ITEM 3.5B Trail Project 15-04OtkooF MINNESOTA V DEPARTMENT INFORMATION Request for City Council Action ORIGINATING DEPARTMENT: REQUESTOR: MEETING DATE: Public Works City Engineer Wagner December 14, 2015 PRESENTER(s): REVIEWED BY: ITEM #: Consent Agenda City Administrator Johnson 3.5B Finance Director Flaherty AGENDA ITEM DETAILS RECOMMENDATION: Staff recommends approval of Partial Payment No. 2 in the amount of $8,044.60 for the 90th Street Trail, City Project No. 15-04 to Omann Brothers. ARE YOU SEEKING APPROVAL OF A CONTRACT? IS A PUBLIC HEARING REQUIRED? No No BACKGROU NDMUSTIFICATION: All work has been completed for the 90th Street Trail project by the Final Completion date of October 15th, 2015. 5% retainage is being held to ensure final vegetation is established. This will be reviewed next spring. This is pay estimate #2 which included Change Order #1. Additional areas beyond the original project boundaries were disturbed during the project to create more gradual and friendly slopes typical of a park setting. Additional topsoil borrow was needed to fill along the trail edge, around the culverts, and fill a depression area NW of the "sledding hill". Also, most of the salvaged topsoil on the project was unusable as topsoil as it was thick sod clumps. The seed mixture was changed from MnDOT mix 22-111 (temporary stabilization mix) to mix 25-131 (low maintenance turf) to provide a better park type turf. The original contract quantities for these items was very small and thus the unit prices were much higher than normal. Staff has negotiated the new unit prices for each item in Change Order #1 so they are about half of the original bid prices. The current project construction cost is $70,157.40. This exceeds the original contract amount, $61,365.00, by approximately 14.3%. Final payment will be made next year after vegetation has been established. SUPPORTING DOCUMENTS: x ATTACHED ❑ NONE List: Partial Pay Estimate No. 2 POSSIBLE MOTION Please word motion as you would like it to appear in the minutes. Motion to approve payment to Omann Brothers in the amount of $8,044.60 for the 90th Street Trail, City Project No. 15-04. Qi lnr'_GT lKWnRMATinN FUNDING: BUDGETED: x YES 203 — Park Development o NO Ar`TlnAI TA6 I=Kl ❑ APPROVED AS REQUESTED ❑ DENIED ❑ TABLED ❑ OTHER (List changes) COMMENTS: PAY ESTIMATE #2 CITY OF OTSEGO 90th Street Trail City Improvement Project No, 15-04 Date: December 3, 2015 Honorable Mayor & City Council City of Otsego 13400 90th Street NE Otsego, MN 55330 RE: 90th Street Trail, City Improvement Project No. 15-04 Contractor: Omann Brothers Paving, Inc. Contract Amount: $61,365.00 Award Date: June 12, 2015 Completion Date: October 15, 2015 Dear Honorable Mayor and Council Members: The following work has been completed on the above -referenced project by Omann Brothers, Inc. OWNER ITEM NO. ITEM DESCRIPTION ESTIMATED QUANTITY UNIT UNIT PRICEE CONTRACTM$1,800.00 TO EXTENSION 1 MOBILIZATION 1 LS $2.500.00$ 2,500.00 2 SALVAGE GRAVEL 1 LS $1,000.00$ 1,000.00 3 SALVAGETOPSOIL 120 CY $15.00,, $ 1.800.00 4 SALVAGE SIGN 2 EA $40.00 $80.00 1 $ 40.00 5 SALVAGE END SECTION 3 EA $100.00 $300.00 2 $ 200.00 6 SALVAGE RIPRAP 4 CY $40.00 $160.00 $ - 7 REMOVE CURB 20 LF $20,00 $400.00 32 $ 640.00 8 REMOVE CONCRETE PAVEMENT 210 SF $1.50 $315.00 210 $ 315.00 9 REMOVE BITUMINOUS PAVEMENT 140 SF $1,00 $140.00 152 $ 152.00 10 SAWING CONCRETE PAVEMENT FULL DEPTH 8 LF 1 $5.00 $40.00 11.67 $ 58.35 11 SAWING BITUMINOUS PAVEMENT FULL DEPTH 40 LF $3.00 $120.00 69 $ 207.00 12 ISUBGRADE PREPARATION 15 STA $110.00 $1,650.00 15 $ 1,650.00 13 COMMON BORROW L 150 CY $10.00 $1,600.00 164 $ 1,540.00 14 AGGREGATE BASE CLASS 5 P 825 TON $18.00 $14.850.00 825 $ 14,850.00 15 TYPE LV WEARING COURSE MIXTURE 3,8 250 TON $89.00 $22,250.00 241,25 $ 21,471.25 16 CONCRETE CURB & GUTTER DESIGN B612 20 LF $45,00 $900,00 36 $ 1,620.00 17 6" CONCRETE WALK 140 SF $13.00 $1,820.00 175 $ 2,275,00 18 TRUNCATED DOMES 24 SF $55.00 $1,320.0 16 $ 880.00 19 15" CMP 125 LF 1 $20.00 $2 500.00 140 $ 2,800.00 20 18" CMP 30 LF $25.00 $750.00 36 $ 900.00 21 REPLACE SALVAGED END SECTION 3 EA $100.00 $300.00 2 $ 200.00 22 15" METAL END SECTION 2 EA $150.00 $3010. 