Loading...
Item 3.4 Lift Station 4 Improvement Project Professional Services Agreement Request for City Council Action DEPARTMENT INFORMATION ORIGINATING DEPARTMENT REQUESTOR: MEETING DATE: Utilities Utility Manager Neidermeier January 27, 2025 PRESENTER(s) REVIEWED BY: ITEM #: Consent AE2S Engineer Schaefer City Administrator/Finance Director Flaherty 3.4 – Lift Station #4 Improvement Project STRATEGIC VISION MEETS: THE CITY OF OTSEGO: Is a strong organization that is committed to leading the community through innovative communication. X Has proactively expanded infrastructure to responsibly provide core services. Is committed to delivery of quality emergency service responsive to community needs and expectations in a cost-effective manner. Is a social community with diverse housing, service options, and employment opportunities. Is a distinctive, connected community known for its beauty and natural surroundings. AGENDA ITEM DETAILS RECOMMENDATION: City Staff is recommending City Council approval of a professional services agreement. ARE YOU SEEKING APPROVAL OF A CONTRACT? IS A PUBLIC HEARING REQUIRED? Yes No BACKGROUND/JUSTIFICATION: The Sanitary Sewer Utility Capital Improvement Plan includes funding in 2025 and 2026 for the Martin Farms Lift Station improvements. The site began operation in 2004 to collect and convey wastewater flows from the area to the West Wastewater Treatment Facility, opening a large service area for development. This lift station equipment currently includes the City’s three largest submersible pumps at 60 horsepower each with a design capacity of 889,350 gallons per day. Current flows reach 250,000 gallons per day and the pumps are sized to meet ultimate capacities. The proposed project will improve reliability for this key piece of City infrastructure. The project scope includes a prefabricated electrical structure (replacing an existing control panel and internal components), adds an onsite emergency generator, and provides capacity for an upcoming drinking water well with power supply and controls that will also be on the same emergency generator. Improvement timing corresponds to the site’s current control panel’s age, condition, and technology. Motor starter equipment for these pumps will improve to variable frequency drives for energy efficiency and controlled flow to the West WWTF benefiting treatment operations. A prefab building provides non-intrusive construction and seamless transfer of operation while mindful of aesthetics and security. Project scheduling identifies a 2025 design and project bidding with construction completion in 2026. A Professional Service Scope was presented to the Public Works Subcommittee on January 22, 2025, with recommendation for approval by the full Council. The City Attorney has reviewed the Agreement along with staff providing recommendation for approval. SUPPORTING DOCUMENTS ATTACHED: • Professional Services Agreement POSSIBLE MOTION PLEASE WORD MOTION AS YOU WOULD LIKE IT TO APPEAR IN THE MINUTES: Motion to approve a Professional Services Agreement between the City and Advanced Engineering and Environmental Services, LLC (AE2S) for the Martin Farms Lift Station Improvements Project in the amount of $97,800.00. BUDGET INFORMATION FUNDING: BUDGETED: Fund 602 – Sanitary Sewer Utility Yes