Item 3.6 2024 Street Renewal Project Accepting Bids and Awarding Contract
Request for
City Council Action
DEPARTMENT INFORMATION
ORIGINATING DEPARTMENT REQUESTOR: MEETING DATE:
Public Works City Engineer Wagner May 13, 2024
PRESENTER(s) REVIEWED BY: ITEM #:
Consent City Administrator/Finance Director Flaherty 3.6 – 2024 Street Renewal
Project
STRATEGIC VISION
MEETS: THE CITY OF OTSEGO:
Is a strong organization that is committed to leading the community through innovative communication.
X Has proactively expanded infrastructure to responsibly provide core services.
Is committed to delivery of quality emergency service responsive to community needs and expectations in a
cost-effective manner.
Is a social community with diverse housing, service options, and employment opportunities.
Is a distinctive, connected community known for its beauty and natural surroundings.
AGENDA ITEM DETAILS
RECOMMENDATION:
City staff recommends the City Council adopt a resolution accepting bids and awarding a contract for the 2024 Street
Renewal Project.
ARE YOU SEEKING APPROVAL OF A CONTRACT? IS A PUBLIC HEARING REQUIRED?
Yes No
BACKGROUND/JUSTIFICATION:
Bids were opened for the 2024 Street Renewal Project, City Project No. 24-03 on May 8, 2024. A total of 10 bids
were received as shown on the attached Bid Tabulation.
The Capital Improvement Plan (CIP) included a budget in the amount of $1,186,019 for this improvement project. The
total estimated project cost is $1,198,472 and will be funded by special assessments in the amount of $159,432, and the
remaining balance of the project paid with funds from the City’s Pavement Management Fund.
The low bid from Knife River Corporation was in the amount of $919,516.23. Including engineering estimated costs of
15%, the project cost as bid is $1,057,444, within the 2024 CIP Budget. City staff recommends awarding the contract to
the low bidder, who has completed multiple projects within the City of Otsego in the past. The work was completed
to specifications and in a timely manner.
SUPPORTING DOCUMENTS ATTACHED:
• Engineer Estimate
• Bid Tabulation
• Resolution 2024-37
POSSIBLE MOTION
PLEASE WORD MOTION AS YOU WOULD LIKE IT TO APPEAR IN THE MINUTES:
Motion to adopt Resolution 2024-37 accepting bids and awarding contract for the 2024 Street Renewal Project, City
Project No. 24-03 to Knife River Corporation of Sauk Rapids, Minnesota in the amount of $919,516.23.
BUDGET INFORMATION
FUNDING: BUDGETED:
Fund 201 – Pavement Management
Yes
Otsego 2024 Street Renewal Project
Engineer’s Estimate
Base Bid
Item
No.
MnDOT
Spec. No.Description Unit
