Loading...
Item 3.1 Sunshine Dental3601 Thurston Avenue Anoka, MN 55303 763.231.5840 TPC@PlanningCo.com 1 PLANNING REPORT TO: Otsego Planning Commission FROM: D. Daniel Licht REPORT DATE: 14 May 2025 60-DAY DATE: 21 June 2025 RE: Otsego – Waterfront Commons; Sunshine Pediatric Dentistry TPC FILE: 101.02 BACKGROUND Arrow Companies, Inc. has submitted an application to develop Outlot A, Otsego Developments Addition located at the northeast quadrant of TH 101 and 90th Street. The proposed development is a 3,495 square foot dentist office that requires consideration of a PUD Development Stage Plan, vacation of existing drainage and utility easement, and final plat that are subject to review by the Planning Commission and approval of the City Council. The submitted plans also illustrate a 3,000 square foot expansion of the proposed building. A public hearing has been noticed for the Planning Commission meeting on 19 May 2025. Exhibits: Property Location Map Architectural plans dated 05-12-2025 (7 sheets) Civil plans dated 05.12.2025 (11 sheets) Final Plat ANALYSIS Comprehensive Plan. The 2023 Comprehensive Plan guides the subject property for commercial uses as part of a retail, service, and office district located adjacent to the TH 101 and CSAH 39 interchange. The proposed building will provide for a pediatric dentist office expanding services and expanding commercial building space within the City. The proposed land use is consistent with the Future Land Use Plan. Item 3.1 2 Zoning. The subject property is zoned PUD, Planned Unit District with allowed uses specified as being those permitted, conditional, and interim uses as allowed in the B-1, Retail Business District. The proposed dentist office is a permitted use within the B-1 District and PUD District. Surrounding Uses. The subject property abuts TH 101 to the west. Areas to the north, east, and south of the subject property are all within the Otsego Waterfront East PUD District. The surrounding uses consist of medical and professional offices, a child-oriented recreation use, a restaurant, and senior housing. The proposed PUD Development Stage Plan for the subject property will be complementary to existing and planned land uses within Otsego Waterfront East. Lot Requirements. The Otsego Waterfront East PUD District establishes no minimum lot area or width requirements. The suitability of the lot to accommodate the proposed development is based on the ability to comply with applicable setbacks, off-street parking, and other site design requirements. The Otsego Waterfront East PUD District establishes setbacks of 30 feet from public street rights-of-way and 10 feet from interior lot lines. The proposed development of Lot 1, Block 1 complies with the required setbacks. The submitted plans illustrate a 3,000 square foot expansion of the proposed building. The expansion encroaches into a drainage and utility easement and over a trunk watermain. The plans for the future expansion will need to be adjusted to avoid the encroachment into the drainage and utility easement or other solution approved by the City Engineer at such time as the planned expansion is to occur. The future expansion of the principal building will be subject to site and building plan review at the time the construction is proposed. Building Plans. The developer has submitted architectural plans for the proposed 3,495 square foot dental office building to be constructed on Lot 1, Block 1. Exterior Materials. The Otsego Waterfront East PUD Design Guidelines and Section 11- 17-4.D.1 of the Zoning Ordinance establish exterior finish requirements for the proposed building. The architectural plans include a schedule for the exterior elevation materials, which indicates ledgestone and glass (Grade A) materials comprise 67.1 percent of the exterior finish, with metal and wood-look (Grade B) materials used for 32.9 percent of the exterior finish. The exterior finishes and mix of materials comply with the requirements of the Zoning Ordinance. Height. Principal buildings within the Waterfront East PUD District are allowed to be up to three stories or 35 feet in height. The proposed building is a single-story structure with a height of 12.0 feet to the top of the roof and 15.5 feet to the top of the angled roof sections. The proposed building complies with the height limits of the Waterfront East PUD District. 