Otsego/Dayton WWTF
Site Selection Process
June 1996 Facilities Plan determines Crow River is the best alternative for discharge of
effluent
♦ WWTF is depicted in Otsego (prior to combining with Frankfurt Township)
► Centrally located to three communities (Otsego, Dayton, Frankfurt Township)
► Close proximity to Crow River and Mississippi River
► Downstream end of natural drainage area
► larger parcels available, up to 80 acres
June 1997 Site Selection Study analyzed three sites in the general location presented in the
Facilities Plan.
♦ General area depicted in Facility Plan
♦ Near the Crow River
♦ In currently undeveloped area
♦ 40 acre parcels
♦ Land along the Crow River was not selected due to limited parcel size, limits on
expandability and proximity to residential development
• Subsequent Analyses
♦ Site by site review as ordered by the City Council
♦ Mayor contacted land owners in area (no willing sellers)
♦ Focus was on land adjacent to CSAH36 to limit access road costs
♦ Land near Crow River was found to be expensive to fill (f $200,000 in additional site
preparation costs)
♦ Discharge point desired west of peninsula per conversations with MPCA
♦ Council selected site to allow for final preparation of Facility Plan
• September 1997 Facility Plan
♦ Central to the Otsego/Dayton service area
♦ Located in an undeveloped area
♦ Close proximity to Crow River and Mississippi River
♦ Less than 500 feet from Crow River
♦ Adequate area available for long-term capacity of the service area
♦ No significant constraints to site grading, landscaping, facility orientation and site
buffering
ot607.ssp
Otsego/Dayton WWTF
Site Selection Process
• June 1996 Facilities Plan determines Crow River is the best alternative for discharge of
effluent
♦ WWTF is depicted in Otsego (prior to combining with Frankfurt Township)
P. Centrally located to three communities (Otsego, Dayton, Frankfurt Township)
► Close proximity to Crow River and Mississippi River
► Downstream end of natural drainage area
► larger parcels available, up to 80 acres
i-RA,1.KFttltr r1)\'.N�;IIII'
Sanitary Sewer Study Area
Proposed Sewer System
Figure 2
4
1 rani
City Of, `Y •�`�
OY!!DO LOIN MMD!
ft"Cl41tASOtl..OMY Otseg t
i I t
mgma
WM WASTEWATER TREATMENT PLANT
tlt LIFT STATION
! FORCEMAIN
/V GRAVITY SEWER
JOINT SEWER DISTRICT BOUNDARY
OTSEGO COMPREHENSIVE LONG-RANGE PLAN
OTSEGO COMPREHENSIVE IMMEDIATE SERVICE PLAN
-- PIPE SECTIONS BUILT IN FIRST 10 YEARS
NOTE All sewer sizes not shown are less than 10"
Hassan
Township
Rogers
6100 — 0 6100 _ 12200 F..t
115,13\5(73(11\CFWFP APR 11 AYr)l ITd\
Bonestroo
J,
r LL Rosene
Anderlik &
11, Associates
1
1
1
TEMPORARY
1
SERVICE AREA
1
TO ROOERS
1
1
1
'City of
_ _ _;
Dayton
6100 — 0 6100 _ 12200 F..t
115,13\5(73(11\CFWFP APR 11 AYr)l ITd\
Bonestroo
J,
r LL Rosene
Anderlik &
11, Associates
a
0
0 ° 0000
0
0
8
0
0
fSttt� + y
0
8
INFLUEN"T--
o
1
0
wAS7EwAT
TREATMENT
FACILITY
-7)
i
W °
0 3 t
O
u ° 0 200 400
scve i, feet0
Z ° CITY OF OTSEGO
FRANC 07 TOWNSHIP
w
ALTERNATIVE 1 - AERATED POND SITE LOCATION An Rosestroo
osene
® Anderlik d
DAYTON, FRANKFORT, OTSEGO, MINN. FIGURE 4 Associates
WASTEWATER FACILITY PLAN
50301F04 JUNE 1996 COMM. 50301
WASTEWATER TREATMENT STUDY
50301F06 JUNE 1996 CCMM. 50301
Otsego/Dayton WWTF
Site Selection Process
• June 1997 Site Selection Study analyzed three sites in the general location presented in the
Facilities Plan.
