Loading...
10-08-99 CCCITY OF TSEGO 899 Nashua Avenue N.E. ON THE GREAT RIVER ROAD (612) 441-4414 Jk River, MN 55330 Fax: (612) 441-8823 October 27, 1999 Sgt. Dennis Compton Wright County Sheriff's Department 10 - 2nd Street NW, Room 170 Buffalo, MN 55313 Re: County Emergency Preparedness Plan City of Otsego Dear Sgt. Compton: I have enclosed the information you requested as part of the Wright County Emergency Preparedness Plan. In addition to the information that I have provided on your form, I can add the following information. None of the potential sites I have suggested that could function as either an Emergency Operations Center, a Citizen Service Request Center, or a Shelter Facility have alternative heating or power sources. The City Hall does not have enough supplies to provide two weeks of stand alone services, nor does it have the finances or the space to purchase and store two weeks of the supplies necessary to stand alone. The City Hall does have an adequate number of phone lines. I will inform the City Council of the details of the Wright County Sheriff's Y2K plans. As I stated to you in our meeting, the City of Otsego provides no "Mission Critical" services which could be affected by any potential Y2K difficulties. If you have any questions, please give me a call. Sincerely, 1�Ii hael Robertson City Administrator CC: City Council City Staff Wright County Sheriff's Office Don Hozempa, Sheriff Wright County Emergency Preparedness Plan Please complete the following information and return by February 15, 1999, to Sgt. Dennis Compton, at the Wright County Sheriffs Office, 10 - 2nd St. NW, Room 170, Buffalo, MN 55313. Use additional sheets if needed. Questions call 612/682-7633. 1. City/Township C/L 0 2. Contact Person/s�A'`141 &2e.,�ce Telephone #'s 3. Proposed Emergency Operations Center (EOC) location and alternate site/s. The EOC is the local primary center of operations and will be the communications link between the sheriffs office, city administration, Red Cross, Federal Emergency Management Agency (FEMA), Minnesota Department of Emergency Management (DEM), National Guard, etc. The primary location and alternate sites should preferably not be located right next to each other. Reason being, for example, that if a tornado came through it would be more likely that one of the buildings would still be standing if they are located some distance apart. Primary EOC location: ( 4 Alternate location #1: Alternate location #2: Do each of these locations have an alternate electrical power source? /1r Alternate heat source? Ample phone lines? Adequate supplies and resources to provide stand alone services for a minimum of two weeks? 4. Citizen Service Request Center location and alternate sites. Located nearby the EOC (or in another area of the same building if the EOC is large enough) would be a citizen service request center. This is where citizens could come for any requests or needs that they may have. It may also include, city administration, Red Cross, FEMA, etc. The site is located away from the EOC so that citizen requests do not interfere with the operation of the EOC. Primary location: Alternate location #1: '' =i �l'k fG0 Alternate location #2: Do each of these locations have an alternate electrical power source? Alternate heat source? Ample phone lines? Adequate supplies and resources to provide stand alone services for a minimum of two weeks? 3. Shelter facility locations and alternate sites. In the event of a disaster that causes any number of local citizens to be without shelter or unable to return to their homes, the city should have designated shelter sites available where people can be relocated. Potential sites could include schools, churches, city hall, community centers, etc. Criteria for choosing these sites is similar as that for the EOC. With each site note approximately how many people could be accommodated Primary shelter: Zy4aot'i �)/ 0 Alternate location #1: O yP 'rl�lven*ll py -- Alternate location #2: Do each of these locations have an alternate electrical power source? Alternate heat source? Adequate supplies and resources to provide stand alone services for a minimum of two weeks? What resources, supplies etc. are available on hand to accommodate people brought to the shelter 1610 (items such as blankets, cots, food, water, sanitation supplies, first aid supplies, etc). Please list in detail what is available or planned. 6. Manpower and Equipment. Lastly, we need to know what personnel and resources the city has available to assist with disaster management. Please list information in the categories outlined below: Do you presently have any type of disasterN2K plan? ZL If so, what is available? OIL 6%9 �',f y Z Do yqu have a pe�sop assigned as Civil Defense Director and if so, who is it? City maintenance workers: ,fG/ C xt Vehicles/special equipment available: �����i�' `o��rC%eb4s Fire department volunteers: Ac 6n'pc' - Ulli 44it /?'el�TL /-0jers Trucks/special equipment available: r l�✓e Transportation resources available: e , (Primarily busses for evacuation or transport to shelter sites.) Other: (e.g. Generator/s and adequate supply of fuel. Please list size of go A 22 CITY OF OTSEGO REQUEST FOR COUNCIL ACTION AGENDA SECTION: DEPARTMENT: MEETING DATE: DEPARTMENT: PREPARED BY: 8. Andrew MacArthur, City Attorney Elaine Beatty, City Clerk/ November 8, 1999 REVISED: 11/8/99 ITEM NUMBER: ITEM DESCRIPTION 8.1. Discussion of Roskaft land - Subdivision 8.2. Any Other Legal Business A. Hearing for Unpaid Fees due the City of Otsego 6:30PM BACKGROUND - 8.1. Andy MacArthur will be present to explain and I have attached the information from Andy. 8.2. This item is for any other legal business that may arise. A. This item was forgotten on the Agenda. All of the people have paid on this original mailing, excepting&for e -°red Bame Owner Island View- E_states Inc 701 Minnetonka Boulevard: Excelsior. Mn. 55331-1910 (Applicant: Mayne German. Amount owing is $713.41, Plus Interest. of 6%.) Attached is the information ready to send to Wright Co. and Original Hearing Notice and Letter for your Information. RECOMMENDATION: This is for Council consideration and any approval needed. Th "s, El e November 8, 19999 Carla Wright County Auditors Office Wright County Government Center 10 N", 2ND ST Buffalo, Minnesota 55313 RE: SPECIAL ASSESSMENTS FOR FEES DUE THE CITY OF OTSEGO Dear Carla: Attached you will find the Certification of Assessment Roll. The Assessment Roll is for unpaid fees due the City of Otsego. This is to be placed on for one year with interest rate of 6% per annum and the amount as shown on the assessment Roll attached. Carla, if you have any questions on this Special Assessment Roll, please call me at 441-4414. Thank you for your help with this. Sincerely, CITY OF OTSEGO Elaine Beatty, Clerk/Zoning Adm. CC: File: 88SP ASS.WPS CITY OF OTSEGO COUNTY OF WRIGHT CERTIFICATION OF ASSESSMENT ROLL I do hereby certify that the attached Aassessrnent Roil for Fees Due the City of Otsego is a true and correct copy. Dated this 8TH day of November, 1999. CITY OF OTSEGO Elaine Beatty, Clerk/Loning Adm. (CITY SEAL) CITY OF OTSEGO SPECIAL ASSESSMENT ROLL UNPAID FEES DUE THE CITY OF OTSEGO Dated: November 8, 1999 PID # NAME AMOUNT 118=121=007140 Island View Estates, Inc. 701 Minnetonka Blvd. $713.41 Plus Interest Excelsior, Minnesota 55331=1910 This is for one year with 6% interest added for fees due the City for a special request for a Rezoning, Subdivision and buildable lot. tee: sssr-ass.VM CITY OF OTSEGO COUNTY OF WRIGHT STATE OF MINNESOTA TO: WHOM IT MAY CONCERN NOTICE OF PUBLIC HEARING: (SPECIAL ASSESSMENT HEARING NOTICE) Notice is hereby given that the City Council of the City of Otsego will meet in the City Council Chambers of the City Hall at 8899 Nashua Avenue NE, Otsego, Minnesota at 6:30PM on Monday, November 8, 1999 to consider a Special Assessment of the following: a) Fees due the City for a special request for Mining Permit #2 PID 4118-500-271400 D & Y Family LTD Partnership % Gilbert M. Darkenwald, 7535 River Road NE, Elk River, Mn. 55330 (Legal description on file at City of Otsego) Amount owing is $1,094.79, plus interest. b) Fees due the City for a special request for a Conditional Use Permit to allow more than one detached accessory building. PID #118-035-001080, Lot 8, Block 1, Vasseur's Oak Grove Estates. Mr. & Mrs. Norbert Chapp, 8723 Needham Avenue NE, Elk River, Mn. 55330. Amount owing is $268.40, plus interest. c) Fees due the City for a special request for a Rezoning and Subdivision request for MRD Commercial Park 2ND Addition, Mary R. Dare 5549 Bimini Drive, Hopkins, MN 55343 - PID # 118-059-000010, Owner and Applicant Roger Ensminger 9055 Ohland Ave. NE, Otsego, MN. 55330 - PID #118-018-005010. Amount owing is $696.50, plus interest. d) Fees due the City for a special request for a PUD/CUP to allow two principal structures on one lot and flexibility from building material and foundation requirements. Request is for Owners John and Susan Krantz, 14100 N Quinwood Lane, Dayton, Minnesota, 55327. Business is Elk River Collision 16401, 60TH ST NE, Otsego, Minnesota 55330 PID #118-802-022102. Amount owing is $ 1,823.28, plus interest. e. Fees due the City for a special request for a Rezoning, Subdivision and buildable lot request. Request is for Fred Bame owner Island View Estates, Inc. 701 Minnetonka Boulevard, Excelsior, Minnesota 55331- 1910. (Home at 5110 Meadville Street, Excelsior, Mn. 55331). Applicant is Wayne German 7240 Brooklyn Blvd. Brooklyn Center, MN. 55429. PID 118-800-142100. Amount owing is $713.41, plus interest. f. Fees due the City for a special request for a Conditional Use Permit 98-9 and a Conditional Use Amendment. Request is for Keith E Knutson, 6630 Odean avenue NE, Otsego, Mn. 55330. PID #118-500- 332401. Amount owing is $402.09, plus interest. Pursuant to Minnesota Statutes, Sections 429.011 to 429.111, the property as listed above is proposed to be assessed. Such persons as desire to be heard with reference to the proposed Special Assessment will be heard at this meeting. A copy of the proposed assessment roll is available at Otsego City Hall and written and/or oral objections will be accepted from any property owner. No appeal may be taken as to the amount of an adopted assessment unless a written objection signed by the property owner is filed with the City Clerk prior to the Hearing or presented to the presiding officer at the Hearing. The owner may appeal an assessment to State District Court pursuant to Minnesota Statutes 429.081 by serving notice on the Mayor or City Clerk of the City within 30 days after the adoption of the assessment and filing that notice with the District Court within (10) days after service on the Mayor or City Clerk. Notice of Public Hearing of, 11/8/99 - Page 2 - Certain deferment procedures exist for some individuals as described in Minnesota Statutes, Chapter 435.193, Senior citizens or retired and disabled persons hardship special assessment deferral and 435.195, termination of rights to deferred payment. The property owner has the right to prepay the entire assessment without interest by the 15TH of November, 1999. After that time interest will be added at a rate to be determined - _ : ,rEE >. . Dated: 10/1499 Posted 10/14/99 Published: 10/27/99 Elk River Star News 2 -Wks. 11/3/99 Elk River Star News FILE SA-HEAP-WPS A Michael C. Couri- Andrew J. MacArthur Marcus W. Miller *A Lw licenced in /Uirois November 3, 1999 City Council Members City of Otsego c/o Elaine Beatty, Clerk 8899 Nashua Avenue NE Elk River, MN 55330 RE: Roskaft Property Dear Council Members: COURI & MACARTHUR Auorneyv at Law 705 Central Avenue East PO Bax 369 St. Midwel, MN55376.0369 (612) 497-1930 (612) 497-2599 (FAX) cowiandmacarthur®pobax caom A question has arisen regarding the process for possible subdivision of the Roskaft property, which lies within the northwest quadrant of the intersection of NE 70th Street and CSAH 39 and directly across 39 to the river. The property is zoned A-1. The parcel is intersected by the County Highway, with approximately 5 acres on each side of the highway. The County records indicate that the parcel is over 10 acres. The survey supplied by the Owner, which is quite old, indicates that the parcel is just 10 acres, or a little smaller. Mrs. Roskaft would like to divide the parcel in two and have two separate building sites. If the parcel is consistent with other provisions of the zoning ordinance, and is greater than ten acres than it can be split administratively. If it is less than ten acres it must be platted and possibly rezoned. The property predates the City zoning ordinance as one parcel. Therefore it has no inherent grandfather rights to an additional building entitlement. However, the property is naturally divided by the County Road, and for all intents and purposes appears to be two separate lots. My examination of the old survey, which is not very precise, leads me to the conclusion that the parcel most likely is more than ten acres total. Letter to Otsego City Council November 3,1999 Page 2 The policy question for the City Council is