3 The submitted plans do not indicate the location of building mechanical equipment. If mounted on the roof of the building, the mechanical units must be screened by the parapet or other measures so as not to be visible from 90th Street and Quantrelle Avenue. This requirement will need to be verified by the Zoning Administrator prior to issuance of a building permit. Access. The subject property abuts 90th Street and Quantrelle Avenue. The access the three commercial lots within the preliminary plat is shared via one driveway to 90th Street and one driveway to Quantrelle Avenue. An ingress/egress and cross parking easement has been recorded with the Otsego Developments Addition final plat. The access to 90th Street is be limited to right-in/right-out only due to the existing median within the four lane roadway. The existing access is 280 feet from Quantrelle Avenue and more than 320 feet from the northbound TH 101 entrance ramp. The access to Quantrelle Avenue is setback at least 200 feet from existing driveways onto Quantrelle Avenue. The location of both of the existing driveways complies with the spacing requirements of Section 11-21-6 of the Zoning Ordinance. A traffic study completed for the Mississippi Landings development evaluated the capacity of 90th Street and Quantrelle Avenue. The study indicated that full build out of the Waterfront East, including the subject property, would necessitate a dedicated right turn lane at the 90th Street and Quantrelle Avenue intersection. The Otsego Developments Addition final plat dedicates right-of-way for the right turn lane. The timing for construction of the right turn lane is deferred until Outlot B, Otsego Developments is final platted and would only be built if a need for the turn lane is determined at that time. Off-Street Parking. The submitted plans illustrate the 59 off-street parking spaces constructed with Phase 1 and 35 spaces to be constructed with Phase 2 for a total of 94 spaces. The Phase 1 approval included a proof-of-parking agreement for construction of five spaces east of the Phase 1 building and the submitted plans illustrate 12 additional spaces that would be constructed with the planned future expansion of the Phase 2 building. The table below outlines that the number of off-street parking spaces available within Phases 1 and 2 under the shared ingress/egress and cross parking easement complies with Section 11-21-13 of the Zoning Ordinance. Business Requirement Area Required Spaces Phase 1 Kennedy Vision 1 space/200sft. 4,060sf.19Lil’ Gym Phase 2 Dentist 3,495sf. 16 Future Expansion 3,000sf. 14 TOTAL 49 4 The off-street parking spaces are designed as nine feet wide by 20 feet in depth and the spaces abutting the sidewalk or perimeter of the parking area as 18 feet deep (with two foot overhang) accessed via 24 foot wide drive aisles in compliance with Section 11-21-7.B of the Zoning Ordinance. The parking area is shown to be surfaced with asphalt and surrounded by perimeter concrete curb as required by Section 11-21-7.C and D of the Zoning Ordinance. The construction specifications for the off-street parking area are to be subject to review and approval of the City Engineer. Sidewalks. There is an existing sidewalk abutting the south line of the subject property. The civil plans illustrate construction of a sidewalk along the front line of the proposed building. A connection along the west side of the driveway to 90th Street must be added between the sidewalk adjacent to 90th Street to the sidewalk at the front of the building to allow for public access to the proposed building and other uses within the Waterfront Commons development. Landscaping. A landscape plan has been submitted that provides for a planting turf grass and one ornamental tree. Section 11-19-2.B.2 of the Zoning Ordinance requires landscaping be installed: a. The boundary or perimeter of the proposed site at points adjoining other property. b. The immediate perimeter of the structure. c. The perimeter of parking and loading areas. Section 11-21-7.K of the Zoning Ordinance further requires that off-street parking areas be landscaped so