00 3 $ 450.00 23 18" METAL END SECTION 2 EA $175.00 $350.00 2 $ 350.00 24 REPLACE SALVAGED SIGN 2 EA $150:00 $300.00 1 $ 150.00 REPLACESALVAGEDRIPRAP 4 CY $40.00 $160.00 $ - F STABILIZED CONSTRUCTION EXIT 1 EA $1,500.00 $1,600.00 1 $ 1,500.00 SILT FENCE 350 LF $3.20 $i,120,00 344 $ 1,i00.80 S;1MuniclpaM0T5EG017241Pay EstimaleskOT724 PE.xlsx PE-3 PAY ESTIMATE #2 CITY OF OTSEGO 90th Street Trail City Improvement Project No. 15-04 OWNER Bid Schedule ITEM NO. "A - ITEM DESCRIPTION ESTIMATED QUANTITY UNIT CONTRACT UNIT PRICE CONTRACT AMOUNT USED TO DATE EXTENSION 28 END SECTION SEDIMENT PROTECTION 4 EA $100.00 $400.00 5 $ 500.00 29 PREMIUM TOPSOIL BORROW L 50 CY $25,00 $1,250.00 60 $ 1,250.00 .30 SEEDMIXTURE22111 3 LBS $30.00 $90.00 3 $ 90.00 31 SEEDING 0.20 ACRE $3,000.00 $600.00 0.20 $ 600.00 32 MULCH MATERIAL TYPE 1 0.20 1 TON 1 $3.000.00 $600.00 0.20 1 $ 600.00 rota, Bid Schedule "A" $ ui,Uon.uu y Change ITEM NO. order No, 7 ITEM DESCRIPTION ESTIMATED QUANTITY UNIT CONTRACT UNIT PRICE CONTRACT AMOUNT USED TO DATE EXTENSION 29 PREMIUM TOPSOIL BORROW L 50 CY -$25.00 -$1,250.00 50 $ (1,250.00) 30 SEED MIXTURE22-111 3 LBS -$30.00 -$90.00 3 $ 90.00 31 SEEDING 0.20 ACRE -$3,000,00 600.00 0.20 $ 600.00 32 MULCH MATERIAL TYPE 1 0.20 TON -$3,000,00 -$600.00 0.20 $ 600.00 33 PREMIUM TOPSOIL BORROW L 324 CY $17.00 $5,608.00 324 $ 5,508,00 34 SEED MIXTURE 22-111 125 LBS $15.00 $1,875.00 125 $ 1,875.00 35 SEEDING 0,69 ACRE $2.500.00 $1,725.00 0.69 $ 1,725.00 36 MULCH MATERIAL TYPE 0.95 TON $2000.00 $1900.00 0.95 1 $ 1,900.00 Bid Schedule "A" Change Order No. 1 TOTAL TOTAL WORK COMPLETED TO DATE LESS 5% RETAINAGE: LESS PAY ESTIMATE #1: WE RECOMMEND PAYMENT OF: APPROVALS: Total Bid Schedule "A" $ 8,468.00 $ 8,468.00 $ 61,365.00 $ 61,689.40 $ 8,468.00 $ 8,468.00 $ 69,833.00 $ 7Q757.40 $ 70,167.40 $ 3,607.87 $ 68,604.93 CONTRACTOR: OMANN BROTHERS PAVING, INC Certification by Contractor. I certify that all items and amounts are correct for the work completed to date. ENGINEER: HAKANSON ANDE ON SSOCIATES, INC. Certiffcatio Inee W e in end payment for work and quantities as shown. Signed: Title: Date OWNER: CITY OF OTSEGO S:\Mun1dpal\A0TSEG0\724\Pay Esffmates\OT724 PE.xlsx PE-4 $ 8,044.60 CHANGE ORDER Rev, July 2010 Page 1 of 1 90TH Street Trail I City Proj. No. 15-04 1 CO No. 1 Project Location: 90th Street from Prairie Center to Prairie Park, Otsego, MN Contractor: Omann Brothers Paving, Inc Contract No. Address/City/State/Zip: P.O. Box 120 Alberville, MN 55301 Total Change Order Amount $ 8,468.00 In accordance with the terms of this Contract, you are hereby authorized and instructed to perform the work as altered by the following provisions: In order to fully complete the Project as contemplated was required that additional areas be disturbed and thus restored. Additional topsoil borrow was needed to fill along the trail edge as well as around the culverts and culvert extensions to create more gradual and friendly slopes typical of a park setting. A depression area NW of the "sledding hill' was also filled in. The seed mixture was changed from MnDOT mix 22-111 (temporary stabilization mix) to mix 25-131 (low maintenance turf) to provide a better park type turf. The new negotiated unit prices for each item listed below will apply. Change Order#1 -Additional Topsoil and Restoration Area Estimate Of Cost: (Include any increases or decreases in contract items, any negotiated or force account items.) Item No. Description. Unit Unit Price + or- Quantity + or - Amount $ 29 PREMIUM TOPSOIL BORROW (LV) CY $25.00 -50 -$1,250.00 30 SEED MIXTURE 22-111 LBS $30.00 -3 -$90.00 31 SEEDING AC $3,000.00 -0.2 4600.00 32 MULCH MATERIAL TYPE 1 TON $3,000.00 -0.2 -$600,00 33 PREMIUM TOPSOIL BORROW (LV) CY $17.00 324 $5,508.00 34 SEED MIXTURE 25-131 LBS $15.00 125 $1,875.00 35 SEEDING AC $2,500.00 0.69 $1,725.00 36 MULCH MATERIAL TYPE 1 TON $2,000.00 0.95 $1,900.00 Net Change for Change Order #1 $8,468.00 Approved by Project Engineer: Print Name: Phone: Date: Approved by Contractor: Date: Print Name: Phone: