Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
11-08-04 CC
4.1 i CITY OF OTSEGO REQUEST FOR COUNCIL ACTION November 8, 2004 ITEM NUMBER: ITEM DESCRIPTION: PREPARED BY: 4.1. Update on East WWTP City Administrator 4.1. The engineers from Bonestroo will be here to update the Council on the plans for the East Waste Water Treatment Plant. The main decision they will be looking for from the Council is whether to bid the plant for one million gallons per day or one and a half million gallons per day. STAFF RECOMMENDATION None. CLAIMS LIST CITY COUNCIL MEETING NOVEMBER 8, 2004 TO: Judy Hudson Attached is the Claims List for the City Council. For more details, please refer to the Check Detail Registers. If you have any questions regarding this service, please let me know. Claims Register APPROVED PAYROLL 10/27/04 GRAND TOTAL 10-27-2004 $ 621,536.14 10-28-2004 $ 17,661.00 11-05-2004 $1,292,999.94 $ 23,988.74 $ 1,956,185.82 If you have any questions or if you would like to review this list further, please let me know. Kathy Grover Bookkeeper CITY OF OTSEGO 11/05/04 11:29 AM Page 1 *Check Summary Register© NOVEMBER 2004 Name Check Date Check Amt 10100 BANK OF ELK RIVER UnPaid 10,000 LAKES CHAPTER OF ICC UnPaid ANDY JR SIGNS UnPaid BARTON SAND & GRAVEL CO UnPaid BLACKWOODS RESTAURANT Unpaid BLUE CROSS BLUE SHIELD OF Unpaid BOISE CASCADE OFFICE PROD UnPaid BONESTROO ROSENE ANDERLI UnPaid BRIAN ROBOLE UnPaid BULOW INC UnPaid CHARTER COMMUNICATIONS UnPaid CITY OF MONTICELLO UnPaid CUB FOODS ELK RIVER UnPaid DAMON FARBER ASSOCIATES UnPaid DXS TOTAL HOME CENTER UnPaid EARL F ANDERSON INC UnPaid ECM PUBLISHERS INC UnPaid ELK RIVER PRINTING & PARTY UnPaid EMPLOYER PLAN SERVICES IN UnPaid FINKEN'S WATER CARE UnPaid GLENS TRUCK CENTER INC UnPaid HAKANSON ANDERSON ASSOC UnPaid HALLMAN OIL COMPANY UnPaid HAROLD LEONARD UnPaid HEARTHSTONE BUILDERS UnPaid ICMA MEMBERSHIP RENEWAL UnPaid ICMA RETIREMENT TRUST UnPaid INTERNATIONAL CODE COUNCI UnPaid JACQUIE ROGNLI UnPaid LONG & SONS UnPaid MAUS FOODS UnPaid MN DEPT OF TRANSPORTATION UnPaid MONTICELLO ANIMAL CONTROL UnPaid NAPA OF ELK RIVER INC Unpaid NOVAK-FLECK INC UnPaid PITNEY BOWES UnPaid PLAISTED COMPANIES UnPaid PUBLIC EMPLOYEES RETIREME UnPaid RANDY'S SANITATION UnPaid RONALD L & KIMBERLY G BEAU UnPaid SHARPER HOMES UnPaid SOFTRONICS UnPaid STS CONSULTANTS LTD UnPaid T & S TRUCKING BUFFALO INC UnPaid TARGET STORES UnPaid UNLIMITED ELECTRIC INC Unpaid US BANK UnPaid VINYL GRAPHICS UnPaid WRIGHT COUNTY AUDITOR -TRE UnPaid WRIGHT COUNTY HIGHWAY DE UnPaid WRIGHT-HENNEPIN CO-OP ELE UnPaid XEROX CORPORATION $60.00 DEC 16 CLASS - TIM $31.95 HARD HAT LOGOS $309.06 CLASS 5 $667.22 ELECTIONS $6,349.00 BLDG -DEC $323.47 PW SUPPLIES $175,060.16 EAST WWTP III $420.00 DOT INSPECTION $65,450.00 SEWER/WATER REFUND $100.01 ;MONTHLY FEE $3,438.25 4TH QTR FIRE $97.32 SUPPLIES $1,489.51 ,PARKS CONST ADMIN $62.77 HARDWARE FOR SHOP $86.09 HC PARKING SIGNS $788.23 VIEW $86.27 BUSINESS CARDS - PETE MERGES $1,324.51 ADMIN OCT-NOV $68.11 13620 90TH ST $79.04 194 FORD TRK $169,220.18 , .PC 4TH $809.55 .OFF ROAD DIESEL $646.30 'CELL $1,000.00 15612 79TH LNDSCP $548.00 MIKE - RENEWAL $422.31 PPE 10/23 CK DTD 10/27 $209.99 BOOKS $875.00, SEPT/OCT VIEW $1,069.13 CLEANING - OCT $94.69• ELECTION $88.93; TRAFFIC CONTROL DEVICES $105.00 3 PICK UPS $16.33 LUBRICAN $1,000.00 11365 79TH LNDSCP $548.53 POSTAGE $1,292.51 ICE CONTROL SAND $2,228.88 PPE 10/23 CK DTD 10/27 $141.79 8899 NASHUA $3,220.00 MACIVER ROAD EASEMENT $2,500.00, 7963 LANDER LNDSCP $842.54 LABOR $6,688.00 LIFT STATION RIVERWOOD NATIONAL $640.00 ST SWEEP 77TH/PUMPHOUSE $24.62 DAWN SOAP $930.53 MISC WIRING $794,868.76 IMPRO BOND 1999B $70.00 VOTE SIGNS $44,262.40 SHERIFF PATROL - NOV 04 $22.10 SIGNS/SUPPLIES $1,815.26 MONTHLY SERVICE $507.66 MONTHLY FEE Total Checks $1,292,999.9:4 CITY OF OTSEGO 11/05/04 11:29 AM Page 2 *Check Summary Register@ NOVEMBER 2004 Name Check Date Check Amt FILTER: None CITY OF OTSEGO 11/05/04 11:31 AM Page 1 *Check Detail Register© NOVEMBER 2004 Check Amt Invoice Comment 10100 BANK OF ELK RIVER Unpaid 10,000 LAKES CHAPTER OF ICC E 250-42410-360 Education/Training/Conferences $60.00 DEC 16 CLASS - TIM Total 10,000 LAKES CHAPTER OF ICC $60.00 Unpaid �ANDY JR SIGNS E 250-42410-203 Supplies - General $31.95 1301 HARD HAT LOGOS Total ANDY JR SIGNS $31.95 Unpaid BARTON SAND & GRAVEL CO ; E 101-43100-370 Sand andGravel $309.06 4183 iCLASS 5 Total BARTON SAND & GRAVEL CO $309.06 Unpaid BLACKWOODS RESTAURANT s E 101-41410-205 Election Supplies $667.22 747 : ELECTIONS Total BLACKWOODS RESTAURANT $667.22 Unpaid BLUE CROSS BLUE SHIELD OF MN 4 E 101-41600-123 Health $671.00 FINANCE - DEC E 101-41400-123 Health $892.00 ADMIN - DEC E 101-43100-123 Health $1,327.00 PW - DEC E 250-42410-123 Health $3,459.00 BLDG -DEC Total BLUE CROSS BLUE SHIELD OF MN $6,349.00 Jnpaid BOISE CASCADE OFFICE PRODUCTS E 101-41400-201• Office Supplies $148.50 164024 OFFICE SUPPLIES E 101-43100-203 Supplies - General $17.40 164024 PW SUPPLIES E 101-41400-201 Office Supplies $138.93 404298 OFFICE SUPPLIES E 250-42410-201 Office Supplies $18.64 995734 j BLDG - SUPPLIES Total BOISE CASCADE OFFICE PRODUCTS $323.47 Unpaid BONESTROO ROSENE ANDERLIK E 429-43256-302 Engineering Fees $152,611.15 113428 EAST WWTP III E 430-43256-302 Engineering Fees $22,449.01 113429 WEST WWTP Total BONESTROO ROSENEANDERLIK $175,060.16 Unpaid BRIAN ROBOLE E101-43100-310 Miscellaneous $420.00 6807 DOT INSPECTION Total BRIAN ROBOLE $420.00 Unpaid BULOW INC G701-22410 RWN SEWER/WATER FEE $65,450.00 SEWERIWATER REFUND Total BULOW INC $65,450.00 Unpaid CHARTER COMMUNICATIONS E 101-41400-390 Contracted Services $100.01 MONTHLY FEE Total CHARTER COMMUNICATIONS $100.01 Unpaid CITY OF MONTICELLO E 213-42200-390 Contracted Services $3,206.25 7760 4TH QTR FIRE E 101-42710-390 Contracted Services $232.00 7760 SEPT ANIMAL CONTROL Total CITY OF MONTICELLO $3,438.25 Unpaid CUB FOODS ELK RIVER E101-41400-203 Supplies -General $97.32 SUPPLIES Total CUB FOODS ELK RIVER $97.32 Unpaid DAMON FARBER ASSOCIATES E 203-45210-390 Contracted Services $541.88 16521 PARKS CONST ADMIN CITY OF OTSEGO 11/05/04 11:31 AM Page 2 *Check Detail Register© NOVEMBER 2004 Check Amt Invoice Comment E 203-45210-390 Contracted Services $947.63 16522 �LILYPOND Total DAMON FARBER ASSOCIATES $1,489.51 Unpaid DXS TOTAL HOME CENTER E 101-41410-205 Election Supplies $14.45 858713 'SUPPLIES E 101-43100-310 Miscellaneous $6.23 861566 HARDWARE FOR SHOP E 101-41410-205 Election Supplies $42.09 862215 SUPPLIES Total DXS TOTAL HOME CENTER $62.77 Unpaid EARL F ANDERSON INC E 101-43100-393 Street Signs $86.09 62896 HC PARKING SIGNS Total EARL F ANDERSON INC $86.09 Unpaid ECM PUBLISHERS INC E 101-43100-350 Print/Binding (GENERAL) $41.50 177756 SNOW PLOW AD E 101-41400-350 Print/Binding (GENERAL) $66.00 177809 PUBLIC HEARING E 101-41400-350 Print/Binding (GENERAL) $118.80 177810 PUBLIC HEARING E 101-41400-347 Newsletter $382.63 178169 VIEW PRINTING E 101-41400-350 Print/Binding (GENERAL) $56.10 178236 ELDON MARTIN E 101-41400-347 Newsletter $123.20 72067 VIEW Total ECM PUBLISHERS INC $788.23 Unpaid ELK RIVER PRINTING & PARTY PLU ° E 101-41400-350 Print/Binding (GENERAL) $86.27 20230 BUSINESS CARDS - PETE MERGES Total ELK RIVER PRINTING & PARTY PLU $86.27 Unpaid EMPLOYER PLAN SERVICES INC E 250-42410-123 Health $473.18 BLDG - OCT/NOV E 101-41400-123 Health $447.28 ADMIN OCT-NOV E 101-43100-123 Health $347.87 PW - OCT/NOV E 101-41600-123 Health $56.18 FINANCE - OCT/NOV Total EMPLOYER PLAN SERVICES INC $1,324.51 Unpaid FINKEN'S WATER CARE E 101-41940-390 Contracted Services $28.17 8899 NASHUA E 101-43100-310 Miscellaneous $10.12 13474 95TH SHOP E 101-41950-310 Miscellaneous $29.82 13620 90TH ST Total FINKEN'S WATER CARE $68.11 Unpaid GLENS TRUCK CENTER INC i k E101-43100-220 Repair/Maint Supply (GENERAL) $34.26 1242810051 94 FORD TRK E101-43100-220 Repair/Maint Supply (GENERAL) $44.78 1242810051' 92 FORD TRK Total GLENS TRUCK CENTER INC $79.04 Unpaid HAKANSON ANDERSON ASSOC INC G 701-22377 OTSEGO WEST PP $3,914.53 11955 OTSEGO PRESERVE G 701-22384 FOREST HILLS $303.39 11956 FOREST HILLS G 701-22374 KITTREDGE FINAL $220.15 11957 KITTREDGE 2,3,4 G 701-22408 Prairie Creek 6th $828.27 11958 PC 6TH G'701-22387 ARBOR PLACE PPREZONE $313.13 11959 ARBOR PLACE G 701-22394 DUERR PROP $45.00 11960 HERITAGE - DUERR G 701-22398 PRAIRIE OAKS $2,265.27 11964 PRAIRIE OAKS G 701-22409 PLEASANT CRK 3RD $3,048.24 11968 PLST CRK 3 G 701-22415 NORIN'S LANDING $150.00 11969 NORINS LANDING G 701-22413 OTSEGO PRESERVE 11 $792.12 11970 OTSEGO PRES 2 G 701-22401 ZIMMERFARMS 3RD $843.61 11971 ZIMMER 3 G 701-22406 KITCROSS 5/6 $13,150.37 11973 KC 5/6 G 701-22396 