONTACT ENGINEER FOR ANY PRIOR HISTORYISSUE / REVISION HISTORYDEVELOPERMUNICIPALITY03-19-2024LDP1900420247535 NE RIVER ROADOTSEGO, MINNESOTA 55330TEL 612-598-39209NORTH050100C200LDP004PRELIMINARY PLATINSET 2C2.25SEE SHEET C2.1MATCH LINESEE SHEET C2.3MATCH LINE392.10 392.10'X X X S89°36'38"E 931.42West line of East 392.10 feet of East 1/2 of NE 1/4.North line of South 605.00 feet of East 1/2 of NE 1/4.West line of East 1/2 of NE 1/4, Sec. 34, Twp. 121, Rng. 23.PID 118170000020PID 118170001010FD IP RLS 13057FD IP RLS 13057ShedBarnSiloSiloEXCEPTIONEXCEPTIONFence 1.5± ft west of cornerfence 1.5± ft west of lineLOT 1BLOCK 1REAR SETBACK 50'SIDE SETBACK 10'Gravel DriveGravel DriveGravel DriveGravel Drive870880890900910920930 872874876878882884886888892894896898902904906908912914916918922924926928 870880890900910872874876 878882884886888892894896898902904906908Proposed Pipeline EasementProposed Pipeline Easement102'102'102'South line of East 1/2 of NE 1/4.South line of East 1/2 of NE 1/4.East line of the NE 1/4, Sec. 34, Twp. 121, Rng. 23.PERMIT ISSUEPLAN REVISIONETLETL02-20-202403-19-2024/SHEET NO. PROJECT NO.FILE NAMELANDFORMcIF THE SIGNATURE, SEAL OR FOUR LINES DIRECTLY ABOVE ARE NOTVISIBLE, THIS SHEET HAS BEEN REPRODUCED BEYOND INTENDEDREADABILITY AND IS NO LONGER A VALID DOCUMENT. PLEASE CONTACTTHE ENGINEER TO REQUEST ADDITIONAL DOCUMENTS.PROJECTCERTIFICATIONLandformΠand Site to FinishΠare registered service marks of Landform Professional Services, LLC.DATE ISSUE / REVISION REVIEWCONTACT ENGINEER FOR ANY PRIOR HISTORYISSUE / REVISION HISTORYDEVELOPERMUNICIPALITY03-19-2024LDP1900420247535 NE RIVER ROADOTSEGO, MINNESOTA 55330TEL 612-598-39209NORTH050100C200LDP004PRELIMINARY PLATINSET 3C2.36SEE SHEET C2.2MATCH LINE 91003871.69SET IP DRONEPID 118500341103PID 118500341101POE OE OE OE OE OE OE OEEX HOUSEEX HOUSEEX SHEDEX GARAGEEX SHEDPondEdge of WaterEXCEPTIONEXCEPTIONEXS89°32'47"E 491.40S89°32'47"E 477.16Traffic Signal LightTraffic Signal Light45'75'45'75'40'40'75'55'50'55'392.10PPPPPPNE PARSON AVEOUTLOT ALOT 1BLOCK 1C.S.A.H. No. 38 (70TH ST NE)FRONT SETBACK 65'FRONT SETBACK 65'>>>>>>STS>>70TH STREET NEQUADAY AVE NE2.3%2.4%3:13:13:13:13:1900916932904924904916938914892906896904900892884884880878876872908 1.7%904896892884888880876872872884888892896896896904900912920916928924932936940944948948 944944944940936932928924920916912908872 896876878900888888900900908 916928912916940940932936940944880 876876876906902900890886886876876TEMPORARYDRAINAGE SWALE81.3881.3882.0077.66(74.00)80.0078.12870872874874874874880878878874876 89888287882.30(80.46)87.48876904878NE PARSON AVEEXISTINGWETLAND0+001+002+003+004+005+005+25.33FUTUREROADWAY876FUTUREDEVELOPMENTFUTUREDEVELOPMENTFUTUREDEVELOPMENT878EROSIONCONTROLBLANKETEROSIONCONTROLBLANKETEROSIONCONTROLBLANKETH.D. SILTFENCESTONETRACKINGPADPROTECT EXISTINGOVERHEAD UTILITYTEMPORARY SEDIMENT BASINTOP OF BASIN=879.50E.O.F.=879.00OUTLET ELEV=878.50BOTTOM OF BASIN=874.50N.W.L.=878.50SEE DETAIL C7.1/487.5933(TYP.)(TYP.)SILTFENCE6" DISCHARGE PIPEL=50'INV-IN=876.50INV-OUT=876.00ENKAMAT76.0079.5088290.0082.9679.19878876878880R250'888 884 884880 880PERMIT ISSUEPLAN REVISIONETLETL02-20-202403-19-2024/SHEET NO. PROJECT NO.FILE NAMELANDFORMcIF THE SIGNATURE, SEAL OR FOUR LINES DIRECTLY ABOVE ARE NOTVISIBLE, THIS SHEET HAS BEEN REPRODUCED BEYOND INTENDEDREADABILITY AND IS NO LONGER A VALID DOCUMENT. PLEASE CONTACTTHE ENGINEER TO REQUEST ADDITIONAL DOCUMENTS.PROJECTCERTIFICATIONLandformΠand Site to FinishΠare registered service marks of Landform Professional Services, LLC.DATE ISSUE / REVISION REVIEWCONTACT ENGINEER FOR ANY PRIOR HISTORYISSUE / REVISION HISTORYDEVELOPERMUNICIPALITY03-19-2024LDP1900420247535 NE RIVER ROADOTSEGO, MINNESOTA 55330TEL 612-598-39209NORTH050100C300LDP004.DWGGRADING &C3.0Contact utility service providers for field location of services 72 hours prior to beginning grading.Remove topsoil from grading areas and stockpile sufficient quantity for reuse. Top soil shall be respead and seeded over all disturbedareas prior to commencing construction. Erosion