Loading...
ITEM 7.1 90th Street trailIV O tSTe F O MINNESOTA g DEPARTMENT INFORMATION Request for City Council Action ORIGINATING DEPARTMENT: REQUESTOR: MEETING DATE: Public Works City Engineer Wagner June 8, 2015 PRESENTER(s): REVIEWED BY: ITEM #: City Engineer Wagner City Administrator Johnson 7.1 AGENDA ITEM DETAILS RECOMMENDATION: Staff recommends awarding the 90th Street Trail Project to Omann Brothers of Albertville, MN in the amount of $61,365. ARE YOU SEEKING APPROVAL OF A CONTRACT? IS A PUBLIC HEARING REQUIRED? Yes No BACKGROUND/JUSTIFICATION: The 90th Street trail will connect the existing trail along Nashua Avenue to trails within Prairie Park. This will provide an off street alternative to using 90th Street for pedestrians coming from the north along Nashua Avenue and from the Meadow Creek development. This project was included in the 2015 Capital Improvement Plan (CIP). Separate from this project, two high visibility push button pedestrian cross walks across 90th Street were approved at an earlier council meeting and are being installed by City forces. Because the project was estimated to be below $100,000 only quotes were required. Request for Quotes were sent to 6 contractors. Quotes were received from 2 contractors June 2, 2015. The quotes received area as follows, lowest to highest. Omann Brothers $61,365.00 Midwest Asphalt Corporation $89,922.00 The amount budgeted in the CIP is $57,070 for the entire project. This included the push button pedestrian signage. The current low quote is approximately $30,000 less than the previous quote even when discounting the push button pedestrian signage. The extension in the time appears to be the reason, as the low bidder stated the previous time line did not allow them to consider the project. The low bidder is local and has completed numerous projects in Otsego satisfactorily. Although the entire project cost is still a little more than 50% above the CIP budgeted amount, it is staffs opinion this is a favorable bid considering the scope of the project is more than what was initially in the CIP. Therefore we would recommend approval. SUPPORTING DOCUMENTS: ❑ ATTACHED ❑ NONE • Quote tabulation POSSIBLE MOTION Please word motion as you would like it to appear in the minutes. Motion to Approve the Low Quote of $61,365 and award the Contract for the 90th Street Trail Project to Cmann Brothers of Albertville, MN. BUDGET INFORMATION FUNDING: BUDGETED: X YES 203 Park Development o NO ACTION TAKEN ❑ APPROVED AS REQUESTED ❑ DENIED ❑ TABLED ❑ OTHER (List changes) COMMENTS: QUOTE TABULATION CITY OF OTSEGO 90th Street Trail Quotes opened 1:00 p.m., Tuesday, June 2, 2015. There were 2 quotes received, as shown herein. Omann Brothers Paving, Inc. Midwest Asphalt Corporation ITEM . NO. ITEM DESCRIPTION ESTIMATED QUANTITY UNIT PRICE EXTENSION UNIT PRICE EXTENSION 1 MOBILIZATION 1 LS $2 500.90 32.600.00 $10.000.001 $10 000.00 2 SALVAGE GRAVEL 1 LS $1 000.00 $1 000.00 $3 600.00 $3 600.00 3 SALVAGE TOPSOIL 120 CY $16.00 $1,800.00 $30,00 $3,600.00 4 SALVAGE SIGN 2 EA $40.00 $80.00 $85.00 $170.00 b ISALVAGE END SECTION 3 EA $100.00 $300.00 $450.00 $1 350.00 6 SALVAGE RIPRAP 4 CY $40.00 $160.00 $45.00 $160.00 7 REMOVE CURB 20 LF $20.00 $400.00 $16.00 $300.00 8 REMOVE CONCRETE PAVEMENT 210 SF $1.60 $315.00 $2.00 $420.00 9 REMOVE BITUMINOUS PAVEMENT 140 SF $1.00 $140.00 $2.00 $280.00 10 SAWING CONCRETE PAVEMENT FULL DEPTH 8 LF $5.00 $40.00 $6.00 $48.00 11 SAWING BITUMINOUS PAVEMENT FULL DEPTH 40 LF $3.001 $120.00 $3.00 $120.00 12 SUBGRADE PREPARATION 15 STA $110.00 $1,650.00 $160.00 2400.00 13 COMMON BORROW L 150 CY $10.00 $1 600.00 $20.00 $3 000.00 14 AGGREGATE BASE CLASS 5 P 825 TON $18.00 $14 850.00 $20.00 $16 600.00 i6 TYPE LV WEARING COURSE MIXTURE 3 B 250 TON $89.Oo $22 260.00 $84.00 $21 000.00 16 CONCRETE CURB & GUTTER DESIGN B012 20 LF $46.00 $900.00 $64.00 $1 000.00 17 6" CONCRETE WALK 140 SF $13.011 $1,820.00 $11.00 $1 540.00 18 TRUNCATED DOMES 24 SF $55.00 $1 320.00 $56.00 $1 344.00 19 16" CMP 125 LF 20.00 $2 600.00 $40.01) $6,750.00 20 18" CMP 30 LF $25.00 $760.00 $49.00 $1 470.00 21 REPLACE SALVAGED END SECTION 3 EA $100.001 $300.00 $675.00 $2 025.00 22 16' METAL END SECTION 2 EA $150.00 $300.00 $1,000.00 $2 000.00 23 18" METAL END SECTION 2 EA $176.00 $350.00 $1 200.00 $2 400.00 24 REPLACE SALVAGED SIGN 2 EA $160.00 $3DO.00 $226.00 $460.00 26 REPLACE SALVAGED RIPRAP 4 CY $40.00 $160.00 $110.00 $440.00 26 STABILIZED CONSTRUCTION EXIT 1 EA 1 $1 500.00 $11,600.00 $1 700.00 $1700.00 27 SILT FENCE 360 LF $3.20 $1 120.00 $4.00 $1,400.00 28 END SECTION SEDIMENT PROTECTION 4 EA $100.00 $400.00 $195.00 $780.00 29 PREMIUM TOPSOIL BORROW LV 50 CY $25.00 $1 250.00 $60.00 $3 000.00 30 SEED MIXTURE 22-111 3 LBS $30.00 $90.00 $226.00 $675.00 31 SEEDING 0 ACRE $3,000.001 $500.00 $2,500.00 $500.00 32 MULCH MATERIAL TYPE 1 1 0 1 TON $3 000.00 $600.00 $2 500.00 $500.00 Total Quote $61,365.00 $89.922.00 SUMMARY OF QUOTES: Total QL10te Omann Brothers Paving, Inc. Midwest Asphalt Corporation $61,365.00 $89,922.00 OT724 quote lab.xlsxQUOTE TABULATION BT - 1 OF 1 QUOTATION FORM To: City of Otsego Project: 90th Street Trail, City Improvement Project No. 15-04 Proposal of; q-'V%AW. t 9t=`T�, Nw1 N-6, 0- (hereinafter called the "Bidder"), organized and existing under the laws of the State of 11114 and doing business as The Bidder hereby proposes to perform all work for the construction of the above referenced Project in accordance with the attached Construction Plans and Contract Documents. Work will be awarded on June 8, 2015. All work shall be completed by October 15, 2015. All labor, material, equipment and other expenses required to complete this project as shown on the Construction Plans shall be considered incidental unless otherwise noted and provided for below. Bidder agrees to perform all the work described in the Construction Plans and Contract Documents for the following unit prices and/or lump sums, which include sales tax and other applicable taxes and fees. ITEM NO. ITEM DESCRIPTION ESTIMATED QUANTITY UNIT PRICE EXTENSION I MOBILIZATION 1 LS S700--' 2 5-00- sr;• 2 SALVAGE GRAVEL 1 LS 000 . 3 SALVAGE TOPSOIL 120 CY / 5.. ✓'`-y j `3 vJ. �� 4 SALVAGE SIGN 2 EA 5 SALVAGE END SECTION 3 EA I(jp+uJU• d7 6 SALVAGE RIPRAP 4 CY O., /Gur •'� 7 REMOVE CURB 20 LF Q0r 1'` f/Gti: V 0 8 REMOVE CONCRETE PAVEMENT 210 SF % � 3 / 5 ` f 9 REMOVE BITUMINOUS PAVEMENT 140 SF /I/O " v!J 10 SAWING CONCRETE PAVEMENT FULL DEPTH) S LF + rsu ye), V" I I SAWING BITUMINOUS PAVEMENT(FULL DEPTH) 40 LF Mko , vJ 12 SUBGRADE PREPARATION 15 STA Su .. --;, 13 COMMON BORROW LV 150 CY ll�lr:J'J / (j„ CJ'4 14 AGGREGATE BASE CLASS 5 (P) 825 TONr �jE1.