Loading...
05-05-03 PCITEM 3 -1 - NORTHWEST ASSOCIATED CONSULTANTS, INC. 5775 Wayzata Boulevard, Suite 555, St. Louis Park, MN 55416 Telephone: 952.595.9636 Facsimile: 952.595.9837 planners@nacplanning.com PLANNING REPORT TO: Otsego Planning Commission FROM: John Glomski / Daniel Licht DATE: 30 April 2003 RE: Otsego —Fricke Rezoning/CUP NAC FILE: 176.02 —03.13 BACKGROUND Mr. Steve Fricke is requesting a Zoning Map amendment to rezone a 74.4 acre parcel from A-1, Agriculture Rural Service Area District to A-2, Agricultural Long Range Urban Service District. The applicant is also requesting a Conditional Use Permit (CUP) allowing a parcel to be less than the minimum 20 acre lot area requirement to allow for an administrative split of the property into two lots. The applicant is planning to utilize the newly created 6.71 acre parcel as a residential lot. The subject site is located off of N.E. 85'h street, approximately a quarter of a mile west of Kadler Avenue. This area is designated by the Comprehensive Plan as rural residential preserve and guided for rural residential uses. Exhibits: A. Site Location Map B. Site Survey Zoning. The subject site is zoned A-1 District and is currently utilized for crop production. The A-1 District requires a minimum 20 acre lot size for residential parcels. As such, the applicant is requesting to rezone the site to the A-2 District, which allows for a residential lot to be less than 20 acres subject approval of a conditional use permit. Density. The A-1 District allows for residential development at a density of one unit per 40 acres of land. The rezoning of the parcel from A-1 District to A-2 District would also enable additional development rights allowing for up to seven residential lots to be subdivided from the parent parcel at the four units per 40 acre density allowed by the Comprehensive Plan within the Rural Residential Preserve and under the performance standards of the A-2 District. Lot Size CUP. The applicant is proposing to divide a 6.7 acre parcel from the existing 74.4 acre property. The A-2 District requires a CUP to allow for a residential lot size less than 20 acres in area and less than 450 feet in width, subject to the requirements of Section 20-52-5.H of the Zoning Ordinance: 1. All other applicable requirements of Section 20-52-6 of the Zoning Ordinance are met. Comment: The subject sites will be required to meet applicable density and setback requirements of the A-2 District. 2. A concept plan utilizing all development rights allowed by Section 20-52-6.B of this Chapter is submitted and recorded with the subdivision. Comment: The subject site would be allowed seven residential units under the provisions of the Comprehensive Plan and A-2 District. The applicant should provide a concept plan utilizing all seven of these development rights. 3. Lots are to be clustered and the overall subdivision designed in such a manner so as to provide for logical future street and utility extension. Comment: Only one lot is to be divided at this time. However, a concept plan for further division of the property should reflect a clustering of available development rights. 4. No lot shall be less than one (1) acre in size or 150 feet in width. Comment: The proposed subdivision meets this requirement. Lot Area Lot Width Parcel A 67.7 845 ft. Parcel B 6.7 ac. 250 ft. 5. The maximum lot size for clustered lots in the Urban Service Reserve Area shall be two and one-half (2.5) acres. Comment: The subject site is not within the Urban Service Reserve Area, meaning this requirement is not applicable. 6. A. resubdivision plan for future division of each lot with availability of municipal sanitary sewer service is submitted and recorded on the deed for each lot. Principal and accessory buildings shall be located on each lot in conformance with all present and future setback requirements based on the resubdivision plan. 2 Comment. Parcel B should be increased to 260 feet in width, which would allow for subdivision of two tiers of urban lots from a local street right-of-way. City Staff also suggests that the north lot line of Parcel B be extended to the half -section line, creating a parcel that is approximately 10 acres in size which will "square" the area with the existing parcel to the southwest and eliminate the future need to create any more irregular shaped lots. 7. A deed restriction is placed on the parcel exercising development rights and all subdivided lots to prohibit additional subdivision unless it conforms to applicable zoning district requirements. Comment. Parcel B will be deed restricted to prohibit further subdivision. Parcel A will be deed restricted to not more than six development rights subject to the requirements of the A-2 District. 8. Each lot is capable of accommodating a private well and septic system. Comment. Provision of on-site utilities is to be made a condition of approval. Right -of -Way. The subject site has frontage to 85th Street, which is designated as a major collector on the City's transportation plan. The applicant will need to dedicate the appropriate right-of-way for 85`h Street as part of the minor subdivision. This roadway is planned as a parkway from Nashua Avenue to Kadler Avenue. The Planning Commission and City Council should comment as to whether the parkway is to be extended to the City's west boundary, which would include the segment abutting this parcel. Park Dedication. The division of the existing 74.4 acre site into two parcels creates one additional building site and triggers a park dedication requirement. The City is not seeking land in this area meaning the Park dedication requirements will be satisfied by a cash fee in lieu of land equal to $2,100. Utilities. The proposed residential use will be served by an on-site septic and well system, which are subject to review and approval of the City Building Official for residential uses. Criteria. Sections 20-3-2.F and 20-4-2.F of the Zoning Ordinance lists the following factors for the City Council and the Planning Commission to consider (but not limited to these factors) when reviewing a request for a Zoning Map amendment and conditional use permit: The proposed action's consistency with the specific policies and provisions of the official City Comprehensive Plan. 3 Comment: The Comprehensive Plan designates this area as Rural Residential Preserve, which allows for residential development at a density of 4 units per 40 acres. The proposed lot is consistent with the allowed density and intended character of the area. 2. The proposed use's compatibility with present and future land uses off the area. Comment: Low density residential use is compatible with the surrounding area, which consists of farms, farmsteads, and large lot residential use. 3. The proposed use's conformity with all performance standards contained within the Zoning Ordinance. Comment. With the approval of a CUP, allowing a lot to be under the required minimum lot area of 20 acres, the proposed use is and will be required to be consistent with the standards contained within the Zoning Ordinance, Subdivision Ordinance and Engineering Manual. 4. The proposed use's effect upon the area in which it is proposed. Comment: The proposed use will have little effect on the surrounding area. 5. The proposed use's impact upon property values of the area in which it is proposed. Comment: Although no specific study has been completed, the proposed use will have no impact on the property values of the surrounding area. 6. Traffic generation of the proposed use in relation to capabilities of streets serving the property. Comment. The proposed Zoning Map amendment and CUP will not have significant traffic impact to N.E. 85th Street even if all seven development rights are utilized. CSAH 99, to the east of the subject site, is designated as a minor arterial street by the Comprehensive Plan. 7. The proposed use's impact upon existing public services and facilities including parks, school's, streets, and utilities, and its potential to overburden the City's service capacity. Comment: There will be no impact upon the City's service abilities related to the proposed rezoning and CUP. 4 CONCLUSION The proposed rezoning of the subject site from an A-1 to an A-2 District is needed in order to allow the applicant to pursue the approval of a CUP permitting the existing 74.4 acre site to be split into two lots, one of which is to be less than the minimum 20 acre lot area requirement. The rezoning is consistent with Comprehensive Plan and the surrounding area. The CUP and minor subdivision also appear to be consistent with the Zoning Ordinance requirements, with the exception of the layout design of Parcel B. Our office recommends approval of the request to rezone the subject site from the A-1 District to the A-2 District and approval of the CUP allowing Parcel B to be less than the required 20 acre lot area subject to the conditions outlined below: Decision 1: Zoning Map Amendment A. Motion to approve a Zoning Map amendment rezoning the 74.4 acre site from the A-1 District to the A-2 District based on a finding that the request is consistent with the Comprehensive Plan. B. Motion to deny the application based on a finding that the request for rezoning from A-1 to A-2 is inconsistent with the direction of the Comprehensive Plan. C. Motion to table the application until further review. Decision 2: Conditional Use Permit A. Motion to approve a CUP allowing for a residential parcel to be less than the minimum 20 acre lot requirement based on a finding that the proposed parcel meets the requirements listed in the Zoning Ordinance, subject to the following conditions: 1. Parcel B is to be redesigned in a manner that will increase its width to 260 feet and extend the northern lot line 389 feet north to the section line to the north, thereby eliminating the need for further irregular lots. 2. A ghost plat using the six remaining development rights is to be submitted subject to review and approval of City Staff. 