control blanket shall be placed on all areas with slopes equal or greater than 3:1.Place and compact fill using lift thicknesses matched to soil type and compaction equipment to obtain specified compactionthroughout the lift.Compact cohesive soils in paved areas to 95% of maximum dry density, Standard Proctor (ASTM D698) except the top 3 feet whichshall be compacted to 100%. Compact to 98% density where fill depth exceeds 10 feet. The soils shall be within 3% of optimummoisture content. In granular soils all portions of the embankment shall be compacted to not less than 95% of Modified ProctorDensity (ASTM D1557).1.2.3.4.GRADING NOTESCOMMON EXCAVATION=122,000 CYFILL NEEDED ON-SITE= 54,000 CYEXCESS FILL REMAINING=68,000 CY**COMMON EXACTION DOES NOT INCLUDE STRIPPING OF TOP SOIL (~8,000CY)EARTHWORKInstall perimeter sediment controls prior to beginning work and maintain for duration of construction. Remove controls after areascontributing runoff are permanently stabilized and dispose of off site.Limit soil disturbance to the grading limits shown. Schedule operations to minimize length of exposure of disturbed areas.Management practices shown are the minimum requirement. Install and maintain additional controls as work proceeds to preventerosion and control sediment carried by wind or water.Refer to SWPPP Notes on Sheet C3.1 for additional requirements.Stabilization must be started immediately to limit soil erosion when the construction activity in that portion of the site has temporarilyor permanently ceased and will not resume for 14 calendar days.Seed, Mulch, Erosion Control Blanket, and Fertilizer shall meet the following Specifications, as modified. Seeded areas withouterosion control blanket shall be disc mulched.ItemSpecification NumberEstimated QuantitiesSeed MNDOT 3876MN Type 21-111 @ 100 lb./ac. - Temporary Erosion Control, May 1 - Jul 31MN Type 21-112 @ 100 lb./ac. - Temporary Erosion Control, Aug 1 - Oct 31 981 lbs.Mulch MNDOT 3882 (MNDOT Type 1 @ 2 ton/ac.) 19.6 tonE.C. Blanket MNDOT 3885 (MNDOT Type 3N (for 12 mo.) 4N (for 24 mo.)) 17,120 s.y.Fertilizer MNDOT 3881 @ 200 lbs./ac 1,962 lbs. General MNDOT 2575 1 l.s.PlacementScrape adjacent streets clean daily and sweep clean weekly.Temporary Sediment Basin Summary:Drainage Area= 5.72 acRequired Storage Volume= Greater Of {Storage Volume Provided=15,370 cf (per HydroCAD output)2.4.5.6.7.8.9.GENERAL NOTESEROSION PREVENTION AND SEDIMENT CONTROL NOTESFor construction staking and surveying services contact Landform at 612.252.9070.1.3LEGEND:Silt Fence:Construction Limits:Vehicle Tracking PadESTIMATED QUANTITY1 ea.830 ft.SYMBOL DESCRIPTION:Erosion Control Blanket 17,260 s.y.EROSION CONTROL(1,800 cf/ac)(5.72 ac)=10,296 cf(2 yr storm- 0.74 in.)(1'/12")(5.72 ac)(43,560 sf/ac)=15,365 cfEnkamat 70 s.y. C301LDP001.DWGSTORMWATER POLLUTION PREVENTION MANAGEMENT MEASURESEROSION PREVENTION AND SEDIMENT CONTROLSITE EVALUATION / ASSESSMENT / PLANNINGOperator must develop pollution prevention management measures, implement good housekeeping BMPs, must follow allapplicable federal, state, and local building codes, Occupational Safety and Health Act (OSHA), and the general conditionsand general requirements of the construction contract.The Operator shall minimize the exposure to stormwater of any of the products, material, or wastes stored on site that may washdownstream or contaminate stormwater.Building products that have the potential to leach pollutants must be under cover.Chemicals and landscape materials shall be under cover to prevent the discharge of pollutants.Operator to track progress of the following items on site maps: portable toilets, material storage areas, vehicle and equipment fuelingand maintenance areas, concrete washouts, paint and stucco washouts, dumpsters or other trash and debris containers, spill kits,stockpiles, any other non-structural non-storm water management BMPs, any temporarily removed structural BMPs, any changes tothe structural BMPs.Solid waste: collected sediment, asphalt and concrete