Loading...
03-12-12 SCCITEM 7 tip O t�e F 0 MINNESOTA TO: Otsego Mayor and City Council FROM: Gary Groen, Finance Director DATE: March 8, 2012 Re: CIP update for Monday, March 12 meeting Included with the CIP information for the March 12 meeting are sources and uses of funds schedules, pages 73 - 95. The schedules have been updated to include more accurate beginning balances (December 31, 2011) based on the year end work that has been completed. The schedules also include the revisions that we have discussed in the February 13 and 27 meetings. At the first two CIP meetings, there were some items that required some additional information from the staff to complete the CIP discussion. • The items included a discussion of the finance request for finance software upgrade to consolidate the various accounting tasks into one finance software system. The discussion also included questions about the use of the current ADP payroll application. The analysis and discussion of the software upgrade is attached with this transmittal. • The CIP discussion included city entrance signs for the City, ADM -12-001, page 18. The entrance sign expenditures have been moved back to 2013 to provide additional time to review sign locations, design and cost. • The public utilities CIP request, UTIL-12-078 and 079, pages 48 and 49, discussed the need to paint the interior and exterior of water tower number #1. The exterior painting has been moved up to 2012 and the interior painting has been moved back to 2016. • The public utilities CIP request, UTIL-12-074, page 48, was a discussion of the west water system service to the Riverwood National development. The city engineer provide an estimate of $650,000 and was moved up and split between 2012 and 2013. • The public works discussion included a discussion of a hydraulic mill, hotbox and contracting for street sweeping and blacktop patching. The hot box request, PW12-008, page 53, was $20,000 for a hotbox. The request has been moved back to 2013. The analysis of contracting street sweeping and blacktop patching is attached with this transmittal. • The city facilities CIP request, FAC -12-007, page 23, discussed the need for an east parking specifically as needed for parking for staff and elections. However, the elections will be divided into precincts in 2012 and the need for the parking area as designed will be revised and brought back to the March 12 CIP meeting. A financing source for this project has not been identified. 2 ITEM 2 sTe Fot SOTA TO: Otsego Mayor and City Council FROM: Gary Groen, Finance Director DATE: March 8, 2012 Re: Finance Software and Payroll Information At the first CIP meeting on Monday February 13, there was discussion of a finance department software upgrade. The proposed software would provide for an integrated financial management system used for all accounting, payroll and utility billing functions. Currently the finance department uses Banyon Data Systems fund accounting software, ADP provides payroll services, and Civic Systems software is used for utility billing. The CIP request IT -12-001, page 25 discussed the proposal to combine all finance functions. Much of that discussion related to the use of ADP payroll software and how it was currently used in relation to the finance. At the current time, the City uses the EzLaborManager for the online employee time reporting. The ADP system allows for the employees to record their time by department and job code. The timesheets are approved by supervisors and all timesheets are printed by Kathy and a final review is completed to determine all timesheets are properly completed. Kathy summarizes the employee hours and calls the information into ADP for processing. Payroll reports are received via UPS the following day along with the payroll checks. ADP does have an option to import the payroll information directly. This option would require several changes to the current