Loading...
Item 3.4 East Wastewater Treatment Facility Pretreatment Channel Lining Request for City Council Action DEPARTMENT INFORMATION ORIGINATING DEPARTMENT REQUESTOR: MEETING DATE: Utilities Utility Manager Neidermeier September 23, 2024 PRESENTER(s) REVIEWED BY: ITEM #: Consent Assistant City Administrator/Human Resources Hille 3.4 – East Wastewater Treatment Facility Pretreatment Channel Lining. STRATEGIC VISION MEETS: THE CITY OF OTSEGO: Is a strong organization that is committed to leading the community through innovative communication. X Has proactively expanded infrastructure to responsibly provide core services. Is committed to delivery of quality emergency service responsive to community needs and expectations in a cost-effective manner. Is a social community with diverse housing, service options, and employment opportunities. Is a distinctive, connected community known for its beauty and natural surroundings. AGENDA ITEM DETAILS RECOMMENDATION: City staff recommends City Council authorize channel lining for East WWTF pretreatment building. ARE YOU SEEKING APPROVAL OF A CONTRACT? IS A PUBLIC HEARING REQUIRED? No No BACKGROUND/JUSTIFICATION: The 2024 Utility budget includes $100,000 within the Rehabilitation and Reconditioning detail of the Sewer Fund for the East Wastewater Treatment Facility pretreatment channel lining. Deterioration of the concrete channel over the past two decades from hydrogen sulfide has caused erosion and softened the concrete, impacting structural integrity. Repairs are necessary for conveyance of influent wastewater through the pretreatment building and its process, including metering, screening, and grit removal. Channel lining consists of coating preparations including hydro blasting, hand tooling, patching and descaling surfaces. A liquid bypass is required for one week to allow for preparations and cure time. Staff will conduct bypass and combo unit services with the coating team for a project reduction of $21,000. Pipe work will be procured to support this project separately quoted for $7,113.67. Hiperline has conducted work with us in the past and their product far exceeds alternatives, important for the environment and conditions this room sustains. Future expansion of this building will not impact the channel reconditioning, further benefiting best coating recommendation. Staff recommends authorization of Hiperline quote for high performance lining of the influent channel for $62,780.00. SUPPORTING DOCUMENTS ATTACHED: • Hiperline Quote • Visual Aid POSSIBLE MOTION PLEASE WORD MOTION AS YOU WOULD LIKE IT TO APPEAR IN THE MINUTES: Motion to authorize East Wastewater Treatment Facility influent channel lining quote from Hiperline for $62,780.00. BUDGET INFORMATION FUNDING: BUDGETED: Fund 602 – Sanitary Sewer Utility (100%) Yes 15725 US Hwy 12 SW Cokato, MN 55321 Tel: 320.286.2471 Email: greg@HIPERLINE.com Web: www.HIPERLINE.com ◊ www.HIPERLINE.com ◊ Job Name: Wastewater Treatment Plant – Influent Channels Quote Date: April 26th, 2024 Job Location: Otsego, Minnesota – Wastewater Treatment Plant - Revised 09/05/2024 - Engineer: City of Otsego, Minnesota – Attn Seth Wilkes Class of Work: SpectraShield Lining Influent Channel Walls & Floors Addenda: Description Total Square Feet Cost SpectraShield Lining Influent Channels 772 $50,180.00 Climate Control $ 3,360.00 Disposal $ 5,040.00 Mobilization $ 4,200.00 TOTAL $62,780.00 Notes: ▪ Hiperline to properly prepare the specified concrete influent channel walls & floors by using a combination of hydro -blasting with up to 40,000psi water pressure, hand tooling, hot high pressure washing, and last install the SpectraShield Lining System throughout the channel walls & floors as drawn and agreed upon. ▪ Hiperline & owner to work together to remove/raise equipment and floor grating out of the way as much as possible. ▪ Lining process includes surface preparation, patching, descaling, grouting, and lining with the SpectraShield® Liner System. ▪ Owner shall be responsible for providing a water source for surface preparation. ▪ Owner is responsible to set up and coordinate the bypass as necessary to keep the channels offline for up to one week. ▪ Owner to provide all vac truck services and staff to vac/clean out channels as necessary when requested by Hiperline. ▪ Invoices are Net 30 Days, no retainage. Interest charge of 1.5% per month for invoices over 30 days. Customer Name ______________________________________ Customer Signature ______________________________________ Send Invoice To _______________________________________