Loading...
05-11-11 PRUTEM 5_-1 Memo To: Chair Mike Brum, Vice Chair Krista Bean, Commission Members Kathy Roberts, Susan Krekelberg, Peter Torresani, Rose Cassady and Duane Lauseng CC: Mayor Jessica Stockamp, Commission Member Doug Schroeder, Tami Loff City Clerk and City Planner Dan Licht From: Sandy Date: May 3, 2011 Re: Home School Softball Club Kari Strunc, Coordinator for the Home School Softball Club, is interested in renting or using the softball field in Prairie Park in late July or August when most leagues are done. The requested dates shall not conflict with any scheduled tournaments. It is up to the Parks and Recreation Commission to recognize this as a youth association where there would be no fees involved in the usage of the field. If not recognized, the group would be charged $ 100. 00 per day in accordance with the fee schedule adopted for field usage. TPC3601 Thurston Avenue N, Suite 100 Anoka, MN 55303 Phone: 763.231.5840 Facsimile: 763.427.0520 TPC(Z.P Plan ni ngCo. com I&PUM191-MINI"11 IT, TO: Otsego Parks and Recreation Commission FROM: Daniel Licht, AICP DATE: 11 May 2011 RE: Otsego — Recreation programming work shop TPC FILE: 101.01 City staff would like to schedule a work shop of the Parks and Recreation Commission for Wednesday, 18 May 2011 at 7:00. The purpose of the work shop is for the Parks and Recreation Commission to meet with representatives of the City of Elk River regarding recreation programming goals. An email regarding the work shop was previously sent to Parks and Recreation Commission members. City staff received confirmation from Commissioners Bean, Krekelberg and Roberts. At least one more Commissioner would need to attend for a quorum to be present. Alternate dates could also be considered if that is the preference of the Parks and Recreation Commission. C. Tami Loff, City Clerk Gary Groen, Finance Director Brad Belair, Public Works Supervisor I -r EE M 6 3601 Thurston Avenue N, Suite 100 Anoka, MN 55303 Phone: 763.231.5840 Facsimile: 763.427.0520 TPCTPC@PlanningCo.com MEMORANDUM TO: Otsego Parks and Recreation Commission FROM: Daniel Licht, AICP DATE: 4 May 2011 RE: Otsego — Prairie Park; Splash pad plans and specs BACKGROUND The Parks and Recreation Commission and City Council previously approved a concept plan for construction of a splash pad at Prairie Park. City staff and SRF have advanced the project to complete plans and specifications and cost estimate for construction. Items of note or specific review by the Parks and Recreation Commission: The sidewalk at the perimeter of the splash pad is specified to be colored to reduce staining from well water. Two controllers are to be installed to regulate the toddler and family/teen spray features separately. The landscape plan will be developed by Aaron Dorvinen working with City staff as his of an Eagle Scout project. It is expected that the landscape plan would be submitted to the Parks and Recreation Commission and City Council after construction approval for the overall splash pad project by July. Public Works staff will also obtain quotes for