Loading...
Item 3.7 Well 11 Raw Water and Directional Drill Accepting Bids and Awarding Contract Request for City Council Action DEPARTMENT INFORMATION ORIGINATING DEPARTMENT REQUESTOR: MEETING DATE: Public Works City Engineer Wagner April 22, 2024 PRESENTER(s) REVIEWED BY: ITEM #: Consent City Administrator/Finance Director Flaherty 3.7 – Well 11 Project STRATEGIC VISION MEETS: THE CITY OF OTSEGO: Is a strong organization that is committed to leading the community through innovative communication. X Has proactively expanded infrastructure to responsibly provide core services. Is committed to delivery of quality emergency service responsive to community needs and expectations in a cost-effective manner. Is a social community with diverse housing, service options, and employment opportunities. Is a distinctive, connected community known for its beauty and natural surroundings. AGENDA ITEM DETAILS RECOMMENDATION: City staff recommends the City Council adopt a resolution accepting bids and awarding a contract. ARE YOU SEEKING APPROVAL OF A CONTRACT? IS A PUBLIC HEARING REQUIRED? Yes No BACKGROUND/JUSTIFICATION: Bids were opened for the Well #11 Raw Water – Directional Drill project on April 17, 2024. A total of nine bids were received as shown on the attached Bid Tabulation. The City has budgeted a total of $1,500,000 in the CIP for this project. The overall project was divided into four sub- projects dependent upon timing of work and contractor specialties. To date, the well drilling portion of the project has been awarded and is nearing completion. This Directional Drill portion of the project is second and further detailed below. The two remaining portions of the project include electrical/SCADA and Pumphouse #3 internal components. City staff have confidence the work completed to date, this portion of the project, and remaining portions of the project will be within the total project budget in the CIP. The Well #11 Raw Water – Directional Drill project, when plans and specifications were completed, the Engineer Estimated Costs for the project were $316,815. As bid, the current Estimated Costs for the project total $249,602. Kuechle Underground Inc. of Kimball, Minnesota is the apparent responsible low bidder. City staff recommend awarding the contract to the low bidder, who has done work for the City in the past with the work completed to specifications and in a timely manner. SUPPORTING DOCUMENTS ATTACHED: • Engineer Estimate • Bid Tabulation • Resolution 2024-35 POSSIBLE MOTION PLEASE WORD MOTION AS YOU WOULD LIKE IT TO APPEAR IN THE MINUTES: Motion to adopt Resolution 2024-35 Accepting Bids and Awarding Contract for the Well #11 Raw Water – Directional Drill project, City Project No. 24-04 to Kuechle Underground Inc. of Kimball, MN in the amount of $217,044.80. BUDGET INFORMATION FUNDING: BUDGETED: Fund 601 – Water Utility Yes WELL #11 RAW WATER - DIRECTION DRILL ENGINEER'S COST ESTIMATE CITY OF OTSEGO Bid Schedule "A" - Well #11 Raw Water Site Work Item No.Item Description Unit Estimated Quantity Unit Price Total Estimated Extension 1 Mobilization LS 1 20,000$ 20,000$ 2 Clear and Grub Tree removal EACH 4 500$ 2,000$ 3 Fence Removal & Replacement LF 83 25$ 2,075$ 4 Traffic Control LS 1 10,000$ 10,000$ 5 Erosion Control Inlet Protection EACH 10 250$ 2,500$ 6 Silt Fence Type; MS LF 1889 5$ 9,445$ 7 Reestablish Vegetation LS 1 2,000$ 2,000$ 8 Sod SY 69.4 15$ 1,041$ 9 Sawing Bituminous Pavement - Full Depth LF 101 10$ 1,010$ 10 Remove Concrete Curb LF 58 20$ 1,160$ 11 Remove Bituminous Pavement SY 105 5$ 525$ 12 Street Patching SY 105 75$ 7,875$ 13 Concrete Curb and Gutter Design Special LF 58 40$ 2,320$ 14 Irrigation System (Allowance)LS 1 2,500$ 2,500$ 64,451$ Bid Schedule "B" - Well #11 Raw Water Item No.Item Description Unit Estimated Quantity Unit Price Total Estimated Extension 15 Connect to Existing Waterman EACH 2 2,500$ 5,000$ 16 8" HDPE Watermain LF 136 85$ 11,560$ 17 8" HDPE Watermain Dirctional Drill LF 1414 135$ 190,890$ 18 DIP Fittings LBS 359 10.00$ 3,590$ 211,040$ Bid Schedule "A" - Well #11 Raw Water Site Work 64,451$ Bid Schedule "B" - Well #11 Raw Water 211,040$ TOTAL ESTIMATED Construction COST 275,491$ 15% Administration, Legal, & Engineering 41,324$ TOTAL ESTIMATED PROJECT COST 316,815$ Total - Bid Schedule "B" Total - Bid Schedule "A" S:\Municipal\AOTSEGO\539.02 Directional Drill\B-PROJECT DEVELOPMENT\3-DESIGN\OT539.02 EngEst.xlsx Page 1 of 1 BID TABULATION CITY OF OTSEGO WELL #11 RAW WATER - DIRECTIONAL DRILL Bids were opened at 2:00 p.m., April 17, 2024. There were nine (9) bids received, as shown herein. Bid Schedule "A" - Well #11 Raw Water Site Work ITEM NO.ITEM DESCRIPTION UNIT ESTIMATED QUANTITY UNIT PRICE EXTENSION UNIT PRICE EXTENSION UNIT PRICE EXTENSION 1 MOBILIZATION LS 1 7,400.00$ 7,400.00$ 10,000.00$ 10,000.00$ 20,000.00$ 20,000.00$ 2 CLEAR AND GRUB TREE REMOVAL EACH 4 500.00$ 2,000.00$ 360.00$ 1,440.00$ 1,100.00$ 4,400.00$ 3 FENCE REMOVAL & REPLACEMENT LF 83 100.00$ 8,300.00$ 96.00$ 7,968.00$ 100.00$ 8,300.00$ 4 TRAFFIC CONTROL LS 1 3,500.00$ 3,500.00$ 3,350.00$ 3,350.00$ 2,000.00$ 2,000.00$ 5 EROSION CONTROL INLET PROTECTION EACH 10 330.00$ 3,300.00$ 180.00$ 1,800.00$ 150.00$ 1,500.00$ 6 SILT FENCE TYPE; MS LF 1889 2.20$ 4,155.80$ 2.50$ 4,722.50$ 2.50$ 4,722.50$ 7 REESTABLISH VEGETATION LS 1 3,000.00$ 3,000.00$ 3,595.00$ 3,595.00$ 20,000.00$ 20,000.00$ 8 SOD SY 69.4 55.00$ 3,817.00$ 56.00$ 