12-23-02 CCCLAIMS LIST
CITY COUNCEL MEETING
DECEMBER 23,2002
TO: Judy Hudson
ITEM 5.
Attached is the Claims List for the City Council. For more details, please refer to the
Check Detail Registers.
If you have any questions regarding this service, please let me know.
Claims Register 12-12-2002 $ 57,314.84
12-18-2002 $ 23,564.71
GRAND TOTAL $ 80,879.55
If you have any questions or if you would like to review this list further, please let me
know.
Kathy Grover
Bookkeeper
CITY OF OTSEGO 12112/02 10:47 AM
Page 1
*Check Summary Register@
DECEMBER 2002
Name Check Date Check Amt
10100 BANKOFELKRIVER
UnPaid
AIRGAS, INC.
$27.83
UnPaid
BERLIN TIRE CENTER, INC
$234.41
UnPaid
BOISE CASCADE OFFICE PRODUCTS
$195.07
UnPaid
BOYER TRUCKS
$180.96
UnPaid
COURI MACARTHUR LAW OFFICE
$18,250.40
UnPaid
CROW RIVER FARM EQUIPMENT
$216.41
UnPaid
CUB FOODS ELK RIVER
$76.22
UnPaid
DJ'S TOTAL HOME CENTER
$107.78
UnPaid
DRAKE CONSTRUCTION, INC.
$1,000.00
UnPaid
ECM PUBLISHERS INC
$341.55
UnPaid
GLENS TRUCK CENTER INC
$61.62
UnPaid
HYDRANT SPECIALIST INC
$79.88
UnPaid
ICMA RETIREMENT TRUST
$422.31
UnPaid
JACK'S SMALL ENGINE INC
$59.00
UnPaid
MEADOWVALE CONSTRUCTION
$24,905.27
UnPaid
NAPA OF ELK RIVER INC
$172.74
UnPaid
PUBLIC EMPLOYEES RETIREMENT FD
$1.095.40
UnPaid
RMR SERVICES, INC
$8,038.94
UnPaid
SHIRWIL TOOL & MFG
$40.00
UnPaid
SOFTRONICS
$473.09
UnPaid
ST JOESPHS EQUIPMENT INC
$181.17
UnPaid
TARGETSTORES
$33.99
Oaid
TOSHIBA AMERICA INFO SYS INC
$211.83
Paid
XCELENERGY
$44.25
UnPaid
ZIEGLER INC
$864.72
Total Checks $57,314.84
FILTER: None
CITY OF OTSEGO 12/12/02 10:48 AM
Theck Detail Register@ Page 1
DECEMBER 2002
Check Amt Invoice Comment
10100 BANKOFELIKIRIVER
Unpai� ' "' -----AIRGAS, IkC.--
E 101-43100-210 Operating Supplies (GENERAL) $8.72 105817943 LEASE MAT 1 YR
E 101-43100-210 Operating Supplies (GENERAL) - $19-11 105828560 HAZMAT/OXYGEN/ACET
Total AIRGAS, INC. $27.83
ER I L I -, N TIR I E . CE'NfER, INC-----",
E 101-43100-220 Repair/Maint Supply (GENERAL) $234.41 2790008614 CATLOADER
Total BERLIN TIRE CENTER, INC -$234.41
pat
n I FFICE PRODUCTS
E 101-41400-201 Office Supplies
$268-00
517930
OFFICE SUPPLIES
E 101-41400-201 Office Supplies
($72,93)
775510
CREDIT
Total BOISE CASCADE OFFICE PRODUCTS
$195.07
E 101-43100-220 Repair/Maint Supply (GENERAL)
$0.38
17014R
81 TRK
E 101-43100-220 Repair/Maint Supply (GENERAL)
$166.65
17708R
92 FORD TRK
E 101-43100-220 Repair/Maint Supply (GENERAL)
$13.93
17784R
81 TRK
Total BOYERTRUCKS
_$180.96
COURI'MACA'R'TH'UR LAW'bFFICE
E 413-43100-301 Legal Services
$2,490.00
ODEAN AVE
G 701-21938 TMH Development
$462.50
OTSEGO BUS PARK
E 101-42420-301 Legal Services
$489.40
ABATEMENT
E 406-43100-301 Legal Services
$537.50
REGIONAL POND
G 701-22318 RIVERVIEW BANK
$562.50
RIVERVIEW BANK
E 101-41700-301 Legal Services
$600.00
RELIANT
G 701-21990 WH LINK
$750.00
WH LINK
G 701-22325 101 MARKET
$787.50
101 MARKET
E 415-43251-500 Capital Outlay (GENERAL)
$890.00
WW TREATMENT
G 701-22321 RIVERPOINTE 2ND
$350.00
RIVERPOINTE 2
G 701-22320 RETAIL OFFICE SPACE
$1,387.50
MARKET WEST
E 101-41700-301 Legal Services
$230.00
DOG ORDINANCE
E 101-41700-301 Legal Services
$4,971.00
GENERAL
G 701-22331 PHEAST RIDGE 6
$1,287.50
PR 6TH
G 701-22324 RIVERPOINTE 3
$187.50
RIVERPOINTE 3
E 101-42420-301 Legal Services
$50.00
BALAMUT
E 101-41700-301 Legal Services
$50.00
LIQUOR
E 415-43251-301 Legal Services
$50.00
WWTP EXPANSION
E 101-41700-301 Legal Services
$70.00
SLUDGE
E 434-43100-301 Legal Services
$320.00
85TH STREET
E 101-41700-301 Legal Services
$187.50
HERITAGE HILLS ISSUES
G 701-22313 BLACKWOODS SITE
$350.00
BLACKWOODS
E 101-42420-301 Legal Services
$200.00
BUTLER
G 701-22329 QUADAY ADDITION
$200.00
DARKENWALD - QUADAY
E 430-43100-301 Legal Services
$200.00
WEST SEWER PLANT
E 101-41700-301 Legal Services
$230.00
87TH ST VACATION
E 406-43100-301 Legal Services
$260.00
DRAINAGE EASEMENT
E 101-41700-301 Legal Services
$100.00
ASSESSOR CONTRACT
Total COURI MACARTHUR LAW OFFICE
_$18,2k.46
CROW.-RIVE'R FARIM-EQUIPME - NT
E 101-43100-220 Repair/Maint Supply (GENERAL)
Total CROW RIVER FARM EQUIPMENT
npat
$216.41 93900 MISC SUPPLIES
i216.41
E 101-41400-205 Election Supplies $76.22 SUPPLIES FOR ELECTION
CITY OF OTSEGO 12/18/02 3:57 PM
Page 1
*Check Summary Register@
DECEMBER 2002
Total Checks $23,564.71
FILTER: None
Name
Check Date Check Amt
10100
BANKOFELKRIVER
--
UnPaid
AIRGAS, INC.
$90.42
UnPaid
AMERICAN ENGINEERING TESTING
$1,754.60
UnPaid
DEHMER FIRE PROTECTION
$107.75
UnPaid
DRAKE CONSTRUCTION, INC.
$1,000.00
UnPajd
EARL F ANDERSON INC
$1,223.70
UnPaid
ECM PUBLISHERS INC
$54.15
UnPaid
FAIRVIEW NORTHLAND
$184.00
UnPajd
G & K TEXTILE LEASING SYSTEM
$486.53
UnPaid
GROEN GARY CPA
$2,362.00
UnPaid
H G WEBER OIL COMPANY
$675.37
UnPaid
ICMA MEMBERSHIP RENEWAL
$525.00
UnPaid
MEDICA
$4,392.05
UnPaid
MINNESOTA LIFE
$102.00
UnPaid
MONTICELLO ANIMAL CONTROL
$64.00
UnPaid
NORTHERN TRAFFIC SUPPLY INC
$70.29
UnPaid
NORTHWEST ASSOC CONSULTANTS
$5,415.26
UnPajd
PITNEY BOWES
$100.02
UnPajd
TARGETSTORES
$69.36
UnPajd
WELSH DEVELOPMENT
$800.24
UnPaid
XCELENERGY
$87.97
UnPaid
ZIEGLER CONSTRUCTION CO INC
-.td ()()n r)n
Total Checks $23,564.71
FILTER: None
CITY OF OTSEGO 12/18i02 3:58 PM
Page 1
*Check Detail RegisterC
DECEMBER 2002
Check Amt Invoice Comment
10100 BANKOFELKIRIVER
I. . . . . . . . . . . .
Unpaid AIRGAS, INC.
E 101-43100-210 Operating Supplies (GENERAL) $47.28 105842335 OXYGENNISOR/CUTTING TIP
E 101-43100-210 Operating Supplies (GENERAL) $43.14 105845383 AC 4CL ACETYLENE
Total AIRGAS, INC. $90.42
Unpaid AMERICAN ENGINEERING TESTING
E 434-43100-302 Engineering Fees $1,754.60 20963 85TH ST EXTENSION
Total AMERICAN ENGINEERING TESTING $1,754.60
Unpaid DEHMER FIRE PROTECTION
E 101-41940-220 Repair/Maint Supply (GENERAL) $107.75 10100 FIRE EXT TESTING/SERVICE
Total DEHMER FIRE PROTECTION $107.75
`6- '"a"j"*'d***'*"""""""""�"",-,",*"",-�'""'*'""'""**"""""""*"-"",-""D"�'R"—A,K,*"E�"-C�"�0"'*'N"'*"S"�'T"'R*""'U""C'*""T""I"'O"*"*N",,,-I-N""C"".,",-","-""","—,------,--,*"****""*,-*"***,*-***'-*
E 702-41400-310 Miscellaneous $1,000.00 15107 83RD ST LNDSCP
Total DRAKE CONSTRUCTION, INC. $1,000.00
EARL F ANDERSON INC
E 101-43100-393 Street Signs $1,223.70 50903 MISS PINES STREET SIGNS
Total EARL F ANDERSON INC $1,223.70
ECM PUBLISHERS INC
E 101-41400-350 Print/Binding (GENERAL) $54.15 138334 NOTICE FARR DEV
Total ECM PUBLISHERS INC $54.15
,p . aid FAIRVIEW NORTHLAND
E 101-43100-310 Miscellaneous $184.00 2014965 RICK K DRUG TESTING
Total FAIRVIEW NORTHILAND $184.00
G & K TEXTILE LEASING SYSTEM
E 101-43100-225
Uniforms
E 101-41940-390
Contracted Services
E 101-43100-225
Uniforms
E 101-43100-2.25
Uniforms
E 101-41940-390
Contracted Services
E 101-43100-225
Uniforms
Total G
& K TEXTILE LEASING SYSTEM
$77.11
104909
UNIFORMS
$80.46
109845
MATS
$73.58
109846
UNIFORMS
$66.90
114807
UNIFORMS
$80.46
119787
MATS
$108.02
119788
UNIFORMS
$486.53
....... . .............. . ..