ARBOR CREEK 2ND $13,119.42 11975 ARBOR CRK 2 G 701-22397 SUNRAY FARMS 2ND $3,930.50 11977 SUNRAY FARMS 2 CITY OF OTSEGO ' *Check Detail Register© NOVEMBER 2004 G 701-22393 THE VILLAGE CONCEPT PLAN $3,387.66 11979 `REMINGTON COVE E 101-43100-302 Engineering Fees $110.75 11981 �' 04 ROAD MAINT E 430-43256-302 Engineering Fees $786.38 11982 WEST LIFT STATION E 499-49400-302 Engineering Fees $487.50 11984 CITY WELL HEAD G 701-22370 KC TRUNK UTIL IMP $497.24 11985 KC TRUNK G 701-22324 RIVERPOINTE 3 $130.52 11986 RIVERPOINTE 3 G 701-22321 RIVERPOINTE 2ND11987 $335.41 RIVERPOINTE 2 G 701-22349 ARBOR CREEK $884.02 11988 ARBOR CREEK E 101-41560-302 Engineering Fees $457.50 11992 MSAA E 101-41560-302 Engineering Fees $585.00 11994 STAFF MEETING G 701-22344 PLEASANT CREEK FARMS $907.25 11995 PLEASANT CREEK G 701-22315 OTSEGO MEADOWS GOLF $16,438.18 11996 RIVERWOOD NATIONAL E 435-43100-302 Engineering Fees $198.69 11998 85TH ODEAN/NASHUA E 435-43100-302 Engineering Fees $42.94 12001 PAGE 85TH ST PROJ E 437-43100-302 Engineering Fees $46.75 12004 87TH ST IMPROV E 426-43100-302 Engineering Fees $1,434.54 12005 QUADAY 78/37 E 427-43100-302 Engineering Fees $30,717.18 12006 MACIVER E 601-49400-302 Engineering Fees $952.80 12007 WELL 6 E 430-43256-302 Engineering Fees $2,784.00 12008 WEST P H/TANKS E 101-41560-302 Engineering Fees $150.00 12009 WETLANDS 1991 G 701-22328 WATERFRONT EAST $956.25 1201.0 WATERFRONT EAST E250-42410-311 Ping & Eng. - 101Traffic Study $1,355.36 12011 TRK HWY 101 E 428-49400-302 Engineering Fees $527.96 12013 W WATER TOWER E 435-43100-302 Engineering Fees $11.69 12014 85TH ST PROJ G 701-21974 Prairie Creek 4th $143.00 12015 PC 4TH G 701-21977 Stone Gate 2nd $175.38 12016 STONE GATE 2 G 701-21940 The "Point 1 & 2" - Big Ed's $107.25 12017 POINTE 2 G 701-22354 ORRIN THOMO CONCEPT $2,142.97 12018 RIVER PLACE E 101-41560-302 Engineering Fees $141.78 12019 CITY MAP E 430-43256-302 Engineering Fees $161.25 12020 WEST SP E 203-45210-302 Engineering Fees $343.81 12021 PRAIRIE PARK E 203-45210-302 Engineering Fees $37.50 12022 LILY POND G 701-22366 MARTIN FARMS $13,785.08 12023 MARTIN FARMS G 701-22369 DR H ZIMMER PROP $16,418.80 12025 ZIMMER G 701-22346 HOTEL/WATERPARK $2,969.71 12026 HOTEL G 701-22356 CROSS PPRZ $2,424.76 12027 KITTREDGE CROSSING .KITTR G 701-22361 SUN RAY FARMS $3,268.18 12028 SUNRAY E 430-43256-302 Engineering Fees $4,602.03 1.2029 W LIFT ST E3 G 701-22388 DENTAL OFFICE SHEILDS $1,020.13 12030 SHEILS E 428-49400-302 Engineering Fees $1,845.09 12039 TRK WATERMAIN E 428-49400-302 Engineering Fees $783.81 12040 KURTTI TRK WATERMAIN E 428-49400-302 Engineering Fees $3,898.85 12041 WELLS 4-5 E 101-41400-348 Maps $777.56 12042 GOPHER ONE MAP G 701-22386 TOM THUMB VAC EASEMENT $161.50 12043 TOM THUMB G 701-22389 TMOBILE CUP $314.44 12043 T -MOBILE E101-41560-302 Engineering Fees $15.75 12043 MISC E 101-41560-302 Engineering Fees $3,293.48 12044 MISC ENG E 101-43100-302 Engineering Fees $37.50 12046 PUBLIC WORKS E 101-41560-302 Engineering Fees $3,241.00 12048 WATERFRONT E UTILITIES Total HAKANSON ANDERSON ASSOC INC $169,220.18 Unpaid HALLMAN OIL COMPANY E10143100-202 Gas & Oil $809.55 136177 OFF ROAD DIESEL Total HALLMAN OIL COMPANY $809.55 Unpaid HAROLD LEONARD E 250-42410-31.0 Miscellaneous $60.00 OCT CELL E 250-42410-321 Mileage/Travel $586.30 OCT MILEAGE 11/05/04 11:31 AM Page 3 CITY OF OTSEGO 11/05/04 11:31 AM Page 4 *Check Detail Register© NOVEMBER 2004 Check Amt Invoice Comment Total HAROLD LEONARD $646.30 Unpaid HEARTHSTONE BUILDERS E 702-41400-310 Miscellaneous $1,000.00 15612 79TH LNDSCP Total HEARTHSTONE BUILDERS $1,000.00 Unpaid ICMA MEMBERSHIP RENEWAL E 101-41400-355 Dues & Memberships $548.00 192012-05 MIKE - RENEWAL Total ICMA MEMBERSHIP RENEWAL $548.00 Unpaid ICMA RETIREMENT TRUST G 101-21705 Other Retirement $230.00 PPE 10/23 CK DTD 10/27 E 101-41400-121 PERA $192.31 PPE 10/23 CK DTD 10/27 Total ICMA RETIREMENT TRUST $422.31 Unpaid INTERNATIONAL CODE COUNCIL INC E 250-42410-203 Supplies - General $209.99 840915 BOOKS Total INTERNATIONAL CODE COUNCIL INC $209.99 Unpaid JACQUIE ROGNLI E 101-41400-347 Newsletter $875.00 2004-06 SEPT/OCT VIEW Total JACQUIE ROGNLI $875.00 Unpaid LONG & SONS E101-41940-203 Supplies -General $153.23 01-41 SUPPLIES E101-41940-389 Cleaning Services $915.90 01-41 CLEANING - OCT Total LONG & SONS $1,069.13 Unpaid MAUS FOODS E 101-41400-205 Election Supplies $94.69 4531989 ELECTION Total MAUS FOODS $94.69 Unpaid MN DEPT OF TRANSPORTATION E101-43100-203 Supplies -General $88.93 TRAFFIC CONTROL DEVICES Total MN DEPT OF TRANSPORTATICN $88.93 Unpaid MONTICELLO ANIMAL CONTROL E 101-42710-390 Contracted Services $105.00 495 3 PICK UPS Total MONTICELLO ANIMAL CONTROL $105.00 Unpaid NAPA OF ELK RIVER INC E101-43100-220 Repair/Maint Supply (GENERAL) $10.11 103478 LUBRICAN E 101-43100-220 Repair/Maint Supply (GENERAL) $6.22 103989 GLASS SEAL Total NAPA OF ELK RIVER INC $16.33 Unpaid NOVAK-FLECK INC E 702-41400-310 Miscellaneous $1,000.00 11365 79TH LNDSCP Total NOVAK-FLECK INC $1,000.00 Unpaid PITNEY BOWES E 101-41400-413 Office Equipment Rental $548.53 POSTAGE Total PITNEY BOWES $548.53 Unpaid PLAISTED COMPANIES E 101-43100-372 Salt & Sand $1,292.51 5148 ICE CONTROL SAND Total PLAISTED COMPANIES $1,292.51 Unpaid PUBLIC EMPLOYEES RETIREMENT FD E 101-41400-121 PERA $265.93 PPE 10/23 CK DTD 10/27 E 250-42410-121 PERA $352.09 PPE 10/23 CK DTD 10/27 CITY OF OTSEGO 11/05/04 11:31 AM Page 5 *Check Detail Register© NOVEMBER 2004 Check Amt Invoice Comment E 101-43100-121 PERA $279.72 PPE 10/23 CK DTD 10/27 E 101-41600-121 PERA $71.00 PPE 10/23 CK DTD 10/27 E 101-41550-121 PERA $190.79 PPE 1.0/23 CK DTD 10/27 G 101-21704 PERA $1,069.35 PPE 10/23 CK DTD 10/27 Total PUBLIC EMPLOYEES RETIREMENT FD $2,228.88 Unpaid RANDY'S SANITATION E 101-43100-325 Garbage Service $58.97 13474 95TH - SHOP E 101-41940-325 Garbage Service $82.82 8899 NASHUA Total RANDY'S SANITATION $141.79 Unpaid RONALD L 8 KIMBERLY G BEAUDRY E 427-43100-500 Capital Outlay (GENERAL) $3,220.00 MACIVER ROAD EASEMENT Total RONALD L & KIMBERLY G BEAUDRY $3,220.00 Unpaid SHARPER HOMES E 702-41400-310 Miscellaneous $2,500.00 7963 LANDER LNDSCP Total SHARPER HOMES $2,500.00 Unpaid SOFTRONICS E 101-41400-390 Contracted Services $421.27 2103 LABOR E 250-42410-390 Contracted Services $421.27 2103 LABOR Total SOFTRONICS $842.54 Jnpaid STS CONSULTANT'S LTD G 701-22315 OTSEGO MEADOWS GOLF $6,688.00 262851 LIFT STATION RIVERWOOD NATIONA Total STS CONSULTANT'S LTD $6,688.00 Unpaid T 8 S TRUCKING BUFFALO INC ; G 701-22349 ARBOR CREEK $500.00 197 ARBOR CREEK ST SWEEP E 101-43100-435 Street Sweeping $140.00 197 ST SWEEP 77TH/PUMPHOUSE Total T & S TRUCKING BUFFALO INC $640.00 Unpaid TARGET STORES E101-43100-203 Supplies -General $24.62 1104010879 DAWN SOAP Total TARGET STORES $24.62 Unpaid UNLIMITED ELECTRIC INC E 250-42410-525 Building Improvements $930.53 6528 MISC WIRING Total UNLIMITED ELECTRIC INC $930.53 Unpaid US BANK E 316-47000-602 Bond Interest $25,022.50 ACCT 33375730 99E E 360-47000-601 Debt Sry Bond Principal $400,000.00 ;: WAT/SEW BOND 2003B E 360-47000-602 Bond Interest $189,846.25 ACCT 33532900 E 316-47000-601 Debt Sry Bond Principal $180,000.00 IMPRO BOND 1999B Total US BANK $794,868.75 Unpaid VINYL GRAPHICS E 101-41400-205 Election Supplies $70.00 2470 VOTE SIGNS Total VINYL GRAPHICS $70.00 Unpaid WRIGHT COUNTY AUDITOR -TREASURE L E 101-42100-390 Contracted Services $44,262.40 04-11 SHERIFF PATROL - NOV 04 Total WRIGHT COUNTY AUDITOR -TREASURE $44,262.40 Unpaid WRIGHT COUNTY HIGHWAY DEPT E 101-43100-393 Street Signs $22.10 4335 SIGNS/SUPPLIES Total WRIGHT COUNTY HIGHWAY DEPT $22.10 CITY OF OTSEGO 11/05/04 11:31 AM Page 6 *Check Detail Register© NOVEMBER 2004 Check Unpaid WRIGHT-HENNEPIN CO-OP ELECTRIC E 601-49400-390 Contracted Services $907.62 13480 MONTHLY SERVICE E 602-49450-390 Contracted Services $907.63 13480 MONTHLY SERVICE Total WRIGHT-HENNEPIN CO-OP ELECTRIC $1,815.25 Unpaid XEROX CORPORATION E101-41400-413 Office Equipment Rental $507.66 5895430 MONTHLY FEE Total XEROX CORPORATION $507.66 10100 BANK OF ELK RIVER $1,292,999.94 Fund Summary 10100 BANK OF ELK RIVER 101 GENERAL FUND $69,189.21 203 PARK DEVELOPMENT $1,870.82 213 Monticello Fire District $3,206.25 250 BUILDING PERMIT FEES $7,958.31 316 1999 Bituminous Debt Service $205,022.50 360 West W & S Debt Service Fund $589,846.25 426 Quaday & 78th PROJECT $1,434.54 427 MACIVER/70TH ST ACCESS $33,937.18 428 WEST WATER PROJ $7,055.71 429 WWTP-East Phase 2 $152,611.15 430 West Trtmnt Plant -Phase 1 $30,782.67 435 85th Street Project - East $253.32 437 87TH/OBRIAN IMPROV $46.75 499 WELLHEAD PROTECTION PROJECT $487.50 601 WATER FUND $1,860.42 602 SEWER