Loading...
ITEM 2.3_attachmentReview No. 2 nl� son I—JoAnd-e-rson ENGINEERING REVIEW Commercial Lot for the City of Otsego by Hakanson Anderson Submitted to: Honorable Mayor and City Council cc: Lori Johnson, Administrator Tami Loff, City Clerk Dan Licht, City Planner Andy MacArthur, City Attorney Kwik Trip, Inc. Joseph T. Radach, P.E., Carlson McCain Reviewed by: Ronald J. Wagner, P.E. Brent M. Larson, P.E. Date: May 15, 2015 Proposed Development: Lot 1, Block 1 of Riverbend South — Kwik Trip Street Location A portion of the SE 1/4 of the SW 1/4 of Section 26, T12IN, of Property: R23W, East of Highway 101 & North of CSAH 37 Applicant: Kwik Trip, Inc. P.O. Box 2107 1626 Oak Street La Crosse, WI 54602-2107 Developer: Kwik Trip, Inc. Owners of Record: Kwik Trip, Inc. Purpose: Riverbend South Addition — Kwik Trip is a proposed 7,396 gross square foot convenient store located on 8.26 acres of Block 1 of Otsego Riverbend South and Lot 1, Block 1 Otsego in the City of Otsego, Wright County, Minnesota. The proposed development will be served with municipal water, sanitary sewer, storm sewer, and public streets typical of an urban commercial setting. Jurisdictional Agencies: City of Otsego, Wright County, Minnesota Department of (but not limited to) Health, Minnesota Department of Natural Resources, Minnesota Pollution Control Agency, Wright Soil and Water Conservation District. Permits Required: NPDES, Minnesota Department of Health (water), Wright County (but not limited to) Highway Permit, and Minnesota Pollution Control Agency (sanitary sewer) TABLE OF CONTENTS INFORMATION AVAILIBLE CIVIL PLANS EXISTING CONDITIONS & REMOVALS PLAN (SP1) SITE LAYOUT PLAN (SP2 - SP2.1) GRADING & EROSION CONTROL PLAN (SP3) UTILITY PLAN (SP4 - SP4.1) STORM WATER POLLUTION PREVENTION PLAN (SWPPP) (SP5) DETAILS (SP6 - SP8) LANDSCAPE PLAN (L1 - L2) PHOTOMETRIC SITE PLAN (E1) HYDROLOGY/S TORMWATER OTHER COMMENTS SUMMARY AND/OR RECOMMENDATION PAGE 2 S:\MunicipaRAotsego22xx\250012015\Kwik Trip\ot2500-2015 Kwik Trip RVW2.doc INFORMATION AVAILABLE Final Plans for Kwik Trip Convenience Store #162, 5/12/15 revision, by Carlson McCain Inc. Preliminary Plans for Kwik Trip Convenience Store # 162, 4 /20/15, by Carlson McCain Inc. Orijzinal Otsego River Bend South Information Final Plat for Otsego Riverbend South, Dated 4/17/15 by Loucks Associates Riverbend South Sanitary Sewer, Watermain, Storm Sewer, & Street Improvement Plans, Dated 4/17/15 by Loucks Associates Additional Information Minnesota Rules, Chapter 4410 — EAW Requirement Trunk Stormwater Facilities Study for Portions of the Otsego Creek Watershed City of Otsego Engineering Manual City of Otsego Zoning and Subdivision Ordinances National Wetland Inventory Map PAGE 3 S:\MunicipalWotsego22)cd2500\2015\Kwik Trip\ot2500-2015 Kwik Trip RVW2.doc CIVIL PLANS Existing Conditions & Removals Plan (Sheet SP1) 1) Provide a signature line for Ronald J. Wagner, City Engineer on the cover sheet. Plans will be signed upon approval. 2) 72nd Street is to be renamed as Quantrelle Avenue changing to 72nd Street at the east plat line. (All sheets) Site Plan (Sheet SP2 - SP2.1) 1) 72nd Street is to be renamed as Quantrelle Avenue changing to 72nd Street at the east plat line. (All sheets) 2) Call out the concrete valley gutter (see detail 702) at the eastern entrance. 