whether or not the Council construes the City ordinance to allow administrative subdivision of this parcel, or whether it should be platted. The Council could determine that due to the unique characteristics of this parcel it would be consistent with the intent of the Comprehensive Plan that such a small naturally divided parcel be considered as for all practical purposes two separate parcels subject to administrative split. Conversely, the Council could determine that the natural division means nothing and it should be considered a parcel that must go though platting and any other applicable processes in order to be subdivided. The City staff seeks direction from the City Council on this policy issue. If you have any questions regarding this matter I will be available to answer them at Monday night's meeting. Verys, An w J. Mac=RTT" r URI & Encls. cc: Dan Licht, NAC Larry Koshak, Hakanson Anderson 011ie Roskaft a w -- - q Awo a �3 Zoo -- �� soo �G`S M"10 R 2 R 8 Ti 4 IQ A WP. ff A 00 NORTH wN VM tR6Qip 1Y� 1% P Az O/W upyvLm kwAPOA sDullca �Miti � P I! APPOMM f[ Kxl IIR t1 1•MAW, U, SECTION 2 MINOR SUBDIVISIONS SECTION: 21-2-1: Qualification 21-2-2: Content and Date Requirements 21-2-3: Design Standards 21-2-4: Processing 21-2-1: QUALIFICATION: This Section shall apply to the following applications: A. In the case of a request to divide a portion of a lot where the division is to permit the adding of a parcel of land to an abutting lot so that no additional lots are created and both new lots conform to zoning ordinance lot size minimum standards. ' B. In the case of a request to combine two (2) existing platted lots. C. In the case of a request to divide a lot from a larger tract of land and thereby creating no more than two lots, both of which conform to Zoning Ordinance minimum ' standards. To qualify, the parcel of land shall not have been part of a minor subdivision within the last five (5) years. D. In the case of a request to divide a base lot which is a part of a recorded plat on which has been constructed a two-family dwelling, townhouse or quadraminium, where ' the division is to permit individual private ownership of a single dwelling unit within such a structure and the newly created property lines will not cause any of the unit lots or the structure to be in violation of this Chapter, the Zoning Ordinance, or the State Building Code. 21-2-2: CONTENT AND DATA REQUIREMENTS: I A. Certificate of Survey: The requested minor division shall be prepared by a registered land surveyor in the form of a Certificate of Survey. B. Property Description and Submission Information: The data and supportive information detailing the proposed subdivision shall be the same as required for a preliminary plat as described in Section 6 of this Chapter. Exceptions, as stipulated in writing, may be granted by the Zoning Administrator. 14 ' 1 21-2-3. DESIGN STANDARDS: The minor subdivision shall conform to all design standards as specified in this Chapter. Any proposed deviation ,from said standards shall require the processing of a variance request. 21-2-4: PROCESSING: I A. If the land division involves property which has been previously platted, or the total property area included is greater than ten (10) acres, the Zoning Administrator may approve the subdivision, provided that it complies with applicable provisions of this Chapter. B. In the case of applications involving property not previously platted, and is property less than ten (10) acres in total area, applicable processing provisions of Section 21-3-2, Preliminary Platting shall be followed. 15 A CITY OF OTSEGO COUNTY OF WRIGHT STATE OF MINNESOTA RESOLUTION NO. 99-43 RESOLUTION REGARDING THE ASSESSMENT OF FEES DUE THE CITY OF OTSEGO FOR A SPECIAL REQUEST FOR A REZONING, SUBDIVISION AND BUILDABLE LOT REQUEST ON PROPERTY LOCATED WITHIN THE CITY OF OTSEGO, WRIGHT COUNTY, MINNESOTA. WHEREAS, the owner was given due notice of the above mentioned fees due and a Hearing at the City Council was held; and WHEREAS, the owner has failed to timely pay the above mentioned fees, thus incurring fees in the amount of $713.41, plus interest; and WHEREAS, said amount was presented to the owner in the form of a bill which remains unpaid; and WHEREAS, pursuant to Otsego Ordinance and Minn. Stat. 429.101 such charges are assessable against the property, and 'WHEREAS, notice was duly given and opportunity to be heard was given to the owner at the Hearing on November 81 1999. THEREFORE, BE IT RESOLVED, that the property identified as PID No. 118- 121-007140, Lot 14, Block 7, Island View Estates, Inc., 701 Minnetonka Blvd, Excelsior Minnesota 55331-1910 shall be and hereby is assessed in the amount of $713.41, (one year) plus interest at the rate of b% per annum, subject to the statutory right of prepayment. The City Clerk is hereby directed to enter said assessment against the property by certifying said assessment to the County of Wright. * *This may he paid within 30 days of November 8, 1999 without interest. (No interest if paid by December 8, 1999 date). Passed this 8th day of November, 1999. In Favor: opposed: Elaine Beatty, Deputy Clerk/Zoning Adm. (City Seal) Me: 88SP-ASS.WPS Larry Fournier, Mayor for City of Otsego Ic ki2 CITY OF OTSEGO REQUEST FOR COUNCIL ACTION AGE.ND - SECTION: DEPARTMENT: MEETING DATE: DEP.4RTINIENT: PREPARED BY: 6. Dan Licht, Assistant City Planner: Elaine Beatty, City Clerk/ November 8, 1999 6:30PM ITEM NUMBER: ITEM DESCRIPTION: 6.1. Discuss Chris Bulow's Park and Trail Fees for Grenins Mississippi Hills Plat. BACKGROUND: 6.1. This item has been raised to the Council, but Mr. Bulow asked that it be brought back to this council agenda. Attached is the background information Xlemorandum dated November 3, 1999 from Dan Licht. He will be present to present and discuss this item. 6.2. Is for any additional Planning Business that may arise. RECOMMENDATION: These are for Council consideration and any decisions. Thanks, Elaine NUv-U,�-1'Jyy U9:22 NAC (/��/-Y 612 595 9837 P.02i05 NNORTHWEST ASSOCIATED CONSULTA ITS INC COMMUNITY PLANNING - DESIGN - MARKET RESEARCH MEMORANDUM- via fax transmission TO: Otsego Mayor and City Council FROM: Daniel Licht DATE. 3 November 1999 RE. Otsego - Grenins Mississippi Hills; Park Dedication Fees FILE NO.: 176.02 - 99.13 BACKGROUND On August 2,1999, the City Council approved a rezoning, PUD -CUP and preliminarynal Plat for Grenins Mississippi Hills for applicant Chris Bulow. The project consisted of 17 single family residential lots and a commercial golf course to be constructed on one lot and one outlot within the requirements of the R -C, Residential Rural Cluster Open Space District. The processing of a PUD -CUP was necessary to accommodate flexibility for ownership and use of the open space required to be preserved within the R -C District. As part of the concept plan for the project, the applicant proposed to provide a trail adjacent to Kadler Avenue. It was understood by staff that the trail was to be an amenity of the project offered by the applicant as incentive approval of density bonuses allowed by the Comprehensive Plan for rural cluster developments and PUD flexibility for the ownership and use of the required open space. The applicant disagrees stating that it was their intention to provide the trail in lieu of park and trail dedication fees_ In consideration of the final plat, the Planning Commission recommended to the City Council to require installation of the proposed trail, as well as require payment of the full park and trail fees based upon the number of platted lots. The City Council considered the recommendation of the Planning Commission and City Staff and approved the final plat with the requirement that the trail be installed and full park and trail dedication fees be paid. The development contract has been signed consistent with the approval of the final plat_ The applicant is requesting that the City Council reconsider requiring both installation of the trail and payment of trail fees. 5775 WAYZATA BOULEVARD, SUITE 555 ST. LOUIS PARK, MINNESOTA 554 1 6 F�HONE 61 2-595-9636 FAX 61 2-595-9837 E-MAIL NAC @-) ---- -- " (AM, 612 595 9e37 F d3/05 ISSUES Trail Proposal. The applicant was proposing to provide an off-street trail adjacent to Kadler Avenue on the west side of the project from CSAH 39 to the north property line of the plat. Extension of the trail further north of the property would be the City's responsibility and would include right-of-way acquisition and construction of the trail. To this end it may be reasoned that the trail proposed by the applicant is only partially beneficial to the public in that it does not provide a full trail corridor. Requiring both the construction of the trail and the payment of the trail fees, which could be used to complete the corridor, results in a more desirable public amenity. Because of the existing physical characteristics of the area adjacent Kadler Avenue, the City Engineer does not recommend construction of the trail as proposed. Rather, it has been recommended that the money for the estimated cost of the trail be escrowed until a future corridor can be determined, possibly with development of other parcels in the area. The escrowed funds may then be applied to that project. The fact that the trail is not recommended to be constructed does not change the considerations effecting this issue. The applicant should provide for the full amenity as the incentive perceived by the City Council for the density bonuses and PUD flexibility. Trail Dedication. Section 21-7-8 of the Otsego Subdivision Ordinance provides for separate dedications for the park facilities and trails. The present cash donation for trails is $125.00 per residential lot. Based upon the 17 lots platted, the applicant is required to pay $875 as a trail dedication in lieu of land. The City also requires $925.00 as payment in lieu of land for park dedication. Because the improvement in question is only related to trails, the applicant should be required to pay $925.00 per lot regardless of the City Council's decision on the trail improvement. Density Bonus. The Comprehensive Plan establishes a base density of four units per forty acres for residential development in the Rural Residential Preserve. The Comprehensive Plan also allows for that density to be increased up to ten units per 40 acres for rural duster developments that satisfy the objectives of the R -C District. The final project approved by the City Council has a density of approximately 7 units per forty acres. The number of lots was reduced from the original proposal of 20 lots to 17 due to site conditions that rendered three lots un -buildable. PUD. As noted above, the project required PUD -CUP flexibility to accommodate a privately owned commercial golf course as satisfaction of the open space requirements of the R -C District. PUD flexibility is to be used to achieve "a development pattern in harmony with the objectives of the Comprehensive Plan" and " a more desirable and creative environment than may be possible through the strict application of zoning and subdivision regulations_" Within this context, it is the burden of the developer to prove a public purpose and benefit for the PUD flexibility. The project must go over and above 2 9837 F J4i05 what can be achieved through a standard subdivision to warrant flexibility from established Ordinances. If no greater public purpose is realized through the PUD, the flexibility is no more than unequitable and arbitrary application of the City's development regulations. If a developer does not wish to be held to this higher standard, then it is their option to pursue a project within the standard provisions of the Ordinances. R -C District Objectives. An objective of the R -C District is to provide "physical integration of neighborhoods, open spaces and places of destination in order to establish municipal identity and community interaction. The Comprehensive Plan identifies a future trail corridor extending along Kadler from CSAH 39 to the Mississippi River. This trail corridor would connect the existing trail on CSAH 39 to the River access. A future park as also been identified in the area adjacent to the Mississippi River by the Comprehensive Plan. Therefore, the providing the trail along with funds for additional required segments would be consistent with the objectives of the R -C District. The Planning Commission and City Council, therefore, allowed additional density for the project on the basis that the trail is provided as an amenity above what may be achieved through a standard subdivision. CONCLUSION The City has the option as part of the rural cluster density bonuses and the PUD flexibility to require amenities above those that would be required for a project within a standard zoning district at base density. Whether or not it was intended by the applicant, the project was approved on the condition that the trail along Kadler Avenue be provided for and that trail fees be paid. The applicant has the option to proceed with the project as approved or to withdraw if they believe the City's required incentives for the density bonuses and PUD flexibility are too significant. The applicant's request is for the City Council to reconsider the conditions of approval. In this regard, the circumstances of the approval must also be considered. The project benefited from density bonuses and PUD flexibility to accommodate the proposed number of building sites and private commercial use of the required open space. The trail proposed by the applicant was accepted as an amenity of the project as an incentive for increased density and PUD flexibility. The City Council must therefore consider if altering the conditions of approval effect the PUD flexibility and project density. The City Council has the following options to consider regarding the applicant's request. Note, option 3 is the requirement imposed by the City Council at the time the final plat was approved. Eliminate the proposed trail or payment for the cost of the trail and require payment of $2,125 as dedication to the City's trail system. NOU-03-1999 09:24 NAC 612 595 9837 F JS/05 2. Require construction of the trail or escrow of funds equal to the cost of the trail (as determined by the City Engineer) for a future project in this area and do not collect the additional $2,125 trail dedication. 