3. All lots are found capable of accommodating a private well and septic system, subject to approval of the City Building Official. 4. Parcel A shall be deed restricted to not more than six development rights subject to the requirements of the A-2 District. Parcel B shall be deed restricted prohibiting further subdivision unless the property is rezoned. 5 5. Park dedication requirements are to be satisfied with a cash fee in lieu of land equal to $2,100 to be paid prior to release of the minor subdivision. 6. Right-of-way is to be dedicated for 85th Street in accordance with the Transportation Plan. 7. The minor subdivision is subject to review and approval of the Zoning Administrator and recorded with Wright County. 8. Comments from other City Staff. B. Motion to deny the application based on a finding that the request does not meet the conditions for granting approval as illustrated in Section 20-52-5.H of the Zoning Ordinance. C. Motion to table the request until further review. PC. Mike Robertson Judy Hudson Andy MacArthur Ron Wagner Steve Fricke 2 NAC BASE MAP DATA PRO VDED 9 Y HakPill Anderson Assoc.,Inc. PREPARED OCTOBER 2001 NOTE: THIS MAP IS FOR PLANNING PURPOSES ONLY AND SHOULD NOT BE USED FOR EXACT MEASUREMENT. ON THE GREAT RIVER ROAD 6°.p'^�10LSfC\6xP�i0-LSIC\C dni>Is�U pr�nl>,.. _rns-pnu.,N 0a^a7S F.002 '00 adv m _m K = W N U 9 - — — — _ _ _ — _ _ — _ _ M,[{,4.6aN. — — — — _ _ M.N.0.69N � U ` 2 ^ O6'S49 _ ._ 00'OSZ _M•CC,L/.S9N LZ'94Z F m 133N15 H1SB "3N \ _ _ _ _ _ i _ — — - - - - — Q m � !0 t/1 -3'N 3N1 JO L/1 'M 3.1 JO ]N11 N1M5 3H1 •_-_-_ 1 j I 1 G V te 1 _--T-________ I Z'9er_______r- S _ N N c 8 ---f BO'OSi--- ---4L'9O2 I 1 Y v VVV I 1 y0j O C 1 r i O O LA l3- I ' � I M•{C,LI.6BN ; •`� � a v s BZ ,p <' M.Mtt.6 l z r 1 .> cj� 1 .4 Co Q)P, o. iO o y a� eg - U 5 _5 — !0 1/1 '3'N ti 'tl 'ILI '1 'ZZ '33S 3.41,99.69N 3H1 ! Z/I 'M 3N1 JO 3Ml W1 N JILL ----- 8 bio o s .`�-s n Enw 6°.p'^�10LSfC\6xP�i0-LSIC\C dni>Is�U pr�nl>,.. _rns-pnu.,N 0a^a7S F.002 '00 adv Hakanson 1 Anderson 3601 Thurston Avenue, Suite 101, Anoka, MN 55303 Assoc., Inc. Phone: 763/427-5860 Fax: 763/427-0520 MEMORANDUM To: Honorable Mayor and City Council From: Ron Wagner, PE cc: Mike Robertson, Administrator Judy Hudson, Clerk Dan Licht, NAC Andy MacArthur, Attorney Date: April 30, 2003 Re: Steve Fricke Rezoning and CUP We have reviewed the Application and have the following comment: 1. Additional right-of-way in the amount of 40' wide is needed for future construction of 85"' Street to collector type status. If the City wishes to extend the 85th Street "parkway" beyond Kadler Avenue and continue to the Monticello Township line, we recommend requiring 60' of right-of-way north of the %2 section line. Civil 'Municipal Engineering 207 G:\Municipal\WOTSEGO2000\2500\2003\ot2500fric Surveying for ITEM 3.2 - NORTHWEST ASSOCIATED CONSULTANTS, INC. 5775 Wayzata Boulevard, Suite 555, St. Louis Park, MN 55416 Telephone: 952.595.9636 Facsimile: 952.595.9837 planners@nacplanning.com PLANNING REPORT - Addendum TO: Otsego Planning Commission FROM: Daniel Licht DATE: 22 April 2003 RE: Otsego — Elk River Alano; Revised Plans NAC FILE: 176.02 — 03.11 CITY FILE: 2003 - 12 BACKGROUND The Planning Commission held a public hearing on 7 April 2003 to consider a conditional use permit request to expand the existing Elk River Alano Society building. After closing the public hearing, the Planning Commission voted to table action on the request to allow the applicant and City Staff to address concerns raised by adjacent property owners and the Planning Commission members. These issues included the following included screening of the parking lot and defining hours of operation. City Staff and the applicants met at the regular staff meeting on 17 April 2003 to discuss these issues. The applicants had taken proactive steps in outlining measures that could be implemented to address the neighbors' concerns and reviewed these with staff. Revised plans were submitted on 21 April 2003 for review by the Planning Commission at their meeting on 5 May 2003. Exhibits: A. Site Location B. Letter dated 21 April 2003 C. Revised Site Plan. ANALYSIS Floor Area. The existing building has an area of 2,736 square feet. The proposed addition to the south-southeast of the building has a floor area of 1,552 square feet. The total floor area of the building would be 4,288, or a 56.7 percent increase in size. Hours. An issue raised by the surrounding property owners regarded the hours of operation with concerns about noise and activity in the parking lot at night and for outdoor events. The applicant has indicated that all of their scheduled events end at 9:00 PM on weeknights and midnight on Saturdays. People may congregate after the event or meeting or there are people that close the building. The Society also does have several outdoor events during the year. In balancing the applicant's schedule and compatibility with surrounding residential uses, the following limitations on hours of operations are recommended: 1. All organized activities, events, or meetings shall be scheduled to end no later than 10:00 PM Sunday through Thursday. 2. All organized activities, events, or meetings shall be scheduled to end no later than 12:00 Midnight 3. All outdoor organized activities, events, or meeting shall be scheduled to end no later than 10:00 PM. 4. Exceptions to the limitations on hours of operation may be approved by the Zoning Administrator for special events or activities, provided that: A. A complete description of the event, planned activities, anticipated attendance, and the name and phone number of a responsible individual(s) to be supervising the event is submitted not less than 10 days prior to the date of the event. B. There shall be no more than six (6) exceptions to the hours of operation limits per calendar year. Screening. Another primary concern raised by the adjacent residents was noise and light from vehicles within the parking lot. To address this issue, the applicant has proposed the following measures: 1. Fence. The applicant is proposing a fence along the south lot line. This fence must be of solid construction and extend from the front line of the building to the front lot line and be at least five feet tall. Fences installed within a required front yard are typically limited to four feet tall and 75 percent open. However, Section 20-16-61 allows for "special purpose fences" differing in construction or height by conditional use permit when necessary to buffer the premises for which the fence is intended, which are applicable in this case. The fence is to be maintenance free if installed on the property line or a wood fence must be setback at least three feet to allow for maintenance. 