Loading...
Item 3.3 Queens Ave3601 Thurston Avenue Anoka, MN 55303 763.231.5840 TPC@PlanningCo.com 1 PLANNING REPORT TO: Otsego Planning Commission FROM: D. Daniel Licht REPORT DATE: 28 August 2025 120-DAY DATE: 11 December 2025 RE: Otsego – Queens Ave Otsego; Preliminary/Final Plat TPC FILE: 101.02 BACKGROUND 104 Investments, LLC is proposing development of a 36,000 square foot industrial building on a 14.78 acre parcel located at the northeast quadrant of Queens Avenue and 65th Street. The subject property is currently developed with a single family dwelling. The proposed development requires consideration of a Zoning Map amendment, preliminary plat, final plat, site and building plan review and Interim Use Permit for outdoor storage. The developer is proposing an initial application to plat the property with a lot for the industrial use and another for the existing single family dwelling. A subsequent application will be submitted for site and building plan review and an Interim Use Permit for the development of the industrial lot. A public hearing to consider the Zoning Map amendment and preliminary plat has been noticed for the Planning Commission meeting on 15 September 2025 at 7:00PM. Exhibits: Site Location Map Building plan dated 07-31-25 Concept Plan dated 07/30/25 Preliminary plat dated 31 July 2025 Final plat Item 3.3 2 ANALYSIS Zoning. The subject property is zoned A-1, Agriculture Rural Service District consistent with the interim land use plan policy of the 2023 Otsego Comprehensive Plan that directs A-1 District zoning is to be maintained until such time as a parcel is proposed for development. Platting and development of Lot 1, Block 1 with an industrial use requires consideration of a Zoning Map amendment to rezone the parcel to I-1, Limited Industrial District. Lot 2, Block 1 will remain zoned A-1 District until such time as redevelopment of the existing single family residential use to an industrial use is proposed. Consideration of the requested Zoning Map amendment is to be based upon, but not limited to, the criteria established by Section 11-3-2.F of the Zoning Ordinance: 1. The proposed action's consistency with the specific policies and provisions of the Otsego Comprehensive Plan. Comment: The 2023 Otsego Comprehensive Plan guides the subject property for future industrial land uses within the East Sewer District. Industrial development is a goal of the Comprehensive Plan so as to diversify the tax base and lessen dependance of residential properties and to create employment opportunities within Otsego. The Future Land Use Plan identifies the area on the east and west sides of Queens Avenue as an appropriate location for development of industrial uses based on proximity and access to TH 101. The proposed subdivision is consistent with the goals and policies of the 2023 Comprehensive Plan. 2. The proposed use's compatibility with present and future land uses of the area. Comment: The following table summarizes existing and planned land uses in the area surrounding the subject property. The proposed development is characteristic of the development along Queens Avenue and the proposed subdivision will be compatible with existing and planned uses in the area. Direction Land Use Plan Zoning Map Existing Use North Industrial I-1 District R+L Carriers East Industrial A-1 District Rural residential South Industrial I-1 District Blue Dot West Industrial I-2 District Gateway North 3. The proposed use's conformity with all performance standards contained within the Zoning Ordinance and other provisions of the City Code. Comment: The proposed subdivision and development of the industrial lot will be required to comply with all requirements of the Zoning Ordinance, Subdivision Ordinance, and Engineering Manual. 3 4. Traffic generation of the proposed use in relation to capabilities of streets serving the property. Comment: Lot 1, Block 1 is to be accessed via Queens Avenue, which the Transportation Plan designates as a Commercial/Industrial Collector Street. Queens Avenue intersects 70th Street (CSAH 38) to the north, which is also designated as a Commercial/Industrial Collector Street. Queens Avenue and 70th Street (CSAH 38) are designed to accommodate up to 15,000 vehicle trips per day, including semi-tractor trailer traffic accessing TH 101. The traffic that will be generated by the proposed use is within the capacity available on Queens Avenue and 70th Street (CSAH 38). 