Unpaid GROEN GARY CPA
E 101-41600-390 Contracted Services $2,362.00 OCT/NOV 52.5 HRS
Total GROEN GARY CPA $2,362.00
Unpaid H G WEBER OIL COMPANY
E 101-43100-202 Gas & Oil $657.26 45596 DIESEL FUEL
E101-43100-202 Gas& Oil $18.11 45642 FUEL FILTER
Total H G WEBER OIL COMPANY $675.37
. ... . ..................... .. ..........
Unpaid ICMA MEMBERSHIP RENEWAL
E 101-41400-355 Dues & Memberships $525.00 MEMBERSHIP RENEWAL
Total ICMA MEMBERSHIP RENEWAL $525.00
'Inpaid MEDICA
E 101-43100-123 Health $1,803.11 PW - JAN
E 101-41400-123 Health $2,588.94 ADMIN - JAN
Total MEDICA $4,392.05
Unpaid MINNESOTA LIFE
E101-41400-130 Employer Paid Ins (GENERAL) $27.40 ADMIN - JAN
CITY OF OTSEGO 12/18/02 158 PM
Page 2
*Check Detail Register@
DECEMBER 2002
Check Amt Invoice Comment
E 101-43100-130 Employer Paid Ins (GENERAL) $74.60 Pw - JAN
Total MINNESOTA LIFE $102.00
E 101-42710-390 Contracted Services $64.00 338 2 P/U 10/28 & 11/26
Total MONTICELLO ANIMAL CONTROL $64.00
npaid NORTHERN TRAFFIC SUPPLY INC
E 10 1 -43100-393 Street Signs $70.29 22-6376 STREET SIGNS
Total NORTHERN TRAFFIC SUPPLY INC $7029
Unpaid NORT WESTAS . SO . C : C ONSULTANITS --
G 701-2-2334 GODFATHER PUD
$47.14
12312
G 701-2-2340 WATERFRONT LIQUOR STORE
$487.62
12312
G 701-22342 WATERFRON CONV STORE
$531.07
12312
G 701-22337 Quest Development
$271.36
12312
G 701-22335 KITTREDGE LNDING
$271.36
12312
G 701-22343 WF3RD ADD FINPLAT
$215.37
12312
G 701-22304 OTSEGO WATERFRONT
$91.00
12312
G 701-22341 WATERFRONT FAM REST
$667.94
12312
E 203-45210-303 Planning Fees
$238.41
12313
E 101-41570-303 Planning Fees
$122.75
12313
E 101-41570-303 Planning Fees
$40825
12313
E 101-45300-390 Contracted Services
$56.22
12313
E 101-41570-303 Planning Fees
$28.52
12313
E 429-43256-303 Planning Fees
$208.50
12313
E 101-42420-310 Miscellaneous
$169.75
12314
E 101-41570-303 Planning Fees
$1,000.00
12315
E 101-41570-303 Planning Fees
$700.00
12316
Total NORTHWEST ASSOC CONSULTANTS
$5,415.26
PITNEY BOWES
GODFATHER
RETAILJLIQ STORE
CONVSTORE
QUEST COMP PLAN
FARR-KITTREDGE
WATERFRONT 3RD F/PLAT
WATERFRONT PUD
FAM RESTAURANT
PARK PLANNING
ZONING MAP UPDATE
GENERAL
HPC
ZONING ORD UPDATE
EAST SEWER
CODE ENFORCEMENT
MEETINGS
CITY CODE
E 101-41400-413 Office Equipment Rental $100.02 POSTAGE METER
Total PITNEY BOWES $100.02
npaid TARGETSTORES
E 101-43100-203 Supplies - General $69.36 1103274670 DAWN/BATTERIES
Total TARGET STORES $69.36
.............. . . .......
WELSH DEVELOPMENT
G 701-22327 MRD BANK SITE $800.24 DEVELOPMENT REFUND
Total WELSH DEVELOPMENT $800.24
XCELENERGY
E 101-43160-322 Utilities $41.88 054157032234 56TH CT SERWER
E 101-43160-322 Utilities $46-09 061929356034 53RD ST WELL
Total XCEL ENERGY $87.97
.............................................
n ZIEGLER CONSTRUCTION CO INC
E 702-41400-310
Miscellaneous
E 702-41400-310
Miscellaneous
E 702-41400-310
Miscellaneous
E702-41400-310
Miscellaneous
Total ZIEGLER
CONSTRUCTION CO INC
10100 BANKOFELKRIVER
$1,000.00
13875 88TH CRT LNDSCP
$1,000.00
13516 89TH ST LNDSCP
$1,000.00
13575 89TH ST LNDSCP
$1,000.00
13780 89TH CIR LNDSCP
$4,000.00
$23,564.71
CITY OF OTSEGO 12/18/02 3:58 PM
Page 3
*Check Detail Register@
DECEMBER 2002
Check Amt Invoice Comment
FILTER: None
ABDO
EICK&
4q
MMRSLLP
Certified Public Accountants & Consultants
7241 Ohms Lane
Suite 200
Edina, MN 55439-2150
Mayor and Council
City of Otsego
8899 Nashua Avenue
Otsego, Minnesota 55330
Dear Mayor and Council:
ITEM 5. 2.
NOV 2 5 2002
October 31, 2002
We are pleased to confirm our understanding of the services we are to provide the City of Otsego for the year ended
December 31, 2002. We will audit the financial statements of the City as of and for the year ended December 31, 2002. We
understand that the financial statements will be presented in accordance with the financial reporting model in effect prior to that
described in GASB Statement No. 34. Also, the document we submit to you will include the following additional information
that will be subjected to the auditing procedures applied in our audit of the financial statements:
Combining and Individual Fund Financial Statements
Audit Objective
The objective of our audit is the expression of an opinion as to whether your financial statements are fairly presented, in all
material respects, in confon-nity with accounting principles generally accepted in the United States of America and to report on
the fairness of the additional information referred to in the first paragraph when considered in relation to the financial statements
taken as a whole. Our audit will be conducted in accordance with auditing standards generally accepted in the United States of
America and will include tests of the accounting records and other procedures we consider necessary to enable us to express such
an opinion. If our opinion on the financial statements is other than unqualified, we will fully discuss the reasons with you in
advance. If, for any reason, we are unable to complete the audit or are unable to form or have not formed an opinion, we may
decline to express an opinion or to issue a report as a result of this engagement.
Management Responsibilities
Management is responsible for making all financial records and related information available to us. We understand that you will
provide us with such information required for our audit and that you are responsible for the accuracy and completeness of that
information. We will advise you about appropriate accounting principles and their application and will assist in the preparation of
your financial statements, but the responsibility for the financial statements remains with you. That responsibility includes the
establishment and maintenance of adequate records and effective internal control over financial reporting, the selection and
application of accounting principles, and the safeguarding of assets. Management is responsible for adjusting the financial
statements to correct material misstatements and for confirm�ing to us in the representation letter that the effects of any
uncorrected misstatements aggregated by us during the current engagement and pertaining to the latest period presented are
immaterial, both individually and in the aggregate, to the financial statements taken as a whole.
952.835.9090 Fax 952.835.3261
www.aemcpas.com
Audit Procedures - General
City of Otsego
October 31, 2002
Page Two
An audit includes examining, on a test basis, evidence supporting the amounts and disclosures in the financial statements;
therefore, our audit will involve judgment about the number of transactions to be examined and the areas to be tested. We will
plan and perform the audit to obtain reasonable rather than absolute assurance about whether the financial statements are free of
material misstatement, whether from errors, fraudulent financial reporting, misappropriation of assets, or violations of laws or
governmental regulations that are attributable to the entity or to acts by management or employees acting on behalf of the entity.
Because an audit is designed to provide reasonable, but not absolute, assurance and because we will not perform a detailed
examination of all transactions, there is a risk that material misstatements may exist and not be detected by us. In addition, an
audit is not designed to detect immaterial misstatements, or violations of laws or governmental regulations that do not have a
direct and material effect on the financial statements. However, we will inform you of any material errors that come to our
attention, and we will inform you of any fraudulent financial reporting or misappropriation of assets that come to our attention.
We will also inform you of any violations of laws or governmental regulations that come to our attention, unless clearly
inconsequential. Our responsibility as auditors is limited to the period covered by our audit and does not extend to matters that
might arise during any later periods for which we are not engaged as auditors.
Our procedures will include tests of documentary evidence supporting the transactions recorded in the accounts, and may include
tests of the physical existence of inventories, and direct confirmation of receivables and certain other assets and liabilities by
correspondence with selected individuals, creditors, and financial institutions. We will request written representations from your
attorneys as part of the engagement, and they may bill you for responding to this inquiry. At the conclusion of our audit, we will
also require certain written representations from you about the financial statements and related matters.
Identifying and ensuring that the City complies with laws, regulations, contracts, and agreements is the responsibility of
management. As part of obtaining reasonable assurance about whether the financial statements are free of material misstatement,
we will perform tests of the City's compliance with applicable laws and regulations and the provisions of contracts and
agreements. However, the objective of our audit will not be to provide an opinion on overall compliance and we will not express
such an opinion.
Audit Procedures - Internal Control
In planning and performing our audits, we will consider the internal control sufficient to plan the audit in order to determine the
nature, tin -Ling, and extent of our auditing procedures for the purpose of expressing our opinion on the City's financial statements.
An audit is not designed to provide assurance on internal control or to identify reportable conditions. However, we will inform
the governing body or audit committee of any matters involving internal control and its operation that we consider to be
reportable conditions under standards established by the American Institute of Certified Public Accountants. Reportable
conditions involve matters coming to our attention relating to significant deficiencies in the design or operation of the internal
control that, in our judgment, could adversely affect the entity's ability to record, process, summarize, and report financial data
consistent with the assertions of management in the financial statements.
City of Otsego
October 31, 2002
Page Three
1 �4144
Audit Administration, Fees, and Other
We understand that your employees will prepare all cash or other confin-nations we request and will locate any invoices selected
by us for testing.
Our fee for these services will be at our standard hourly rates plus out-of-pocket costs (such as report reproduction, typing,
postage, travel, copies, telephone, etc.). We estimate that our gross fee, including expenses will be approximately $8,500. This
estimate is based on completion of our year end accounting checklist by City staff. Our standard hourly rates vary according to
the degree of responsibility involved and the experience level of the personnel assigned to your audit. Our invoices for these fees
will be rendered each month as work progresses and are payable on presentation. In accordance with our firm policies, work may
be suspended if your account becomes 90 days or more overdue and may not be resumed until your account is paid in full. If we
elect to terminate our services for nonpayment, our engagement will be deemed to have been completed upon written notification
of tem-driation, even if we have not completed our report. You will be obligated to compensate us for all time expended and to
reimburse us for all out-of-pocket costs through the date of termination. The above fee is based on anticipated cooperation from
your personnel and the assumption that unexpected circumstances will not be encountered during the audit. If significant
additional time is necessary, we will discuss it with you and arrive at a new fee estimate before we incur the additional costs.