Estimated
Unit Price
Estimated
Quantity
Total Estimated
Extension
1 2021.501 MOBILIZATION LS 30,000.00$ 1.17 30,000.00$
2 2104.503 REMOVE SEWER PIPE (STORM)LF 17.00$ 230 3,910.00$
3 2104.504 REMOVE BITUMINOUS PAVEMENT (DRIVEWAYS)SY 10.00$ 1,403.54 14,035.44$
4 2104.513 SAWING BIT PAVEMENT (FULL DEPTH)LF 5.00$ 1,921 9,605.00$
5 2105.607 HAUL & STOCKPILE EXCESS MATERIAL (LV)CY 10.00$ 704.23 7,042.33$
6 2211.509 AGGREGATE CLASS 5 MOD (DRIVEWAY)TON 36.00$ 99.36 3,576.96$
7 2211.509 AGGREGATE SHOULDER (FROM EXCESS RECLAIM)CY 23.00$ 723.19 16,633.26$
8 2211.509 BIT. DRIVEWAY TYPE SP 4.75 WEARING COURSE MIXTURE (2,B)SY 15.00$ 1,551 23,265.00$
9 2215.504 FULL DEPTH RECLAMATION SY 3.00$ 46,095.24 138,285.73$
10 2232.501 MILL BITUMINOUS SURFACE SY 6.00$ 3,019.8 18,118.80$
11 2357.506 BITUMINOUS MATERIAL FOR TACK COAT GAL 5.00$ 2,568.47 12,842.36$
12 2360.509 TYPE SP 9.5 WEARING COURSE MIXTURE (2,B)TON 70.00$ 4,334.3 303,400.81$
13 2360.509 TYPE SP 12.5 NON WEAR COURSE MIXTURE (2,B)TON 67.50$ 5,779.06 390,086.76$
14 2501.502 12" RC PIPE APRON EACH 1,500.00$ 4 6,000.00$
15 2501.502 15" RC PIPE APRON EACH 1,600.00$ 12 19,200.00$
16 2501.502 18" RC PIPE APRON EACH 1,700.00$ 2 3,400.00$
17 2501.502 24" RC PIPE APRON EACH 1,900.00$ 2 3,800.00$
18 2500.503 12" RC PIPE CULVERT LF 80.00$ 68 5,440.00$
19 2501.503 15" RC PIPE CULVERT LF 85.00$ 200 17,000.00$
20 2501.503 18" RC PIPE CULVERT LF 90.00$ 32 2,880.00$
21 2501.503 24" RC PIPE CULVERT LF 95.00$ 52 4,940.00$
22 2563.601 TRAFFIC CONTROL LS 5,000.00$ 1 5,000.00$
23 2575.505 TURF ESTAB. (EROSION CONT. MAT CAT 3 & SEED MIX 25-141) ACRE 1,700.00$ 1.21 2,057.00$
24 2573.503 SILT FENCE, TYPE MS LF 3.00$ 26.00 78.00$
25 2574.525 PULVERIZED TOPSOIL BORROW (LV)CY 60.00$ 25.87 1,552.08$
Base Bid 1,042,149.55$
15% Admin, Legal, & Engineering 156,322.43$
Project Total 1,198,471.98$
BID TABULATION
CITY OF OTSEGO
2024 OTSEGO STREET RENEWAL PROJECT
Bids were opened at 2:00 p.m., May 8, 2024.
There were ten (10) bids received, as shown herein.
Base Bid
ITEM
NO.
Mn/DOT
SPEC. NO.ITEM DESCRIPTION UNIT
ESTIMATED
QUANTITY UNIT PRICE EXTENSION UNIT PRICE EXTENSION UNIT PRICE EXTENSION
1 2021.501 MOBILIZATION LS 1 26,000.00$ 26,000.00$ 28,440.00$ 28,440.00$ 9,850.00$ 9,850.00$
2 2104.503 REMOVE SEWER PIPE (STORM)LF 516 9.00$ 4,644.00$ 12.00$ 6,192.00$ 8.26$ 4,262.16$
3 2104.504 REMOVE BITUMINOUS PAVEMENT (DRIVEWAYS)SY 1404 7.70$ 10,810.80$ 7.35$ 10,319.40$ 5.30$ 7,441.20$
4 2104.513 SAWING BIT PAVEMENT (FULL DEPTH)LF 2014 2.50$ 5,035.00$ 3.80$ 7,653.20$ 2.30$ 4,632.20$
5 2104.603 SPRINKLER SYSTEM ALLOWANCE LS 1 10,000.00$ 10,000.00$ 10,000.00$ 10,000.00$ 10,000.00$ 10,000.00$
