Loading...
ITEM 3.16 Culvert replacement�, Request for OF City Council Action Otkzo MINNESOTA V DEPARTMENT INFORMATION ORIGINATING DEPARTMENT: REQUESTOR: MEETING DATE: Public Works City Engineer Wagner September 22, 2014 PRESENTER(s): REVIEWED BY: ITEM #: City Engineer Wagner City Administrator Johnson 3.16 AGENDA ITEM DETAILS RECOMMENDATION: Staff recommends replacing corroded culvert under 77th St to the contractor with the lowest quote received. ARE YOU SEEKING APPROVAL OF A CONTRACT? IS A PUBLIC HEARING REQUIRED? Yes I No BACKGROUNDMUSTIFICATION: A culvert near the corner of 77th St and Nashua Ave has corroded to the point that replacement is necessary. The existing culvert is also too short which creates slopes on either side that are too steep. The south side which is near a driveway is 1:1 and the north side is approximately a 2:1 slope. The existing culvert is a 15" corrugated metal pipe. Any centerline culvert in the City has been replaced with a minimum size of 24" to minimize issues of plugging. Therefore we are recommending both extending the length of the culvert to help with slope issues and increasing the size to minimize plugging concerns. In most cases we would also recommend changing from corrugated metal pipe to concrete for longevity reasons but in this case the street is planned for a reroute within the next 10 to 20 years so corrugated metal pipe makes better financial sense. We have prepared a plan for quoting process as the work is on a fairly busy street and requires closure of the street. Working with a contractor with larger equipment will ensure the work can be completed in one work day minimizing the inconvenience of the detour for the residents and the traveling public. Attached are the plan and the estimate of cost. The project is located within the "out district" storm water area. The "out district" fund has $62,590 according the finance department. We are looking for approval to obtain some quotes and would like this project completed prior to Thanksgiving but the earlier we can complete it the better the gravel surface can set up prior to the 1St snowfall. So far one quote was received and it was above the engineers estimate. The quote received was from Northdale Construction of Otsego and is in the amount of $14,614.00. Due to the simplicity of the project and that Public Works staff can complete much of the observation we would anticipate engineering and overhead not to exceed 10% of construction cost. The project costs would be anticipated to be approximately $16,000 using Northdale's SUPPORTING DOCUMENTS: X ATTACHED NONE • Plans and Specification • Engineers Estimate of Cost • Quote from Northdale Construction MOTION: (Please word motion as you would like it to appear in the minutes.) Motion to approve authorizing staff to enter the City into a Service Contract with the Contractor that provides the lowest quote. BUDGET INFORMATION FUNDING: BUDGETED: X YES Storm Sewer— "Out District" NO ACTION TAKEN ❑ APPROVED AS REQUESTED ❑ DENIED ❑ TABLED ❑ OTHER (List changes) COMMENTS: N F I y z Wo4� •w F � z V J 2 U WW W F- N 1 /rllf it dollop 1 it 1 I 1 T i i� i I yzxY C ciw� 3 Y aot: o5e"+ z t�Sa a -3, e3 a •3, �a i i � I ilii ��7 \\.\ ' d �� •� FM\ 1 Wiz. 4`il 1 I I c $€^pa Illi i� 1 � i •--- < i343 Ifjlr. " '� :'moi✓'''?i ` - � �:.. III � I �I � I 1 l� � I �s DANEWAY N• 1 afi it � 1 lry Zjo ^I 1 I N I 1 �.I F gr 6 ey2N IrNW tett ttII t'9G\t'>\ttSi l[Lo\IIA�.n� Y Wit. �aed ti y 0 0 0 0 0 .... 0 0 0 0 0 00 oa o 0 0 W W J J J J J (n J F❑ U N U Fj w °' z 0 LU U m d J N dLu d Oa W O (� N W Z O W F O a O O ❑ u.} Q It N IWL m U O Z ZI W K Z J ZO LL V` (La 0 O F J Z O Z Z O Q V U �. Z O OF O a O Z J W U Q W N W m tQ ni L, LL U �U?KI-uJ-FU Um )i woraMa��r-�o�� tz Otsego - Culvert Replacement - 77th e Unit Price Total Mobilization: IIs $2,350.00 $2,350.00 Culvert Removal 42 If $12.50 $525.00 Tree Removal 3 ea $275.00 $825.00 24" CMP 54 If $77.50 $4,185.00 24" FES 2 ea $475.00 $950.00 Regrade slopes 1 1s $2,150.00 $2,150.00 Flexmat 22 sy $24.50 $539.00 Fiber Blanket/seed 140 sy $3.50 $490.00 Class 5 31 ton $55.00 $1,705.00 Misc items 1 Is $895.00 $895.00 Total $14,614.00