3_ Require construction of the trail or escrow of funds equal to the cost of the trail for a future project in this area and collect $2,125 as trail dedication_ pc. Mike Robertson Elaine Beatty Andy MacArthur Lany Koshak 4 TOTAL P.05 Hakanson Anderson Assoc., Inc. ";vil & Municipal Engineering nd Surveying CITY OF OTSEGO CITY ENGINEER COUNCIL AGENDA ITEMS COUNCIL MEETING 1118199 3601 Thurston Avenue Suite 101 Anoka, Minnesota 55303 612/427-5860 612/427-0520 Fax ITEM 7.1 REPORT ON STORMWATER DRAINAGE IN DOWNTOWN OTSEGO We have been requested by the City Council to identify a reduced scope of services to study the area and purpose methods to control runoff from this area. We will also recommend an impact fee for trunk facilities. See attached memo and drawing. ITEM 7.2 ANY OTHER ENGINEERING BUSINESS City Engineer Council Agenda Items Page 1 of 1 November 3, 1999 11Ha01lShared DocslMunicipaAAOTSEGOk9011ot901agenda11-8-99.doc Hakanson Anderson Assoc., Inc. "ivil & Municipal Engineering and Surveying ITEM 7.1 MEMORANDUM TO: Lawrence G. Koshak, PE FROM: Craig J. Jochum, PE DATE: November 2, 1999 RE: Proposed Hydrologic Study 3601 Thurston Avenue Suite 101 Anoka, Minnesota 55303 612/427-5860 612/427-0520 Fax We have reviewed the hydrologic study proposed for the commercial/industrial area near County Road 39 and State Highway 101, and have reduced the scope of work to limit the study to only the commercial area. This study is required to determine local impacts of the improvements to CSAH 39, CSAH 42 and Highway 101 area that were made in the early and mid -1990's. As part of these improvements, 100 -year design events were used to size the culverts under CR 39 and Highway 101 at the intersection of the two roadways. A ponding area was constructed east of TH 101 and an outlet to the river provided. The study area and the commercial or high density development areas are shown on the attached exhibit. The proposed study would focus on the following items: • Determine the ultimate pipe size which would extend to the west from the intersection of CR 39 and Highway 101. This pipe would serve the proposed development along CR 39 and the developments which are NW and SW of the intersection of CR 39 and 42. • Determine the capacity of the existing Mn/DOT pond and propose additional regional ponding if necessary. • Coordinate the proposed drainage system with Mn/DOT since the system ultimately discharges to existing Mn/DOT storage pond located SE of the intersection of CR 39 and Highway 101. • Prepare a report which discusses the proposed drainage system and improvement costs. • Recommend method for financing the improvements. The anticipated cost for this study is $3,070. CCT111R ATS TASK HOURS v $/HOUR TOTAL 1.0 Review Old Reports 4 $70 $280 2.0 Modeling 16 $70 $1,120 3.0 CADD Exhibits 10 $55 $550 4.0 Coordinate with Mn/DOT 6 $70 $420 5.0 Report 10 $70 $700 TOTAL: $3,UIU \\Ha01\Shared Docs\Municipal\AOTSEGO\901\ot9011k2.doc 0, FRI. STUDY ARBA Cb 13 o 'J!6 00 0 o 4p 5 / ca 0 o if °0 60 00 6 0 '0 0 00 cooc a, 5%, .0 00*0 2 1 IN 0 2� j2�0 :.l 4 7/111 o lb YU, 15MIMA b 3iCITY OF OTSEGO REQUEST FOR COUNCIL ACTION AGENDA SECTION: DEP.4RT.MENT: MEETING DATE: 5. CONSENT AGENDAElaine Beatty, City Clerk' November 8, 1999 - 6:30FtiI ITEM iVL'MBER: ITEM DESCRIPTION: 5.1. Approve Resolution Regarding Park and Recs. Haunted House 5.2. Consider Payment of attached Pay Estimate 91, Street and Utility Improvements on Quaday Ave., 78TH ST. and Page Ave. NE. COP#99.02 $207,232.46 to LaTour Construction 5.3. Consider Payment of attached Pay Estimate #5, Sanitary Sewer and Watermain Project, COP 1#98.04. $45-5.273.73 to Barbarossa & Sons 5.4. Consider Payment of attached Pay Estimate #5, Pumphouse No. 1, COP #98.02. $41,405.28 to EnComm Midwest. LLC. Consider Payment of attached Pay Estimate #2, 1999 Street Improvement 5.5. Project COP #99.01 $341225 46 to Bauerly Bros.. Inc. 5.6. Consider Payment request, Engr. Bonestroo Rosene Anderlik & Assoc. for Wastewater Treatment Facility X140 705 to Gridor Construction, Inc. BACKGROLA-D: 5.1. Attached is Resolution No.99-42 "A Resolution Acknowledging the Contributions of the Otsego Park & Recreation Commission and Commending the 1999 Haunted House Festival" written by Mike Robertson for the Council's Consideration for Approval. 5.2 through 5.5. are for consideration of payment (Information attached) from John Harwood 5.6. is for consideration for payment (Information attached from Bonestroo. RECOXaIENDA TI0NN- This is for Council consideration and approval. If Council has any questions or need to discuss further, the item should be removed to another section of the Agenda. Thanks, Elaine RESOLUTION NO. 99-42 CITY OF OTSEGO COUNTY OF WRIGHT, MINNESOTA A RESOLUTION ACKNOWLEDGING CONTRIBUTIONS OTSEGO PARR & RECREATION COMMISSION AND COMMENDING THE 1999 HAUNTED HOUSE FESTIVAL WHEREAS, the Otsego Park and Recreation Commission has contributed greatly to the enjoyment of Otsego residents through their dedicated volunteer efforts to improve Otsego's parks and recreation opportunities; and, WHEREAS, the Otsego Park & Recreation Commission has for four years now put on the "Otsego Haunted House"; and, WHEREAS, in 1999 the Otsego Haunted House set a new record for attendance with over 900 people attending the Haunted House, Hayride, and other family events. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF OTSEGO, MINNESOTA that the Park & Recreation Commission is officially commended for their efforts on behalf of Otsego residents with the production of the 1999 Haunted House. Dated this 8th day of November, 1999 CITY OF OTSEGO Larry Fournier, Mayor ATTEST: Elaine Beatty, City Clerk IIIHakanson Anderson Assoc., Inc. ';vil & Municipal Engineering .nd Surveying CITY OF OTSEGO COUNCIL AGENDA NOVEMBER 8, 1999 ITEM 5.0 CONSENT AGENDA CONTRACT PAYMENTS 3601 Thurston Avenue Suite 101 Anoka, Minnesota 55303 612/427-5860 612/427-0520 Fax ITEM 5.2 CONSIDER APPROVAL OFATTACHED PAY ESTIMATE #- I IMPROVEMENTS ON QUADAY AVE., 78R FORTHE STREET AND UTILITY AND PAGE AVE. N.E. The amount of Payment No. 1 to LaTour Construction is $207,232.46 The trunk sewer extension westerly from Quaday into the development areas is well underway. The first payment is for work related to clearing and grubbing, stripping of topsoil, excavation and embankment to subgrade and for initial sewer construction. The contractor is planning on three separate construction Crews ather theking ma majority of the work is scheduled n sanitary, watermain and storm systems. With good we 1 to be completed by Thanksgiving. ITEM 5.3 CONSIDER APPROVAL O ATERMAIN PROJECTTCOP #98.04 TTACHED PAY ESATE #5 0R THE SANITARY SEWER AND W We recommend payment of $455,273.73 to Barbarossa & Sons for work on the sanitary sewer and watermain project. This is for the trunk sewer and water project. Primary remaining work is near the CR 39 and 42 intersectionthe cont pufinal es toelectrical work onnrest mechanical work at the lift station. The contractor with recent construction of curb and gutter and bituminous restoration. ITEM 5.4 CONSIDER PAYMENT OF 8 02ATTACHED PAY ESTIMATE #5, PUMPHOUSE NO. 1, COP We recommend payment of $41,405.28 to EnComm Midwest, LLC for work on the Pumphouse No. 1. ITEM 5.5 CONSIDER PAYMENT OF ATTACHED #PAY ESTIMATE #2, 1999 STREET IMPROVEMENT PRECT We recommend payment of $341,225.46 to Bauerly Bros., Inc. for work on the 1999 Street Improvement Project. \\Ha01\Shared Docs\Municipa1\A0TSEG0\901\ot901consentagenda11-8-99.doc PAY ESTIMATE #1 October 26.. 1999 Honorable Mayor & City Council City of Otsego 8899 Nashua Avenue N.E. Otsego, MN 55330 78th Street Water & Sewer Contractor: LaTour Construction Contract Amount: 51.348.570.12 Award Date: September 21, 1999 Completion Date: Final completion on or before July 15, 2000. Dear Council Members: The following work has been completed on the above referenced project Bid Schedule "A" -Roadway Bid Schedule "B" - Storm Sewer Estimated Used to Contract Used to Date Extension Estimated Quanti Extension Date Unit Price Price Spec.Ref Item Description Item # Spec.Ref Item Descri tion 50.00 0.25 55.095.00 5620.00 0 18 1 LS 520.380.00 LS 520.380.00 p 1 2021.501 Mobilization 3 Ea 5325.00 Ea 5975.00 1 57,800.00 2501.515 15" RC Pipe Apron 1 LS $7,800.00 LS 57.800.00 2 2101.511 Clearin & Grubbing 9n 2501.515 24" RC Pipe Apron 2.500 52.250 .00 2500 LF 50.90 LF 52,250.00 3 2104.501 Remove Fence p 50.00 180 SY 51.50 SY 5270.00 4 2104.503 Remove Bituminous Pavement 50.00 Bituminous Pavement (Full Depth) 425 LF 51.50 LF 5637.50 0 5 2104.513 Sawing 51.25 CY 540,668.75 30,000 537,500.00 6 2105.501 Common Excavation 32535 CY $0.00 24,000 531,200. 0 CY $1.30 CY 6A Common Excavating, Ponding 56,450.0 2550 CY $2.15 CY 55,482.50 3,000 7 2105.505 Muck Excavation 544.280.00 36,505 543,806.00 36900 CY 51.20 CY g 2105.535 Salvaged Topsoil 0 50.00 12875 Ton $6.00 Ton 577,250.00 9 2211.501 Ag regate Base Cl 5 0 50.00 4610 Ton $23.50 Ton 5108,335.00 10 2340.508 Type 41 Wearing Course Mixture $0.00 4510 Ton $22.00 Ton 599.220.00 0 11 2340.514 Type 31 Wearing Course Mixture 50.00 1600 Gal 51.00 Gal 51.600.00 0 12 2357.502 Bituminous Material for Tack Coat 50.00 144 LF 569.90 LF 510,065.60 0 13 2501.511 42" RC Pipe Culvert Cl 3 0 50.00 1 Ea 51,085.00 Ea 51,085.00 14 2501.515 42" RC Pipe,' - - p 50.00 1 Ea 53,300.00 Ea 53,300.00 15 2501.602 Inlet Structure (16-1) 0 50.00 14.9 CY 545.80 CY 5682.42 16 2511.501 Random Riprap Class III 50.00 Concrete Curb &Gutter Design 8618 10670 LF 56.45 LF 568.821.50 0 17 2531.501 $492,128.27 5134,101.00 Subtotal "A" Bid Schedule "B" - Storm Sewer 11/3/99 \\ha01\shared docs\municipal\aoisego\01613\ci6138P Used to Estimated Unit Price Extension Date Extension Item # Spec.Ref Item Description Quanti 50.00 2 Ea 5310.00 Ea 5620.00 0 18 2501.515 12" RC Pipe Apron p $0.00 3 Ea 5325.00 Ea 5975.00 1g 2501.515 15" RC Pipe Apron 0 50.00 4 Ea 5410.00 Ea 51.640.00 9n 2501.515 24" RC Pipe Apron 11/3/99 \\ha01\shared docs\municipal\aoisego\01613\ci6138P Subtotal "B" $182,139.26 $0.00 LATOUR CONSTRUCTION, Wfr Subtotal "C" 5507,812.69 $0.00 1 1,2/99 \\ha0tlsharearlocs,muniaparaotsego\oi6l3\ot6l3BP xis Bid Schedule "D" - Wa Item # Spec.Ref 52 2504.602 53 2504.602 54 2504.602 55 2504.602 56 2504.602 57 2504.603 58 2504.603 59 2504.603 60 2504.62 er System "E" - Traffic Control Item Description Permanent Barricade Estimated Ouantit 4 Ea Unit Price $225.00 Ea Extension $900.00 Used to Date 0 Extension $0.00 Unit Spec.Ref 61 2554.602 62 Estimated Traffic Control 1 LS Used to $500.00 Item Description QuantityPrice 63 Extension Date Extension Connect to Existing Watermain 4 Ea $250.00 Ea $1.000.00 0 $0.00 4" Solid Line Yellow -Epoxy 4 Ea $1.465.00 Ea S5.860.00 0 50.00 Hydrant 2564.603 4" Solid Line White -Epoxy 10780 LF $0.50 LF $5,390.00 6" Gate Valve & Box 4 Ea 5460.00 Ea $1,840.00 0 50.00 8" Gate Valve & Box 5 Ea $620.00 Ea $3.100.00 0 S0.00 12" Butterfly Valve & Box 10 Ea $835.00 Ea $8.350.00 0 50.00 6' Water Main -Duct Iron Cl 52 44 LF $10.40 LF 5457.60 0 50.00 8" Water Main -Duct Iron Cl 52 375 LF 513.00 LF S4,875.00 0 $0.00 12" Water Main -Duct Iron Cl 52 4954 LF $19.10 LF $94,621.40 0 S0.00 Ductile Iron Fittings 3275 Lbs 51.40 Lbs $4,585.00 0 50.00 Subtotal "D" 5124,689.00 LATOUR CONSTRUCTION, Wr $0.00 Bid Schedule "E" - Traffic Control Item Description Permanent Barricade Estimated Ouantit 4 Ea Unit Price $225.00 Ea Extension $900.00 Used to Date 0 Extension $0.00 Item # Spec.Ref 61 2554.602 62 2563.601 Traffic Control 1 LS 5500.00 LS $500.00 0 $0.00 63 2564.603 4' Double Solid Line Yellow -E ox 4620 LF $1.10 LF $5,082.00 0 $0.00 64 2564.603 4" Solid Line Yellow -Epoxy 720 LF $0.55 LF $396.00 0 S0.00 65 2564.603 4" Solid Line White -Epoxy 10780 LF $0.50 LF $5,390.00 0 $0.00 66 2564.603 12" Crosswalk Line White -Epoxy 640 LF $1.50 LF $960.00 0 50.00 67 2564.603 8' Solid Line Yellow -Epoxy 520 LF $1.50 LF $780.00 0 50.00 68 2564.604 Crosswalk Marking -Epoxy 2520 SF $2.00 SF $5,040.00 0 $0.00 69 2564.604 Sign Panels Type C 183 SF S21.30 SF $3,897.90 0 $0.00 Subtotal "E" 522,945.90 S0.00 Bid Schedule "F" - Restoration & Lanoscape Item Description Estimated 222ntit Unit Price Extension Used to Date Extension Item # Spec.Ref 70 2573.502 Silt Fence, Type Pre -Assembled Seeding Seeding Mixture 500 SoddingType Lawn Mulch Material, Type 1 Disk Anchorin Commercial Fertilizer, 20-10-10 2000 LF S1.00 LF $2,000.00 0 50.00 71 2575.501 7 AC 5250.00 AC $1,750.00 0 $0.00 490 Lbs 52.00 Lbs $980.00 0 50.00 72 2575.502 73 2575.505 6000 SY S1.80 SY $10,800.00 0 S0.00 74 2575.511 14 Ton 5100.00 Ton $1,400.00 0 S0.00 75 2575.519 7 AC 550.00 AC $350.00 0 S0.00 76 2575.532 3150 Lbs 50.50 Lbs $1,575.00 0 50.00 Subtotal "F" $18,855.00 50.00 11"?