5. The proposed use can be accommodated by existing public services and facilities and will not overburden the City's service capacity. Comment: The subject property is located within the East Sewer District established by the 2023 Otsego Comprehensive Plan. Sewer and water utilities are available at the subject property with sufficient capacity to accommodate the proposed use. The City has the ability to provide all other required municipal services to the subject property within the East Sewer District. Concept Plan. The developer has submitted a concept plan and building plans for development of Lot 1, Block 1. Approval to implement the development plans for Lot 1, Block 1 require application for site and building plan review and an Interim Use Permit to allow the illustrated outdoor storage area. The need for additional applications may be identified based on City staff review of more detailed plans for compliance with the provisions of the Zoning Ordinance. No entitlement for development of Lot 1, Block 1 is being considered with the current application. Lot Requirements. Lots within the I-1 District are required to be a minimum of one acre in area and have a minimum width of 200 feet measured at the setback line from the front lot line in accordance with Section 11-85-7.A and B of the Zoning Ordinance. The lots proposed on the preliminary and final plat comply with the minimum requirements of the I-1 District. Min. Lot Area Min. Lot Width Required 1.00ac. 200ft. Lot 1, Block 1 5.01ac. 550ft. Lot 2, Block 1 6.37ac. 493ft. 4 Setbacks. The table below outlines I-1 District setbacks established by Section 11-85-7.C of the Zoning Ordinance applicable to Lot 1, Block 1 and future application of I-1 District setbacks to Lot 2, Block 1. The concept plan for Lot 1, Block 1 complies with these setback requirements. Queens Ave. 70th St. East South North Wetland Lot 1, Block 1 30ft. NA 20ft. 10ft. 10ft. 40ft. Lot 2, Block 1 30ft. 30ft. 10ft. NA 20ft. 40ft. Site Coverage. Section 11-85-8 of the Zoning Ordinance establishes maximum site coverage limits for lots within the I-1 District. Budlings and structures may not occupy more than 50 percent of the lot area and all impervious surfaces may not exceed 85 percent of the lot area. The proposed 36,000 square foot building to be developed on Lot 1, Block 1 would cover 16.5 percent of the 5.01 acre area of the lot. Impervious surfaces coverage is not identified and will be required to be shown on a site plan submitted for site and building plan review approval. Right-of-Way. The subject property abuts Queens Avenue to the west and 65th Street to the south. Both Queens Avenue and 65th Street are designated by the 2023 Transportation Plan as Commercial/Industrial Collector Streets. Queens Avenue is an existing three lane urban section roadway with a trail on the east side of the right-of-way abutting the subject property. No right-of-way dedication or improvement is required by the City for Queens Avenue, which was acquired and constructed with the Gateway North Industrial Park. The preliminary and final plat provides for dedication of 50 feet of right-of-way for the north half of 65th Street. No improvements to 65th Street are proposed, which is a rural gravel roadway. The City will require that 65th Street be improved at such time application is made to develop Lot 2, Block 1 with an industrial use or Outlot A, Jacobs Plat is developed on the south side of the street. All right-of-way dedication is subject to review by the City Engineer. Utilities. Sewer and water utilities are available in Queens Avenue abutting the subject property. Utility Availability Charges are required to be paid at the time of final plat approval and utility connection fees are to be paid for the proposed use of a lot at the time a building permit is issued. The developer is requesting that payment of the Utility Availability Charges be deferred until the site and building plans are approved. Payment of Utility Availability Charges for Lot 2, Block 1 are requested to be deferred until the lot is rezoned to I-1 District. The terms for payment of the Utility Availabity Charges will be set forth in the development contract, which will include that the Utility Availability Charges be paid based on the City fee schedule in effect at the time of payment. 