the irrigation system to be considered at the same time. The City Engineer and SRF have worked together to design a drainage system that will flow by gravity from the splash pad to the wetland area at the west side of Prairie Park without the need for storage tanks and/or pumps reducing both cost and complexity. The Parks and Recreation Commission must select the design for the rock wall from the three samples provided. The plans involve removal of additional asphalt trail adjacent to the play containers due to wear as recommended by Public Works Supervisor Belair. These asphalt trail sections would be replaced with concrete. City staff met with Wright -Hennepin Electric Co -OP to discuss a pedestrian lighting plan for the trails within Prairie Park including adjacent to the proposed splash pad. These plans will be submitted for review by the Parks and Recreation Commission at their 11 June 2011 meeting. Labor for the project will be broken down as follows. Those items to be performed by contractor will involve solicitation of quotes for City Council approval. 1 . Project oversight: City staff 2. Removals: Public Works 2. ' Surveying: City Engineer 3. Splash Pad piping/concrete/mechanicals: Contractor 4. Sitting walls: Contractor 5. Landscaping: Dorvinen/Public Works 6. Irrigation: Contractor 7. Furniture/Signs: Public Works The project costs for labor and materials are summarized below. Estimated costs reflect the numbers used in developing the concept plan: 1 Splash Pad: a. Controller: $51,260 b. Facility: $77,642 2. Tables: $ 3,150 3. Drainage system: $20,103 4. Landscaping: $11,800 (est.) 5. Lighting: $ 6,000 (est.) 6. Irrigation: $ 4,500 (est.) 7. Signage: $ 2,500 (est. TOTAL: $176,955 The total project cost as outlined on the estimate for Concept Plan A-2 dated 8 March 2011 was $135,480.00 and did not include the drainage system. The project cost based on the plans and specifications has a $15,150 increase for asphalt and concrete. There is additional pavement replacement based on the drainage solution chosen, although that solution will reduce the overall project costs. The cost to add color to the perimeter sidewalk adjacent to the splash pad is $3,340. City staff expects the costs for landscaping, lighting and signage to be significantly less than the concept plan estimate but has used these numbers above for continuity. 2 EXHIBITS A. Cost estimate (3 gages) B. Sitting wall cut sheets (6 sheets) C. Table photo (1 page) D. Splash pad plans and specs (10 sheets) E. Drainage plan (2 sheets) RECOMMENDATION City staff recommends approval of the Plans and Specifications for consideration by the City Council at their meeting on 23 May 2011. POSSIBLE ACTIONS A. Motion to recommend approval of plans and specifications for construction of a splash pad at Prairie Park. B. Motion to table. C. Tami Loff, City Clerk Gary Groen, Finance Director Brad Belair, Public Works Supervisor Ron Wagner, City Engineer Andy MacArthur, City Attorney Timothy Wold, SRF Aaron Dorvinen Prairie Park Splash Pad Otsego, Minnesota UNIT LEGENDS: LS=Lump Sum, SF=Square