We appreciate the opportunity to be of service to the City and believe this letter accurately summarizes the significant ternis of
our engagement. If you have any questions, please let us know. If you agree with the terms of our engagement as described in
this letter, please sign the enclosed copy and return it to us.
Sincerely,
ABDO, EICK & MEYERS, LLP
Certified Public Accountants
kteven R. [MflcDio�na'1d'CVPA
RESPONSE:
This letter correctly sets forth the understanding of the City of Otsego.
Lo
C
Date:
IEJKILLf�CHILLING LTD.
CONSULTANTS AND CERTIFIED PUBLIC ACCOUNTANTS
July 10, 2002
To the Partners
Abdo, Eick & Meyers, LLP
Dean R Ager, CPA
Thomas L Sykes, CPA
Michael S. Altman, CM
Williarrij. Grave1le, CPA
Deborahj. Medlin, CPA
Darla R. Benoi� CPA
We have reviewed the system of quality control for the accounting and auditing practice of Abdo, Eick &
Meyers, LLP (the firm) in effect for the year ended May 31, 2002. A system of quality control
encompasses the firm's organizational structure and the policies adopted and procedures established to
provide it with reasonable assurance of conforming with professional standards. The elements of quality
control are described in the Statements on Quality Control Standards issued by the American Institute of
Certified Public Accountants (AICPA). The design of the system and compliance with it are the -
responsibility of the firm. Our responsibility is to express an opinion on the design of the system, and the
firm's compliance with the system based on our review.
Our review was conducted in accordance with standards established by the Peer Review Board of the
AICPA. In performing our review, we obtained an understanding of the system of quality control for the
firm's accounting and auditing- practice. In addition, we tested compliance with th6 firm's quality control
policies and procedures to the extent we considered appropriate. These tests covered the application of
the firm's policies and procedures on selected engagements. Because our review was based on
selective tests, it would not necessarily disclose all weaknesses in the system of quality control or all
instances of lack of compliance with it.
Because ' there are inherent limitations in the effectiveness of any system of quality control, de . partures
from the system may occur and not be detected. Also, projection of any evaluation of a system of quality
control to future periods is subject to the risk that the system of quality control may become inadequate
because of changes in conditions, or because the degree of compliance with the policies or procedures
may deteriorate.
In our opinion, the system of quality control for the accounting and auditing practice of Abdo, Eick &
Meyers, LLP in effect for the year ended May 31, 2002, has been designed to meet the requirements of
the quality control standards for an. accounting and auditing practice established by the AICPA and was
complied with during the year then ended toprovide the firm with reasonable assurance of conforming
with p"rofessional standards.
600 Wells Fargo Center - 230 West Superior Street - Duluth, MN 55802-1953 - Phone 218-722-4705 - Fax 218-722-8589
807 Cloquet Avenue - Cloquet, MN 55720-1677 - Phone 218-879-1503 - Fax 218-879-6240
Suite 228 - 1225 Tower Avenue - Superior, Wl 54880 - Phone 715394-6621 - Fax 715394-5629
wwweikill.com
'T -EM
SUMMARY PUBLICATION
ORDINANCE No. 2 0 0 2 - 21
As authorized by state law, City of Otsego has approved the publication of an
ordinance- the "Charter cable franchise" - in summary form. The full text of the ordinance
is posted, and copies are available for inspection, in the office of the City Clerk.
The approved summary of the ordinance follows:
CITY OF OTSEGO, MINNESOTA
ORDINANCE No. 2 0 0 2 - 21
The Charter cable franchise grants a fifteen (15) year cable television franchise to
CC VIII Operating LLC d/b/a Charter Communications. The Charter cable franchise
authorizes Charter to use rights-of-way in the City to construct, operate and maintain a
system to provide cable services. The Charter cable franchise establishes requirements for
operation of the system and delivery of cable services, imposes a franchise fee, and
generally sets forth the conditions required for cable franchises under Minnesota Statutes,
Chapter 238.
The ordinance is effective on the date of acceptance by Charter.
BY ORDER OF CITY OF OTSEGO
By
Its
ATTEST:
By
Its
Michael C Couri-
Andrew J. MacArthur
Roben T. Ruppe-
David R. Wendorf
*Also licensed in Illinois
"Also licensed in M�fbrnia
December 17, 2002
City Council Members
City of Otsego
c/o Judy Hudson, City Clerk
8899 Nashua Avenue NE
Otsego, NfN 55330
COURI & MACARTHUR
Attorneys at Law
705 Central Avenue East
PO Box 369
St. Michael, MN55376-0369
(763) 497-1930
(763) 497-2599 (FAX)
couriand7nacarthur@pobox.com
RE: Centerpoint Minnegasco- Ordinance Summary for Publication
Dear Council Members:
Please find enclosed for your consideration a proposed Summary of the recently
approved Franchise Ordmiance with Centerpoint Mimegasco for publication purposes.
It is my understanding that Centerpoint Minnegasco has already executed the Franchise
ordinance and has returned it to the City,
I recommend Council approval of the Summary.
Very truly yours,
ew J. M
COURI& CARTHUR
Encl.
cc: Arnie Hendrickson, Centerpoint Minegasco
CITY OF OTSEGO
COUNTY OF WRIGHT
STATE OF MINNESOTA
ORDINANCE SUMMARY, OTSEGO ORDINANCE NO. 02-20
OFFICIAL ORDINANCE SUMMARY- ORDINANCE NO. 02-20
GRANTING A NON-EXCLUSIVE GAS ENERGY FRANCHISE TO
CENTERPOINT ENERGY MINNEGASCO, A DIVISION OF
CENTERPOINT ENERGY RESOURCES CORPORATION, A
DELEWARE CORPORATION.
As authorized by State law, including Minnesota Statutes, section 412.191, subd.
4, the City of Otsego has approved the publication of the above-described
ordinance in summary form. The full text of the ordinance is posted, and copies
are available for *inspection at the office of the Otsego City Clerk.
The approved summary of the ordinance follows:
CITY OF OTSEGO, MINNESOTA
ORDINANCE NO. 02-20
The non-exclusive gas energy franchise ordinance grants Centerpoint Energy
Minegasco the right to operate gas energy lines and other facilities within the
City of Otsego over the term of the franchise, and sets forth the terms and
conditions for construction and operation of the same. The Franchise Ordinance
incorporates the regulations of the current City right-of-way ordiance.
The ordinance shall be effective upon the date of publication of this summary.
ADOPTED BY THE OTSEGO CITY COUNCIL this day of December,
2002.
IN FAVOR:
OPPOSED:
CITY OF OTSEGO
Larry Fournier, Mayor
Judy Hudson, City Clerk
ITEM 5.5.
CITY OF OTSEGO
COUNTY OF WRIGHT
STATE OF MINNESOTA
ORDINANCE NO. 2002-22
AMENDMENT TO ORDINANCE 2001-12
SNOWMOBILES AND OTHER RECREATIONAL
MOTOR VEHICLES
THE CITY COUNCIL OF THE CITY OF OTSEGO ORDAINS AS
FOLLOWS:
Section 8-1-8:A. of Ordinance No. 2001-12 is hereby amended to read as
follows:
Recreational motor vehicles may not be operated in designated areas except
on private property with owner's written permission between the hours of
8:00 AM and 10:00 PM.
ADOPTED this 23 rd day of December 2002 by the Otsego City Council.
IN FAVOR:
OPPOSED:
CITY OF OTSEGO
Larry Fournier, Mayor
ATTEST:
Judy Hudson, Clerk
ITEM 6. 1.
"alkirowtsir ASSOCIAltub CONSUum"l-s" INC,
5775 Wayzata Boulevard, Suite 555, St. Louis Park, MN 55416
Telephone: 952.595.9636 Facsimile: 952.595-9837 planners@nacpianning.com
PLANNING REPORT -addendum
TO:
FROM -
RE:
REPORT DATE
NAC FILE. -
BACKGROUND
Otsego Mayor and City Council
Daniel Licht
Otsego - Waterfront PUD; Convenience Gas
17 December 2002 APPLICATION DATE: 30 October 2002
176.02 - 02,39 CITY FILE- 2002-
Landcor Construction, Inc. has submitted plans for a 6,900 square foot convenience store
with attached car wash and gasoline sales. The subject site is located at the southwest
corner of the Otsego Waterfront development (Outlot A) at the corner of CSAH 39 and
CSAH 42.
The subject site is planned for commercial uses within the east sanitary sewer service
district designated by the Comprehensive Plan. The City Council approved a rezoning
to PUD District on 8 April 2002 subject to a development stage plan and specific project
guidelines. This site is not within the WS Overlay District.
The Planning Commission recommended several changes to the site plan, including
rotating the orientation of the building and gas islands. The City Council tabled
consideration of the application at two meetings in order to allow the applicant to prepare
revised plans and submit them for staff review. These plans have been reviewed and our
comments follow.
Exhibits:
A. Site Location D. Building Plans
B. Site Plan E. Grading Plan
C. Landscape Plan F Utility Plan
ANALYSIS
PUD Zoning. The subject site is zoned PUD District, which is based on the requirements
of the B-3 District. Convenience stores with gasoline sales are allowed as a conditional
use within the B-3 District. As such, the use may be allowed in this PUD Development
subject to the same conditions and the applicable performance standards unique to the
development stage plan. Consideration of the site and building plans for each phase of
the Waterfront project is processed as an amendment to the PUD District. The Planning
Commission and City Council are to consider the site and building plans based upon (but
not limited to) the criteria outlined in Section 20-3-2.F of the Zoning Ordinance:
1 The proposed action's consistency with the specific policies and provisions of the
official City Comprehensive Plan.
2. The proposed use's compatibility with present and future land uses of the area.
3. The proposed use's conformity with all performance standards contained in the
Zoning Ordinance (i.e., parking, loading, noise, etc.).
4� The proposed use's effect upon the area in which it is proposed.
5. The proposed use's impact upon property values of the area in which it is proposed.
6. Traffic generation by the proposed use in relation to the capabilities of streets
serving the property.
7. The proposed use's impact upon existing public services and facilities including
parks, schools, streets, and utilities and its potential to overburden the City's
service capacity.
The development stage plan approved for the Waterfront project planned for a
convenience gas use at this location. The site plan has been revised such that the
building front and pump islands are oriented east as on the original concept plan.