EzLaborManager set up that we are currently not using and do not believe are necessary including a scheduling program, wage program and holiday program. The current 8, 9 and 10 hour days, pay differential and payroll earnings links would all require additional time to restructure the current ADP setup. The City currently has the option to use Easypaynet. The system allows the Kathy to review the employee timesheet information and enter it into the ADP system rather than call in the information. The ADP payroll reports would be available for review within an hour. There is no additional set up fee but would require additional online training. The ADP payroll information is summarized by department and the department totals are entered into the fund accounting system via journal entry. The journal entries take about 30 minutes each month to enter into the fund accounting system. According to ADP, they currently do interface with some accounting software applications. However, the ADP information can not be interfaced with the current Banyon Fund Accounting software. With the proposed Civic Systems software, the ADP payroll information may be able to interface into the fund accounting software. Civic Systems believes that it could be completed and estimated approximately $1,000 in programming time for the interface. The proposal from Civic Systems to combine the fund accounting, payroll and utility billing systems totaled $37,675, based on a July, 2011 quote, of which $16,600 was the cost of payroll software, training and on-site assistance. The job costing information that we currently receive from ADP is not included in the Civic Systems proposal. It is my recommendation that the software upgrades includes only the fund accounting application and remain with ADP for the payroll services. The software upgrade would provide an important link between the fund accounting and software utility billing system. The software upgrade without the payroll application would cost approximately $21,000. 2 Sweeper Cost Comparison ***Numbers are based on new equipment prices and potential trade in of 50% of purchase price. **Numbers are based off of 2011 labor, fuel and maintenance costs *Based on 214.5 actual hours of operations for the sweeper for 2011. m W 2011 Sweeper Sweeper 2011 Fuel, 2011 Total Quoted Year and Year Purchase End of Life Total Service Annual Labor Maint. Costs Per Sweeper Contract Model Purchased Price Value Sweeper Cost Life Cost Costs** Costs** Hour* Cost Price 1993 Elgin 2005 $31,955.63 $10,000.00 $21,955.63 6 yrs $3,665.94 $6,615.39 $3,303.83 $63.33 $13,585.16 $18,125.25 2007 Elgin 2011 $77,484.38 $40,000.00 $37,484.38 8 yrs $4,685.55 $6,615.39 $3,303.83 $68.09 $14,604.77 $18,125.25 2011 Elgin*** 2011 $175,000.00 $75,000.00 $100,000.00 12 yrs $8,333.33 $6,615.39 $3,303.83 $85.09 $18,252.55 1 $18,125.25 ***Numbers are based on new equipment prices and potential trade in of 50% of purchase price. **Numbers are based off of 2011 labor, fuel and maintenance costs *Based on 214.5 actual hours of operations for the sweeper for 2011. m W 96th Street Skinpatching Costs Labor Hours Hourly Rate Labor Cost Kevin Lamson 26 $35.00 $910.00 Steve Springer 26 $30.00 $780.00 Brent Kolles 26 $31.00 $806.00 Don Mass 17 $37.00 $629.00 Brad Sherrill 26 $24.00 $624.00 Pat Launderville 26 $37.00 $962.00 Rick Knutson 26 $37.00 $962.00 Rene Metcalf 9 $15.50 $139.50 Adam Swenson 16 $12.50 $200.00 Mike Brumm 17 $12.50 $212.50 Dirk Udee 26 $15.50 $403.00 Dean Kolles 5 $12.50 $62.50 James Gornick 19 $12.50 $237.50 265 hrs. $6,298.00 Labor Costs= 265 hours at $6298.00 Bituminous Cost= 34.15 ton @ $65.58/ton = $2393.09 Tack Oil= 150 gallons @ $3.20/gal. = $481.90 Roller 26 hrs @ $20.00/hr. = $520.00 Misc. Equipment & Supplies= 26 hrs @ $20/hr. = $520.00 Single Axle truck 26 hrs (@ $25.00/hr. = $650.00 Total Project Cost of $10,862.99 Avg. of $318/Ton of Bit. Date Tons of Bituminous Cost/Ton