FUND $907.63 701 DEVELOPMENT ESCROWS FUND $182,029.73 702 BUILDERS ESCROW FUND $4,500.00 $1,292,999.94 CITY OF OTSEGO 10/28/0412:58 PM Page 1 *Check Summary Register,© OCTOBER 2004 Name Check Date Check Amt 10100 BANK OF ELK RIVER UnPaid BOYER FORD TRUCKS INC $17,661.00 90 FORD L8000 Total Checks $17;661.00 FILTER: None CITY OF OTSEGO 10/28/04 12:58 PM Page 1 *Check Detail Register© OCTOBER 2004 Check Amt Invoice Comment 1.0100 BANK OF ELK RIVER Unpaid BOYER FORD TRUCKS INC E 206-43100-501 Equipment $17,661.00 S55385A 90 FORD 1-8000 Total BOYER FORD TRUCKS INC $17,661.00 10100 BANK OF ELK RIVER $17,661.00 Fund Summary 10100 BANK OF ELK RIVER 206 CAPITAL EQUIPMENT REVOLVING $17,661.00 $17,661.00 CITY OF OTSEGO 10/27/04 1:20 PM Page 1 *Check Summary Register© OCTOBER 2004 Total Checks $621,536.14 ', FILTER: None Name Check Date Check Amt, 10100 BANK OF ELK RIVER UnPaid AMERICAN LIBERTY CONSTRUC $165,354.84 LILYPOND PARK UnPaid BUFFALO BITUMINOUS $362,785.88 MACIVER AVE/70TH UnPaid LATOUR CONSTRUCTION $36,021.38 TRUNK WATERMAIN UnPaid TRAUT WELLS $57,374.04 WELLS 4 & 5 Total Checks $621,536.14 ', FILTER: None CITY OF OTSEGO *Check Detail Register© OCTOBER 2004 10/27/04 1:20 PM Page 1 Fund Summary Check Amt Invoice Comment 10100 BANK OF ELK RIVER $165,354.84 427 MACIVER/70TH ST ACCESS $362,785.88 Unpaid AMERICAN LIBERTY CONSTRUCTION $93,395.42 E 203-45210-530 Improvements Other Than Bldgs $165,354.84 3 PAY 'LILYPOND PARK Total AMERICAN LIBERTY CONSTRUCTION $1.65,354.84 Unpaid BUFFALO BITUMINOUS + E 427-43100-530 Improvements Other Than Bldgs $362,785.88 PAY 2 MACIVER AVE/70TH Total BUFFALO BITUMINOUS $362,785.88 Unpaid LATOUR CONSTRUCTION ) E 428-49400-500 Capital Outlay (GENERAL) $36,021.38 PAY 7 TRUNK WATERMAIN Total LATOUR CONSTRUCTION $36,021.38 Unpaid TRAUT WELLS E 428-49400-500 Capital Outlay (GENERAL) $57,374.04 PAY 10 FINAL WELLS 4 & 5 Total TRAUT WELLS $57,374.04 10100 BANK OF ELK RIVER $621,536.14 Fund Summary 1.0100 BANK OF ELK RIVER 203 PARK DEVELOPMENT $165,354.84 427 MACIVER/70TH ST ACCESS $362,785.88 428 WEST WATER PROJ $93,395.42 $621,536.14 i ,L NORTHWEST ASSOCIATED CONSULTANTS, INC. 5775 Wayzata Boulevard, Suite 555,,, St. Louis Park, MN 55416 Telephone: 952.595.9636 Facsimile: 952.595.9837 planners@nacplanning.com PLANNING REPORT TO: FROM: APPLICATION: REPORT DATE: NAC FILE: BACKGROUND Otsego Mayor and City Council Laurie Shives/Daniel Licht, AICP Otsego — Duerr Creek; Final Plat 3 November 2004 176.02 — 04.07 Heritage Development, Inc. has submitted application fora final plat for Duerr Creek consisting of 75 single family lots on 40 acres located north of 701h Street NE and approximately one-quarter mile east of County Road 19 (Labeaux Avenue NE). The subject site is guided for low density residential land uses within the west sanitary sewer service district established by the Comprehensive Plan. The subject property is zoned R-6, Residential Townhouse, Quadraminium and Low Density Multiple Family District per a zoning amendment as a part of preliminary plat approval on 12 April 2004. The R- 6 District allows for single family homes as a permitted use. Portions of the subject property are within the Shoreland Overlay District of Otsego Creek. Exhibits: A. Site Location Map B. Preliminary Plat C. Final Plat D. Landscape, Street Signage and Lighting Plan ANALYSIS Preliminary Plat Consistency. The preliminary plat has been revised to show 75 single family lots, down slightly from 77 lots approved with the preliminary plat. The reduced number of lots is due to changes to the plat required to minimize wetland impacts. The preliminary plat has been updated to show compliance with the 75 foot lot width requirement for the lots located within the Shoreland Overlay District. However, Lot 38, Block 2 and Lot 1, Block 3 do not have sufficient width to meet the required 65 foot setbacks for lots abutting 70th Street. The final plat must be revised such that the 65 foot setback from the right-of-way along 70th Street NE can be met. Access. The applicant must acquire easement for road night -of -way for construction of the continuation of Lambert Avenue and 'Street B' to 70th ,Street. The applicant has indicated that they have reached an agreement with the adjacent property owner. If the necessary right-of-way cannot be acquired, Lambert Avenue and Street "B" must be temporarily terminated after 500 feet with a cul-de-sac and proposed lots to the east platted as outlots. I Landscape Plan. A landscape plan has been submitted ;showing the required two trees per lot and the required residential buffer along 70th ,Street NE. However, the applicant should move the plantings currently proposed at the rear of Lots 13 and 14, Block 3 out of the right-of-way. The developer should also provide a single row of plantings along the rear of Lots 15-20, Block 3 recognizing that the existing trees will likely be taken out when 70th Street is expanded. An additional row of trees would ensure some level of protection for these homes when the street is widened. Park and Trail Dedication. No land is to be dedicated to the City for parks as part of the final plat. Park and trail dedication requirements are to be satisfied as a cash fee in lieu of land equal to $2,820 per dwelling unit — a total sum of $211,500. Grading and Drainage. Final grading, drainage and erosion control plans are subject to the review and approval of the City Engineer. Utilities. The utility plan is subject to the review and approval of the City Engineer. This final plat was included in the analysis of available sanitary sewer capacity outlined in the memorandum from our office dated 22 September.2004. As such, there is 401 RECs of sewer treatment capacity available for residential development if the final plat is approved. Development Contract. The applicant is required to enter into a development agreement with the City and pay all applicable fees and securities upon approval of a final plat. The development contract is subject to review and approval of the City Attorney. RECOMMENDATION The proposed Duerr Creek Final Plat is consistent with the approved preliminary plat, the Zoning and Subdivision Ordinances. Our office recommends approval of the requested final plat, subject to the conditions below: N A. Motion to approve the final plat for Duerr Creek subject to the following conditions: 1. All rights-of-way, street designs, street names, grading plans, utility plans, easements and construction documents shall be subject to review and approval of the City Engineer. 2. The developer must make a cash contribution in lieu of land of $211,500 in order to satisfy the City's park and trail dedication requirements. 3. The applicant must acquire right-of-way for the zontinuation of Lambert Avenue and 'Street B' to 70th Street or said streets must be ended with a cul- de-sac after extending 500 feet from the north/northwest portion of the plat. 4. The final plat shall be revised to provide adequate building envelopes for Lot 38, Block 2 and Lot 1, Block 3 with conformance to the required 65 -foot setback from the 70th Street right-of-way. 5. The applicant shall move the plantings currently proposed at the rear of Lots 13 and 14, Block 3 out of the right-of-way and provide an additional row of plantings along the rear of Lots 15-20, Block 3< 6. The applicant shall enter into a development contract with the City and post all required securities and pay applicable fees, subject to review and approval of the City Attorney. B. Motion to deny the final plat on a finding that the proposed development does not conform to the requirements of the Zoning Ordinance, Subdivision Ordinance or Engineering Manual. C. Motion to table. C. Mike Robertson Judy Hudson Andy MacArther Ron Wagner Todd Foster 07A,.,ZGO D � M �1 FCONCE�PT PLAN ,l i •T�l. I I(B I.sR. H E R S) I LOT REOUIREMENTS SETBACKS DISTRICT MNM61 U)T MFA MNDAlALOTVAOTN FRONT SIDE REAR WETUWD R10RELA Of B.mD.F. DD FT ARIERML LOCAL COSDE Q(TEMOR DOUDLEFRONT WMFW41 ��� �� 1" 13 Fr 61 FT UFT 25 FF ID FT SAMEASFRONT AFT 0 F pA.J1E51C TLR2I.ROUNO 1YA 75 FT nuI na rw w RLN90x5 PRu a FOR: ROSE C0N51LTNG FNCwEFNS. " R� " PLANNERS RRa LAND SURVLYDRs .o HERITAGE DEVELOPMENT ENGINEERING , , - E. 422 EAST CO. RD. D COMPflNY, INC. ST. PAUL uN 55117 _ L_ IDM EAST 1.633 STREET, 6URNSMLU:. Y .VSS01A 55.337 PH (952)432-3300D 1.oJ821 FF•ASFD — nix .... — — 1m o 1m 2m wo VICINITY MAP -I,\p I� al 1a �.