Feet, SY=Square Yards, EA=Each, LF=Lineal Foot, FF=Face Feet, CY=Cubic Yards, AC = Acres SRF Consulting Group, Inc. Project No. 0005521 Prairie Park Splash Pad - Construction Cost Estimate 5/5/11 1 - Site Surveying Removals Estimated Unit Cost Total Cost No]Section Description Qty- Unit (in Dollars) (in Dollars) Provide all necessary construction surveying 1 and staking to meet layout and grading 1 LS $500.00 $500.00 requirements for all work - complete 2 Remove all items specifically noted for 1 LS $3,500.00 $3,500.00 removal on Sheet 1 - complete. Section 1 - Site Surveying/Removals Total: $4,000.00 Estimated Unit Cost Total Cost No]Section 2- Earthwork Description Qty- Unit (in Dollars) (in Dollars) 1 1 Furnish and install 12" depth topsoil 288 CY $9.00 $2,592.00 Section 2 - Earthwork Total: $2,592.00 Estimated Unit Cost Total Cost No]Section 3- UtiliteLq2§cription Oty. Unit (in Dollars) (in Dollars) Furnish and install 4" PVC water service 1 including connection to existing irrigation 305 LF $22.00 $6,710.00 service and all required appurtenances - complete. Furnish and install 2" PVC water service 2 pipe and all required appurtenances - 56 LF $16.00 $896.00 complete. Furnish and install 6" PVC drainage pipe 3 from splash pad drains to storage tank - 86 LF $15.00 $1,290.00 [complete. Section 3 - Utilities Total: $8,896.00 ISection Estimated I Unit Cost Total Cost No. 4- Asphalt &Concrete Description Qty- Unti (in nmilars) (in Dollars) Furnish and install asphalt paving for trails, 1 including 2 1/2" thick MnDOT 2360 asphalt 112 SY $21.00 $2,352.00 wearing course and 6" MnDOT 3138 Class 5 aggregate base -complete 2 Furnish and install 6" thick concrete paving 2,481 SF $7.00 $17,367.00 with integral color - complete. 3 Furnish and install 4" thick concrete paving 1,336 SF $6.00 $8,016.00 with integral color - complete. 4 Furnish and install 4" thick concrete E 2,692 SF $3.50 $9,422.00 complete Section 4 - Asphalt & Concrete Total: $37,157.00 Prairie Park Splash Pad Otsego, Minnesota SRF Consulting Group, Inc Project No. 0005521 ALTERNATE BID ITEMS I Estimated No.iAlternate Bid IteM_g2§cNptiion Unit Cost Total Cost No. Section 5- Site F�L��Description QtV. Unit (in Dollars) (in Dollars) $3,000.00 Install splash pad spray features, controllers, $150.00 Alternate Bid Items with 5% Contingency $3,150.00 and timer/power source including electrical 1 service, enclosure and concrete pad for 1 EA $12,500.00 $12,500.00 timer, 1" PVC piping, and all necessary appurtenances - complete. Furnish and install modular block seatwall 2 with cap including 6" MnDOT 3138 Class 5 340 FF $25.00 $8,500.00 .aggregate base - complete. I 3 Reinstall salvage benches and trash ireceptacle 3 EA $100.00 $300.00 - complete. Section 5 - Site Furnishings: $21,300.00 Subtotal $73,945.00 5% Contingency $3,697.25 Total Estimated Construction Cost with 5% Contingency $77,642.25 ALTERNATE BID ITEMS No.iAlternate Bid IteM_g2§cNptiion Estima Qtyi:te:d . � (Unit C.st) in Doll rs Total Cost (in Dollars) 1 1 Furnish and install picnic tables- complete. 