ITEM 2 E-8 School Planning1W 0 tsTe F o MINNESOTA MEMORANDUM TO: Mayor and City Council FROM: Lori Johnson, City Administrator DATE: February 26, 2015 SUBJECT: E-8 School Planning ITEM 2 According to Superintendent Bezek, ISD 728 (District) plans to have the new Otsego E-8 school open in the fall of 2017. That requires that the City plan backward from that date to ensure infrastructure is available to meet the District's construction schedule. The following infrastructure needs to be constructed: • Streets — MacIver and 85th o Storm Sewer • Watermain • Sewer lines and lift station To meet the anticipated opening date of fall 2017, construction of the improvements needs to take place in 2016. Before the City can proceed with the infrastructure project, the appropriate agreement(s) need to be in place with the District. The agreement would address funding, construction timing, dedication of required easements, and other related project items. In order to meet the preliminary schedule that staff has drafted, that agreement needs to be approved by the District in September, 2015. The Council should approve the agreement by June to give the District adequate time for review and approval of the agreement. On Monday, we will present an overview of the proposed street alignments, storm sewer requirements, sewer system design, and water connection. The City Engineer has estimated costs for the project based on the proposed design assumptions; the allocation of those costs to the District, City, and surrounding or benefitting property needs to be determined as well.