� i I 5 SITE j 5 TOTAL AREA = 40.00 ACRES / 1.742.430 S.F. R/W AREA = 2.83 ACRES / 123.337.55 S.F. SINGLE FAMILY LOTS = 75 SINGLE FAMILY DENSITY =77/40.0=1.88 LOTS/ACRE AREA OF EXIST. WETLANDS -1.51 ACRES / 65,990 S.F. EXISTING ZONING - AGRICULTURAL PROPOSED ZONING - R-6 PROPERTY OWNERS RONALD k NANCY DUERR 11230 70ST NE ALBERTVILLE MN., 55301 Preliminary Plat OTSEGO - EXHIBIT 13 D UERR CREEK \ \ 1 4 � P'ry2/t 2 , 73RD STRE%T :v:\ ♦ III. I r I I v l :wn'rooa ./] Y rK SL r. b'^ 006 NORTH Im.. o Im zoo a0D . Scale w Feel v K -11v1 I T MAV aaw NO a 1 1 4SCALE v 20-- r oBniw.E um,rtLm usia�]rts neE s]aNn Mus: �:! Lam— s TrE SOUM lwE6 r1E SQ1rmvE5r I I OIIU]rEPOF SECrpn b, TOM6]np ,],. 6+I F� �.IOE ]ti BA4 u. A4'inEO BEMwG 6 I I NM1M®Y � K£al. Q OENO)Ea Vt.al, BYuwp, wp]]gpE eE.wscierwvioMuo�o]nam sa]e sE,, us]wEO Br r.¢]ne mu®En,Bom. or Ewes,,s.ess or,¢msvg sno++]ox r]ar w.]owuE]o arueaawsw a]. na:rur RAr.NOreiftT NwOMNt1MpIWMO aTIFEI . rE9 ,T w6,Br ,. wO, wOO qPE rO wis. ]um BEw+Eor EwEsuMEssoMEmr se �servmnw,reu]ov nEccawwcraB u.onr. a r]IE nwr. . suBaEo er uceese w]MBEn ,aoa THIS PLAN DOES NOT HAVE FINAL CITY APPROVAL. PNGINEERING COMPRNY, INC. SHEET 2 OF 2 SHEETS_ EXHIBIT C 1 Ill Fes. 11 \ IF fl 1 I - ]ll 't it it 01 I \` IYI BI 1 I(eh 1011HfiRS) , III' OMID O 11�® MEN 14 1- � I 11—�16URlibM / I L________ v � IIIUM� I I II I 4 --- ONSWNG dm+cCRs. P GE] ria w]lomlww ¢rsl ROBE KN0MRS alfa esu SURVEYORS ENGINEERING v COMPANY, INC. E 1w0 UST 145th STIREU. BURNTALf. NINNEWTA 5SM7 PN (9611432-3m0 °'�� "e--- YEn1Ee Nno IoIII ETRm NORTH tw m 0 0 $ignage Symbol Quantity mor! O Stop Sign (30-) M.I. 4 1. CITY Of OTSEGO— INSTALL STOP SIGN A STREET O Turn Sign AYE SIGNS AT LANILERT AVE.—ERT ]IST STREET NE AND LARGE AVE. O3 Str,et Nam, Sign } 5 Q Electric Li IIt P,Ie 16 PLANTING SCHBDUI.R — SINGIii FAMILY TATS PINff ] GEn¢L— ]RusOnwrrrtn s¢E ury ¢IwnaY G 6.r W (WnNe( Pales. w..sm r bbb AS A. .IA mlmb Y. C.ab OSIRIS 1M ¢' bab ]9 all o Ynyle, R.].1 Rol s• bbb So W AN = 11SPI., AA— fib, r Mb 41 1 N.ia..,i r % TAIL laalbl R I —,% . im PLANTING SCHEDULE - SCREENING Oe �.+n ]R� 06WPOOV 5¢E ury quaAnw a. Oma Ab nwn P.t.ar s— s' bob m ] IN — Ibe .e6 •tl..1d1. Ab m IaY b b e r.ml,Aea.ae Q7RSOfAIs (REFS pr3atmEbl ti¢C uAl OWNfeY ISO p Im Cm 7 a,% IiDi-,:,u/u, llUwl¢v 15-4 D r 1 It YJ 1 e Ne a OSCW.. l]M. Pbm eat M a.— nes turn an (I) tM on - aq/o arglr..auvv ewl .a. A Ilmm .Nn rm evr (s) W c nor. prra.elY uv.. em.m nv ca.mp r.ml r pbror Iw .Nlv amn Tog (SO) e.a OPaL Eloy... ln.. Imam eu mr.mp am d PLm,. ml mn omn T,Yn (I5) Id 4.4. HER ITTA PEE DEVELA1,11. ML OPMENT R„ q Landscape. Street Signage and Lighting Plan T. FAST GD. R0. D ,. DUERR CREEK rn m OTSEGO, (OTA EXHIBIT D Review No. 1 ENGINEERING REVIEW Hakanson Residential Subdivision Anderson for the City of Otsego Assoc., Inc. by Hakanson Anderson Associates, Inc. Submitted to: Christopher Ockwig, Probe Engineering, Inc. cc: Mike Robertson, Administrator Judy Hudson, City Clerk Dan Licht, City Planner Andy MacArthur, City Attorney Thomas Von Bische, Heritage Development Reviewed by: Ronald J. Wagner, P.E. Brent Larson Date: November 4, 2004 Proposed Development: Duerr Property Street Location of Property: A portion of the S'/2 of Section 25, T121, R24 40.0 Acres, north of 70th Street NE and east of CSAH 19 Applicant: Thomas Von Bische Heritage Development of Minnesota 422 East County Road D Little Canada, MN 55117 Developer: Heritage Development of Minnesota Owners of Record: Wilfred and Nancy Duerr 11230 70th Street NE Albertville, MN 55301 Purpose: A proposed 75 lot single family residential development on 40.0 acres in the City of Otsego, Wright County, Minnesota. The proposed development, will be served with municipal water, sanitary sewer, storm sewer and public streets typical of an urban setting. Jurisdictional Agencies: City of Otsego, Wright County, Minnesota Department of (but not limited to) Health, Minnesota Department of Natural Resources, Minnesota Pollution Control Agency Permits Required: NPDES (but not limited to) \\Ha01\Shared Docs\Municipal\Aotsego22xx\2280\ot2280RVW2.doc TABLE OF CONTENTS INFORMATION AVAILABLE FINAL PLAT CONSTRUCTION PLANS COVER SHEET SANITARY SEWER AND WATERMAIN STORM SEWER AND STREET CONSTRUCTION GRADING AND DETAILS HYDROLOGY REPORT OTHER CONSIDERATIONS SUMMARY AND/OR RECOMMENDATION \\Ha01\Shared Docs\Municipal\Aotsego22xx\2280\ot2280RVW2.doc INFORMATION AVAILABLE Preliminary Plat, 3/11/04, by Probe Engineering, Inc. Preliminary Utility Plan, 3/11/04, by Probe Engineering, Inc. Preliminary Grading Plan, 3/11/04, by Probe Engineering, Inc. Preliminary Detail Plan, 3/11/04, by Probe Engineering, I;nc. Final Plat, October 2004, by Probe Engineering, Inc. Construction and Grading Plans, 10/11/04, by Probe Engineering, Inc. Wetland Delineation Report, November 2003, by Peterson Environmental Consulting, Inc. Hydrology Report, 10/13/04, by Probe Engineering, Inc. City of Otsego Engineering Manual Minnesota Rules, Chapter 4410 — EAW Requirement Trunk Stormwater Facilities Study for Portions of the Otsego Creek Watershed, February 2003 City of Otsego Zoning and Subdivision Ordinances, 10/14/02 National Wetland Inventory Map, 1991 FINAL PLAT 1. The plan shall be revised to show the 75' minimum lot width within the Shoreland Overlay District (300' from the centerline of Otsego Creek). Example Lots 9, 10, 19, & 20, Block 2 and Lots 12 & 13, Block 3. 2. A minimum of sixty (60) feet of right-of-way must be provided for all public streets. It does not appear that adequate right-of-way is proposed at the east entrance. (21-7- 7.A.) 3. Include centerline horizontal curve data. 4. Streets shall be named in accordance with the Wright County street name grid system. Page 1 \\Ha01\Shared Docs\Municipal\Hotsego22xx\2280\ot2280RVW2.doc 5. The outlots shall be revised such that they are incorporated into the adjacent lots and covered under drainage and utility easements. 6. A protective buffer of natural vegetation at Ieast;20' wide from the delineated edge shall surround all wetlands. A principal building setback of 40' from the delineated edge of all wetlands or 20' from the protective buffer easement, whichever is greater, shall be provided. (20-16-9.E.) Example Lots 1, ,2, '& 16, Block 2 and Lots 14 & 15, Block 3. 7. A 65' setback from 70th Street NE is required for all lots along 701h Street NE. This would make Lot 38, Block 2 and Lot 1, Block 3 unusable. 8. It is planned that 70th Street NE will become a County Road in the future and it is therefore desirable to maintain the 1/ mile spacing requirement of Wright County. The plan does not show this. We anticipate that the west access will be required to be a right in/right out intersection in the future if the street locations remain as shown. 9. Additional drainage and utility easement is required over the cross drainage through the rear yards of Lots 33-38, Block 3. DEVELOPMENT PLAN COVER SHEET 1. Provide a signature line for Ronald J. Wagner, P.E. City Engineer. 2. Please include the Block numbers. 3. Include the NWL and 100 -yr HWL for all ponds and wetlands. SANITARY SEWER AND WATERMAIN (SHEETS 2-6) 1. There is insufficient hydrant coverage for many lots. The temporary hydrant at the north end of Lambert Avenue NE is needed to provide coverage for Lots 1-4, Block 2. Lots 8, 9, & 14, Block 3 and Lot 22, Block 2 have insufficient coverage. 2. Please label all inverts with a direction. 3. Label the class of PVC and DIP for all pipes in the profile. 4. All water service curb stops shall be located 10' back of the R.O.W. Please revise. 5. Sheet 2, please revise the sheet label to Lambert Avenue. 6. Sheet 2, MH 1 shall have a sealed lid. Please indicate on the plans. Page 2 \\Ha01\Shared Docs\Municipal\Aotsego22xx\2280\ot2280RVW2.doc 7. Sheet 2, the 21" storm sewer crossing in the profile is located approximately 25' too far east. Please revise. 8. Sheet 2, it is unclear why MH 7 is not located on the centerline of the street. Please relocate MH 7. 9. Sheet 2, the wye stationing for Lot 19, Block 2 is incorrect. 10. Sheet 3, the builds are not included in the profile for MH 1 to MH 12. 11. Sheet 3, insulation is required between the watermain and 21" storm sewer crossing at approximate station 15+75. Please revise. 12. Sheet 3, sanitary and water service information is;needed for Block 2, Lot 20. 13. Sheet 4, please depict the services to lots west of MH 19. 14. Sheet 4, maintain 18" minimum separation between the water services and the sanitary sewer for Lots 15-19, Block 3. 15. Sheet 4, the contractor is not likely to bring the watermain back up to minimum depth between the services to Lots 15 & 16, Block 2. Please revise the profile. 16. Sheet 5, 2-450 bends shall be used in-place of the 90° bend at the south end of Large Avenue NE. 17. Sheet 5, a'temporary hydrant is required for flushing purposes at the southwest corner of Lot 38, Block 2. 