Loading...
Item 3.9 Wellhouse 3 Well 11 Improvements Request for City Council Action DEPARTMENT INFORMATION ORIGINATING DEPARTMENT REQUESTOR: MEETING DATE: Utilities Utility Manager Neidermeier September 23, 2024 PRESENTER(s) REVIEWED BY: ITEM #: Consent Assistant City Administrator/Human Resources Hille 3.9 - Wellhouse 3, Well 11 Improvements STRATEGIC VISION MEETS: THE CITY OF OTSEGO: Is a strong organization that is committed to leading the community through innovative communication. X Has proactively expanded infrastructure to responsibly provide core services. Is committed to delivery of quality emergency service responsive to community needs and expectations in a cost-effective manner. Is a social community with diverse housing, service options, and employment opportunities. Is a distinctive, connected community known for its beauty and natural surroundings. AGENDA ITEM DETAILS RECOMMENDATION: City staff recommends City Council to authorize Rice Lake Construction Group to complete the work associated with the Wellhouse 3, Well 11 Connection. ARE YOU SEEKING APPROVAL OF A CONTRACT? IS A PUBLIC HEARING REQUIRED? No No BACKGROUND/JUSTIFICATION: Well 11 is Otsego’s newest municipal well, located on the West WWTF parcel. A test well was completed in 2023 successfully finding water within the Tunnel City Wonewoc (TCW) aquifer. The expected capacity based on test pumping is 400 gallons per minute. Currently pipework from the well head site to the well house is being installed, substantially complete by Oct 4. The pipework connection from Well 11 to Wellhouse 3 is needed to advance water production capabilities at the site, including tie in with the existing header pipe, backflow prevention devices and metering. AE2S Engineering provided drawings and specifications and sought quotes from four (4) prime contractors for this work. Rice Lake Construction Group provided the lowest responsive and responsible quote for the combined lump sum base bid price of $104,000 within Engineering estimate of $150,000. Entire project costs are in line with Capital Improvement Planning and Budgeted financing. CIP defined cost is $1,350,000 with a current bid and actual costs including this proposal at $1,117,449.42. Remaining items for project completion is SCADA integration projected at $35,000. Rice Lake Construction Group is base out of Deerwood, MN with a long history of water and wastewater work in Minnesota. They are currently working with Otsego on several projects including the West WWTF Improvements Phase 1 and the East WWTF Biosolids Building Project providing staff and Engineering recommendation to accept Rice Lake’s quote for completing this work. SUPPORTING DOCUMENTS ATTACHED: • AE2S recommendation • Bid Tab Summary • Rice Lake’s Quote POSSIBLE MOTION PLEASE WORD MOTION AS YOU WOULD LIKE IT TO APPEAR IN THE MINUTES: Motion to accept Rice Lake Construction Group’s quote for Wellhouse 3, Well 11 Improvements for $104,000.00. BUDGET INFORMATION FUNDING: BUDGETED: Fund 601 – Water Utility (100%) Yes September 16, 2024 Mr. Kurt Neidermeier Utility Manager City of Otsego 13400 90th St. NE Otsego, MN 55330 Re: Recommendation for Notice of Award Wellhouse No. 3 Well 11 Improvements City of Otsego, Minnesota Dear Mr. Neidermeier: Pursuant to the authority of the Otsego City Council and following proper legal advertisement, the quote opening for the Wellhouse No. 3 Well 11 Improvements project was conducted on Monday, September 16, 2024 at 2:00 PM through electronic email quote process offered privately to four (4) prime contractors deemed capable of performing the work. A total of four (4) sealed quotes were received for the project. All four (4) quotes submitted were completed in accordance with the project requirements. Advanced Engineering and Environmental Services, Inc. (AE2S) has reviewed the quote results, conferred with City staff, and recommends that the City of Otsego award a contract to the apparent lowest quoted contractor. The lowest responsive and responsible quote was from Rice Lake Construction Group for the combined lump sum base bid price of $104,000. AE2S truly appreciates the opportunity to be able to continue working with the City of Otsego on this important project for the City. Should you have any questions or comments please feel free to contact me. Sincerely, Ryan Hanson, PE Project Engineer AE2S Otsego Wellhouse No. 3 Well 11 Improvements City of Otsego Otsego, MN AE2S Project No. P05409-2023-011 Quotes Due 2:00 PM CDT Date Monday, September 16, 2024 Contractor QuoteClarification 1 & 2 Acknowledgement1 Market & Johnson, Inc. 2 Rice Lake Construction Group 3 Municipal Builders, Inc. 4 Magney Construction, Inc. Engineer's Estimate Ryan Hanson, PE Advanced Engineering and Environmental Services, LLC Water Tower Place Business Center 6901 E Fish Lake Rd, Suite 184 Maple Grove, MN 55369 Tel: 763-763-5036 Total Lump Sum Price $148,900.00 $104,000.00 $117,114.00 $141,000.00 $150,000.00 September 16, 2024 AE2S 6901 East Fish Lake Rd. Suite 184 Maple Grove, MN 55369-5457 Attn: Ryan Hanson Re: Wellhouse No. 3 Well 11 Improvements Proposal Ryan, Rice Lake has reviewed the drawings and performance specifications for the Otsego Wellhouse No. 3 Well 11 Improvements Project that were sent to us on 9/3/2024. We also acknowledge receipt of Clarification No. 1 that was sent on 9/11/2024. The total cost to complete the work shown in plans, specifications and clarification No. 1 is $104,000.00. Please let me know if you have any questions. Sincerely, RICE LAKE CONSTRUCTION GROUP Matt Perpich Project Manager