3 EA 1 $1,000.00 $3,000.00 Alternate Bid Items Total $3,000.00 5% Contingency $150.00 Alternate Bid Items with 5% Contingency $3,150.00 ENGINEER'S ESTIMATE EFFLUENT PIPE PLAN PRAIRIE PARK SPLASH PAD CITY OF OTSEGO ITEM NO. SPEC. REF. DESCRIPTION UNIT UNIT COST TOTAL ESTIMATED QUANTITY TOTAL ESTIMATED COST 1 F021 5-01 MOBIL17ATION LUMP SUM $500.00 1 $500 2 2601.515 8"METALAPRON EACH $200.00 1 $200 3 2502.621 6" PVC PIPE DRAIN L $ 0 2NN 4 2502.541 18" PERF PE PIPE DRAIN LIN FT 5 1 1�206 5 2506.501 ICONSTRUCT DRAINAGE STRUCTURE DESIGN N �E�ACH $ 50.00 4 6 2506.516 1 CASTING ASSEMBLY I EACH 1 $425-00 4 K:'cad_eng�PROJECTSWUNICIPAL%OT720-201 I�Exoehsplash Paftt720-Scheduleuds March 30. 2011 Prairie Park Splash Pad City of Otsego Site Furnishings Tables 46"Round ADA Accessiblie Color: Dark Blue Top/Seats with Black Frame Seat Walls Keystone Verazzo or approved equal Color: Buff SRF Consulting Group, Inc. May 5, 2011 PLAN SYMBOLS STATE LINE COUNTY UNE - TOWNSHIP OR RANGE LIN, SECTION INE QUARTER I SXTEENTH LNE . ... . ... GENERAL SITE IMPROVEMENTS Ll ohki I RIGHT -OF -W AY UNE— P ESENT RIGHT-OF-WAY LINE— _0_0_0_ Consulting Group, Inc. C NTROL OF ACCESS LINE PROPERTY LINE (E .. pt Lord Lines) - VACATED PLATTED PROPERTY CORPORATE OR CITY LIMITS TRUNK HIG WAY CENTER LINE - - - - - - - - - - P-' T PRAIRIE PARK CITY OF OTSEGO C C. RETAINING WALL RA�UROA RA LROAD RIGHT-OF-WAY LINE SPLASH PAD QUOTE PACK RIVER OR CREEK DR R Y V Ce 1hall 1h C, _g Ut7 re DRAINAG DITCH RA N TI D I CULVERT SIZE CONSTRUCTION PLANS FOR WATER AND ELECTRICAL SERVICE, INTEGRALLY COLORED CONCRETE, .0"". DROP INLET GUARD RAIL BARBED WIRE FENCE 0� MODULAR WALLS, AND LANDSCAPING. PRINT NAME: TImothy B. Wold WOVEN %RE FENCE — W W SIGNATURE: DATE: MaY 5. 2011 CHAIN LINK FE CE— RAILROAD SNOW FENCE— —XC—XC� LIaNSE #: 42164 FE STONE WALL OR NCE— HEDGE RA �L OAD CROSSING SIGN - A UROAD CROSSING EIEUL— ELECTRIC WARNING SIGN 6005tHM &MUMICAT)" Remms CRO SING GATE EANDER CORNER MAIL BOX + MB THE 20M OPMON Or TIM 1-�A MrAftnWr OF TRUMMOWATMM STAMPARD INFOU'rATUNIS PM CAPHSTMOTIOW BHA" 6000ft NO. DATE BY CHICO APPR SPRINGS MARSH T ==ZT r 0 WrLangA SWOWNWIN AND IMT I AN A MLY LrAM490 LAN05C.W0 TIMBER ORC ARD BRU H AW.*rTWr UMPM TM LAM OF TM STATr OF V-�A, Print Nwe: 'nMCTHY 5. PYa.D DRAWN BY Tw DEMNED BY Tw NURSERY CATCH BASIN C.B. 0 FIRE HYDRANT — -(� CHEOM BY KG COMM. NO. 0095521 CATTLE GUARD— y &I y --7-7= 42164 OVERPASS (High.,y O�)-- UNDERPASS (High..y Urd.,)— Arr BRIDGE BUILDING (Ore Story Fr.me) F -FR ME C -CONCRETE 75' OTSEGO Al S -STONE T- TILE SHEET INDEX B_ BIR CK ST -STUCCO IRON PIPE OR ROD MONUM ENT (STONE. CONCRETE. OR METAL) WOODE N HUR 1 2 CZ)VER. SHEETANVEX R.EMOVAL5/EXST1N(5 CAONPITIONS PLM 4-J 0 GRAVEL PI G 3 4 OVERALL LAYOUT PLAN LAYOUT ENLAR&EMENT PLAN SAND PIT S 0 C z 8 RROW PIT— ROCK OUARRY 0 @ 5 6 PAVEMENT/JOiN-nNG PL -Z 57RAOIN& PLAN g < 2 CL E Un S 1 LANDSIC-APE PLAN LLJ = 0 UTILITY SYMBOLS Sch I PLANTINIS DETAILS U) cm (1) POWER POL LINE L.k 10 MSCELLANEOUIS OETAL-S 5EAT YAALL PLAN :5 V) 4--j a- U) ce TELEPHONE OR TELEGRAPH V) 0 LU POLE I -I E JOINT TE PHONE AND POWER 0 ON POWER POL S ON TELEPHONE