ITEM 5.3 60th ST/70th ST0 ots111.1 o MINNESOTA V DEPARTMENT INFORMATION Request for City Council Action ORIGINATING DEPARTMENT: REQUESTOR: MEETING DATE: Public Works City Engineer Wagner April 13, 2015 PRESENTER(s): REVIEWED BY: ITEM #: City Engineer Wagner City Administrator Johnson 5.3 AGENDA ITEM DETAILS RECOMMENDATION: Approve Resolution 15-19 Authorizing Hakanson Anderson to prepare a Feasibility Report regarding the Improvement of Packard Avenue from 601h St to 70th St, ARE YOU SEEKING APPROVAL OF A CONTRACT? IS A PUBLIC HEARING REQUIRED? No I No BACKGROUND/JUSTIFICATION: Packard Avenue is included in this year's Capital Improvement Project list. The street was paved in 1991. Currently it has a Pavement Condition Index of 42 and is in need of improvement. The street has transverse and longitudinal cracking, rutting and spalling. The street provides access for 15 homes and 7 properties. The street also provides a connection between CSAH 37 (paved) at the north end and 60th St (gravel) at the south end. The south end is the border with St. Michael. City staff has received phone calls regarding the condition of the street and the PCI rating places the street as one of the worst within the City thus placing it on the CIP. City staff has looked at two options. Option one is to skin patch areas of spalling and surface imperfections using Public Works staff. This will be time consuming and not correct the other issues the street has such as rutting. This option is not preferred by staff as it would be a short term fix (1 or 2 years) and the safety issue of rutting will not be corrected. Option two is to skin patch the spalling and surface imperfections, place a 1" leveling course to fill in ruts and more surface imperfections and then place a 1 Yi' wear coarse for additional strength and a smooth surface. Option 2 should provide 10 to 15 years of service. Preliminary cost estimate for the preferred option is included as an attachment. We have estimated the project to cost $160,000. Photos of Packard are also included in the attachment. SUPPORTING DOCUMENTS: X ATTACHED NONE • Location Map 0 Engineer's Opinion of Project Cost • Photos of Packard Avenue • Proposed Schedule • Resolution 2015-19 MOTION: (Please word motion as you would like it to appear in the minutes.) Motion to Approve Resolution to direct the Hakanson Anderson to complete a Feasibility Report regarding Improving Packard Avenue between 60th St and 70th St. BUDGET INFORMATION FUNDING: BUDGETED: X YES Assessments Tax Levy No ACTION TAKEN ❑ APPROVED AS REQUESTED ❑ DENIED ❑ TABLED ❑ OTHER (List changes) COMMENTS: PACKARD AVENUE STREET IMPROVEMENTS 28 2 I 33 �4 NE 70TH STREET (CSAH 37) I ----- PROJECT ------------------------------- -------------------- ----- LOCATION ----- ----LOC TION---- ------------ d 3 34 TI NE 60TH 1t Hakanson °° 600 1200 Anderson SCALE IN FEET Apr 07, 2015 — 1:54pm ..1hm K:\.,d_eng\PROJECTS\MUNICIPAL\OT392 2015\dwg\AN392 2015 TITLE.dwg Engineers Opion of Project Cost Packard Avenue Overlay Item No. Description Estimated Quantity Unit Price Extended 1 Mobilization LS 1 $ 3,000.00 $ 3,000.00 2 Type LV4 leveling course Mixture (B) Ton 800 $ 67.50 $ 54,000.00 3 Type LV4 wearing course Mixture (B) Ton 1200 $ 65.00 $ 78,000.00 4 CL 5 Aggregate Base (driveways) Ton 30 $ 12.50 $ 375.00 5 CL 2 Aggregate Shouldering Ton 140 $ 12.50 $ 1,750.00 6 Bituminous Material for Tack Coat Gallons 710 $ 2.45 $ 1,739.50 7 4" Yellow Dash (paint) LF 1060 $ 0.20 $ 212.00 8 24" White Stop Bar (paint) LF 30 $ 2.00 $ 60.00 Engineering, Inspection, Contract Admin, Contingency =15% Total $ 139,136.50 $ 20,863.50 $ 160,000.00 rf �. � _ � c _ �q I r i. IV ilk : d � � ` � � »� \ . �� \� ] . / . . ` \: � � .� I � '� �\ � 7. ��� � ! � - I �§ \\ � � ., .� 2; � � :/ � ®: �- � � � � ��/�' � . . � .�x� �� . - a. ? t . . ® . �� \� �� . . . y � : . �. � ` t « . t.(/z* . \ , _ »� \� �� �' \ 2 � � � \a ` » � �. ��!}_�_� � � . � ��� � �� � - - . &:f ' } � � �»� . �. � . :: :< � » r / ® �� . - - � � �� � . /� �_� . � �!� » - &% , « . ` ��. \% \� - \� \\� . t `���! . . .�-� �:� !22 »i � � �. � ` _ 7 .. - -�� `�».st+,: <� : � . _ 2 m� - _ t J. ter_. I 44 i� f �1 i J F i t • l e �� �� _ _ f w IL _ _ SSE , le ,. � .� s .i - j '17' _d - ���' �, � ` ' , u >< x -. c e , x � � •.IIF i' • •� r, � y � �� • � � ' _ .l a . L .,� � _ �A-� : ,'yam•-�-Y; i 1_ _ , � :r �.. � K'414E` ! i p , f i _ I,1 - I 1p JL Packard Avenue Overlay Proposed Schedule April 13 Council Request Feasibility Report April 27 Council Accepts Feasibility Report And Sets Date for Public Hearing (May 26) Advertise May 2 and May 9 Send Notices to Benefitting Property Owners prior to May 16 May 26 Hold Public Hearing Council Approves Plans and Specs and Orders Advertisement for Bids Advertise for Bids June 6, June 13 and June 20 in ERSN Advertise for Bids June 10, June 17, and June 24 in Finance and Commerce June 30 Council Award Project Construction prior to August 31 Sept 28 Hold Assessment Hearing Oct 12 Approve Assessment Roll RESOLUTION NO. 2015 -19 RESOLUTION ORDERING PREPARATION OF FEASIBILITY REPORT FOR THE IMPROVEMENT OF PACKARD AVENUE FROM 60TH STREET TO 70TH STREET WHEREAS, it is proposed to improve LaBeaux Avenue from 60th Street to 70th Street which is twenty four years old and in need of improvement, and to assess the benefited property for all or a portion of the cost of the improvement, pursuant to Minnesota Statutes, Chapter 429, NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF OTSEGO, MINNESOTA; That the proposed improvement be referred to Hakanson Anderson for study and that they are instructed to report to the council with all convenient speed advising the council in a preliminary way as to whether the proposed improvement is feasible and as to whether it should best be made as proposed or in connection with some other improvement, and the estimated cost of the improvement as recommended. Adopted by the council this 13th day of April, 2015. Motioned By: Seconded By: /_11ffIi7iR.Tii Those Opposed: Jessica Stockamp, Mayor Tami Loff, Clerk ot3920rderingFeasRpt