ITEM 1 Water System Improvements0 tSTe F O MINNESOTA MEMORANDUM TO: Mayor and City Council FROM: Lori Johnson, City Administrator DATE: January 4, 2016 SUBJECT: Water System Improvements The recently approved Capital Improvement Plan (CIP) includes several water system improvements to both the west and east water systems. There was considerable discussion during the CIP work sessions about improvements to water tower 1 to bring the tower back on line after years of sitting dormant. Although the requested improvements were approved in the CIP, a work session was called to analyze further and to understand better the water system and the short and long-term benefits of water tower 1 improvements and other identified future improvements. The ultimate long-term goal is to connect the two existing water systems into one interconnected system; thus, in addition to review of the east water system, staff has prepared a similar analysis of the west water system. Staffs analysis takes into consideration how future improvements or policy changes affect five main categories of importance to the water system: redundancy, fire suppression, drought conditions, regulatory requirements, and future development impact. Redundancy is important in the event that a well or tower experiences a failure. Adequate capacity and interconnection between wells and towers creates redundancy as long as the waterlines are looped. Fire suppression indicates the ability to fight a fire for three hours with the highest producing well out of service during peak day demand and while maintaining a 20% capacity reserve to maintain adequate pressure. Drought conditions category refers to the well pumping capacity and the ability to keep the towers filled adequately during drought conditions. The Department of Natural Resources (DNR) regulates the State's water resources and places regulations on cities through rules, legislation, and permits, thus the regulatory requirements category. Finally, the ability to develop with urban services beyond the existing developed area or area with municipal utility access is captured in the development impact section. As I stated earlier, the long-term goal is to integrate the two water systems into one city-wide system. However, since they are currently very different systems, they will be presented separately with decisions on each independent of the other system. Before discussing each system separately, though, it is important to note the items that are relevant to both systems. One is DNR regulation of public water systems and water use. The DNR requires certain conservation efforts such as tiered water rates with higher rates for higher utilization and recommends other conservation methods such as imposing watering restrictions. Otsego is required to implement a Water Supply Plan to support long-term water sustainability, conservation measures, and emergency management needs. The attached capacity summaries indicate that implementing odd/even watering restrictions provides nine years of additional water system capacity at no cost. Therefore, implementing watering restrictions is a financially responsible and recommended water system policy. The peaks of seasonal watering are what drive capital costs and managing use to eliminate those peak days through watering restrictions can significantly reduce capital costs. Implementing watering restrictions while the system is small and still growing will be easier than implementing later. Many cities have watering restrictions in place thus new residents moving from other urban areas will be used to such restrictions. Another overarching item is the goal of achieving an outcome from this comprehensive water system review that provides long-term solutions and eliminates a piece meal approach to managing the water systems. The preferred options identified should allow the east system to meet needs until 2039 and the west until 2032. Finally, the costs listed in the summaries are in today's costs. For each year that the projects are delayed, the costs must be adjusted for inflation. Using today's costs, the water fund is able to finance these improvements based on current financial conditions and projections. East Water System: Water tower 1 was taken off line in 2008 because it was no longer needed following construction of tower 3. Additional connections and required blending of water from well #8 require system enhancements including bringing tower 1 back on line to meet existing and projected future user demand. The tower rehabilitation project was originally programmed for 2016, but is now recommended for 2017 to ensure that adequate water supply is available during the peak season in 2016 as Kurt Neidermeier explains in his attached memo addressing water tower maintenance. West Water System: An ongoing discussion with the west water system has been the Riverwood National development water system. That system is independent, although part of the City's water system, and is not properly sized for the development to support the full build out of the 155 lots in the neighborhood of which 109 are currently developed. It is adequate in terms of domestic water use for interior home uses and meets Minnesota Department of Health requirements for up to 150 homes. Where it falls short is in adequately suppling water for irrigation needs or fire protection generally