Loading...
Item 3.13 West WWTF Improvements Phase 1 Project Change Order Proposals Request for City Council Action DEPARTMENT INFORMATION ORIGINATING DEPARTMENT REQUESTOR: MEETING DATE: Utilities Utility Manager Neidermeier May 27, 2025 PRESENTER(s) REVIEWED BY: ITEM #: Consent AE2S Engineer Schaefer City Administrator/Finance Director Flaherty 3.13 – West WWTF Project Change Order Proposals STRATEGIC VISION MEETS: THE CITY OF OTSEGO: Is a strong organization that is committed to leading the community through innovative communication. X Has proactively expanded infrastructure to responsibly provide core services. Is committed to delivery of quality emergency service responsive to community needs and expectations in a cost-effective manner. Is a social community with diverse housing, service options, and employment opportunities. Is a distinctive, connected community known for its beauty and natural surroundings. AGENDA ITEM DETAILS RECOMMENDATION: City Staff is recommending that the City Council approve change orders for the West WWTF project. ARE YOU SEEKING APPROVAL OF A CONTRACT? IS A PUBLIC HEARING REQUIRED? No No BACKGROUND/JUSTIFICATION: A package of Change Order Proposals for the West WWTF project were reviewed with the Public Works Subcommittee at their meeting on May 21, 2025. The following table is a summary of the change orders that were recommended for consideration of approval by the City Council. The change orders represent various justifications ranging from necessary modifications to complete the project to noise abatement to mitigate sound levels with the proximity to neighboring homes and the adjacent park. The proposed net increase in project cost of $86,080 represents 0.254% of the bid cost and would bring the total change order plus authorized direct purchase items amount to a net increase to 5.03% for the project. CPR #Description Amount CPR 65 Add Pnuematic Actuator to MTB-UVV-BFV1 $7,784 CPR 66 Sound Attenuating Fences $51,697 CPR 67 Flashing at ADM $3,297 CPR 68 Ductile pipe and fittings escalation (part 2)$11,481 CPR 69 Relocating EF-5 at PTB $3,480 CPR 70 Spare Valve Actuator $4,106 CPR 71 Additional Trees $1,599 CPR 72 Raised Electrical Manhole $2,636 SUPPORTING DOCUMENTS ATTACHED: • Change Order Proposals for #65 to #72 POSSIBLE MOTION PLEASE WORD MOTION AS YOU WOULD LIKE IT TO APPEAR IN THE MINUTES: Motion to approve Change Order Proposals #65 to #72 as indicated in the table above in the amount of $86,080 to Rice Lake Construction Group for the West WWTF Project. BUDGET INFORMATION FUNDING: BUDGETED: Fund 602 – Sanitary Sewer Utility Yes March 24, 2025 AE2S 6901 East Fish Lake Rd. Suite 184 Maple Grove, MN 55369-5457 ATTN: Scott Schaefer, PE Re: Otsego West WWTF Improvements Phase 1 RLCG Project No. 2215 Change Order Proposal #: 065 – Add Pneumatic Actuator to MTB-UVV-BFV1 Scott, It was requested to furnish and install a pneumatic actuator to valve MTB-UVV-BFV1 in the basement of the MTB Building. The total cost to add this actuator is $7,784.00. Attached is a breakout of the costs. Please let me know if you have any questions. Please note that a spare actuator was used from Memcor’s equipment package, and the price above does not include a replacement actuator. Sincerely, Rice Lake Construction Group Matt Perpich Project Manager 2215 Otsego West WWTF Improvements Phase 1 22360 County Road 12, PO Box 517 3/24/2025 Deerwood, MN 56444 65 HOURS $ RATE TOTAL RATE TOTAL RLCG Labor 12.00 HR 12.00 106.00$ $1,272.00 -$ $0.00 -$ -$ 1,272.00$ RLCG Material 1.00 LS -$ $0.00 200.00$ $200.00 -$ -$ 200.00$ RLCG Equipment LS -$ $0.00 -$ $0.00 -$ -$ -$ -$ $0.00 -$ $0.00 -$ -$ -$ APS - Parts for Valve 1.00 LS -$ $0.00 2,877.00$ $2,877.00 -$ -$ 2,877.00$ Killmer 1.00 LS -$ $0.00 -$ $0.00 2,264.00$ -$ 2,264.00$ -$ $0.00 -$ $0.00 -$ -$ -$ -$ $0.00 -$ $0.00 -$ -$ -$ -$ $0.00 -$ $0.00 -$ -$ -$ Misc. Small Tools and Mat'l 5% of Labor 1.00 ea 5.00%63.60$ Sales Tax 1.00 ea 7.375%226.93$ Totals 12.00 1,272.00$ 3,077.00$ 2,264.00$ -$ 6,903.53$ Rice Lake Mark-up on Subs (5%)113.20$ Rice Lake Mark-up on Labor, Material, and Equipment (15%)652.35$ Bond Cost (1.5%)115.04$ Total Change Order Proposal Request 7,784.00$ Days Requested 0 RLCG PROJECT #: PROJECT NAME: DATE: COP: CHANGE ORDER PROPOSAL MATERIAL SUBCONTRACTOR TOTAL EQUIPMENT TOTAL LINE TOTALDESCRIPTIONQTYUNITLABOR Advanced Process Solutions Quote QQ-2901048-02 Date 3/10/2025 Advanced Process Solutions Quote Validity Expiration: 4/9/2025 1 Company Rice Lake Construction - Deerwood Sales Rep Patrick Connelly Name Matt Perpich Email patrick.connelly@aps-inc.com Email matt_perpich@ricelake.org Phone +1 612 398 2667 Phone +1 218 546-5519 Prepared By Luke Habermeyer Email luke.habermeyer@aps-inc.com Phone +1 763-694-7551 x2486 Quote Ref Rice Lake