ITEM 7.1 90th Street trailIV
O tSTe F O
MINNESOTA g
DEPARTMENT INFORMATION
Request for
City Council Action
ORIGINATING DEPARTMENT:
REQUESTOR:
MEETING DATE:
Public Works
City Engineer Wagner
June 8, 2015
PRESENTER(s):
REVIEWED BY:
ITEM #:
City Engineer Wagner
City Administrator Johnson
7.1
AGENDA ITEM DETAILS
RECOMMENDATION:
Staff recommends awarding the 90th Street Trail Project to Omann Brothers of Albertville, MN in the
amount of $61,365.
ARE YOU SEEKING APPROVAL OF A CONTRACT? IS A PUBLIC HEARING REQUIRED?
Yes No
BACKGROUND/JUSTIFICATION:
The 90th Street trail will connect the existing trail along Nashua Avenue to trails within Prairie Park. This
will provide an off street alternative to using 90th Street for pedestrians coming from the north along
Nashua Avenue and from the Meadow Creek development. This project was included in the 2015
Capital Improvement Plan (CIP). Separate from this project, two high visibility push button pedestrian
cross walks across 90th Street were approved at an earlier council meeting and are being installed by City
forces.
Because the project was estimated to be below $100,000 only quotes were required. Request for
Quotes were sent to 6 contractors. Quotes were received from 2 contractors June 2, 2015. The quotes
received area as follows, lowest to highest.
Omann Brothers $61,365.00
Midwest Asphalt Corporation $89,922.00
The amount budgeted in the CIP is $57,070 for the entire project. This included the push button
pedestrian signage.
The current low quote is approximately $30,000 less than the previous quote even when discounting the
push button pedestrian signage. The extension in the time appears to be the reason, as the low bidder
stated the previous time line did not allow them to consider the project. The low bidder is local and has
completed numerous projects in Otsego satisfactorily. Although the entire project cost is still a little
more than 50% above the CIP budgeted amount, it is staffs opinion this is a favorable bid considering
the scope of the project is more than what was initially in the CIP. Therefore we would recommend
approval.
SUPPORTING DOCUMENTS: ❑ ATTACHED ❑ NONE
• Quote tabulation
POSSIBLE MOTION
Please word motion as you would like it to appear in the minutes.
Motion to Approve the Low Quote of $61,365 and award the Contract for the 90th Street Trail Project to
Cmann Brothers of Albertville, MN.
BUDGET INFORMATION
FUNDING: BUDGETED: X YES
203 Park Development o NO
ACTION TAKEN
❑ APPROVED AS REQUESTED ❑ DENIED ❑ TABLED ❑ OTHER (List changes)
COMMENTS:
QUOTE TABULATION
CITY OF OTSEGO
90th Street Trail
Quotes opened 1:00 p.m., Tuesday, June 2, 2015.
There were 2 quotes received, as shown herein.
Omann Brothers Paving, Inc.
Midwest Asphalt Corporation
ITEM .
NO.
ITEM DESCRIPTION
ESTIMATED QUANTITY
UNIT PRICE
EXTENSION
UNIT PRICE
EXTENSION
1
MOBILIZATION
1
LS
$2 500.90
32.600.00
$10.000.001
$10 000.00
2
SALVAGE GRAVEL
1
LS
$1 000.00
$1 000.00
$3 600.00
$3 600.00
3
SALVAGE TOPSOIL
120
CY
$16.00
$1,800.00
$30,00
$3,600.00
4
SALVAGE SIGN
2
EA
$40.00
$80.00
$85.00
$170.00
b
ISALVAGE END SECTION
3
EA
$100.00
$300.00
$450.00
$1 350.00
6
SALVAGE RIPRAP
4
CY
$40.00
$160.00
$45.00
$160.00
7
REMOVE CURB
20
LF
$20.00
$400.00
$16.00
$300.00
8
REMOVE CONCRETE PAVEMENT
210
SF
$1.60
$315.00
$2.00
$420.00
9
REMOVE BITUMINOUS PAVEMENT
140
SF
$1.00
$140.00
$2.00
$280.00
10
SAWING CONCRETE PAVEMENT FULL DEPTH
8
LF
$5.00
$40.00
$6.00
$48.00
11
SAWING BITUMINOUS PAVEMENT FULL DEPTH
40
LF
$3.001
$120.00
$3.00
$120.00
12
SUBGRADE PREPARATION
15
STA
$110.00
$1,650.00
$160.00
2400.00
13
COMMON BORROW L
150