Total Bit. Cost 7/28/11 10.02 65.58 $702.29 8/4/11 12.05 65.58 $844.57 8/17/11 6.02 65.58 $421.93 8/22/11 6.06 65.58 $424.30 34.15 ton J 1 $2,393.09 96th St. Repair Options T Tonnage Cost Staff Skinpatching @ $318/ton 34.18 $10,862.99 Omann Bros. Patching $400/ton 34.18 $13,672.00 Omann Bros 1" Overlay 672 $43,860.00 In -House Annual Costs for Blacktopping Year Labor Hours ADP Labor Cost Equipment & Misc. Supplies* Omann Bros. for bituminous mix Vance Bros. for tack oil and supplies In House Annual Cost of Patching Cost/Ton 2009 439.25 $8,057.13 $5,022.03 79 ton @ $5259.90 $1,582.59 $19,921.65 $252.17 2010 772 $15,792.14 $4,266.82 67.12 ton @$4307.05 $1,913.86 $26,279.87 $391.54 2011 984.25 $18,884.94 $5,689.52 89.5 ton @ $5869.70 $1,622.77 $32,066.93 $358.29 *Equipment and Misc. Supplies cost averages $63.57/Ton. Total Annual Blacktopping Repairs by Contractors and Staff Bargen for Year Cracksealing Bargen for Infrared Manhole Repairs Rum River Contracting for Overlay Repairs In House Annual Cost of Patching Annual Cost of Blacktop Repairs 2009 $59,095.60 $0.00 $0.00 $19,921.65 $79,017.25 2010 $28,017.00 $600.00 $0.00 $26,279.87 $54,896.87 2011 $41,647.95 $6,300.00 $2,300.00 $32,066.93 $82,314.88 In-house Blacktop Repairs: Potholes Skin Patching Cut-outs: deep potholes, curbstops Catch basin Repairs In street sewer/water repairs Culvert replacement repairs Utility cut repairs Contracted Blacktop Repairs: Cracksealing Infrared Heating on manholes/valves Larger overlay projects (Riverplace, full width of street) Street/trail overlays ITEM 4 City of Otsego, Minnesota Capital Improvement Plan 2012 thru 2016 SOURCES AND USES OF FUNDS Source 2012 2013 2014 2015 2016 Total 101 General Fund Beginning Balance 0 0 0 0 0 Revenues and Other Fund Sources Revenue General Property Taxes 0 40,000 20,000 50,000 10,000 Total Total Revenues and Other Fund Sources 20,000 Total Funds Available 10,000 Expenditures and Uses 20,000 Capital Projects & Equipment 10,000 Administration 20,000 PHONE SYSTEM UPGRADE ADM -12-002 0 Total Public Utilities 0 SW COLL SYS (REPLACE CULVERTS OUT OF UTIL-12-067 SW COLL SYS (KADLER CULVERT/DITCH N OF UTIL-12-068 0 Total Total Expenditures and Uses Change in Fund Balance Ending Balance 0 40,000 20,000 50,000 10,000 0 40,000 20,000 50,000 10,000 0 40,000 20,000 50,000 10,000 0 0 (20, 000) 0 0 0 0 (20,000) 0 0 0 0 0 (50,000) (10,000) 0 (40,000) 0 0 0 0 (40,000) 0 (50,000) (10,000) 0 (40,000) (20,000) (50,000) (10,000) 0 0 0 0 0 0 0 0 0 0 Page 73 Thursday, March 08, 2012 Source 201 Pavement Management Fund Beginning Balance Revenues and Other Fund Sources Revenue General Property Taxes Total Total Revenues and Other Fund Sources Total Funds Available Expenditures and Uses Capital Projects & Equipment Public Works ANNUAL STREET SEAL COATING PW-ST12-059 ANNUAL STREET CRACK FILLING PW-ST12-060 ANNUAL STREET STRIPING PW-ST12-061 ANNUAL STREET PREVENTATIVE MAINTENAN PW-ST12-062 Total Total Expenditures and Uses Change in Fund Balance Ending Balance 2012 2013 2014 2015 2016 Total 879,000 603,000 382,000 305,000 224,000 300,000 310,000 320,000 330,000 340,000 300,000 310,000 320,000 330,000 340,000 300,000 310,000 320,000 330,000 340,000 1,179,000 913,000 702,000 635,000 564,000 (460,000) (390,000) (260,000) (265,000) (135,000) (53,000) (76, 000) (70, 000) (76, 000) (70,000) (26,000) (27,000) (28,000) (29,000) (29,000) (37,000) (38,000) (39,000) (41,000) (42,000) (576,000) (531,000) (397,000) (411,000) (276,000) (576,000) (531,000) (397,000) (411,000) (276,000) (276,000) (221,000) (77,000) (81,000) 64,000 603,000 382,000 305,000 224,000 288,000 Page 74 Thursday, March 08, 2012 Source 202 Trail Management Fund Beginning Balance Revenues and Other Fund Sources Revenue General Property Taxes Total Revenues and Other Fund Sources Total Funds Available Expenditures and Uses Capital Projects & Equipment Public Works ANNUAL TRAIL MANAGEMENT Total Expenditures and Uses Change