5 Stormwater Management. There is no regional stormwater management plan for the subject property and thus no stormwater impact fee to be paid at the time of final plat approval. The developer has submitted a preliminary plan for grading, drainage for stormwater management with development of Lot 1, Block 1. Approval of stormwater management plans for Lot 1, Block 1 will be determined at the time of site and building plan review and are subject to review and approval of the City Engineer. Easements. Section 10-8-12 of the Subdivision Ordinance requires dedication of drainage and utility easements at the perimeter of the two proposed lot as well as over stormwater drainage facilities or public utilities not within outlots to be deeded to the City. The preliminary plat illustrates the required 10 foot wide drainage and utility easements at the perimeter of the two lots as required by Section 10-8-12.A of the Subdivision Ordinance. Drainage and utility easements are also shown over the wetland within Lot 2, Block 1. The City may require that Lot 2, Block 1 be replatted in the at the time it is redeveloped to an industrial use to dedicate an outlot encompassing this wetland to the City for stormwater management purposes in accordance with Section 10-8-12.D of the Subdivision Ordinance. Drainage and utility easements are also dedicated on the preliminary plat and final plat over Outlot A (wetland) and Outlot B (future stormwater basin). All drainage and utility easements are subject to review and approval of the City Engineer. Outlots. The preliminary plat and final plat includes two outlots. Outlot A encompasses a wetland along the northeast plat line. Outlot B is provided for a future stormwater basin to be constructed with development of Lot 1, Block 1. Outlot A is to be deeded to the City for stormwater management purposes with approval of the final plat. Outlot B will be required to be deeded to the City concurrent with approval of the site and building plans for Lot 1, Block 1. Park Dedication. The Parks System Master Plan does not identify land within the area of the subject property for acquisition by the City for park purposes. Section 10-8-15.I of the Subdivision Ordinance allows the City to require payment of a cash fee in lieu of land for park dedication. A park dedication fee in lieu of land will be required to be paid with final plat approval for Lot 1, Block 1. Park dedication requirements for Lot 2, Block 1 will be deferred until the lot is rezoned to I-1 District and paid in accordance with the fee schedule in effect at that time. Development Contact. Section 10-10-4.A of the Subdivision Ordinance requires that the developer enter into a development contract with the City to provide for construction of any public improvements, establishment of required securities, transfer of property to the City, and payment of applicable fees. The development contract will be drafted by the City Attorney for approval by resolution of the City Council. 6 RECOMMENDATION The proposed Queens Ave Otsego preliminary plat and final plat complies with the provisions of the Zoning Ordinance and Subdivision Ordinance. Approval of the preliminary plat and final plat will provide opportunity for additional industrial development furthering the economic development goals of the Comprehensive Plan. City staff recommends approval of the applications as outlined below. POSSIBLE ACTIONS A. Motion to recommend approval of a Zoning Map amendment, preliminary plat, and final plat for Queens Ave Otsego subject to the following conditions: 1. Approval of the preliminary plat shall not guarantee access to sanitary sewer service. The City shall only allocate sanitary sewer capacity to approved final plats with signed development contracts to assure the City of timely development. 2. Development of Lot 1, Block 1, shall require application for, but not limited to, the following approvals: a. Site and building plan review. b. Interim Use Permit allowing outdoor storage 3. Lot 2, Block 1 shall remain zoned A-1 District until such time as a proposal to develop the lot with a use consistent with the Comprehensive Plan is submitted. 4. All right-of-way dedication shall be subject to review and approval by the City Engineer. 5. Utility Availability Charges are required to be paid subject to the following: a. Lot 1, Block 1: Upon approval of site and building plans for construction of an industrial use. b. Lot 2, Block 1: Upon approval of a Zoning Map zoning the lot to allow development of a land use as guided by the Comprehensive Plan. c. Utility Availability Charges shall be based on the City fee schedule in effect at the time of payment. 