2 2. Landscaping. The applicant is proposing installation of shrubs to form a hedge along the east property line that will be maintained at a minimum three foot height. The hedge will screen headlight glare towards residences to the east while maintaining visibility of the property from Odean Avenue. The landscaping should consist of Hedge Cotteneaster plants three feet on center, subject to City Staff review and approval. Parking. The Zoning Ordinance requires institutional uses to provide 10 parking stalls plus 1 for every 150 square feet of principal use over 2,000 square feet. This requirement equals 24 parking stalls for the proposed building. The site provides 48 parking stalls, including four disability accessible spaces, thereby exceeding the number of parking stalls required. The parking lot has an asphalt surface, but no concrete curb as required by Section 20- 21-3.H.15 of the Zoning Ordinance. Unless required for stormwater drainage purposes, no curb will be required as the proposed expansion does not trigger an expansion of the parking area. The applicant anticipates expanding the existing parking lot in the future to provide additional parking. All parking areas must be setback ten feet from a front lot line and five feet from a side or rear lot line. Expansion of the parking area would also require review by the City Engineer of any stormwater drainage issues. We recommend that any future changes to the parking areas not related to expansion of the principal building be subject only to City Staff review and approval. Existing Garage. The applicant indicated that the existing 264 square foot accessory building may be relocated to another location on the property at some time in the future. Under Section 20-19-2.A, building relocations that occur within the confines of a single parcel do not require a conditional use permit. The only condition on relocating the building would be application for a building permit and setback compliance. Criteria. Section 20-62-5.6 of the Zoning Ordinance allows for neighborhood community centers and similar quasi -public institutions to be located in the R-2 District as a conditional use. Applications for an amendment of an existing conditional use are to be evaluated based on (but not limited to) the criteria outlined in Section 20-4-2.F of the Zoning Ordinance: 1. The proposed action's consistency with the specific policies and provision of the official City Comprehensive Plan. Comment. The proposed action is consistent with the intent of the Comprehensive Plan to provide community based organizations in a manner accessible and compatible with surrounding residential areas. 2. The proposed use's compatibility with present and future land uses of the area. 3 Comment: The subject site is surrounded by the uses outlined below: There are extensive mature pine trees and vegetation at the perimeter of the subject site to buffer the existing single family uses to the north, west and south. Odean Avenue is a physical barrier that separates the subject site from the existing single family uses to the east. The applicant will construct a fence along the south lot line of the property and add landscaping along the east lot line to further screen the existing use, improving the facility's compatibility with surrounding land uses. 3. The proposed use's conformity with all performance standards contained within the Zoning Ordinance. Comment: The proposed use will be required to conform to all applicable requirements of the Zoning Ordinance. 4. The proposed use's effect upon the area in which it is proposed. Comment: The proposed use will not have a negative effect on the surrounding area. 5. The proposed use's impact upon property values of the area in which it is proposed. Comment: Although no specific study has been completed, the proposed use is not anticipated to negatively impact property values as all applicable performance standards will be met. 6. Traffic generation by the proposed use in relation to capabilities of streets serving the property. Comment: The subject site has access to Odean Avenue, which is designated as a collector street by the Comprehensive Plan. Odean Avenue was upgraded to an MSA standard in 2009 and has adequate capacity for traffic generated by the proposed use. 7. The proposed use's impact upon existing public services and facilities including parks, schools, streets, and utilities, and its potential too over burden the City's service capacity. 4 Land Use Plan Zoning Map Existing Use North LD Residential R-2 District Single Family East LD Residential R-3 District Sin le Family South LD Residential R-2 District Single Family West LD Residential R-2 District I Single Famil There are extensive mature pine trees and vegetation at the perimeter of the subject site to buffer the existing single family uses to the north, west and south. Odean Avenue is a physical barrier that separates the subject site from the existing single family uses to the east. The applicant will construct a fence along the south lot line of the property and add landscaping along the east lot line to further screen the existing use, improving the facility's compatibility with surrounding land uses. 3. The proposed use's conformity with all performance standards contained within the Zoning Ordinance. Comment: The proposed use will be required to conform to all applicable requirements of the Zoning Ordinance. 4. The proposed use's effect upon the area in which it is proposed. Comment: The proposed use will not have a negative effect on the surrounding area. 5. The proposed use's impact upon property values of the area in which it is proposed. Comment: Although no specific study has been completed, the proposed use is not anticipated to negatively impact property values as all applicable performance standards will be met. 6. Traffic generation by the proposed use in relation to capabilities of streets serving the property. Comment: The subject site has access to Odean Avenue, which is designated as a collector street by the Comprehensive Plan. Odean Avenue was upgraded to an MSA standard in 2009 and has adequate capacity for traffic generated by the proposed use. 7. The proposed use's impact upon existing public services and facilities including parks, schools, streets, and utilities, and its potential too over burden the City's service capacity. 4 Comment: The expansion of the existing use will not negatively impact the City's service capacity. CONCLUSION The proposed expansion of the Alano building is consistent with all applicable requirements of the Zoning Ordinance. Furthermore, the additional measures proposed by the applicant and those outlined by City Staff will serve to improve the compatibility of the existing use with the surrounding area. As such, our office recommends approval of the conditional use permit amendment subject to the following conditions: A. Motion to approve a CUP amendment, subject to the following conditions: 1. The expansion is constructed in conformance with the plans submitted to the City on 17 March 2003 and 21 April 2003. 2. The proposed expansion is of the same color and building material of the existing structure. 3. The hours of operation shall be subject to the following limitations: a. All organized activities, events, or meetings shall be scheduled to end no later than 10:00 PM Sunday through Thursday. b. All organized activities, events, or meetings shall be scheduled to end no later than 12:00 Midnight on Friday and Saturday. C. All outdoor organized activities, events, or meeting shall be scheduled to end no later than 10:00 PM. d. Exceptions to the limitations on hours of operation may be approved by the Zoning Administrator for special events or activities, provided that: 1. A complete description of the event, planned activities, anticipated attendance, and the name and phone number of a responsible individual(s) to be supervising the event is submitted not less than 10 days prior to the date of the event. 2. There shall be no more than six (6) exceptions to the hours of operation limits per calendar year. 4. A solid wall fence with a minimum height of five feet and maximum height of six feet shall be installed from the front line of the principal building to the front lot line along the south property line. A fence constructed of wood or other material requiring maintenance shall be setback a minimum of three (3) feet from the side property line. 5. Three to four foot tall Hedge Cottonester plants shall be installed at three feet on center in the yard between the parking lot and front lot line, subject to City Staff review and approval. 6. Future expansion of the parking area shall be subject to review and approval of City Staff for compliance with all setback requirements and stormwater drainage. 7. Any impact to the on-site septic system or drainage shall be subject to review and approval of the City Engineer. 8. Comments from other City Staff. B. Motion to deny the request based on a finding that it is inconsistent with the Comprehensive Plan and Zoning Ordinance. C. Motion to table the application. PC. Mike Robertson Judy Hudson Andy MacArthur Ron Wagner Harry Dellwo 2 ON THE GREAT RIVER ROAD ELK RIVER ALANO SOCIETY ........................................................... .......................... I ................................. ...................... ................................... ............................. .................. 