millings, floating debris, paper, plastic, fabric, construction and demolitiondebris and other wastes must be disposed of properly and must comply with MPCA disposal requirements.Hazardous waste: oil, gasoline, paint and any hazardous substances must be properly stored in sealed containers to prevent spills,leaks or other discharge. Restricted access to storage areas must be provided to prevent vandalism. Storage and disposal ofhazardous waste or materials must be in compliance with Minn. R. Ch. 7045 including secondary containment as applicable.Portable toilets must be positioned so that they are secure and will not be tipped or knocked over.Concrete and other washout waste: operator must provide effective containment for all liquid and solid wastes generated by washoutoperations. The liquid and solid wastes must not contact the ground, and the containment must be designed so that it does not resultin runoff from the washout operations or areas. Liquid and solid wastes must be disposed of properly and in compliance with MPCArules. A sign must be installed adjacent to each washout facility that requires site personnel to utilize the proper facilities for disposalof concrete and other washout wastes.External vehicle washing: external washing of trucks and other construction vehicles must be limited to a defined area of the site.Runoff must be contained and waste properly disposed of. No engine degreasing is allowed on site.Operator shall take reasonable steps to prevent the discharge of spilled or leaked chemicals, including fuel, from any area wherethey will be loaded or unloaded as detailed in the Permit.INSPECTIONS AND MAINTENANCE1.2.3.4.5.6.7.8.9.10.11.See Grading and Erosion Control sheets for the location and type of temporary erosion prevention and sediment control BMPs. SeeErosion Control sheets for the location and type of permanent erosion prevention and sediment control BMPs.Minimize Disturbed Areas and Protect Natural Features and SoilAppropriate construction practices (e.g. construction phasing, vegetative buffer strips, horizontal slope grading) shall be used tominimize erosion.Areas not to be disturbed (buffers, infiltration basins, etc.) shall be protected with construction or silt fence before work begins.Operator shall develop methods to minimize soil compaction outside of building pads, pavement areas and utility trenches and shalluse tracked equipment wherever practicable.Topsoil shall be salvaged and reused to the extent practicable.Phase Construction ActivityOperator must not disturb more land than can be effectively inspected and maintained.Sediment control practices shall be established on all down gradient perimeters before any upgradient land disturbing activities begin.These practices shall remain in place until final stabilization has been established in accordance with the Permit.The timing of the installation of sediment control practices may be adjusted to accommodate short-term activities such as clearing orgrubbing, or passage of vehicles. Any short-term activity must be completed as quickly as possible and the sediment controlpractices shall be installed immediately after the activity is completed. However, sediment control practices shall be installed beforethe next precipitation event even if the activity is not complete.Control Stormwater Flowing onto and Through the ProjectThe normal wetted perimeter of any temporary or permanent drainage ditch or swale that drains water from any portion of theconstruction site, or diverts water around the site, shall be stabilized within 200 lineal feet from the property edge, or from the point ofdischarge into any surface water.Stabilization of the last 200 lineal feet shall be completed within 24 hours after connecting to a surface water.Stabilization of the remaining portions of any temporary or permanent ditches or swales shall be complete within 14 days afterconnecting to a surface water and construction in that portion of the ditch has temporarily or permanently ceased.Temporary or permanent ditches or