Lot Requirements. The development of lots within the PUD District are intended to be
subject to the requirements of the B-3 District, outlined below:
K
Lot Area Lot Width
Setbacks
Front Side
CSAH39 CSAH 42/Quaday
Rear
North
Required
1.0ac. 200ft.
65ft. 65ft./35ft,
20ft.
Proposed
1.4ac. 241ft.
100ft. 29ft./l 50ft.
64ft.
K
As shown above, the proposed site plan meets all of the applicable B-3 District lot
requirements except for the setback from CSAH 42, which is 29 feet. The site plan
approved with the original development plan with the building oriented to the east would
have encroached to within 45 feet of CSAH 42.
Section 20-36-2.M of the Zoning Ordinance allows that setbacks at the perimeter of a PUD
District may be reduced to 30 feet. Given that this design provides for a more consistent
alignment of the buildings along CSAH 39 (bank, family restaurant, and convenience gas)
and CSAH 42 (convenience gas, liquor store, and market west) based on changes in right-
of-way width along CSAH 42, the setback is appropriate. The site plan will need to be
revised such that the building is a full 30 feet from the CSAH 42 right-of-way.
Building Design. The proposed building is a 24 foot tall, single story building. Dormers
have been used on the north and south facades to create the appearance of a two story
building, consistent with the PUD District design guidelines. The majority of the building
is faced with brick and there is a narrow band of artificial stucco just below the asphalt
shingled roof. Colors for the proposed building should be specified. The building mass
has been minimized though the use of large windows on the building front and brick
pilasters Sp2ced evenly around the perimeter to add articulation. The rear wall of the car
wash features four sets of three windows to avoid a solid wall. Building mechanicals are
located at the south of the building and screened behind a cedar fence.
Plans have not been submitted for the canopy above the pump islands and must be
submitted. The architectural design and color of the canopy should be similar to that of
the principal building in an off-white color. The face of the canopy may not be illuminated
and should not include extensive color banding that contrasts with the building color.
Landscaping. The landscaping plan for the perimeter of the property is generally
consistent with the plans approved with the overall project. Additional coniferous tree
plantings and shrubs have been provided along CSAH 42 and CSAH 39 to screen the
carwash entrance and exit, as well as the stacking lanes. The size of plantings shown on
the landscape plan are consistent with the Zoning Ordinance requirements. All of the
selected plant materials are appropriate.
Signs. The only sign identified on the submitted plans is a wall sign above the building
entrance. Plans for any additional signing must be submitted. As a corner lot, signs may
be allowed on more than one side of the building, but the total sign area may not exceed
15% of the facade area facing two public streets. Any signs located on the canopy should
be limited to maintain an appropriate scale and not exceed 20 percent of the facade area
facing a public street. No sign may exceed 100 square feet.
One free standing sign is allowed with a maximum height of 20 feet. The PUD District
approval a] lowed that this sign may be located near the Quaday Avenue and CSAH 39
intersection for visibility, where it is shown on the site plan. The sign location is setback
more than 10 feet from any lot line as required by Section 20-37-2. E.
0
All signs require issuance of a sign permit and these plans are subject to further review
and approval of City Staff.
Accessory Uses. Under the PUD District and performance standards applicable to
convenience gas uses, outdoor sales, storage and display is prohibited. Exceptions to this
requirement are limited to 20lbs. propane tank sales provided that they are secured and
meet all fire codes.
Compressed air and coin operated vacuum are identified on the site plan on the north side
of the building. The applicant should provide information on the noise created by the
vacuum. Consideration may be given to limiting the use of the vacuum to those hours
when the car wash is allowed to operate to minimize noise conflicts.
A propane tank is shown along the east property line. Additional shrubs and low-level
plantings should be provided around the propane tank to provide screening, subject to
applicable fire code requirements.
If a public address system is to be used, the system is to be set so as not to be audible at
any property line. Playing of music or advertisements over the public address system is
to be prohibited.
Hours. The hours for convenience gas uses in a B-3 District are limited to 6:00 AM to
12:00 midnight unless extended by the City Council. The applicant applicant is proposing
that the gas sales and convenience store be allowed to operate 24 hours. The car wash
would operate between 7-00 AM to 10:00 because of staffing needs and expected volume.
The Planning Commission believed these hours to be reasonable given the planned site
design changes and recommended approval of this specific arrangement.
Access. Vehicle access to the subject site is shared with the use to the north via one
curb cut to Quaday Avenue, which measures 32 feet wide. Section 20-21-4.H.7 limits curb
cut width to 24 feet unless approved by the City Engineer. The width of the curb cut
opening matches that of the median within Quaday Avenue and the access on the east
side of the roadway. The additional width is necessary to allow fueling trucks and delivery
trucks to access the site. The shared access requires cross access and parking
agreement for these two lots.
A second curb cut is proposed 115 feet to the south of the shared access. Because of the
median in Quaday Avenue, this access is right-inlright-out only. This access point is 80
feet from the intersection of Quaday Avenue and CSAH 39. Standard design requirements
dictate that access to a local commercial street be setback at least 125 feet from the
intersection with a minor arterial street. Furthermore, this access does not appear to be
necessary for on-site circulation. Subject to further comment from the City Engineer, we
would recommend that this south right-in/right-out access be removed.
51
Pedestrian access to the site is available from sidewalks on the east, south, and west side
of the property, The site plan has been revised to provide for pedestrian connections to
these sidewalks.
Parking/Loading. The table below outlines off-street parking requirements for the
proposed use. There are 28 stalls provided on the proposed site plan, which is an
oversupply of five stalls. Nine located along the north property line are oversized to
accommodate vehicles with trailers or RVs. All other stalls are designed to a 9 foot by 18
foot dimension with at least a two foot overhang.
Use Requirement Calculation Required
I I I Stalls
Motor Fuel 4 stalls + 1 stall/service bay 4 stalls + no service bays 4
Convenience Store 1 stall / 200 square feet 3788.7sf, x 10%/200 17
I TOTAL 21
The fuel tanks are located on the east side of the property. There are two service doors
on the north and south sides of the building for product delivery. Circulation is good for
access by fuel trucks and other delivery vehicles.
Access to the pump islands is also good with room on each side of the island for one
vehicle and 24 feet between pumps. Additional space has been provided between the
pump islands and the building to avoid conflicts between traffic at the pumps and cars
parked adjacent to the building. This space also allows for circulation of oversize vehicles
such as RVs or truck and boat trailer combinations.
The drive aisle leading to the car wash is segregated from other site traffic and has
stacking space for approximately ten cars. Stacking can occur beyond the segregated
drive aisle without disrupting site traffic. There is also a bypass lane just before the
entrance to the car wash to allow vehicles to go around the building and escape the car
wash.
Lighting. The site plan does not identify any free standing light locations. Decorative light
fixtures consistent with the PUD District design standards are shown on all sides of the
principal building. It is also assumed that lighting will be provided under the canopy, but
again no plans have been provided.
For lighting under the canopy, recessed canister spotlights will be required with no portion
of the light source or fixture extending below the bottom face of the canopy. A photometric
light plan demonstrating compliance with Section 20-16-10.C.1 (as revised) shall be
submitted. Outdoor lighting and any illuminated signs are to be turned off not more than
one hour after closing as required by Section 20-16-10. C.
6-1
Trash. A trash room has been provided at the northeast corner of the building with
exterior folding door. Adequate access has been provided for garbage trucks.
Grading. Plans have been submitted for site grading and drainage and are subject to
review and approval of the City Engineer.
Utilities. Plans for sanitary sewer and water connections have been submitted. These
plans show that the utility connections are made directly to public facilities within
easements or rights-of-way and not shared with the adjacent use to the north. All utility
plans are subject to review and approval of the City Engineer.
Development Contract. Upon approval of the application, the developer must enter into
a development contract with the City. The development contract will include all applicable
conditions of approval, fees and securities. The development contract is subject to review
and approval of the City Attorney.
CONCLUSION
The proposed development plan meets most applicable requirements of the Zoning
Ordinance and PUD District. The revised plans address concerns raised by our office and
the Planning Commission related to the building orientation and additional details have
been resolved. As such, we recommend approval of the PUD Development Stage plan.
The Planning Commission held a public hearing on 18 November 2002 to consider site
and building plans for a convenience gas use proposed for Outlot A of the Waterfront
Addition. The Planning Commission closed the public hearing and recommended by a 7-0
vote to approve the application subject to the conditions outlined below.
A. Motion to approve a PUD Development Stage plan for a convenience gas use on
Outlot A of the Waterfront addition, subject to the following conditions:
The site plans is revised to provide a 30 foot setback from the CSAH 42
right-of-way.
2. Plans for the canopy are submitted demonstrating that the design and color
are consistent with that of the principal building, without extensive
contrasting color bands and no illuminated fascia.
3. Plans for all signs are to be submitted, subject to review and approval of City
Staff.
A
4. Outdoor sales, display, or storage shall be prohibited except for 20lbs.
propane tanks kept in Conformance with applicable fire codes. The propane
tank shall be screened with shrubs and low-level plantings.
5. Sound from a public address system may not be audible at any property line
and broadcast of music or advertising shall be prohibited.
6. The gas sales and convenience store are allowed 24 hour operations and
the car wash operation shall be limited to 7:00 AM to 10:00.
7. A photometric light plan shall be submitted illustrating all proposed light
sources and illumination patterns extending to the property line. All lighting
mounted under the canopy is to be recessed canisters with no portion of the
light source or fixture extending below the bottom face of the canopy. All
lighting is subject to review and approval of City Staff. The use shall comply
with the requirements of Section 20-16-10 of the Zoning Ordinance
regarding outdoor lighting.
8. All grading and drainage plans are subject to review and approval of the City
Engineer.
9. All utility plans are subject to review and approval of the City Engineer.
10. The applicant shall enter into a development contract with the City, abide by
its conditions, and pay all applicable fees and securities, subject to review
and approval of the City Engineer.
11. Comments of other City Staff.
B. Motion to deny the request based on a finding that the application is inconsistent
with the Comprehensive Plan, Zoning Ordinance, and PUD District.
C. Motion to table the request.
PC. Mike Robertson
Judy Hudson
Andy MacArthur
Ron Wagner
Bob Fields
7
I -P
RASE MAP DAU PROVIDgony
Manson
eison
Amoc.,lnc.
PREPARED OCTOBER 2001
NOTE:
THIS MAP 1.5 fOR I'VANNING
PURPOSES ONLY AND Si IOULD
NOT BE USED FOR EXACT
MEASUREMENT
0 T S
ON THE GRE AT RIVER ROAD
L7
LBJ
UTTMTTFO!'