Construction Quote Line No Product Details Qty Unit Price Line Total Delivery 1 Part Number ASSEMBLY 1 $2,627.00 $2,627.00 1-2 Week(s) 1.01 Part Number 6A6DR5-0200NN015KA4 E/P,2W,4-20mA I/FB,DA,GAGE BLK 1 1.02 Part Number 6A/KT-40 MK Positioner to Actuator Coupler and Mounting Bracket 1 1.03 Part Number 6A.KT-40HF Positioner to Actuator Hose and Fittings 1 1.04 Part Number 551000-74603533 S55 FIL/REG,5 MICRON,1/4NPT 1 1.05 Part Number MR31.12-KT40 Actuator to Valve Mounting Kit 1 2 Part Number Mtg. and Automation On-site mounting and automation of valve 1 $250.00 $250.00 Total Price: ( USD ) If you elect to pay via credit card, your total will include an additional 3% checkout fee for payment by credit card (not greater than our cost of acceptance). Other payment options not subject to the fee include check, wire, ACH, or debit. $2,877.00 Payment Terms Net 30 Days Terms Notes All deliveries subject to terms of confirmed order. Buyer is solely responsible for knowing its application requirements and specifications and the suitability of the products therefor (including material compatibility and pressure and temperature limits). Information about the Bray products, including the technical specifications for them, can be found in the corresponding manual for each available at https://www.bray.com/resources/documents/manuals-guides?page=1 Please contact productspecs@bray.com with any questions An Equal Opportunity Employer March 15, 2025 Mr. Matt Perpich Rice Lake Construction Group Re: Otsego West WWTP Dear Matt, Killmer Electric Company proposes to the following change to our contract for the subject project: Change Request – Modulating Valve add to Filtrate to UV Costs below are broke out to add conduit and wiring to add modulating pneumatic actuator per email form Mr. Matt Perpich. Does not include any cost from IPS as it is assumed spares are available in respective control panel for the Analog in and out. Add Modulating Control Valve for Filtrate to UV QTY Mat unit Mat total Labor unit Total labor Terms in Control Panel 1 $0.00 2 2 Valve wiring/Connection 1 38 $38.00 3 3 3/4" Rigid 90 4.25 $382.50 0.065 5.85 16awg 2/c TSP 200 0.02 $4.00 0.012 2.4 Totals $424.50 13.25 Tax $33.96 114 / hour $1,510.50 $458.46 $1,510.50 $1,968.96 15.00% $295.34 $2,264.30 Total Cost Add: $2,264.00 Please call with any questions or comments. Regards, Matthew Pettit Project Manager Outlook Fw: Otsego West - Actuator of EFF Line From John Larkin <John.Larkin@AE2S.com> Date Wed 3/12/2025 8:44 AM To Matt Perpich <matt_perpich@ricelake.org>; Sam Boelter <sam_boelter@ricelake.org> Cc Scott Schaefer <Scott.Schaefer@AE2S.com>; Jason Benson <Jason.Benson@AE2S.com> Caution: This email originated from outside the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. Scratch that last response. For Cable & Conduit: Run 2-2/C-#16 STP in 3/4" RMC from MTB-SCP1 to MTB-UVV-BFV1 Ulize the following I/O points in MTB-SCP1: 0/3/2: FILTRATE PUMP EFFLUENT FLOW CONTROL VALVE POSITION FEEDBACK 0/4/2: FILTRATE PUMP EFFLUENT FLOW CONTROL VALVE POSITION COMMAND Thank, John John Larkin, EIT Engineer in Training Mobile: (763) 355-8901 From: Jason Salber <Jason.Salber@AE2S.com> Sent: Wednesday, March 12, 2025 8:34 AM To: Dan Hanson <Dan.Hanson@AE2S.com> Cc: Sco Schaefer <Sco.Schaefer@AE2S.com>; John Larkin <John.Larkin@AE2S.com>; Jason Benson <Jason.Benson@AE2S.com> Subject: RE: Otsego West - Actuator of EFF Line   Sorry, I should have asked if it was modulang vs. open/close… Please replace everything below with the following: For Cable & Conduit: Run 2-2/C-#16 STP in 3/4" RMC from MTB-SCP1 to MTB-UVV-BFV1 Ulize the following I/O points in MTB-SCP1: 3/24/25, 2:18 PM Mail - Matt Perpich - Outlook https://outlook.office365.com/mail/id/AAQkADJkZjEzMGYxLWEzYjMtNDhkZi1hZjM3LTcwNGExNzdmYjI0MwAQADTooWUHxuVNms%2B9hFO9le8%3D 1/4 0/3/2: FILTRATE PUMP EFFLUENT FLOW CONTROL VALVE POSITION FEEDBACK 0/4/2: FILTRATE PUMP EFFLUENT FLOW CONTROL VALVE POSITION COMMAND Jason Salber, EIT Advanced Technical Specialist Mobile: (701) 204-8106 From: Jason Salber Sent: Tuesday, March 11, 2025 11:58 PM To: Dan Hanson <Dan.Hanson@AE2S.com> Cc: Sco Schaefer <Sco.Schaefer@AE2S.com>; John Larkin <john.larkin@AE2S.com>; Jason Benson <Jason.Benson@AE2S.com> Subject: RE: Otsego West - Actuator of EFF Line Guys, Please forward this along as needed For Cable & Conduit: Run 5-1/C-#14 in 3/4" RMC from MTB-SCP1 to MTB-UVV-BFV1 Ulize the following I/O points in MTB-SCP1: 0/5/8: FILTRATE PUMP EFFLUENT ISOLATION VALVE OPEN INDICATION 0/5/9: FILTRATE PUMP EFFLUENT ISOLATION VALVE CLOSED INDICATION 0/10/2: FILTRATE PUMP EFFLUENT ISOLATION VALVE OPEN COMMAND Let me know if you have any quesons. Thanks, Jason Salber, EIT Advanced Technical Specialist Mobile: (701) 204-8106 From: Dan Hanson <Dan.Hanson@AE2S.com> Sent: Monday, March 10, 2025 11:22 AM To: Jason Salber <Jason.Salber@AE2S.com> Cc: Sco Schaefer <Sco.Schaefer@AE2S.com>; John Larkin <John.Larkin@AE2S.com>; Jason Benson <Jason.Benson@AE2S.com> Subject: FW: Otsego West - Actuator of EFF Line Salber, Can you dig into this one for Otsego and provide direction for the control///power for the valve referenced below? Thx Dan Hanson, PE Senior Project Engineer - Electrical 3/24/25, 2:18 PM Mail - Matt Perpich - Outlook https://outlook.office365.com/mail/id/AAQkADJkZjEzMGYxLWEzYjMtNDhkZi1hZjM3LTcwNGExNzdmYjI0MwAQADTooWUHxuVNms%2B9hFO9le8%3D 2/4 From: Ma Perpich <ma_perpich@ricelake.org> Sent: Monday, March 10, 2025 10:33 AM To: Sco Schaefer <Sco.Schaefer@AE2S.com>; John Larkin <John.Larkin@AE2S.com>; Jason Benson <Jason.Benson@AE2S.com>; Dan Hanson <Dan.Hanson@AE2S.com> Cc: Mike Krug <mike_krug@ricelake.org>; Sam Boelter <sam_boelter@ricelake.org> Subject: Re: Otsego West - Actuator of EFF Line AE2S, As discussed on the call this morning, the parts to make valve MTB-UVV-BFV1 modulating have been ordered. I just received an email stating they will be out next Thursday (3/20) to install them on the actuator and get this going. What we need from AE2S is direction on how this valve will be controlled and where Killmer will need to run power/control wiring from. Is that something you can get to us this week so that Killmer can have that in place for next Thursday? Thanks, Matt Matt Perpich 22360 County Rd. 12 PO Box 517 Deerwood, MN 56444 Office 218-546-1915 Cell 218-821-9003 matt_perpich@ricelake.org ricelake.org From: Ma Perpich <ma_perpich@ricelake.org> Sent: Wednesday, March 5, 2025 11:29 AM To: Sco Schaefer <Sco.Schaefer@ae2s.com>; John Larkin <John.Larkin@AE2S.com>; Jason Benson <Jason.Benson@AE2S.com> Cc: Mike Krug <mike_krug@ricelake.org>; Sam Boelter <sam_boelter@ricelake.org> Subject: Otsego West - Actuator of EFF Line AE2S, Attached is a quote to provide all the accessories needed to install the spare actuator on valve MTB-UVV-BFV1 and make it a modulating valve. Shall we proceed with this? Note there will be some other costs associated with this as well: - Cost for a new bare actuator to replace the spare we are using - Cost to run air piping over to this valve - Cost to run power/control wiring to this valve Need to know where Killmer should pull this from. Thanks, Matt 3/24/25, 2:18 PM Mail - Matt Perpich - Outlook https://outlook.office365.com/mail/id/AAQkADJkZjEzMGYxLWEzYjMtNDhkZi1hZjM3LTcwNGExNzdmYjI0MwAQADTooWUHxuVNms%2B9hFO9le8%3D 3/4 Matt Perpich 22360 County Rd. 12 PO Box 517 Deerwood, MN 56444 Office 218-546-1915 Cell 218-821-9003 matt_perpich@ricelake.org ricelake.org 3/24/25, 2:18 PM Mail - Matt Perpich - Outlook https://outlook.office365.com/mail/id/AAQkADJkZjEzMGYxLWEzYjMtNDhkZi1hZjM3LTcwNGExNzdmYjI0MwAQADTooWUHxuVNms%2B9hFO9le8%3D 4/4 April 30th, 2025 AE2S 6901 East Fish Lake Rd. Suite 184 Maple Grove, MN 55369-5457 ATTN: Scott Schaefer, PE Re: Otsego West WWTF Improvements Phase 1 RLCG Project No. 2215 Change Order Proposal #: 066 – Fence at BB and FSB REV1 Scott, Rice Lake has put together pricing to furnish and install a 10’ tall cedar fence around the blower intakes and HVAC openings on the West side of the Blower Building along with also building a fence around two sides of the FSB Odor Control Unit. The pricing breakdown is as follows: - Fence at BB with Sound Block Fabric o $42,330.00 - Fence at BB without Sound Block Fabric o $30,269.00 - Fence at FSB Odor Control Unit with Sound Block Fabric o $26,216.00 - Fence at FSB Odor Control Unit without Sound Block Fabric o $21,428.00 Please note that the fence at the Blower Building will be bolted directly to the 6” thick sidewalk, which may be susceptible to movement due to freeze/thaw cycles. Rice Lake cannot warranty the fence for any damage caused by movement in the sidewalk. The fence at the FSB Odor Control unit will be on 4’ deep, 12” diameter sono tubes. Please let me know if you have any questions. Sincerely, Rice Lake Construction Group Matt Perpich Project Manager 2215 Otsego West WWTF Improvements Phase 1 22360 County Road 12, PO Box 517 4/30/2022 Deerwood, MN 56444 66REV1 HOURS $ RATE TOTAL RATE TOTAL RLCG Labor 135.00 HR 135.00 109.00$ $14,715.00 -$ $0.00 -$ -$ 14,715.00$ RLCG Material 1.00 LS -$ $0.00 -$ $0.00 -$ -$ -$ RLCG Equipment LS -$ $0.00 -$ $0.00 -$ -$ -$ -$ $0.00 -$ $0.00 -$ -$ -$ Lumber 1.00 LS -$ $0.00 11,650.00$ $11,650.00 -$ -$ 11,650.00$ Sound Block Material 1.00 LS -$ $0.00 8,000.00$ $8,000.00 -$ -$ 8,000.00$ -$ $0.00 -$ $0.00 -$ -$ -$ -$ $0.00 -$ $0.00 -$ -$ -$ -$ $0.00 -$ $0.00 -$ -$ -$ Misc. Small Tools and Mat'l 5% of Labor 1.00 ea 5.00%735.75$ Sales Tax 1.00 ea 7.375%1,449.19$ Totals 135.00 14,715.00$ 19,650.00$ -$ -$ 36,549.94$ Rice Lake Mark-up on Subs (5%)-$ Rice Lake Mark-up on Labor, Material, and Equipment (15%)5,154.75$ Bond Cost (1.5%)625.57$ Total Change Order Proposal Request 42,330.00$ Days Requested 0 DESCRIPTION QTY UNIT LABOR CHANGE ORDER PROPOSAL MATERIAL SUBCONTRACTOR TOTAL EQUIPMENT TOTAL LINE TOTAL Pricing with Sound Barrier at Blower Builidng RLCG PROJECT #: PROJECT NAME: DATE: COP: 2 2215 Otsego West WWTF Improvements Phase 1 22360 County Road 12, PO Box 517 4/30/2022 Deerwood, MN 56444 66REV1 HOURS $ RATE TOTAL RATE TOTAL RLCG Labor 119.00 HR 119.00 109.00$ $12,971.00 -$ $0.00 -$ -$ 12,971.00$ RLCG Material 1.00 LS -$ $0.00 -$ $0.00 -$ -$ -$ RLCG Equipment LS -$ $0.00 -$ $0.00 -$ -$ -$ -$ $0.00 -$ $0.00 -$ -$ -$ Lumber 1.00 LS -$ $0.00 11,650.00$ $11,650.00 -$ -$ 11,650.00$ -$ $0.00 -$ $0.00 -$ -$ -$ -$ $0.00 -$ $0.00 -$ -$ -$ -$ $0.00 -$ $0.00 -$ -$ -$ -$ $0.00 -$ $0.00 -$ -$ -$ Misc. Small Tools and Mat'l 5% of Labor 1.00 ea 5.00%648.55$ Sales Tax 1.00 ea 7.375%859.19$ Totals 119.00 12,971.00$ 11,650.00$ -$ -$ 26,128.74$ Rice Lake Mark-up on Subs (5%)-$ Rice Lake Mark-up on Labor, Material, and Equipment (15%)3,693.15$ Bond Cost (1.5%)447.33$ Total Change Order Proposal Request 30,269.00$ Days Requested 0 DESCRIPTION QTY UNIT LABOR MATERIAL SUBCONTRACTOR TOTAL EQUIPMENT TOTAL LINE TOTAL Pricing without Sound Barrier at Blower Builidng CHANGE ORDER PROPOSAL RLCG PROJECT #: PROJECT NAME: DATE: COP: 2 2215 Otsego West WWTF Improvements Phase 1 22360 County Road 12, PO Box 517 4/30/2022 Deerwood, MN 56444 66REV1 HOURS $ RATE TOTAL RATE TOTAL RLCG Labor 92.00 HR 92.00 109.00$ $10,028.00 -$ $0.00 -$ -$ 10,028.00$ RLCG Material 1.00 LS -$ $0.00 -$ $0.00 -$ -$ -$ RLCG Equipment 1.00 LS -$ $0.00 -$ $0.00 -$ 750.00$ 750.00$ -$ $0.00 -$ $0.00 -$ -$ -$ Lumber/Concrete 1.00 LS -$ $0.00 7,568.00$ $7,568.00 -$ -$ 7,568.00$ Sound Block Material 1.00 LS -$ $0.00 3,000.00$ $3,000.00 -$ -$ 3,000.00$ -$ $0.00 -$ $0.00 -$ -$ -$ -$ $0.00 -$ $0.00 -$ -$ -$ -$ $0.00 -$ $0.00 -$ -$ -$ Misc. Small Tools and Mat'l 5% of Labor 1.00 ea 5.00%501.40$ Sales Tax 1.00 ea 7.375%779.39$ Totals 92.00 10,028.00$ 10,568.00$ -$ 750.00$ 22,626.79$ Rice Lake Mark-up on Subs (5%)-$ Rice Lake Mark-up on Labor, Material, and Equipment (15%)3,201.90$ Bond Cost (1.5%)387.43$ Total Change Order Proposal Request 26,216.00$ Days Requested 0 EQUIPMENT TOTAL LINE TOTALDESCRIPTIONQTYUNITLABORMATERIALSUBCONTRACTOR TOTAL CHANGE ORDER PROPOSAL RLCG PROJECT #: PROJECT NAME: DATE: COP: Pricing with Sound Barrier at Fine Screen Bldg Odor Control 2 2215 Otsego West WWTF Improvements Phase 1 22360 County Road 12, PO Box 517 4/30/2022 Deerwood, MN 56444 66REV1 HOURS $ RATE TOTAL RATE TOTAL RLCG Labor 84.00 HR 84.00 109.00$ $9,156.00 -$ $0.00 -$ -$ 9,156.00$ RLCG Material 1.00 LS -$ $0.00 -$ $0.00 -$ -$ -$ RLCG Equipment 1.00 LS -$ $0.00 -$ $0.00 -$ 750.00$ 750.00$ -$ $0.00 -$ $0.00 -$ -$ -$ Lumber/Concrete 1.00 LS -$ $0.00 7,568.00$ $7,568.00 -$ -$ 7,568.00$ -$ $0.00 -$ $0.00 -$ -$ -$ -$ $0.00 -$ $0.00 -$ -$ -$ -$ $0.00 -$ $0.00 -$ -$ -$ -$ $0.00 -$ $0.00 -$ -$ -$ Misc. Small Tools and Mat'l 5% of Labor 1.00 ea 5.00%457.80$ Sales Tax 1.00 ea 7.375%558.14$ Totals 84.00 9,156.00$ 7,568.00$ -$ 750.00$ 18,489.94$ Rice Lake Mark-up on Subs (5%)-$ Rice Lake Mark-up on Labor, Material, and Equipment (15%)2,621.10$ Bond Cost (1.5%)316.67$ Total Change Order Proposal Request 21,428.00$ Days Requested 0 EQUIPMENT TOTAL LINE TOTALDESCRIPTIONQTYUNITLABORMATERIALSUBCONTRACTOR TOTAL CHANGE ORDER PROPOSAL RLCG PROJECT #: PROJECT NAME: DATE: COP: Pricing without Sound Barrier at Fine Screen Bldg Odor Control 2 DETAIL 110'3'-312"3'-212"3'-212"2'4'4'5'-412"Fence Consisting of:1x6-10' Tall Cedar Boards2x8 Double Top Plate(4) rows of 2x4's on the outside6"x6"-10' tall wood posts spaced at 4' O.C.(4) rows of 2x4's on the inside(3) rows of Sound Block 8506'Use something similar to thebracket below to bolt the postto the sidewalk1P302_______PBLW1-BFV1PBLW4-BFV1CGM-CAT1CGM-MCP1?11 111138' - 7 1/4"24" AIR5DETAIL 16'-2"43'-3"4'3'-2"6'-2"Install (3) angles fromtop of fence back to thebuildingThe Fence Design was notEngineered. Please confirm if AE2Sand the City of Otsego are good theproposed design. - Rice Lake GGGGGTTT\\\\\\\ \ \ \ \ \ \ \ \ \\ \ \ \ \ \ \ \ \ \\ \9504'4'DETAIL 210'-0"20'-0"DETAIL 210'3'-312"3'-212"3'-212"2'4'4'Fence Consisting of:1x6-10' Tall Cedar Boards2x8 Double Top Plate(4) rows of 2x4's on the outside6"x6"-10' tall wood posts spaced at 4' O.C.