POLES E) 8 ANCHOR STEEL TOWER A STREET UGHT ST. MICHAEL PEDESTAL (TEUEPHCNE CABLE TERMINAL) Ste' 11=POP. Foster Lok. GAS AIN WATER MAIN I CONDU T TELEPHONE CABLE IN CONDUIT —T ELECTRIC CABLE IN CONDUIT ====�P TELEPHONE MANHOLE ELECTRIC MANHOLE :URIE TELEPHONE CABLE —T- UR— URIED ELECTRIC CABLE AERIAL T EPHONE CABLE SEWER. (SANITARY) -----P-BUR— SHEEr SEWER, (STORM) BE _WER MANHOLE OF HANDHOLE dH 10 OWL' A101 TBC C: 914.1 0 1-9 \ CONCRETE 912.1 VALLEY GUTTER 8 19 O:F TBC 913.64 \j /7 911.80 911 7 N.59 X911.32 2.10 X 912.20 X912.32 X912.69 X 912.85 91 Z TBC 911.251�q 913.261 �Ie LO) rz Ce rp) II X912.4' 3 TBC TBC 913.95 913.95 -�X S14 -a,5 9A6 7 d �iy 4 03 913.0 x 91 6� x 91 2.04J X911.74 -915- 914- _qj O'L/8 X911.05 91 RJ3,4OVE PLAY CURB AND BITJMINOUS PAVEMe4T THIS AREA - SALVAISIE: BENC,H AND TRASH RECEPTACLE 91 /911 914 i I ; 91 J. 94 m!movE Brn�imm X912.23 -4 PAVE!MENT (BY OTHIRS 4 4. 4 . 4 P1CMCXRj[�,TER A .4 .4 9 12.38 *942-44 - - - - - )(9 2-.3-2- - -:3�12.03 912.14 911.03 0 911.8 911 X 911.51 X911.13 (BY OTHERS) REMOVE TREM 4 SHRUBS, rY?. (BY OTHERS) 1311. PATH Xlfl Namk 1. CoONTR0114TOK SMALL REMOVE ALL n" RZ2,111IRM TO C400TPILIC11' FRADPOSM NFRO� INC-41CHIS GL#06. A -A MATOwd- Am roorme As 04CAOUNTIPM. --2. C42,11TRA4TOK SMALL FftOIWT ALL M*0 TO RIW4K 11"I'MMIS, TO IR04AN VA#4ASM SMALL W PWAMM OR KNOLACM TO PREWPOTPUACrION WNIPMON AT THE CAONTRAO"Toft C445M S. C42,1171'PLACT011111t SMALL CoOOPtPlNATE Y40ORK rfW OTH19t C424TPItAf,T0M ON SM 4. ALL 067UROW AftbAS SMALL W 11IMTORIV TO FIM S. C0124TRACTOIlt SMALL SIC P2511"ONS" FM SOCARINS THE rRjOJBCr SM TH11111140IJ!" THE UM OF POCIN6 OR OTHat APPROV11W NeTwv TRAILS Avu*aw TO THE r04%wT Srm AM TO Rib" Om THRAOIJ1115440IN THIS PLIKATICK OF GONsTmAcnoM. KEMOVE� TR� I SHRLSS,TYP. (BY OTHERS) 908.97 REMOVE MISCEL.LANEOU5 coNaRem FoornN69 PSITHIN BITUMINOUS PAVEMENT - COMPLEM (BY OTHERS) REMOVE BITUMINOUS PAVEMENT - SAN 0JT EP615 APJACO'41T TO PAVEMENT TO RE!MAdN, TYP. (B*YCTHER5) 911.14 X91 .75 X91 911.8 911.251�q 0 �Ie LO) rz Ce 0 X9 0.69 S z 8 5HRVBB,TYF. 0 X 910.85 z (BY OTHERS) -, 1-1 4-1 910.29 0 SALVAGE BENCA4 AND FkC:Nr- -Z TABLES - REMOVE FOOTNGS U AS ENOIDIINTERW, TYP, (BY OTHERS) 911.01 Q) x9A58 -u-- (D) C� tv x 10.47 0-) )11.45 X911.99 E)- xZ09.93 X 911.6 6 0 Is so / wA" in foa /�E� I I 161 Oki I Consulting Group, Inc. OTSEGO ON THE GREAT RrVER ROAD I heir Ytc8nt.ha sgp.la�.' t'CIV. 1. ' al. red .UL- unN.r my,'di.-I suipe-on , , l � . ce -9� jCd- nchitect undgr e la- of St.tg%A f Minnesota. PRINT NAME: TImothy B. WoIId SIGNATURE: DATE: May S. 2011 LICENSE #: 42164 REVISIONS NO. DATE BY CHKD APPR DRAWN BY TW DESIGNED BY TW CHECKED BY KG COMM. NO. 0083521 SHEET 2 OF 10 4-J 0 0 �Ie LO) rz Ce 0 S z 8 LU M 0 z 4-1 0 4- 0 U SHEET 2 OF 10 0 rri 912.19\ 916 9 -915,12.04JI F1 JRZAL t-�: ALL ELECTRICAL 111ORK SHALL BE PERFORMED BY LICENSED ELECTRICAN (STATE OF MINNESOTA) AND CONFORM TO ALL LOCAL AND STATE COVE. THE CONTRACTOR SHALL WORVINATE CZ)NTROLI-ER. FRO&RAMMIN6 Y41TH MANUFACTURER AND PROVIDE GENERAL NOTES: 1. C-ONTRAC-TOR. SHALL STAKE THE LAYOUT OF IMPROVEMENTS A4,V HAVE SUCH STAKIN6 APPROVED BY T14E OY0e1;?.'S REPRESENTATIVE MOP. TO PROCEEDING ATH CONSTRIX-TION. -'2. Y4RIrrEN DIMENSIONS SHALL PRLVAIL OVER, DRAWNG. Consulting Group, Inc. 91 4- OPERATIONAL TRAINING TO THE ONNEIR� -912- 9. RADII ARE 5'UNLE55 OTHERASE NOTED. 