6 2105.607 HAUL & STOCKPILE EXCESS MATERIAL (LV)CY 561 11.50$ 6,451.50$ 11.40$ 6,395.40$ 18.20$ 10,210.20$
7 2105.607 HAUL & DISPOSE OF EXCESS MATERIAL (LV) [VOG ONLY]CY 1242 15.00$ 18,630.00$ 14.65$ 18,195.30$ 16.20$ 20,120.40$
8 2211.509 AGGREGATE CLASS 5 (DRIVEWAY)TON 99 15.00$ 1,485.00$ 36.20$ 3,583.80$ 60.00$ 5,940.00$
9 2211.509 AGGREGATE SHOULDER (FROM EXCESS RECLAIM)CY 548 29.50$ 16,166.00$ 19.50$ 10,686.00$ 35.50$ 19,454.00$
10 2211.509 BIT. DRIVEWAY TYPE SP 9.5 WEARING COURSE MIXTURE (2,B)SY 1551 17.75$ 27,530.25$ 28.61$ 44,374.11$ 32.00$ 49,632.00$
11 2215.504 FULL DEPTH RECLAMATION SY 46095 1.80$ 82,971.00$ 1.25$ 57,618.75$ 1.69$ 77,900.55$
12 2232.501 MILL BITUMINOUS SURFACE SY 333 6.00$ 1,998.00$ 18.00$ 5,994.00$ 2.25$ 749.25$
13 2357.506 BITUMINOUS MATERIAL FOR TACK COAT GAL 2568 0.01$ 25.68$ 4.00$ 10,272.00$ 3.00$ 7,704.00$
14 2360.509 TYPE SP 9.5 WEARING COURSE MIXTURE (2,B)TON 4334 63.00$ 273,042.00$ 71.80$ 311,181.20$ 75.85$ 328,733.90$
15 2360.509 TYPE SP 12.5 NON WEAR COURSE MIXTURE (2,B)TON 5779 62.00$ 358,298.00$ 67.84$ 392,047.36$ 70.00$ 404,530.00$
16 2501.502 12" RC PIPE APRON EACH 4 715.00$ 2,860.00$ 1,527.98$ 6,111.92$ 1,393.20$ 5,572.80$
17 2501.502 15" RC PIPE APRON EACH 12 786.50$ 9,438.00$ 1,785.05$ 21,420.60$ 1,444.80$ 17,337.60$
18 2501.502 18" RC PIPE APRON EACH 2 891.00$ 1,782.00$ 1,914.45$ 3,828.90$ 1,548.00$ 3,096.00$
19 2501.502 24" RC PIPE APRON EACH 2 2,140.00$ 4,280.00$ 2,087.56$ 4,175.12$ 1,702.80$ 3,405.60$
20 2500.503 12" RC PIPE CULVERT LF 68 122.00$ 8,296.00$ 74.88$ 5,091.84$ 84.62$ 5,754.16$
21 2501.503 15" RC PIPE CULVERT LF 200 127.00$ 25,400.00$ 86.11$ 17,222.00$ 90.82$ 18,164.00$
22 2501.503 18" RC PIPE CULVERT LF 32 150.00$ 4,800.00$ 88.18$ 2,821.76$ 94.94$ 3,038.08$
23 2501.503 24" RC PIPE CULVERT LF 52 150.00$ 7,800.00$ 122.20$ 6,354.40$ 105.26$ 5,473.52$
24 2563.601 TRAFFIC CONTROL LS 1 4,000.00$ 4,000.00$ 6,950.00$ 6,950.00$ 4,500.00$ 4,500.00$
25 2575.505 TURF ESTAB. (EROSION CONT. MAT CAT 20 & SEED MIX 25-141)ACRE 1 6,200.00$ 6,200.00$ 19,100.00$ 19,100.00$ 10,320.00$ 10,320.00$
26 2573.503 SILT FENCE, TYPE MS LF 26 2.50$ 65.00$ 6.00$ 156.00$ 2.58$ 67.08$
27 2574.525 PULVERIZED TOPSOIL BORROW (LV)CY 26 58.00$ 1,508.00$ 62.00$ 1,612.00$ 67.08$ 1,744.08$
Total Base Bid 919,516.23$ 1,017,797.06$ 1,039,632.78$
Knife River Corporation Northwest Asphalt Omann Brothers Paving Inc.
Page 1 of 4
BID TABULATION
CITY OF OTSEGO
2024 OTSEGO STREET RENEWAL PROJECT
Bids were opened at 2:00 p.m., May 8, 2024.
There were ten (10) bids received, as shown herein.
Base Bid
ITEM
NO.