3,886.40$ 60.00$ 4,164.00$ 9 SAWING BITUMINOUS PAVEMENT - FULL DEPTH LF 101 4.00$ 404.00$ 5.00$ 505.00$ 5.00$ 505.00$ 10 REMOVE CONCRETE CURB LF 58 7.00$ 406.00$ 12.00$ 696.00$ 10.00$ 580.00$ 11 REMOVE BITUMINOUS PAVEMENT SY 105 10.00$ 1,050.00$ 10.00$ 1,050.00$ 10.00$ 1,050.00$ 12 STREET PATCHING SY 105 100.00$ 10,500.00$ 213.00$ 22,365.00$ 100.00$ 10,500.00$ 13 CONCRETE CURB AND GUTTER DESIGN SPECIAL LF 58 79.00$ 4,582.00$ 78.00$ 4,524.00$ 75.00$ 4,350.00$ 14 IRRIGATION SYSTEM (ALLOWANCE)LS 1 5,000.00$ 5,000.00$ 5,000.00$ 5,000.00$ 5,000.00$ 5,000.00$ Bid Schedule "A" Total $57,414.80 $70,901.90 $87,071.50 Bid Schedule "B" - Well #11 Raw Water ITEM NO.ITEM DESCRIPTION UNIT ESTIMATED QUANTITY UNIT PRICE EXTENSION UNIT PRICE EXTENSION UNIT PRICE EXTENSION 15 CONNECT TO EXISTING WATERMAN EACH 2 9,300.00$ 18,600.00$ 7,640.00$ 15,280.00$ 3,000.00$ 6,000.00$ 16 8" HDPE WATERMAIN LF 136 111.00$ 15,096.00$ 104.00$ 14,144.00$ 83.00$ 11,288.00$ 17 8" HDPE WATERMAIN DIRECTIONAL DRILL LF 1414 85.00$ 120,190.00$ 78.00$ 110,292.00$ 86.00$ 121,604.00$ 18 DIP FITTINGS LBS 359 16.00$ 5,744.00$ 22.00$ 7,898.00$ 20.00$ 7,180.00$ Bid Schedule "B" Total $159,630.00 147,614.00$ 146,072.00$ Bid Schedule "A" + Bid Schedule "B" Total $217,044.80 $218,515.90 $233,143.50 Kuechle Underground Inc. Kuechle Underground Inc. Bituminous Roadways Inc. Bituminous Roadways Inc. C&L Excavating, Inc. C&L Excavating, Inc. Page 1 of 3 BID TABULATION CITY OF OTSEGO WELL #11 RAW WATER - DIRECTIONAL DRILL Bids were opened at 2:00 p.m., April 17, 2024. There were nine (9) bids received, as shown herein. Bid Schedule "A" - Well #11 Raw Water Site Work ITEM NO.ITEM DESCRIPTION UNIT ESTIMATED QUANTITY 1 MOBILIZATION LS 1 2 CLEAR AND GRUB TREE REMOVAL EACH 4 3 FENCE REMOVAL & REPLACEMENT LF 83 4 TRAFFIC CONTROL LS 1 5 EROSION CONTROL INLET PROTECTION EACH 10 6 SILT FENCE TYPE; MS LF 1889 7 REESTABLISH VEGETATION LS 1 8 SOD SY 69.4 9 SAWING BITUMINOUS PAVEMENT - FULL DEPTH LF 101 10 REMOVE CONCRETE CURB LF 58 11 REMOVE BITUMINOUS PAVEMENT SY 105 12 STREET PATCHING SY 105 13 CONCRETE CURB AND GUTTER DESIGN SPECIAL LF 58 14 IRRIGATION SYSTEM (ALLOWANCE)LS 1 Bid Schedule "A" Total Bid Schedule "B" - Well #11 Raw Water ITEM NO.ITEM DESCRIPTION UNIT ESTIMATED QUANTITY 15 CONNECT TO EXISTING WATERMAN EACH 2 16 8" HDPE WATERMAIN LF 136 17 8" HDPE WATERMAIN DIRECTIONAL DRILL LF 1414 18 DIP FITTINGS LBS 359 Bid Schedule "B" Total Bid Schedule "A" + Bid Schedule "B" Total UNIT PRICE EXTENSION UNIT PRICE EXTENSION UNIT PRICE EXTENSION 18,000.00$ 18,000.00$ 25,000.00$ 25,000.00$ 23,200.81$ 23,200.81$ 250.00$ 1,000.00$ 1,000.00$ 4,000.00$ 545.00$ 2,180.00$ 40.00$ 3,320.00$ 55.00$ 4,565.00$ 67.00$ 5,561.00$ 1,850.00$ 1,850.00$ 