4. ALL I�IMEN51ON5 TO CURB ARE MEASURED FROM EACX OF OURB. 5. ALL U15TURSED ARE,6-5 SHALL BE RESTORED TO FINISH &RAVE AND SODDED UNLESS OTHERNISE NOTED. Clrf OF OTSEGO ��O`N THE G EAT R NIT R ROAD X912.4� rri 911.80 X911,�5 9 S. /8 S?, x 911.05 6. BENCHMARKS AND SURVEY OONTROL SHALL BE PROVIPEV BY THE OYNER, AT THE TIME OF 0ONSTRIJr-TION. r. �- - 4' THICK COW-R.ETE YNIALK''I"Y'P. (f) MATCH GRADES Y41TH ADJACENT PLAY CONTANER. CURB, -1-M. U 908.97 SMART POINT C-ONTROLLER (2) X69.61 .ycen1,ha1.t11.s I hg� Pe r a d P t p.la�." 9 r unaer my. dl�t supervLsIon afid am Lwd-t -ha1tVty.U=M1a..1 t Stgp%� he f Minnesota. MDR NAME: 71mothy B. Wold SIGNATURE: DATE: May 5, 2011 LICENSE *: 42164 RLVISIONS NO. DATE BY OWD APPR 911. 7 .59 /9'1-�2 TIMER/POAER. SOURr-E KTH ENCL05URE ON 12. 5 CONICIREM PAO ............... \SALVAGED 4 C-ONORETE AREA A44SESS 9�6 RAMP PROVIDE ELECTItr-AL CAVININECTION FROM 911.. REINSTALL SALVA6W 15 BENCH 4 TRASH EXISTIN& PANEL TO SPLASH RAI;? RECEPTA(-LE TIMER/POY�ER SOURCE (120 VOLT, 5 AMP) WILLON& Mma. 7 X912.03 , "12 BIT. PATH ��10.20 9 6 \-914 ALL FIFIN& BETY4EEN SPRAY FEATURES AND CONTROLLERS SHALL BE 1' SCHEDULE 40 1, PVC, TYP. 2" PVC, YNIATER. SERVIC-E TO EACH CZ)HTROLLER 911.14 x 91 .75 DRAVM BY Tw DESMWD BY Tw OiECKED V KG CONN. N& 0085521 ... ..... . ........... 7 ............... . . . . . . . . . ..... . . . ......... .... ... . ... ...... . .. .. ... . . ... .... .. ...... ..... .. .. .. . ... .... ..... ... . .......... .... . ..... ........ ....... ....... . .. .. . ... . .... . ... ... .... .......... ....................... v YCM BM)HNOA TRAL -X191 �u ...... qi� 51 x 910.85 4 4 2.10 X 912.20 4 PIDflCxPj.%TER r'AL FROVIOE ELFJ-TR - SERV= WORDINATE INSTALLokTION OF FROM TIMERVPOP4ER SOURCE TO YiATER. SERVICE PIPE ATH EACH CONTROLLER (24 VOLT) DRAINAGE PIPE NSTALLATION - INCLUDING NM SEE PRANA6E FLAN5. 912.3bi C-ONNEjr,T TO EXISTING IRRISATION 1� INATER. SEIRVICE LINE -X-912--&2- - - - 12.03 IQ 2�11 X911 SELF-DRANING CURB BOX (2) x .4j--- R09M TO DRAINA&E X910.69 PLANS FOR PIPE SIZE AND ROUTINC, FOR ALL DRAINA&EPPE 910.2 4" rVC AATM _91 0 4" THICK CONCRETE ViALK, TYP. MATCH GRADES X9A58 YNITH ADJACENT PLA�Y CONTANER. x 10.47 C'URB' TYF. 0) 4-J V) < LU 0 �--4 U) CU 4-J U) 0 0 -0 U 0 > 0 x 911. 99 X912.32 X910. CIONCIRIETE PLAY AREA X912.69 X 912.85 X911.51 X911.13 ACIGESS RAMP - FIELD VER 1;� LOCATION)NI-1-H 011 0 a w 6 In ftft X911.66 SHEEr 3 OF 10 0 ?OJECT )CATION 0 - INDICATES PROJECT LOCATION 1. BARE ROOT PERENNIALS MUST BE INSTALLED IN THE SPRING NO LATER THAN JUNE 1ST OR FOLLOW THE FALL DECIDUOUS PLANTING DATES. 2. ACTUAL DATES MAY CHANGE DEPENDING UPON SEASONAL CONDITIONS, AS DETERMINED BY THE ENGINEER. 