as to be screened from view of public rights-of-way. The landscape plan must be revised to include shade and/or ornamental trees in the yard along 90th Street and west side of the driveway accessing 90th Street. Tall grasses and shrubs should also be incorporated to screen parking areas at a lower level and at the foundation of the building. The revised landscape plan is to be subject to review and approval of the Zoning Administrator. Section 5-2-3.C.2 of the City Code requires installation of in-ground irrigation for the yards and planting areas within the property, which must be indicated on the landscape plan. 5 Signs. The PUD Development Stage Plan approved for Phase 1 of Waterfront Commons established allowances for the following signs within the development: Freestanding signs: o One freestanding sign not to exceed 320 square feet in area and a height not to exceed 70 feet or 20 feet above the centerline elevation of TH 101 measured perpendicular to the sign location, whichever is less. o One freestanding sign not to exceed 64 square feet in area or 15 feet in height at each driveway access to 90th Street and Quantrelle Avenue. o All freestanding signs must be setback 10 feet from perimeter property lines. Wall signs to be mounted on the principal buildings are allowed on all four elevations to 15 percent of the wall area of the building with no individual sign larger than 100 square feet in area. The submitted plans identify a freestanding pylon sign at the southwest corner of the subject property, as well as a monument sign at the 90th Street access. The proposed pylon sign is not provided for by the initial Waterfront Commons PUD General Development Plan approval and should be removed from the plans unless supported by the Planning Commission. The architectural plans do not identify proposed wall signs. A sign permit subject to review and approval of the Zoning Administrator is required prior to placement of any signs upon the property. Exterior Lighting. Section 11-16-6 of the Zoning Ordinance establishes performance standards for exterior lighting. An exterior lighting plan including photometric measurements of light intensity and indicating the type, location, and height of all exterior light fixtures must be submitted with application for a building permit. The exterior lighting plan is to be subject to review and approval of the Zoning Administrator. Waste Storage. The submitted plans show a location for waste storage containers along the west side of the off-street parking area. Plans for the enclosure that comply with the requirements of Section 11-18-4.C of the Zoning Ordinance for screening outdoor waste storage areas must be submitted with application for a building permit. The waste enclosure structure is to be subject to review and approval of the Zoning Adminstrator. Utilities. The developer has submitted a utility plan for connection of the proposed building to City sewer and water utilities. The City Engineer has met with the Utility Department to review the submitted plans. All utility plans are subject to review and approval of the City Engineer. 6 The developer will pay Utility Availability Charges for Lot 1, Block 1 at the time of final plat approval in accordance with the current Fee Schedule. Utility Connection Charges will be collected when a building permit is issued for the proposed building subject to Fee Schedule in effect at that time. Grading Plan. Plans for grading, erosion control, and stormwater management have been submitted for the property. All grading, drainage, and erosion control plans are subject to review and approval of the City Engineer. Easements. Section 10-8-12 of the Subdivision Ordinance requires dedication of drainage and utility easements at the perimeter of each lot, over public utility lines, and regional stormwater drainage facilities. The proposed final plat illustrates the required easements, which are subject to review and approval of the City Engineer. A drainage and utility easement dedicated at the southeast corner of Outlot A, Otsego Waterfront Addition to overlay a catch basin is proposed to be vacated. The City Engineer is requiring that the catch basin be relocated to the west curb of the private drive. With relocation of