in Fund Balance Ending Balance 2012 2013 2014 2015 2016 Total 47,000 22,000 23,000 24,500 26,500 25,000 26,000 26,500 27,000 28,000 Total 25,000 26,000 26,500 27,000 28,000 25,000 26,000 26,500 27,000 28,000 72,000 48,000 49,500 51,500 54,500 PW-ST12-058 (50,000) (25,000) (25,000) (25,000) (25,000) Total (50,000) (25,000) (25,000) (25,000) (25,000) (50,000) (25,000) (25,000) (25,000) (25,000) (25,000) 1,000 1,500 2,000 3,000 22,000 23,000 24,500 26,500 29,500 Page 75 Thursday, March 08, 2012 Source 203 Park Development Beginning Balance Revenues and Other Fund Sources Other Fund Sources TRSA Contribution Total Total Revenues and Other Fund Sources 5,000 Total Funds Available 5,000 Expenditures and Uses 0 Capital Projects & Equipment 5,000 Parks & Recreation 5,000 WILDFLOWER MEADOWS PARK P&R-12-055 NORIN LANDING PARK PROJECT P&R-NL12-032 PRAIRIE PARK ADDITIONAL BALLFIELDS P&R-PP12-034 PRAIRIE PARK BALLFIELD LIGHTING P&R-PP12-035 PRAIRIE PARK ROUGH GRADE PARKING AREA P&R-PP12-036 PRAIRIE PARK PICNIC SHELTER P&R-PP12-041 PRAIRIE PARK SHADE SHELTERS P&R-PP12-050 PRAIRIE PARK BB FIELD BACKSTOP FENCING P&R-PP12-051 PRAIRIE PARK NW PARKING LOT P&R-PP12-053 PRAIRIE PARK SOCCER FIELDS & PARKING LO P&R-PP12-054 (30,000) Total Total Expenditures and Uses 0 Change in Fund Balance (8,000) Ending Balance 0 2012 2013 2014 2015 2016 Total 344,000 107,500 (472,500) (467,500) (1,162,500) 0 5,000 5,000 5,000 5,000 0 5,000 5,000 5,000 5,000 0 5,000 5,000 5,000 5,000 344,000 112,500 (467,500) (462,500) (1,157,500) 0 0 0 (640,000) 0 0 0 0 0 (310,367) 0 0 0 0 (200,000) 0 0 0 0 (500, 000) (198,500) 0 0 0 (128,000) 0 0 0 (60, 000) 0 (30,000) 0 0 0 0 (8,000) 0 0 0 0 0 0 0 0 (152,000) 0 (585, 000) 0 0 0 (236,500) (585,000) 0 (700,000) (1,290,367) (236,500) (585,000) 0 (700,000) (1,290,367) (236,500) (580,000) 5,000 (695,000) (1,285,367) 107,500 (472,500) (467,500) (1,162,500) (2,447,867) Page 76 Thursday, March 08, 2012 Source 205 Park Capital Eqpt Fund Beginning Balance Revenues and Other Fund Sources Revenue General Property Taxes Total Total Revenues and Other Fund Sources Total Funds Available Expenditures and Uses Capital Projects & Equipment Parks & Recreation PRAIRIE PARK PLAYGROUND P&R-PP12-044 SCHOOL KNOLL PRE -K PLAY STRUCTURE P&R-SK12-045 Total Total Expenditures and Uses Change in Fund Balance Ending Balance 2012 2013 2014 2015 2016 Total 84,000 104,000 155,500 193,500 248,500 50,000 51,500 53,000 55,000 56,500 50,000 51,500 53,000 55,000 56,500 50,000 51,500 53,000 55,000 56,500 134,000 155,500 208,500 248,500 305,000 (30,000) 0 0 0 0 0 0 (15,000) 0 0 (30,000) 0 (15,000) 0 0 (30,000) 0 (15,000) 0 0 20,000 51,500 38,000 55,000 56,500 104,000 155,500 193,500 248,500 305,000 Page 77 Thursday, March 08, 2012 Source 2012 2013 2014 2015 2016 Total 206 Capital Eqpt Revolving Fund Beginning Balance 485,000 252,758 38,758 (81,242) (253,242) Revenues and Other Fund Sources Revenue General Property Taxes 150,000 155,000 160,000 165,000 170,000 Total 150,000 155,000 160,000 165,000 170,000 Total Revenues and Other Fund Sources 150,000 155,000 160,000 165,000 170,000 Total Funds Available 635,000 407,758 198,758 83,758 (83,242) Expenditures and Uses Capital Projects & Equipment Building Safetv CHEVROLET EXT CAB (BD.19) BLD -12-001 0 0 (25,000) 0 0 FORD EXPLORER (BD.20) BLD -12-002 0 0 0 0 (30,000) Total 0 0 (25,000) 0 (30,000) Information Techndoa_v SOFTWARE UPGRADE IT -12-001 (19,000) (19,000) 0 0 0 Total (19,000) (19,000) 0 0 0 Public Works HYDRAULIC 18' MILL PW -12-001 (9,500) 0 0 0 0 SIDE AND REAR FLAIL MOWERS (PW.35.01) PW -12-002 (15,000) 0 0 0 0 ONE TON DUMP TRUCK WITH PLOW (PW.38) PW -12-003 (45,000) 0 0 0 0 SPEEDWAGON (PW.31) PW -12-004 (91000) 0 0 0 0 EXMARK MOWER (PW.22) PW -12-005 (10,000) 0 0 0 (10,000) SIGN TRUCK PW -12-006 0 (60,000) 0 0 0 CAT IT28 LOADER (PW.21) PW -12-007 0 0 0 0 (150,000) BLACKTOP HOT BOX PW -12-008 0 (20,000) 0 0 0 S/A DUMP TRUCK WITH PLOW (PW.03) PW -12-009 (180,000) 0 0 0 0 HARLEY RAKE PW -12-010 (8,000) 0 0 0 0 UPGRADE GASBOY SYSTEM PW -12-021 (15,000) 0 0 0 0 CHEVROLET EXT CAB (BD.17) PW -12-022 0 (25,000) 0 0 0 ELGIN PELICAN STREET SWEEPER (PW.01) PW -12-023 (38, 742) 0 0 0 0 INT'L S/A DUMP TRUCK (PW.02) PW -12-024 0 0 (180,000) 0 0 FORD DUMP TRUCK W/PLOW (PW.04) PW -12-025 0 0 0 0 (45,000) CHEVROLET EXT CAB (PW.06) PW -12-026 0 0 (35,000) 0 0 INT'L HARVESTER TANDEM AXLE TRUCK (PW. PW -12-028 0 0 0 (200,000) 0 CAT GRADER (PW.05) PW -12-029 0 (150, 000) 0 0 0 FELLING TRAILER (PW.13) PW -12-030 0 0 0 0 (10,000) JOHN DEERE SKID LOADER (PW.14) PW -12-031 0 0 0 (20,000) 0 MULTI -QUIP ASPHALT ROLLER (PW.16) PW -12-033 0 (20,000) 0 0 0 CHEVROLET 2500 PICKUP (PW.17) PW -12-034 0 0 0 (35,000) 0 CHEVROLET EXT CAB (PW.18) PW -12-035 0 (25,000) 0 0 0 SNOWBLOWER (PW.24) PW -12-038 0 0 0 (50,000) 0 Page 78 Thursday, March 08, 2012 Source (214,000) 2012 2013 2014 2015 2016 Total 206 Capital Eqpt Revolving >�iuid 252,758 38,758 (81,242) (253,242) FORD F350 PICKUP WITH PLOW (PW.28) PW -12-039 (33,000) 0 0 0 0 JOHN DEERE 1545 MOWER (PW.37) PW -12-043 0 0 0 (20,000) 0 TORO HL4800 LAWN SWEEPER (PW.41) PW -12-046 0 0 0 0 (25,000) JOHN DEERE Z925A ZTRAK MOWER (PW.45) PW -12-049 0 0 0 (12,000) 0 CAT 908 LOADER (PW.46) PW -12-050 0 0 (40,000) 0 0 JD GATOR (PW.48) PW -12-052 0 0 0 0 (20,000) WIDE AREA MOWER FOR PARKS PW -12-056 0 (50,000) 0 0 0 Total Total Expenditures and Uses Change in Fund Balance Ending Balance (363,242) (350,000) (255,000) (337,000) (382,242) (369,000) (280,000) (337,000) (260,000) (290,000) (232,242) (214,000) (120,000) (172,000) (120,000) 252,758 38,758 (81,242) (253,242) (373,242) Page 79 Thursday, March 08, 2012 Source 2012 2013 2014 2015 2016 Total 208 Community Facilities Fund Beginning Balance 800,000 (114,717) (149,717) (149,717) (149,717) Revenues and Other Fund Sources Revenue No Funds 0 0 0 0 0 Total 0 0 0 0 0 Total Revenues and Other Fund Sources 0 0 0 0 0 Total Funds Available 800,000 (114,717) (149,717) (149,717) (149,717) Expenditures and Uses Capital Projects & Equipment Cily Facilities CITY HALL HVAC SYSTEM FAC -12-001 (75,000) 0 CITY HALL REMODELING FAC -12-002 (75,000) 0 CITY HALL HANDICAP ACCESSIBLE FAC -12-003 (40,000) 0 CITY HALL ROOFING FAC -12-004 (118,000) 0 Total (308,000) 0 Parks & Recreation WATERFRONT EAST PARK P&R-12-047 (35,000) (35,000) DARKENWALD LANDING P&R-DI12-033 (480,700) 0 NORIN LANDING BOAT RAMP P&R-NL12-042 (83,517) 0 PRAIRIE PARK SPLASH PAD WATER TREATME P&R-PP12-001 (7,500) 0 Total (606,717) (35,000) Total Expenditures and Uses (914,717) (35,000) Change in Fund Balance (914,717) (35,000) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Ending Balance (114,717) (149,717) (149,717) (149,717) (149,717) Page 80 Thursday, March 08, 2012 Source 2012 2013 2014 2015 2016 Total Page 81 Thursday, March 08, 2012 209 Street Reconstruction end Beginning Balance 263,000 163,000 163,000 (69,000) (69,000) Revenues and Other Fund Sources No Funds 0 0 0 0 0 Total 0 0 0 0 0 Total Revenues and Other Fund Sources 0 0 0 0 0 Total Funds Available 263,000 163,000 163,000 (69,000) (69,000) Expenditures and Uses Capital Projects & Equipment Public Works CSAH 39 SERVICE ROAD PW-ST12-066 0 0 (146,000) 0 0 LEBEAUX AVE FRONTAGE ROAD PW-ST12-067 (100,000) 0 0 0 0 78TH ST EXTENSION - QUADAY TO QUAM PW-ST12-068 0 0 0 0 (360,000) NASHUA REALIGNMENT AT CSAH 39 PW-ST12-069 0 0 (86,000) 0 0 Total (100,000) 0 (232,000) 0 (360,000) Total Expenditures and Uses (100,000) 0 (232,000) 0 (360,000) Change in Fund Balance (100,000) 0 (232,000) 0 (360,000) Ending Balance 163,000 163,000 (69,000) (69,000) (429,000) Page 81 Thursday, March 08, 2012 Source 214 Fire Capital Reserve Beginning Balance Revenues and Other Fund Sources Revenue General Property Taxes Total Total Revenues and Other Fund Sources 140,000 Total Funds Available 150,000 Expenditures and Uses 135,000 Capital Projects & Equipment 145,000 Public Safety 