(4) rows of 2x4's on the inside(3) rows of Sound Block 850Use something similar to thebracket below to bolt the post to 4'deep, 12" diameter sono tubes4'1'4'The Fence Design was notEngineered. Please confirm if AE2Sand the City of Otsego are good theproposed design. - Rice Lake May 1st, 2025 AE2S 6901 East Fish Lake Rd. Suite 184 Maple Grove, MN 55369-5457 ATTN: Scott Schaefer, PE Re: Otsego West WWTF Improvements Phase 1 RLCG Project No. 2215 Change Order Proposal #: 067 – Additional Flashing at ADM REV1 Scott, Rice Lake has put together pricing to furnish and install additional flashing in Office 103 to conceal an exposed beam, as well as at the top of the Kalwall window (TP-5) in the entrance of the ADM Building to cover the exposed insulation. The total cost to furnish and install the flashing is $3,297.00. Attached is a breakout of the costs. Sincerely, Rice Lake Construction Group Matt Perpich Project Manager 2215 Otsego West WWTF Improvements Phase 1 22360 County Road 12, PO Box 517 5/1/2025 Deerwood, MN 56444 67REV1 HOURS $ RATE TOTAL RATE TOTAL RLCG Labor HR 0.00 106.00$ $0.00 -$ $0.00 -$ -$ -$ RLCG Material LS -$ $0.00 -$ $0.00 -$ -$ -$ RLCG Equipment LS -$ $0.00 -$ $0.00 -$ -$ -$ -$ $0.00 -$ $0.00 -$ -$ -$ WL Hall 1.00 LS -$ $0.00 -$ $0.00 3,094.00$ -$ 3,094.00$ LS -$ $0.00 -$ $0.00 -$ -$ -$ -$ $0.00 -$ $0.00 -$ -$ -$ -$ $0.00 -$ $0.00 -$ -$ -$ -$ $0.00 -$ $0.00 -$ -$ -$ Misc. Small Tools and Mat'l 5% of Labor 1.00 ea 5.00%-$ Sales Tax 1.00 ea 7.375%-$ Totals - -$ -$ 3,094.00$ -$ 3,094.00$ Rice Lake Mark-up on Subs (5%)154.70$ Rice Lake Mark-up on Labor, Material, and Equipment (15%)-$ Bond Cost (1.5%)48.73$ Total Change Order Proposal Request 3,297.00$ Days Requested 0 MATERIAL SUBCONTRACTOR TOTAL EQUIPMENT TOTAL LINE TOTALDESCRIPTIONQTYUNITLABOR RLCG PROJECT #: PROJECT NAME: DATE: COP: CHANGE ORDER PROPOSAL April 30, 2025 AE2S 6901 East Fish Lake Rd. Suite 184 Maple Grove, MN 55369-5457 ATTN: Scott Schaefer, PE Re: Otsego West WWTF Improvements Phase 1 RLCG Project No. 2215 Change Order Proposal #: 068 – Pipe and Fitting Escalation Costs Part 2 Scott, As noted in the addendum, Rice Lake and our vendors were to not carry the escalation risk in our bid as the City would be taking that on. The total escalation on the remaining process pipe and fittings since Change Order Proposal 052 is $11,481.00. Attached is a breakout of the costs. Please let me know if you have any questions. Sincerely, Rice Lake Construction Group Matt Perpich Project Manager 2215 Otsego West WWTF Improvements Phase 1 22360 County Road 12, PO Box 517 4/30/2025 Deerwood, MN 56444 68 HOURS $ RATE TOTAL RATE TOTAL RLCG Labor HR 0.00 104.00$ $0.00 -$ $0.00 -$ -$ -$ RLCG Material LS -$ $0.00 -$ $0.00 -$ -$ -$ RLCG Equipment -$ $0.00 -$ $0.00 -$ -$ -$ -$ $0.00 -$ $0.00 -$ -$ -$ Core & Main - Escalation 1.00 LS -$ $0.00 10,534.74$ $10,534.74 -$ -$ 10,534.74$ -$ $0.00 -$ $0.00 -$ -$ -$ -$ $0.00 -$ $0.00 -$ -$ -$ -$ $0.00 -$ $0.00 -$ -$ -$ -$ $0.00 -$ $0.00 -$ -$ -$ Misc. Small Tools and Mat'l 5% of Labor 1.00 ea 5.00%-$ Sales Tax 1.00 ea 7.375%776.94$ Totals - -$ 10,534.74$ -$ -$ 11,311.68$ Rice Lake Mark-up on Subs (5%)-$ Rice Lake Mark-up on Labor, Material, and Equipment (15%)-$ Bond Cost (1.5%)169.68$ Total Change Order Proposal Request 11,481.00$ Days Requested 0 MATERIAL SUBCONTRACTOR TOTAL EQUIPMENT TOTAL LINE TOTALDESCRIPTIONQTYUNITLABOR RLCG PROJECT #: PROJECT NAME: DATE: COP: CHANGE ORDER PROPOSAL 2 Contractor Rice Lake Construction Group Job #2215 Vendor Core & Main PO #2215-S15001 (OTSEGO WWTP) cmt#15367 QTY Dia Description Quoted Unit Quoted Total Unit Price Billed Unit Total Escalation Invoice Number Invoice Entry Date Release Date 1 16 FLG X PE DI PIPE P401 PR 8'-3" PRIMED USA $ 4,306.04 $ 4,306.04 $ 5,068.74 5,068.74$ 762.70$ W521972 4/22/2025 2/25/2025 1 16 MEGA FLANGE W/SS B&N $ 1,765.47 $ 1,765.47 $ 2,001.85 2,001.85$ 236.38$ S034600 4/25/2023 10/11/2022 1 16 FLG X FLG DI PIPE P401 PR 5'-7" PRIMED USA $ 4,649.16 $ 4,649.16 $ 5,674.32 5,674.32$ 1,025.16$ W521972 4/22/2025 2/25/2025 1 16 FLG S FLG DI PIPE P401 PR 16'-6" PRIMED USA $ 8,418.42 $ 8,418.42 $ 9,909.53 9,909.53$ 1,491.11$ W521972 4/22/2025 2/25/2025 1 16 FLG X FLG DI PIPE P401 PR 1' PRIMED USA $ 3,107.18 $ 3,107.18 $ 3,859.22 3,859.22$ 752.04$ W521972 4/22/2025 2/25/2025 1 12 FLG X FLG DI PIPE P401 PR 1'-6" PRIMED USA $ 1,813.55 $ 1,813.55 $ 2,134.77 2,134.77$ 321.22$ W521972 4/22/2025 2/25/2025 1 12 FLG X FL DI PIPE P401 PR 4'-0" PRIMED USA $ 2,396.80 $ 2,396.80 $ 2,958.64 2,958.64$ 561.84$ W521972 4/22/2025 2/25/2025 1 12 FLG X PE DI PIPE P401 PR 3'-6" PRIMED USA $ 1,536.05 $ 1,536.05 $ 2,357.37 2,357.37$ 821.32$ W521972 4/22/2025 2/25/2025 1 12 MEGA FLANGE W/SS B&N $ 819.48 $ 819.48 $ 929.20 929.20$ 109.72$ S034600 4/25/2023 10/11/2022 1 12 FLG X FLG DI PIPE P 401 PR 1' PRIMED USA $ 1,696.90 $ 1,696.90 $ 1,997.46 1,997.46$ 300.56$ W521972 4/22/2025 2/25/2025 1 12 FLG X FLG DI PIPE P401 PR 2'-6" PRIMED USA $ 2,046.85 $ 2,046.85 $ 2,272.08 2,272.08$ 225.23$ W521972 4/22/2025 2/25/2025 1 16 MEGA FLANGE W/SS B&N $ 1,765.47 $ 1,765.47 $ 2,001.85 2,001.85$ 236.38$ S034600 