18. Sheet 6, bends are not allowed with in the R.O.W. on sanitary sewer services. Please revise the service to Lot 12, Block 1. 19. Sheet 6, at the rear lot line of Lot 12, Block 1, remove the 8" DIP plug and connect to the existing watermain with an 8" gate valve. 245° bends shall be used in-place of the 900 bend. STORM SEWER AND STREET CONSTRUCTION (SHEETS 7-12) 1. Label all ponds and wetlands and include the NWL and 100 -yr HWL. 2. Include the PVI, PVC, and PVT information for all vertical curves. 3. Skimmer structures 100 and 112 do not have profiles shown. Please revise. 4. Label the class of all storm sewer pipes in the profiles. 5. Sheet 7, move the overlapping text at station 0+50,. Page 3 \\Ha01\Shared Docs\Municipal\Aotsego22xx\2280\ot2280RVW2.doc 6. Sheet 8, the riprap for skimmer 121 is depicted at the upstream invert. Please show the riprap at the downstream invert. Verify that 14 CY of class III riprap is required at the end of the FES out of Skimmer 121. 8. Sheet 8, the centerline of Lambert Avenue is not depicted at the correct elevation in the profile over the 36" culvert. Please revise. 9. Sheet 9, Pond 1's HWL of 945.7 does not agree with the hydrology report HWL of 945.57. Please verify and revise. 10. Sheet 9, the minimum storm sewer pipe size is 15". The hydrology report correctly has a 15" pipe between Skimmer 116 to CBMH 115. Please revise the construction plans. 11. Sheet 10, include a street grade between the vertical curves from 6+50 to 8+50 on 71St Street NE. 12. Sheet 10, the minimum storm sewer pipe size is 115". Please revise the storm sewer from CB 109 to CBMH 108 and from CBMH 108 to the FES. 13. Sheet 10, skimmer Structure 121 is already depicted on Sheet 8. 14. Sheet 10, the inverts for Skimmer 107 are incorrect. The outlet pipe shall be 15" minimum. Please revise. 15. Sheet 11, depict and label the riprap downstream ,of STMH 101. 16. Sheet 11, the minimum storm sewer pipe size is 15". Please revise the storm sewer from CB 119 to CBMH 103. GRADING AND EROSION CONTROL PLAN (SHEETS .13-17) 1. Earth berms at least four (4) feet in height are required for adjacent to 70th Street NE. 2. Label the Ponds and wetlands. Include the 2 -yr and 10 -yr elevations for each. 3. The contours depict the creek at the elevation of':942. The NWL of the Creek must be verified. It is likely that the NWL of some ponds will have to be adjusted accordingly. 4. The Otsego Creek HWL of 944.9 should be called out in the plans. 5. Sunray Farms (the development to the north) has submitted revised grading plans to depict the proposed pond in the northeast corner, of Duerr Creek. The regrading of this area must allow the existing lots to drain down the lot Fines. Please revise the grading plans in this area to match those submitted by Sunray Farms. Page 4 \\Ha01\Shared Docs\MunicipalWotsego22xx\2280\ot2280RVW2.doc 6. 1.5' of freeboard is required from the HWL or emergency overflow elevation to the lowest opening. This is not provided for Block 2, Lots 31-34. 7. The distance between the inlet and outlet for Pond 1 shall be maximized to avoid short-circuiting. Please relocate the inlet and/or outlet. 8. Please move the riprap depicted at the outlet of Pond 3 to the inlet between Lots 17 & 18, Block 2. 9. Please review the lowest floor elevation for Lots ,16-17, Block 3. They are currently labeled with a low floor elevation that is below the NWL of the creek. 10. The top of berms around the sedimentation ponds shall be 1.0' above the HWL of the pond. Please revise. 11. Show the riprap overflow for Wetland 7. 12. We recommend that the rear yard grading for Block 3, Lots 2 & 3, be revised slightly to eliminate cross drainage, or a drainage and utility easement shall be provided. 13. The hydrology report has a 100 -yr HWL of 945.5;2 and E.O.F. of 945.6 for Pond 6. This does not match the grading plans. 14. Please remove the wetland mitigation information (hatching) from sheets 13-15 to make the plans easier to read. 15. Include the abbreviations for the house types in the legend. 16. Benchmarks shall be shown on the plan. 17. See Final Plat comment #10. 18. Depict biorolls, bale checks, inlet protection, or other erosion control measures. (Example the rear yard swale behind Block 3, rear yard catch basins) 19. Wetland 5 shall have an outlet to allow for drainage of the area behind Block 3 homes. DETAILS (SHEETS 18-22) 1. Please include a detail for the draintile. 2. Call out the section to be used in the typical section detail. Page 5 \\Ha01\Shared Docs\Municipal\Aotsego22xx\2280\ot2280RVW2.doc HYDROLOGY REPORT 1. The hydrology report is still under review. We are in the process of modeling the discharge from Albertville south of 70th Street NE. Additional comments will be forthcoming. 2. We have some concerns with the modeling of the storm sewer as reaches for the 100 -year return frequency storm event:. (Example, Reach 28R) 3. Tailwater shall not be considered when modeling the ponds. 4. The normal water elevation of the creek must be verified. It appears that some of the ponds have NWL's that are lower than the adjacent creek. 5. A Mannings value of 0.013 shall be used for all RCP pipe. 6. Please model the overflow structure grates for each pond with a structure. The front edge of the grate shall be at or above the 2 -year HWL. 7. No flow from Reach 35 is modeled. Please revise to include the runoff from the east. 8. See Grading comment #19. OTHER CONSIDERATIONS 1. A permit from the Department of Natural Resources will be required for the proposed creek crossing. 2. It appears that there is an overhead electric utility;line along the east plat line that will have to be moved considering the proposed location of the east entrance road. The developer must coordinate this and all associated costs are to be borne by the developer. . 3. We assume that there is an easement associated with the overhead electric utility line that will have to be vacated for the proposed development, assuming that the line is moved. 4. Submit Specifications for review. 5. Submit Inlet Spread Calculations for review. SUMMARY AND/OR RECOMMENDATION We recommend approval contingent upon the above comments being addressed. Page 6 \\Ha01\Shared Docs\Municipal\Aotsego22xx\2280\ot2280RVW2.doc 7 _ NORTHWEST ASSOCIATED 'CON SULTANTS,_1-NC 4800 Olson Memorial Highway, Suite 202, Golden Valley, MN 55422 Telephone: 763.231.2555 Facsimile: 763.231.2561 planners@nacplanning.com PLANNING REPORT TO: Otsego Mayor and City Council FROM: Laurie Shives/Daniel Licht, AICP APPLICATION: Otsego — Zimmer Farms 4th Addition; Final Plat REPORT DATE: 3 November 2004 NAC FILE: 176.02 — 04.32 BACKGROUND D.R. Horton, Inc. has submitted application for a final plat for Zimmer Farms 0 Addition consisting of 25 single family lots and 62 townhouse units. The 4th Addition is part of Phase II of the overall Zimmer Farms development plan. Units within the 4th Addition are located on portions of Outlot B and Outlot C of the final platted Phase I. The final plat of Phase I was approved in December 2003 and the preliminary plat approval for Phase II was granted in March 2004. The subject site is guided for low-density and medium-high density residential land uses within the west sanitary sewer service district established by the Comprehensive Plan. The preliminary plat approval of Phase II included a Zoning Map amendment rezoning the subject site to R-6, Residential Quadraminium, Townhouse and Low -Density Multiple Family District and a PUD -CUP approval for development of townhouses and development within a Shoreland Overlay District. Exhibits: A. Site Location Map B. Preliminary Plat C. Final Plat ANALYSIS Preliminary Plat Consistency. The proposed final plat; is the same number of lots and design for both single family and townhome units as the 'approved preliminary plat. The alignment of 64th Street NE is slightly different on the proposed final plat than on the preliminary plat. All lots widths are well within the requirements for the R-6 District. Landscape Plan. The applicant previously submitted a landscape plan for the overall development, which was found to be consistent with Section 20-16-7 of the Subdivision Ordinance and, as a result, has already been approved!, The applicant must provide a cost estimate for the portion of the landscape plan to be installed with this final plat, which will be incorporated as part of the development coritract securities. Park and Trail Dedication. No land is proposed to be; dedicated to the City from the the 4th Addition Final Plat for parks and trails development. Thus, the park dedication requirements