155,000 PUBLIC SAFETY - EMERGENCY RESPONSE VE PS -12-002 PUBLIC SAFETY - FIRE DEPT PS -12-003 EMERGENCY VEHICLE STAGING AREA PS -12-004 FIRE STATION PS -12-005 Total Total Expenditures and Uses Change in Fund Balance Ending Balance 2012 2013 2014 2015 2016 Total 1,236,000 1,371,000 1,511,000 1,656,000 1,706,000 135,000 140,000 145,000 150,000 155,000 135,000 140,000 145,000 150,000 155,000 135,000 140,000 145,000 150,000 155,000 1,371,000 1,511,000 1,656,000 1,806,000 1,861,000 0 0 0 (100,000) 0 0 0 0 0 (500,000) 0 0 0 0 (250,000) 0 0 0 0 (1,500,000) 0 0 0 (100,000) (2,250,000) 0 0 0 (100,000) (2,250,000) 135,000 140,000 145,000 50,000 (2,095,000) 1,371,000 1,511,000 1,656,000 1,706,000 (389,000) Page 82 Thursday, March 08, 2072 Source 222 Stormwater Utility Fund Beginning Balance Revenues and Other Fund Sources Revenue Stormwater Utility Fees Total Total Revenues and Other Fund Sources Total Funds Available Expenditures and Uses Capital Projects & Equipment Public Utilities STORMWATER COLLECTION SYSTEM (IN DIST UTIL-12-064 STORMWATER COLLECTION SYSTEM (OTSEG UTIL-12-066 Total Total Expenditures and Uses Change in Fund Balance Ending Balance 2012 2013 2014 2015 2016 Total 49,000 99,000 149,000 139,000 139,000 50,000 50,000 50,000 50,000 50,000 50,000 50,000 50,000 50,000 50,000 50,000 50,000 50,000 50,000 50,000 99,000 149,000 199,000 189,000 189,000 0 0 (50,000) (50,000) (50,000) 0 0 (10,000) 0 0 0 0 (60,000) (50,000) (50,000) 0 0 (60,000) (50,000) (50,000) 50,000 50,000 (10,000) 0 0 99,000 149,000 139,000 139,000 139,000 Page 83 Thursday, March 08, 2012 Source 2012 2013 2014 2015 2016 Total 473,000 423,000 273,000 273,000 273,000 0 0 0 0 0 0 0 403 Collector Street Fund Beginning Balance 0 Revenues and Other Fund Sources 0 No Funds 0 0 Total Total Revenues and Other Fund Sources 273,000 Total Funds Available 273,000 Expenditures and Uses Capital Projects & Equipment Public Works 85TH STREET EXTENSION PW-ST12-070 OVERLAY 85TH ST - PAGE TO PARRISH PW-ST12-073 Total Total Expenditures and Uses Change in Fund Balance Ending Balance 2012 2013 2014 2015 2016 Total 473,000 423,000 273,000 273,000 273,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 473,000 423,000 273,000 273,000 273,000 (50,000) (150,000) 0 0 0 0 0 0 0 (100,000) (50,000) (150,000) 0 0 (100,000) (50,000) (150,000) 0 0 (100,000) (50,000) (150,000) 0 0 (100,000) 423,000 273,000 273,000 273,000 173,000 Page 84 Thursday, March 08, 2012 Source 2012 2013 2014 2015 2016 Total 408 Otsego Creek Watershed Beginning Balance 672,000 607,000 607,000 532,000 532,000 Revenues and Other Fund Sources Revenue No Funds Total Total Revenues and Other Fund Sources 0 Total Funds Available 0 0 Expenditures and Uses 0 Capital Projects & Equipment 0 0 Parks & Recreation 0 BEAUDRY PARK DRAINAGE P&R-BP12-043 672,000 Total Public Utilities 532,000 532,000 SW COLLECTION SYSTEM (OTSEGO CREEK C UTIL-12-065 Total Public Works LEBEAUX AVE FRONTAGE ROAD PW-ST12-067 Total Total Expenditures and Uses Change in Fund Balance Ending Balance 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 672,000 607,000 607,000 532,000 532,000 (20,000) 0 0 0 0 (20,000) 0 0 0 0 0 0 (75, 000) 0 0 0 0 (75,000) 0 0 (45, 000) 0 0 0 0 (45,000) 0 0 0 0 (65,000) 0 (75,000) 0 0 (65,000) 0 (75,000) 0 0 607,000 607,000 532,000 532,000 532,000 Page 85 Thursday, March 08, 2012 Source 414 Revolving Capital Impry Beginning Balance Revenues and Other Fund Sources Other Fund Sources Transfer from General Fund Total Revenues and Other Fund Sources Total Funds Available Expenditures and Uses Capital Projects & Equipment Administration CITY ENTRANCE SIGNS (3) City Facilities PUBLIC WORKS 2ND FLOOR BUILD -OUT DEMOLITION OF OLD TOWN HALL Public Safety EMERGENCY SIRENS (2) Total Expenditures and Uses Change in Fund Balance Ending Balance 2012 2013 2014 2015 2016 Total 942,000 855,500 825,500 875,500 925,500 50,000 50,000 50,000 50,000 50,000 Total 50,000 50,000 50,000 50,000 