6. Utility Connection Charges are to be paid for the proposed use of Lot 1 and Lot 2, Block 1 at the time a building permit is issued. 7 7. Stormwater management plans for Lots 1 and 2, Block 1 shall be subject to review and approval of the City Engineer with application for site and building plan review, 8. Outlot A shall be deeded to the City for stormwater management purposes. 9. Park dedication: a. Lot 1, Block 1: Park dedication shall be satisfied as a cash fee in lieu of land at the time of site and building plan approval. b. Lot 2, Block 1: (1) Park dedication shall be satisfied upon approval of a Zoning Map zoning the lot to allow development of a land use as guided by the Comprehensive Plan. (2) The required park dedication cash fee in lieu of land shall be based on the City fee schedule in effect at the time of payment. 10. The developer shall enter into a development contract as required by Section 10- 10-4.A of the Subdivision Ordinance, subject to review by the City Attorney and approval of the City Council. B. Motion to recommend the application be denied based on a finding that the request is inconsistent with the Comprehensive Plan and does not comply with the requirements of the Zoning Ordinance and/or Subdivision Ordinance. C. Motion to table. c. Adam Flaherty, City Administrator/Finance Director Audra Etzel, City Clerk Ron Wagner, City Engineer David Kendall, City Attorney Property Location Queens Ave Otsego Plat 921 ft Overview Legend Highways Interstate State Hwy US Hwy Roads City/Township Limits c t Parcels Date Last Revised:Copyright Michael J. Thomas Architect,LLC. All rights reserved.The architectural works depicted herein are thesole property of Michael J. Thomas Architect, LLCand may not be constructed or used without itsexpressed written permission. No permission tomodify or reproduce any of these architecturalworks, including without limitation theconstruction of any building, is expressed orshould be implied from delivery of preliminarydrawings or unsealed construction drawings.Permission to construct the buildings(s) depictedin sealed construction drawings is expresslyconditioned on the full and timely payment of allfees otherwise due to Michael J. ThomasArchitect, LLC and, in absence of any writtenagreement to the contrary, is limited to a one-time use on the site indicated on these plans.MJTProject No:File Name:25014 Gladwin Otsego07-31-25.plnDrawn By:25014SignatureI hereby certify that this plan, specification, orreport was prepared by me or under my directsupervision and that I am a duly LicensedArchitect under the laws of the State ofMinnesota.23592Minnesota License No.:00-00-00Date Signed:06-18-25, 07-07-25, 07-31-25A0.04918 S. Tri Oak Circle NEEast Bethel, MN 55092Phone: 651-245-2346Email: mjtallc2520@gmail.comWeb:michaeljthomasarchitect.comSCALE INDICATED BASED UPON PRINTED 24" X 36" (ARCHITECTURAL D) SHEETPreliminary Do Not Use for ConstructionNew Building - Tenant Lease Spacefor David Gladwin104 Investments, LLC16686 65th Street NEOtsego, MN 55330125014 Gladwin Otsego 07-31-25 - NW View - Close225014 Gladwin Otsego 07-31-25 - NE View325014 Gladwin Otsego 07-31-25 - SE View425014 Gladwin Otsego 07-31-25 - SW View525014 Gladwin Otsego 07-31-25 - NW View - AerialClear Anodized AluminumExterior Storefront Windowsand DoorsHaas 700 Series OverheadGarage DoorsElevate Una-Clad Prefin MetalParapet Cap FlashingFabcon - Top side, exposedaggregate. Gray OnyxFabcon - Top side, exposedaggregate. GrayFabcon - Cast-In Brick FinishReynobond Composite MetalPanels at Canopy Face East line of the West Half of the West Half of the East Half of the SouthwestQuarter of the Northeast Quarter of Section 35, Township 121, Range 23West line of the East Half of the West Half of the Southwest Quarter of the Northeast Quarter of Section 35, Township 121, Range 23North line of the Southwest Quarter of the Northeast Quarter of Section 35, Township 121, Range 23 South line of the Northeast Quarter of Section 35, Township 121, Range 23 A-1 ZONING JUNE & AARON HOFFMAN I-2 ZONING Owner: DUKE REALTY LP 120°NO PARKINGPROPOSED BUILDING 120 x 300 = 36,000 SF FFE=932.00 DOCK=928.00NO PARKING12 0 °120°150°90° STORM WATER MANAGEMENT BASIN 1/1CIVIL ENGINEERINGSITE DESIGN12468 Hassan Court Rogers, MN 55374 David Gladwin 612-483-1745 davidtgladwin@gmail.com 104 Investments