/99 ^ ha01 \sha red docs,mun,c,par aotsego\ot613\o16 t 30P. xis Summary of Bid Schedules: $134,101.00 Bid Schedule "A" - Roadway Bid Schedule "B" - Storm Sewer Bid Schedule "C" - Sanitary Sewer Bid Schedule "D" - Water System Bid Schedule "E" - Traffic Control Bid Schedule "F" - Restoration & Landscape Material on Hand - 18" PVC Sewer Pipe TOTAL WORK COMPLETED TO DATE: LESS 5% RETAINAGE: WE RECOMMEND PARTIAL PAYMENT OF: 5492,128.27 $134,101.00 $182,139.26 $0.00 $507,812.69 $0.00 $124, 689.00 $0.00 $22.945.90 $0.00 $18.855.00 $0.00 $84,038.43 Total Contract Amount: 51.348.570.12 $218,139.43 $10,906.97 $207,232.46 APPROVALS: CONTRACTOR: Certification by Contractor: I certify that all items and amounts are correct for the work completed to date. Signed: Title: Date: ENGINEER: Certification by Engineer: We recommend payment for work and quantities as shown. HAKANSON ANDERSON ASSOCIATES, >C.. Signed: ,v(� Title: /7i/o�CGi /G/Vi�/Date: II DL �f OWNER: CITY OF Signed: Title: \\ha01\shared docs,municapaPaotsego\ot613\ot6 t 3BP. MS Date: 1 1/2/99 ITEM 5.3 PAY ESTIMATE #5 Jober 27, 1999 rbarossa & Sons 000 93rd Avenue North O. Box 367 >seo, MN 55369 _. Sanitary Sewer and Watermain Trunk Facilities :)ntractor: Barbarossa & Sons, Inc. ontract Amount: $2,173,560.25 ,vard Date: May 5, 1999 ompletion Date: November 1, 1999 ear Council Members: he following work has been completed on the above referenced project: lid Schedule "A" - REMOVALS Total Contract Previous Work this Estimated Quantity Contract Price Price Work Period Total to Date Extension em Spec Re Description 1 LS $ 55,000.00 LS $ 55,000.00 1 0 1 LS $ 55,000.00 1 2021 Mobilization, Maximum 3% 1 LS $ 2,500.00 LS $ 2,500.00 1 0 1 LS $ 2,500.00 2 2101 Clear and Grub (Sta 36+00 — 94+00) LS $ 4,000.00 1 0 1 LS $ 4,000.00 3 2101 Clear and Grub(Sta 7+00 — 35+00) 1 LS $ 4,000.00 $ 2,000.00 0.5 p 0.5 LS $ 1,000.00 4 2104 Relocate Bank Sign 1 LS $ 2,000.00 LS EA $ 9,000.00 0.5 2.5 3 EA $ 4,500.00 5 2104 Relocate Light Pole 6 EA $ 1,500.00 $ 570.00 0 53 0 530 LF $ 530.00 6 2104 Remove Barbed Wire & Electric Fence 570 LF $ 1.00 LF 0 0 0 LF $ - 7 2104 Remove Barbed Wire Fence 1,800 LF $ 1.00 LF $ $ 1,800.00 4,200.00 35 0 35 SY $ 52.50 8 2104 Remove Bituminous Pavement 2,800 SY $ 1.50 SY $ 1,737.00 90 0 90 LF $ 162.00 9 2104 Remove Concrete Curb & Gutter 965 LF $ 1.80 LF SY $ 380.00 0 60 60 SY $ 240.00 10 2104 Remove Concrete Pavement 95 SY $ 4.00 $ 3,200.00 505 0 505 LF $ 1,010.00 11 2104 Remove Pipe Culverts 1,600 LF $ 2.00 LF $ 975.00 2 0 2 EA $ 75.00 12 2104 Salvage and Reinstall Traffic and other Signs 26 EA $ 37.50 EA 0 0 0 EA $ 13 2104 Salvage Mailbox and Reinstall on new Standard 5 EA $ 105.00 EA $ 525.00 0 200 200 LF $ 200.00 14 2104 SBituminous Pavement 835 LF $ 1.00awcut LF $ 835.00 350.00 —0-20 20 LF $ 100.00 15 2104 Sawcut Concrete Pavement 70 LF $ 5.00 LF $ $ 1,000.00 2 0 2 EA $ 1,000.00 16 2104 Remove and Salvage Stone Retaining Wall 2 EA $ 500.00 EA 2 0 2 EA $ 1,000.00 171 2104 Remove and Salvage Wood Retaining Wall 2 EA $ 500.00 EA $ 1,000.00 $ 89,072.00 $ 71,369.50 TOTAL BID SCHEDULE "A": 11/3/99 \\ha01\shared docs\municipal\aolsego\ot612\ot612bt BID SCHEDULE "B" - RESTORATION ITEM 5.3 PAY ESTIMATE #5 Item Spec Ref. Description Estimated Quantity Contract Price Total Contract Price Previous Work Work this Period Total to Date Extension 18 2105 Topsoil Borrow 2500 CY $ 1.00 CY $ 2,500.00 0 0 0 CY $ 19 2211 Class 5 Aggregate Base 12000 TN $ 6.50 TN $ 78,000.00 1360.5 3500 4860.5 TN $ 31,593.25 20 2301 6" Concrete Pavement 95 SY $ 27.00 SY $ 2,565.00 0 0 0 SY $ - 21 2340 Type 31 Bit. Base Course 300 TN $ 44.00 TN $ 13,200.00 0 0 0 TN $ 22 2340 Type 41 Bit. Wear Course 250 TN $ 45.00 TN $ 11,250.00 0 0 0 TN $ 23 2357 Bit. Material for Tack Coat 100 GAL $ 1.50 GAL $ 150.00 0 0 0 GAL $ 24 2511 Bituminous Flume 4 EA $ 300.00 EA $ 1,200.00 0 0 0 EA $ 25 2531 B612 Concrete Curb & Gutter 1,200 LF $ 8.00 LF $ 9,600.00 0 0 0 LF $ - 261 2531 8618 Concrete Curb & Gutter 140 LF $ 8.75 LF $ 1,225.00 0 0 0 LF $ - 27 2564 4" Double Yellow Paint 85 LF $ 3.70 LF $ 314.50 0 0 0 LF $ 28 2564 4" Solid White Paint 415 LF $ 1.85 LF $ 767.75 0 0 0 LF $ 29 2564 Pavement Paint - Left Turn Arrow 2 EA $ 90.00 EA $ 180.00 0 0 0 EA $ - 30 2564 Pavement Paint -"Only" 1 EA $ 110.00 EA $ 110.00 0 0 0 EA $ 31 2564 Pavement Paint -Right Turn Arrow 2 EA $ 90.00 EA $ 180.00 0 0 0 EA $ - 32 2564 Traffic Control 1 LS $ 4,000.00 LS $ 4,000.00 0.5 0.5 1 LS $ 4,000.00 33 2573 Temporary Erosion Control 1 LS $ 3,000.00 LS $ 3,000.00 0.5 0 0.5 LS $ 1,500.00 34 2575 Agricultural Restoration 25 AC $ 400.00 AC $ 10,000.00 10 0 10 AC $ 4,000.00 35 2575 Seeding - Type Field Restoration 50 AC $ 520.00 AC $ 26,000.00 25 0 25 AC $ 13,000.00 36 2575 Seeding - Type Lawn Restoration 3 AC $ 580.00 AC $ 1,740.00 2 0 2 AC $ 1,160.00 37 2575 Wetland Restoration 5 AC $ 1,200.00 AC $ 6,000.00 2.5 0 2.5 AC $ 3,000.00 38 2575 Sod 7000 SY $ 1.90 SY $ 13,300.00 0 0 0 SY $ - TOTAL BID SCHEDULE "B": 185,282.25 58,253.25 \\ha01\sharPd docs\municipal\aotsego\ot612\ot612bt 11/3/99 ITEM 5.3 BID SCHEDULE "C" - CULVERTS AND DRAINAGE PAY ESTIMATE #5 Item Spec Ref. Description Estimated Quantity Contract Price Total Contract Price Previous Work Work this Period Total to Date Extension 39 2501 8" CS Pipe Culvert 22 LF $ 15.00 LF $ 330.00 20 0 20 LF $ 300.00 40 2501 15" CS Pipe Culvert 128 LF $ 18.00 LF $ 2,304.00 0 122 122 LF $ 2,196.00 41 2501 58 %" Span RC Arch Pipe 32 LF $ 104.00 LF $ 3,328.00 0 0 0 LF $ - 42 2501 58 %" Span RC Arch Pipe Apron 2 EA $ 850.00 EA $ 1,700.00 0 0 0 EA $ - 43 2503 12" RCP Design 3006 Cl 5 24 LF $ 22.00 LF $ 528.00 48 0 48 LF $ 1,056.00 44 2503 12" RCP Apron 2 EA $ 300.00 EA $ 600.00 4 0 4 EA $ 1,200.00 45 2503 15" RCP Design 3006 CI 5 706 LF $ 23.00 LF $ 16,238.00 438 0 438 LF $ 10,074.00 46 2503 15" RCP Apron 36 EA $ 325.00 EA $ 11,700.00 20 0 20 EA $ 6,500.00 471 2503 18" RCP Design 3006 Cl 3 102 LF $ 24.00 LF $ 2,448.00 0 0 0 LF $ - 48 2503 18" RCP Apron 4 EA $ 375.00 EA $ 1,500.00 0 0 0 EA $ - 49 2503 24" RCP Design 3006 CI 3 344 LF $ 28.00 LF $ 9,632.00 192 0 192 LF $ 5,376.00 50 2503 24" RCP Apron 13 EA $ 400.00 EA $ 5,200.00 4 0 4 EA $ 1,600.00 51 2503 30" RCP Design 3006 C13 24 LF M36.00 LF $ 864.00 0 0 0 LF $ - 52 2503130" RCP Apron 1 EA 1 $ 475.00 EA 1 $ 475.00 1 0 01 0 EA $ TOTAL BID SCHEDULE "C": BID SCHEDULE "D" - WATERMAIN 56,847.00 28,302.00 Item Spec Ref. Description Estimated Quantity Contract Price Total Contract Price Previous Work Work this Period Total to Date Extension 53 2600 24" Steel Pipe Casing -Jacking 370 LF $ 140.00 LF $ 51,800.00 190 130 320 LF $ 44,800.00 54 2611 Connect to Existing Watermain 4 EA $ 850.00 EA $ 3,400.00 3 0 3 EA $ 2,550.00 55 2611 8" Cl 52 DIP Watermain 1250 LF $ 18.00 LF $ 22,500.00 1250 0 1250 LF $ 22,500.00 56 2611 16" Cl 52 DIP Watermain 15256 LF $ 32.00 LF $ 488,192.00 10033 4864 14897 LF $ 476,704.00 57 2611 DIP Fittings 11500 LB $ 2.00 LB $ 23,000.00 7000 3000 10000 LB $ 20,000.00 58 2611 8" Gate Valve 1 EA $ 650.00 EA $ 650.00 2 0 2 EA $ 1,300.00 59 2611 16" Butterfly Gate Valve 23 EA $ 1,350.00 EA $ 31,050.00 18 0 18 EA $ 24,300.00 60 2611 4" Watermain Insulation 9 SY $ 15.00 SY $ 135.00 4.5 0 4.5 SY $ 67.50 61 2611 6" CL 52 DIP Watermain Hydrant Leads 200 LF $ 17.00 LF $ 3,400.00 125 0 125 LF $ 2,125.00 62 2611 6" Gate Valve - Hydrant 15 EA $ 450.00 EA $ 6,750.00 10 3 13 EA $ 5,850.00 631 2611 Hydrant 15 EA $ 1,600.00 EA $ 24,000.00 10 3 13 EA $ 20,800.00 TOTAL BID SCHEDULE "D": 654,877.00 620,996.50 \\ha01\shared docs\municipal\aotsego\ot612\ot612bt 11/3/99 BID SCHEDULE "E" - SANITARY SEWER ITEM 5.3 PAY ESTIMATE #5 Item Spec I Ref. Description Estimated I Quantity Contract Price I Total Contract Price Previous I Work Work this I Period I Total to Date Extension E-1 - GRAVITY FLOW SYSTEM 78 64 2600 24" Steel Pipe Casing -Jacking 530 $ 160.00 LF $ 84,800.00 350 130 480 LF $ 76,800.00 65 2621 8" SDR 26 PVC Pipe (all depths) 30 LF $ 40.00 LF $ 1,200.00 30 0 30 LF $ 1,200.00 66 2621 15" SDR 26 PVC Pipe (16'-20') 400 LF $ 44.00 LF $ 17,600.00 0 215 215 LF $ 9,460.00 67 2621 15" SDR 26 PVC Pipe(20'-24') 4500 LF $ 45.00 LF $ 202,500.00 0 4212 4212 LF $ 189,540.00 68 2621 15" SDR 26 PVC Pipe(24'-28') 1335 LF $ 46.00 LF $ 61,410.00 0 1323 1323 LF $ 60,858.00 69 2621 15" SDR 26 PVC Pipe (28'-32') 600 LF $ 47.00 LF $ 28,200.00 0 650 650 LF $ 30,550.00 70 2621 8" PVC Pipe Plug 2 EA $ 20.00 EA $ 40.00 1 0 1 EA $ 20.00 71 2621 15" PVC Pipe Plug 1 EA $ 75.00 EA $ 75.00 0 0 0 EA $ - 72 Deleted per Addendum No. 1 86 2621 Lift Station Pumps 1 LS 35,300.00 $ - 0 0 0 $ - 73 2621 16" DIP Sewer 100 LF $ 65.00 LF $ 6,500.00 100 0 100 LF $ 6,500.00 74 2621 18" RCP Sewer 18 LF $ 55.00 LF $ 990.00 15 0 15 LF $ 825.00 75 2621 Sanitary Sewer MH to 8' Deep 23 EA $ 2,050.00 EA 1 $ 47,150.00 15 7 22 EA $ 45,100.00 76 2621 Extra Depth Sanitary MH > 8' 352 VF $ 80.00 VF 1 $ 28,160.00 2001 100 300 VF $ 24,000.00 77 2621 Construct Outside Drop 3 EA $ 1,600.00 EA 1 $ 4,800.00 21 0 2 EA $ 3,200.00 Item Spec I Ref. Description Estimated I Quantity Contract Price Total Contract Price Previous I Work Work this I Period I Total to Date Extension E-2 SANITARY FORCE MAIN 78 2600 18" Steel Pipe Casing — Jacking 295 LF 125.00 LF $ 36,875.00 310 0 310 LF $ 38,750.00 79 2621 8" DR18 C900 CL 150 PVC Forcemain 18100 LF 23.00 LF $ 416,300.00 14784 3263 18047 LF $ 415,081.00 80 2621 DIP Fittings 870 LB 2.00 LB $ 1,740.00 570 0 570 LB $ 1,140.00 81 2621 Cleanout MH — Forcemain 3 4,075.00 EA $ 12,225.00 3 0 3 EA $ 12,225.00 82 2621 Air Release MH —Forcemain 2 EA 3,100.00 EA $ 6,200.00 2 0 2 EA $ 6,200.00 83 2621 8" Gate Valve — Force Main 7 EA 650.00 EA $ 4,550.00 7 01 7 11EA $ 4,550.00 E-3 SANITARY SEWER LIFT STATION $ 477,890.00 84 2621 Lift Station Electrical 1 5,200.00 LS $ 5,200.00 0 0.5 0.5 LS $ 2,600.00 85 2621 Lift Station Mechanical 1 LS 13,000.00 LS $ 13,000.00 0 0.5 0.5 LS $ 6,500.00 86 2621 Lift Station Pumps 1 LS 35,300.00 LS $ 35,300.00 0 0.5 LS $ - 87 2621 Lift Station Structure 1 LS 72,525.00 LS $ 72,525.00 1 0 1 LS $ 72,525.00 88 2621 Lift Station Valve MH F-6 1 LS 3,800.00 LS $ 3,800.00 0 1 1 LS $ 3,800.00 89 2621 Lift Station Site Grading 1 LS 1,000.00 LS $ 1,000.00 0 0.5 0.5 LS $ 500.00 TOTAL BID SCHEDULE E1, E2, AND E3: 1,092,140.00 $ 1,011,924.00 \\ha01\shared docs\municipal\aotsego\ot612\ot612bt 11/3/99 ITEM 5.3 BID SCHEDULE "F" - SPECIAL CROSSING OF CSAH 42 PAY ESTIMATE #5 Item Spec Ref. Description Estimated Quantity Contract Price I Total Contract Price Previous Work Work this Period Total to Date Extension F-1 SANITARY SEWER JACKING UNDER CSAH 42; STA 34+80 107 2104 Remove Pipe Culverts 90 2600 16" Steel Pipe Casing -Jacking, Sanitary Sewer 120 $ 125.00 248.00 0 15,000.00 120 0 120 LF $ 15,000.00 91 2621 Construct Outside Drop 1 EA $ 1,300.00 12,500.00 $ 1,300.00 1 0 1 EA $ 1,300.00 92 2621 8" DIP Sewer 128 LF $ 30.00 HF$ $ 3,840.00 128 0 128 LF $ 3,840.00 93 2621 DIP Fittings 45 LB $ 2.00 0 $ 90.00 45 0 45 LB $ 90.00 94 2564 Traffic Control, W. of CSAH 42 1 LS $ 500.00 0 $ 500.00 1 0 1 LS $ 500.00 95 2575 Seeding & Restoration W. of CSAH 42 0.3 AC $ 1,000.00 AC $ 300.00 0 0.3 0.3 AC $ 300.00 F-2 SANITARY SEWER AND WATERMAIN JACKING UNDER CSAH 42; STA 45+21 1,600.00 $ 21,030.00 1,600.00 0 1 1 EA $ 96 2600 16" Steel Pipe Casing -Jacking Watermain 80 LF $ 125.00 LF $ 10,000.00 80 0 80 LF $ 10,000.00 97 2611 DIP Fittings 300 LB $ 2.00 LB $ 600.00 150 0 150 LB $ 300.00 98 2611 8" CL 52 DIP Watermain 100 LF $ 18.00 LF $ 1,800.00 80 0 80 LF $ 1,440.00 99 2611 6" CL 52 DIP Watermain Hydrant Leads 10 LF $ 17.00 LF $ 170.00 0 10 10 LF $ 170.00 100 2611 6" Gate Valve - Hydrant 1 EA $ 500.00 EA $ 500.00 0 1 1 EA $ 500.00 101 2611 Hydrant 1 EA $ 1,600.00 EA $ 1,600.00 0 1 1 EA $ 1,600.00 102 2600 16" Steel Pipe Casing, Jacking, Sanitary Sewer 110 LF $ 125.00 LF $ 13,750.00 110 0 110 LF $ 13,750.00 103 2621 8" SDR 26 PVC Pipe(all depths) 128 LF $ 30.00 LF $ 3,840.00 128 0 128 LF $ 3,840.00 104 2621 8" PVC Pipe Plug 1 EA $ 10.00 EA $ 10.00 0 1 1 EA $ 10.00 105 2564 Traffic Control West of CSAH 42 1 LS $ 500.00 LS $ 500.00 1 0 1 LS $ 500.00 106 2575 Seeding & Restoration, West of CSAH 42 0.3 AC $ 1,000.00 AC $ 300.00 0 0 0 AC $ - Item Spec I Ref. Description Estimated I Quantity Contract Price I Total Contract Price Previous Work Work this Period Total to Date Extension F-3 SANITARY SEWER AND WATERMAIN JACKING UNDER CSAH 