Mn/DOT
SPEC. NO.ITEM DESCRIPTION UNIT
ESTIMATED
QUANTITY
1 2021.501 MOBILIZATION LS 1
2 2104.503 REMOVE SEWER PIPE (STORM)LF 516
3 2104.504 REMOVE BITUMINOUS PAVEMENT (DRIVEWAYS)SY 1404
4 2104.513 SAWING BIT PAVEMENT (FULL DEPTH)LF 2014
5 2104.603 SPRINKLER SYSTEM ALLOWANCE LS 1
6 2105.607 HAUL & STOCKPILE EXCESS MATERIAL (LV)CY 561
7 2105.607 HAUL & DISPOSE OF EXCESS MATERIAL (LV) [VOG ONLY]CY 1242
8 2211.509 AGGREGATE CLASS 5 (DRIVEWAY)TON 99
9 2211.509 AGGREGATE SHOULDER (FROM EXCESS RECLAIM)CY 548
10 2211.509 BIT. DRIVEWAY TYPE SP 9.5 WEARING COURSE MIXTURE (2,B)SY 1551
11 2215.504 FULL DEPTH RECLAMATION SY 46095
12 2232.501 MILL BITUMINOUS SURFACE SY 333
13 2357.506 BITUMINOUS MATERIAL FOR TACK COAT GAL 2568
14 2360.509 TYPE SP 9.5 WEARING COURSE MIXTURE (2,B)TON 4334
15 2360.509 TYPE SP 12.5 NON WEAR COURSE MIXTURE (2,B)TON 5779
16 2501.502 12" RC PIPE APRON EACH 4
17 2501.502 15" RC PIPE APRON EACH 12
18 2501.502 18" RC PIPE APRON EACH 2
19 2501.502 24" RC PIPE APRON EACH 2
20 2500.503 12" RC PIPE CULVERT LF 68
21 2501.503 15" RC PIPE CULVERT LF 200
22 2501.503 18" RC PIPE CULVERT LF 32
23 2501.503 24" RC PIPE CULVERT LF 52
24 2563.601 TRAFFIC CONTROL LS 1
25 2575.505 TURF ESTAB. (EROSION CONT. MAT CAT 20 & SEED MIX 25-141)ACRE 1
26 2573.503 SILT FENCE, TYPE MS LF 26
27 2574.525 PULVERIZED TOPSOIL BORROW (LV)CY 26
Total Base Bid
UNIT PRICE EXTENSION UNIT PRICE EXTENSION UNIT PRICE EXTENSION
54,500.00$ 54,500.00$ 105,000.00$ 105,000.00$ 72,000.00$ 72,000.00$
22.00$ 11,352.00$ 7.70$ 3,973.20$ 9.00$ 4,644.00$
9.35$ 13,127.40$ 10.60$ 14,882.40$ 8.00$ 11,232.00$
3.00$ 6,042.00$ 2.80$ 5,639.20$ 2.50$ 5,035.00$
10,000.00$ 10,000.00$ 10,000.00$ 10,000.00$ 10,000.00$ 10,000.00$
18.55$ 10,406.55$ 24.00$ 13,464.00$ 35.25$ 19,775.25$
23.32$ 28,963.44$ 13.90$ 17,263.80$ 26.15$ 32,478.30$
49.06$ 4,856.94$ 41.80$ 4,138.20$ 52.95$ 5,242.05$
40.04$ 21,941.92$ 0.01$ 5.48$ 40.00$ 21,920.00$
22.77$ 35,316.27$ 34.10$ 52,889.10$ 20.00$ 31,020.00$
1.65$ 76,056.75$ 1.30$ 59,923.50$ 1.45$ 66,837.75$
8.80$ 2,930.40$ 6.10$ 2,031.30$ 17.00$ 5,661.00$
3.00$ 7,704.00$ 2.35$ 6,034.80$ 3.00$ 7,704.00$
74.58$ 323,229.72$ 71.00$ 307,714.00$ 72.00$ 312,048.00$
68.86$ 397,941.94$ 66.00$ 381,414.00$ 71.50$ 413,198.50$
825.00$ 3,300.00$ 1,270.00$ 5,080.00$ 715.00$ 2,860.00$
935.00$ 11,220.00$ 1,370.00$ 16,440.00$ 786.50$ 9,438.00$
1,045.00$ 2,090.00$ 1,500.00$ 3,000.00$ 891.00$ 1,782.00$
1,155.00$ 2,310.00$ 4,610.00$ 9,220.00$ 2,200.00$ 4,400.00$
77.00$ 5,236.00$ 92.90$ 6,317.20$ 122.00$ 8,296.00$
90.20$ 18,040.00$ 102.00$ 20,400.00$ 127.00$ 25,400.00$
94.60$ 3,027.20$ 106.00$ 3,392.00$ 147.00$ 4,704.00$
110.00$ 5,720.00$ 169.00$ 8,788.00$ 150.00$ 7,800.00$
5,000.00$ 5,000.00$ 4,340.00$ 4,340.00$ 3,950.00$ 3,950.00$
8,800.00$ 8,800.00$ 18,400.00$ 18,400.00$ 6,200.00$ 6,200.00$
10.00$ 260.00$ 25.50$ 663.00$ 2.50$ 65.00$
49.50$ 1,287.00$ 88.20$ 2,293.20$ 60.00$ 1,560.00$
1,070,659.53$ 1,082,706.38$ 1,095,250.85$
Duininck, Inc.Park Construction CompanyAsphalt Surface Technologies
Corp.