3. FALL PLANTING IS NOT ALLOWED FOR BARE ROOT FORM OF THE FOLLOWING SPECIES: HAWTHORN, DOGWOOD, POPLAR, HACKBERRY, LINDEN, IRONWOOD, HONEYLOCUST, BIRCH, MOUNTAIN ASH, MAPLE, WILLOW, CRABAPPLE, PLUM/CHERRY, OAKS, AND SUMAC. I PLANTING DATE BY ZONES I KEY I SPRING I FALL I nFrintimis, I r.nNIFFRnI I� I PrRFNNIALS I <ZFFm iNrq I DECIDUOUS AFKIL / I AVIIIL / I AI'KILJ / TO TO JUNE 1 To MAT 1 NOV. 5 SEPT. 11 TO TO TO 0/mON/ I MAY 17 1 JUNE 15 MAY 7 1 UL " 1'U I "U" "5 PLANT INSTALLATION PERIOD LONG DILYPROPYLENE OR OLYETHYLENE, 40 MIL THICK NO 1.5" WIDE STRAPS. TTACH WITH 10 go WIRE. PLANTING PLANTING A SOIL SOIL MULCH MULCH 171 :1B B BALLED & BURLAPPED STOCK 1. SCARIFY SIDES AND BOTTOM OF HOLE. 2. PROCEED WITH CORRECTIVE PRUNING AS DIRECTED BY THE ENGINEER. 3. SET PLANT ON UNDISTURBED NATIVE SOIL OR THOROUGHLY COMPACTED PLANTING SOIL. INSTALL PLANT SO THE ROOT FLARE IS AT OR UP TO 2" ABOVE THE FINISHED GRADE WITH BURLAP AND WIRE BASKET. (IF USED). INTACT. 4 - BACKFILL TO WITHIN APPROXIMATELY 12" OF THE TOP OF THE ROOTBALL, THEN WATER PLANT. REMOVE THE TOP 1/3 OF THE BASKET OR THE TOP TWO HORIZONTAL AND NAILS FROM THE TOP 1/3 OF THE RAI I. REMOVE ALL TWINE. REMOVE OR CORRECT STEM GIRDLING ROOTS. 5. SLIT REMAINING TREATED BURLAP AT 6" INTERVALS. - PLUMS AND BACKFILL WITH PLANTING SOIL. 7. WATER THOROUGHLY WITHIN 2 HOURS TO SETTLE PLANTS AND FILL VOIDS. 8. BACK FILL VOIDS AND WATER SECOND TIME. 9. PLACE MULCH WITHIN 48 HOURS OF THE SECOND WATERING UNLESS SOIL MOISTURE IS EXCESSIVE. INSTALLATION OF PLANTS 1. SCARIFY SIDES AND BOTTOM OF HOLE. 2. PROCEED WITH CORRECTIVE PRUNING OF TOP AND ROOT AS DIRECTED BY THE ENGINEER. 3. REMOVE CONTAINER AND SCORE OUTSIDE OF SOIL MASS TO REDIRECT AND PREVENT CIRCLING FIBROUS ROOTS. REMOVE OR CORRECT STEM GIRDLING ROOTS. 4. SET PLANT ON UNDISTURBED NATIVE SOIL OR THOROUGHLY COMPACTED PLANTING SOIL. INSTALL PLANT SO THE TOP OF THE ROOT FLARE IS AT OR UP TO -r ABOVE THE FINISHED GRADE. 5. PLUMB AND BACKFILL WITH PLANTING SOIL. 6. WATER THOROUGHLY WITHIN 2 HOURS TO SETTLE PLANTS AND FILL VOIDS. 7. BACK FILL VOIDS AND WATER SECOND TIME. 8. PLACE MULCH WITHIN 48 HOURS OF THE SECOND WATERING UNLESS SOIL MOISTURE IS EXCESSIVE. TEEL POST SEE CHART ZONE 2 MA�N- in IULCH ONTARIO INISHED GRADE INDISTURBED SOIL STEEL POST SIZING CALIPER STEEL POST TYPE APRIL 21 APRIL 21 MAY 1 APRIL 21 OCT. I AUG. 25 7'-G-,) I -U4'-Cr T174 T- TO TO 1 TO TO 1 TO 1 TO I �1")- B.B. GREATER 10'. 2.2 LB. FLANGED JUNE 1 JUNE 1 JUNE 1 5 JUNE 1 NOV. 1 SEPT 16 AFKIL / I AVIIIL / I AI'KILJ / TO TO JUNE 1 To MAT 1 NOV. 5 SEPT. 11 TO TO TO 0/mON/ I MAY 17 1 JUNE 15 MAY 7 1 UL " 1'U I "U" "5 PLANT INSTALLATION PERIOD LONG DILYPROPYLENE OR OLYETHYLENE, 40 MIL THICK NO 1.5" WIDE STRAPS. TTACH WITH 10 go WIRE. PLANTING PLANTING A SOIL SOIL MULCH MULCH 171 :1B B BALLED & BURLAPPED STOCK 1. SCARIFY SIDES AND BOTTOM OF HOLE. 2. PROCEED WITH CORRECTIVE PRUNING AS DIRECTED BY THE ENGINEER. 3. SET PLANT ON UNDISTURBED NATIVE SOIL OR THOROUGHLY COMPACTED PLANTING SOIL. INSTALL PLANT SO THE ROOT FLARE IS AT OR UP TO 2" ABOVE THE FINISHED GRADE WITH BURLAP AND WIRE BASKET. (IF USED). INTACT. 4 - BACKFILL TO WITHIN APPROXIMATELY 12" OF THE TOP OF THE ROOTBALL, THEN WATER PLANT. REMOVE THE TOP 1/3 OF THE BASKET OR THE TOP TWO HORIZONTAL AND NAILS FROM THE TOP 1/3 OF THE RAI I. REMOVE ALL TWINE. REMOVE OR CORRECT STEM GIRDLING ROOTS. 