9231 ODEAN AVENUE NE OTSEGO MN 55330 763-441-7589 April 21, 2003 CITY of OTSEGO PLANNING COMMISSION Re: ELK RIVER ALANO SOCIETY CUP Please find attached the Concern Resolution of the Elk River Alano Society in regard to neighborhood and City interests in the conduct and activities of the Society. The Society Building Committee formulated this resolution after consultation with and consideration of City Staff recommendations on April 17, 2003. The Society Board of Directors reviewed and accepted the Resolution on April 17 and directed its immediate distribution to the Membership. All recommendations, guidelines, and regulations outlined in the Resolution are under the direct supervision of the Board. The South property line fence project has been placed under the supervision of the Building Committee and construction will commence as soon as the required permits, contracts and funding are obtained. This resolution statement is submitted in good faith and with complete confidence that all aspects contained within will be adhered to by the Society and its membership from this time forward. Please consider this in your review of our application for a conditional use permit for the proposed building expansion project on Odean Avenue. May you have any questions, comments or concerns I am at your service. You may contact me at 763-263-6634 or 763-441-2300 ext.3511. Thank you. Sincerely K vin E. Palmer Chairman Elk River Alano Society, Inc. Building Committee cc: Ron Wagner Daniel Licht Judy Hudson Andy MacArthur EXHIBIT B ELK RIVER ALANO SOCIETY BUILDING COMMITTEE CUP APPLICATION CONCERN RESOLUTION April 17, 2003 TO: ELK RIVER ALANO BOARD of DIRECTORS CC: CITY of OTSEGO PLANNING COMMISSION PROPOSED ACTIONS TO ADDRESS ADJACENT NEIGHBOR CONCERNS I. NOISE REDUCTION a. Society will police its own Membership and guest's use of excessively loud vehicles while entering, exiting and parked at facility. b. Members and guests are reminded to limit the noise at any outside activities or gatherings to an acceptable level for a residential neighborhood. c. The proposed building expansion project will create a naturally secluded "patio" area on the West side of facility for outside activities and gatherings. The Membership is asked to use this area as much as possible when holding outside meetings and activities. II. PARKING LOT CONTROL a. A fence will be constructed on South property line from East edge of storage garage to Odean Avenue side of parking lot. The fence will be 5 to 6 feet in height and made of a maintenance -free material. This fence will serve to screen adjacent neighbors to the South from vehicle lights and noise in the Society parking lot. The construction of this fence is not contingent on the acceptance of the proposed building expansion. b. Future proposed parking lot expansion to the East to include curb, landscaping and private hedge planting. Hedge planting will be of an acceptable variety according to City of Otsego recommendations and will be maintained at a 3 to 4 foot height by the Society. The hedge planting will serve to screen parking lot noise and vehicle lights and provide a more ascetically pleasing appearance to the parking facility. c. Parking lot is to be used only during meeting hours or Society Special Functions. Any abandoned vehicles will be towed at owner's expense. Member vehicles will be allowed to remain parked there for a limited amount of time when members are carpooling in order to attend Society sponsored events or activities. d. Parking lot is to be used in a safe and lawful manner at all times. III. HOURS OF OPERATION a. Regularly scheduled squad meetings will end by 10:00 PM with Society property to be cleared by all those not attending to maintenance, cleanup or Special meetings by 10:30 PM. b. Nighttime Special Functions are to be held on Saturday or legal holidays that may land on a weekday night only and are not to extend beyond Midnight. Members may socialize and clean-up facility but should vacate property by 1:00 AM. c. Pledging members may use the facility at their own discretion but are asked to do so in small groups only and in a conscientious and responsible manner. e. Overnight campouts will be permitted on Society property on Saturday or Legal Holiday nights only in limited numbers (1 or 2 a year). These will only be held with the express permission and under the direct supervision of the Board of Directors of the Society. No excessively loud activities will be permitted outside of the facility during a campout function. IV. BURNING PIT AND BON FIRES a. Burning pit fires are to be limited to the City Ordinance specified size of three (3) foot by three (3) foot. b. There will be NO burning of garbage or Hazardous Materials. c. No fires will be allowed outside of the burning pit at any time unless the appropriate Burning Permits are obtained. d. Failure to follow this guideline WILL result in loss of burning privileges. V. MEMBERSHIP RESPONSIBILITIES a. The Elk River Alano Society is only to be used for its intended purpose as outlined in the Articles and Bylaws of the Society. Members and Guests are asked to respect the Community and the Neighborhood and to conduct themselves in a safe and responsible manner at all times. b. Any and all complaints as to the conduct of members and guests of the Society while in attendance at the facility will be investigated and acted upon by the Board of Directors. Any warranted disciplinary or legal actions will be taken by the Board to assure compliance with the laws of the State of Minnesota, Otsego City Ordinances and Society Guidelines. c. Members and Guests of the Society will be reminded on a regular basis that the Society is located in a residential neighborhood in a growing and active community. The welfare of that community, and the Society, is the responsibility of not only the residents but also the responsibility of those who frequent both for business or recreational use. • x W 3aH r.v3Uo �. ` o _ dam-. � j I Lul I CA aI i� i a ° a �a y 1 lad I I� Nj !! • �i, f;,l: ili�l Hakanson 1 Anderson 3601 Thurston Avenue, Suite 101, Anoka, MN 55303 Assoc., Inc. Phone: 763/427-5860 Fax: 763/427-0520 April 3, 2003 Mr. Mike Robertson City of Otsego 8899 Nashua Avenue NE Otsego, MN 55330 Re: Harry Dellwo Conditional Use Permit Elk River ALANO Society, Inc. Dear Mike: We have reviewed Harry Dellwo's application for a Conditional Use Permit. A 1,550 square foot addition is proposed to expand their assembly area and meeting rooms on the south side of the existing Elk River ALANO Society, Inc. facility. No major grading which would change stormwater runoff routes is shown. No additional wastewater facilities (i.e. sinks or restrooms) are proposed. Therefore, we have no engineering issues with this request and recommend Conditional Use Permit approval. If you have any questions, you may contact me at 763-427-5860. Sincerely, Hakanson Anderson Associates, Inc. Ronal J.gner, RJW:sjn cc: Judy Hudson, Clerk Dan Licht, NAC Harry Dellwo Civil d'Municipal �� Engineering Land Surveying for ° - ITEM 3_3_ NORTHWEST ASSOCIATED CONSULTANTS, INC. 5775 Wayzata Boulevard, Suite 555, St. Louis Park, MN 55416 Telephone: 952.595.9636 Facsimile: 952.595.9837 planners@nacplanning.com PLANNING REPORT -review #2 TO: Otsego Planning Commission FR: Daniel Licht RE: Otsego — Kittredge Crossing; Rezoning / Preliminary Plat REPORT DATE: 30 April 2003 APPLICATION DATE: 2 April 2003 NAC FILE: 176.02 — 03.08 BACKGROUND Darrel A. Farr Development Corporation has submitted an application for PUD development stage plan and preliminary plat approval for the first phase of Kittredge Crossing. The first phase includes approximately 580 dwelling units, 26 acres of commercial uses, and 24 acres of parks and open spaces on a total of 124.3 acres. The proposed development stage plan is implementation of the Comprehensive Plan amendment approved by the City Council on 9 December 2002 for 320 acres of land for a mixed use master planned community. City Staff met with the developer on 17 April 2003 to discuss project issues. Based on the comments of our office and the City Engineer, the applicant has revised the site illustration (Exhibit B) and preliminary plat (Exhibit E). The balance of the required plans are still generally representative of the project, but will need to be revised and submitted for review prior to subsequent PUD Development Stage or final plat applications. Exhibits: A. Site Location E. Preliminary Plat (revised) B. Site Illustrative (revised) F. Preliminary Grading & Drainage Plan C. PUD Master Guide Plan G. Preliminary Utility Plan D. Preliminary Landscape Plan H. Phasing Plan (market driven) ANALYSIS Comprehensive Plan. The Comprehensive Plan was amended to provide for the land uses generally corresponding to the proposed development plan based