the catch basin, the existing drainage and utility easement no longer serves a public purpose. Park Dedication. Section 10-8-15 of the Subdivision Ordinance establishes park dedication requirements for new subdivisions. Park dedication requirements for Otsego Waterfront East, including the subject property, were satisfied with the initial final plat approval with dedication of park easements and improvements within the outlot encompassing the Mississippi River frontage. No additional park dedication is required for the proposed final plat. Development Contact. A development contract is required with final plat approval by Section 10-10-4.A of the Subdivision Ordinance to provide for completion of public improvements, establishment of required securities, and payment of applicable fees related to the subdivision of the subject property. Section 11-9-7 of the Zoning Ordinance also requires that the developer enter into a performance agreement with the City to provide for construction of the project improvements within the subject property. The City Attorney will draft the development contract, which is subject to approval by City Council resolution concurrent with the zoning and subdivision applications. RECOMMENDATION The proposed Sunshine Pediatric Dental development is consistent with the policies of the Comprehensive Plan and the requirements of the Zoning Ordinance and Otsego Waterfront East PUD District, as well as the Subdivision Ordinance. Our office recommends approval of the applications as outlined below. 7 POSSIBLE ACTIONS A.Motion to recommend approval of a PUD Development Stage Plan for Sunshine Pediatric Dentistry, vacation of drainage and utility easements, and a final plat of Sunshine Addition, subject to the following conditions: 1.The subject property shall be developed in accordance with the site and building plans submitted to the City subject to the stipulations, limitations, and conditions as approved by the City Council in accordance with Section 11-9-4 of the Zoning Ordinance. 2.Any mechanical equipment mounted on the roof of the buildings shall be screened by the parapet or other measures so as not to be visible from 90th Street and Quantrelle Avenue, subject to review and approval of the Zoning Administrator prior to issuance of a building permit. 3.A five foot wide concrete sidewalk shall be constructed between 90th Street and the sidewalk at the front line of the principal building along the west side of the driveway accessing 90th Street. 4.The construction specifications for the off-street parking area shall be subject to review and approval of the City Engineer. 5.Landscaping: a.The landscape plan shall be revised to comply with Section 11-19-2.B.2 and Section 11-21-7.L of the Zoning Ordinance, subject to review and approval of the Zoning Administrator. b.An in-ground irrigation system for all yards and planting areas within Lot 1, Block 1 shall be required in compliance with Section 5-2-3.C.2 of the City Code. 6.Signs shall comply with the PUD Development Stage Plan for Waterfront Commons, unless modified by approval of the City Council, subject to issuance of a sign permit of the Zoning Administrator. 7.An exterior lighting plan including photometric measurements of light intensity and indicating the type, location, and height of all exterior light fixtures compliant with Section 11-16-6 of the Zoning Ordinance shall be submitted with application for a building permit and is subject to review and approval of the Zoning Administrator. 8 8. Plans for a waste container enclosure that complies with the requirements of Section 11-18-4.C of the Zoning Ordinance shall be submitted with application for a building permit, subject to review and approval of the Zoning Administrator. 9. All grading, drainage, and erosion control plans shall be subject to review and approval of the City Engineer. 10. All utility plans shall be subject to review and approval of the City Engineer. 11. The developer shall pay Utility Availability Charges for Lot 1, Block 1 in accordance with the City Code and current fee schedule in effect at the time of final plat approval. 12. All drainage and utility easements shall be subject to review and approval of the City Engineer. 