CY
$10.00
$1 600.00
$20.00
$3 000.00
14
AGGREGATE BASE CLASS 5 P
825
TON
$18.00
$14 850.00
$20.00
$16 600.00
i6
TYPE LV WEARING COURSE MIXTURE 3 B
250
TON
$89.Oo
$22 260.00
$84.00
$21 000.00
16
CONCRETE CURB & GUTTER DESIGN B012
20
LF
$46.00
$900.00
$64.00
$1 000.00
17
6" CONCRETE WALK
140
SF
$13.011
$1,820.00
$11.00
$1 540.00
18
TRUNCATED DOMES
24
SF
$55.00
$1 320.00
$56.00
$1 344.00
19
16" CMP
125
LF
20.00
$2 600.00
$40.01)
$6,750.00
20
18" CMP
30
LF
$25.00
$760.00
$49.00
$1 470.00
21
REPLACE SALVAGED END SECTION
3
EA
$100.001
$300.00
$675.00
$2 025.00
22
16' METAL END SECTION
2
EA
$150.00
$300.00
$1,000.00
$2 000.00
23
18" METAL END SECTION
2
EA
$176.00
$350.00
$1 200.00
$2 400.00
24
REPLACE SALVAGED SIGN
2
EA
$160.00
$3DO.00
$226.00
$460.00
26
REPLACE SALVAGED RIPRAP
4
CY
$40.00
$160.00
$110.00
$440.00
26
STABILIZED CONSTRUCTION EXIT
1
EA
1 $1 500.00
$11,600.00
$1 700.00
$1700.00
27
SILT FENCE
360
LF
$3.20
$1 120.00
$4.00
$1,400.00
28
END SECTION SEDIMENT PROTECTION
4
EA
$100.00
$400.00
$195.00
$780.00
29
PREMIUM TOPSOIL BORROW LV
50
CY
$25.00
$1 250.00
$60.00
$3 000.00
30
SEED MIXTURE 22-111
3
LBS
$30.00
$90.00
$226.00
$675.00
31
SEEDING
0
ACRE
$3,000.001
$500.00
$2,500.00
$500.00
32
MULCH MATERIAL TYPE 1
1 0
1 TON
$3 000.00
$600.00
$2 500.00
$500.00
Total Quote $61,365.00 $89.922.00
SUMMARY OF QUOTES:
Total QL10te
Omann Brothers Paving, Inc. Midwest Asphalt Corporation
$61,365.00 $89,922.00
OT724 quote lab.xlsxQUOTE TABULATION BT - 1 OF 1
QUOTATION FORM
To: City of Otsego
Project: 90th Street Trail, City Improvement Project No. 15-04
Proposal of; q-'V%AW. t 9t=`T�, Nw1 N-6, 0-
(hereinafter called the "Bidder"), organized and existing under the laws of the State of
11114 and doing business as
The Bidder hereby proposes to perform all work for the construction of the above referenced Project in accordance with the attached
Construction Plans and Contract Documents. Work will be awarded on June 8, 2015. All work shall be completed by October 15, 2015.
All labor, material, equipment and other expenses required to complete this project as shown on the Construction Plans shall be considered
incidental unless otherwise noted and provided for below.
Bidder agrees to perform all the work described in the Construction Plans and Contract Documents for the following unit prices and/or lump
sums, which include sales tax and other applicable taxes and fees.
ITEM
NO.
ITEM DESCRIPTION
ESTIMATED
QUANTITY
UNIT PRICE
EXTENSION
I
MOBILIZATION
1
LS
S700--'
2 5-00- sr;•
2
SALVAGE GRAVEL
1
LS
000 .
3
SALVAGE TOPSOIL
120
CY
/ 5.. ✓'`-y
j `3 vJ. ��
4
SALVAGE SIGN
2
EA
5
SALVAGE END SECTION
3
EA
I(jp+uJU•
d7
6
SALVAGE RIPRAP
4
CY
O.,
/Gur •'�
7
REMOVE CURB
20
LF
Q0r 1'`
f/Gti: V 0
8
REMOVE CONCRETE PAVEMENT
210
SF
% �
3 / 5 ` f
9
REMOVE BITUMINOUS PAVEMENT
140
SF
/I/O " v!J
10
SAWING CONCRETE PAVEMENT FULL DEPTH)
S
LF
+ rsu
ye), V"
I I
SAWING BITUMINOUS PAVEMENT(FULL DEPTH)
40
LF
Mko , vJ
12
SUBGRADE PREPARATION
15
STA
Su .. --;,
13
COMMON BORROW LV
150
CY
ll�lr:J'J
/ (j„ CJ'4
14
AGGREGATE BASE CLASS 5 (P)
825
TONr
�jE1.>
f.. ✓i°
15
TYPE LV WEARING COURSE MIXTURE 3,B
250
TON
'
J ), J-!;lJ..0`J
16
CONCRETE CURB & GUTTER DESIGN B612
20
LF
'i7/ +`f �
900.09
17
6" CONCRETE WALK
140
SF
kgac>•Zo
18
TRUNCATED DOMES
24
SF
j 3' ; r�
19
15" CMP
125
LF
av
20
18" CMP
30
LF
S ray
75 0-
21
REPLACE SALVAGED END SECTION
3
EA
*3oc7,
22
15" METAL END SECTION
2
EA
jS Vr:/'
3c;D..���
23
18" METAL END SECTION
2
EA
24
REPLACE SALVAGED SIGN
2
EA
S v :w
:JU •' °'�'
25
REPLACE SALVAGED RIPRAP
4
CY
26
ISTABILIZED CONSTRUCTION EXIT
1
EA
S- '�
/, 5 ��'•' `x"'
QF-1 00300
ITEM
NO.