swales that are being used as a sediment containment system (with properly designed rock ditchchecks, bio rolls, silt dikes etc.) do not need to be stabilized. These areas shall be stabilized within 24 hours after no longer beingused as a sediment containment system.Stabilize SoilsAll exposed soil areas, including stockpiles, must be stabilized.Stabilization must be started immediately to limit soil erosion when the construction activity in that portion of the site has temporarilyor permanently ceased and will not resume for 14 calendar days. Stabilization must be complete within 14 days of cessation ofconstruction activity.Temporary soil stockpiles shall have silt fence or other effective sediment controls, and cannot be placed in surface waters, includingstorm water conveyances such as curb and gutter systems, or conduits and ditches unless there is a bypass in place for the stormwater.Temporary stockpiles without significant silt, clay or organic components (e.g. clean aggregate stockpiles, demolition concretestockpiles, sand stockpiles) and the constructed base components of roads, parking lots and similar surfaces, are exempt from thisrequirement.Perimeter sediment control measures must be in place prior to the placement of any stockpiles.Any erosion control netting shall be "wildlife friendly" and of a natural type that can decompose and shall have non-welded moveablejoints.Any sediment control device made of soil must be stabilized within 24 hours.Protect SlopesOperator shall avoid work on slopes with a grade of 3:1 or greater when practicable. Grading on slopes with a grade of 3:1 or steeperwill require techniques such as phasing and stabilization practices designed for steep slopes(e.g. slope draining and terracing).Protect Storm Drain InletsAll storm drain inlets shall be protected by appropriate BMPs during construction until all sources with potential for discharging to theinlet have been stabilized. Inlet protection may be temporarily removed if a specific safety concern has been identified.Provide Energy Dissipation at all Pipe Outlets within 24 HoursAfter connection to a surface water or permanent stormwater treatment system.Establish Perimeter Controls and Sediment BarriersPrior to disturbing soils on a project site, establish sediment control BMPs on all down-gradient perimeters and where site dischargesto public waters.Retain Sediment On-site and Control Dewatering PracticesDischarge shall not cause nuisance conditions, erosion in receiving channels, adversely affect receiving water or impact wetlands, ordownstream properties. Discharge points shall be adequately protected from erosion and scour by accepted energy dissipationmeasures.Discharge water containing oil or grease shall be treated to remove oil or grease prior to discharge to surface waters.Refer to Permit requirements for temporary or permanent sediment basins.Discharge shall be photographed at the beginning of discharge and at least every 24 hours afterward, while discharge is occurring.If nuisance conditions result from dewatering, dewatering shall be stopped until nuisance condition can be remedied.Establish Stabilized Construction ExitsVehicle tracking pads shall be established as shown on the Erosion Control sheet to minimize tracking of sediment from theconstruction site onto adjacent streets.Infiltration Basin ProtectionOperator must not excavate infiltration systems to final grade or within three (3) feet of final grade until the contributing drainage areahas been constructed and fully stabilized unless rigorous erosion prevention and sediment controls have been installed.When excavating an infiltration system to within three (3) feet of final grade, operator shall mark off and protect the area from heavyconstruction equipment to prevent compaction of soils.Dewatering and Basin DrainingPermittees must discharge turbid or sediment-laden waters related to dewatering or basin draining to a temporary or permanentsediment basin. Discharges must not cause erosion or scour near the discharge