Page 2 of 4
BID TABULATION
CITY OF OTSEGO
2024 OTSEGO STREET RENEWAL PROJECT
Bids were opened at 2:00 p.m., May 8, 2024.
There were ten (10) bids received, as shown herein.
Base Bid
ITEM
NO.
Mn/DOT
SPEC. NO.ITEM DESCRIPTION UNIT
ESTIMATED
QUANTITY
1 2021.501 MOBILIZATION LS 1
2 2104.503 REMOVE SEWER PIPE (STORM)LF 516
3 2104.504 REMOVE BITUMINOUS PAVEMENT (DRIVEWAYS)SY 1404
4 2104.513 SAWING BIT PAVEMENT (FULL DEPTH)LF 2014
5 2104.603 SPRINKLER SYSTEM ALLOWANCE LS 1
6 2105.607 HAUL & STOCKPILE EXCESS MATERIAL (LV)CY 561
7 2105.607 HAUL & DISPOSE OF EXCESS MATERIAL (LV) [VOG ONLY]CY 1242
8 2211.509 AGGREGATE CLASS 5 (DRIVEWAY)TON 99
9 2211.509 AGGREGATE SHOULDER (FROM EXCESS RECLAIM)CY 548
10 2211.509 BIT. DRIVEWAY TYPE SP 9.5 WEARING COURSE MIXTURE (2,B)SY 1551
11 2215.504 FULL DEPTH RECLAMATION SY 46095
12 2232.501 MILL BITUMINOUS SURFACE SY 333
13 2357.506 BITUMINOUS MATERIAL FOR TACK COAT GAL 2568
14 2360.509 TYPE SP 9.5 WEARING COURSE MIXTURE (2,B)TON 4334
15 2360.509 TYPE SP 12.5 NON WEAR COURSE MIXTURE (2,B)TON 5779
16 2501.502 12" RC PIPE APRON EACH 4
17 2501.502 15" RC PIPE APRON EACH 12
18 2501.502 18" RC PIPE APRON EACH 2
19 2501.502 24" RC PIPE APRON EACH 2
20 2500.503 12" RC PIPE CULVERT LF 68
21 2501.503 15" RC PIPE CULVERT LF 200
22 2501.503 18" RC PIPE CULVERT LF 32
23 2501.503 24" RC PIPE CULVERT LF 52
24 2563.601 TRAFFIC CONTROL LS 1
25 2575.505 TURF ESTAB. (EROSION CONT. MAT CAT 20 & SEED MIX 25-141)ACRE 1
26 2573.503 SILT FENCE, TYPE MS LF 26
27 2574.525 PULVERIZED TOPSOIL BORROW (LV)CY 26
Total Base Bid
UNIT PRICE EXTENSION UNIT PRICE EXTENSION UNIT PRICE EXTENSION
24,927.45$ 24,927.45$ 65,000.00$ 65,000.00$ 22,825.40$ 22,825.40$
11.03$ 5,691.48$ 12.10$ 6,243.60$ 9.10$ 4,695.60$
11.73$ 16,468.92$ 6.00$ 8,424.00$ 11.35$ 15,935.40$
1.81$ 3,645.34$ 2.15$ 4,330.10$ 3.80$ 7,653.20$
10,000.00$ 10,000.00$ 10,000.00$ 10,000.00$ 10,000.00$ 10,000.00$
21.79$ 12,224.19$ 12.50$ 7,012.50$ 25.77$ 14,456.97$
27.67$ 34,366.14$ 18.70$ 23,225.40$ 25.21$ 31,310.82$
48.94$ 4,845.06$ 27.00$ 2,673.00$ 54.35$ 5,380.65$
41.76$ 22,884.48$ 36.20$ 19,837.60$ 49.93$ 27,361.64$
21.87$ 33,920.37$ 18.00$ 27,918.00$ 35.09$ 54,424.59$
1.66$ 76,517.70$ 2.30$ 106,018.50$ 2.57$ 118,464.15$
13.43$ 4,472.19$ 9.00$ 2,997.00$ 8.64$ 2,877.12$
2.01$ 5,161.68$ 4.85$ 12,454.80$ 4.18$ 10,734.24$
79.00$ 342,386.00$ 75.30$ 326,350.20$ 77.62$ 336,405.08$
75.32$ 435,274.28$ 70.05$ 404,818.95$ 70.62$ 408,112.98$
1,253.52$ 5,014.08$ 1,453.00$ 5,812.00$ 1,536.08$ 6,144.32$