42; STA 58+59 107 2104 Remove Pipe Culverts 62 LF $ 4.00 LF 1 $ 248.00 0 0 0 LF $ - 108 2600 16" Steel Pipe Casing, Jacking, Watermain 100 LF $ 125.00 LF $ 12,500.00 0 105 105 LF $ 13,125.00 109 2611 DIP Fittings 300 LB $ 2.00 LB $ 600.00 0 150 150 LB $ 300.00 110 2611 8" CL52 DIP Watermain 130 $18.00 LF $ 2,340.00 0 130 130 LF $ 2,340.00 111 2611 6" CL 52 DIP Watermain Hydrant Leads 10 LF $ 17.00 LF $ 170.00 0 10 10 LF $ 170.00 112 2611 6" Gate Valve - Hydrant 1 EA $ 500.00 EA $ 500.00 0 1 1 EA $ 500.00 113 2611 Hydrant 1 EA $ 1,600.00 EA $ 1,600.00 0 1 1 EA $ 1,600.00 114 2600 16" Steel Pipe Casing, Jacking, Sanitary Sewer 130 LF $ 125.00 LF $ 16,250.00 0 130 130 LF $ 16,250.00 115 2621 8" SDR 26 PVC Pipe (All depths) 158 LF $ 28.00 LF $ 4,424.00 0 165 165 LF $ 4,620.00 116 2621 8" PVC Pipe Plug 1 EA $ 10.00 EA $ 10.00 0 1 1 EA $ 10.00 117 2503 15" RCP Apron 2 EA $ 325.00 EA $ 650.00 0 0 0 EA $ - 118 2503 15" RCP Design 3006 Cl 5 50 LF $ 23.00 LF $ 1,150.00 0 0 0 LF $ - 119 2564 Traffic Control West of CSAH 42 1 LS $ 500.00 LS $ 500.00 0 1 1 LS $ 500.00 120 2575 Seeding & Restoration West of CSAH 42 0.3 AC $ 1,000.00 AC $ 300.00 0 0 0 AC $ - TOTAL BID SCHEDULE F1, F2 and F3: $ 95,342.00 $ 92,555.00 \\ha01\shared docs\municipal\aotsego\ot612\ot612bt 11/3/99 APPROVALS: CONTRACTOR; Certification by Contractor; I certify that all items and amounts shown are correct for the work completed to date. BARBAROSSA & SONS. INC. Signed: Title: Date: ENGINEER: I recommend payment for items and amount of work as shown. HAKANSON ANDERSON ASSOCIAIPS, INC. Signed: Title:/, �� fCG>'J/ti�tt Date: OWNER: CITY OF OTSEGO Signed: Title: Date: $ 71,369.50 $ 58,253.25 $ 28,302.00 $ 620,996.50 $ 1,011,924.00 $ 92,555.00 $ 1,883,400.25 $ 94,170.01 $ 166,107.50 $ 258,399.76 $ 372,436.58 $ 537,012.67 $ 455,273.73 \\ha01\shared docs\municipal\aolsego\ot612\ot612bt 11/3/99 ITEM 5.3 PAY ESTIMATE #5 BID SCHEDULE "A" - REMOVALS $ 89,072.00 BID SCHEDULE "B" - RESTORATION $ 185,282.25 BID SCHEDULE "C" - CULVERTS AND DRAINAGE $ 56,847.00 BID SCHEDULE "D" WATERMAIN $ 654,877.00 BID SCHEDULE "E1, E2 & E3" - SANITARY SEWER": $ 1,092,140.00 BID SCHEDULE "F1, F2 & F3" - SPECIAL CROSSING: $ 95,342.00 TOTAL CONTRACT PRICE: $ 2,173, 560.25 TOTAL TO DATE: LESS 5% RETAINAGE: LESS PAY ESTIMATE #1: LESS PAY ESTIMATE #2: LESS PAY ESTIMATE #3: LESS PAY ESTIMATE #4: WE RECOMMEND PAYMENT OF: APPROVALS: CONTRACTOR; Certification by Contractor; I certify that all items and amounts shown are correct for the work completed to date. BARBAROSSA & SONS. INC. Signed: Title: Date: ENGINEER: I recommend payment for items and amount of work as shown. HAKANSON ANDERSON ASSOCIAIPS, INC. Signed: Title:/, �� fCG>'J/ti�tt Date: OWNER: CITY OF OTSEGO Signed: Title: Date: $ 71,369.50 $ 58,253.25 $ 28,302.00 $ 620,996.50 $ 1,011,924.00 $ 92,555.00 $ 1,883,400.25 $ 94,170.01 $ 166,107.50 $ 258,399.76 $ 372,436.58 $ 537,012.67 $ 455,273.73 \\ha01\shared docs\municipal\aolsego\ot612\ot612bt 11/3/99 ITEM 5.4 PAY ESTIMATE #5 October 26, 1999 CONTRACTOR Honorable Mayor & City Council City of Otsego 8899 Nashua Avenue N.E. Otsego, MN 55330 RE: Pumphouse #1 Contractor: EnComm Midwest, LLC. Contract Amount: $392,736.00 Award Date: April 29, 1999 Completion Date: Substantial Completion by November 15, 1999, Final Completion by July 1, 2000. Dear Council Members: The following work has been completed on the above referenced project: PART 1 Estimated 1 BID SCHEDULE "A" - SITE WORK i Quantity Unit Unit Price . _.___..._.....__.___ . Estimated Item Description __- i __.._..__ _ - 4" Soil Pipe 180 LF $ 26 00 _.._....-- ......_.. Item Description Quantity Unit : 15 16 Unit Price 2 Used to Date _ Extension _ _ .... _ - _.... __. --- .------- 1 Clearing-& Grubbing ._. 6 TREE: $ 300 00 TREE 4 $ 1,200.00 - 2 Gradin & Excavation 9 1 I -� --- _----- LS I $ I.: 00 00 --- - LS -18 - $� 1,200.00 —._... -� 3 Class V Gravel (LV) 1251 CY ' $ 1500 __..... - ._..........— CY 5 _... 115 $ 1,725.00 -- - _._............_..._._.. 4 Parking Lot Bituminous Pavement __._...._--- _ . __-..._1401 —.. SY _$ 48.00 _ 2.3-.5.0. ..._ ... SY . -- $ _ .... _.-_...._-.__. 5 Concrete Walk & AC Pad 5.61 SY ; $ 60.00 ; SY 5.6 $ - 336.00 _ 6 Silt Fence 120, LF $ --- 2.00 - :. LF '_ -- 220 ..._. $ 440.00 -"`--- _—.._._ _—..._ - -- -- --- 7 Temporary Security Fences -T..__ ----- 420 -----1 LF LF---- $ 1 00 LF __ ._. 420 ---- - _ , $ ___ 420.00 ...... - �_._. - -- 8 Cedar Split Rail Fence -- ---- 360' - --- LF i $ _ _ 5.90 _ LF - - -_ $ 14,420.00 _ _ ---------t 9 ;Rip Rap Class III E 25. CY $ 86.00 -- _CY ? - $ ' . 10 12" CMP Culvert 28 LF $ _ 20A0 LF -i 21 $ 420_00 j ----....__..._.^. 11 8" PVC Culvert —r 20':: •--... LF $ —..- 18.00 --._._.....-------....._.._._._.--....._...._._.._..._.__.._-_._..._.._ LF ; $ $ _ . _.._... 12 { Seeding_includes seed (_ �-- 0.7. _AC $ 800.00 - -- ! At.; - _ .. _._........ ... _ ...._.__.._.._ $ 50000; TON $ 13 Mulching-1.4~TON 14 1 Fertilizer 3501 LBS ' $ 0.80 LB ! $ _ TOTAL BID SCHEDULE "A": BID SCHEDULE "B" - YARD PIPING $ 5,741.00 TOTAL BID SCHEDULE B : Estimated 1 BID SCHEDULE "C"- WELL PUMP AND APPURTENANCES i Quantity Unit Unit Price Used to Date Estimated Extension Item Description __- i __.._..__ _ - 4" Soil Pipe 180 LF $ 26 00 LF 90 $ 2.340.00_ 15 16 4' Dia. Seepage Manhole 2 EA $ 2,100.00 EA 2 $ 4,200-00 - - -� 17 16 DIP Class 52--- 26 LF $ -- 80.00 - LF 26 - - $ 2,080.00 - -18 - - - - _..... _.-- ._......_.. _.. _ 10 DIP Class 52 i 6, LF - + $ _._. __. 126.50 LF 6 ._.._.... - $ 7 _ 59.00 - 19 -- _ .. ................__......_._. __....__..___.....----....___.. 8" DIP Class 52 ..-..._._ 25 LF $ 48.00 LF _ 25 $ 1,200.00 `- 20 "-- Fittings �- 520 __ LB __-_.. $ 3.35 LB 520 $ 1,742.00 21 ~ ............ _ .. _.._ 6"Flushing Hydrant including valve & piping 1 LS $ 2,700.00 LS 1_ $ 2.700.00 1 LS S 300.00 LS 1 $ 300.00 $ 15,021.00 TOTAL BID SCHEDULE B : BID SCHEDULE "C"- WELL PUMP AND APPURTENANCES _._ _. Estimated Item Description Quantity. Unit Unit Price Used to Date Extension 21A Turbine Well Motor 1 LS $ 5,100.00 LS 1 $ $ 5,100.00 1,900.00 22 Well Head 1 LS S 1,900.00 LS 1 $ 1,760.00 23 6" Column Pipe 80 LF $ 22.00 LF 80 $ 960.00 24 1 1/4" Line Shaft 80 LF S 12.00 LF 80 $ 3,600.00 25 Pump Bowl Assembly 1 LS $ 3,600.00 LS 1 $ 800-00 26 Concrete Pump Base (includes reinforcment) 4 CY $ 200.00 CY 4 27 Pre -Lubrication, Pipe & Valves 1 LS S 300.00 LS 1 $ 300.00 $ 14,420.00 TOTAL BID SCHEDULE C: TOTAL PART 1: S 35,182.00 11/3199 \\ha0l\shared docs\municipal\aotsego\ol50Tot507bt PAY ESTIMATE #5 October 26, 1999 Honorable Mayor & City Council City o,Otsego oasyNashua Avenue w.E. Otsego, MN eanau RE: Pumpxvusewn Commmnc EnCmnmMidwo,t, LLC. Contract Amount: $392.736.00 Award Date: April 29, 1999 Completion Date: Substantial Completion by November 15, 1989, Final Completion byJuly 1, 2000. Dear Council Members: The following work has been completed vnthe above referenced project: PART BID SCHEDULE "A" - SITE WORK CO R.' Item Estimated Quantity Estimated Quantity Unit Unit Price Used to Date Extension Used to Date Extension _�qesc�Liption Item Description Quantity Unit Unit Price Used to Date Extension 3 Class V Gravel (LV) 125. $ 5,100.00 i LS 26 2,080.00 4 !Parking Lot Bituminous Pavement 14( SY $ 440.00 1 7 !Temporary Security Fences 420: LF $ 1.00 LF 420 $ 420.00 i 8 Cedar Split Rail Fence 360. LF i $ 5.90 LF 26 Concrete Pump Base (includes reinforcment) 4� CY $ 200.00 CY 4 $ 800.00 TOTAL BID SCHEDULE C: 12 Seeding (includes seed) 0.7 13 iMulching 1.4 $ TOTAL BID SCHEDULE "A": BID SCHEDULE "B" - YARD PIPING Item Description Estimated Quantity Unit Unit Price Used to Date Extension Estimated Item Description Quantity Unit Unit Price Used to Date Extension 17 DIP Class 52 a $ 5,100.00 i LS 26 2,080.00 4 1 1/4" Line Shaft 80 LF 6 520 1,742.00 TOTAL BID SCHEDULE "Br: BID SCHEDULE ~C"WELL PUMP AND APPURTENANCES Estimated Item Description Quantity Unit Unit Price Used to Date Extension 21A Turbine Well Motor 1: LS $ 5,100.00 i LS 1 4 1 1/4" Line Shaft 80 LF 6 26 Concrete Pump Base (includes reinforcment) 4� CY $ 200.00 CY 4 $ 800.00 TOTAL BID SCHEDULE C: $ 14.420.00 TOTAL PART 1: \\ha1Xshar° $ 35.182.00 PART 2 Estimated Quantity Unit i Unit Price i Used to Date Extension I 33 !Chlorine Gas Treatment 1 LS ; $ 19,800.00 LS BID SCHEDULE "A" - PUMPHOUSE ' 34 -;Fluoridation & Polyphosphate Treatment ----- 1 ` LS $ 5,780.00 L LS 0.75 i $ 4,335.00 , 35 Process Water Piping for Chemical Treatment .._...- -- — -- - - - 36 Booster Pump ` _ 1 1 LS $ - LS $ —._. _. ._.. _..._ _ ........... Estimated SUMMARY OF COMPLETION: ' PART 1: ---- -' 4 -" — � { Item ! Description Quantity Unit $ Unit Price Bid Schedule "C" - WELL PUMP & APPURTENANCES Used to Date i Extension 28 Pumphouse Building 1 LS $ 69,150.00 1 LS 0.94 $ 65,001.00 1 29 —1 Building Mechanical _--- 1 LS $ 45,250.00 1 LS 0.75 1 $ 33,937.50 30 :Painting and Protective Coating 1 LS ' $ 6,200.00 1 LS 0 $ - 31 Building Electrical & Controls — 1 LS $ 65,980.00 C LS 0.08 $ 5,278.40 32 SCADA System __. _......_ _. _ ...-- -- - ..._ _.... .....-._ --- - 1 -- ---- - _ LS _ $ 84,920.00 ' -- -- —---._..... LS 0 _-----..—._..--. i $ - TOTAL BID SCHEDULE "A": $ 104,216.90. BID SCHEDULE "B" - CHEMICAL TREATMENT - _ Item Description Estimated Quantity Unit i Unit Price i Used to Date Extension I 33 !Chlorine Gas Treatment 1 LS ; $ 19,800.00 LS 0.75 $ 14,850.00 ' 34 -;Fluoridation & Polyphosphate Treatment ----- 1 ` LS $ 5,780.00 L LS 0.75 i $ 4,335.00 , 35 Process Water Piping for Chemical Treatment .._...- -- — -- - - - 36 Booster Pump ` _ 1 1 LS $ - LS $ 1,200.00 1 LS - ---- — 780.00 ) LS 0 $ _ - ----- --- 0.75 —($ 585.00 TOTAL BID SCHEDULE "B": $ 27,560.00 $ 19,770.00 BID SCHEDULE "C" - PERMITS Estimated i Item I Description Quantity j Unit I Unit Price Used to Date 1 Extension I �._..___37........ -Permits _^_..._._—...._._._...__,._..._...__ _ 1 LS j $ -2,000.00 LS 0.607 j $ _ 1,214.58 TOTAL BID SCHEDULE "C" BID SCHEDULE "D" - MOBILIZATION AND DEMOBILIZATION $ 1,214.58 - — Estimated Item Description _ — _ Quantity Unit i Unit Price Used to Date l Extension 38- Mobilization &Demobilization 11 LS $ 7,000.00 1 LS 0.5 $ 3,500.00 TOTAL BID SCHEDULE "D": $ 3,500.00 TOTAL PART 2: $ 128,701.48 ALTERNATIVE "A": Portable Power Generator (T Estimated { Item Description _ Quantity Unit Unit Price_ Used to Date Extension -- ---^ _ _ Portable Power Generator as per Section -� 1 39 16201 1 LS $ 37,000.00 ILS 01 $ - SUMMARY OF COMPLETION: PART 1: Bid Schedule "A" - SITE WORK $ 5,741.00 Bid Schedule "B" - YARD PIPING $ 15,021.00 Bid Schedule "C" - WELL PUMP & APPURTENANCES $ 14,420.00 Total Part 1: $ 35,182.00 PART 2: Bid Schedule "A" - PUMPHOUSE $ 104,216.90 Bid Schedule "B" - CHEMICAL TREATMENT $ 19,770.00 Bid Schedule "C" - PERMITS $ 1,214.58 Bid Schedule "0" - MOBILIZATION & DEMOBILIZATION $ 3,500.00 Total Part 2: $ 128,701.48 Alternative "A" - GENERATOR $ - TOTAL WORK COMPLETED TO DATE: $ 163,883.48 \\ha01 \shared docsVnunicipaMolsegokot507\ot5O7bt.xis 10/26/99 TOTAL WORK COMPLETED TO DATE: $ 163,883.48 LESS 5% RETAINAGE: $ 8,194.17 LESS PARTIAL PAYMENT #1 $ 19,674.81 LESS PARTIAL PAYMENT #2 $ 21,522.94 LESS PARTIAL PAYMENT #3 $ 42,576.18 LESS PARTIAL PAYMENT #4 $ 30,510.10 WE RECOMMEND PARTIAL PAYMENT OF: $ 41,405.28 APPROVALS: CONTRACTOR: Certifications tractor: I certify that all items and amounts are correct for the work completed to date. Signed:_ Title: Date: ENGINEER: Certification b ng eer: Wer commend payment for work and quantities as shown. HAKANSON A -N RS,&N ASSOCI ES,INCA Signed: Title: DateAn&b / OWNER: CITY OF Signed: Title: Date: \\ia01\shared docs\municipal\aolsego\ot507\o1507bt.xls 1 C/26/99 ITEM 5.5 Pay Estimate #2 November 2, 1999 Honorable Mayor & City Council City of Otsego 8899 Nashua Avenue N.E. Otsego. MN 55330 RE: 1999 Street Improvement Contractor: Bauerty Bros., Inc. Contract Amount: 51,187.606.70 Award Date: 8/10/99 Completion Date: November 15, 1999 Dear Council Members: The following work has been completed on the above referenced project: BID SCHEDULE A - OVERLAY, RECLAMATION AND STREET RECONSTRUCTION Page 1 of 3 Item # Spec.Ref. Item Description Estimated Quantity Contract Price Used to Date Extension 1 2021.5 Mobilization 1 LS S6,200.00 /LS 0.5 53,100.00 2 2101.51 Grub 36" Stump) 3 EA $125.00 /EA 0 $0.00 3 2104 Salvage Retaining Wall 2 EA S250.00 /EA 1 S250.00 4 2104.5 Remove Culverts 24" or less 835 LF $6.00 /LF 80 $480.00 5 2104.5 Remove Bit. Pavement 9500 SY $1.00 /SY 35 $35.00 6 2104.5 Remove Concrete Pavement 90 SY $2.00 /SY 0 $0.00 7 2104.51 Sawcut Bit. Pavement 1750 LF $3.00 /LF 2725 $8,175.00 8 2104.51 Sawcut Concrete 325 LF $7.00 /LF 0 $0.00 9 2105.5 Common Excavation CV P 23700 CY $4.56 /CY 0 $0.00 10 2105.52 Granular Borrow CV P 10300 CY $5.66 /CY 0 $0.00 11 2105.61 Minor Grading 3251 RD STA $30.25 /RD STA 357 $10,799.25 12 2112.6 Sub rade Preparation 9500 SY $0.30 /SY 0 $0.00 13 2120.5 Earth Shouldering To Soil 3500 CY $7.50 /CY 0 $0.00 14 2211.5 Agaregate Base Cl 5 5900 Ton $6.18 /Ton 1281 $7,916.58 15 2211.5 Aggregate Base Cl 5 DW 125 Ton $6.82 /Ton 425 $2,898.50 16 2211.5 Aggregate Base Cl 5(patch) 575 Ton $6.18 /Ton 275 $1,699.50 17 2221.5 Aggregate Shoulderin , Cl 2 240 Ton $20.00 /Ton 0 $0.00 18 2221.5 Aggregate Shoulderin , Cl 5 1070 Ton $6.82 /Ton 981 $6,690.42 19 2232.5 Reclamation of Bituminous Surface 86355 SY S0.68 /SY 62,554 542,536.72 20 2232.5 Reclamation of Bituminous Surface & Transport 16150 SY $0.97 /SY 0 1 $0.00 21 2340.51 Type 41 Wear 22810 Ton $23.18 /Ton 16,192.6 5375,344.47 22 2340.51 Type 41(patch) 210 Ton 535.00 /Ton 280 59,800.00 23 2357.5 Bit. Mat for Tack 4540 Gal $0.75 /Gal 2100 51,575.00 24 2401.52 Structural Excavation, Cl U, CV P 300 CY $2.00 /CY 0 $0.00 25 2451.51 Course Filter Aggregate 60 CY $14.00 /CY 0 S0.00 26 2501.52 30" RCP End Section 1 EA S470.00 /EA 1 5470.00 27 2501.52 24" RCP End Section 12 EA 5390.00 /EA 18 57,020.00 28 2501.52 15" RCP End Section 20 EA S320.00 /EA 12 $3,840.00 29 2501 30" RCP FES Trash Guard 11 EA S895.00 /EA 0 $0.00 30 2502.54 3" PERF PE PIPE DRAIN 1600 LF $5.45 /LF 0 $0.00 \\ha01\shafH) docs\muruc,pal\aolsego\o13361o13368P 1113/99 Pay Estimate #2 Page 2 of 3 Item # Spec.Ref. Item Description Estimated Quantity Unit Price Used to Date Extension 31 2502.6 Connect to Existing Drain 4 EA $255.00 /EA 1 $255.00 32 2503 30" RCP 734 LF $37.80 /LF 443 $16.745.40 33 2503.51 24 " RCP 328 LF $28.60 /LF 356 $10.181.60 34 2503.51 18 " RCP 1037 LF $23.95 /LF 80 $1,916.00 35 2503.51 15" RCP 614 LF $22.05 /LF 212 $4,674.60 36 2503.6 Connect Existing Drain Pipe to Storm Sewer 1 EA $350.00 /EA 0 $0.00 37 2503.6 Ductile Iron Pie 100 LF $26.70 /LF 0 $0.00 38 2506 Construct Drainage Structure C,G, N or H 13 EA $820.00 /EA 0 $0.00 39 2506.5 Construct Drainage Structure 48" 4020 1 EA $930.00 /EA 1 $930.00 40 2506.5 Construct Drainage Structure 54" 4020 1 EA $1,780.00 /EA 0 $0.00 41 2506.5 Construct Drainage Structure 60" 4020 2 EA $2,115.00 /EA 0 $0.00 42 2511.5 Random Ri ra Cl II 75 CY $45.00 /CY 21.4 $963.00 43 2531.51 6" Concrete DrivewayPavement 40 SY $40.00 /SY 0 $0.00 44 2540.6 Relocate Mailbox Support 376 EA $75.00 /EA 198 $14,850.00 45 2563.6 Traffic Control 1 LS $4,000.00 /LS 0.5 $2,000.00 46 2564.6 Relocate Sin 6 EA 1 $50.00 /EA 0 $0.00 47 2564.6 Si n Panels T e C 9 SF $22.00 /SF 0 $0.00 48 2573.5 Bale Check 20 EA $6.00 /EA 0 $0.00 49 2573.5 Silt Fence, Type Preassembled 1000 LF $1.60 /LF 0 $0.00 50 2575.5 Seedinq 10 Acre $600.00 /Acre 0 $0.00 51 Install Retaining Wall 1 EA $500.00 /EA 0 $0.00 52 11ristall Bituminous Flume 4 EA $150.00 /EA 0 $0.00 TOTAL BID SCHEDULE A: Rin SCHFnt1LF R - SEAL COAT AND CRACK FILLING $535,146.04 53 2231.51 Crack Fillinq Material 10200 LB $0.91 /LB 22,225 $20,224.75 54 2356.51 Bit. Mat for Seal Coat 22000 Gal $0.99 /Gal 0 $0.00- 55 2356.51 Seal Coat Aqqregate FA2 1645 Ton $19.00 /Ton 622.5 $11,827.50 56 2564.6 4" Double Solid Yellow - Epoxy 211101 LF 1 $0.49 /LF 0 $0.00 572564.6 4" Solid White - Epoxy 90000 LF $0.22 /LF 0 50.00 581 2564.6 4" Dashed Yellow - Epoxy 5060 LF 1 $0.36 /LF 0 $0.00 TOTAL BID SCHEDULE B: $32,052.25 \\ttaoI\sharea docs\mumctpai\aotsego\ot336\ot3368P As 11/2/99 Pay Estimate #2 BID SCHEDULE C - OTSEGO CREEK (83RD ST.) CULVERT REPLACEMENT Page 3 of 3 Item # Spec.Ref. Item Description Estimated Quantity Unit Price Used to Date Extension 59 2104.5 Remove 60" CMP 50 LF $10.00 /LF 50 $500.00 60 2105.51 Channel Excavation, CV P 70 CY S8.70 /CY 70 $609.00 61 2401.52 Structural Excavation, CI U, CV P 300 CY $4.00 /CY 300 $1,200.00 62 2503 88" SPAN RCPA 641 LF $207.00 /LF 64 $13,248.00 63 2503 88" SPAN RCPA FES 2 EA $1,740.00 /EA 2 $3.480.00 64 2105 Aqqreqate Bedding Material 15 CY $16.00 /CY 15 $240.00 65 2015 Common Borrow 150 CY $4.20 /CY 80 $336.00 64 2511.5 Random Riprap Cl IV 1001 CY $47.00 /CY 35 $1,645.00 65 2511.52 Geotextile Fabric Type V 870 SY $1.20 /SY 780 5936.00 TOTAL BID SCHEDULE C: SUMMARY OF BIDDING: USED TO DATE: LESS 5% RETAINAGE: LESS PAY ESTIMATE #1: WE RECOMMEND PAYMENT OF: $22,194.00 BID SCHEDULE A: 5535,146.04 BID SCHEDULE B: $32,052.25 BID SCHEDULE C: $22,194.00 TOTAL USED TO DATE: $589,392.29 APPROVALS: CONTRACTOR: BAUERLY BROS., INC. Certification by Contractor: I certify that all items and amounts are correct for the work completed to date. Signed: Title: Date: ENGINEER: Certification by Engineer: We recommend payment for work and quantities as shown. HAKANSON ANDERSON ASSOCIATES, INC. Signed: Title: OWNER: CITY OF OTSEGO Signed: Title: Date: Date: $589,392.29 $29,469.61 $218,697.21 $341,225.46 Uha0 t \shared docs,.mun e,parausegowrJ36\ot3360P.,is 11/2/99 da- GRIDOR CONSTR.' INC. 1886 BERKSHIRE LANE P.O. BOX 41246 PLYMOUTH, MN 55441 owner CITY OF OTSEGO, MN For Period 9/28/99 TO 1026/99 Engineer BONESTROO ROSENE ANDERLIK & ASSOC. SUMMARY: I ORIGINAL CONTRACT AMOUNT 2 CHANGE ORDER - ADDITION 3 CHANGE ORDER - DEDUCTION 4 RE VIS ED CONTRACT AMOUNT VALUE COMPLETED TO DATE 6 MATERIAL STORED - .Nlo(jN": EARNED TO DATE LESS RETAINAGE - 504 SUB -TOTAL. 10 LESS ANIOUNT PREVIOUSLY PAID I I A:NIOU:NT DUE THIS REQUEST REQUEST FOR PAYMENT WASTEWATER TREATMENT FACILITY S S Date t No. 5.194 612-559-3734 1026/99 6 S 2,031,323 S 2,036,517 S 1,000,010 S 377,711 S 1.377.721 S 8 S 1.377,721 S 1.237,016 S 140,705 E?rc nnntcnuc! l)r Approval by: I30N LSTIZ00 ROSENE ANDERLIK & ASSOC. * Alternate Petail0age Amount Required (5%) _ $68,886 D� Pledged Security (CD) _ $100,000 (Pfl1�CC[ 'I1 _L'I llCef� Approved h� Contractor GRII)Olt CONSTR., INC. �� R()ls1-12 l' MI'YER i'micct M.mau-cr 1026.99 spce1f1t;d L' mtract Completion Datc: 7 100 Approved by Ox%ncr: CITE' OF ... Date UNIT BID WASTEWATER TREATMENT FAC9,fTY PAY ESTIMATE NO. 6 OTSEGO, MN 9/28/99 TO 10/26/99 ITEM AMOUNT AMOUNT TOTAL NO DESCRIPTION CONTRACT PREVIOUSLY COMPLETED COMPELTED I SILT FENCE AMOUNT APPROVED THIS PERIOD TO DATE 2 EROSION- HAY BALES 3200 150 1.30 5.00 4,160 3,715 3,715 3 18" PVC. SDR 35.0'-8' DEEP 500 25.50 750 12,750 250 12,622 250 4 24" PVC. SDR 35.0'-8' DEEP 520 35.50 18,460 18,460 12,622 18,460 5 24" PVC. SDR 35. 8'-10' DEEP 200 37.00 7,400 7,770 7,770 6 24" PVC. SDR 35, 10'-12' DEEP 25 38.00 950 950 950 7 24" PVC, SDR 35, 12'-14' DEEP 40 39.00 1,560 1,560 1,560 8 24" PVC, SDR 35, 14'-16' DEEP 45 42.00 1,890 1,470 1.470 9 24" PVC, SDR 35, 16'-18' DEEP 140 45.50 6,370 6,270 6.370 16 18" DIRECTIONAL BORING 130 242.00 31,460 31,460 31,460 17 4 FT. SANITARY MANHOLE 5 1682.00 8,410 8,410 8.410 18 4 FT. MANHOLE OVER 8' DEEP 32 90.00 2,880 1,989 1,989 19 CONC. COLLAR OVER HDPE 1 1160.00 1,160 1,160 1,160 20 FOUNDATION MATERIAL 1300 0.01 13 21 SUBGRADE EXCAVATION (EV) 4900 1.75 8,575 8,575 0 8,575 22 CLASS 5 AGGREGATE 3300 5.80 19,140 17,388 17.388 23 SELECT GRAI\TULAR BORROW -CV 3800 6.20 23,560 16,895 16.895 24 18" RCP CLASS 5 42 37.00 1.554 1,184 1,184 25 18" RCP APRON W/ TRASH GRD. 2 830.00 1,660 1.660 1,660 _6 4" PERF DRAM TILE W/SOCK & ROC 108 6.00 648 564 564 27 GEOTEXTILE FAB. TYPE V -STREET 4000 1.30 5,200 4,485 4,485 28 SEED W TOPSOIL & FERT. 6.5 2830.00 18,395 0 29 SOD W TOPSOIL & FERTILIZER 9000 2.20 19.800 0 3u WELL, MOBILIZATION 1 19000.00 19,000 16,150 16.150 31 DRILL. CASE &: GROUT 6" WELL 150 34.00 5,100 5,440 3,440 32 DRILL HOLE THRU IRONTON-GV 50 16.00 800 1,680 1.6901 33 DEVELOP WELL BY JETTING 20 160.00 3200 0 34 DEVELOPMENT OF WELL 20 160.00 3200 640 64U 35 TEST PUMPING 16 105.00 1,680 0 36 6" SCREEN LN PLACE 20 50.00 1,000 0 37 15" RCP. CLASS 5 70 32.50 2,275 1,040 1.040 38 15" RCP, APRON W/ TRASH GRD. 4 790.00 3,160 1,580 1,580 39 12" RCP, CLASS 5 24 24.50 588 588 588 40 12" RCP, APRON W/ TRASH GRD 1 655.00 655 655 655 41 RIP RAP - CLASS 3 20 62.50 1,250 500 500 42 AND'L 4' WU)E SIDEWALK/ L.F. 150 5.80 870 0 0 0 0 0 U 0 0 SUBTOTAL PART I 239,523 175,210 0 175,210 MATERIAL STORED 0 0 0 (CHANGE ORDERS) 0 U TOTAL 239,523 175 210 0 175•210 LS BID WASTEWATER TREATMENT FACILITY OTSEGO, MN PAY ESTIMATE NO. 928/99 TO 1026/99 m ITEM AMOUNT AMOUNT NO DESCRIPTION CONTRACT PREVIOUSLY COMPLETED 1 BOND AND MOBILIZATION AMOUNT APPROVED THIS PERIOD 2 EXCAVATION & BACKFILL 25,000 20,000 3 FINE GRADE SITE 142,000 120,000 15,000 4 CHAIN LINK FENCE 3,000 5 CONCRETE WORK 1300 C. Y. 15,000 -270.00 351,000 340,000 5,000 6 REINF. STEEL 125 TON 1000.00 125,000 123,000 7 PRECAST CONCRETE 8 MASONRY 5,000 5,000 9 MISC. METALS, WEaS & BAFFLES 32,000 32,000 10 CARPENTRY & ROOFING 46,000 2,000 3,000 11 F. R. P. DOMES & COVERS 33,000 28,000 4,000 12 ' INSULATION 60,000 1,000 13 METAL SIDING & TRIM 1,000 1,000 14 CALq-KING 28,000 18,000 15 DOORS. FRAMES & FIN. HDW. 800 16 1�•'i1NDU�b'S 12,000 1,000 17 PAINT(�NG 6,000 6.000 IS Fri ISH CEILINGS 39,000 1,000 19 SPF.CIALTEES 4 ,000 20 CENTRIFUGAL PUMPS 4,000 21 SUPPAERSMLE PUMPS X3,000 22 Pi CAVITY PUMP 7.000 23 FLNAI. CLARIFIERS 19,000 24 BLOWERS 60.000 x,000 '5 AER-ATION 27,000 26 AIECH MNICAL AERATORS 11,000 27 S("BMERSBLE MIXER 96,000 28 C10--M1CAL TANKS & PUMPS 13,000 22,000 29 S.,\NU'LER & PARSHALL FLUME 7.000 3U FLOW METERS 6,000 31 U -V DISIv1=ECTION 32 ODOR CONTROL 43.000 33 LAB EQUIPMENT & FURNITURE 23,000 34 PROCESS PIPE, VALVES - MATERIALS 19,000 35 PIPE LABOR - EXTERIOR 110,000 36 PIPE LABOR - INTERIOR 72,000 48,000 20,000 37 PLf'MBING 8,000 2,000 3 c FN"LILA CION 34,000 10,000 1.1.=C I RIC:AL. 24,000 8,000 Io 236.000 7,000 2,800 SUBTOTAL MATERIAL STORED (CHANGE ORDERS) UNIT PRICE ITEMS TOTAL TOTAL COMPELTED TO DATE 20,000 135,000 0 0 345,000 123,000 5,000 32,000 5,000 32,000 1,000 1,000 18,000 0 1,000 6.000 1.000 0 0 0 0 0 2,000 0 0 0 0 0 0 0 0 0 0 0 68,000 2,000 10,000 8,000 9,800 0 1,791,800 749,000 75,800 824,800 377,912 (201) 377,711 0 239,523 175,210 175,210 2,031,323 1,302,122 75,599 1,377,721 STORED MAT'L 377,912 4,755 4,956 377,711 TOTAL COMPLETED & STORED (201) 6 WASTEWATER TREATMENT FACILITY MATERIAL STORED OTSEGO, MN PAY ESTIMATE NO. ITEM NO. DESCRIPTION SUPPLIER PREVIOUS THIS AMOUNT AMOUNT INSTALLED NET AMOUNT 6 MISC. REINF. AMBASSADOR STEEL 765 9 MISC. METALS METRO MFG. 15,975 765 11 F R P DOMES & COVERS FIBERGLASS STRUCTURES 56,763 15,975 15 DOORS & FRAMES DAVID HDW. 8,981 56,763 16 WINDOWS VAL-PRO 4,956 8,981 19 SPECIALTIES CONST. SUPPLY 4,956 0 21 SUBMERSIBLE PUMP WALDOR 1,163 5,836 1,163 22 PROG. CAVITY PUMP NETZSCH, INC. 17,248 5,836 23 FINAL CLARIFIERS WESTECH 52,271 17,248 25 AERATION SANITAIRE / PLANT & FL 8,504 52,271 26 MECH. AERATORS BAKER HUGHES 9,319 8,504 27. SUBMERSIBLE MIXER WALDOR 12,109 9,319 28 CHEMICAL PUMPS MILTON ROY 12,244 12,109 28 CHEMICAL TANKS VESSCO 8,017 12,244 29 SAMPLERS AMERICAN SIGMA 4,896 8,017 29 FLUME & ENCLOSURE AMERICAN SIGMA 1,364 4,896 30 FLOW METERS WM. E. YOUNG 5,851 1,364 31 U -V DISINFECTION TROJAN 41,961 5,851 32 ODOR CONTROL CALGON 23,430 41,961 14 D I PIPE PLANT & FLANGED 70,405 3,592 23,430 73,997 34 SUMP BASKET TRI STATE PUMP 532 34 PVC PIPE & FITTINGS INDELCO PLASTICS CORP 490 532 34 MANHOLE CASTINGS NEENAH 605 490 3-1 HYDRAN"fS KUPFERLE FOUNDRY 2.550 605 34 NLaNHOLL'S ELK RIVER CONC. PROD. 4,931 2.550 34 EXPANSION JOINTS STANCHFIELD & HAUPT 809 4.931 38 HVAC GREEN MECH. 7,100 809 7.100 377,912 4,755 4,956 377,711 TOTAL COMPLETED & STORED (201) 6 22 CITY OF OTSEGO REQUEST FOR COUNCIL ACTION AGENDA SECTION: DEPARTMENT: MEETING DATE: DEP.4RTNIENT: PREPARED BY: 8. Andrew MacArthur, City Attorney Elaine Beatty, City Clerk' November 8, 1999 6:30PM ITEM NUMBER: ITEM DESCRIPTION 8.1. Discussion of Roskaft land - Subdivision 8.2. Any Other Legal Business BACKGROUND: 8.1, Andy MacArthur will be present to explain and I have attached the information from Andy. 8.2. This item is for any other legal business that may arise. RECOMMENDATION: This is for Council consideration and any approval needed. Thanks, EIame November 3, 1999 Transportation Task Force -------River Rider Highlights from the meeting.... I told them Otsego will pay $3000 for 2000 services. They thanked us and will put the difference that they were asking for and the $3000 in the fund for repairing or buying new buses. Everyone gave their reports, copy of them enclosed. Monticello ridership is down but some of that is due to the road construction. Albertville had request for transportation for about 7 people back and forth to Monticello but was turned down as there is no bus going there. It was hoped that Albertville and Montrose will be signing on someday, right now they do not participate. Monticello and Annandale have regular schedules of bus service in their cities. Monticello also has the Guardian bus service going to and from the hospital but that is more expensive and the insurance companies are being charged for that. Most rides are at least $15.00 on way plus mileage. We are asking them to the next meeting so we can discuss what kind of service they are giving. We have sold advertising for the buses in the amount of $12,500. There is one sign for $5000 and one for $2,500 and the rest are smaller signs. The contracts go for one year and the companies that ordered them have to have the signs made up. Sherburne County does not have a program like Wright County but they would like to meet with us to get ideas how to improve their system. The county takes care of their buses without the cities help. MnDot reported there is a meeting Dec. 9h in St. Cloud 10 -noon about a new program called 5310 transportation program This would provide buses for seniors and disabled and the state would pay 80% with the county or different organization paying 20%. The bus would