CK
I I I I u
Ounar 8
LOT 4
BLOCK a tit
LOT 3
OUM
C5
mm% 2
LOT I
V BLOCK i
gath C.S.1m mm 39
iz----------- ------
H7.0
OTSEGOS WATERFRONT r Associates. Inc.
J�h,, 0
OTSEGO. MN
7
__AG_
- ----- 7MA&v.M5L_ EXHIBIT A-2
CONCEPT PLAN .F. -
o.&..) x F"
3: 21
T,
Lij
LL,
R, w
2
E.
------ ---------
I.j
j
NE -i)Q th Street
(C. S. A H'.",,,, -No.- - _3,9)
sou t
OTSEGO WATERFRONT
NORTH CONVENIENCE STORE
o 2o 40 AND CAR WASH
%7.� OUTLOT A
sclu IN FEET
C I T Y 0 F
I . Al P � � � �
WLandCor
, Constfuclion, Inc.
MCCOY ARCHITECTS
-4 CEDM LAKE P411MUMAY
55-
121-
-U&M—
SIT
SITE PLAN NOTES
WA ASSOCIATES
VARIES
..0, SEE M.
E� VARE SEE
7 T -i
iCK)Sf ROOTSOf
TO �TWC
a
DECIDUOUS TREE PLANTING DETAIL
"3
0
PERENNIAL PLANTING
0 DICIO—S5— .12POT
Tl— —1
To—
.low
LOOSEN ROOTSOF 4L
RIFIR TO
C�AMELUET��
SCAROYBOTT(WANDSIDE OF
IS I
SHRUBS TO BE AAC D SO TMT
"'61 _CKIYEDSUs-
TOP Of MN—ot . lW11
wicH rxEp Sl SPIC
�F� SUSKC.
:OGING-f —SEESPEC.
m—e- ftrmlo�
A--
-11—S—M-POT
SEE
_LM
"2 SHRUB PLANTING DETAIL
a
DECIDUOUS TREE PLANTING DETAIL
"3
0
.11—S I.A.1 TRUE - I
ME.
0 DICIO—S5— .12POT
Tl— —1
To—
.low
(D
N1-1
I ITT.,.
1.
IS I
"'61 _CKIYEDSUs-
Al—E C—NT
SP
-S =UPY SIDUM
PLANT PALETTE:
MIN
isle
Ise
WIT all
Mwj.".M� MMjM
NJ ml
1"IME
!MEN
low
01 M, 11
0 ITT' 20' 40
- M N.E. 90th STREET
M'M ill
OTSEGO WATERFRONT
CONVENIENCE 37GRE
AND CAR WASH
OUTLOT A
C I T Y 0 F
M I N N E S 0 T A
WLandCor
, Construction, Inc.
MCCOY ARCHITECTS
cf.- 1� —1
5506
SIT:
:;Z;—
AssOCIATES
0 DICIO—S5— .12POT
(D
-C-10- 1
1.
I—A—C:==
"'61 _CKIYEDSUs-
Al—E C—NT
SP
-S =UPY SIDUM
I.—
A--
-11—S—M-POT
0 ITT' 20' 40
- M N.E. 90th STREET
M'M ill
OTSEGO WATERFRONT
CONVENIENCE 37GRE
AND CAR WASH
OUTLOT A
C I T Y 0 F
M I N N E S 0 T A
WLandCor
, Construction, Inc.
MCCOY ARCHITECTS
cf.- 1� —1
5506
SIT:
:;Z;—
AssOCIATES
0
P�j
z
m
.1 4 1 �-, I
j�i1poiEUwAw -- - -- 1
6-20r,2 10 _ARCHIQCI�
C, t,
2 t=
-H V, MINNE
U011TV"ELNIENCE LU
LL
:�dklc . - ;l"'.
C'A R' WAr-",) J: '-' Al OLI M14 554. 11
_,;.
OTSE ("'1 0, S (D T A
U, LA
1�,I.K"-- laf , -, " ` ��
4 U
$1
T;
g
1-3
P�j
z
m
.1 4 1 �-, I
j�i1poiEUwAw -- - -- 1
6-20r,2 10 _ARCHIQCI�
C, t,
2 t=
-H V, MINNE
U011TV"ELNIENCE LU
LL
:�dklc . - ;l"'.
C'A R' WAr-",) J: '-' Al OLI M14 554. 11
_,;.
OTSE ("'1 0, S (D T A
U, LA
1�,I.K"-- laf , -, " ` ��
4 U
$1
T;
1-3
A,
iWA
P�j
z
m
.1 4 1 �-, I
j�i1poiEUwAw -- - -- 1
6-20r,2 10 _ARCHIQCI�
C, t,
2 t=
-H V, MINNE
U011TV"ELNIENCE LU
LL
:�dklc . - ;l"'.
C'A R' WAr-",) J: '-' Al OLI M14 554. 11
_,;.
OTSE ("'1 0, S (D T A
U, LA
1�,I.K"-- laf , -, " ` ��
T;
1-3
P�j
z
m
.1 4 1 �-, I
j�i1poiEUwAw -- - -- 1
6-20r,2 10 _ARCHIQCI�
C, t,
2 t=
-H V, MINNE
U011TV"ELNIENCE LU
LL
:�dklc . - ;l"'.
C'A R' WAr-",) J: '-' Al OLI M14 554. 11
_,;.
OTSE ("'1 0, S (D T A
U, LA
1�,I.K"-- laf , -, " ` ��
-Tj — -------
--------------
a7
F-
70
-T)
kL
F- -IL ,
I r
>
8i
I F"nn[-- 0::,
: I wt
:: L
m m m
I F1124
IJ
L�
c 41,
tj
: I wt
:: L
m m m
I F1124
c 41,
0
133A NJ 31YDS
7o%�%
ol oz o
N—N
`W�
0.3031
- --- - --------
LOWS
.b
flm� off v 9 D)
jee4g L1166 3N
I----------
"'M 'AM IV
------- 310"N'm "wLs
r ------ --------- — SIX3 01 133NNO3
anis
PD
3 W 13INNOD
9 H.1 0
77—
MAlm
0
.K
&
;k"
e.,
7
r
P LOCATE
5' 8E...o
C NEC TO EX
PK WATERMAN
C-1
IK
C5
C C' 1,0 ZIMT.l,
0lVR
NIP TUS
5, 1�
r
2 *Er
IER S.0 -
L
CONNEcT TO EXIS
=
FTTIJ
.1.10, E
AT M, 060.6a
- - - -
- - - - - -
- --- ------
WATERUMN SIM
7
min
loin
c B 2
c./
'I To E x 'USBT
KR ST
'AT
RIM-
54.
0
605
-Lt--
-85879
INV -45P
C C' 1,0 ZIMT.l,
0lVR
NIP TUS
5, 1�
r
2 *Er
IER S.0 -
L
CONNEcT TO EXIS
=
- - -- - - m__
.1.10, E
AT M, 060.6a
- - - -
- - - - - -
- --- ------
min
loin
min
-85879
INV -45P
C C' 1,0 ZIMT.l,
0lVR
NIP TUS
5, 1�
r
2 *Er
IER S.0 -
L
CONNEcT TO EXIS
=
- - -- - - m__
.1.10, E
AT M, 060.6a
- - - -
- - - - - -
- --- ------
NE 90th Street
(C. S. A /-['\,-N-o. _3
1 1, "
II.,- _txj,
South
OTSEGO WATERFRONT
CONVENIENCE STORE
AND CAR WASH
OUTLOT A
C I TY OF
NORTH
0 4o
M I N N E S 0 T A
SCAIX IN FEET LandCor
W,
WConstruction. Inc
MASTER LEGEND
M COY ARCHITECTS
12' C- L.E -1-Al
W.—, .1-ES.1A 11-
121-11541
sil t
=7_1 Z t-1 r. m Z ==xt
=nn-
lAs!�oclATESJ
612 595 9e37 p.01/01
ITEM 6. 2.
L A330CIATID calm 3 UILTA"Irs" INC,
5775 Wayzata Boulevard, Suite 555, St. Louis Park, MN 55416
Telephone: 952-595.9636 Facsimile: 952.595-9837 planners@nacplanning.com
MEMORANDUM - via fax transmission
TO- Mike Robertson / Judy Hudson
FROM: Daniel Licht
DATE- 13 November 2002
RE: Otsego - Waterfront PUD; Civic Monument Sign
NAC FILE: 176.02 - 02.04
We have received the letter from Landcor Construction, Inc. dated 8 November 2002
regarding the proposed civic monument/area identification sign to be placed at TH 101 and
CSAH 39. We have the following comments:
The height of the sign may not exceed 20 feet. Given the sign's location, a lower
profile sign may be preferred to the present design so as not to obstruct view of the
bank building.
2. The text for'Gity of"and'On the Great River Road" should be a Times New Roman
font to match the City's logo.
3. Consideration should be given to placing the logo within an outline of the City to
promote the City's identification, instead of overlaying an outline of the State of
Minnesota.
4. The letter states that the sign structure will support four signs for use by the interior
lots along CSAH 39 and CSAH 42. These signs will not be allowed- Provision was
made in the PUD approval for a separate area identification sign along TH 101 that
would allow for identification of individual businesses. Identification of the
individual business along TH 101 would be allowed only if freestanding signs for
each lot were limited to monument signs at the site entrances. Further, it would be
improper in our opinion to identify the City along with certain businesses while
excluding other businesses within the community outside of this development.
PC. Steve Fisher
Le I Landor, Inc.
Reat Estate Broker, Devetoper, Property Management
November 8, 2002
Mike Roberstson
City of Otsego
8899 Nashua Avenue
Otsego, Minnesota 55330
Dan Licht
City of Otsego
8899 Nashua Avenue
Otsego, Minnesota 55330
Ron Wagner
City of Otsego
8899 Nashua Avenue
Otsego, Minnesota 55330
Re: Civic MonumentJDevelopment ID Pylon
Gentlemen,
NOV 12 2002
lIDy-
COPied to City Clerk
I have received proposals from three different sign companies for the fabrication and
installation of a civic monument pylon that would identify the City of Otsego, as well as
our development, Otsego Waterfront West. The sign will include, at no additional
expense to the City, four signs for use by the four interior lots along County Road 39 and
County Road 42.
Please review the attached three (3) proposals and process our request for the City to
cover fifty percent of the cost of this sign, with the other fifty percent being added to the
current special assessments on our development.
If you have any questions or should require additional information, please contact me at
763-315-0818.
Very truly yours,
Steve Fischer
Development Agent
Js
Attachments
cc: Bob Fields
9464 Hemlock Lane N., Maple Grove, MN 55369 0 Phone: 763-315-0818 e Fax: 763-315-0817
24" 24-
30* -1
V- "P,
30,
MOFILE
Steve Fischer
Landcor Inc.
