Loading...
ITEM 1 Wasterwater System Master PlanningCity of Otsego Wastewater System Master Planning Wastewater Collection and Treatment Master Plan Assumptions: The flow split between the West WWTF and the East WWTF will be determined through an iterative evaluation of alternatives to optimize the City's wastewater treatment infrastructure Assumes that GIs of the collection system exists as a basis for determining flow splits Scope items highlighted yellow are to be led by City Engineer and/or City Planner with AE2S input/review only Note that items in italics are not required, but would help facilitate a better Baseline Planning • Baseline Planning Workshop with City Staff/Key Stakeholders • Development of Utility Planning Horizons • Land Use Review/Confirmation (East and West WWTF service areas) • Population Projections Review/Confirmation (East and West WWTF service areas) Wastewater Generation Rates Projections (flows and loads) • Regulatory review (MPCA coordination, future discharge limits projections, East and West WWTFs) • Technical Memorandum Development and Presentation WWTF Planning • Existing Conditions o Age/condition framework (desktop) based upon age of WWTFs o Determine hydraulic and load capacity of existing East and West WWTFs o Document hydraulic and load capacity of existing East and West WWTFs o Identify liquid treatment deficiencies and redundancy issues (East and West WWTFs) o Summarize previous biosolids system planning (West WWTF) o Identify biosolids system deficiencies (East WWTF) Alternatives Kick -Off Meeting Alternatives Pre -Screening o Identify up to five potential liquids treatment alternatives at each WWTF (ten total) o Identify two biosolids alternatives for each WWTF and two consolidated biosolids alternatives (six total) o Develop qualitative scoring factors for the preliminary alternatives o Conduct pre-screening of alternatives (likely a Kepner-Tregoe analysis) or combinations of liquids/biosolids alternatives to "short-list" three to four alternatives for further consideration Land Acquisition Analysis o Determine land availability and cost to support alternatives outside of the existing WWTF footprint(s). o Determine land availability and cost for additional buffer. WWTF Alternatives o Further Development of Pre -Screened Alternatives o Alternatives Evaluation (advantages/disadvantage; Otsego WWTF Planning Draft— October 21, 2015 AE2S o Alternative Cost Opinions o Alternatives review meeting • Implementation o Conclusions and Recommendations o Phasing and Implementation Schedule • Documentation o Technical Memorandum / Report o Subcommittee Presentations (three assumed) o Council Presentation Collection System Development • The Collection System task and flow split alternatives are intended to be developed concurrently with the treatment preliminary alternatives • This task assumes that "local" development collection system layouts will not be modified, but the trunkline/interceptor system would be reconfigured to optimize the split between the W WTFs • Collection and Review of Existing Data o Assumes City GIS collection system data includes required information (needs to be confirmed) o Data Coordination • Wastewater Collection System Model Development o Model Development and Mapping o Three alternatives for modifying the flow split between the east and west WWTFs • Wastewater Collection System Alternative Cost Opinions Evaluation of Collection and Treatment Alternatives • Document the matrix of collection and treatment system alternatives that form viable combinations • Evaluate combinations based upon cost and non -cost factors • Implementation o Conclusions and Recommendations o Phasing and Implementation Schedule • Documentation o Technical Memorandum / Report o Subcommittee Presentations (three assumed) o Council Presentation Otsego WWTF Planning Draft —October 21, 2015 AE2S Antirinatpd Fee Ranges (Base Scone) L: Baseline Planning Fee Range $3,000 $5,000 East and West WWTF Planning $45,000 $55,000 Collection System Planning $4,000 $8,000 Evaluation of Collection/Treatment Combinations $4,000 $10,000 Total $56,000 $78,000 Note that fee ranges are estimated based on past experience and were not developed based on detailed projections with specific staff. Additional Scope Items • Items highlighted in yellow are assumed to be primarily conducted by the City Engineer and City Planner; scope is included for collaboration and input only • Existing WWTF condition assessment (on -site, detailed) —West WWTF and East WWTF o Process, electrical, and structural o Documentation technical memorandum o Rehabilitation/replacement/reinvestment summary for larger (>$25,000) items o Budget range $30,000 - $35,000 o Would provide clarity to existing conditions if evaluating ag%onditions assumptions becomes critical to alternatives selection or for refinement of a phasing plan. • Environmental Assessment Worksheet o Likely an MPCA requirement for expansion projects, but depends on the recommendation o Recommend conducting EAW when project implementation is on the horizon because environmental work can have a "shelf life" • Detailed odor control evaluation • Tasks for additional facility planning requirements to meet State Revolving Fund criteria (this would be follow on from the Master Plan recommendation and be timed with the EAW) o Likely structured as a Facility Plan Amendment to the Master Plan to streamline the process • Wastewater Utility Financial Review (this work assumed to be conducted "in-house" by the City) o Financial Data Request and Review o CIP Development/Refinement from planning tasks outlined above o Develop 10 year financial proforma/Gap Analysis (including appropriate escalation factors): ■ Administrative Expense ■ Operations and Maintenance Expense ■ Debt Service Requirements (CIP) Otsego WWTF Planning Draft— October 21, 2015 AE2S ■ Reserve Requirements ■ Baseline Rate Revenue including growth projections ■ Other Misc. Revenues o Gap Closure Analysis ■ Rate increase scenarios o Regional Rate Comparison Analysis o Outside funding needs analysis o Action Planning o Summary Technical Memorandum and Presentation to Council Otsego WWTF Planning Draft —October 21, 2015 AE2S