on the following policies: ■ Compatible uses and activities shall be concentrated and clustered into functionally related sub -units of the community. ■ Transitions between distinctly differing types of land uses shall be accomplished in an orderly fashion which does not create a negative (economic, social, or physical) impact on adjoining developments. ■ Incompatible land uses shall be properly regulated and related so that conflicts are minimized. This shall be achieved through the use of natural and man-made physical barriers (i.e., topography, drainageways, transportation routes, etc.) distances, screens, and/or proper physical orientation fo lots and buildings. ■ Wherever possible, changes in types of land use shall occur either at center or rear, mid -block points so that similar uses front the same street, or at borders of areas separated by major man-made or natural barriers. ■ The community shall be planned and developed on a unit (neighborhood) basis as determined by physical barriers and/or homogeneous land use characteristics and urban/rural development area boundaries. ■ Residential neighborhoods shall be protected from penetration by through traffic on local streets. ■ Major streets are to border and not penetrate residential neighborhoods. ■ A high quality "life cycle" residential environment shall be maintained throughout the community which emphasizes physically coordinated neighborhoods which incorporate all types, sizes and styles of dwellings. ■ Residential development shall be promoted proximate to areas targeted for economic development to provide ancillary and market support. The layout of the proposed development stage plan is generally consistent with the approved Comprehensive Plan amendment. The Comprehensive Plan amendment included the condition that the intensity of the dwelling units along the northern portion of the project be reduced by incorporating small lot single family lots in place of attached dwellings. Based on this condition, the row townhomes designated for Block 11 should likely be changed to single family lots or detached townhomes. ra Zoning. The proposed development is to be implemented under a PUD District to address the variety of uses and development standards. The PUD District provides the City greater opportunity to ensure that the development that occurs is consistent with the concept plan presented with the Comprehensive Plan amendment and to control the pace of residential to commercial development. Evaluation of the PUD District rezoning is to be based upon (but not limited to) the criteria outlined in Section 20-3-2.F of the Zoning Ordinance, which are addressed throughout this report: 1. The proposed action's consistency with the specific policies and provisions of the official City Comprehensive Plan. 2. The proposed use's compatibility with present and future land uses of the area. 3. The proposed use's conformity with all performance standards contained in the Zoning Ordinance (i.e., parking, loading, noise, etc.). 4. The proposed use's effect upon the area in which it is proposed. 5. The proposed use's impact upon property values of the area in which it is proposed. 6. Traffic generation by the proposed use in relation to the capabilities of streets serving the property. 7. The proposed use's impact upon existing public services and facilities including parks, schools, streets, and utilities and its potential to overburden the City's service capacity. The PUD District must specify allowed uses. The types of residential uses developed are to be consistent with those described by the proposed development stage plans and governed by the requirements of either the City's R-6 District or R-7 District. The areas designated for office showroom/warehouse, office, assembly/processing, or business park are to be limited to the uses allowed in the City's B -W, Business Warehouse District. The 1.5 acre site designated for retail uses may include those uses allowed in the City's B-3, General Business District. Lot requirements applicable to each of the uses must also be specified and are discussed in later paragraphs. In accordance with Section 20-9-3 of the Zoning Ordinance, all non -single family lot elements of the proposed development plan will be subject to site and building plan review as a separate PUD development stage application. EAW. A mandatory Environmental Assessment Worksheet (EAW) was required for the project based on Minnesota Rules Section 4410.4300, Sudp. 19 for a project with more than 250 dwelling units and Subp. 36 for a residential development resulting in the permanent conversion of 80 or more acres of agricultural land. An EAW was prepared by the applicant and approved by City Staff for publication in the EQB Monitor on 31 K3 March 2003 initiating a 30 -day comment period. The 30 -day comment period ends on 30 April 2003. As outlined in Section 20-38-3.D.4 of the Zoning Ordinance, the decision on the need for an Environmental Impact Statement (EIS) and its scope is to be based upon on the information gathered during the EAW process and on the comments received on the EAW. Pursuant to Minnesota Rules 4410.1700, in deciding whether a project has the potential for significant environmental effects, the following factors are to be considered: a. Type, extent and reversibility of environmental effects. b. Cumulative potential effects of related or anticipated future projects. C. The extent to which the environmental effects are subject to mitigation by ongoing public regulatory authority. d. The extent to which environmental effects can be anticipated and controlled as a result of other environmental studies undertaken by public agencies or the project proposer, or of EISs previously prepared on similar projects. The only comments received to date on the EAW were from the DNR. The comment letter did not identify any specific environmental concern with the project, but raised the issue with the potential cumulative environmental effects of this project and others within the west sanitary sewer service district. Our response to this comment is that while the pace of development proposals exceeds expectations, the extent and type of growth was anticipated and planned for as part of the Comprehensive Plan update process completed in 2001. Furthermore, the all development proposals are subject review for Comprehensive Plan consistency and conformance with applicable performance standards outlined in the City's Zoning Ordinance, Subdivision Ordinance and Engineering Manual as well as the other agency applications outlined in Paragraph 8 of the EAW. Compliance with these policies and performance standards will mitigate any potential significant environmental effects, which are not anticipated. Surrounding Land Use. The subject site is planned land uses outlined in the table below. Plan amendment process, the proposed land from intensive land uses along 70th Street tc compatibility issues are anticipated. surrounded by the following existing or As discussed during the Comprehensive uses provide an appropriate transition the Otsego Creek on the north. No Direction Land Use Plan Zoning Map Existing Use North Industrial A-1 District Agriculture East Commercial A-1 District Agriculture Rural Single Family South Albertville Industrial Light Industrial Agriculture West Kittredge Crossing A-1 District Agriculture Rural Single Family IH Access. Primary access to the development will be off of 70th Street. The two intersections are spaced approximately 850 feet apart and will need to be aligned with planned intersections to the south in Albertville. This roadway is a MNDoT right-of-way and all access points are subject to their approval and that of the City Engineer. Copies of the preliminary plat should be submitted to MNDoT in the required form for review. The preliminary plat provides two accesses to land to the west of the subject site. Only one access is provided at the north plat line due to the segment of Otsego Creek that goes from west to east north of the subject site. One future street connection has also been provided to the east, which will allow for a connection a planned intersection at CSAH 19. The preliminary plat illustrates proposed public rights-of-way. The applicant has requested use of Kittredge Parkway for the main collector street within the plat which is inconsistent with the County grid pattern. The Planning Commission and City Council may approve the use of this street name. All public or private street sections must conform to the Engineering Manual and are subject to approval of the City Engineer. Lot Area/Width. The preliminary plat specifies only a minimum lot size for the 28 single family lots, which is 9,000 square feet. The typical lot area or lot