3) There have been discussions with the developer of Riverbend South regarding expanding Outlot B to cover the entire delineated wetland and buffer area and possibly the existing watermain and sanitary sewer. This would help "clean up" the various required drainage, utility, and conservation easements required by covering the entire Outlot B with the necessary easements. 4) Per Wright County comments dated 515115 a. The entrance off of CSAH 37 shall be a right in only entrance. b. A right turn lane shall be constructed along CSAH 37 for this entrance. (Plans shall be submitted for review of the proposed turn lane.) c. At the time of construction a Right -of -Way permit is required when the above work is to be done. Grading & Erosion Control Plan (Sheet SP3) 1) City of Otsego requires articulated block (or "Flexmat" as an approved equal inmost cases) to be used instead of riprap on all public improvements. The overflow from the infiltration area shall be changed to articulated block. Utility Plan (Sheet SP4 - SP4.1) 1) Label the size and type of material of all utility stubs being used along 72nd Street/Quantrelle Avenue. 2) The storm sewer runoff from the Kwik Trip site has some unique requirements per the NPDES permit. Since the site is a proposed fueling station, some of the water is not allowed to infiltrate into the soil. The runoff from the areas where fueling is to occur must bypass all infiltration practices. We have provided both developers engineers' of Riverbend South and Kwik Trip with a sketch (see attached) of a potential option to re-route the storm sewer in the area near Outlot A to meet these requirements. The inverts and pipe sizes are subject to PAGE 4 S:\Municipal\Aotsego22xx\2500\2015\Kwik Trip\ot2500-2015 Kwik Trip RVW2.doc change and are just starting points. The storm sewer routing will continue to be coordinated between both sites. 3) We recommend placing a sanitary manhole in lieu of the cleanout at the end of the sanitary service line near the carwash. SWPP Plan (Sheet SP5) 1) Provide silt fence on the east side of the southern entrance off of CSAH 37. Details (Sheet SP6 — SP8) 1) No comments Landscape Plan (Sheet L1 — L2) 1) No comments Photometric Site Plan (Sheet EI) 1) No comments STORMWATER MANAGEMENT 1) Provide hydrology model calculations of the infiltration basin including calculations regarding the sizing and draw down times in accordance with the NPDES permit. 2) Provide storm sewer sizing calculations using the Rational Method for the internal storm sewer. A minimum time of concentration = 10 minutes and a 10 -yr, 10 -minute intensity of 5.8 in/hr should be used. OTHER COMMENTS 1) No comments. SUMMARY AND/OR RECOMMENDATION We recommend approval contingent upon the above comments being addressed. PAGE 5 S:\Municipal\Aotsego22xa\2500\2015\Kwik Trip\ot2500-2015 Kwik Trip RVW2.doc (s,yl �N� ` $$� •SSP �' c-roy'�, saj {gy}�j +wu z PJpl�.�o LAK gtiQt Vx NSA a$ -WA a a'��- �sa�+c�" : pg�sti- '�d' Y • ,•�'' �'''' G0.�r..vj wt �� jL�J' J �l.v♦ �87.�$ rct IHV 1 a$y�t ��p�' L ..r.. ^*�-,..ate-z-.-_w•-.".:': tT.yl�r�"•;� .�' �* �: �s�s..r_.��. y:�►i:��� .............. -..,Q•�-:,;s• � � �-.. � ��..�..-...� � � � �� —''rs' Js•�-rte --- - i MH RI3�S9: — l �"s . / 4:: ' � ♦ �b �'1 �� � ]f � 7 S"C Milk � p1 ) - Mpp 14 d •gp�** dirt // J( � 1 F •i.YT S F f �S. Win' �."S.^ �S�t� �Ft�� Y I jf � l - , Mr�'x''t - 5 ,.ter . ■ % f �...ff i a n - + f . _..- .. ,: r+` y -,_•'_i'::: r �i�x-��'�'�� ,<?�����M'�';v'.'� _�:`:`:Yp:. .� . p=`��.`x:�'.' 4 '��-:=&_>F:Ys,:.'`:� a�se�� i t f r A lxv� X7.23 15ITUMINOUS CONCRETE CONCF PROF: EASE STO SAMITA W, U NDERGR UNOERCROi1NC UNDERGROUND 1 OVERHEr UT L ELECTRIC ELECTRIC TRA