of Section 21-7-18 of the Subdivision Ordinance will be satisfied as a cash fee in lieu of land. Total park and trail dedication fees for ithe 87 dwelling units within the 4th Addition at $2,820.00 per unit equals $245,340. Grading and Drainage. Final grading, drainage, erosion control plans as well as construction plans are subject to the review and approval of the City Engineer. Utilities. The utility plan is subject to the review and approval of the City Engineer. The memorandum from our office dated 22 September 2004 identified that there are 401 RECs remaining from the west waste water treatment plant for residential development (in addition to 720 RECs reserved for commercial or industrial uses). As such there is capacity available to serve the proposed final plat. The remaining capacity for residential uses if this final plat is approved will be 314. Homeowner's Association. The developer must submit documents for review by City Staff detailing the homeowner's association's responsibilities including maintenance of the common areas. Development Contract. The applicant is required to enter into a development agreement with the City and pay all applicable fees and securities upon approval of a final plat. The development contract is subject to review and approval of the City Attorney. RECOMMENDATION The proposed Zimmer Farms 4th Addition Final Plat is consistent with the approved preliminary plat as well as the Zoning and Subdivision Ordinances. Our office recommends approval of the requested final plat, subject to the conditions below: 2 A. Motion to approve the final plat for Zimmer Farms,4th Addition subject to the following conditions: 1. Landscaping shall be installed within areal of the final plat in accordance with the submitted landscape plan, subject to City Staff approval. 2. All rights-of-way, street designs, street names, grading plans, utility plans, easements and construction documents shall be subject to review and approval of the City Engineer. 3. Park and trail dedication requirements. of Section 21-7-18 of the Subdivision Ordinance are to be satisfied' as a cash fee in lieu of land totaling $245,340. 4. Documents providing for the ownership and maintenance of common areas shall be submitted for review by City Staff. 5. The applicant shall enter into a development contract with the City and post all required securities and pay applicable fees, subject to review and approval of the City Attorney. B. Motion to deny the final plat on a finding that the proposed development does not conform to the requirements of the Zoning Ordinance, Subdivision Ordinance or Engineering Manual. C. Motion to table. pc. Mike Robertson Judy Hudson Tim Rochel Andy MacArthur Ron Wagner Tom Bakritges Fran Hagen 3 BABE MAP DATA PRO VDED B Y 171==.Ana H' rso n derson sst Anc. PREPARED OCTOBER 2001 NOTE: THIS MAP IS FOR PLANNING PURPOSES ONLYAND SHOULD NOT BE USED FOR EXACT MEASUREMENT. SUBJECT SITE CITY OF mOTSEGO _+ ON THE GREAT RIVER ROAD D J 21 r� 50 0 30 100 150 Scda &, /set Smle: I &,Ne 50 /rot ZIMMER FA PMS 4TH ADDITION PRELIMINARY 0 Dent" 1/1 &,di by 14 &,ch bm mm mf nA set mDoom elf s~ whom of sl f p mMed DY Lk—,No. 13011 repubap locolbn hdtrofm ° I/1 incl,ch 14 h 6y 11 &,N m f ft, dl to sat 0h&, 1 yvo, o/ • Denotes 1/1 &,N by 14 &,1W bon .moment Me rxad&,q o/ mi, plot. 1—d mo . by Lkmse Nc 1101! __------ --------------------------- _----------------- MATCHLPEA --------------- -------------------------------- -------------- x m•m's4' nzm a.0 i x • �°•. 1.°e+• .zm OUILOT A 6 w 4 Iha dknfafian o/ fbia be-&,° aysfpn 6 based m the east lila or md., R, 1/YMFR FARMS JRD ADDIRON ahio is -W to bear N 00°14'48- W. 2 Y 813 $ Y^ ^ - .v °r•P'.°!-y, im_x_, _ .. R 4' a .ee a < M g zry�y�•f.- ^ 9�b +9°at _ T_ _ _ _ _4e_ = _ _ _ _ _ aee:4 6m BT. NE R..m + .� 8 `a 34i K 9 J°''' .ap0'ri. J� i` ivzm ________ �o:�m -- -m-al�'_'�- � 4 m. • w :,zm k p.oT,!°; ,e i~__' . J a +°j e. ../ 8 m•, « 8 8 8- .zm azm b z umP S �a s 2 a' r; 2' xm,44e r "a ° 14 m rm �; 9a,> s 17s as°a° as �8 s ^a sea 4'a 3 .h ry`b ' 8 : 'tkye^ •� ,, `-10 OUMO V B ' 8 x oo•�� m•,r4e a azm �, a•a !8^ i°; ` � -:,`k aro,° x ,9�y.w 8b ,.a16 m•3.e x., eesa "�•7; ;° " >rzra 00az mm r u.m e r_W 2um 421! 88, '••,:,,-y 8 '_''1 ✓�°'z 4 - •cam: 4 az •a g8 2 q3 °1�J .4-=.v ;,: `b +.__ 1. -84. �'>.8...f 88 '-a^�. '+: - . r.,;p • ar ,ro.. ._ j !r .•4e.. i 4 ' jw e 8 + + 'rw -• ,a'�, • Y, I r .ky x m.e r 00.xm�� �A / ^ 8 '••. y.r 8 = - ^ g 4 '°^ 8 ^ 8e u m u m '�•oybr 8 ar.� .� ^^8'� ,_3 Aaoo = fi o a �, z 3 18 e� ^ 88 4. 8 3o 19 - F 8 v. + • , 01 / c t' l y11 � l "`d{` xm•:„n•. ' +� , �.. x,nr _2l .�i.Imc 15 2 a�1"' 2 / N 00°46'19• w &sato / EXHIBIT C-2 WESTWOOD R'ofvssimd SwHcea, lnc Sheaf J or 1 .aero 011 0m .zm $ .:.m >� .am § 4zm yx 9 10 6 8T?83?84?85:8 g:/:82?89-84:85 8 8: 1 2834^4:85:8 8: /:8.2;83:.;47•: 5� a_ 3_ 3_ _ 3_ 3_ _ 3= .1rm xJrm Jrm 4rm _ JLm Jrm_ rrm III 2 Y 813 $ Y^ ^ - .v °r•P'.°!-y, im_x_, _ .. R 4' a .ee a < M g zry�y�•f.- ^ 9�b +9°at _ T_ _ _ _ _4e_ = _ _ _ _ _ aee:4 6m BT. NE R..m + .� 8 `a 34i K 9 J°''' .ap0'ri. J� i` ivzm ________ �o:�m -- -m-al�'_'�- � 4 m. • w :,zm k p.oT,!°; ,e i~__' . J a +°j e. ../ 8 m•, « 8 8 8- .zm azm b z umP S �a s 2 a' r; 2' xm,44e r "a ° 14 m rm �; 9a,> s 17s as°a° as �8 s ^a sea 4'a 3 .h ry`b ' 8 : 'tkye^ •� ,, `-10 OUMO V B ' 8 x oo•�� m•,r4e a azm �, a•a !8^ i°; ` � -:,`k aro,° x ,9�y.w 8b ,.a16 m•3.e x., eesa "�•7; ;° " >rzra 00az mm r u.m e r_W 2um 421! 88, '••,:,,-y 8 '_''1 ✓�°'z 4 - •cam: 4 az •a g8 2 q3 °1�J .4-=.v ;,: `b +.__ 1. -84. �'>.8...f 88 '-a^�. '+: - . r.,;p • ar ,ro.. ._ j !r .•4e.. i 4 ' jw e 8 + + 'rw -• ,a'�, • Y, I r .ky x m.e r 00.xm�� �A / ^ 8 '••. y.r 8 = - ^ g 4 '°^ 8 ^ 8e u m u m '�•oybr 8 ar.� .� ^^8'� ,_3 Aaoo = fi o a �, z 3 18 e� ^ 88 4. 8 3o 19 - F 8 v. + • , 01 / c t' l y11 � l "`d{` xm•:„n•. ' +� , �.. x,nr _2l .�i.Imc 15 2 a�1"' 2 / N 00°46'19• w &sato / EXHIBIT C-2 WESTWOOD R'ofvssimd SwHcea, lnc Sheaf J or 1 .aero 3 ? ;l og/g I alp i--l.2ltr.60-ivy_ � °f °C 9� e\orl ^le w I I r R .aTrfzsnn y r l .Ztc I I ar Q z , uj •��•�'� OSIP I I HI .N 18 I 1 ' i Q = �--iiis.-•w�-- P• Q) 18 81 18 81 I$ m �----rlyz J 8 8 1 h 1 81 ____ 18 1 N Ci $I 81 I$ L � �_ S:) Of 1 � 1Z ` aC�T.aca.-ren---�I I 1 tyb Tz to a a' 1 $� W d 61p10'42.W _-SO.01 3o31'06• E 2JB••TB 4C5/Z 3-Lf,SIo6B N " .'i=''•• Bl Z6C3 Lf,S6o68 N ^R v � 3 •Ll,Lfe68 N �i ' 57 cease --e m,----R- a'o 0 s<ve . ` .. +o iw'bt LU M 's�""h�"ro n el '••ate ��8 � . �. { ` .� N � +9' •8. �"�• S' of L� \� \ � � t C `> ' WCr °y'o •" Nta•--i--- _ 1 Fi'` �_Qi /9 •`•°`1¢p ��i. M1,fr _ U � �'•'�o � ` d 9p ' b... q •. 4r< ��� C_ `r ��^ _ " I- � 4.I .g I �°�a� O/:`� d �.x N y.�bbr � � I � `� � � `/9 y,((S��nn\°�•! o�� L �n.v `t � $Ory IO•ppx O(�rDx irf f•S<t`p ` �J/ ?Z �l 3f: ciSe <r.< _ �. $i O°I Q ? ;l og/g I alp i--l.2ltr.60-ivy_ � °f °C 9� e\orl ^le w I I r R .aTrfzsnn y r l .Ztc I I ar Q z , uj •��•�'� 17 I 81L�/ � 18 8i �tS 1) j8 I ,�--�_nn.ae n-- � 81 18 IS r - I 18 R _ •0•+ {I� I S 1 IL __ R 13N 'lS HlDB R � I _ a.rcn.w �aI I I I HI .N 18 I 1 ' i Q = �--iiis.-•w�-- P• Q) 18 81 18 81 I$ m �----rlyz J 8 8 1 h 1 81 ____ 18 1 N Ci $I 81 I$ L � �_ S:) Of 1 � 1Z ` n it !1 7 j1Y 6 r toroe'rr-) 1 __a_Z4Gr,ae H- y(l/ •.(. ,ba.f-O le 'I $ I 1 I I >26E, 1 ° se �_ 81 10 $ - I T --- ` aC�T.aca.-ren---�I I 1 tyb Tz to a a' 1 $� II 18 - - I agar 3o31'06• E 2JB••TB ``4 28.54,w �� � 3 •Ll,Lfe68 N �i ' 57 i—do6 •t w I n it !1 7 6 $ a I I >26E, 1 ° se B i I E� I „1s$ Cas: ��S $ - I T --- I i=.ea a' 1 ass II � 8 it !1 7 6 $ � z �sc4 ° se 1 o �E 1 0 W r' I I I II « g N xu� P4 \' I� mg i> �� � i� I I �II s e•a a o�l 11 'i ? ; � � II o ��� � _ ✓ �,�\ I I II r LL fes: jjj g I xs � i�J7 I1-7 it I III. 6S v- 5$b F~G Ir'1 IIS§:gas ys 3 w A 3E d3 . 4cl Y Q --, I II � � p�'1 , �: IQ� l"�: r' i'��r� � `�y�,\•�.i��.J�� °� � J'i`g �`' I'Ij ���3 g a IVI �I I 88._ 6b88h 9. 444 48A�� �°'��11 , , !'�11rr•,����J%%/��� $� �/I%•1�r � �/ I I' 11 jI� . � � � !.///h • I/I/\ )r� � l /� I I . i ,� I11 .7j. l � /,p y�e il' 7l/ �\p':� • I I � s �1 iil L . JI I CYl.. ' ' I r� d'1•• II• I r <�` "' .' Y' � r� I�I III I � �' �LRJ ' , I'� P'i q3- 'iii —�f ^���� ��q til I =I •I '�; rr�-•w -i I II' i 11 1t �� --Tl rT-,--� I'll (1 �•J 1J r LL °1_J iEt4vsw ,Ij �� a i �• IAs Tl rr im��d_, J� .I,.Lr_, I � • yg� i;�. .�... �.