area per unit requirements that will be applied to the proposed uses are outlined below. The single family lots and commercial lots meet these requirements. Conformance of the other sites will be evaluated with each subsequent PUD Development Stage Plan application. Setbacks. The following setbacks are to be required within the PUD District, as reflected on the preliminary plat: Front Single Family or Detached Townhome Townhome Multiple Family Commercial Market Senior Minimum Rear Between Bldgs. on Private Wetlands Arterial or Lot Area or 9,000sf. 5,000Sf. 2,500sf. 1,000sf. 1.0ac. Lot Area/Unit Collector Collector Setbacks. The following setbacks are to be required within the PUD District, as reflected on the preliminary plat: Front Side Rear Between Bldgs. on Private Wetlands Arterial or Local or Major Minor Base Lot Drives Collector Collector 65 ft. 35 ft. 10 ft. 1 20 ft. 20 ft. 25 ft. 40 ft. 1. All lot lines abutting a public right-of-way shall be subject to front setback requirements. Landscaping. A generalized landscaping plan has been provided for various elements of the project. Each of the landscape "themes" is appropriate for its intended purpose. Our only comment is that Amur Maple trees can be overly invasive and should be removed from the plant list. More specific plans indicating the type, size and quantities of proposed plantings will be required for construction along public rights-of-way and as 5 part of each site development stage plan application. Additionally, a minimum of two shade trees will be required for each of the single family lots. Park Dedication. Section 21-7-18 of the Zoning Ordinance requires dedication for public park purposes. The City may accept land, a cash fee in lieu of land or a combination thereof. The residential portion of the development has a gross density of 4.7 dwelling units per acre, which requires 13 percent land dedication per Section 21-7- 18.H.1 of the Subdivision Ordinance. The commercial portion of the development requires 10 percent land dedication per Section 21-7-18.H.2 of the Subdivision Ordinance. Based on the ratio of residential and commercial land use and the density of the residential uses, the following land dedication requirement is calculated: Land Use Total Percent of % Net Land Dedication Land Site Area Net Land x Requirement Requirement Area Total Area Residential 124.3 ac. 56.5% 70.2 ac. 13% 9.1 ac Commercial 43.5% 54.1 ac. 10% 5.4 ac TOTAL 14.5 ac. The development plan includes two park parcels on either side of Kittrege Parkway. Block 7, adjacent to the wetland area at the southwest corner of the project, is 2.3 acres in size and intend as a neighborhood park with family oriented activities. Block 7 includes 4.8 acres on the north side of Kittredge Parkway as a transition from commercial to residential uses. This park would be intended to be oriented more towards active playfields. The total proposed land dedication is 7.1 acres or 49% of the required dedication. Any ponding areas or wetlands within the park parcels will not be credited towards satisfaction of land dedication requirements. The percent of land not dedicated in satisfaction of park dedication requirements will be satisfied through an equivalent percentage of the cash fee in lieu of land required by Section 21-7-18.1 of the Subdivision Ordinance at the time of final plat approval. Dedication of the park lands is to be further subject to review and approval of the Parks and Recreation Commission and the City's park design consultant. Grading Plan. A preliminary grading plan has been submitted for the proposed development. The grading plan must be revised to match the updated preliminary plat and provide a minimum 20 foot buffer and conservation easement around all delineated wetlands in accordance with Section 20-16-9.E of the Zoning Ordinance. The preliminary plat and grading plan must be revised to provide drainage and utility easements for the perimeter of all single family and commercial lots and overlaying the common base lot of the proposed detached townhouse and townhouse sites, wetlands or stormwater drainage ponds. All grading and drainage plans are subject to review and approval of the City Engineer. 0 Utility Plan. A utility plan has been submitted for the proposed development and is subject to review and approval of the City Engineer. Provision of sanitary sewer service to the subject site will require extension of trunk service lines over one-half mile from the waste water treatment plant. The applicant has petitioned for this service extension and the City Council has authorized the City Engineer to proceed with a feasibility report. The applicant will be responsible for the costs associated with extending the trunk sewer lines to the proposed development, subject to a limited reimbursement agreement should other potentially benefiting properties connect. Such an agreement is necessary to conform with the City's policies that "users pay" policy and of not requiring connection through assessment for properties not requesting service. Development Contract. The applicant will be required to enter into a development contract upon approval of a final plat following approval of the present applications. One of the conditions of the Comprehensive Plan amendment was that specific provisions for staging development of residential elements of the project in relation to commercial or industrial uses are to be incorporated as part of subsequent zoning applications. City staff has discussed limiting the amount of residential development to 70 percent of the sanitary sewer capacity allocated to this service district as part of the facility plan. This approach would be consistent with the broader application of the City's growth management policies for lands within the sanitary sewer service districts. The feasibility report allocates 180,000 gpd. of capacity for the area west of CSAH 19. Seventy percent of this capacity is 126,000 gpd. or 504 residential units at 250 gpd. per household. This approach would essentially require build out of all of the uses on the present PUD Master Guide Plan before expanding residential development to the other areas within the overall project anticipated as part of the Comprehensive Plan. As such, the following stipulations are to be incorporated in the development contract: 1. Approval of the preliminary plat shall not guarantee access to sanitary sewer service. The City shall only allocate sanitary sewer capacity to approved final plats with signed development contracts to assure the City of timely development. 2. The total sanitary sewer capacity allocated to the subject site shall not exceed 180,000 gallons per day, as determined by the City Engineer, unless approved by the City Council. 3. The total sanitary sewer capacity allocated to the subject site for residential uses shall not exceed 126,000 gallons per day, as determined by the City Engineer, unless approved by the City Council. 7 CONCLUSION The application for a Zoning Map amendment and PUD development stage plan represents implementation of the Comprehensive Plan amendment approved in December 2002 and it is furthermore generally consistent that prior approval. As such, our office recommends approval of the applications subject to the conditions below. A. Motion to approve a Zoning Map amendment rezoning the subject site to PUD District, PUD development stage plan and preliminary plat for Kittredge Crossing, subject to the following conditions: Approval of the preliminary plat shall not guarantee access to sanitary sewer service. The City shall only allocate sanitary sewer capacity to approved final plats with signed development contracts to assure the City of timely development. 2. The submitted EAW is processed in accordance with the provisions of Section 38 of the Zoning Ordinance and approval of the preliminary plat is subject to a finding by the City Council that the project has no potential for significant environmental effects. 3. All non -single family lot uses within the PUD District shall be subject to site and building plan review as a separate PUD development stage application. 4. Uses within the PUD District shall be subject to the following requirements: a. Residential Uses: Residential uses shall be consistent with those described on the proposed development stage plans in terms of general unit type (single family, townhouse, multiple family) and density, subject to the most applicable requirements of the City's R- 6 Townhouse, Quadraminium, and Low Density Multiple Family District or R-7, Residential High Density District. b. Commercial Uses: Areas designated for office showroom/warehouse, office, assembly/processing, or business park shall include those uses allowed in the City's B -W, Business Warehouse District, subject to the same performance standards. 