Loading...
ITEM 2.1_Engineer ReportReview No. 1 H d�Anerso ■■■ n ENGINEERING REVIEW Residential Subdivision for the City of Otsego by Hakanson Anderson Submitted to: Honorable Mayor and City Council cc: Lori Johnson, Administrator Tami Loff, City Clerk Dan Licht, City Planner Andy MacArthur, City Attorney Mark Bezek, Elk River School District Superintendent Gregory M. Hein, ISD #728 Executive Director of Business Neil Tessier, P.E. SAFEngineering, PLLC Josh Grenier, AIA, Wold Architects and Engineers Reviewed by: Ronald J. Wagner, P.E. Brent M. Larson, P.E. Date: September 23, 2015 Proposed Development: Otsego E-8 School Street Location A portion of the SW'/4 of the SW'/4 of S19, T121, R23. of Property: North of 80th Street NE and West of Marlowe Avenue NE Applicant: Independent School District #728 815 Highway 10 Elk River, MN 55330 Developer: Independent School District #728 Owners of Record: Independent School District #728 Purpose: The Independent School District #728 School site is a proposed approximate 20± acre site for an E-8 school with athletic facilities within the City of Otsego, Wright County, Minnesota. The proposed development will be served with municipal water, sanitary sewer, storm sewer, and public streets typical of an urban setting. Jurisdictional Agencies: City of Otsego, Wright County, Minnesota Department of (but not limited to) Health, Minnesota Department of Natural Resources, Minnesota Pollution Control Agency, Wright Soil and Water Conservation District. Permits Required: NPDES, Minnesota Department of Health (water), and (but not limited to) Minnesota Pollution Control Agency (sanitary sewer) TABLE OF CONTENTS INFORMATION AVAILABLE PRELIMINARY PLAT TOPOGRAPHIC SURVEY/EXISTING CONDITIONS FINAL PLAT CONSTRUCTION PLANS STORMWATER MANAGEMENT OTHER CONSIDERATIONS SUMMARY AND/OR RECOMMENDATION PAGE 2 SAM unicipal\Aotsego23xx\2329\ot2329RVW 1.doc INFORMATION AVAILABLE Construction Documents for Elk River ISD #728 E-8 School, dated 9/22/2015, by SAFEngineering, PLLC and CEI Engineering Associates, Inc. Wetland Delineation Report for Elk River ISD #728 E-8 School Site, dated 7/27/20 5, by Kjolhaug Environmental Services Company, Inc City of Otsego Engineering Manual Trunk Stormwater Facilities Study for Portions of Lefebvre Watershed, March 1999 City of Otsego Zoning and Subdivision Ordinances National Wetland Inventory Map, 1991 PAGE 3 SAM unicipal\Aotsego23xx\2329\ot2329RVW 1.doc PRELIMINARY PLAT A preliminary plat is required. The following required information is missing from the submitted construction documents; a. Boundary lines of plat to include bearings, distances, curve data, and total acreage of proposed plat, clearly indicated. b. Existing zoning classifications for land in and abutting the subdivision. c. Total area and setbacks of the proposed plat shall be listed. d. Boundary lines of adjoining unsubdivided or subdivided land, identified by name and ownership within 150'. TOPOGRAPHIC SURVEY/EXISTING CONDITIONS See Preliminary Plat comments. FINAL PLAT A Final Plat is required. It may be submitted and accepted simultaneously with the preliminary plat CONSTRUCTION AND GRADING PLANS The full plan set was not reviewed in detail yet. The following are only the major comments for the plans received 9/23/15 to initiate discussions developer and engineer. Appears wetland in SE corner will be impacted by pond construction. Justification and mitigation will be necessary for TEP approval. Approval is required prior to impacting this wetland. 2. Connection and reconstruction of field catch basin along west property line is beyond property limits. Written permission from adjacent property shall be obtained. The existing structure and drain tile off of the School's property shall be covered by a drainage and utility easement. 3. A small storm pond in the SW corner of the School property will be needed to facilitate some runoff from 80th St reconstruct. The large pond in the SE corner of the School property will need to facilitate some runoff from 80th St. 4. Some minor changes in contours will be needed to accommodate outlet pipe in SW corner of site. 5. We recommend that the waterline on north side of building remain under the paved fire lane. 6. We will incorporate our 80th St design with this drawing. Some ditching and culverts shown on your plan will likely be alleviated on the north side as curb and gutter and storm sewer will be installed. PAGE 4 SAM unicipal\Aotsego23xx\2329\ot2329RVW 1.doc 7. We suggest a water main stub on the east side of the building over to Marlowe for future looping. 8. We suggest a trail along the west side of the parking lot so pedestrians can choose between crossing the parking lot entrance or crossing after the parking lot with less traffic. 9. To avoid needing to remove the lift station and forcemain from the school area and replacing the forcemain with gravity in the future we suggest the temporary lift station be located near future Maciver Avenue and that a gravity line be run from the school to the lift station instead. STORM SEWER MANAGEMENT The site shall meet all City and NPDES Permit requirements. A stormwater management report shall be submitted. 2. Storm sewer design calculations shall be submitted. OTHER CONSIDERATIONS Statement certifying the environmental condition of the site including the presence of any hazardous substance as defined in Minnesota Statutes 11513.02, Subd 8 2. Soil borings and geotechnical data with a recommended R -value for pavement design shall be provided. SUMMARY AND/OR RECOMMENDATION We recommend approval contingent upon the above comments being addressed. PAGE 5 SAM unicipal\Aotsego23xx\2329\ot2329RVW 1.doc