associated with similar urban style development. Watering restrictions were implemented in this neighborhood successfully several years ago addressing the previous capacity issues that the neighborhood experienced. However, the 2 solution to the under -sizing issue is to connect the system to the west water system. Fortunately, this connection benefits the entire west system, not just Riverwood National. In addition, the entire west water system will bump up against capacity issues within three years based on current data and future projects. Connecting the Riverwood National system and upgrading that well will provide capacity through 2023 for the entire west system. Implementing watering restrictions adds another nine years of capacity without any capital costs. Below is a list of the benefits of connecting Riverwood National to the west water system prepared by Kurt Neidermeier: For Riverwood National Water Storage Capacity Increase from 10,000 gallons to 1,000,000 gallons Resolves limited fire protection Eliminates water ban Improved system maintenance for hydrant flushing Provides emergency preparedness • Redundancy Increase from one well to three wells and 1 MG tower Increases water capacity as demand is supported by tower and multiple wells Supports maintenance of wells and tower Provides emergency preparedness For the West Water System • Redundancy Increases from two wells to three wells Increased flow dynamics Support during water tower maintenance Added Water Capacity Provides emergency preparedness In conclusion, it is staff's goal to be proactive to provide a well -managed and sufficiently sized water system to meet current and future needs of the City versus reacting after the fact to issues that should have or could have been anticipated. That includes planning far enough in advance to accommodate construction timelines and to structure finances to meet the future funding obligations. There are numerous attachments to this memo that provided significant information about the water system and help lead to the recommended conclusion/options. It is somewhat challenging to get the entire scope of this matter from the attached documents without further explanation; therefore, all of the information will be reviewed and explained fully at the work session to give you a comprehensive understanding of the water system to enable you to make informed decisions about upcoming water system improvements and policy. 11 0 0a.-1.1: O MINNESOTA MEMORANDUM TO: Mayor and City Council FROM: Kurt Neidermeier, Utility Manager DATE: January 7, 2016 SUBJECT: Tower Maintenance Schedule Water Tower inspections are conducted on a three to five year frequency based on American Water Works Association Standards. These tank and coating inspections provide a planning basis for budgeting and scheduling repairs. Included are the engineer's project cost estimates from the 2015 inspections. Single Pedestal Spheroid: Water Tower 1 is the original storage tank providing water to the East Public Water System; its storage capacity is 400,000 gallons. The tower has been offline since 2008 as Water Tower 3 was initiated. Kollmer Consultants conducted a coating inspection in September of 2015. Water Tower #1 (1999) — East Public Water Svstem Proiect Cost Estimate: Interior Structure Repairs $7500.00 Interior Wet Coating Complete Replacement $85,250.00 Type of Coating — Epoxy/System Repair Interior Dry Coating Complete Repair $25,000.00 Exterior Structural Repairs $17,500.00 Exterior Coating Complete Replacement w/containment $169,600.00 Type of Coating — Epoxy/Urethane System Engineering Specifications and Inspection Fee $58,000.00 Estimated Total Cost $362,850.00 (2015 dollars) Staff recommends installation of a submersible mixer after cleaning to prevent future ice buildup and uniform water disinfection in 2017. $20,000.00 The adopted 2016 CIP budget scheduled $428,600.00 for Water Tower 1 repairs allowing room for the addition of a submersible mixer. Tentative Water Tower 1 Project schedule: February 2016 March 2016 June 2016 March 2017 May 2017 Engineering and specification Antenna Notification Bid Advertisement Bid Acceptance Project Initiation Project Completion Project overview: Engineering and specifications can be produced quickly as the schedule indicates. Antenna Carrier notification and requirements is directed by the Engineering firm providing opportunity for removal and temporary reset of antenna equipment and review of additional City requests. To receive the best qualified contractor and pricing through competitive bidding, it is recommended the project bid 9-12 months prior to the scheduled start date. A construction schedule of eight weeks is anticipated for the quantity of repairs. Staff has met with two consultants to further asses cost estimates and scheduling for Water Tower #1. Staff is awaiting comments from the 2nd firm. Copies of the detailed inspection reports are available for review upon request. These maintenance costs are necessary to continue distribution service and provide fire protection to our customers. Tower 1 is scheduled to be reinstated for service the last week of March of 2016 to accommodate water demands of the East Public Water System and provide continued water service during Water Tower 3 cleaning in April. Cleaning and disinfection quote $2000.00 Hydropillars: Water Tower 3 