50,000 50,000 50,000 50,000 50,000 50,000 992,000 905,500 875,500 925,500 975,500 ADM -12-001 0 (60,000) 0 0 0 Total 0 (60,000) 0 0 0 FAC -12-006 (100,000) 0 0 0 0 FAC -12-009 0 (20,000) 0 0 0 Total (100,000) (20,000) 0 0 0 PS -12-001 (36,500) 0 0 0 0 Total (36,500) 0 0 0 0 (136,500) (80,000) 0 0 0 (86,500) (30,000) 50,000 50,000 50,000 855,500 825,500 875,500 925,500 975,500 Page 86 Thursday, March 08, 2012 Source 601 Water Fund Beginning Balance Revenues and Other Fund Sources Revenue Water Utility User Fees Total Revenues and Other Fund Sources Total Funds Available Expenditures and Uses Capital Projects & Equipment Public Utilities BOOSTER STATION REPAIRS/MAINT WELL #2 PUMP & AQUIFER REHAB WELL #1 PUMP & AQUIFER REHAB WELL #5 PUMP & AQUIFER REHAB WELL #6 PUMP & AQUIFER REHAB METER REPLACEMENT PROJECT WEST SEWER DISTRICT WELL CAPACITY WATER TOWER #1 INT PAINTING WATER TOWER #1 EXT PAINTING Total Expenditures and Uses Change in Fund Balance Ending Balance 2012 2013 2014 2015 2016 Total 900,000 705,440 555,880 707,320 622,760 175,440 175,440 175,440 175,440 175,440 Total 175,440 175,440 175,440 175,440 175,440 175,440 175,440 175,440 175,440 175,440 1,075,440 880,880 731,320 882,760 798,200 UTIL-12-018 0 0 (24,000) 0 0 UTIL-12-021 0 0 0 (70,000) 0 UTIL-12-022 0 0 0 (70,000) 0 UTIL-12-023 0 0 0 (120,000) 0 UTIL-12-026 0 0 0 0 (100,000) UTIL-12-045 0 0 0 0 (50,000) UTIL-12-074 (325,000) (325,000) 0 0 0 UTIL-12-078 0 0 0 0 (170,000) UTIL-12-079 (45,000) 0 0 0 0 Total (370,000) (325,000) (24,000) (260,000) (320,000) (370,000) (325,000) (24,000) (260,000) (320,000) (194,560) (149,560) 151,440 (84,560) (144,560) 705,440 555,880 707,320 622,760 478,200 Page 87 Thursday, March 08, 2012 Source 2012 2013 2014 2015 2016 Total 602 Sewer Fund Beginning Balance 700,000 720,198 832,396 902,594 974,792 Revenues and Other Fund Sources Revenue Wastewater Utility Fees 112,198 112,198 112,198 112,198 112,198 Total Total Revenues and Other Fund Sources 112,198 Total Funds Available 112,198 Expenditures and Uses 112,198 Capital Projects & Equipment 112,198 Public Utilities 112,198 WEST WWTF ROOF REPLACEMENT UTIL-12-001 EAST WWTF ROOF REPLACEMENT UTIL-12-002 LS #1 REPLACE PUMPS #1 AND #2 UTIL-12-003 LS #6 REPLACE PUMPS #1 AND #2 UTIL-12-005 LS #7 REPLACE PUMPS #1 AND #2 UTIL-12-007 LS #5 REPLACE PUMPS #1, #2 & #3 UTIL-12-010 SCADA COMPUTER REPLACEMENT UTIL-12-M Total Public Works ONE TON DUMP TRUCK WITH PLOW (PW.38) PW -12-003 Total Total Expenditures and Uses Change in Fund Balance Ending Balance 112,198 112,198 112,198 112,198 112,198 112,198 112,198 112,198 112,198 112,198 812,198 832,396 944,594 1,014,792 1,086,990 (40,000) 0 0 0 0 (40,000) 0 0 0 0 0 0 0 (40, 000) 0 0 0 (28, 000) 0 0 0 0 (14,000) 0 0 0 0 0 0 (51,000) 0 0 0 0 (15,000) (80,000) 0 (42,000) (40,000) (66,000) (12,000) 0 0 0 0 (12,000) 0 0 0 0 (92,000) 0 (42,000) (40,000) (66,000) 20,198 112,198 70,198 72,198 46,198 720,198 832,396 902,594 974,792 1,020,990 Page 88 Thursday, March 08, 2012 Source 2012 2013 2014 2015 2016 Total Ending Balance 0 0 0 0 0 Page 89 Thursday, March 08, 2012 Assessments Beginning Balance 0 0 0 0 0 Revenues and Other Fund Sources Revenue Assessments 145,000 0 146,000 1,250,000 0 Total 145,000 0 146,000 1,250,000 0 Total Revenues and Other Fund Sources 145,000 0 146,000 1,250,000 0 Total Funds Available 145,000 0 146,000 1,250,000 0 Expenditures and Uses Capital Projects & Equipment Public Works CSAH 39 SERVICE ROAD PW-ST12-066 0 0 (146,000) 0 0 LEBEAUX AVE FRONTAGE ROAD PW-ST12-067 (145,000) 0 0 0 0 STREET RECONSTRUCTION - MISSISSIPPI SH PW-ST12-077 0 0 0 (1,250,000) 0 Total (145,000) 0 (146,000) (1,250,000) 0 Total Expenditures and Uses (145,000) 0 (146,000) (1,250,000) 0 Change in Fund Balance 0 0 0 0 0 Ending Balance 0 0 0 0 0 Page 89 Thursday, March 08, 2012 Source Federal Grants Beginning Balance Revenues and Other Fund Sources Revenue Federal Grants Total Total Revenues and Other Fund Sources