cost approx. $40,000 and that would have wheel chair lift on it. More info to follow after the next meeting in Jan. Virgie Wendel Q� 0 �a functional industries inc. SEPTEMBER MILES: FUNCTIONAL INDUSTRIES, INC. Box 336, Buffalo, Minnesota 55313-0336 Phone: (612) 682-4336 Fax: (612) 682-9692 PROGRAM LOCATIONS IN BUFFALO AND COKATO TOTAL: 23188 ROUTE MILES: 17055 CREW MILES: 1661 PEOPLE TRANSPORTED TO AND FROM WORK: 105 S v� WIN PEOPLE IN OCTOBER = 11 6e WINjPEOPLE NEEDING TRANSPORTATION = 7 � WE LOSE MONEY EACH MONTH ON OUR TRANSPORTATION BUT I HAVE ANY OF THESE FIGURES. d0 S �S ��o T DO NOT OUR GOAL AT FUNCTIONAL IS TO GET PEOPLE COMMUNITY JOBS. ONE OF THE LARGEST HANG UPS WITH THIS IS FINDING WAYS TO GET THEM TO THEIR JOBS AND ALSO GETTING THEM THERE DURING THE HOURS THAT THEY ARE NEEDED. SOME OF OUR PEOPLE LIVE 25 MILES AWAY AND THEIR ONLY TRANSPORTATION IS A FII VAN. THEY ARE LIMITED TO JOBS THAT ARE WITHIN THE HOURS THAT OUR VANS RUN AND IF THERE IS ADDITIONAL TRANSPORTATION AVAILABLE BY RIVER RIDER AND ANNANDALE HEARTLAND. ELAINE THOLE Cc)uY\Ty R VOL Q.r S P A 1 5 C) ►'Y1 Q- . Q � -a- V_ `4 `4 v, c� P �A-Vt o v Ver 4z�'1 �11 FUNCTIONAL IS SHORT ONE DRIVER. THIS IS A DIFFICULT POSITION -(f TO FILL AS IT IS THE LIFT VAN AND TWO OF THE RIDERS ARE IN LARGE WHEELCHAIRS. WE ARE COVERING IT BY USING PROGRAM STAFF WHICH SHORTS US, ALSO BY HAVING PEOPLE WORK MORE HOURS. OUR VANS ARE FULL. WE CAN CARRY 14 PEOPLE ON A VAN BUT SOME 0 OF OUR ROUTES HAVE 17 LISTED. WE ARE ABLE TO DO THIS ONLY Z G BECAUSE NOT ALL THE PEOPLE RIDE EACH DAY BUT WE HAVE REACHED OUR LIMIT ON THIS ALSO. WE HAVE ONE MORNING VAN THAT GOES 80 MILES BEFORE 8;00. HE NEEDS TO DROP OFF SOME OF HIS COUNTRY RIDERS SO HE CAN FINISH HIS ROUTE WITH IN -TOWN PEOPLE. C �P OUR LIFT VANS ARE FULL. WE HAVE HAD ONE CALL THIS WEEK THAT I REFERRED TO ANNANDALE HEARTLAND AND WE HAVE ANOTHER PERSON STARTING IN THE SPRING THAT ALSO NEEDS A LIFT VAN. OUR 2 LIFT VANS MAKE 2 OR 3 RUNS EACH MORNING AND EVENING. OUR GOAL AT FUNCTIONAL IS TO GET PEOPLE COMMUNITY JOBS. ONE OF THE LARGEST HANG UPS WITH THIS IS FINDING WAYS TO GET THEM TO THEIR JOBS AND ALSO GETTING THEM THERE DURING THE HOURS THAT THEY ARE NEEDED. SOME OF OUR PEOPLE LIVE 25 MILES AWAY AND THEIR ONLY TRANSPORTATION IS A FII VAN. THEY ARE LIMITED TO JOBS THAT ARE WITHIN THE HOURS THAT OUR VANS RUN AND IF THERE IS ADDITIONAL TRANSPORTATION AVAILABLE BY RIVER RIDER AND ANNANDALE HEARTLAND. ELAINE THOLE Cc)uY\Ty R VOL Q.r S P A 1 5 C) ►'Y1 Q- . Q � -a- V_ `4 `4 v, c� P �A-Vt o v Ver 4z�'1 �11 :5 CITY OF OTSEGO REQUEST FOR COUNCIL ACTION AGENDA SECTION: DEPARTMENT: MEETING DATE: DEPARTMENT: PREPARED BY: 9. COUNCIL ITEMS: Elaine Beatty, City Clerk/ November 8, 1999 6:30PM ITEM NLTM13ER: ITEM DESCRIPTION: 9;2i Mike Robertson; City Administrator - Update: A. Update 6ti Courity Emergency Preparedness Plan B. Discussion of Hookup Fee Payment Policy C. Any Other Administrative Business. BACKGROUND, AA B. Mike Robertson will be here to explain this and answer questions. See attached information from Mike. C. Is for any Other Administration Business. RECOMMENDATION: This is for Council consideration and any approval needed; Thanks, �Elaine MEMO Date: November 3, 1999 To: Mayor & Council From: City Administrator Mike Robertson Re: Assessment Policies - Sewer & Water Hookup Fees As Council requested, I have enclosed a copy of the summary of Otsego's Assessment Policy. I have underlined those sections which have to do with Sewer & Water assessments. The Assessment Policy states that the City will assess benefited property for lateral sewer and water lines. The Council has reaffirmed that policy in many meetings since the Assessment Policy was adopted. The Council has always discussed receiving its Sewer (SAC) & Water (WAC) hookup fees up front when a development was approved. The Council did agree for three recent residential developments (Prairie Creek, Pheasant Ridge, and Crimson Ponds) to receive 500 of the SAC/WAC fees up front and the other 500 on the building permit. Rudy Thibideau of Fun City has asked for some or all of his SAC/WAC fees to be assessed. Christ Lutheran Church has also mentioned a similar assessment but has not made a request or provided any details. In reviewing these or similar requests the City Council should examine both the proposed land uses and what they would add to the City and the impact that assessing hookup fees would have on financing the Sewer & Water system. SEWER & WATER SYSTEM FINANCING Though all costs are not yet final, I estimate that the City will need approximately 65 SAC/WAC hookups a year to make the bond payments on the money it borrowed to construct the Sewer & Water system. As the Council was previously informed, due to the capitalized interest on the bond and the money Dayton is paying for its portion of the sewer plant, Gary Groen and I expect that the City will not need any money from SAC/WAC hookup fees to make bond payments until June, 2001. Based on the final plats approved for the three residential developments, right now it looks like there will be more than enough residential development to take care of the first few years of bond payments. This would allow Council flexibility in terms of assessing hookup fees if they wished to do so. PROPOSED LAND USES SAC/WAC hookup fees vary according to land use. The Council has adopted the Met Council's Procedures Manual for determining how many hook up fees are generated by each type of land use. Restaurants, because they use a lot of water, pay high hookup fees, one fee for every 22 seats for fast food restaurants (Godfather's Pizza), or one fee for every 8 seats for a sit down restaurant. Churches pay a low hookup fee for their sanctuary, one fee for every 275 seats. What Christ Lutheran is building is not sanctuary space but is meeting and classroom space, which is charged at one fee for every 1,650 square feet of space. RECOMAENDATION Churches do not pay property taxes and the services they provide are usually limited to their members. Therefore any benefit granted to them benefits only their members. I would not recommend allowing their hookup fees to be assessed. Restaurants do pay taxes and use of them is only limited by the ability to pay for meals. Benefits granted to them are therefore available to almost everyone. This provides a reasonable basis for Council to assess their hookup fees, if that is what they wish to do. cc: City Staff E CITY OF OTSEGO COUNTY OF WRIGHT STATE OF MINNESOTA APPROVED SUMMARY OF OTSEGO ORDINANCE NO. 24-1, AN ORDINANCE RELATING TO LOCAL IMPROVEMENTS AND SPECIAL ASSESSMENTS AND ESTABLISHING A GENERAL POLICY THEREFOR. The following is an approved summary of Ordinance 24-1, pursuant to Minn. Stat. 412.191, Subd. 4. The entire ordinance is so lengthy as to prohibit full publication. A printed copy of the ordinance is on file at the Otsego City Hall and is available for public inspection. The following summary clearly informs the public of the intent and effect of the ordinance. Ordinance 24-1 establishes the basic City policy regarding construction of local improvements, and policy regarding assessment for the same. The ordinance directs that the particulars of specific assessment scenarios be addressed in an Assessment Policy Manual. The Ordinance divides public improvements into three classes, Class A improvements are those improvements such as public buildings or parks which are of general benefit to the city at large, Class B improvements are those like trunk water and sewer mains which are of general benefit and of special benefit to abutting or nearby property, and Class C improvements are those improvements like street surfacing which primarily benefit the abutting or nearby property. The Ordinance establishes the basic City policy that Class A improvements will be paid for from thw.city :general fund and that Class B and C improvements will be paid for through assessment of benefited property owners. Section 24-1-3 establishes the basic regulations for assessment of Class B improvements. Section 24-1-3, A sets forth the basic assessment rules for trunk water mains and sanitary sewers, Section 24-1-3, B sets forth the assessment rules for collector street surfacing, including MSA eligible streets, and states that within newly constructed residential or commercial -industrial developments that the Developer shall be responsible for 100% of new street costs, or for the cost of a typical street if the street is MSA eligible. Section 24-1-3, c sets forth assessment policy for storm sewer improvements. Section 24-1-4 lists assessment rules for Class C improvements. The__ ordinance states that water and sewer mains both internal.__and__ lateral-shal_ a assesse on the basis of fr_on7Eage, and that street improvements, including curb -antic qufter,� graveling, oiling, and applying non permanent surfacing, and permanent surfacing on residential streets, shall be assessed on the basis of frontage, or, in the case of streets, either based on frontage, lot unit, or lot unit equivalent. Assessment for nuisance abatement shall be done on a case by case basis. Section 24-1-5 sets forth special rules for corner lots, intersections, and adjusted frontage. Section 24-1-6 states that the City may postpone until a later date assessments against abutting benefited properties if the city advances its own money in making improvements. Section 24-1-7 allows the City to apportion assessments, when said assessment has previously been levied and the land is subsequently subdivided. Section 24-1-8 states that upon receipt of federal, state, or county funds for a project, the amounts received shall apply to reduce the amount of the project which would normally be paid from general city funds, and even if the amount received is in excess of that amount it shall not reduce the amount of assessment under this ordinance. Section 24-1-9 requires. property ers to construct service lines to connec to sewer facilities and allows the city o ins a serve er comp v within thirty 3ays of notice from the* tygineer. Section 24-1-10 allows prepayment of the assessment prior to certification of the assessment to the county auditor, Section 24- 1-11 directs the city clerk to certify the assessments to the county auditor, and Section 24-1-12 directs City Staff to prepare a City Assessment Manual. This Ordinance Summary approved this -19th day..of March, 1995. Motion for approval of the summary was made by Councilperson Larry Fn>>rni ar and seconded by Councilperson fir-., uo; �ttor IN FAVOR: Norman F Freske, Larry Fournier, Ron Black, Vern Heidner and OPPOSED: Suzanne Ackerman No One CITY OF OTSEGO Norman F. Freske, Mayor Elaine Beaty, City Clerks CLAIMS LIST CITY COUNCIL MEETING November 8, 1999 TO: City Council Attached is the Claims List for your consideration. For more detail, please refer to the Check Detail Registers. GRAND TOTAL $ 1,512,208.42 If you have any questions or if you would like to review this list further, please let me know. Judy Hudson Deputy Clerk/Treasurer CITY OF OTSEGO Wednesday, November 03, 1999 Check Summary Register Page 1 of 1 Name Check Date Check Amt 10100 BANK OF ELK RIVER UnPaid AIRGAS, INC. $35.88 UnPaid AT&T $75.56 UnPaid BARBAROSSA & SONS $455,050.23 UnPaid BAUERLY $341,225.46 UnPaid BOYER TRUCKS $32.80 UnPaid CAMAS MINNESOTA, INC. $32.57 UnPaid CHRISTIAN BUILDERS INC $1,500.00 UnPaid CITY OF ALBERTVILLE $14,482.52 UnPaid CITY OF MONTICELLO $1,787.75 UnPaid DUERRS WATERCARE SERVICE $41.40 UnPaid EAST SIDE LEASING CO $237.92 UnPaid ECO SYSTEMS $240.00 UnPaid ELK RIVER MUNICIPAL UTILITIES $664.18 UnPaid ENCOMM $41,405.28 UnPaid EVERGREEN LAND SERVICES CO $1,270.00 UnPaid FORTIS BENEFITS INSURANCE CO $80.69 UnPaid GLENS TRUCK CENTER INC $214.58 UnPaid GRIDOR CONSTR., INC. $140,705.00 UnPaid HAKANSON ANDERSON ASSOC INC $80,328.72 UnPaid I.S.D. 728 $3,313.68 UnPaid ICMA RETIREMENT TRUST $614.70 UnPaid J -CRAFT INC $245.88 UnPaid JEFF BARTHELD $22.29 UnPaid JERRY OLSON $4,843.88 UnPaid LATOUR CONSTRUCTION $207,232.46 UnPaid LONG & SONS $875.58 UnPaid MICHAEL DAY $324.17 UnPald MINNEGASCO $168.94 UnPaid MINNESOTA COPY SYSTEMS $292.98 UnPaid NAPA OF ELK RIVER INC $192.48 UnPaid PITNEY BOWES $515.00 UnPaid PRINCIPAL FINANCIAL GROUP $402.85 UnPaid PUBLIC EMPLOYEES RETIREMENT FD $701.43 UnPaid RANDY'S SANITATION $258.75 UnPaid RURAL AMERICAN GRAPHICS $95.62 UnPaid STATE CAPITAL CREDIT UNION $50.00 UnPaid STEPHEN CONROY, ATTORNEY $387.50 UnPaid SUPERIOR LAWN & SNOW $657.10 UnPaid US BANK $199,159.82 UnPaid US WEST COMMUNICATIONS $506.77 UnPaid WRIGHT COUNTY AUDITOR -TREASURE $10,626.88 UnPaid WRIGHT COUNTY RECORDER $58.50 UnPaid WRIGHT-HENNEPIN CO-OP ELECTRIC $1,250.62 Total Checks 1,512,208.42 CITY OF OTSEGO Wednesday, November 03, 1999 Check Detail Register Page 1 of 5 ......... :%........- -.'- ". - Check Amt Invoice Comment ......... .... . ............ ... ... . . ............ . ........ ........... .............. . ................ 10100 BANKOFELK RIVER A—IR-GII-A-S--,—,,--.------'.-------,..---.,.,.—,,-.,.--,-.-.-.-,.....-.1-1--.....--..-.—..