♦ General area depicted in Facility Plan
♦ Near the Crow River
♦ In currently undeveloped area
♦ 40 acre parcels
♦ Land along the Crow River was not selected due to limited parcel size, limits on
expandability and proximity to residential development
"Of
SO III
SITE i
A. Parcel Data:
♦ Description: SEY4 of SEY4 of Section 35, Township 121, Range 23
♦ Owners per County Records: Fae Jacobs, Loretta Moos, Dorothy Kirkpatrick
♦ Area: 40 acres plus right-of-way for access = 2.5 acres
Total Acquisition: approximately 42.5 acres
B. Environmental
♦ Wetlands - None identified from aerial photos.
♦ Distance from center of site to nearest residential development
1700' N.W. and S.W. - Greater than a quarter mile
♦ Drainage:
Ninety percent of 40 acres drain to the northeast to a ditch. The drainage pattern is developed with the ditch being
the outflow conveyance. The pattern of drainage is functional. Availability for storage pond of runoff appears to be
good in N.E. corner of 40 acres.
♦ Public Access:
Remote 40 acres with no public access. Road would need to be built at least a '/4 mile to reach the boundary. The 40
acres are not adjacent to TH 101 or CSAH36 by at least Y2 mile.
C. Physical Issues:
♦ Topography - Rolling with some sharp changes in grade.
The topo is diverse in that the westerly 2/3 (generally about 5-12% slope) is currently being farmed as cropland. About
7-8 acres is 5-7% slope and the rest is either flat or very steep.
♦ Soils - Hayden (HI) & Glencoe (Majority of site area is Hayden)
♦ Ground Cover
25-30 acres appear from aerial photo have been grain crop fields. Other area could be pasture land.
D. Site Development Condition
♦ Access: A road would need to be built either from 65th Street south to the site and/or from the Southwest 59th Street
and Quenroe Avenue. A street from the south may be closer, however, that would access through residential property.
Access from the north would make for a long dead road from CSAH 42 to 65th Street to the site approximately 3/4
mile. 65th Street is dead -ended at TH101. R.O.W. to the site would need to be acquired.
♦ Area Available
It appears that about 8-10 acres is a developable site for a Wastewater Treatment Plant. The rest could be used as a
buffer and expansion of the facilities.
♦ Elevation
It appears that the average/mean elevation on the site area for the plant site is 915.0 with a 920.0 on the south end
and a 905.0 on the north end which is about 1.5% slope north to south.
♦ Distance to Discharge Point in Crow River
About 2500 LF from the center of site to river. Easement to place the discharge pipe will be required.
Otsego/Dayton WWTF
Site Selection Process
• Subsequent Analyses
♦ Site by site review as ordered by the City Council
♦ Mayor contacted land owners in area (no willing sellers)
♦ Focus was on land adjacent to CSAH36 to limit access road costs
♦ Land near Crow River was found to be expensive to fill (± $200,000 in additional site
preparation costs)
♦ Discharge point desired west of peninsula per conversations with MPCA
♦ Council selected site to allow for final preparation of Facility Plan
r0
pbr, pip
.0—
Q'A
it
zf�
ijI qvq;
.3:T
7
L -
IX
m -7
.3:T
7
L -
NOW
4b,
, 7�z
EM
TT
m -7
NOW
4b,
, 7�z
EM
TT
•
S C. 1 , T. 120, R.23
ALSO PART OF SEC. 12 J. 120 ,R.23
2CO l Co 0 2C0
t S _ SCALE W Fera
.. (C.S.A.H-NO-36) — N.E. T T
014200
1- -
Ponrn j{�GLj
.r6t yH of on f rior
014200
// I
12ff00
N. 1/2 SSC. 1 , T. 120, R.23
ALSO PART OF SCC. 6, T. 120 , R. 22
200 100 0 204
SCALE IN rr
I OII:OG
012401
i
I
i
41
2401 On30t
1`__I 6Zo I t
_ I 0124.04 � y a` �
-C.5.4.N.
sem_
3 012400 ori+o• ` S --
T -�^
m
i
0111
011100
011301
N. 1/2 S' -C. 17 T. 1207 R.23
ALSO PART OF SEC. 6, T. 120, R. 22
200 too 0 eco
ski IN FU -7
011300
011100
___
i[ Y QI RZ3 j SfC 31,T, QI,R.22
_-- src.G: .QO.i13
Cl13Cl �� O:I301
I �
5'
`G.