ITEM DESCRIPTION
ESTIMATED
QUANTITY
UNIT PRICE
EXTENSION
27
SILT FENCE
350
LF
%1
28
END SECTION SEDIMENT PROTECTION
9
EA
yf��
29
PREMIUM TOPSOIL BORROW (LV)
50
CY
30
SEED MIXTURE 22-111
3
LBS
31
SEEDING
0.2
ACRE
3000,1
32
MULCH MATERIAL TYPE 1
0.2
TON
3' 0001 x>
an
Total Quotation
Respectfully submitted:
Signature
Attest: _Title
Address
Date
QF-2 00300
QUOTATION FORM
To: Clty of Otsego
Project: 90th Street(( Trail, City Improvement Project No. 15.04
Proposal of; _�/iAIAhG A�r�1,.,1- Cori-,,o6c,;&—
(hereinafter called the "Bidder"), organized and existing under -the laws ofthe State of
—41, and doing business as
The Bidder hereby proposes to perform all work for the construction of the above referenced Project In accordance with the attached
Construction Plans. and Contract Documents, Work will be awarded on June 8, 2015. All work shall be completed by October 15, 2015,
All labor, material, equipment and other expenses required to complete this project as shown on the Construction Plans shall be considered
Incidental unless otherwise noted and provided for below.
Bidder agrees to perform all the work described in the ConstructlonPlans and Contradt Documents for the following unit prices and/or lump
sums, which include sales tax and other applicable taxes and fees,
ITEM
NO.
ITEM DESCRIPTION
ESTIMATED
QUANTITY
UNIT PRICE
EXTENSION
1
MOBILIZATION
1
LS
1 t) 00. 00
100, 00
2
SALVAGE GRAVEL
I
LS
5 ' , " 5
43 5Gu.cPs
3
SALVAGE TOPSOIL
120
CY
'p, •
4
SALVAGE SIGN
2
EA
95 X)
5
SALVAGE END SECTION
3
EA
rd , 6b
50
6
SALVAGE RIPRAP
4
CY
lid
3 . Oo
7
REMOVE CURB
20
LF
W
17m, do
8
IREMOVE CONCRETE PAVEMENT
210
SF
rL ' O, C1S
9
REMOVE BITUMINOUS PAVEMENT
140
SF
(2y
.-L7 $b,
10
SAWING CONCRETE PAVEMENT. (FULL DEPTH)
8.
LF
e , GU
11
SAWING BITUMINOUS PAVEMENT (FULL DEPTH)
40
LF
�a
2d, 06
12
SUBGRADE PREPARATION
15
STA
( G , 03
'7 00. C )
13
COMMON BORROW (LV)
150.
CY
b. co
GtiG . 4fi
14
AGGREGATE BASE CLASS 5.(P).
1325
TON
Zb, Cod
ir 16. Via).00
15
TYPE LV WEARINO COURSE MIXTURE 3,13)
250
TON
ob
Zi A%i 06
16
CONCRETE CURB & GUTTER DESIGN B612
20
LF
q,a
V D, U
17
6" CONCRETE WALK
140
SF
t,
{1. .-t(b, Ob
18
TRUNCATED DOMES
24
SF
. ry 0
t
19
15" CMP .
125
LF
L („00b
20
18" CMP
30
LF
L
21
REPLACE SALVAGED END SECTION
3
EA
22
15" METAL END SECTION
.2
EA
23
18" METAL END SECTION
2
EA
L -
24
REPLACE SALVAGED SIGN
2
EA
1 �'� a
O
25
REPLACB.SALVAGEDIUPRAP
4
CY
26
STABILIZED CONSTRUCTION EXIT
1
EA
( ()5. Gri
io fX1.40
QF_1 00300
ITEM
NO.
ITEM DiESCRIPTION
ESTIMATED
QUANTITY
UNIT PRICE,
EXTENSION
27
SILT FENCE
350
LF
0 , (76
(4%b . O0
28
END SECTION SEDIMENT PROTECTION
4
EA
j lqg-.(zM
29
PREMIUM TOPSOIL BORROW (LV)
50
CY
Ob
30
SEED MIXTURE 22-111
3
LBS
5
`7S. 0
31
SEEDING
0.2
ACRE
06
500 , 60
32
MULCH MXFERIAL TYPE 1
0.2
TON
5,A) 0
jj; 5vo, C�z
Total Quotation
Respectfully submitted:
1 Signature
Attest: .; ' , Tfab
Address
C/) ti 5
Date
QF-2 00300