> f.. ✓i° 15 TYPE LV WEARING COURSE MIXTURE 3,B 250 TON ' J ), J-!;lJ..0`J 16 CONCRETE CURB & GUTTER DESIGN B612 20 LF 'i7/ +`f � 900.09 17 6" CONCRETE WALK 140 SF kgac>•Zo 18 TRUNCATED DOMES 24 SF j 3' ; r� 19 15" CMP 125 LF av 20 18" CMP 30 LF S ray 75 0- 21 REPLACE SALVAGED END SECTION 3 EA *3oc7, 22 15" METAL END SECTION 2 EA jS Vr:/' 3c;D..��� 23 18" METAL END SECTION 2 EA 24 REPLACE SALVAGED SIGN 2 EA S v :w :JU •' °'�' 25 REPLACE SALVAGED RIPRAP 4 CY 26 ISTABILIZED CONSTRUCTION EXIT 1 EA S- '� /, 5 ��'•' `x"' QF-1 00300 ITEM NO. ITEM DESCRIPTION ESTIMATED QUANTITY UNIT PRICE EXTENSION 27 SILT FENCE 350 LF %1 28 END SECTION SEDIMENT PROTECTION 9 EA yf�� 29 PREMIUM TOPSOIL BORROW (LV) 50 CY 30 SEED MIXTURE 22-111 3 LBS 31 SEEDING 0.2 ACRE 3000,1 32 MULCH MATERIAL TYPE 1 0.2 TON 3' 0001 x> an Total Quotation Respectfully submitted: Signature Attest: _Title Address Date QF-2 00300 QUOTATION FORM To: Clty of Otsego Project: 90th Street(( Trail, City Improvement Project No. 15.04 Proposal of; _�/iAIAhG A�r�1,.,1- Cori-,,o6c,;&— (hereinafter called the "Bidder"), organized and existing under -the laws ofthe State of —41, and doing business as The Bidder hereby proposes to perform all work for the construction of the above referenced Project In accordance with the attached Construction Plans. and Contract Documents, Work will be awarded on June 8, 2015. All work shall be completed by October 15, 2015, All labor, material, equipment and other expenses required to complete this project as shown on the Construction Plans shall be considered Incidental unless otherwise noted and provided for below. Bidder agrees to perform all the work described in the ConstructlonPlans and Contradt Documents for the following unit prices and/or lump sums, which include sales tax and other applicable taxes and fees, ITEM NO. ITEM DESCRIPTION ESTIMATED QUANTITY UNIT PRICE EXTENSION 1 MOBILIZATION 1 LS 1 t) 00. 00 100, 00 2 SALVAGE GRAVEL I LS 5 ' , " 5 43 5Gu.cPs 3 SALVAGE TOPSOIL 120 CY 'p, • 4 SALVAGE SIGN 2 EA 95 X) 5 SALVAGE END SECTION 3 EA rd , 6b 50 6 SALVAGE RIPRAP 4 CY lid 3 . Oo 7 REMOVE CURB 20 LF W 17m, do 8 IREMOVE CONCRETE PAVEMENT 210 SF rL ' O, C1S 9 REMOVE BITUMINOUS PAVEMENT 140 SF (2y .-L7 $b, 10 SAWING CONCRETE PAVEMENT. (FULL DEPTH) 8. LF e , GU 11 SAWING BITUMINOUS PAVEMENT (FULL DEPTH) 40 LF �a 2d, 06 12 SUBGRADE PREPARATION 15 STA ( G , 03 '7 00. C ) 13 COMMON BORROW (LV) 150. CY b. co GtiG . 4fi 14 AGGREGATE BASE CLASS 5.(P). 1325 TON Zb, Cod ir 16. Via).00 15 TYPE LV WEARINO COURSE MIXTURE 3,13) 250 TON ob Zi A%i 06 16 CONCRETE CURB & GUTTER DESIGN B612 20 LF q,a V D, U 17 6" CONCRETE WALK 140 SF t, {1. .-t(b, Ob 18 TRUNCATED DOMES 24 SF . ry 0 t 19 15" CMP . 125 LF L („00b 20 18" CMP 30 LF L 21 REPLACE SALVAGED END SECTION 3 EA 22 15" METAL END SECTION .2 EA 23 18" METAL END SECTION 2 EA L - 24 REPLACE SALVAGED SIGN 2 EA 1 �'� a O 25 REPLACB.SALVAGEDIUPRAP 4 CY 26 STABILIZED CONSTRUCTION EXIT 1 EA ( ()5. Gri io fX1.40 QF_1 00300 ITEM NO. ITEM DiESCRIPTION ESTIMATED QUANTITY UNIT PRICE, EXTENSION 27 SILT FENCE 350 LF 0 , (76 (4%b . O0 28 END SECTION SEDIMENT PROTECTION 4 EA j lqg-.(zM 29 PREMIUM TOPSOIL BORROW (LV) 50 CY Ob 30 SEED MIXTURE 22-111 3 LBS 5 `7S. 0 31 SEEDING 0.2 ACRE 06 500 , 60 32 MULCH MXFERIAL TYPE 1 0.2 TON 5,A) 0 jj; 5vo, C�z Total Quotation Respectfully submitted: 1 Signature Attest: .; ' , Tfab Address C/) ti 5 Date QF-2 00300