13. The developer shall enter into a development contract as required by Section 10- 10-4.A of the Subdivision Ordinance Section 11-9-7 of the Zoning Ordinances drafted by the City Attorney and subject to approval of the City Council. B. Motion to recommend the application be denied based on a finding that the request is inconsistent with the Comprehensive Plan and requirements of the Zoning Ordinance and/or Subdivision Ordinance. C. Motion to table. c. Adam Flaherty, City Administrator/Finance Director Audra Etzel, City Clerk Ron Wagner, City Engineer David Kendall, City Attorney Jason Coombe, Building Official Property Location Sunshine Pediatric Dentist 460 ft Overview Legend Highways Interstate State Hwy US Hwy Roads City/Township Limits c t Parcels Torrens 72,/(772,/(7/$%67(5,/(3$1,1)$17(;$06725$*(0(&+2375($70(17%$<%5($.5220%,=0*5'2&2)),&(5(&(37,21:$,7,1*+$//7$1.'HSDUWPHQW/HJHQG$&&(6625<&,5&8/$7,21(;$02)),&(6725$*(:$,7,1*%(1&+.,'6 &2817(5a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►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►DD857.5 857.5864 861862 862 863863856856857857858858859859860860863861862863863864864862862863863DD►►►►►►►►►►►►►►►►►►►►►►262286868►►►6286286286868686N 66°28'42" E 386.68S 25°0 9' 3 9" E 1 0 2. 6 3 71.7862.33S 68°30'35" W 284.21N 26°3 1' 2 5" W 1 1 6. 9 1 N 37°35'23" W 101.27S 66°28'42" W 87.43N 23°3 1' 1 8" WN 23°55'07" E5.00S 83°19'43" WHTVCCCVCCTCL O T 1N 23°55'07" E 62.34O U T L O T AO U T L O T BB L O C K 126.0QUAN T R E L L E A V E.L=55.98 R=35.00=91°38'21"R=175.00=30°35'24" L=93.43L=71.62 R=2567. 0 0 =01°35'5 5 "L=19.31R=125.00=08°51'03"L=136.70R=125.00=62°39'35" ►►███HTTTDFUTURESTAFFPARKINGSUNSHINE PEDIATRICDENTISTRY~3,495 SQ FTFUTUREEXPANSION~3,000 SQ FT█ ████ ████ █████ █████ ████ ██████ █████ ██████ ██████ █████ ████ ██████ █████ ████ ██████ █████ ████ ██████ █████ ████ █████ █████ ████ ███████ █████ ███ ██ ███ ██ ██ █ ███ █ █████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████FFE = 864.3███████████████████████████ █████ ███████████████████████████████████████████████████████████████DDDDDD HT███████████████████████████████████████████████████████████████████████████████████████████████ ███ ██ ███ ██ ████████████████████████████████████████████████ █ █ █ █ █ █ █ █ █ █ █ █ █ █ █ █ █ █ ██ ██ ██ ██ ██ ██ ███ █████ ██ █████ ██ ███████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████ ███ ███ ███ ███ ██ ███ ███ ███ ███ ████ ███ ███ ████████████████████████████████████████████████████████████████████████████████TT███████████████████████████████████████████████████████████████████████████████DFUTURESTAFFPARKINGSUNSHINE PEDIATRICDENTISTRY~3,495 SQ FTFUTUREEXPANSION~3,000 SQ FT███████████ ██████████ ███████████ ███████████ ██████████ ██████████████ ███████████ ████████████ █████████████ ██████████████ ██████████████ ███████████████████ ███████████████ ██████████ ██████████████ ███████████ ██████████ ██████████████ ███████████ ██████████ ███████████ ███████████ ██████████ ███████████ ███████████ ██████████ ██ █████ ███████ ████████████████████ █ ███ ██ ██████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████FFE = 864.3██████████████████████████████████████████████████████████████████████████████████████████ ███████████████████████ ██████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████861862863863863864 864 864 861861861861861861 862862862862 863863863863863863863864864864864►►830███8638638638638638648648648648648648648864864 8638638638863863863863863863863864864864864864 DDDDDD ►►DS►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►HT►►►►►►►►►►►►►►►►►►►►►►►►►TTDFUTURESTAFFPARKINGSUNSHINE PEDIATRICDENTISTRY~3,495 SQ FTFUTUREEXPANSION~3,000 SQ FT►►█ ███████ █████████ ██████████ ██████████ █████████ ████████████ ██████████ ███████████ ██████████ ██████████ █████████ ████████████ ██████████ █████████ █████████████ ██████████ █████████ █████████████ ██████████ █████████ ██████████ ██████████ █████████ ███████████████ ██████████ ██████ ██ █►►█►►█ █►►█ ██ █ █►►►►██ █ ██████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████FFE = 864.3████████████████████████████████████████►►►►►►►█►►►►►███████████████ ████████ ████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████►►►►►►►►►►►►►►►►►►►►►DDDDDDDDDDDDDDD►►► ████►►HTTTD6520860.527rain