Loading...
ITEM 5.3 90th Street trail project0 ots1101 o MINNESOTA g DEPARTMENT INFORMATION Request for City Council Action ORIGINATING DEPARTMENT: REQUESTOR: MEETING DATE: Public Works City Engineer Wagner 4/27/15 PRESENTER(s): REVIEWED BY: ITEM #: City Engineer Wagner City Administrator Johnson 5.3 AGENDA ITEM DETAILS RECOMMENDATION: Staff recommends Revising the Sco ARE YOU SEEKING APPROVAL OF A CONTRACT? Yes BACKGROUND/JUSTIFICATION' of the project and re -quoting the 90th Street Trail Project. IS A PUBLIC HEARING REQUIRED? The 90th Street trail will connect the existing trail along Nashua Avenue to trails within Prairie Park. This will provide an off street alternative to using 90th Street for pedestrians coming from the north along Nashua Avenue and from the Meadow Creek development. This project was included in the 2015 Capital Improvement Plan (CIP). The project will also provide two high visibility push button pedestrian cross walks across 90th Street. Because the project was estimated to be below $100,000 only quotes were required. Request for Quotes were sent to 6 contractors. Quotes were received from 2 contractors April 22, 2015. The quotes received area as follows, lowest to highest. Midwest Asphalt Corporation $99,449.00 Rum River Contracting $135,051.00 The estimated cost of the project was approx. $69,500 and the amount budgeted in the CIP is $57,070. The reasoning for the large difference between the Engineers Estimate and the bid price (43% higher) cannot be attributed to any single item or group of items since the cost for nearly every item was higher than anticipated. We did receive a couple of phone calls from contractors that said they were too busy at this time of the year to take on this work. Therefore we feel that the time of the year as well as the tight schedule of the project (finished paving by June 1St) may have contributed to the few number of bids and the higher bid prices. The Council may consider extending the completion date to later in the summer. The Council may also consider removing the push button pedestrian cross walk signals from the project and instead using regular pedestrian crossing signs with painted cross walks. SUPPORTING DOCUMENTS: ❑ ATTACHED ❑ NONE • Quote tabulation POSSIBLE MOTION Please word motion as you would like it to appear in the minutes. Motion to Approve the Low Quote of $99,449.00 and award the Contract for the 9011h Street Trail Project to Midwest Asphalt Corporation. Motion to revise scope of project and re -quote the 90th Street Trail Project. Motion to Deny awarding the contract for the 90th Street Trail Project at this time. BUDGET INFORMATION FUNDING: BUDGETED: X YES 203 Park Development ci NO ACTION TAKEN ❑ APPROVED AS REQUESTED ❑ DENIED ❑ TABLED ❑ OTHER (List changes) COMMENTS: BID TABULATION (ENTER NAME OF CITY/TOWNSHIP) (Enter Name of Project) Bids opened 1:00 P.m., April 22, 2015 There were 2 bids =010 a, U S- 1 -Midwest Asphalt Corp. Rum River Contracting QUANTITY UNIT PRICE EXTENSION UNIT PRICE EXTENSION NO. ITEM DESCRIPTION 1 LS $9,500.00 $9,500.00 $9,000.00 $9,000:00 I MOBILIZATION 1 LS $2,700.00 $2,700.00 $1,500.00 $1,500.00 2 SALVAGE GRAVEL 120 CY $22.50 $2,700.00 $19.00 $2,280.00 3 SALVAGE TOPSOIL $170.00 $150.00 $300.00 2 EA $85.00 4 SALVAGE SIGN EA $450.00 $1,350.00 5350.00 $1,050.00 5 SALVAGE END SECTION 3 $125.00 $500.00 5 4 CY $45.00 $180.00 SALVAGEENDSE RIPRURB SALVAREMOVGE $380.00 $40.00 $800.00 20 LF $19.00 7 $1.50 $315.00 $ .00 $ 00.00 8 REMOVE CONCRETE PAVEMENT 210 SF $266.00 $5.00 $5 $700.00 $ 9 REMOVE BITUMINOUS PAVEMENT 140 SF $1.90 $44.00 $25.00 $200.00 10 SAWING CONCRETE PAVEMENT (FULL DEPTH) 8 LF $5.50 $5.00 $200.00 11 SAWING BITUNIINOUS PAVEMENT (FULL DEP 40 $3.00 $120.00 $3,900:00 15 T STA $160.00 $2,400.00 $260.00 12 SUBGRADEPREPARATTON BGRADEPREPA 150 CY $20.00 $3,000.00 $35.00 $5,250.00 13 S $18.50 $15,262.50 $22.00 $18,150.00 14 AGGREGATE BASE CLASS 5 825 TON $84.00 $21,000.00 $120.00 $30,000.00 15 TYPE LV WEARING COURSE MIXTURE 3,B) 250 TON $100.00 $2,000.00 16 CONCRETE CURB & GUTTER DESIGN B612 20 LF $54.00 $1,080.00 $4,200.00 140 SF $11.00 $1,540.00 $30.00 17 6" CONCRETE WALK $56.00 $1,344.00 $34.00 $816.00 18 TRUNCATED DOMES 24 SF $5,750.00 $30.00 $3,750.00 125 LF $46.00 19 15" CMP 30 LF $49.00 $1,470.00 $32.00 $960.00 20 18" CMP 3 EA $675.00 $2,025.00 $350,00 $1,050.00 21 REPLACE SALVAGED END SECTION $1,600.00 $2,000.00 $150.00 $300.00 22 15" METAL END SECTION 2 EA $1,200.00 $2,400.00 $150.00 $300.00 23 18" METAL END SECTION 2 EA $225:00 $450.00 $225.00 $450.00 24 REPLACE SALVAGED SIGN 2 EA EA $3,510.00 $1 $9,125.00 $3 25 INSTALL CROSSWALK SIGN - FLASHER TYPE 4 $440.00 $440.00 $125.00 $500.00 $500.00 26 REPLACE SALVAGED RIPRAP 4 CY $110.00 $1,700.00 $5$0.60 $500.00 27 STABILIZED CONSTRUCTION EXIT 1 E $1,7$3.00 $3.50 $1,225.00 350 LFF $3.25 $1,137.50 28 SILT FENCE 4 EA $195.00 $780.00 $0.00 $400.00 29 END SECTION SEDIMENT PROTECTION $47.00 $2,350.00 $30.00 $3 $1,500.00 30 PREMIUM TOPSOIL BORROW (LV) 50 CY $675.00 $100.00 $300.00 3 LBS $225.00 3i SEED MIXTURE 22-111 0.2 ACRE $2,300.00 $460.00 $5,000.00 $1,000.00 32 SEEDING 0.2 TON $2,300.00 $460.00 $5,000.00 $1,000.00 33 MULCH MATERIAL TYPE l .999.449.00 $135,181.00 SUMMARY OF BIDDING: Total Bid Schedule A through D BT- 1OF1 OT72413idTab.)dsBID TABULATION Midwest Asphalt Corp. Rum River Contracting $99,449.00 $135,181.00