9464 Hemlock Lane North
Maple Grove MN 55369
Phone: 763-315-0818
KIN A 1 2002
Fax: 763-315-0817
Proposal Date: 10/30/02
Salesperson: Dennis Mellein
Job Location: Otsego
E -Mail:
Signcrafters proposes to furnish all labor and materials as needed to fabricate and install
one 2 sided entrance pylon sign. Design as per print. All lcttering and logos will be halo
lit with LED lighting. Lettering will be 1/4" aluminum with a polyurethane enamel finish.
Support poles will be clad in anodized aluminum panels with a 20 -year no fade paint
warranty. Lower portion of column to be clad in brick. All fabrication and installation to
be performed by union employees. -4 3 8,000. 00
Projected completion date is after receipt of down payment, signed contract, approved
drawings and city approval.
I
If provisions of above include installation of sign base and/or electrical hookup, sign base is bid "under
normal ground conditions only" and electrical hookup is included in bid price with adequate power brought
to within six feet (6') of sip(s) area(s) by others.
Total bid price: S38,000.00(DZ�s not include charges for sales tax(es), permits, permit staff time fees, and
Paymentterms: 50% down payment($ 19,000.00); balance due upon job completion and receipt of invoice.
Authorized signature:
Dennis Me em
Note: This proposal may be withdrawn by
Signcrafters, Inc., if not accepted within
thirty days.
I/We accept the prices, terms, conditions and/or
specifications listed here and on reverse page, and
hereby authorize You to perform the work as
sp-,c,S,--d.
Customer signature Date accepted
7775 MAIN STREET MINNEAPOLIS, MN 55432
(763) 571-2995p (763) 571-3588f
E -Mail: Signcrafters@SCOUTDOOR.com
Me
FAX NO. :7635766907 Nov. 04 2002 11:03FM P1
Steve Fischer
LandCor, Inc.
9464 Hemlock Lane North
Maple Grove, MN 55369
We are pleased to propose the following for the Otsego pylon project.
Fabricate two sided pylon with an alum. cap and aluminum letters'�DTSEGO WATER FRONT WES71.
(2) 8' x 10' cabinets and 2 shapes of the state of Minnesota fabricated of alum.
(2)'Vity of" in neon lettm.
(2)'�OTSEGO" in fabricated channel letters with plex face and noon Ulumination.
(2) sets of 1/4" aluminum waves stud mounted with 1/2"spacers.
(2)'�DN THE GREAT RIVER ROAD" 'A" aluminum lefters stud moLmted with 1/2"spacas.
S29,900.00
Aluminum pole covers ptd, one color.
S5,800.D0
Installation of bricks on 4 columns, bricks by others.
S4,600.00
Excavate and fin-aish cmerete footings and anchor bolts
S4,200,00
9C) C) a,
q,
We would be very pleased to handle this work for you.
Sincerely,
L
) � K CJ V 041 -
Gregory F
le;C.kwar 1<
PHONE
Gal -888-0553
800-699-9568
,FAX
651-Gaa-2osi
- , - 4 1- / VV4 I I . 'T j MIYI
P.O. BOX 357
�RONOCO, MN 55960
607-367-2531 FAX 507-387-2633
o�,nmu imAo ojujv�
The Sign oF Quality
NO. 0 6 16 P. 2
racq--,AL., CIDNTRACT �
1610 E. CLIFF RD. BLDG #5
SURNSVILLF- MN 55337
952-894-2421 FAX 952-894-2748
SUBMITTED TO; Steve FiSbcr PHONE: 763-315-0818 DATE: 10/21/02
COMPANY: LandCor, Inc JOB DESCRIPTION; Pylon Sign
ADDRESS: 9464 Hemlock Lane North JOB LOCATION: Otsego Waterfront West
CITY, STATE: Maple Grove, NIN. 55369 CITY, STATE: Otsego, MN
WE HERESY SUBMIT SPECIFICATIONS AND ESTIMATES FOR:
Labor. material and equipment to complete die following:
Fabricate and install one 8' by 10' pylon sign 25 feet above gTade, Letters to be flat cut alum and Halo lighted letters with L -E -D's
Per drawin.-
Cost................................................................................................................................. $39,900.00
Electrical book up by others
City Sign permit EXMA
7he power supply to the sign must have a dedicated ground wire with no more than two (2) circuits on a neutral. The sign
circuit must allow for the normal operation of the GFCI transformers as noted in the NEC and UL21 61. Any sign service
work that resufts from problems caused by the power supply will be billed at our normal service rate.
MINNESOTA SALES =IS INCLUDED, SUTDOES NOT INCLUDE MN.LIS15 MOR OUrSTATE W.
PRICES DO NOT INCLUDE ;UEL SUPCHARGE, S)GN PERMITS. SECURAL OF PSRMITS, OIR ELECTRICAL.
PURCHASER IS RESPONSIBLE FOR ADDITIONAL EXPENSE OR OVEPAGE DUE TO UN -FORESEEN OBSTRUCTION SUCH AS EXCESS ROCK
TEEL, CEMENT, LMLJ77ES, SPPINKLER SYSTEMS, COMMUNICATION LINES OR 07HER UNFORESEEABLE POUNDA710N OR WALL CONDITIONS.
THESE ITEMS MLL BE BILL.ED AS ADDITIONAL 2XPENSES.
PAYMENT TO BE MADE AS FOLLOws: Thirty nine tbousand 00/100 DOLLARS ($ 39,900-00
Balance upon completion
THIS PROPOM "Y BE WTHDRAM IF NOT ACCEPTEC) WrrHIN 30 DAYS. SALES REPRP-SENTATiVE
THIS CONTRACT, WITH ALL CONDITIONS NOTEO, is HEREWTH ACCEMD BY BOTH PAR'n&S.
PURCHASER
$CHAD TRACY SIGNS, INC.
Rick Ballantyne
BY
TITLE
TITLE Sales Representative
PERSONALLY
GUAAANTIZED CONTRACT DATE Octobur 21, 2002
SUBJECT TO TERMS AND CONDITIONS ON PAGE TWO
Hakanson
Anderson
Assoc., Inc.
3601 Thurston Avenue, Suite 101, Anoka, MN 55303
Phone: 763/427-5860 Fax: 763/427-0520
CITY OF OTSEGO
CITY COUNCIL
CITY ENGINEER'S AGENDA
December 23, 2002
Item 7.1: Consider Ordering Plans and Specifications for:
a. Water Tower — 1 M. Gal
b. 2 Wells — 500 gpm to 1000 gpm
C. Pumphouse
d. Lift Station El and Force Main
e. Lift Station E3
f. Watermain from Wells to Water Tower
Item 7.2-. Consider accepting amended Feasibility Report for 85 1h Street and Page
Avenue
Item 7.3: Consider Pay Estimate #3 and Change Order #1 for the 85t' Street
Extension Project
Item 7.4: Consider Any Other Engineering Items
Civil &Municipal 9
Engineering, irow5
C:\Documents and Settings\Diane.HAKANSON\Af b�&fkqW�ViGhcilagenda27.doc
—1 Hakanson
Anderson 3601 Thurston Avenue, Suite 101, Anoka, MN 55303
Phone:763/427-5860 Fax:763/427-0520
111 Assoc., Inc.
December 19, 2002
Honorable Mayor and City Council
City of Otsego
8899 Nashua Avenue NE
Otsego, MN 55-330
Re: Otsego West Wastewater Treatment District
Dear Honorable Mayor and City Council:
With the permit for the Otsego West Wastewater Treatment Facility proceeding towards
approval, we have compiled a time line and costs for other trunk systems, which will be required
to be constructed by the City prior to any urban development.
During earlier discussions by City Council and staff there was some talk of having city services
(water and sewer) available to developers in the fall of 200"). Although the Wastewater
Treatment Facility will not be completed until 2004 (as outlined in Mr. Ted Fields recent letter to
council) it is proposed that during the initial low flow period (<I 0,000 gpd), the wastewater
would be hauled by trucks from lift station(s) in the west to the existing East Otsego plant for
treatment. Initial wastewater flows in late 2003 and early 2004 would most likely be insufficient
to operate the facility with any efficiency or within MPCA Standards so trucking of wastewater
is required regardless if the west facility is operational or not. The water tower will be the most
difficult trunk facility to complete in time to supply city services to developers. I have spoken to
contractors who bid water towers in the region and they say a water tower can not realistically be
completed by the fall of 2003. A July 2004 completion date is a realistic time line. A recent
water tower bid in southern Minnesota had alternate completion dates of either October 15, 2003
or July 1, 2004. The cost difference was $60,000 or a 8.4% surcharge (see bid tabulation
attachment). If the City is committed to supplying Developers water by fall of 2003, the options
are to either allow Developers to install temporary wells w/individual pneumatic tanks in homes
until city water service arrives with the extra costs to be born by the Developer or install a
temporary large pneumatic tank on the municipal well in the purnphouse much as River Pointe
has. Estimated additional cost is $50,000.
All other trunk facilities needed for city services can be completed in a single construction
season. A sketch of which trunk facilities required to be installed is attached. Dashed facilities or
lines are assumed at this time to be installed by developers as they develop with trunk credits
being applied in development agreements.
G:\MunicipaMOTSEGO\6-17\ot6l7]inicc.doe
Civil 6- Municipal
Engineering 25
Land Surveyingfor
0
Preliminary cost estimates for each of the required trunk systems are as follows:
E I District Lift Station
E3 District Lift Station
I Million Gallon Water Tower
Trunk Watermain (Pumps to Watertower)
2 Wells and Pumphouse
Total Preliminary Project Cost Estimate
We estimate the design cost for each of the projects as follows:
El District Lift Station
E3 District Lift Station
I Million Gallon Water Tower
Trunk Watermain (Pumps to Watertower)
2 Wells and Pumphouse
Estimated Design Cost
$ 473,000
$ 390,000
$1,170,000
$ 375,000
$ 650,000
$3,058,000
$
34,300
$
29,500
$
69,030
$
28,750
$
49,750
$
211,330
If the City Council would like to have water and sewer service available to the Developers in
Phase I of the Otsego West Study Area, we recommend ordering plans and specifications. The
council will need to decide which option they would like to proceed with. Water service by fall
of 2003 will require extra costs for temporary pneumatic tank(s). Water service by mid summer
of 2004 when the water tower can be completed will not involve extra costs.
If you have any questions, please contact me at 763-427-5860.
Sincerely,
Hakanson Anderson Associates, Inc.
Ronal 4Ja er,4-P7/'F
V
RJW:dlc
Cc: Mike Robertson, City Administrator
Judy Hudson, City Clerk
G:\Municipa]\AOTSEGO\6-17\ot6l7llmcc.doc
Hakanson
Anderson
Assoc., Inc.