1,378.88$ 16,546.56$ 1,817.00$ 21,804.00$ 1,592.97$ 19,115.64$
1,554.37$ 3,108.74$ 2,180.00$ 4,360.00$ 1,706.75$ 3,413.50$
1,805.07$ 3,610.14$ 2,180.00$ 4,360.00$ 1,877.43$ 3,754.86$
63.18$ 4,296.24$ 71.45$ 4,858.60$ 93.30$ 6,344.40$
70.20$ 14,040.00$ 76.30$ 15,260.00$ 100.13$ 20,026.00$
78.22$ 2,503.04$ 78.75$ 2,520.00$ 104.68$ 3,349.76$
122.34$ 6,361.68$ 115.00$ 5,980.00$ 116.06$ 6,035.12$
4,200.00$ 4,200.00$ 19,500.00$ 19,500.00$ 4,293.35$ 4,293.35$
15,042.27$ 15,042.27$ 0.01$ 0.01$ 19,984.25$ 19,984.25$
25.07$ 651.82$ 15.00$ 390.00$ 27.76$ 721.76$
113.51$ 2,951.26$ 65.00$ 1,690.00$ 87.03$ 2,262.78$
1,111,111.11$ 1,113,838.26$ 1,166,083.58$
OMG Midwest Inc. dba
Minnesota Paving & Materials GMH Asphalt Corporation North Valley, Inc.
Page 3 of 4
BID TABULATION
CITY OF OTSEGO
2024 OTSEGO STREET RENEWAL PROJECT
Bids were opened at 2:00 p.m., May 8, 2024.
There were ten (10) bids received, as shown herein.
Base Bid
ITEM
NO.
Mn/DOT
SPEC. NO.ITEM DESCRIPTION UNIT
ESTIMATED
QUANTITY
1 2021.501 MOBILIZATION LS 1
2 2104.503 REMOVE SEWER PIPE (STORM)LF 516
3 2104.504 REMOVE BITUMINOUS PAVEMENT (DRIVEWAYS)SY 1404
4 2104.513 SAWING BIT PAVEMENT (FULL DEPTH)LF 2014
5 2104.603 SPRINKLER SYSTEM ALLOWANCE LS 1
6 2105.607 HAUL & STOCKPILE EXCESS MATERIAL (LV)CY 561
7 2105.607 HAUL & DISPOSE OF EXCESS MATERIAL (LV) [VOG ONLY]CY 1242
8 2211.509 AGGREGATE CLASS 5 (DRIVEWAY)TON 99
9 2211.509 AGGREGATE SHOULDER (FROM EXCESS RECLAIM)CY 548
10 2211.509 BIT. DRIVEWAY TYPE SP 9.5 WEARING COURSE MIXTURE (2,B)SY 1551
11 2215.504 FULL DEPTH RECLAMATION SY 46095
12 2232.501 MILL BITUMINOUS SURFACE SY 333
13 2357.506 BITUMINOUS MATERIAL FOR TACK COAT GAL 2568
14 2360.509 TYPE SP 9.5 WEARING COURSE MIXTURE (2,B)TON 4334
15 2360.509 TYPE SP 12.5 NON WEAR COURSE MIXTURE (2,B)TON 5779
16 2501.502 12" RC PIPE APRON EACH 4
17 2501.502 15" RC PIPE APRON EACH 12
18 2501.502 18" RC PIPE APRON EACH 2
19 2501.502 24" RC PIPE APRON EACH 2
20 2500.503 12" RC PIPE CULVERT LF 68
21 2501.503 15" RC PIPE CULVERT LF 200
22 2501.503 18" RC PIPE CULVERT LF 32
23 2501.503 24" RC PIPE CULVERT LF 52
24 2563.601 TRAFFIC CONTROL LS 1
25 2575.505 TURF ESTAB. (EROSION CONT. MAT CAT 20 & SEED MIX 25-141)ACRE 1
26 2573.503 SILT FENCE, TYPE MS LF 26
27 2574.525 PULVERIZED TOPSOIL BORROW (LV)CY 26
Total Base Bid
UNIT PRICE EXTENSION
50,000.00$ 50,000.00$
9.50$ 4,902.00$
12.50$ 17,550.00$
2.75$ 5,538.50$
10,000.00$ 10,000.00$
24.00$ 13,464.00$
29.00$ 36,018.00$
