Loading...
ITEM 3.5 East WWTFOtsTe F O MINNESOTA DEPARTMENT INFORMATION Request for City Council Action ORGINATING DEPARTMENT: REQUESTOR: MEETING DATE: Utilities Utility Manager, Kurt October 26, 2015 Neidermeier PRESENTER(s): REVIEWED BY: ITEM #: Consent Agenda Administrator, Lori Johnson 3.5 AGENDA ITEM DETAILS RECOMMENDATION: Staff recommends approval of Electrical Installation & Maintenance CO (EIM) to replace the variable frequency drive and cabinet for the East Wastewater Treatment Facility Solids Handling Pump. Replacement was reviewed at the October 20th Public Works Subcommittee with recommendation of approval. ARE YOU SEEKING APPROVAL OF CONTRACT? IS A PUBLIC HEARING REQUIRED? No No BACKGROUNDMUSTIFICATION: A small control panel and variable frequency drive (VFD) for a Solids Handling Pump located at the East Wastewater Treatment Facility was damaged in July believed caused by water intrusion during a heavy rain event. The origin of intrusion was not identified between staff and two electrical contractors; however water was present in the base of the control box. Replacement is required as controls support the thickening process and solids transfer at the Facility. The variable frequency drive and panel will be replaced with provisions to prevent future water intrusion. The City's insurance deductible is $10,000 and will not be sought as replacement is under this value. Two quotes for replacement parts and equipment were received. A purchase order has been executed to proceed with staff recommendation of low quote proposal from Electrical Installation and Maintenance (EIM) with ABB Variable Frequency Drive and cabinet replacement for $6,400. SUPPORTING DOCUMENTS: (X) ATTACHED • Proposal MOTION: (Please word motion as you would like it to appear in the minutes.) Motion to approve the Electrical Installation & Maintenance Co. for the replacement of a Solids Handling Pump control panel cabinet and VFD replacement for $6400. BUDGET INFORMATION FUNDING: BUDGETED: (X) YES 602 — Utilities $6,400 ACTION TAKEN PROPOSAL — East WW Progressive Cavity Pump 15HP VFD Location — East Wastewater Facility, 5850 Randolph Ave, Otsego, MN Date: 10/2/15 SCOPE OF WORK: Remove existing VFD and cabinet for the 10 HP progressive cavity pump. Install new cabinet with 15 HP VFD. Reconnect existing wires where possible or replace as needed. New VFD is ABB Drive ACQ550-PC-023A-4+BO55+G305 rated for 480V and 15 HP at 23 Amps. Lump Sum $6,400.00. Notes: Due to current schedule we propose to complete this project in the winter as we have manpower available. Contact Nevin Fenstermacher with questions regarding scope of work. Contact info nevin.fenstermache r@eimcompany.us, 763-479-3744. Notes & Provisions: Contracts/Purchase Orders should be made out to AE2S Construction L-C, dba EIM.