�. I I I ' r 1 •1 I 1 3 JJ i I _ d'8 fill '8 g Unix I saes �e R rJill O Review No. 1 ENGINEERING REVIEW Hakanson Residential Subdivision Anderson for the City of Otsego Assoc., Inc. by Hakanson Anderson Associates, Inc. Submitted to: Honorable Mayor and City Council cc: Mike Robertson, Administrator Judy Hudson, City Clerk Dan Licht, City Planner Andy MacArthur, City Attorney Tom Bakritges, D.R. Horton Fran Hagen Il, P.E. Westwood Professional Services, Inc. John Becker, Westwood Professional Services, Inc. Reviewed by: Ronald J. Wagner, P.E. Shane M. Nelson, P.E. Brent M. Larson Date: November 3, 2004 Proposed Development: Zimmer Farms 4th Addition Street Location of Property: A portion of the W '/2 of Section 31, T121, R23, south of 70th Street NE and east of Maciver Ave. Applicant: Tom Bakritges D.R. Horton 26860 Kenbridge Court, Suite#100 Lakeville, MN 55044 Developer: D.R. Horton Owners of Record: D.R. Horton Purpose: Zimmer Farms 4th Addition -is is a proposed single family and townhouse residential development in the City of Otsego, Wright County, Minnesota. The proposed development will be served with municipal water, sanitary sewer, storm sewer and public streets typical of an urban setting. Jurisdictional Agencies: City of Otsego, Wright County, Minnesota Department of (but not Limited to) Health, Minnesota Department of Natural Resources, Minnesota Pollution Control Agency Permits Required: NPOES (but not limited to) Page 1 \\Ha01\Shared Docs\MunicipalWotsego22xx\2292\ot2292RVW1.doc TABLE OF CONTENTS INFORMATION AVAILABLE FINAL PLAT CONSTRUCTION PLANS COVER SHEET OVERALL PLAN SANITARY SEWER AND WATERMAIN PLAN STORM SEWER AND STREET PLAN DETAILS GRADING, DRAINAGE, AND EROSION CONTROL PLAN STORM SEWER AND INLET SPREAD CALCULATIONS HYDROLOGY SPECIFICATIONS OTHER CONSIDERATIONS SUMMARY AND/OR RECOMMENDATION Page 2 \\Ha01\Shared Docs\Municipal\Aotsego22xx\2292\ot2292RVW1.doc INFORMATION AVAILABLE Final Plat, sent 10/27/04, by Westwood Professional Services, Inc. Construction Plans for Zimmer Farms 4th Addition, 10/28'/,04, by Westwood Professional Services, Inc. Construction Plans for Zimmer Farms 1St -3rd Additions, 7/.30/04 revisions, by Westwood Professional Services, Inc. Preliminary Plat for Zimmer Farms, 7/15/04, by Westwood Professional Services, Inc. Grading, Drainage, and Erosion Control Plan for Zimmer:lFarms, sheets 4,5,7, & 8 revision 9/15/04, by Westwood Professional Services, Inc. Storm Sewer Design Calculations, 10/18/04 revision, by Westwood Professional Services, Inc. Hydrology Report for Zimmer Farms, 4/14/04 revision, by Westwood Professional Services, Inc. City of Otsego Engineering Manual Minnesota Rules, Chapter 4410 — EAW Requirement Trunk Stormwater Facilities Study for Portions of the Otsego Creek Watershed, February 2003 City of Otsego Zoning and Subdivision Ordinances, 10/14/02 National Wetland Inventory Map, 1991 Page 3 \\Ha01\Shared Docs\Municipal\Aotsego22xx\2292\ot2292RVW1.doc FINAL PLAT 1. The storm sewer from Wetland 12B along the southern plat line to the development east of Zimmer Farms 4th Addition shall be covered by a drainage and utility easement. 2. 65th Street NE shall be Manchester Avenue NE from 63rd Street NE until in turns towards he west. CONSTRUCTION PLANS COVER SHEET 1. No Comments. OVERALL PLAN (SHEET 2) 1. Hydrant coverage is insufficient for Blocks 1, 2, &,3. Please revise to provide a maximum 500' spacing (250' radius) in single-family residential areas. 2. 65th Street NE shall be Manchester Avenue NE from 63rd Street NE until it turns towards the west. Please revise all sheets. 3. There appears to be a phase line between the single-family lots and the townhome area. SANITARY SEWER AND WATERMAIN PLAN (SHEETS 3-6) 1. Sheet 3, please label the plat line for 4th Addition. 'It is difficult to differential from the utilities. 2. Sheet 3, MH 403 is incorrectly labeled a drop manhole. Please revise. 3. Sheet 4, an additional gate valve is required at the southeastern intersection of 65th Circle NE and 65th Street NE, approximate station 9+40. STORM SEWER AND STREET PLAN (SHEETS 6-12) 1. B618 curb and gutter is required on the west side 'of 65th Street NE (Manchester Avenue NE) and on the inside of 65th Circle NE. DETAILS (SHEET 13) 1. Numerous details are not included in the plans. Including details in the specifications will be acceptable, however, we have not received specifications for this project. GRADING, DRAINAGE, AND EROSION CONTROL PLANS 1. The grading along the east plat line shall be coordinated with Quality Site Desings. Page 4 \\Ha01\Shared Docs\Municipal\Aotsego22xx\2292\ot2292RVW1.doc STORM SEWER AND INLET SPREAD CALCULATIONS 1. No Comments. HYDROLOGY REPORT 1. No Comments. SPECIFICATIONS 1. Submit for review. SUMMARY AND/OR RECOMMENDATION We recommend approval contingent on the above comments. Page 5 \\Ha01\Shared Docs\Municipal\Aotsego22xx\2292\ot2292RVW1.doc ! '}r E IE1li - 7.3 - NORTHWEST ASSOCIATED CONSULTANTS, INC. 5775 Wayzata Boulevard, Suite 555,,, St. Louis Park, MN 55416 Telephone: 952.595.9636 Facsimile: 952.595.9837 planners@nacplanning.com MEMORANDUM TO: Otsego Mayor and City Council Otsego Planning Commission FROM: Daniel Licht, AICP DATE: 26 October 2004 RE: Otsego — Subdivision Ordinance; Park and Trail Dedication NAC FILE: 176.08 BACKGROUND The City's current park and trail fee in lieu of was adopted by the City Council on 8 March 2004. To ensure that the park and trail dedication fee in lieu of land is adequate and representative of the impacts of new development to, the City's park system, the fee should be reviewed annually. ANALYSIS Current Fee. The City's current park and trail fee in lieu of land for residential development is $2,860.00 per dwelling unit. The fee is based on the estimated cost of land acquisition ($1,600.00 per dwelling unit) and construction costs for development of new neighborhood park facilities ($530.00 per dwelling, per square mile) using data generated in 2003 and $690.00 per dwelling for future construction of a community center. Park and Trail dedication fees in lieu of land for commercial and industrial subdivisions are $7,000.00 and $3,500.00 per gross acre respectively, based on 2003 land values. Land Cost. No change in residential, commercial or industrial land prices from those cited in our office's 29 January 2004 memorandum has been observed by City Staff during 2004. As such, the land value component of the residential cash fee in lieu of land is not recommended to be changed. We also do not recommend changes to the commercial ($7,000.00 per acre) and industrial fee ($3,500.00 per acre) in lieu of land for the same reason. Construction Cost. The Engineering News -Record establishes a construction cost index that can be applied to project estimates over time to account for changes in labor and materials costs. Based on the year end construction cost index for 2003 and the construction cost index for October 2004, the cost per dwelling unit per square mile for development of a neighborhood park has increased frord'$530.00 to $579.00. Community Center. Research was also done in the 2003 analysis regarding the cost for construction of a community center similar to that built by Monticello, Maple Grove, Becker and Elk River. The assumed cost of a similar facility for Otsego was $14,800,000 based on that data. Under park and trail dedication requirements, the City may include that portion of the cost for a community center to be borne by new residents moving into.the community. The 2000 Census identifies Otsego as having 2,062 households. The City is projected to have a household count of 21,471 by 2040 based on a, growth rate of 400 to 600 new households per year. As such, the cost per household for the proposed community center would be $690.00, which may be added to the park and trail fee in lieu of land. The construction cost index must also be applied to the estimated cost of constructing a future community center to account for inflation. Again using the 2003 year end index and the October 2004 index, the cost per household for construction of a future community center should be increased from $690.00 to $753.00. CONCLUSION Our office recommends that the park and trail fee for residential subdivisions be amended to $2,932.00. The City Council may direct the Planning Commission to consider this issue at a public hearing in December such that the proposed increase is effective 1 January 2005. C. Mike Robertson Judy Hudson Andy MacArthur Ron Wagner 2 I - SWO of M (nese" D*Pnr1 menf of Transportation CHANGE ORRER##2 Contractor: lo-Bituminouo. Inc. S.P. No. N/A Address: 2852 Co, Rd. 12 N. Box 337 F.F.I No. NIA �1�II0, jirLN 5613 Location: Maciver Avenue NE and 701h Street NC Contract No, NIA in acomdance with the "Pi of thle, Contract, you are hereby autharlmd and Instructed to pqlbrm the Work as altered by the Mlowine Pmvlelao Add clearing and grubbing of 70"' Street NE right-of-way. Additional storm sower work. Additional cost for end -dumping Class 