serving the East Public Water System and Water Tower #2 serving the West Public Water System is 1,000,000 gallon Hydropillars, inspected by KLM Engineering in May 2015. Water Tower #3 (2008) — East Public Water Svstem Proiect Cost Estimate: No engineer's cost estimate has been prepared as no coating repairs are required at this time. Interior Wet Structure Maintenance items include: Confirmation of weir overflow box height — adjust if needed Biofilm cleaning Sediment removal 2 Routine maintenance scheduled: Interior cleaning is tentatively scheduled for the first week of April 2016 prior to hydrant flushing. Interior sediment removal quoted at Exterior cleaning quoted at $2500.00 $9875.00 Staff recommends installation of a submersible mixer after cleaning to prevent future ice buildup and uniform water disinfection. The mixer addition is not budgeted for 2016 however staff feels the benefit and timing of installation is appropriate and benefits provide justification for installation. $20,000.00 Water Tower #2 (2004) — West Public Water System Project Cost Estimate: Interior Wet Structural Repairs $7,700.00 Interior Wet Coating Complete Repair $70,100.00 Type of Coating — Epoxy System Interior Dry Structural Repairs $9,000.00 Interior Dry Coating Spot Repair $67,800.00 Type of Coating — Epoxy System Exterior Structural Repairs $4,500.00 Exterior Coating Spot Repair at Structural Modifications $63,300.00 Type of Coating — Epoxy System/Urethane System Mobilization $25,000.00 Estimated Total Cost $247,400.00 (2015 dollars) The 2019 CIP includes $250,000.00 in 2019 for spot repairs base on these cost estimates. There is concern that coatings used in 2004 are not candidates for spot repair, if full coating replacement is required estimates would reach $908,987.00. These coatings will be reevaluated in 2019 for further information coinciding with sediment removal. Cleaning and coating evaluation 2019 $4000.00 Staff recommends installation of a submersible mixer after cleaning to prevent future ice buildup and uniform water disinfection in 2019. $20,000.00 The Capital Improvement Plan and Water Budgets will be adjusted accordingly to provide a conservative estimate for future repairs and maintenance based on findings and recommendations. wt�ti;it Minnesota Water Conservation Goals and Objectives Minnesota's existing statutes and rules establish programs and measures that are consistent with the water conservation and efficiency goals and objectives adopted by the Regional Body and Compact Council. Water conservation goals in Compact Section 4.2.1 have been adopted in Minnesota Statutes 103G.801. These goals include: a. Ensuring improvement of the Waters and Water Dependent Natural Resources; b. Protecting and restoring the hydrologic and ecosystem integrity of the Basin; c. Retaining the quantity of surface water and groundwater in the Basin; d. Ensuring sustainable use of Waters of the Basin; and e. Promoting the efficiency of use and reducing losses and waste of Water. Minnesota statutes require the Department of Natural Resources to develop and manage water resources to assure an adequate supply to meet long-range seasonal requirements for domestic, municipal, industrial, agricultural, fish and wildlife, recreational, power, navigation, and quality control purposes from waters of the state (M.S. 103G.265). Water conservation plays a critical role in balancing the development and protection of Minnesota's water resources. Minnesota's water conservation programs include water supply planning, implementation of measures to improve water use efficiencies, and placing prohibitions or limits on wasteful or inefficient uses of water. These programs guide the review of applications for the use and appropriation of waters of the state. Water Appropriation Permits. A permit is required for all groundwater or surface water withdrawals that exceed in 10,000 gallons per day or one million gallons per year. Applicants for water appropriation permits must evaluate alternatives to the actions proposed in the permit application including conservation measures to improve water use efficiencies and reduce water demand. Measuring Withdrawals. Flow meters are required to measure water withdrawals. Other methods of measurement can be approved based on the type and volume of the appropriation. DNR Ecological and Water Resources December 8, 2010 Water Use Reporting. Permit holders are required to submit annual water use reports and fees based on the volume of water appropriated. The annual water use reporting fee schedule is intended to encourage conservation, • increasing block rates for annual volumes over 50 million gallons that range from $3.50 to $8.00 per million gallons • summer surcharges for municipal use and golf course and landscape irrigation • special rates for once -through HVAC systems that use groundwater Statewide Drought Plan. This plan provides a framework of conservation measures and water use priorities for responding to drought. Water Use Priorities. Minnesota statutes establish water use priorities. Nonessential uses are the lowest priority and are subject to restrictions to protect higher priority uses. Public Water Suppliers (serving over 1,000 people) • Must have an approved water supply plan that addresses emergency preparedness, water sustainability and water conservation. • Water conservation rate