guardian6527861.223trash b6533861.807trash6537861.412trash e cls6539861.218os-1FUTURESTAFFPARKINGSUNSHINE PEDIATRICDENTISTRY~3,495 SQ FTFUTUREEXPANSION~3,000 SQ FT█ ███ ███ ████ ████ ███ █████ ████ ██████ █████ ███ ████ ███████ ██████ ██ ████ ███ ███ █████ ████ ███ ████ ████ ███ ████ ████ ██ █ ████ ██ ██ █ ███ █ ██████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████FFE = 864.3██████████████████████████████████ ██████ ██████████████████████████████████████████████████████████DDDDDD D2S1SFUTURESTAFFPARKINGSUNSHINE PEDIATRICDENTISTRY~3,495 SQ FTFUTUREEXPANSION~3,000 SQ FT█ ███████ █████████ ██████████ ██████████ █████████ ████████████ ██████████ █████████ ██████████ ██████████ █████████ ████████████ ██████████ █████████ █████████████ ██████████ █████████ █████████████ ██████████ █████████ ██████████ ██████████ █████████ ███████████████ ██████████ ██████ █ ██ ██ █ █ ███ █ ██████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████████FFE = 864.3██████████████████████████████████████████ █████ ███████████████████████████████████████████████████████████████████████████████████████████████████████████████████████►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►HT►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►►DDD►►►►►►►►►►►►►►► N 37°35'23" W 101.27S 66°28'42" W 87.43N 23°3 1' 1 8" W 5.00L O T 1B L O C K 1S 66°28'42" W 168.20N 21°29' 2 5 " W 1 3 6. 6 4 N 68°30'35" E 287.5543.57 N 26°3 1' 2 5" W SITECITY COUNCIL, CITY OF OTSEGO, MINNESOTAThis plat of SUNSHINE ADDITION was approved and accepted by the City Council of the City of Otsego, Minnesota, at a regular meeting thereof held this______ dayof ______________________, 20_____, and said plat is in compliance with the provisions of Minnesota Statutes, Section 505.03, Subd. 2. By ____________________________________________, Mayor By _______________________________________, ClerkWRIGHT COUNTY SURVEYORI hereby certify that in accordance with Minnesota Statutes, Section 505.021, Subd. 11, this plat has been reviewed and approved this ______ day of _________________________, 20_______. _________________________________________ Wright County SurveyorWRIGHT COUNTY LAND RECORDSPursuant to Minnesota Statutes, Section 505.021, Subd. 9, taxes payable for the year 20_______ on the land hereinbefore described have been paid. Also, pursuant to Minnesota Statutes, Section 272.12, there are no delinquent taxes and transfer entered this ______ day of __________________________, 20_______. _________________________________________ Wright County Land Records AdministratorWRIGHT COUNTY RECORDERI hereby certify that this instrument was filed in the office of the County Recorder for record on this _____ day of _________________________, 20_____, at ________o'clock _____.M. and wasduly recorded in Cabinet No. __________________________, Sleeve __________________________, as Document No. _____________________________. _______________________________________ Wright County RecorderKNOW ALL PERSONS BY THESE PRESENTS: That Otsego Developments, LLC, a Minnesota limited liability company, owner of the following described property situated in the County of Wright,State of Minnesota, to wit: OUTLOT A, OTSEGO DEVELOPMENTS ADDITION, Wright County, Minnesota.Has caused the same to be surveyed and platted as SUNSHINE ADDITION and does hereby dedicate to the public for public use the public way and the drainage and utility easements as created by this plat.In witness whereof said Otsego Developments, LLC, a Minnesota limited liability company, has caused these presents to be signed by its proper officer this_____ day of __________________________,20____.Otsego Developments, LLC By _____________________________________________ , Vice President, Chief Financial Officer, and Treasurer (signature)STATE OF ________________COUNTY OF ________________This instrument was acknowledged before me this ______ day of ___________________, 20____, by Steven Fischer, Vice President, Chief Financial Officer, and Treasurer of Otsego Developments, LLC,a Minnesota limited liability company, on behalf of the company. __________________________________________ ________________________________________________ (Signature) (Printed name) Notary Public,_______________________ County, ________________ My Commission Expires___________________I Gregory R. Prasch do hereby certify that this plat was prepared by me or under my direct supervision; that I am a duly Licensed Land Surveyor in the State of Minnesota; that this plat is a correctrepresentation of the boundary survey; that all mathematical data and labels are correctly designated on this plat; that all monuments depicted on this plat have been, or will be correctly set within oneyear; that all water boundaries and wet lands as defined in Minnesota Statutes, Section 505.01, Subd. 3, as of the date of this certificate are shown and labeled on this plat; and all public ways are shownand labeled on this plat.Dated this ____________day of ____________________, 20 ______. ______________________________________ Gregory R. Prasch, Licensed Land Surveyor Minnesota License No. 24992STATE OF MINNESOTACOUNTY OF HENNEPINThe foregoing Surveyor's Certificate was acknowledged before me on this ______ day of ___________________, 20____, by Gregory R. Prasch, Land Surveyor, Minnesota License No. 24992. __________________________________________ ________________________________________________ (Signature) (Printed name) Notary Public, Hennepin County, Minnesota My Commission Expires___________________SUNSHINE ADDITION BEARING ORIENTATION:THE SOUTHERLY LINE OF OUTLOT A, OTSEGODEVELOPMENTS ADDITION IS ASSUMED TOBEAR NORTH 66°28'42" EASTSec. 14 & 15, Twp. 121, R. 23Vicinity MapNo ScaleSCALE IN FEET06030901 INCH = 30 FEET Main Office: 3601 Thurston Avenue, Anoka, MN 55303 Phone: 763/427-5860 www.haa-inc.com MEMORANDUM TO: Honorable Mayor and City Council CC: Adam Flaherty, City Administrator Audra Etzel, City Clerk Daniel Licht, City Planner Dave Kendall, City Attorney Steve Fischer, Arrow Companies Jeffrey Prasch, Demarc FROM: Ronald Wagner, P.E. City Engineer DATE: May 7, 2025 RE: Sunshine Addition We have reviewed the following information provided by Demarc on behalf of Arrow Companies regarding the Sunshine Addition. Site Development Plans and Preliminary Plat for Sunshine Addition, Otsego, dated 4/15/2025. The submittal is to be considered for preliminary acceptance. We would offer the following comments: Preliminary Plat 1. The catch basin in proposed Lot 1, Block is to be replaced with a catch basin in west curb line of the private drive and the grading plan modified accordingly; the final plat is also to be revised to remove the drainage and utility easement overlaying the catch basin and stormwater pipe. Title Sheet 2. Add an approval signature block for City Engineer. Details 3. Add Otsego Standard plate #301 Existing Conditions and Removals Plan 4. Removals of pavement for catch basin in private drive. 5. Removals of trail for ADA ramps at either side of private drive crossing. Sunshine Addition Page 2 Site Plan 6. Proposed monument sign is in easement, which is not allowed. Easement should be removed with relocation of the catch basin as described above. 7. Proposed building extension cannot be within existing easement. Grading & Drainage Plan 8. Regrade to southeast of building to be able to relocate catch basin and remove D& U easement so monument sign can be located as proposed. Utility Plan 9. Water and sewer access apparently was not relocated with Otsego Developments Addition to prevent removal of a portion of private drive. Water and sewer utility service shall be designed and constructed such that a minimal number of bends are required. All sanitary sewer bends will need clean outs. The water service is located as close as feet from trail. Unless directional drilled, portions of the trail will need to be removed. If trail removed, replacement will be from needed ADA ramps to west until past improvements to minimize joints. We highly recommend moving utility room to east side of building to eliminate these issues. 10. With the building permit, a water meter along with a deduct irrigation meter will be required. Irrigation line will also need a backflow preventer installed. Storm Water Pollution Prevention Plan 11. Will require update with catch basin relocated. Landscape Plans 12. No comments. Other Consideration 13. No comments. Summary and/or Recommendation 14. Please make the corrections listed above and re-submit.