011400 /
6y
�� OmCO
-- -- - ' _- -- 3NV31 ' 37MIGNM
! EE 1—
j__, -- ■ -- - --- -----
' �._ _ _—_...�--`•-•,.-. ..i-• a : f i� •ice -y._ ,ti � � ....�.-
LJ
L1
Li
NIF-
-
LU 0
� '� ,.- '""•�. `- +ilk`*
n W tn; — -s _ i��- T' �1'I :�, ��ij':,f' T' ■ 1 :.`r-�'' �i"-� i
y ',,I �� � r7i;�. _ ' _..� '' 1" I, i i`- f`�i\■-r'"'.1��-71t�+'•.. .tel
' t � � V + • i Ai -1'. -- — I ' ' '�- Via'` . .� iti
`s?'� �! - -'': -`� - =+ ids -'I •' —a
�I LW p -J
I W - - ■ .
LIJ
7P 101. -H
IL
•w ■
,P-25-1997 17:34
r.
OF DAYTON
CITY
.a
J
J
}
X)
x
Uj
'
J
O n
�'
N
N
�
`s
j In rn
7 ;1
c
wan41.
mLn
O
� � i
I
ul
O.J•v
./ l //
Jam: .�'. �'
• j 4.:,1
I 1` '.':`r...
I I
E
z
J
CL
0
d
J
TC
w
.a
E
z
J
CL
0
d
J
TC
w
CITY OF- OTSEGO
Hakanson
1 500 0 1500
3000 Anderson
SCALE IN FEET Assoc • , I n c
0TTREAT.DWG
CITY OF OTSEGO
PRELIMINARY TREATMENT SITE LOCATION
8/12/97
EXHIBIT A
� Hakanson
1500 0 1500 3000 owl Anderson
SCALE IN FEET A s s o C., I n C.
OTTREAT.DWG
Otsego/Dayton WWTF
Site Selection Process
• September 1997 Facility Plan
♦ Central to the Otsego/Dayton service area
♦ Located in an undeveloped area
♦ Close proximity to Crow River and Mississippi River
♦ Less than 500 feet from Crow River
♦ Adequate area available for long-term capacity of the service area
♦ No significant constraints to site grading, landscaping, facility orientation and site
buffering
FROt'EIZtY LINE
( 6.7 AQP 91,E)
I
I
Ot7Ot2 ONTiZOL
t
5Cta�EN &
a It t3iJJIL171NG -R ' i
I I I
I
OXIt7ATION
PMC} tE5
� I
CONTROL & I •- -• t
�: 18
PUMP 13UILPING �
a• I
Isle
—
FINAL '
CLAPJFIEZ5
i 1
LLTIZAVIOLEt ' --
251NFECTION
I '
i
I 1
I
I
C.5AN. 36
O 50 100
Scale in feet
RECOMMENDED ALTERNATIVE ON PROPOSED SITE
DAYTON/OTSEGO, MINN. FIGURE NO. 5
C!LITIES PLAN
AiTATEt2
5LLVa VMK
5U It a
5110E -Aa
LIME
Tla�ATM;NT
Bonestroo
® Rosene
Anderlik &
Associates
z �7-
Z� NOLIva Jo AM
z 0 NOSO d Gi2i
Li
= w
r g
(RAWLINGS AVE. �p
Cry'-- H���N3ti
w
z�V)
I N
I H I
I 2
I �J
W
F-
N
r
LO
(D
W
—H�— — — --1
-3"N •3Av
"3'N
/ V 00
'3'N 3AV SN3: M `..11GH`iiP
sbrA
r