2. Areas designated for retail uses shall include those uses allowed in the City's B-3, General Business District, subject to the same performance standards. b7 A 7 c NJ Lot Requirements: The following lot requirements shall apply within the PUD District: Setbacks. The following setbacks shall apply within the PUD District: Front Single Family Attached Townhome Multiple Family Commercial Market Senior Minimum Side Rear Bldgs. on Base Lot Lot Area or 9,000 5,000sf. 2,500sf. 1,000sf. 1.0ac. Lot Area/Unit 20 ft. 25ft. 40 ft. 1. All lot lines abutting a public right-of-way shall be subject to front setback requirements. Setbacks. The following setbacks shall apply within the PUD District: Front Between Side Rear Bldgs. on Base Lot Private Drives Wetland Arterial or Major Collector Local or Minor Collector 65 ft. 35 ft. loft. 20 ft. 20 ft. 25ft. 40 ft. 1. All lot lines abutting a public right-of-way shall be subject to front setback requirements. e. Building Height: The height of all structures shall not exceed 3 stories or 35 feet, except as specifically approved as part of a development stage plan. The uses designated for Block 11 are changed to single family lots or detached townhomes. All street names are to conform to the County grid system unless approved by the City Council. All intersections to 70th Street are subject to MNDoT approval. 8. Specific landscape plans indicating the type, size and quantities of proposed plantings will be required for construction along public rights-of- way and as part of each site development stage plan application with a minimum of two shade trees required for each of the single family lots on the preliminary plat. 9. Park dedication shall be satisfied with a combination land and a pro -rated cash fee line lieu of land to be paid at the time of final plat approval in accordance with the Subdivision Ordinance, subject to review and approval of the Parks and Recreation Commission. 10. The grading plan must be revised to reflect the current preliminary plat and provide a minimum 20 foot buffer and conservation easement around all delineated wetlands in accordance with Section 20-16-9.E of the Zoning Ordinance. 0 11. The preliminary plat must be revised to provide drainage and utility easements for the perimeter of all single family and commercial lots and overlaying the common base lot of the proposed detached townhouse and townhouse sites, wetlands, and stormwater drainage ponds. 12. The applicant shall be responsible for all costs associated with extending the trunk sewer lines to the proposed development, subject to a limited reimbursement agreement should other potentially benefiting properties connect during a specified time period. 13. All streets, grading, drainage, utilities, and easements are subject to review and approval of the City Engineer. 14. The applicant shall enter into a development contract upon approval of a final plat to include specific provisions for staging development of residential elements of the project in relation to commercial or industrial uses are to be incorporated as part of subsequent zoning applications, subject to review and approval of the City Council. 15. Comments of other City Staff. B. Motion to deny the application based on a finding that the request is inconsistent with the policies of the Comprehensive Plan and intent of the Zoning and Subdivision Ordinances. C. Motion to table. PC. Mike Robertson Judy Hudson Andy MacArthur Ron Wagner Lucinda Gardner Mike Gair David Nash 10 ON THE GREAT RIVER ROAD i atl I`yq e Y 1 s Ind j I • .. � ; m e t 1 i Mwd7JIl D, ~. aj I � �' 1 I ��j • � d I I 41 1� I Y y Yj =1 I I 5 c 4 I I ky . A 4q 1 • 3 e i atl I`yq e Y 1 s Ind j I � ; 1 i aj I � �' 1 I • � d I I 41 1� I Y y Yj =1 I I I I 11�dHakanson Anderson 3601 Thurston Avenue, Suite 101, Anoka, MN 55303 Assoc., Inc. Phone: 763/427-5860 Fax: 763/427-0520 April 3, 2003 Mr. Mike Robertson City of Otsego 8899 Nashua Avenue NE Otsego, MN 55330 Re: Harry Dellwo Conditional Use Permit Elk River ALANO Society, Inc. Dear Mike: We have reviewed Harry Dellwo's application for a Conditional Use Permit. A 1,550 square foot addition is proposed to expand their assembly area and meeting rooms on the south side of the existing Elk River ALANO Society, Inc. facility. No major grading which would change stormwater runoff routes is shown. No additional wastewater facilities (i.e. sinks or restrooms) are proposed. Therefore, we have no engineering issues with this request and recommend Conditional Use Permit approval. If you have any questions, you may contact me at 763-427-5860. Sincerely, Hakanson Anderson Associates, Inc. Ronal J. gner, RJW:sjn cc: Judy Hudson, Clerk Dan Licht, NAC Harry Dellwo Civil 6- Municipal �� Engineering Land Surveying for s - ..FRAvy� l 4��ii t r a iS4w 4 [t. e �� `$� T c MCLwnaa fnN Rma X01 CY 'b t rl�•ix - wcn•ra J? r;.Yw,Y hLl t 1�.. ri� — .... ....... .......«..... Darrel Farr xa Development Corp. F:. C� f' M 7 NimuYW.NM zo la t �c4..�,' as .. xFRO '�'P •.<4 uv za � '� r .c •Y\`. f e by �"'��, �} j t� �` F .w'3-,._=;ta . tt r 'r k iSk ys o t ,r �i1. s, r.t �r.ak x , 'yep e,• �T s3' -tail f:E; s. .c - Kittredge Crossing arr.; l aY >"` LFts I Ir �.t ' `xi -h,5._ —Tt :'4'i^ I ' '•'1r r� 'f5=ail r r�rt'rTJ k � - tlYpothelical 'Green �, k t $ITF SUNNARY Pace Illustration 1,>y� _ 4�'^F?• W .3i'..'; ;�:A.EAs ic— P c.- -, . %'h„ %(I? '•ry'•�'��§5-=- I ' irk ` ' u � � .. '� J r � � "y s.'x�• -. 1 �.` v'4'+~•(r•7,r �k i6•E'S „� A i : � .,D Y L �', IN yyIY �� ars. s.•cst ....cos un ,wr..irr - � � .. Y� F:� Yom. 7`�f j `'' 2/ � � f1 �r t�i%.dA ���.G ' t•.3:: r � :... a 4 MLT4N0.;. .y�' -Y rY 'o `� \ r r t i 2, i•c•. :>Y SS A�.t' u' ❑ .i.oas .a, wrs .In • `F.�. :a,,, a -t 0'•N `r � rel" .. � d.S•iT �. Wirws tla r/tf s•tl riti • ;•Sk'b:.I ;:r': E ti � xNa�e Y �`� �r f- Y 4 .'fi.T��x� 3�. �}`i �: a• _ 0 • rV �». il:4 wa4 O fry 'SZ,y 4 U tF _ '3.> :r: _ t arr aW9W n., .au ,er Misr J z ` Vt1�° SNht +Y t r 1�"`� T f wCR�la o I s'!¢Ye'tif?' �•` '� W OwYYr. 's � •",�" .'3 l; �� •£x,z.- — �V � .� ea. l'. dw 7L.,a — — ri .,., . � ... ...,. wcTww r i W E �y 70TH STREET N.E. EXHIBIT _.. ___ __.__ .... _.. .._.....- _.. .... — � YfM fef 110: 1,111 lae wi.�5r, q S.,er,a.. q 0..2aiioaA i1.�i. µ CDS o $ - 6 Z �s, aa � Y tt p ftltlLL 33 a ❑DaaClaa�aa0❑0❑ 1 00^a a � O,, - mz N< WOia OW N2oi N� N Oa Wei WJ a apN LLZOj� Wiq 42 N n-3Nn O2 1 20=-. 3; �O<; N � / r Z]� JOoe WOia V� � N2oi !•Y-�Ye�'^�eyOnJ•0�0•0\[SItItlYJ\�e�0mpi� M L•t tlKn - '•etC 0� - tm[ '�0 mY ap O=o� x3 30 m wW O� x00 aZaS auz2a ,Z 2"0�< oeo mteau« - YYl�']fY m.af rq BLOCK 13 C e +18 eP q BLOCK s 1• 1ph BLOCK 15 'r _• ?� )_? 2s WETLAND WETLAND c 2.4 4 is B .r s 1 • q • p f w • S 20 �r JQ� • 16 Y KAHCfR25 • BLOCK 12 a< • Is LhOCK ± 1 , Y ,. vu h ) :u ..n >• a� �sr K BLOCK 10 BLOCK 8 - o` 731d P 8yp g�C,7 8 TYPICAL LOT W/SETBACKS BLOCK^ 9 R .n �r Nor _ WETLAND 72nd sa 2q ur B PROPERTY DESCRIPTION m PARK BLOCK 7 OUTLOT A LOT TABULATION - LOCK 6 PARK a BLOCK 3 BLOCK - B�OC� a l...n m .. a - w.l a a WETLAND s 3 s+ 71St •1 a. •. • BLOCK 1. Q WETLAND 4 BLOCK 2 _ wm mti ., ].). u ri ... 'a9f✓r4.r. - PARK NOTES BLXK • Y DEVELOPMENT NOTES - .. r i o BLOCK 1 9 S a n. _ yy h Z iYr.n J ��.Y'm^'Y•u..y<u4YawJ�•Y�.fw .a i.our t4Yu BLO[K) n°n� r • rra] . rw •w.•r n a r.ru .•,Yc.u• .^s •fu _ v 3 ryas wnm uau wum�• 70TH STREET N.E. EXHI i.•.rnq pemnq . inw.^q FRA McisaM irsat Roos 14saciws. Me. r ural A Farr Irelop(mnl Cap. aaswt r M kedge Croalnq Yf. oa Met, eliminary Plat .nN rr .ap^ mr.i Y ef•Ira BIT E .Mea: IIID W -2a) "... i. 0, Ai CC zq; .s = jci1. '• �i � co i 8 Y� z d 9ee,a vo\b•v\tiu,ar�\Iva�.v,\:y va3sn - cru -coot 'io ,er - x W e III j ILII II II rs- a z N I 1�68Aa .';, i� 7 i g?19 i gpaa3xi� !i� �IElla a i�gg � L _ 9ee,a vo\b•v\tiu,ar�\Iva�.v,\:y va3sn - cru -coot 'io ,er BLOCK I} FRA LOTS O. L -0 MCCanL foal DRRs CARM/Nf LAW -_-- _ 11csRtfaln, NE. �` BLOCK 8 � • .l wtruno LOT I __..___. .'-..• br m.....,. r , BLOCK la PHASE_ ` - i LOT i DRRtIA Farr Development Corp. 9 BLOCK 5 '°Dw BLOCK E s j BL CK I6 R 1 BLOCK 9 LOT I 'Q Cf. C/RCLf 'D LOTS BLOCK a CRIM5ON s 2 l,i our tot A n LOT 2 s 2 %= o el CK n �° Kittredge Crossing I 1 r 7 ] V ou s Ye i J 13 N `� �'• LAVCNOfR CROSS/NG PuaUC Row W R BLOCK a i Pp LOT I %r a Phasing Plan u (wrw earn) r BLOCK 15 A 2 Lor 1 P o�fq ms HO . i DEVELOPMENT SFQUFNCF BLOCK 3 xra '+•+ nn sow .w' • mr wb "' LOT 1 .r..x r a• - -- ob;. O.L.-E •"' �\ KI rTRIOGE PARK •on • son l . + Y.«. PHASE 3 BLOCK to PHAS 4-8LOT I M•x:�.. �--y wEtL-otRE00E `.OVERM R, al . i al . w,• I • R.." j a x Ron . You w .RI' ffRRA COfIA UNf Y041+ u" i wEtURD 1 BLOCK !2 C LOT I! r • a 2 ` i W BLOCK IBLOCK I n You Ir .RI LOT 2 LOT 3 you '! 10.L.