4/25/2023 10/11/2022 1 12 FLG X FLG DI PIPE P401 PR 1'-6" PRIMED USA $ 2,280.15 $ 2,280.15 $ 2,684.02 2,684.02$ 403.87$ W521972 4/22/2025 2/25/2025 1 12 FLG X FLG DI PIPE P 401 PR 1'-6 1/2" PRIMED USA $ 1,813.55 $ 1,813.55 $ 2,272.08 2,272.08$ 458.53$ W521972 4/22/2025 2/25/2025 1 6 FLG X FLG DI PIPE P401 PR 4'-6 1/2" PRIMED USA $ 1,031.17 $ 1,031.17 $ 1,284.08 1,284.08$ 252.91$ W521972 4/22/2025 2/25/2025 1 6 FLG X FLG DI PIPE P401 PR 5'-6" PRIMED USA $ 1,150.56 $ 1,150.56 $ 1,284.08 1,284.08$ 133.52$ W521972 4/22/2025 2/25/2025 1 6 FLG X FLG DI PIPE P401 PR 13'-6" PRIMED USA $ 2,105.63 $ 2,105.63 $ 2,478.59 2,478.59$ 372.96$ W521972 4/22/2025 2/25/2025 1 6 FLG X PE DI PIPE P401 PR 13'-6" PRIMED USA $ 1,854.11 $ 1,854.11 $ 2,182.52 2,182.52$ 328.41$ W521972 4/22/2025 2/25/2025 1 6 MEGA FLANGE W/SS B&N $ 302.82 $ 302.82 $ 343.35 343.35$ 40.53$ S034600 4/25/2023 10/11/2022 1 6 MEGA FLANGE W/SS B&N $ 302.82 $ 302.82 $ 343.35 343.35$ 40.53$ S034600 4/25/2023 10/11/2022 1 6 X 3" COMPANION FLANGE PRIMED USA $ 198.54 $ 198.54 $ 237.49 237.49$ 38.95$ S348378 5/10/2023 10/11/2022 1 6 FLG X PE DI PIPE P401 PR 4'-6" PRIMED USA $ 779.65 $ 779.65 $ 1,620.39 1,620.39$ 840.74$ W521972 4/22/2025 2/25/2025 1 6 MEGA FLANGE W/SS B&N $ 302.82 $ 302.82 $ 343.35 343.35$ 40.53$ S034600 4/25/2023 10/11/2022 1 6 FLG X FLG DI PIPE P401 PR 16'-6" PRIMED USA $ 2,463.79 $ 2,463.79 $ 3,251.50 3,251.50$ 787.71$ W521972 4/22/2025 2/25/2025 1 6 FLG X FLG DI PIPE P401 PR 6'6") PRIMED USA $ 1,269.94 $ 1,269.94 $ 1,565.14 1,565.14$ 295.20$ W521972 4/22/2025 2/25/2025 8 6 6"-8" 304SS HEX B & N KIT USA $ 138.37 $ 1,106.96 $ 138.67 1,109.36$ 2.40$ S097696 2/20/2023 10/11/2022 Total Escalation 10,880.45$ April 30, 2025 AE2S 6901 East Fish Lake Rd. Suite 184 Maple Grove, MN 55369-5457 ATTN: Scott Schaefer, PE Re: Otsego West WWTF Improvements Phase 1 RLCG Project No. 2215 Change Order Proposal #: 069 – Relocating EF in the PTB Scott, As noted in the response to RFI 137, EF-5 in the PTB will need to be relocated to the West side of the PTB. The total cost to relocate this is $3,480.00. Attached is a breakout of the costs. Please let me know if you have any questions. Sincerely, Rice Lake Construction Group Matt Perpich Project Manager 2215 Otsego West WWTF Improvements Phase 1 22360 County Road 12, PO Box 517 4/30/2025 Deerwood, MN 56444 69 HOURS $ RATE TOTAL RATE TOTAL RLCG Labor 12.00 HR 12.00 109.00$ $1,308.00 -$ $0.00 -$ -$ 1,308.00$ RLCG Material - Steel Plate for Existing Opening 1.00 LS -$ $0.00 150.00$ $150.00 -$ -$ 150.00$ RLCG Equipment LS -$ $0.00 -$ $0.00 -$ -$ -$ -$ $0.00 -$ $0.00 -$ -$ -$ PBS - Exterior Metal Panel Work 1.00 LS -$ $0.00 -$ $0.00 1,596.00$ -$ 1,596.00$ -$ $0.00 -$ $0.00 -$ -$ -$ -$ $0.00 -$ $0.00 -$ -$ -$ -$ $0.00 -$ $0.00 -$ -$ -$ -$ $0.00 -$ $0.00 -$ -$ -$ Misc. Small Tools and Mat'l 5% of Labor 1.00 ea 5.00%65.40$ Sales Tax 1.00 ea 7.375%11.06$ Totals 12.00 1,308.00$ 150.00$ 1,596.00$ -$ 3,130.46$ Rice Lake Mark-up on Subs (5%)79.80$ Rice Lake Mark-up on Labor, Material, and Equipment (15%)218.70$ Bond Cost (1.5%)51.43$ Total Change Order Proposal Request 3,480.00$ Days Requested 0 RLCG PROJECT #: PROJECT NAME: DATE: COP: CHANGE ORDER PROPOSAL MATERIAL SUBCONTRACTOR TOTAL EQUIPMENT TOTAL LINE TOTALDESCRIPTIONQTYUNITLABOR Outlook RE: Otesgo - Pricing Requested From Dave Lage <dave@pbsmetals.com> Date Tue 4/29/2025 8:54 AM To Matt Perpich <matt_perpich@ricelake.org>; Aaron Appicelli <aaron@pbsmetals.com>; Sam Boelter <sam_boelter@ricelake.org> Cc Joe Doering <joe@pbsmetals.com> Caution: This email originated from outside the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. $1,596.00 David Lage Project Manager/Estimator 6551 Jansen Ave N.E. #201 Otsego, MN 55301 Direct: 763-515-8746 / Cell: 763-229-4916 www.pbsmetals.com From: Ma Perpich <ma_perpich@ricelake.org> Sent: Monday, April 28, 2025 3:19 PM To: Aaron Appicelli <aaron@pbsmetals.com>; Sam Boelter <sam_boelter@ricelake.org> Cc: Joe Doering <joe@pbsmetals.com>; Dave Lage <dave@pbsmetals.com> Subject: Re: Otesgo - Pricing Requested It's going to be a change order proposal to the City that they want Lump Sum, so if you could put together a LS price, that would work best. Matt Perpich 22360 County Rd. 12 PO Box 517 Deerwood, MN 56444 Office 218-546-1915 Cell 218-821-9003 matt_perpich@ricelake.org ricelake.org 4/30/25, 2:34 PM Mail - Matt Perpich - Outlook https://outlook.office365.com/mail/inbox/id/AAQkADJkZjEzMGYxLWEzYjMtNDhkZi1hZjM3LTcwNGExNzdmYjI0MwAQAPYGzYpG0tVPu17TXGa%2Fs…1/6 Priorities: TO: Scott Schaefer, PE Priority (1-5) 1 1 = 8 hours 4 = 5 days Received: 2 = 2 days 5 = 2 weeks Answered: 3 = 3 days cc: Superintendent, RLCG ____________________ ___________________ ___________________ RFI# 137 REQUEST FOR INFORMATION Subject: PTB Exhaust Fan Conflict Location: PTB Owner: City of Otsego Routing: Project: Otsego, MN WWTP Other: Drawing No: PTB M106 Spec. REQUEST PTB/M106 shows that a new exhaust fan (EF-5) is to be installed in an existing opening on the main level of the PTB. However, this will not be possible as the exhaust fan will hit the vortex chamber on the outside of the PTB. Please advise on how to proceed. Name: Matt Perpich Company: Rice Lake Construction Date: March 5, 2025 RESPONSE Name: Date: REBALANCE EXISTING 12x6 SR TO 350 CFM (TYP OF 3) MAU-5 MOUNT MAU-5 ON 24" HIGH STRUCTRAL STEEL STAND. PAINT STAND WITH RUST INHIBITOR PAINT. 