BID TABULATION
500,000 GALLON ELEVATED WATER STORAGE TANK
SE MARSHALL STREETIBLAKE AVENUE
CITY PROJECT NO, 0 132
ALBERT LEA, MINNESOTA
Bid Date: December 4, 2002 @ 3:00 p.m,
ZRT Fl(e K70.7062
Engineer's Estimate TV qq0 $
(1) Base l3id includes project completion dale of October 15, 2003
A"emate No. 1 � Deduct to delete Arches and Words Southern Gate From Logo.
Aftemate No. 2 — Deduc;t to change conlPfelion date from October 15, 2003 to juty 1, 2004.
T
Bid Amount
With both
Alter Lqtes I & 2
s 75Z000
-- -e—
s 719 too
T
7
Base Bid
AMQRnt I
Alternate No. I Alternate No. 2
Bid Amount
Bid Arnount
qeduct Amount Peduct Am,,nt
with
with
Caldwell Tanks
AlternateNo. 2
Louisville, KY
s 817 400 0
$ $—.(90- 000 $
dotZ 000
7S7000
CB&I Water
$
Clive, ]A
953 -foo
$ 500c) $ -<-16 0 $
XY� 7,60
7Z Z-6 0
Maguire iron. Inc.
Sioux Falls, SD
s 7/ Z-
703
s
-300
�';_
goo
$ vf--
Engineer's Estimate TV qq0 $
(1) Base l3id includes project completion dale of October 15, 2003
A"emate No. 1 � Deduct to delete Arches and Words Southern Gate From Logo.
Aftemate No. 2 — Deduc;t to change conlPfelion date from October 15, 2003 to juty 1, 2004.
T
Bid Amount
With both
Alter Lqtes I & 2
s 75Z000
-- -e—
s 719 too
T
7
CO 9 (D 0 IT f
CY) 0 m "I "1 11 0
CO a) 0
Cf) 0 .0 9
0 m m m
9 9 Cu v 'IT 't
m E E E m :3 9 0
fu �C 9
:3
C 0
Cu C 0) CL — > .0
Cu (1) CL D (1) 0 0 a) M (U
LL 2 m a) CL I
< < U) .10 Iz LL 1< n
2 Wells
Pumphouse
Lift Station
Water Tower
ot6l7gnatt.xlsChart
mber 1,
,ertise and
L : Construction
and test
Fou J -,'','JI --4
ndation
Erect Tower
n
Comple �e tow
!erection and site
work
Pa i n t St r-u-c,t'u' re,
�,,.Av d319TIV 6 r, i
qA
u ck: 0
Q6,
ell
N6
3*OlWn- 3
rg
Ul cn t
cn
3
3nN3AV 83t<)VA
'Ilk
141),
N., NO -1.0 3
c
0 ta.
OZ
LM Q0
0
0 1 E,
L'i
co� CT4
I x
C4 Cn
C'4
C
c
I Eal (S
2 Co r -b
0 r"4 44
cn
Cf)
cn
Q)
r14
2t
r,4
L CIO Co
cr
lu
3-11LA108-1v Jo kL,o 1; 3111AL83elV JO ).113
r7('.l I.V. 'T
cr-) c:
C-3
7 ul
-V WSW 'TN rrf
dIHSNMOi Norl
RESOLUTION NO.
RESOLUTION RECEIVING AMENDED REPORT
ON IMPROVEMENT
WHEREAS, pursuant to a resolution of the council acceptance of the amended
Feasibility Report for 85 �h Street and Page Avenue a report which has been prepared by
Hakanson Anderson Associates, Inc. with reference to the improvement of 85 th Street
from Page Avenue to Nashua Avenue and was originally presented to the council and
was approved on March 12, 2001 -, and has been amended to include Page Avenue
from CSAH 39 to 85 th Street and presented to the council for approval December 23,
2002.
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF
Otsego MINNESOTA:
The Mayor and Clerk are hereby authorized to accept the amended Feasibility Report
for 85 th Street and Page Avenue with references to the improvement of 85 th Street from
Page Avenue to Nashua Avenue and Page Avenue from CSAH 39 to 85 th Street.
Adopted by the council this 23rd day of December, 2002.
Clerk
G: \M u n icip a MOTS EG0Q45\ot345 RES2, doc
Mayor
Hakanson
Anderson
Assoc.,Inc.
Order No. 1
Date: December 4, 2002
CONTRACT CHANGE ORDER
Project- City of Otsego Project 02-07 Street, Sanitary Sewer, Watermain & Storm Sewer
Construction - 85t� Street N.E. ( East of C.S,A.H. No. 42)
Owner: City of Otsego
To: W. B. Miller, Inc.
(Contractor)
YOU are hereby requested to comply with the following changes from the contract plans and specifications:
Description of Changes INCREASE DECREASE
In Contract Price in Contract Price
1
Add line item # 55 — 24" RCP FES, 1 EACH @
$ 1,420.00
$ 1,420 EACH
2.
Add line item #56 — 8" DIP Sanitary Sewer, 18 LF
@ $ 38.00/ LF
$ 684.00
3.
Add line item #57 Valve Nut Extensions, 13 EACH
@ $ 152.00/ EACH
$ 1,976.00
4.
Add line item #58 — Restocking Cost 30" HDPE,
230 LF @ $ 2.52/ LF
$ 579.60
5.
Add line item #59 — Granular Borrow, 612 CY
@ $ 4.75/ CY
$ 2,907.00
6.
Decrease line item #27 — 27" HDPE, 230 LF
@ $ 24.55/ LF
$5,646.50
7.
Decrease line item #29 — 4' Dia. Storm Manhole, 2
EACH, @ $1,350.00/ EACH
$2,700.00
Totals
$ 7,566-60
$ 8346.50
Net Change in Contract
$779.90
Justification: Deleted all storm drainage east of Cul-de-sac. Ran short on usable fill material in
0 street. Standard water valves are below water table.
AHA01\Shared Docs\Municipai'AOTSEGO\343\changeorderl,doc
Due to the change order, the contract period will be: Unchanged
Original Contract Amount
Previous contract changes, Change Order # to #
Prior approved contract amount
Change in contract due to this change order
Total contract including this and previous change orders
S 238,929.58
$ N/A
$ 238,929.58
$ -779.90
$ 238,149.68
Original contract period: Nov.15,2002
Change contract period from previous Change Order N/A
Contract period including this and all previous change orders: Nov.15,2002
This document will become a supplement to the contract and all provisions will apply hereto.
Recommended:
Accepted:
Approved by:
11 - - I IUI k[NCJ I IU 01 iU I I Llt� I
0-W-6 7
Date
- /.;? - / -3 - C).:-,>
Date
Date
This information will be used as a record of any changes to the original construction contract.
k\HA01\Shared Docs�Muniapal�AOTSEGOk343\changeorderl.doc
PAY ESTIMATE NO. 3
CITY OF OTSEGO IMPROVEMENTS PROJECT 02-07
85TH STREET (EAST OF C.S.A.H. 42)
December 2_,), zuu/-
Honorable Mayor & City Council
City of Otsego
8899 Nashua Avenue NE
Otsego, MN 55330
RE: Improvement Project No. 02-07, 85th Street ( East of C.S.A.H. 42)
Contractor: W.B. Miller, Inc.
Original Contract Amount: $ 238,929.58
Revised Change Order No. 1 Contract Amount: $ 238,149.68
Award Date: 08/12/02
Completion Date: 11/15/02
Dear Council Members:
The following work has been completed on the above referenced project:
Schprhilp '*A'* . Rtrppt
CONTRACTOR
Item
No.
Description
Unit
Qty
Unit Price
Contract
Extension
Used To-
Date
Used to -Date
Extension
1
Mobilization
LS
1
$5,000.00
$5,000-00
1
$5,000.00
2
Traffic Control
LS
1
S8,300.00
$8,300.00
1
$8,300.00
3
Class 5 Aggregate Base
TN
2100
$10.00
$21,000.00
1773.69
$17,736.90
4
Type 31 Non -Wearing Course Mixture
TN
635
$32.90
$20,891.50
688.94
$22,666.13
5
Type 41 Wearing Course Mixture
TN
476
$40.25
$19,159.00
30
$316.50
6
Bituminous Material for Tack Coat
GAL
290
$1.30
$377,00
472
$6,041.60
7
Curb and Gutter Design B618
LF
2064
$7.45
$15,376.80
2017
$15,026.65
8
Sign Panels (Type C)
SF
36.75
$33.50
S1,231.13
36.75
$1,231.13
9
Pavement Message (Right Arrow) - Epoxy
EA
1
$260.00
$260.00
6
$8,340.00
10
4" Double Solid Line Yellow - Epoxy
LF
940
$1.15
$1,081.00
21
$2,700.00
11
4" Solid Line White - Epoxy
LF
1910
$0.55
$1,050.50
3
$3,405.00
12
24" Stop Bar White - Epoxy
LF
35
$12.85
$449.75
2
$1,390.00
13
Adjust frame and Ring Casting
EA
4
$255.00
S1,020.00
5
$1,275.00
14
Ad -just Water Valve Box
EA
5
$180.00
$900.00
6
$1,080.00
15
Straw Bales
EA
60
$10.30
$618.00
12
$123.60
16
Turf Establishment by Seeding
AC
2
$825.00
$1,650.00
17
Saw Bituminous Pavement
LF
150
$2-60
$390.00
18
lRemove Existing Bituminous Pavement
SY
17 1
$7.25
$123.25
.19
1 Mill Bitu .. ino.s Surface
SY
17 1
$7.25
$12325
Schedule "A" Totals $99,001.18 $72,439.40
Sr.hprlijlp "R" - Rtnrm Rawar
Item
No.
Description
Unit
Qty
Unit Price
Contract
Extension
Used To-
Date
Used to -Date
Extension
- 20
15" RC Pipe Class 5
LF
96
$17.50
S1,680.00
96
$1,680.00
- 21
24" RC Pipe Class 5
LF
223
$31.65
$7,057.95
226
$7,152.90
- 22
15" RC Pipe Class 3
LF
65
$17.50
$1,137.50
65
$1,137.50
- 23
18" RC Pipe Class 3
LF
169
$19.35
$3,270.15
164
$3,173.40
24
15" HOPE Pipe
LF
40
$10.55
$422.00
30
$316.50
25
18" HDPE Pipe
LF
387
$12.80
$4,953.60
472
$6,041.60
26
21" HDPE Pipe
LF
10
$16.35
$163.50
10
$163.50
27
27" HOPE Pipe(Per C.O. #11)
LF
$24.55
28
4' Dia. Catchbasin/Manhole
EA
3
$1,390.00
$4,170.00
6
$8,340.00
29
4' Dia. Storm Manhole( Per C.O. # 1)
EA
5
$1,350.00
$6.750.00
21
$2,700.00
- 30
2' x 3' Cat h1basin
EA
3
$1,135.00
$3,405.00
3
$3,405.00
31
18" RCP FES
EA
2
$695.00
$1,390.00
2
$1,390.00
32
Class 11 Field Stone Rock Rip -Rap
CY
4
$105.00
$420.00
8.5
$892.50
Schedule "B" Totals
Otsego/343/ot343payestl Pay Est. 3 PE -1
$34,819.70 $36,392.90
0
HAY !=,� I IMA I E NU. :3
CITY OF OTSEGO IMPROVEMENTS PROJECT 02-07
85TH STREET ( EAST OF C.S.A.H. 42)
-qrhprfiilp 'T" - qnnitary -Rpwpr
CONTRACTOR
Item
No.