6,000.00$ 6,000.00$ 2,450.00$ 2,450.00$ 165.00$ 1,650.00$ 125.00$ 1,250.00$ 475.00$ 4,750.00$ 0.01$ 18.89$ 2.25$ 4,250.25$ 3.60$ 6,800.40$ 1,700.00$ 1,700.00$ 3,000.00$ 3,000.00$ 6,000.00$ 6,000.00$ 20.00$ 1,388.00$ 60.00$ 4,164.00$ 14.85$ 1,030.59$ 7.50$ 757.50$ 3.50$ 353.50$ 5.60$ 565.60$ 10.00$ 580.00$ 8.00$ 464.00$ 6.70$ 388.60$ 18.00$ 1,890.00$ 16.00$ 1,680.00$ 10.25$ 1,076.25$ 70.00$ 7,350.00$ 130.00$ 13,650.00$ 131.75$ 13,833.75$ 75.00$ 4,350.00$ 65.00$ 3,770.00$ 88.00$ 5,104.00$ 5,000.00$ 5,000.00$ 5,000.00$ 5,000.00$ 5,000.00$ 5,000.00$ $48,854.39 $77,146.75 $77,941.00 UNIT PRICE EXTENSION UNIT PRICE EXTENSION UNIT PRICE EXTENSION 11,000.00$ 22,000.00$ 12,000.00$ 24,000.00$ 7,500.00$ 15,000.00$ 90.00$ 12,240.00$ 165.00$ 22,440.00$ 81.00$ 11,016.00$ 102.50$ 144,935.00$ 75.00$ 106,050.00$ 91.50$ 129,381.00$ 14.50$ 5,205.50$ 17.50$ 6,282.50$ 25.00$ 8,975.00$ 184,380.50$ 158,772.50$ 164,372.00$ $233,234.89 $235,919.25 $242,313.00 Rachel Contracting, LLCNew Look Contracting, Inc. New Look Contracting, Inc. Minger Construction Co. Inc. Minger Construction Co. Inc.Rachel Contracting, LLC Page 2 of 3 BID TABULATION CITY OF OTSEGO WELL #11 RAW WATER - DIRECTIONAL DRILL Bids were opened at 2:00 p.m., April 17, 2024. There were nine (9) bids received, as shown herein. Bid Schedule "A" - Well #11 Raw Water Site Work ITEM NO.ITEM DESCRIPTION UNIT ESTIMATED QUANTITY 1 MOBILIZATION LS 1 2 CLEAR AND GRUB TREE REMOVAL EACH 4 3 FENCE REMOVAL & REPLACEMENT LF 83 4 TRAFFIC CONTROL LS 1 5 EROSION CONTROL INLET PROTECTION EACH 10 6 SILT FENCE TYPE; MS LF 1889 7 REESTABLISH VEGETATION LS 1 8 SOD SY 69.4 9 SAWING BITUMINOUS PAVEMENT - FULL DEPTH LF 101 10 REMOVE CONCRETE CURB LF 58 11 REMOVE BITUMINOUS PAVEMENT SY 105 12 STREET PATCHING SY 105 13 CONCRETE CURB AND GUTTER DESIGN SPECIAL LF 58 14 IRRIGATION SYSTEM (ALLOWANCE)LS 1 Bid Schedule "A" Total Bid Schedule "B" - Well #11 Raw Water ITEM NO.ITEM DESCRIPTION UNIT ESTIMATED QUANTITY 15 CONNECT TO EXISTING WATERMAN EACH 2 16 8" HDPE WATERMAIN LF 136 17 8" HDPE WATERMAIN DIRECTIONAL DRILL LF 1414 18 DIP FITTINGS LBS 359 Bid Schedule "B" Total Bid Schedule "A" + Bid Schedule "B" Total UNIT PRICE EXTENSION UNIT PRICE EXTENSION UNIT PRICE EXTENSION 14,025.00$ 14,025.00$ 71,780.27$ 71,780.27$ 9,000.00$ 9,000.00$ 504.00$ 2,016.00$ 480.00$ 1,920.00$ 500.00$ 2,000.00$ 136.50$ 11,329.50$ 150.00$ 12,450.00$ 45.00$ 3,735.00$ 2,940.00$ 2,940.00$ 2,800.00$ 2,800.00$ 2,000.00$ 2,000.00$ 300.00$ 3,000.00$ 135.75$ 1,357.50$ 250.00$ 2,500.00$ 3.10$ 5,855.90$ 2.50$ 4,722.50$ 3.00$ 5,667.00$ 8,715.00$ 8,715.00$ 6,000.00$ 6,000.00$ 7,000.00$ 7,000.00$ 78.25$ 5,430.55$ 25.00$ 1,735.00$ 30.00$ 2,082.00$ 5.00$ 505.00$ 5.00$ 505.00$ 8.00$ 808.00$ 10.00$ 580.00$ 