- , INC. E101-43100-210 Operating Supplies (GENERAL) $35.88 44027 Oxygen Total AIRGAS, INC. $35.88 UnPaid AT&T E 101-43100-320 Telephone E 201-45000-320 Telephone E 101-41400-320 Telephone $11.42 Public Works $11.77 Shed Phone $52.37 City Hall Total CAMAS MINNESOTA, INC. $32.57 UnPaid CHRISTIAN BUILDERS INC E 702-41400-310 Miscellaneous $1,500.00 Escrow Ref 14672 71 st St Total CHRISTIAN BUILDERS INC $1,500.00 unpaj . CITY OF ALBERTVILLE E 202-42200-390 Contracted Services $7,241.26 1999 2nd half fire service E 202-42200-390 Contracted Services $7,241.26 1999 1 st half fire service Total CITY OF ALBERTVILLE $14,482.52 Unpaid CITY OF MONTICELLO E 101-42710-390 Total AT&T $75.56 Animal Control UnPaid BARBAROSSA & SONS $1,688.75 6225 4th Qtr Fire Service E 415-43251-500 Capital Outlay (GENERAL) ($223.50) Pay Est #5 E415-43251-500 Capital Outlay (GENERAL) $455,273.73 Pay Est #5 Operating Supplies (GENERAL) Total BARBAROSSA & SONS $455,050.23 E 101-41950-310 UnPaid BAUERLY Salt Head Start Total E 416-43100-530 Improvements Other Than Bldgs $341,225.46 Pay Est #2 EAST SIDE LEASING CO Total BAUERLY $341,225.46 Office Equipment Rental UnPaid BOYER TRUCKS Total EAST SIDE LEASING CO E 101-43100-220 Repair/Maint Supply (GENERAL) $32.80 1992 Ford Truck parts Total BOYER TRUCKS $32.80 Miscellaneous nPaid CAMAS •MINNESOTA, INC. E 101-41950-310 Miscellaneous $32.57 1585150 Head Start - sand Total CAMAS MINNESOTA, INC. $32.57 UnPaid CHRISTIAN BUILDERS INC E 702-41400-310 Miscellaneous $1,500.00 Escrow Ref 14672 71 st St Total CHRISTIAN BUILDERS INC $1,500.00 unpaj . CITY OF ALBERTVILLE E 202-42200-390 Contracted Services $7,241.26 1999 2nd half fire service E 202-42200-390 Contracted Services $7,241.26 1999 1 st half fire service Total CITY OF ALBERTVILLE $14,482.52 Unpaid CITY OF MONTICELLO E 101-42710-390 Contracted Services $99.00 6225 Animal Control E 202-42200-390 Contracted Services $1,688.75 6225 4th Qtr Fire Service E 101-43160-322 Total CITY OF MONTICELLO $1,787.75 39 & 101 ..... ......... UnPaid DUERRS WATERCARE SERVICE $62.20 E101-43100-210 Operating Supplies (GENERAL) $18.70 Public Wks supplies E 101-41950-310 Miscellaneous $22.70 Salt Head Start Total DUERRS WATERCARE SERVICE $41.40 Unpaid EAST SIDE LEASING CO E 101-41400-413 Office Equipment Rental $237.92 4999 October rental Total EAST SIDE LEASING CO $237.92 Unpaid ECO SYSTEMS E 101-41400-310 Miscellaneous $240.00 Test Water/Kadler Total ECO SYSTEMS $240.00 :.,.N:::.,.::,.:::.:::.:::,:.:, --------------------- Unpaid ELK RIVER MUNICIPAL UTILITIES E 101-43160-322 Utilities $32.38 Cty Rd 39 E 101-41950-322 Utilities $42.04 Old City Hall E 101-43160-322 Utilities $280.99 39 & 101 E 101-43160-322 Utilities $62.20 Antelope Park E 101-43100-322 Utilities $45.81 Public Works E 101-43160-322 Utilities $39.41 96th Street CITY OF OTS E G O Wednesday, November 03, 1999 Check Detail Register Page 2 of 5 :::.::........................................ Check Amt Invoice Comment ............................... ......,................... E 101-43160-322 Utilities $33.55 ............................,........................... 42 & Parrish E 101-43160-322 Utilities $12.78 Parrish & 88th E 101-43160-322 Utilities $12.78 85th & Parrish E 101-43160-322 Utilities $7.77 94th & Nashua E 101-43160-322 Utilities $12.78 39 & Nashua E 101-43160-322 Utilities $46.65 Country Ridge E 101-43160-322 Utilities $10.12 Flashers 39/Parrish E 101-43160-322 Utilities $7.99 39 & page E 101-43160-322 Utilities $16.93 101 & 130 Total ELK RIVER MUNICIPAL UTILITIES $664.18 UnPaidENCOMM ""........,.:..,,...........,.........,.................................... E415-43251-500 Capital Outlay (GENERAL) $41,405.28 Pay Est # 5 Total ENCOMM $41,405.28 .............:.:,,.,..,..<...........,,.,:.,.::.EVERGREEN LAND SERVICES CO:,,....................,............ ,.....,,.,.,...................................,, ,.,: w.....,. E 413-43100-390 Contracted Services $200.00 8661 ROW E 415-43251-390 Contracted Services $1,070.00 ROW Total EVERGREEN LAND SERVICES CO $1,270,00 Un aid FORTIS BENEFITS INSURANCE CO E 101-43100-130 Employer Paid Ins (GENERAL) $27.00 STD due 11-1-99 E 101-41400-130 Employer Paid Ins (GENERAL) $53.69 STD due 11-1-99 Total FORTIS BENEFITS INSURANCE CO $80.69 .:::::.,.:.,.::..,,.:::::::"w.,-.....:::.,.:",.:::::G",,.::::LENS:.:•N:::.,,..,,,.:::TRUCK.:.,r•..CENTER INC :,.,,•::::.,..�•:.,.:,:.,:. • ::::::::.:::.:v:., " H,:., Unpaid G ,�-.,,,MM " M w.:N� .,............................. E 101-43100-220 Repair/Maint Supply (GENERAL) $214.58 1981 Truck parts Total GLENS TRUCK CENTER INC $214.58 UnPaid GRIDOR CONSTR., INC. E415-43251-500 Capital Outlay (GENERAL) $140,705.00 Payment #6 Total GRIDOR CONSTR., INC. $140,705.00 ..Unpaid::::.........................................,.,.,..................................................,,,...........................................,..............::,.. HAKANSON ANDERSON ASSOC INC E 101-41560-302 Engineering Fees $993.25 Miscell Eng E 415-43251-302 Engineering Fees $3,080.00 Water Tower Const G 701-21918 Bridgeland/Luconic $75.00 Bridgeland Dev G 701-21912 PLT 99-4, D. Ullmer $2,486.33 Prairie Creek PP G 701-21915 Crimson ponds/Backes 99-7 $7,753.08 Crimson Ponds E 417-43251-302 Engineering Fees $2,475.37 78th St S & W E 415-43251-302 Engineering Fees $1,987.29 Pump House G 701-21920 JKO Holdings $1,398.38 JKO Holdings E 101-41560-302 Engineering Fees $1,052.41 Quale Ave ROW G 701-21926 Thibodeau CUP 99-17 $825.00 Fun City G 70 1-21 922 Pheasant Ridge $465.25 Pheasant Ridge E 415-43251-302 Engineering Fees $350.00 Water Tower Const E 101-41560-302 Engineering Fees $229.33 Wetlands Cons Act G 701-21914 Grenings - Miss Hills 99-6 $223.50 Grenings Miss Hills E 101-41560-302 Engineering Fees $94.88 City Map E 415-43251-302 Engineering Fees $35.00 WW Treat SS E 413-43100-302 Engineering Fees $15,954.71 Odean Ave E 415-43251-302 Engineering Fees $32,042.29 Trunk Sanit Sewer E 418-43100-302 Engineering Fees $140.00 78th Street E 416-43100-302 Engineering Fees $8,667.65 Bit Overlay Total HAKANSON ANDERSON ASSOC INC :UnPaici .:.., $80,328.72 ..>.........::..s.:......,,.,,....:....:.,-:.I.S.D. 728:::.:...........,,...:....,,.,.....:..,.,., ..............,...:....:.,,,,....:..,....,::.::....".....,......................,..:...,,......,.:....,,.:..::: ,... E 101-45100-390 Contracted Services $3,313.68 Nov & Dec 1999 CITY OF OTSEGO Wednesday, November 03, 1999 Check Detail Register Page 3 of 5 Check Amt Invoice Comment .......................... :::::.:.::::..::.::..:......................:._ :•;.•::•::•::;•::::. ;;•::::: •:::.:: •: :::._::.,:.::.::::.:.::.:::::::::::::::..:::::.,:..,,,:•.,•:::::.,.::.::<::::.,-:::. Total I.S.D. 728 $3,313.68 Unpaid -.,-:.,-.,,:.:.,,,,v. ..,,..,:.::.,,,-.,,,,-::::::..,,,•:.::.,::..,::,,:..,.::..,,. ICMA RETIREMENT TRUST .:::::.::::......................... ......... E 101-41400-121 PERA $192.31 PPE 10-16-99 G 101-21705 Other Retirement $422.39 PPE 10-16-99 Total ICMA RETIREMENT TRUST $614.70 UnPaid J -CRAFT INC E 101-43100-220 Repair/Maint Supply (GENERAL) $245.88 1994 Ford Truck Total J -CRAFT INC $245.88 :.Unpaid::...................................,............. JEFF BARTHELD .................................................................................................:..............:... E 201-45000-310 Miscellaneous $22.29 Haunted Hse supplies Total JEFF BARTHELD $22,29 ..0 n Paid :::.............................. <...:..:.v........::: J E R RY OLSO N::•..K::...,:.........,,:.,..............,w:.,,:<.,.<:,:....N,,,:�,,,,.�:,.�<,�,n,.......V....<.<:..:k.,...,.........,.�s,..,<.�.M,,........,....,�.,,..,,,.....,.,.. E 101-42410-390 Contracted Services $4,843.88 October Permits Total JERRY OLSON $4,843.88 »>«<•>:,•>:r•�»>:«..::;<-;:;«:,:f<-::«•�:«<.:,�«�.�M<.,.Y,,,<«;.;:«.:<.�:<,:::<«««�<k,,.>:.:a:,«.«<.:...�.,.««:.>n,..<,�...�,..r<..�,<n<.�,,,.«<..,.:.Y«.r..,«..<,:<:<:::r...«::..x:.w.-<:.�,«,.�««<,,,,,.-.:,.w:..:.,N:.::n.,:,.v,-.:. UnPaid LATOUR CONSTRUCTION E 418-43100-530 Improvements Other Than Bldgs $207,232.46 Pay Est #1 Total LATOUR CONSTRUCTION $207,232.46 UnPaid LONG & SONS E 101-41940-389 Cleaning Services $53.44 Tax E 101-41940-389 Cleaning Services $146.14 Supplies E 101-41940-389 Cleaning Services $306.00 Community Room E 101-41940-389 Cleaning Services $370.00 October Cleaning Total LONG & SONS $875.58 Unpaid MICHAEL DAY E 201-45000-310 Miscellaneous $324.17 Haunted Hse Supplies Total MICHAEL DAY $324.17 UnPaid N...:..,:.::. MI N N EGASCO - r .....�...............................>,,..,..,,,..........,...........,,.,,:.,,,,:. E 101-41940-322 Utilities $125.22 City Hall E 101-41950-322 Utilities $43.72 Old City Hall Total MINNEGASCO $168.94 UnPaid MINNESOTA COPY SYSTEMS E101-41400-413 Office Equipment Rental $292.98 Usage 8-25tol0-24-99 Total MINNESOTA COPY SYSTEMS $292.98 ::::.::.::..:::::::::::.,::..,:.:::::::._::::::::::::::.::.,•:::.:.::...:.::::::::::.::.::,.::::::::::::::.:::::::::::.:::.,•::::::.,::.::.::.::::,:::,,:::,:::.::,.::::,:...:� Unpaid NAPA OF ELK RIVER INC N :::. :,.�........................................... E 101-43100-220 Repair/Maint Supply (GENERAL) $180.80 Miscall parts E 101-43100-220 Repair/Maint Supply (GENERAL) $11.68 92 Ford Truck parts Total NAPA OF ELK RIVER INC $192.48 nPaid:.....................................:.:::.......,•::PITNEY BOWES:.:...:.......,........,................................................................:............................,,:N...::..:.... ......<.<,.H.»...: E 101-41400-206 Postage $515.00 Postage Total PITNEY BOWES $515.00 UnPaid PRINCIPAL FINANCIAL GROUP E 101-41400-123 Health $144.76 ADM Dental E 101-43100-123 Health $258.09 PW Dental Total :::::............................................... PRINCIPAL FINANCIAL GROUP $402.85 . Unpaid .................................:..................................�,w,,...,,...:.:�,,....-......,....,... PUBLIC EMPLOYEES RETIREMENT FD E 101-43100-121 PERA $171.16 PPE 10-16-99 E 101-41400-121 PERA $194.75 PPE 10-16-99 G 101-21704 PERA $335.52 PPE 10-16-99 Total PUBLIC EMPLOYEES RETIREMENT FD .......................... $701.43 (JnPaicJ,,....,.,««:.....,..,-.,-.RANDY'S SANITATION:::::.,,.,.,.,.,,...::.:::::.:.....,...:..:.:,.:................:..:....:..:,.,..:.:....,........,...................,.....<:...,,......,::......... CITY OF OTSEGO Wednesday, November 03, 1999 Page 4 of 5 Check Detail Register G 101-21709 Medicare $50.00 PPE 10-16-99 Total STATE CAPITAL CREDIT UNION $50.00 .............................:................ UnPaid STEPHEN CONK:•.�:::OY •ATTORNEY:::::.......,.............................:...........-:........................................:..:...:......:...:.....,..... E 101-42420-301 Legal Services $387.50 October Total STEPHEN CONROY, ATTORNEY $387.50 Unpaid SUPERIOR LAWN & SNOW E 101-41950-310 Miscellaneous $104.37 448 Old City Hall E 101 -45200-390 Contracted Services $223.65 448 Prairie Park Lawn E 101-41940-390 Contracted Services $207.67 448 City Hall Lawn E 101-45200-390 Contracted Services $121.41 448 Volley Ball Area Total SUPERIOR LAWN & SNOW $657.10Y Unpaid. ......................................»..._::., ;<USBANKU E 316-47000-602 Bond Interest $33,159.38 991MPRO Bond E 315-47000-602 Bond Interest $56,485.44 99 S&W Rev Bond E 315-47000-602 Bond Interest $109,515.00 98 S & W Rev Bond Total US BANK $199,159.82 UnPaicl US WEST COMMUNICATIONS E 201-45000-320 Telephone $36.05 Shed E 101-43100-320 Telephone $57.60 Public Works E 101-41400-320 Telephone $413.12 City Hail Total US WEST COMMUNICATIONS $506.77 UnPaid WRIGHT COUNTY AUDITOR -TREASURE E 101-42100-390 Contracted Services $10,626.88 Sheriff Patrol November Total WRIGHT COUNTY AUDITOR -TREASURE $10,626.88 1JnFaid w. WRIGHT COUNTY RECORDER E 101-41400-340 Recording Fees $19.50 Adm Split - Lindenfelser E 101-41400-340 Recording Fees $19.50 Adm Split- NNGAS E 101-41400-340 Recording Fees $19.50 Deed Restrict Linden Total WRIGHT COUNTY RECORDER $58.50 Unpaid WRIGHT-HENNEPIN CO-OP ELECTRIC E 101-43160-322 Utilities $12.51 Oday Acres E 101-41940-322 Utilities $31.22 Shed E 101-43160-322 Utilities $7.77 Country Ridge E 601-49400-322 Utilities $29.20 City Well E 101-43160-322 Utilities $201.27 Signal Light E 101-43160-322 Utilities $13.51 Ogren Light 1s E 101-43160-322 Utilities $13.51 Lin Bar E 101-43160-322 Utilities $12.51 Rolling Ridge Creek E 101-43160-322 Utilities $12.51 Meyer Addition E 101-43160-322 Utilities $12.51 Lin Bar E 101-43160-322 Utilities $12.51 Heritage Hills E 101-43160-322 Utilities $9.79 Quaday Siren E 101-43160-322 Utilities $8.95 Country Ridge E 101-43160-322 Utilities $8.95 37 & Odean east CITY OF OTSEGO Check Detail Register Wednesday, November 03, 1999 Page 5 of 5 ..............:.......:::.: ............. ....... n.................:.., •n: , .:................................................................ Check Amt Invoice _:: n:v::..........::::; Comment ......................................................... .. E 101-41940-322 Utilities ..................................... $7.77 .................................................................... City Hall Parking E 101-41940-322 Utilities $668.36 City Hall E 101-43160-322 Utilities $8.95 37 & Odean west Total WRIGHT-HENNEPIN CO-OP ELECTRIC $1,071.80 10100 BANK OF ELK RIVER 1,512,029.60