points.Remove Sediment from Surface WatersAll sediment deposits and deltas must be removed from surface waters, including drainage ways, catch basins, and other drainagesystems, and the removal areas restabilized within seven (7) days.1.2.3.4.5.6.7.8.9.10.11.12.13.Permittees must ensure that a trained person will inspect the entire construction site at least once every seven ( 3) days duringactive construction and within 24 hours after a rainfall event greater than 0.5-inches in 24 hours.Records of inspections shall include all maintenance activities and must be recorded within 24 hours of the inspection and retainedwith the SWPPP.Inspections shall include stabilized areas, erosion prevention, and sediment control BMPs. Additionally, areas adjacent to the projectshall be inspected.Surface waters on or adjacent to the site must be inspected for evidence of erosion or sediment deposition.Permittees must record all inspection and maintenance activities within 24 hours of being conducted as detailed in the Permit.Inspection Records content shall include:A. Date and time of inspections;B. Name of persons conduction inspections;C. Findings of inspections, including specific locations where corrective actions are needed;D. Corrective actions taken including dates, times, and the party taking the corrective action;E. Dates of all rainfall events greater than 1/2 inch in 24 hours (refer to Permit for measurement requirements);F. Any discovered discharge must be recorded, including photographs, descriptions of discharge (color, odor, settled orsuspended solids, oil sheen, or other obvious indicators of pollution), and specific location of discharge location;G. Any amendments to the Permit as a result of inspections must be documented within seven calendar days as described in thePermitH. All photographs of dewatering activities and documentation of nuisance conditions resulting from dewatering.BMP Maintenance:A. Nonfunctional BMPs must be repaired or replaced by the end of the next business day after discovery unless a different timeframe is indicated.B. Follow the designer's or manufacturer's recommended maintenance procedures for all BMPs.C. Remove sediment from BMPs when the depth of sediment has reached 1/2 the height of the BMP and properly dispose ofsediment into controlled areas to prevent soil from returning to the BMP during subsequent rain events.D. Remove sediment from paved roadwayswithin one calendar day of discovery.E. Remove sediment from around BMPs protecting storm drain inlets.F. Surface waters with evidence of sediment deposition must be stabilized and sediment removed within seven calendar daysof discovery, or as stated by the Permit.G. Ensure that construction support activities, including borrow areas, waste areas, contractor work areas, and material storageareas and dedicated concrete and asphalt batch plants are cleaned and maintained.H. Replace damaged BMPs that no longer operate effectively.Add BMPs as needed during construction to minimize erosion and prevent sediment from leaving the site.Any basin that has the water quality volume reduced by half shall be drained and have the sediment removed within 72 hours ofdiscovery.Any temporaty or permanent sediment basin that has the water quality volume reduced by half shall be drained and have thesediment removed within 72 hours of discovery.1.2.3.4.5.6.7.8.RECORD KEEPING / RECORD RETENTIONThe SWPPP (original or copies), including all changes to it, and inspections and maintenance records, shall be kept at the site duringconstruction by the Owner / Operator who has operational control of that portion of the site. The SWPPP can be kept in either thefield office or in an on site vehicle during normal working hours.All Owners(s) must keep the SWPPP, along with the following additional records, on file for three (3) years after submittal of theNotice of Termination (NOT). This does not include any records after submittal of the NOT.The following is a list of records that shall be kept at the project site available