Total Funds Available Expenditures and Uses Capital Projects & Equipment Public Works 70TH ST EXTENSION -MARTIN FARMS TO OAK PW-ST12-075 Total Total Expenditures and Uses Change in Fund Balance Ending Balance 2012 2013 2014 2015 2016 Total 0 0 0 (800,000) (800,000) 0 0 0 0 800,000 0 0 0 0 800,000 0 0 0 0 800,000 0 0 0 (800,000) 0 0 0 (800,000) 0 0 0 0 (800,000) 0 0 0 0 (800,000) 0 0 0 0 (800,000) 0 800,000 0 0 (800,000) (800,000) 0 Page 90 Thursday, March 08, 2012 Source MSA State Aid Beginning Balance Revenues and Other Fund Sources Revenue MSA Construction State Aid Total Total Revenues and Other Fund Sources Total Funds Available Expenditures and Uses Capital Projects & Equipment Public Works 70TH ST EXTENSION -MARTIN FARMS TO OAK PW-ST12-075 70TH ST EXTENSION - MARLOWE TO MARTIN PW-ST12-076 Total Total Expenditures and Uses Change in Fund Balance Ending Balance 2012 2013 2014 2015 2016 Total 1,100,000 1,044,000 1,294,000 344,000 394,000 464,000 450,000 450,000 450,000 450,000 464,000 450,000 450,000 450,000 450,000 464,000 450,000 450,000 450,000 450,000 1,564,000 1,494,000 1,744,000 794,000 844,000 (100,000) (200,000) (1,400,000) (400,000) 0 (420,000) 0 0 0 0 (520,000) (200,000) (1,400,000) (400,000) 0 (520,000) (200,000) (1,400,000) (400,000) 0 (56,000) 250,000 (950,000) 50,000 450,000 1,044,000 1,294,000 344,000 394,000 844,000 Page 91 Thursday, March 08, 2012 Source 2012 2013 2014 2015 2016 Total Other Aids/Grants Beginning Balance 0 0 0 0 0 Revenues and Other Fund Sources Revenue DNR Grant 83.517 0 0 0 0 Total 83,517 0 0 0 0 Total Revenues and Other Fund Sources 83,517 0 0 0 0 Total Funds Available 83,517 0 0 0 0 Expenditures and Uses Capital Projects & Equipment Parks & Recreation NORIN LANDING BOAT RAMP P&R-NL12-042 (83,517) 0 0 0 0 Total (83,517) 0 0 0 0 Total Expenditures and Uses (83,517) 0 0 0 0 Change in Fund Balance 0 0 0 0 0 Ending Balance 0 0 0 0 0 Page 92 Thursday, March 08, 2012 Source Other Local Sources Beginning Balance Revenues and Other Fund Sources Revenue Insurance Reimbursements Total Revenues and Other Fund Sources Total Funds Available Expenditures and Uses Capital Projects & Equipment City Facilities CITY HALL ROOFING Total Expenditures and Uses Change in Fund Balance Ending Balance 2012 2013 2014 2015 2016 Total 0 0 0 0 0 18,000 0 0 0 0 Total 18,000 0 0 0 0 18,000 0 0 0 0 18,000 0 0 0 0 FAC -12-004 (18,000) 0 0 0 0 Total (18,000) 0 0 0 0 (18,000) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Page 93 Thursday, March 08, 2012 Source Proceeds of Long Term Debt -Tax Beginning Balance Revenues and Other Fund Sources Revenue Proceeds of Long Term Debt Total Total Revenues and Other Fund Sources Total Funds Available Expenditures and Uses Capital Projects & Equipment Public Works STREET RECONSTRUCTION - MISSISSIPPI SH PW-ST12-077 Total Total Expenditures and Uses Change in Fund Balance Ending Balance 2012 2013 2014 2015 2016 Total 0 0 0 0 0 0 0 0 1,250,000 0 0 0 0 1,250,000 0 0 0 0 1,250,000 0 0 0 0 1,250,000 0 0 0 0 (1,250,000) 0 0 0 0 (1,250,000) 0 0 0 0 (1,250,000) 0 0 0 0 0 0 0 0 0 0 0 Page 94 Thursday, March 08, 2012 Source 2012 2013 2014 2015 2016 Total Unfunded Beginning Balance 0 (297,750) (297,750) (297,750) (2,197,750) Revenues and Other Fund Sources No Funds 0 0 0 0 0 Total 0 0 0 0 0 Total Revenues and Other Fund Sources 0 0 0 0 0 Total Funds Available 0 (297,750) (297,750) (297,750) (2,197,750) Expenditures and Uses Capital Projects & Equipment Cily Facilities PUBLIC WORKS EAST PARKING LOT FAC -12-007 (162,750) PUBLIC WORKS BUILDING EXPANSION FAC -12-008 0 Total (162,750) Parks & Recreation TRAIL - QUEENS TO RIVERPOINTE AREA P&R-12-048 (135,000) Total (135,000) Total Expenditures and Uses (297,750) Change in Fund Balance (297,750) 0 0 0 0 0 0 (1,900,000) 0 0 0 (1,900,000) 0 0 0 0 0 0 0 0 0 0 0 (1,900,000) 0 0 0 (1,900,000) 0 Ending Balance (297,750) (297,750) (297,750) (2,197,750) (2,197,750) Page 95 Thursday, March 08, 2012