Loading...
Item 3.8 Well 11 Electrical Equipment Installation Quotes and Authorize Request for City Council Action DEPARTMENT INFORMATION ORIGINATING DEPARTMENT REQUESTOR: MEETING DATE: Utilities Utility Manager Neidermeier August 12, 2024 PRESENTER(s) REVIEWED BY: ITEM #: Consent City Administrator/Finance Director Flaherty 3.8 – Well 11 Project STRATEGIC VISION MEETS: THE CITY OF OTSEGO: Is a strong organization that is committed to leading the community through innovative communication. X Has proactively expanded infrastructure to responsibly provide core services. Is committed to delivery of quality emergency service responsive to community needs and expectations in a cost-effective manner. Is a social community with diverse housing, service options, and employment opportunities. Is a distinctive, connected community known for its beauty and natural surroundings. AGENDA ITEM DETAILS RECOMMENDATION: City staff recommends the City Council accept quotes and authorize Well 11 Electrical Equipment Install. ARE YOU SEEKING APPROVAL OF A CONTRACT? IS A PUBLIC HEARING REQUIRED? No No BACKGROUND/JUSTIFICATION: Well 11 is Otsego’s newest municipal well, located on the West WWTF parcel. A control panel required for its operations was approved at the July 8, 2024, City Council meeting. A subsequent quote package was sent to three electrical installation contractors for the on-site installation of this control panel. AE2S Engineering provided plans, specifications, sought and received three quotes from three electrical contractors ranging from $55,947.00 to $62,500.00. Design Electric provided the low quote for the project within the Engineering estimates of $65,000.00. Funding for this addition is part of Well 11 funds supported within the water project fund. Design Electric has worked with Otsego Utility projects in the past with an excellent standard practice of workmanship and communication. Staff and Engineering provide recommendation to accept Design Electric quote for Well 11 Electrical Equipment Installation. SUPPORTING DOCUMENTS ATTACHED: • Recommendation of Award • Quote Tabulation • Proposal: Design Electric • Project Cost Summary POSSIBLE MOTION PLEASE WORD MOTION AS YOU WOULD LIKE IT TO APPEAR IN THE MINUTES: Motion to accept quotes and to authorize Design Electric to complete the Well 11 Electrical Equipment Installation in the amount of $55,947.00. BUDGET INFORMATION FUNDING: BUDGETED: Fund 601 – Water Utility Yes August 2, 2024 Mr. Kurt Neidermeier Utility Manager City of Otsego 13400 90th St. NE Otsego, MN 55330 Re: Recommendation for Notice of Award Well 11 Electrical Equipment Install City of Otsego, Minnesota Dear Mr. Neidermeier: Pursuant to the authority of the Otsego City Council and following proper legal advertisement, the quote opening for the Well 11 Electrical Equipment install was conducted on Friday, August 2, 2024 at 2:00 PM through electronic email quote process offered privately to three (3) electrical contractors deemed capable of performing the work. A total of three (3) sealed quote were received for the project. The three quotes submitted was completed in accordance with the project manual. The lowest quote received was $55,947 as a comparison of the quote received the Engineer’s opinion of probable cost for the project was $65,000. Based on a review of the quotes received and pending City official’s acceptance of the contract price, Advanced Engineering and Environmental Services, Inc. (AE2S) recommends that the City award a contract to Design Electric, Inc for Otsego’s well 11 electrical equipment install. Design Electric, Inc was the lowest responsive and responsible quote for the combined Lump Sum Base bid price of $55,947. AE2S truly appreciates the opportunity to be able to continue working with the City of Otsego on this important project for the City. Should you have any questions or comments please feel free to contact me. Sincerely, Mark Ruda, PE Senior Project Engineer AE2S Otsego Well 11 to WH3 Connection Panel Install City of Otsego Otsego, MN AE2S Project No. 05409-2023-011 Bid Opening Time 2:00 PM CDT Date Friday, August 2, 2024 Contractor Bid receivedGeneral Construction Base Bid 1 Design Electric, Inc.P $55,947.00 2 Erickson Electric Company, Inc.P $56,370.00 3 Killmer Electric Co., Inc.P $62,500.00 Engineer's Estimate $65,000.00 Mark Ruda, PE Advanced Engineering and Environmental Services, LLC Water Tower Place Business Center 6901 E Fish Lake Rd, Suite 184 Maple Grove, MN 55369 Tel: 763-763-5036 Page 1 of 2 PROPOSAL Design Electric, Inc. 4807 Heatherwood Road PO Box 1252 St Cloud, MN 56301-56302 COMMERCIAL INDUSTRIAL TRANSPORTATION PROPOSAL SUBMITTED TO: PHONE DATE AE2S 8/02/24 STREET JOB NAME Otsego Well 11 CITY, STATE AND ZIP CODE JOB LOCATION Otsego MN FAX DATE OF PLANS ATTN: JOB PHONE 8/02/24 Mark Ruda We hereby submit specifications and estimates for: Included Wire, conduit, and labor New pad New bollards Fiber and feeder to new panel Install new cabinet Wire well. Excluded Programming of new panel CP panel by others Base Bid of $55,947.00 We propose hereby to furnish material and labor – complete in accordance with the above specifications, for the sum of: See above Dollars $ Payment to be made as follows: All material is guaranteed to be as specified. All work to be completed in a professional manner according to standard practices. Any alteration or deviation from above specifications involving extra costs will be executed only upon written orders, and will become an extra charge over and above the estimate. All agreements contingent upon strikes, accidents or delays beyond our control. Owner to carry fire, tornado and other necessary insurance. Our workers are fully covered by Work er’s Compensation Insurance. Price above is based on standard AGC contract and insurance limits. We reserve the right to charge for any attorney fees that would be associated with collecting any money owed on this contract. There is no bond included unless noted otherwise. Authorized Signature: Note: This proposal may be withdrawn by us if not accepted within 30 days. Page 2 of 2 Phone: (320) 252-1658 www.DesignElect.com Fax: (320) 252-4276 Acceptance of Proposal – The above prices, specifications and conditions are satisfactory and are hereby accepted. You are authorized to do the work as specified. Payments will be made as outlined above. Date of Acceptance: ____________________________________ Signature: ________________________________ Signature: ________________________________ _________ Description As Bid/Actual Cost Projected Cost As-Bid/Actual + Projected CIP Budget 1,350,000.00$ Well #11 Electrical 161,891.00$ Well #11 Drilling and Internals (Traut)388,346.00$ Raw Watermain (Kuechle)217,044.80$ Pumphouse Internals and Electrical upgrades Projected 150,000.00$ Site work at West WWTF (Rice Lake)48,959.00$ Engineer HAA 90,808.62$ Engineering AE2S 106,400.00$ SCADA Integration AE2S Projected 35,000.00$ 1,013,449.42$ 185,000.00$ 1,198,449.42$ 1,350,000.00$ Well #11 Cost Summary