Description
Unit
Qty
Unit Price
Contract
Extension
Used To-
Date
Used to -Date
Extension
33
8" PVC SOR 26 12 - 14' Deep
LF
114
14.7
$1,675.80
225
$3,307,50
34
8" PVC SOR 26 14-16'Deep
LF
145
$14.80
$2,146.00
150
$2,220.00
35
8" PVC SDR 26 16-18' Deep
LF
370
$15.35
$5,679.50
465
$7,137.75
36
8" PVC SDR 26 18-20' Deep
LF
300
$16.15
$4,845.00
130
$2,099.50
37
8" PVC SDR 26 20-22'Deep
LF
85
$16.70
$1,419.50
261
$434.20
38
Standard Sanitary Sewer Manhole 0-8' Deep
EA 1
3
$1,445.00
$4,335.00
31
$4,335.00
39
Manhole Overdepth
VF 1
24
$77.25
$1,854.00
28.23
$2,180.77
40
Connect to Existing Sanitary Sewer Drop Manhole
LS
1
$2,975.00
$2,975.00
1
$2,975.00
41
8"x 6" PVC Wye
EA
8
$36.00
$288-00
8
$288.00
42
6" PVC SDR 26 Service Pipe
LF
350
$10.60
$3,710.00
392
$4,155.20
4
6" PVC SDR 26 Riser
VF
24
$20.50
$492.00
13.5
$276.75
44
8" Plug
EA
1
$55.00 1
$55.00
1 11
$55.00,
45
Televise Sanitary Sewer
LF
1014
$0.80 1
$811.20
1 1
1
46
Dewatering
LF
1014
$15.45 1
$15.666.30
1 10141
$15,666.301
Schedule "C" Totals $45,952.30 $45,130.97
Schedule "D" - Watermain
Item
No.
Description
Unit
Qty
Unit Price
Contract
Extension
Used To-
Date
Used to -Date
Extension
47
6" DIP Watermain Class 52
LF
487
$13.90
S6,769.30
471
$6,546.90
48
12" DIP Watermain Class 52
LF
1020
$22.15
$22,593.00
1022
$22,637.30
49
Insulation
SF
96
$3.10
$297.60
192
$595.20
50
Watermain Fittings
LBS
3580
$1.50
$5,370.00
1673
$2,509.50
$579.60
onnect to Existing 16" DIP, cut and install 16" x 12" Ti
LS
1
$2.575.00
$2,575.00
1
$2,575.00
52
Hydrant w/ Gate Valve
EA
4
$2,165.00
S8,660.00
4
$8,660.00
53
12"Butterfly Valve
EA
1
$825.00
$825.00
1
$825.00
54
6" Gate Valve
EA
8
$465.00
S3,720,00
8
$3,720.00
Schedule "D" Totals $50,809.90 $48,068.90
Chanap Ordpr Nn I
Item
No.
Description
Unit
Cty
Unit Price
Contract
Extension
Used To-
Date
Used to -Date
Extension
$72,439.40
55
24" FES
EA
1
$1,420.00
$1,420.00
1
$1,420.00
0 56
8" DIP Sanitary Sewer, Class 52
LF
18
1 $38.00 1
$684.00
1 18
$684.00
57
Valve Nut Extensions
EA
13
$152.00
$1,976.00
13
$1,976.00
58
Restocking Cost 30" HDPE
LF
230
$2-52
$579.60
230
$579.60
59
Granular Borrow
CY ,
612
$4.75
$2,907.00
612
$2,907.00
Schedule "D" Totals
$7,566.60
$7,566.60
BIDDING SUMMARY
Total Schedule "A" - Street
$99,001.18
$72,439.40
Total Schedule "B" - Storm Sewer
$34,819.70
$36,392.90
Total Schedule "C" - Sanitary Sewer
$45,952.30
$45,130.97
Total Schedule "D" - Watermain
$50,809.90
$48,068.90
Change Order No. 1
$7,566.60
$7,566.60
Total All Schedules
$238,149.68
$209,598.77
WORK COMPLETED TO DATE:
$209,598.77
LESS 5% RETAINAGE:
$10,479.9T
LESS PAY ESTIMATE NO. 1
$94,577.50
LESS PAY ESTIMATE NO. 2
$95,660.51
WE RECOMMEND PARTIAL PAYMENT OF:
$3,880.81
otsego/343/ot343payestl Pay Est. 3
PE -2
0
PAY Eb I IMAFE NU. 3 CONTRACTOR
CITY OF OTSEGO IMPROVEMENTS PROJECT 02-07
85TH STREET ( EAST OF C.S.A.H. 42)
APPROVALS:
CONTRACTOR: W.B. Miller, Inc.
Certification I certify that all items and amounts are correct for the work completed to date.
Signed: '4M
Title: Date:) -02,
ENGINEER: Certification by Engineer: We recommend payment for work and quantities as shown.
HAKANSON AND�RS.0�1 ASSOC�IATEJ, INC.
Signed:
Title: Date:
OWNER CITY OF OTSEGO
Signed:
Title:
otsego/343/ot343payestl Pay Est. 3
Date:
PE -3
Minnesota Department of Transportation
Metropolitan Division Traffic Engineering
Waters Edge Building, 2 nd Floor South
1500 West County Road B-2
Roseville, Minnesota 55113-3105
December 13, 2002
Mr. Ron Wagner
City Engineer
8899 Nashua Avenue NE.
Otsego, MN 55330-7314
Phone #: (651) 634-2152
Fax #: (651) 634-2085
email: john.bieniek@d
FP F=, F---"
I P1
ITEM 9.1.11. Ij I
Luu�
nzs
Copied to City Cler�
Copied -to City Adrr
SUBJECT: Evaluation Results for Potential AWF Device atTH 101 and CR 36
Dear Mr. Wagner:
Mn/DOT's Traffic Engineering Section has reviewed the request for installation of an Advance
Warning Flasher at the southbound intersection approach of State Trunk Highway 10 1 to Wright
County Road 36. The information and July 30, 2002 memo prepared by Hakanson and Associates
on behalf of the City of Otsego was also reviewed and considered during the Mn/DOT evaluation.
The evaluation includes measurements, observations and data collected by Mn/`DOT personnel, both
from computerized records and from the field. The conclusions of the evaluation were arrived at
from analvsis of this data by Mn/DOT Signal Design staff and after consultation with Mri/DOT
Signal operations and Central Office Traffic staff. The overall goal of the evaluation is to recognize
whether or not this location is suitable for the deployment of an AWF. Improper applications and
overuse of this device or any other traffic warning devices must be avoided so that the warranted
devices remain effective.
The warrant guidelines used to determine the justification of an AWF are presented by a Mn/DOT
Technical Memo dated 2/11/02. These guidelines were supplied earlier to the City of Otsego and
were used by Hakanson and Associates to structure the format of their evaluation. Mn/DOT's
evaluation also follows the structure of these guidelines. The measurements, observations and data
used, along with the conclusion with regard to each guideline are being provided in this memo, in
the order that they appear in the Technical Memo. These conclusions will constitute the remainder
of this letter.
1) Category: Isolated or unexpected si=alized intersection - The distance from the last intersection
is greater than 10 miles, or at locations where the intersection is unexpected. Evaluation: The
distance from the previous intersection (Co Rd 42) is 2.4 miles. The signal does not occur in an
unexpected location, and the expectation of signalization on this road corridor is clear to the
reasonable driver.
2) Category: Limited sight distance — The distance to the stop bar with two signal heads visible is
insufficient. Evaluation: The conservative sight distance calculation that considers the
downgrade on the final part of the southbound approach to the intersection and the increased
braking distance needed by trucks gives the required sight distance to be 745 feet. Field
measurements of the actual sight distance are 1580 feet or more than twice the required sight
distance.
AWF Device at TH 10 1 and CR 36
Page 2
December 13, 2002
3) Category: Dilemma Zone — The Yellow interval is not loma enough and a "dilemma zone"
occurs. Evaluation: The conservative Yellow interval calculation for this intersection gives a
minimum interval length of 5.3 seconds. The actual Yellow interval used at this intersection is
6.5 seconds. No dilemma zone exists at this intersection.
4) Category: Accidents — The approach has an accident problem. Evaluation: This category is the
most subjective one to evaluate. Crash records were pulled for a three year period. The specific
crash rate for this intersection was compared to average crash rates for all intersections of this
type (four lane, divided, signalized, rural). Additionally, the individual crashes were analyzed
for the contributing factors, time of day, and direction. Overall the intersection has a lower than
average crash rate for the three year period ending December 31, 2001 (0.7 crashes per million
vehicle miles traveled versus the average of 0.8 crashes pmvmt). The crashes that did occur
were primarily rear end type collisions of a property -damage -only nature. Crashes were not
concentrated in the morning peak period or any other time period. No day -of -week pattern
existed either. Driver inattention is frequently cited as a contributing factor in the crash report.
Going by the data, there is no "crash problem" at this intersection that would warrant an AWF.
5) Category: Heavy Truck Volume — The roadway has a P
grade of 3% or greater and truck volurn
exceeds 15%. Evaluation: Design plans show that the final approach grade at this intersection
is 2.9%. Truck volume is substantially lower than 15%. Heavy truck volume is not a warranting
parameter for an AWF at this intersection.
In summary, in the interest of maintaining effective traffic warning devices, only warranted devices
should be deployed. The Mn/DOT evaluation is clear about this location, its geometry and its record
of safety. There is not a warranted need for an Advance Warning Flasher device at this intersection
approach. Please contact me with any further questions.
in rely,
Jo4i"ieniek P.E., PTOE
Division Traffic Engineer
cc: Frank Pafko, Mn/DOT - Metro Division Area A
Ramankutty Kannankutty — MnIDOT - Metro Division Area A
Amr Jabr — MnIDOT - Metro Division — Traffic