42.00$ 4,158.00$
34.00$ 18,632.00$
30.00$ 46,530.00$
2.30$ 106,018.50$
6.50$ 2,164.50$
0.01$ 25.68$
77.00$ 333,718.00$
73.00$ 421,867.00$
2,140.00$ 8,560.00$
2,225.00$ 26,700.00$
2,345.00$ 4,690.00$
2,790.00$ 5,580.00$
109.00$ 7,412.00$
117.00$ 23,400.00$
156.00$ 4,992.00$
179.00$ 9,308.00$
27,000.00$ 27,000.00$
10,000.00$ 10,000.00$
10.20$ 265.20$
56.00$ 1,456.00$
1,199,949.38$
Bituminous Roadways Inc.
Page 4 of 4
1
CITY OF OTSEGO
COUNTY OF WRIGHT
STATE OF MINNESOTA
RESOLUTION NO: 2024-37
ACCEPTING BIDS AND AWARDING CONTRACT
FOR THE 2024 STREET RENEWAL PROJECT
WHEREAS, pursuant to an advertisement for bids for the construction of the Otsego 2024 Street Renewal Project, City Project
No. 24-03, the improvement of streets within Vasseur’s Oak Grove 3rd and 4th Additions and Halls 1st, 2nd, and 3rd Additions,
bids were received, opened on May 8, 2024, and tabulated according to law, and the following bids were received complying
with the advertisement:
Contractor Total Base Bid
1. Knife River Corporation $919,516.23
2. Northwest Asphalt $1,017,797.06
3. Omann Brothers Paving Inc. $1,039,632.78
4. Asphalt Surface Technologies Corp. $1,070,659.53
5. Park Construction Company $1,082,706.38
6. Duininck, Inc. $1,095,250.85
7. Minnesota Paving & Materials $1,111,111.11
8. GMH Asphalt Corporation $1,113,838.26
9. North Valley, Inc. $1,166,083.58
10. Bituminous Roadways, Inc. $1,199,949.38
WHEREAS, it appears that Knife River Corporation of Sauk Rapids, Minnesota is the lowest responsible bidder.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF OTSEGO, MINNESOTA:
1. The Mayor and City Clerk are hereby authorized and directed to enter into a contract with Knife River Corporation of
Sauk Rapids, Minnesota in the name of the City of Otsego for the Otsego 2024 Street Renewal Project, City Project
No. 24-03, according to the plans and specifications therefore approved by the City Council and on file in the office of
the City Clerk.
2. The City Clerk is hereby authorized and directed to return forthwith to all bidders the bid bond made with their bids,
except that the bid bond of the successful bidder and the next lowest bidder shall be retained until a contract has
been signed.
2
ADOPTED by the Otsego City Council this 13th day of May, 2024.
MOTION BY:
SECONDED BY:
IN FAVOR:
OPPOSED:
CITY OF OTSEGO
__________________________________
Jessica L. Stockamp, Mayor
ATTEST:
__________________________________
Audra Etzel, City Clerk