9.33$ 541.14$ 10.00$ 580.00$ 10.00$ 1,050.00$ 14.49$ 1,521.45$ 15.00$ 1,575.00$ 109.10$ 11,455.50$ 152.40$ 16,002.00$ 80.00$ 8,400.00$ 46.87$ 2,718.46$ 65.00$ 3,770.00$ 80.00$ 4,640.00$ 5,000.00$ 5,000.00$ 5,000.00$ 5,000.00$ 5,000.00$ 5,000.00$ $74,620.91 $130,104.86 $54,987.00 UNIT PRICE EXTENSION UNIT PRICE EXTENSION UNIT PRICE EXTENSION 14,590.00$ 29,180.00$ 11,232.85$ 22,465.70$ 15,000.00$ 30,000.00$ 137.41$ 18,687.76$ 77.40$ 10,526.40$ 135.00$ 18,360.00$ 86.64$ 122,508.96$ 80.01$ 113,134.14$ 135.00$ 190,890.00$ 24.59$ 8,827.81$ 10.60$ 3,805.40$ 20.00$ 7,180.00$ 179,204.53$ 149,931.64$ 246,430.00$ $253,825.44 $280,036.50 $301,417.00 Northdale Construction Company, Inc.G M Contracting, Inc.Burschville Construction Inc. Northdale Construction Company, Inc.G M Contracting, Inc.Burschville Construction Inc. Page 3 of 3 1 CITY OF OTSEGO COUNTY OF WRIGHT STATE OF MINNESOTA RESOLUTION NO: 2024-35 ACCEPTING BIDS AND AWARDING CONTRACT FOR THE WELL #11 RAW WATER – DIRECTIONAL DRILL PROJECT WHEREAS, pursuant to an advertisement for bids for the construction of Well #11 Raw Water – Directional Drill, City Project No. 24-04, bids were received, opened on April 17, 2024, and tabulated according to law, and the following bids were received complying with the advertisement; and 1. Kuechle Underground Inc. $217,044.80 2. Bituminous Roadways Inc. $218,515.90 3. C&L Excavating, Inc. $233,143.50 4. New Look Contracting, Inc. $233,234.89 5. Minger Construction Co. Inc. $235,919.25 6. Rachel Contracting, LLC $242,313.00 7. Northdale Construction Company, Inc. $253,825.44 8. G M Contracting, Inc. $280,036.50 9. Burschville Construction Inc. $301,417.00 WHEREAS, it appears that Kuechle Underground Inc. of Kimball, Minnesota is the lowest responsible bidder. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF OTSEGO, MINNESOTA: 1. The Mayor and City Clerk are hereby authorized and directed to enter into a contract with Kuechle Underground Inc. of Kimball, Minnesota in the name of the City of Otsego for Well #11 Raw Water – Directional Drill, City Project No. 24-04, according to the plans and specifications therefore approved by the City Council and on file in the office of the City Clerk. 2. The City Clerk is hereby authorized and directed to return forthwith to all bidders the bid bond made with their bids, except that the bid bond of the successful bidder and the next lowest bidder shall be retained until a contract has been signed. 2 ADOPTED by the Otsego City Council this 22nd day of April, 2024. MOTION BY: SECONDED BY: IN FAVOR: OPPOSED: CITY OF OTSEGO __________________________________ Jessica L. Stockamp, Mayor ATTEST: __________________________________ Audra Etzel, City Clerk