20Ø MAU-4 MOUNT MAU-4 ON 24" HIGH STRUCTRAL STEEL STAND. PAINT STAND WITH RUST INHIBITOR PAINT. TRANISTION AS REQUIRED TO 20/16 RECONNECT EXISTING 24" DIA FRP TO NEW ODOR SCRUBBER. MODIFY AS REQUIRED. VERIFY EXTENT. 20x16 EXISTING 24Ø FRP EXISTING EF-5 EF-6 MD-9 MD-10 INSTALL EXHAUST IN SAME LOCATION OF REMOVED FAN. INFIL OPENING AS REQUIRED. INSULATE EXTRA SPACE INSTALL EXHAUST IN SAME LOCATION OF REMOVED LOUVER. INFIL OPENING AS REQUIRED. INSULATE EXTRA SPACE MAKE-UP AIR UNIT MAU-4 CONTROL PANEL MAKE-UP AIR UNIT MAU-5 CONTROL PANEL ODOR SCRUBBER. REFER TO PROCESS PLANS. EXTEND AND MAKE PVC DRAIN CONNECTION TO NEW SCRUBBER. VERIFY EXACT CONNECTION SIZE AND LOCATION. SR-1-400-10x10 12' A.F.F. SR-1-600-10x10 DUCT SUPPORT 20"Ø FRP DUCT INSULATED AND JACKETED. PROVIDE DUCT SUPPORTS AS REQUIRED. 20Ø SA B.O.D. (8' -2") 20" FRP UP TO UPPER LEVEL 20" FRP FROM ABOVE. TRANSITION TO 24" FRP AND CONNECT TO EXIST. 24" FRP ELBOW. VERIFY EXACT CONNECTION LOCATION. 24Ø FRP EXISTING 0 4'8'2' M106 1 MAIN LEVEL HVAC PLAN PROJECT NUMBER CHECKED / APPROVED DATE DRAWING TYPE PREPARED BY /Layout: 22x34DRAWING FACILITYI HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA.SIGNATURE:___________________________________________________TYPED NAME: ZACHARY C. THOMPSONMARCH 28, 2022 REG. NO. #57835Advanced Engineering and Environmental Services, LLC Water Tower Pl Business Ctr 6901 E Fish Lake Rd Ste 184 Maple Grove, MN 55369 (t) 763-463-5036 (f) 763-463-5037 www.ae2s.comBIM 360://05409-2017-004 Otsego West WWTF Phase 1 Improvements/05409-2017-004-Otsego_West_PTB-M_v20.rvt3/25/2022 9:11:58 AMMAR 2022 05409-2017-004 DAS ZCT SRS CONSTRUCT MAIN LEVEL HVAC PLANOTSEGO, MNCITY OF OTSEGOOTSEGO WEST WWTF PHASE 1 IMPROVEMENTSPTB M106 GENERAL NOTES: 1. SEAL ALL PENETRATIONS OF SCREENING ROOM WALLS. 2. MAINTAIN REQUIRED CLEARANCES IN FRONT OF AND DIRECTLY OVER ALL ELECTRICAL PANELS IN ELECTRICAL ROOM. COORDINATE WITH DIVISION 26. 3. ALL PIPING AND DUCTWORK HANGERS AND SUPPORTS WITHIN SCREENING ROOM TO BE TYPE 316 STAINLESS STEEL OR APPROVED CORROSION RESISTANT MATERIALS. 4. REFER TO ELECTRICAL PLANS FOR NEC SPACE RATINGS. 5. ALL EXTERIOR DUCTWORK TO BE INSULATED AND JACKETED WEATHERTIGHT.SYMDATEDESCRIPTIONAPPRPage 127 CONFORMED May 12, 2025 AE2S 6901 East Fish Lake Rd. Suite 184 Maple Grove, MN 55369-5457 ATTN: Scott Schaefer, PE Re: Otsego West WWTF Improvements Phase 1 RLCG Project No. 2215 Change Order Proposal #: 070 – Spare Valve Actuator Scott, A previously provided spare actuator was used as part of CPR065. The total cost to furnish a new actuator and provide the City with a shelf spare is $4,106.00. Attached is a breakout of the costs. Please let me know if you have any questions. Sincerely, Rice Lake Construction Group Matt Perpich Project Manager 2215 Otsego West WWTF Improvements Phase 1 22360 County Road 12, PO Box 517 5/12/2025 Deerwood, MN 56444 70 HOURS $ RATE TOTAL RATE TOTAL RLCG Labor HR 0.00 109.00$ $0.00 -$ $0.00 -$ -$ -$ RLCG Material - Steel Plate for Existing Opening LS -$ $0.00 -$ $0.00 -$ -$ -$ RLCG Equipment LS -$ $0.00 -$ $0.00 -$ -$ -$ -$ $0.00 -$ $0.00 -$ -$ -$ APS 1.00 LS -$ $0.00 3,306.00$ $3,306.00 -$ -$ 3,306.00$ -$ $0.00 -$ $0.00 -$ -$ -$ -$ $0.00 -$ $0.00 -$ -$ -$ -$ $0.00 -$ $0.00 -$ -$ -$ -$ $0.00 -$ $0.00 -$ -$ -$ Misc. Small Tools and Mat'l 5% of Labor 1.00 ea 5.00%-$ Sales Tax 1.00 ea 7.375%243.82$ Totals - -$ 3,306.00$ -$ -$ 3,549.82$ Rice Lake Mark-up on Subs (5%)-$ Rice Lake Mark-up on Labor, Material, and Equipment (15%)495.90$ Bond Cost (1.5%)60.69$ Total Change Order Proposal Request 4,106.00$ Days Requested 0 RLCG PROJECT #: PROJECT NAME: DATE: COP: CHANGE ORDER PROPOSAL MATERIAL SUBCONTRACTOR TOTAL EQUIPMENT TOTAL LINE TOTALDESCRIPTIONQTYUNITLABOR Advanced Process Solutions Quote QQ-2909494-01 Date 5/6/2025 Advanced Process Solutions Quote Validity Expiration: 6/5/2025 1 Company Rice Lake Construction - Deerwood Sales Rep Patrick Connelly Name Matt Perpich Email patrick.connelly@aps-inc.com Email matt_perpich@ricelake.org Phone +1 612 398 2667 Phone +1 218 546-5519 Prepared By Luke Habermeyer Email luke.habermeyer@aps-inc.com Phone +1 763-694-7551 x2486 Quote Ref Rotork KT-40 Line No Product Details