structures are required by January 1, 2013. • Demand reduction measures that include conservation rates and education programs are required before requesting increases in authorized water volumes or new municipal wells. • Annual reports provide water use by customer categories and unaccounted water • Annual water use fees are subject to a summer surcharge of $30/million gallons for volumes above winter use level. • Benchmarks for unaccounted water, per capita use, and peak demands were developed in consultation with the American Water Works Association and are used for water supply planning and permitting approvals. Soil and Water Conservation Plans. Failure to implement adequate soil and water conservation measures can result in suspension or termination of a water appropriation permit. Landscape Irrigation Systems. Automated irrigation systems are required to have technology that inhibits or interrupts operation during periods of sufficient moisture. Prohibited or Limited Uses. The use of groundwater for augmenting surface water basins and groundwater use for once -through heating ventilation and air conditioning (HVAC) systems. DNR Ecological and Water Resources December 8, 2010 East Water System Capacity Summary Year Oa Water System Description 100 REC's per Capacity in REC's Estimated Notes Comments TodayCapacity Expenditure Year > Existing System Water Tower #3 Past 1313 n/a Requires Improvement Not dire but needs addressing soon - equates to 2.9 hour fire Well #3 and Well #8 fighting ability versus suggested 3 hour fire fight ability Water Tower #3 Well #3 and Well #8 2018 1786 Need Policy change and Only obtains two additional years ✓ ✓ and Odd/Even Ban enforcement Increased dependency on Well #8 $450000 Water Tower #1 and Water Tower #3 WT #1 Rehab 14 additional years of service for $450k and creates a drought with All Wells 2030 2872 $40,000 tolerant system - creates a more flexible system to allow ✓ ✓ ✓ ✓ decreased reliance on Well #8 2 Circulating Pump s Water Tower 41 and Water Tower #3 $450000 with All Wells 2039 3866 WT #1 Rehab Need Policy change and Preferred option to extend the Capcity year beyond 2030 when ✓ ✓ ✓ ✓ ✓ and Odd/Even Ban $40,000 enforcement the east and west systems will likely be connected 2 Circulating Pumps - Haicanson ■■Anderson * January 1st, 2015 = 1406 RECs +Wells #1, #2, and #8 have Radium Issues Redundancy - ability to handle water supply with a well off the system Fire - ability to handle 3 hour fire during peak day demand with best well out Drought - ability to handle long periods of high demand with no wells out Regulatory - meet DNR policies regarding conservation of water resource efforts EAST OTSEGO MUNICIPAL WATER SYSTEM I, 9 T E i• w w a N 11 C ,1� WELL #2 a WELL #6 PUMP HOUSE #1 I II WELL #1 78THS REET ALTITUDE VALVE a a °a + r 4� fit• --�\ ST ET ��[! l: WATER TOWER #1 1 ;1 65TH S REET BOOSTER STATION/ ALTITUDE VALVE ALTITUDE VALVE PUMP HOUSE #2 z E w y ' a 3 WATER TOWER #3 D 7 ®® 0 11, WELL #3 WELL #8 1 \ Y I! Legend N ® Watermain Frj Parcels w + E ot�i��o �-�- Raw Watermain 11 City Boundary ��D"� Higher Pressure Area °S MINNESOTA DATASOURCES: W lGI COUN SURVEYDERT.,MNDNR,BCITYOFOTSEGO DATE:MARCH 2O13 E 0 0 C%l V. E uj 0 0 E c-, C) Elf 0 o Li o Ld LLI z 0 U) uj 03 V) < I H ff�7' CL U- O 00 CL C:) LJ .4, -9 'M --N ;,­3 1 RIA Le a West Water System Capacity Summary ,. ,. V, .. Existing System Water Tower #2 2019 1918 n/a 3 years away from minor issues involving storage capacity Well #4 and Well #5 of West Otsego Water System Water Tower #2 $800,000 Open Cut Remedies two water supply issues with one project. Well #4 and Well #5 2023 2342 or $1,250,000 Directional bore 1) RWN water supply and fire protection ✓ .... w/ Connection of Well #7 plus $250,000 for Well #7 2) Storage Capacity of West Otsego Water System and Upgrade Well #7 upgrade 3) Promotes development of Industrial sites along Radler Ave Existing System Water Tower #2 ✓ ✓ ✓ ✓ �t ' Well #4 and Well #5 2026 2595 $0 Need Policy change and No cost and delivers 10 years with no storage capacity issues. w/ Odd/Even Watering Ban enforcement Does not address RWN water supply or fire protection issues. ./ • �v Water Tower #2 $800,000 Open Cut Well #4 and Well #5 w/ Connection of Well #7 2032 3199 or $1,250,000 Directional bore Need Policy change and Preferred Option - Provides service beyond 2030 @ 100 new RECs ✓ V, V, Combined w/ Odd/Even Watering Ban plus $250,000 for Well #7 enforcement per year at which point east and west connection is likely West and Upgrade of Well #7 upgrade 1-111Anderson Hal<anson * January 1st, 2015 = 1483 RECs Redundancy - ability to handle water supply with a well off the system Fire - ability to handle 3 hour fire during peak day demand with best well out Drought - ability to handle long periods of high demand with no wells out Regulatory - meet DNR policies regarding conservation of water resource efforts v � CD CD D CD O N O m � - CL -�i n. Z. O_ Ut 0 � 1 � 1 O � 7 1 � N � O_ N rr ti- r-i- '"S G CD CD (D N C)C) = N G) �s m SllC CD CD X d Co G O Cn h - a- ® n 00 O V q J n 3 In m INJ Z wo �Q C) U U d U d' W N V) O x W --� U EL IL za a aZz ® ��a YO~ x W I w co ❑ II co O N II w Q> II �ry II U) w W J_ M N II a d Ilo III II � w 3 p ~ N H a 3 n a N W p 3 a N rn J H 3 �- 6.xpyxg .(}{aoEo� waps(5 �a}oM}saM\9N1Yi3N19N3\SWZ-1O6L0\1tld10{NOH\SL�3fO8d\6urPna\�H woa[�Ot — 5laL '6L azd