for inspectors to review:xCopy of the SWPPP, with any modifications;xInspection and maintenance records;xPermanent operation and maintenance agreements;xCalculations for the design of temporary and permanent stormwater management systems;xAny other permits required for the project;xRecords of all inspection and maintenance conducted during construction; andxAll permanent operation and maintenance agreements that have been implemented, including all right-of-way, contracts,covenants and other binding requirements regarding perpetual maintenance1.2.3.LOG OF CHANGES TO THE SWPPP / AMENDMENTSThe Owner / Operator(s) must amend the SWPPP within seven (7) days to include additional requirements, such asadditional or modified BMPs, designs to correct problems identified during inspections, or address situations as detailedin the Permit.1.FINAL STABILIZATIONThe Owner / Operator(s) must ensure final stabilization of the site. Final stabilization includes:A. Ensuring all areas have permanent cover.B. Vegetative areas must have perennial cover with a density of 70% of expected final growth.1.POST CONSTRUCTION / PERMANENT BMPSSee Grading sheets for post construction and permanent stormwater BMPs.1.TERMINATION OF COVERAGEOwner / Operator(s) wishing to terminate coverage under the Permit must submit a Notice of Termination (NOT) to theMPCA. Compliance with the Permit is required until a NOT is submitted. Refer to the Permit for details. Conditions forsubmitting a NOT include:A. Site must have achieved final stabilization (refer to section above).B. The permanent stormwater treatment and conveyance systems must be clean and all accumulated sediment removed.C. All temporary synthetic erosion prevention and sediment control BMPs must be removed from the site and disposed ofproperly.1.The Operator shall have primary responsibility and significant authority for the development, implementation, maintenance, inspectionand amendments to the approved SWPPP. Duties include but are not limited to:xEnsuring full compliance with the SWPPP and the PermitxImplementing all elements of the SWPPP, including but not limited to:xxImplementing prompt and effective erosion and sediment control measuresxxImplementing all non-storm water management, and good housekeeping BMPs ensuring that no materials other thanStorm water are discharged in quantities, which will have an adverse effect on receiving waters or storm drain systems,etc.xConducting routine inspections and maintenancexEnsuring elimination of all unauthorized dischargesxCoordinating to ensure all of the necessary corrections / repairs are made immediately, and that the project complies with theSWPPP, the Permit, and approved plans at all times.1.SWPPP CONTACT AND TRAINING INFORMATIONOwner:Darkenwald Holdings, LLCattn: Casey Darkenwald7535 NE River RoadOtsego, MN 55330612-598-3920casey@darkenwaldOperator:To Be Determined.SWPPP Designer:Eric Luth, P.E.Landform Professional Services105 South Fifth Avenue, Suite 513Minneapolis, MN 55401612-252-9070eluth@landform.netCertification: U of MN, Design of Construction SWPPP, Exp. May 31, 2025.SWPPP Inspector / Manager:Chris OlsonLandform Professional Services105 South Fifth Avenue, Suite 513Minneapolis, MN 55401612-638-0239colson@landform.netCertification: U of MN, Construction Site Management, Exp. May 31, 2024BMP Installation And Repair:Contact Owner until BMP Installer And Maintainer is selected.Certification: , Exp.1.2.3.4.5.WATERS WITHIN ONE MILE OF SITESCHEDULE OF BMP INSTALLATION AND CONSTRUCTION ACTIVITYInstall perimeter sediment control BMPs prior to start of other site work. Refer to Grading and Erosion Control sheet(s) for initiallocations of BMPs.Perform work in phases to minimize disturbed area at any one time. Operator to develop phasing plan prior to start of work. Openwork areas should be limited to those that can be managed and inspected within required time frames.Strip topsoil from areas to be disturbed and stockpile with perimeter sediment control BMPs. Provide stabilization if stockpile is leftlonger than 14 days.Rough grade site.Final grade future roadway areas and compact subgrade.Provide final stabilization.Remove temporary BMPs and dispose of properly.1.2.3.4.5.6.7.DESCRIPTION OF CONSTRUCTION ACTIVITYConstruction activity includes erosion and sediment control BMPs installation, clearing and grubbing, site grading.1.MN SPECIAL (PROHIBITED, RESTRICTED, OTHER) & IMPAIRED WATERS1.NPDES PERMIT AND SWPPP COMPONENTSThe current Minnesota Construction Stormwater General Permit (Permit) dated August 1, 2018 is referenced in thisdocument as the Permit.The SWPPP includes the following components:xConstruction Documents prepared by LandformxStormwater Management Plan prepared by LandformAll components must be kept onsite, or electronically available onsite, by the Operator during regular work hours. TheOperator shall contact Civil Engineer if they do not have all of the above documents.1.TEMPORARY SEDIMENTATION BASIN(S)This project does have more than five (5) disturbed acres draining to a common location therefore a temporary sediment basin is notrequired. Refer to sheet(s) C1.1 for further information.Temporary sediment basins shall provide treatment to runoff before it leaves the construction site or enters surface waters. Thecontractor shall comply with the following requirements:A. Sedimentation basins must provide live storage of runoff resulting from the 2-year 24-hour rainfall event from each acredrained to the basin, with a minimum of 1,800 c.f./acre live storage volume. (Where no calculation has been performed, eachbasin shall provide at least 3,600 c.f./acre live storage.) Sedimentation basins must include a stabilized emergency overflowto prevent basin integrity failure.B. Discharge from temporary sedimentation basins will be withdrawn from the surface in order to minimize the discharge ofpollutants.Discharge from basin draining shall not adversely affect the receiving water or downstream properties. Contractor will visually checkto ensure adequate treatment has been obtained and that nuisance conditions will not result from the discharge.Any discharge observed to be occurring during the inspection shall be recorded, described, and photographed.If any proposed temporary BMPs are not working as intended refer to the "Stormwater Compliance Assistance Toolkit for SmallConstruction Operators", MPCA, 2017 for additional information. Operator shall contact the SWPPP Designer for additionalrequirements and information.1.2.3.4.5.SITE INFORMATIONSite location: Latitude: 45.251816, Longitude: -93.564224Disturbed area = 10.17 ac.Pre-construction impervious area within disturbed area = 0.19 ac.Post-construction impervious area within disturbed area = 0.19 ac.Net change in impervious area within disturbed area = 0 ac.Mississippi River is within 1 mile of this site and stormwater does not discharge to it. Impairments are for aquatic consumption andaquatic recreation, PCBs in Fish, and Fecal Coliform.A. TMDLs established for this impaired water includes Mercury in Fish Tissue.xThis site will meet these TMDLs because the pollutant mercury is not feasible to treat and remove.DRINKING WATER SUPPLY MANAGEMENT AREA1. The site is not within a Drinking Water Supply Management Area (DWSMA).PERMIT ISSUEPLAN REVISIONETLETL02-20-202403-19-2024/SHEET NO. PROJECT NO.FILE NAMELANDFORMcIF THE SIGNATURE, SEAL OR FOUR LINES DIRECTLY ABOVE ARE NOTVISIBLE, THIS SHEET HAS BEEN REPRODUCED BEYOND INTENDEDREADABILITY AND IS NO LONGER A VALID DOCUMENT. PLEASE CONTACTTHE ENGINEER TO REQUEST ADDITIONAL DOCUMENTS.PROJECTCERTIFICATIONLandformΠand Site to FinishΠare registered service marks of Landform Professional Services, LLC.DATE ISSUE / REVISION REVIEWCONTACT ENGINEER FOR ANY PRIOR HISTORYISSUE / REVISION HISTORYDEVELOPERMUNICIPALITY03-19-2024LDP1900420247535 NE RIVER ROADOTSEGO, MINNESOTA 55330TEL 612-598-39209MN SWPPP NOTESC3.11 MILESURFACE WATER BUFFERS50 foot buffers from Surface Waters are impossible to maintain due area needed for fill. Therefore double silt fence has been includedwithin 50' of the Surface Waters.1. PERMIT ISSUEPLAN REVISIONETLETL02-20-202403-19-2024/SHEET NO. PROJECT NO.FILE NAMELANDFORMcIF THE SIGNATURE, SEAL OR FOUR LINES DIRECTLY ABOVE ARE NOTVISIBLE, THIS SHEET HAS BEEN REPRODUCED BEYOND INTENDEDREADABILITY AND IS NO LONGER A VALID DOCUMENT. PLEASE CONTACTTHE ENGINEER TO REQUEST ADDITIONAL DOCUMENTS.PROJECTCERTIFICATIONLandformΠand Site to FinishΠare registered service marks of Landform Professional Services, LLC.DATE ISSUE / REVISION REVIEWCONTACT ENGINEER FOR ANY PRIOR HISTORYISSUE / REVISION HISTORYDEVELOPERMUNICIPALITY03-19-2024LDP1900420247535 NE RIVER ROADOTSEGO, MINNESOTA 55330TEL 612-598-39209C701LDP001.DWGCIVIL CONSTRUCTION DETAILSC7.1FLOW2' MIN.NO SCALESILT FENCE2NOTES:1. DIG A 6" TRENCH ALONG THE INTENDED FENCE LINE OR USE MACHINE SLICED ANCHOR.2. INSTALL ON CONTOUR AT CONSTANT ELEVATION.3. DRIVE ALL POSTS INTO THE GROUND AT THE BACK SIDE OF THE TRENCH.4. LAYOUT WIRE MESH AND SILT FENCE ON THE UPHILL SIDE ALONG THE FENCE LINE, AND BACK FILL.STEEL T-POST1.25 lbs/FT @6 FT O.C. MAXUV STABILIZED GEOTEXTILE24"-36" HEIGHT.MACHINE SLICED ANCHOR OR 6"X6"TAMPED EARTH BACKFILL.UNDISTURBED SOILWELDED STEEL PLATEEXISTING PAVEMENTNO SCALEVEHICLE TRACKING PAD1SILT FENCEIF NEEDEDDISTANCE VARIES -REFER TO PLANS(50' TYP.)RADIUS AS SHOWNON PLANSWIDTH PERPLANGEOTEXTILE SEPARATOR FABRIC PLACED UNDER ROCK18" HIGH CUTOFF BERM AT SILTFENCE IS NEEDED3" MINIMUM DIA.WASHED ROCK50' MINIMUM LEGTH6" MINIMUM DEPTHNO SCALEHEAVY DUTY SILT FENCE3NOTES:1. DIG A 6" TRENCH ALONG THE INTENDED FENCE LINE OR USE MACHINE SLICED ANCHOR.2. WIRE MESH MUST BE MINIMUM OF 2" INTO THE GROUND AND NO MORE THAN 36" ABOVE THE ORIGINALGROUND SURFACE.3. DRIVE ALL POSTS INTO THE GROUND AT THE BACK SIDE OF THE TRENCH.4. LAYOUT WIRE MESH AND SILT FENCE ON THE UPHILL SIDE ALONG THE FENCE LINE, AND BACKFILL.6" MIN6" MIN24" MIN.BACKFILLUV STABILIZED GEOTEXTILE24"-36" HEIGHTWIRE MESH 6"x6" MAX.,(14 MIN. GAUGE) - MIN.2" EMBEDMENT INTO SOILSTEEL T-POST1.25 LBS/FT@ 6' O.C. MAX.FLOWWELDED STEEL PLATETo OutletDischarge PipeTransition from Solid to Perforated PipeNO SCALETEMPORARY SEDIMENT BASIN4OVERFLOW ORFICEELEV=878.50TOP OF POND=879.50BOTTOM OF POND=874.50INV-OUT=876.50FLOATING HEADPOND SKIMMER v1-19Dec23 1 FINDINGS OF FACT AND DECISION GRADING PERMIT APPLICANT: Darkenwald Holdings, LLC APPLICATION: Request for approval of a Grading Permit for excavation of more than 50 cubic yards for the property at 15815 70th Street. CITY COUNCIL MEETING: 25 March 2024 FINDINGS: Based upon review of the application and evidence received, the Otsego City Council now makes the following findings of fact: A. The property is identified as PID 118-500-341100. B. The applicant is proposing excavation and grading of more than 50 cubic yards of material. C. Section 11-24-1 of the Zoning Ordinance requires approval of a Grading Permit for the proposed excavation and grading. D. Applications for Grading Permits are subject to review by the City Engineer and approval of the City Council. E. The Request for Council Action dated 25 March 2024 prepared by the City Planner, The Planning Company LLC, is incorporated herein. DECISION: Based on the foregoing information and applicable ordinances, the requested is hereby APPROVED, subject to the following conditions: 1. A security of $3,000 per disturbed acre as determined by the City Engineer shall be required. 2. The property owner shall execute a Grading Agreement prior to initiation of excavation and grading activities. 3. The proposed excavation and grading shall comply subject to approval of the City Engineer with the following: a. Title 9, Chapter 6 of the City Code (Erosion and Sediment Control). b. Title 9, Chapter 7 of the City Code (Post Construction Stormwater Management). c. Engineering Manual v1-19Dec23 2 ADOPTED by the Otsego City Council this 25th day of March, 2024. MOTION BY: SECONDED BY: IN FAVOR: OPPOSED: CITY OF OTSEGO __________________________________ Jessica L. Stockamp, Mayor ATTEST: __________________________________ Audra Etzel, City Clerk