Qty Unit Price Line Total Delivery 1 Part Number KT-40-DA-HT-N-EP-0 KTORK PNEUMATIC ACT, DOUBE ACT 1 $3,306.00 $3,306.00 9-11 Week(s) Total Price: ( USD ) If you elect to pay via credit card, your total will include an additional 3% checkout fee for payment by credit card (not greater than our cost of acceptance). Other payment options not subject to the fee include check, wire, ACH, or debit. $3,306.00 Payment Terms Net 30 Days Terms Notes All deliveries subject to terms of confirmed order. Buyer is solely responsible for knowing its application requirements and specifications and the suitability of the products therefor (including material compatibility and pressure and temperature limits). Information about the Bray products, including the technical specifications for them, can be found in the corresponding manual for each available at https://www.bray.com/resources/documents/manuals-guides?page=1 Please contact productspecs@bray.com with any questions May 12, 2025 AE2S 6901 East Fish Lake Rd. Suite 184 Maple Grove, MN 55369-5457 ATTN: Scott Schaefer, PE Re: Otsego West WWTF Improvements Phase 1 RLCG Project No. 2215 Change Order Proposal #: 071 – Additional Trees Scott, It was requested that (3) additional White Spruce Trees be planted around the FSB Odor Control Unit. The total cost to furnish and install these additional trees is $1,599.00. Attached is a breakout of the costs. Please let me know if you have any questions. Sincerely, Rice Lake Construction Group Matt Perpich Project Manager 2215 Otsego West WWTF Improvements Phase 1 22360 County Road 12, PO Box 517 5/12/2025 Deerwood, MN 56444 71 HOURS $ RATE TOTAL RATE TOTAL RLCG Labor HR 0.00 109.00$ $0.00 -$ $0.00 -$ -$ -$ RLCG Material - Steel Plate for Existing Opening LS -$ $0.00 -$ $0.00 -$ -$ -$ RLCG Equipment LS -$ $0.00 -$ $0.00 -$ -$ -$ -$ $0.00 -$ $0.00 -$ -$ -$ L&K Tree and Shrub 1.00 LS -$ $0.00 -$ $0.00 1,500.00$ -$ 1,500.00$ -$ $0.00 -$ $0.00 -$ -$ -$ -$ $0.00 -$ $0.00 -$ -$ -$ -$ $0.00 -$ $0.00 -$ -$ -$ -$ $0.00 -$ $0.00 -$ -$ -$ Misc. Small Tools and Mat'l 5% of Labor 1.00 ea 5.00%-$ Sales Tax 1.00 ea 7.375%-$ Totals - -$ -$ 1,500.00$ -$ 1,500.00$ Rice Lake Mark-up on Subs (5%)75.00$ Rice Lake Mark-up on Labor, Material, and Equipment (15%)-$ Bond Cost (1.5%)23.63$ Total Change Order Proposal Request 1,599.00$ Days Requested 0 MATERIAL SUBCONTRACTOR TOTAL EQUIPMENT TOTAL LINE TOTALDESCRIPTIONQTYUNITLABOR RLCG PROJECT #: PROJECT NAME: DATE: COP: CHANGE ORDER PROPOSAL May 12, 2025 AE2S 6901 East Fish Lake Rd. Suite 184 Maple Grove, MN 55369-5457 ATTN: Scott Schaefer, PE Re: Otsego West WWTF Improvements Phase 1 RLCG Project No. 2215 Change Order Proposal #: 072 – Raise Electrical Manhole Scott, The grade of the pavement near electrical manhole HH-2 was raised after the manhole had already been installed. Therefore, an extension needs to be added to the manhole. The total cost to furnish and install this extension is $2,636.00. Attached is a breakout of the costs. Please let me know if you have any questions. Sincerely, Rice Lake Construction Group Matt Perpich Project Manager 2215 Otsego West WWTF Improvements Phase 1 22360 County Road 12, PO Box 517 5/12/2025 Deerwood, MN 56444 72 HOURS $ RATE TOTAL RATE TOTAL RLCG Labor 2.00 HR 2.00 109.00$ $218.00 -$ $0.00 -$ -$ 218.00$ RLCG Material 1.00 LS -$ $0.00 300.00$ $300.00 -$ -$ 300.00$ RLCG Equipment LS -$ $0.00 -$ $0.00 -$ -$ -$ -$ $0.00 -$ $0.00 -$ -$ -$ Killmer 1.00 LS -$ $0.00 -$ $0.00 1,874.22$ -$ 1,874.22$ -$ $0.00 -$ $0.00 -$ -$ -$ -$ $0.00 -$ $0.00 -$ -$ -$ -$ $0.00 -$ $0.00 -$ -$ -$ -$ $0.00 -$ $0.00 -$ -$ -$ Misc. Small Tools and Mat'l 5% of Labor 1.00 ea 5.00%10.90$ Sales Tax 1.00 ea 7.375%22.13$ Totals 2.00 218.00$ 300.00$ 1,874.22$ -$ 2,425.25$ Rice Lake Mark-up on Subs (5%)93.71$ Rice Lake Mark-up on Labor, Material, and Equipment (15%)77.70$ Bond Cost (1.5%)38.95$ Total Change Order Proposal Request 2,636.00$ Days Requested 0 MATERIAL SUBCONTRACTOR TOTAL EQUIPMENT TOTAL LINE TOTALDESCRIPTIONQTYUNITLABOR RLCG PROJECT #: PROJECT NAME: DATE: COP: CHANGE ORDER PROPOSAL An Equal Opportunity Employer May 8, 2025 Mr. Matt Perpich Rice Lake Construction Group Re: Otsego West WWTP Dear Matt, Killmer Electric Company proposes to the following change to our contract for the subject project: Change Request – Handhole Extension for Grade revision Costs below to provide and install a 36x48 handhole extension and cut as needed to match revised grading. Handhole Extension for Grade Revision QTY Mat unit Mat total Labor unit Total labor PG3648 extension 1 1072 $1,072.00 4 4 Totals $1,072.00 4 Tax $85.76 118 / hour $472.00 $1,157.76 $472.00 $1,629.76 15.00% $244.46 $1,874.22 Total Cost Add: $1,874.22 Please call with any questions or comments. Regards, Matthew Pettit Project Manager