-A n..Yu rens BLOCK 12 - _. _`_ - e i j PHASE 4-8 ga: LOT 1 - - '- - - T BLOCK 1 LOT 1 1i I _____________________________________ --`__-__._____ -_________ 7OrN STNEET N.E--------------------------------------------------------- 'qu==� -__ - EXHIBIT H YEn Eaf ae. 111!1 .RD Review No. 2 ENGINEERING REVIEW Hakanson Commercial and Anderson Residential Subdivision Assoc., Inc. for the City of Otsego by Hakanson Anderson Associates, Inc. Submitted to: Honorable Mayor and City Council cc: Mike Robertson, Administrator Judy Hudson, City Clerk, Dan Licht, City Planner Andy MacArthur, City Attorney Lucinda Gardner, Darrel A. Farr Development Corp. Dave Nash, PE, McCombs Frank Roos Assoc., Inc. Reviewed by: Ronald J. Wagner, P.E. Jeff Elliott, PE Date: April 28, 2003 Proposed Development: Kittredge Crossing Street Location of Property: A portion of the south Y2 of Section 26, T121 N, R24W, 124.3 acres, north of 70th Street NE, west of LeBeaux Avenue NE, and east of Kadler Avenue NE. Applicant: Lucinda Gardner Darrel A. Farr Development Corporation 3025 Harbor Lane, Suite 317 Plymouth, MN 55447 (763) 553-9972 Developer: Darrel A. Farr Development Corporation Owners of Record: Darrel A. Farr Development Corporation Purpose: Kittredge Crossing is a proposed 16 block commercial and residential development on 124.3 acres in the City of Otsego, Wright County, Minnesota. The proposed development will be served with municipal water, sanitary sewer, storm sewer, and public streets typical of an urban setting. Jurisdictional Agencies: (but not limited to): City of Otsego, Wright County, Minnesota Department of Natural Resources, Minnesota Pollution Control Agency, Wright Soil and Water Conservation District. Permits Required (but not limited to):NPDES \\Ha01\Shared Docs\Municipal\AOTSEGO2000\2261\ot2261REV2.doc TABLE OF CONTENTS INFORMATION AVAILABLE PRELIMINARY PLAT STREETS TRAFFIC/ACCESS ISSUES WETLANDS SURFACE WATER MANAGEMENT ENVIRONMENTAL SANITARY SEWER COLLECTION SYSTEM WATER DISTRIBUTION SYSTEM OTHER CONSIDERATIONS SUMMARY AND/OR RECOMMENDATION \\Ha01\Shared Docs\Munici pa MOTS E G02 000\22 61 \ot2261 REV2.doc INFORMATION AVAILABLE Existing Conditions and Boundary, 4/1/03, by McCombs Frank Roos Associates, Inc. Preliminary Plat, 4/1/03, by McCombs Frank Roos Associates, Inc. P.U.D. Master Guide Plan, 4/1/03, by McCombs Frank Roos Associates, Inc. Preliminary Grading and Drainage Plan, 3/1/03, by McCombs Frank Roos Associates, Inc. Preliminary Utility Plan, 3/1/03, by McCombs Frank Roos Associates, Inc. Preliminary Landscape Plan, 4/1/03, by McCombs Frank Roos Associates, Inc. Phasing Plan, 4/1/03, by McCombs Frank Roos Associates, Inc. Illustrative Site Plan, 4/1/03, by McCombs Frank Roos Associates, Inc. Stormwater Computations, 4/1/03, by McCombs Frank Roos Associates, Inc. City of Otsego Engineering Manual City of Otsego Zoning and Subdivision Ordinances, 10/14/02 National Wetland Inventory Map, 1991 Trunk Stormwater Facilities Study for Portions of the Otsego Creek Watershed, February 2003. PRELIMINARY PLAT 1. Existing zoning classifications for land in and abutting the subdivision shall be shown on the plan (Section 21-6-2.B.2). 2. Existing 100 -year flood elevations shall be shown on the plan (Section 21-6-2.B.9). 3. Location, size, and elevations of existing storm sewer and culverts, or any other underground facility within 150 feet of the proposed plat, shall be shown on the plan (Section 21-6-2.B.5). 4. Boundary lines of adjoining unsubdivided or subdivided land need to be identified by name and ownership (Section 21-6-2.B.6). 5. Location, dimensions, and purpose of all proposed easements shall be shown on the plan (Section 21-6-2.C.51. 6. Illustrate the boundaries of the Shoreland Overlay District on the plan (Section 20-92-5) 7. Geotechnical data shall be submitted for review (Section 21-6-2.B.11). \\Ha01\Shared Docs\MunicipaMOTS EG02000\2261\ot2261REV2.doc 8. The locations and widths of pedestrian ways shall be shown on the plan (Section 21-6- 2.C.2). 9. The minimum front and side street building setback lines shall be shown on the plans (Section 21-6-2.C.7). 10. The width of the lot at the setback line when on a curve shall be shown on the plans (Section 21-6-2.C.8). 11. Right-of-way for North East Crossing, Kittredge Parkway, and Terra Cotta Lane should be 80 feet wide. All remaining right-of-way shall be 60 feet wide. On the preliminary plat, Sheet 3 of 9, Terra Cotta Lane scales 80 feet, but is labeled 60 feet. STREETS 1. Include centerline horizontal curve data on plan. 2. The minimum roadway centerline curvature shall be 250' radius. Some curves do not meet this requirement (Section 21-7-7.6). 3. Tangents of at least 100' shall be introduced between reverse curves (Section 21-7-7-C.) 4. The streets shall be named according to the City and County requirements 5. Where adjoining areas are not subdivided, but may be subdivided, the arrangement of streets in a new subdivision shall make provision for the proper projection of streets into adjoining areas by carrying the new streets to the boundaries of the new subdivision at appropriate locations. A temporary turn -around facility shall be provided at the closed end, in conformance with cul-de-sac size requirements. Temporary facilities shall not require curb and gutter and the construction standards shall be established by the City Engineer. Construction of said streets shall be to the boundary of the plat (Section 21- 7-5. E). 6. The proposed right-of-way varies from 60 to 80 feet in width. The street section detail shall be revised to show the distance between property lines ranges from 60 to 80 feet. 7. Show rock entrance drive location(s) on plan view. 8. Two street section details shall be illustrated. Show both the 60 foot wide right-of-way detail and the 80 foot wide right-of-way detail and their specific requirements. 9. The street located in Block 6 that intersects Kittredge Parkway needs to have curb and gutter and not inverted crowns. \\Ha01\Shared Docs\Municipal\AOTSEG02000\2261\ot2261REV2.doc TRAFFIC/ACCESS ISSUES 1. The two streets that intersect 70th Street NE, and 70th Street NE need to be evaluated for access; as to whether turn lanes, bypass lanes and traffic controls are warranted. 2. The two streets that intersect 70th Street NE are spaced 880 feet apart. The exact street locations and spacing needs to be reviewed further to determine their locations. WETLANDS 1. Avoidance of wetlands must be attempted. If wetlands must be disturbed or filled they must be mitigated as per WCA requirements (Section 20-16-9.E.2). 2. A protective buffer of natural vegetation at least 20' wide from the delineated edge shall surround all wetlands. A principal building setback of 40' from the delineated edge of all wetlands or 20' from the protective buffer easement, whichever is greater, shall be provided (Section 20-16-9.E). SURFACE WATER MANAGEMENT 1. A complete stormwater drainage report shall be submitted as outlined in the City of Otsego Engineering Guidelines, Appendix C, Policy on Stormwater Drainage Submittal Requirements for Developer. 2. All storm ponds shall be constructed as per City of Otsego Standard Plate No. 404 and shall utilize a skimmer structure. 3. Access routes shall be provided to each of the skimmer structures and/or storm sewers (minimum 10' width). 4. The silt fence locations shall be shown on the plans. ENVIRONMENTAL 1. A statement certifying the environmental condition of the site is required (Section 21-6- 2.B.11). SANITARY SEWER COLLECTION SYSTEM 1. The sanitary sewer shall be shown on centerline of street right-of-way. In some locations, the sanitary sewer is shown behind the curb. 2. Pipe oversizing and/or additional pipe depth may need to be required to extend service to other areas. In addition the route may need to be revised to service other areas. \\Ha01\Shared Docs\Municipal\AOTSEGO2000\2261\ot2261REV2.doc WATER DISTRIBUTION SYSTEM 1. Watermain shall be DIP Class 52. 2. Water supply and distribution facilities within a commercial, industrial, institutional or medium to high-density residential area having a pipe size of twelve -inch diameter and smaller is by definition a lateral facility. Only oversizing greater than the defined lateral size is a trunk cost (from City of Otsego Engineering Manual, Appendix B). This is a conflict with the utility notes and the notes need to be revised. OTHER CONSIDERATIONS 1. On Phasing Plan, Sheet 8 of 9, Block 1, Lot 3 may be mislabeled. Based on the Development Sequence legend, it should be labeled Block 11, Lot 1. 2. The Phasing Plan and Preliminary Plat are labeled differently. SUMMARY AND/OR RECOMMENDATION 1. We recommend approval contingent on the above comments. \\Ha01\Shared Docs\Municipal\AOTSEG02000\2261\ot2261REV2.doc