314 Aggregate. Add conduit crossings. i ESTIMATE OF COST I ITEM NO. ITEM NAME UNIT QUAKTITY UNIJ PRICE AMOUNT 1 AdditionaLPFming and Grubbing i -g ► 1 M,700,013 $4.700.00 2 Additlo a Sin Sewer Work LS 8,17.2.17$9,122.17 3 Added Costs for End Dumping Close 314 Apprepate000 1.00 2 000.00 L 4 Conduit romain s H 161 .56 on 900.00 "original Contract Amount $2,558,910.34 ,jproved Change Orders (#1) $123,917.73 Change In Contract due to this Change Order $50,722.17 Total Contract Amount $2,733,550.24 . Issued by: Project Enghmar pate Approved by: Otsego Ity t7ftici 1 0 to Accepted by: YL 1A/l D Cont ator's ,KUM6r ed Repro tive e CHANGE IN CONTRACT TIME " Pus h this changs, the CmIract Time: 11 ❑ Is Increased by 1 Working DAys 'I ❑ Is Decreased by t:alendw Qays M to not changed. Q May be revised tf the wot erfheatod" oontmlling operation. +,1HnOl1 Shared DxnWuniclpaMOTSECXA356bt389m2.dot ,l MEMO Date: November 8, 2003 To: City Council From: City Administrator Mike Robertson Re: Meeting with Post Office Officials City Planner Dan Licht and I met with Tim Padden and Don Wandzel, representatives of the US post office, to discuss our request for a zip code and a post office. ZIP CODES They said that the criteria for anew zip code was both numbers, because there are only so many nine digit numbers in one zip code, and having more than 50 carrier routes in any one post office. They said that none of the post offices serving Otsego are anywhere close to these criteria. We also discussed whether the number of zip codes serving Otsego could be consolidated. They did indicate that the Dayton post office routes are run out of the Elk River post office so that they would take a look at whether that could be consolidated. We also discussed the problems we have been having when we put Otsego for the city name in the mail going through the Albertville, Monticello, Dayton, and Rogers postal districts. We said that we had not had a problems in the Elk River district. They said we should not be having any problems and seemed disturbed by the idea that,',we were. They offered to run some tests for us to see if mail to those districts was being delivered in the same manner as the other districts. They also said that sometimes the problem is with the -bulk mail companies rather than the post office. I've enclosed their email regarding this test. POST OFFICE The post office representatives stated that the post office is trying to move away from bricks and mortar facilities. They also mentioned the post office in Andover, which was the most recent new post office that they could remember. They said that post office was built because;Andover grew so much they carriers were driving 20; minutes from the post office before they could start their routes. MIn T.TMc i-kM nn v t-lhi nrf t-hPv mPnt-i need which seemed cc: City Council 6.1 Page 1 of 1 Otsego City Hall From: "Wandzel, Donald G - Minneapolis, MN" <donald.g.wandzel @ usps.gov> To: <mike@ci.otsego.mn.us> Cc: "Eineke, Robert J - Minneapolis, MN" <robe rt.j.eineke @ usps.gov>; "Padden, Tim P - Minneapolis, MN" <tim.p.padden@usps.gov> Sent: Friday, November 05, 2004 1:27 PM Subject: Test Mail Mike; During our recent meeting we discussed sending test mail to determine if the service to the various Otsego ZIP Codes was meeting established service standards. As you are aware some of the ZIP Codes have a limited number of residents. If you would provide us with the names and addresses of five different Otsego residents, one for each Zip Code 55301, 55327, 55330, 55362, and 55374, we would be willing to set up a week long service test. We would contact these residents and inform them as to when to begin expecting the mail. Basically all they would have to do is write the date the on the mail piece indicating when it was delivered. We would also provide them an envelope or a box to return the mail. Some of the test pieces would likely be the more valuable electronic letters we mentioned. As discussed we will be generating a map showing the Otsego delivery boundaries for each of the five Zip Codes. As promised we will also analyze the possibility of consolidating the Otsego delivery area into three or four rather than five ZIP Codes. Don Wandzel 11/8/04 Don Lindell Chief Deputy Dave Miller, Captain Operations Gary Torfin, Captain Jail Administrator Elizabeth Frank - WRIGHT COUNTY 2 SHERIFF'S OFFICE OPZ 1, M GARY L. MILLERy d X855 SHERIFF Non -Emergency 763-682-1162 Administration 763-682-7620 Records 763-682-7622 10 2nd St. NW, RM 170 Civil 763-682-7645 Buffalo, Minnesota 55313-1197 Warrants 763-682-7688 1-800-362-3667 Investigation 763-682-7633 Jail Admin. 763-682-7662 Fax 763-682-7610 Victim Assist. 763-682-4537 It has been brought to my attention that you are the owner'of the property at 13662 95 1h St. Otsego. I am writing to inform you of the problems that we have had with the house the last few months. In the last several months, I personally have been to the house on 3 different occasions. The first was for a very large juvenile drinking party. A neighbor that could not sleep because of the large number of people making noise called us. That night there was a number of citations issued and the beer was confiscated. One of your tenants was given a stern verbal warning at this time. The second time this house was brought to my attention was when I caught 4 juvenile's walking from this house to their car that they parked 3 blocks away. That time three of the four were drinking and were issued citations. The third time was when a neighbor called because the tenants were having band practice at 1:30 am and woke them up. Again they tenants were given a verbal warning. Deputy Halverson advised me that he has handled noise complaints from this house on different occasions. I am unaware of the actions that he took them times. The last call we had was on 10-31-04 at 12:10 am. We were called because partygoers were jumping out in the middle of the road and being loud. When the first squad arrived there were well over 100 people there. He had to call in back up because the crowd was being loud and aggressive. Because so many people were..:there and being unruly we had to have 4 Deputies, 2 Sergeants, and 4 Reserves respond to take control of the situation. There were multiple arrests for underage drinking, disorderly conduct, drug paraphernalia, and the tenants were cited with having a loud party. The party was so out of control that it was almost a riot. One of your tenants continued to yell and scream even after we left the party at 2:00 am. This event took over 2 hours for 10 members of Don Lindell Chief Deputy Dave Miller, Captain Operations Gary Torfin, Captain Jail Administrator WRIGHT COUNTY SHERIFF'S OFFICE GARY L. MILLER SHERIFF 10 2nd St. NW, RM 170 Buffalo, Minnesota 55313-1197 1-800-362-3667 JNT Y Q,c z = m 7855 Non -Emergency 763-682-1162 Administration 763-682-7620 Records 763-682-7622 Civil 763-682-7645 Warrants 763-682-7688 Investigation 763-682-7633 Jail Admin. 763-682-7662- 63-682-7662Fax Fax 763-682-7610 Victim Assist. 763-682-4537 the Sheriff's Office to resolve. It was a major strain on us'due to the fact that normally only one Deputy patrols Otsego at this time. This is not the extent of the problems that we are having with this house. Two weeks ago at a meeting with the Otsego Police Commission, this house was one of the main topics that were discussed. At the meeting I was advised that neighbors are having problems with this house on a weekly basis. I asked them to make reports of the incidents and they advised that they are too scared to because they are afraid of retaliation. They cited an incident were people came from that house and attempted to throw eggs at their house because they called in a complaint. Besides the criminal liabilities the tenants hold for continuing to have these loud beer parties they also may assume civil liabilities if someone is+injured as a result of the party. At the party on 10-31-04 there were dozens of cars there and out of the 100 or more people there we could only find three or four of them who' were sober enough to drive. I hope that you are able to assist us in ending the problems at this residence before someone gets hurt as a result of the drinking. So far the tenants have not responded to the warnings and citations that we have issued. If you have any questions feel free to contact me at 763-682-1162. My normal hours are from 10 pm to`6:30 am. A copy of this letter and report will also be given to the City of Otsego and the'Sheriff Office Administration so they may also be able to answer any questions. Thank you, Deputy Picht #149