5. SLIT REMAINING TREATED BURLAP AT 6" INTERVALS. - PLUMS AND BACKFILL WITH PLANTING SOIL. 7. WATER THOROUGHLY WITHIN 2 HOURS TO SETTLE PLANTS AND FILL VOIDS. 8. BACK FILL VOIDS AND WATER SECOND TIME. 9. PLACE MULCH WITHIN 48 HOURS OF THE SECOND WATERING UNLESS SOIL MOISTURE IS EXCESSIVE. INSTALLATION OF PLANTS 1. SCARIFY SIDES AND BOTTOM OF HOLE. 2. PROCEED WITH CORRECTIVE PRUNING OF TOP AND ROOT AS DIRECTED BY THE ENGINEER. 3. REMOVE CONTAINER AND SCORE OUTSIDE OF SOIL MASS TO REDIRECT AND PREVENT CIRCLING FIBROUS ROOTS. REMOVE OR CORRECT STEM GIRDLING ROOTS. 4. SET PLANT ON UNDISTURBED NATIVE SOIL OR THOROUGHLY COMPACTED PLANTING SOIL. INSTALL PLANT SO THE TOP OF THE ROOT FLARE IS AT OR UP TO -r ABOVE THE FINISHED GRADE. 5. PLUMB AND BACKFILL WITH PLANTING SOIL. 6. WATER THOROUGHLY WITHIN 2 HOURS TO SETTLE PLANTS AND FILL VOIDS. 7. BACK FILL VOIDS AND WATER SECOND TIME. 8. PLACE MULCH WITHIN 48 HOURS OF THE SECOND WATERING UNLESS SOIL MOISTURE IS EXCESSIVE. TEEL POST SEE CHART ZONE 2 MA�N- in IULCH ONTARIO INISHED GRADE INDISTURBED SOIL STEEL POST SIZING CALIPER STEEL POST TYPE A B C D LESS THEN ROLLED STEEL FENCE POST (Mn/DOT 34-03) 7'-G-,) I -U4'-Cr T174 T- 3'-0* 4 INCHES OR APPROVED EQUAL. VINES MIN. �1")- B.B. GREATER 10'. 2.2 LB. FLANGED (TV') (1.5") B.B. (61-) (1 T) (1.75-) B.B. (66") THEN 4 INCHES CHANNEL STEEL SIGN POST (Mn/DOT 3401) MIN. (19") (3*) B.B. (96') (29-) OR APPOVED EQUAL. (2R (47) B.B. (129"�----T2 ) CONIFEROUS TREES AT LEAST 2/3 OF ALL CONIFER BRANCHES WILL CONTAIN TERMINAL BUDS STAKING AND GUYING 1. STEEL POSTS TO BE NOTCHED OR DRILLED TO RETAIN GUY WIRES. PLACE OUTSIDE OF ROOT BALL. DRIVE PLUMB REGARDLESS OF GROUND SLOPE. 2. REQUESTS TO SUBSTITUTE RUBBER HOSE AND WIRE GUYING SYSTEMS WILL NOT BE APPROVED. . T EE STAKING IS NOT REQUIRED UNLESS SPECIFIED OR NECESSARY TO MAINTAIN TREES IN A PLUMB CONDITION WHERE VANDALISM, SOIL, OR WIND CONDITIONS ARE A PROBLEM. OR AS REQUESTED BY THE ENGINEER. 4. REMOVE AFTER ONE YEAR. 5' FOR DECIDUOUS TREES 8' FOR CONIFEROUS TREES HOLE EXCAVATION WIDTH IN ACCORDANCE WITH MINIMUMS FROM THE PLANTING HOLE DIMENSIONS CHART (SEE BELOW) PREPARED PLANTING BED AND BACKFILL SOIL (THOROUGHLY LOOSENED) MULCH FINISHED GRADE PLANTING SPACING OF MASS BEDS U NAC E KAN. PLANTING HOLE DIMENSIONS HOLE DEPTH FOR B&B AND CONTAINER PLANTS SHALL NOT EXCEED MEASURMENT FROM ROOT FLAIR TO BOTTOM OF SOIL BALL. PLANT TYPE PLANT SIZE up MINIMUM TO AND INCLUDING k") HOLE WIDTH �PPROXIMATE B HOLE DEPTH DECIDUOUS & ORNAMENTAL TREES 11 (427) (11.) (1)) Sl� 48") (To) (6-) B.B. (�54:-) T174 T- (8.) B.B. F56-7- (16-) (10-) B.B. (66') VINES (12!') B.G. (6c) �1")- B.B. Z' SW (1.25-) B.B. �56' (TV') (1.5") B.B. (61-) (1 T) (1.75-) B.B. (66") (16") (2*) B.B. (7 2- T- (2.5*) B.F- (84-) (19") (3*) B.B. (96') (29-) (3.5*) B.B. (1147) (2R (47) B.B. (129"�----T2 ) CONIFEROUS TREES AT LEAST 2/3 OF ALL CONIFER BRANCHES WILL CONTAIN TERMINAL BUDS (2') B.G. (36') (1 (r) (3') B.B. (4V) 0 11.) (4') B.B. (SI-) (5') B.B. (60r) 1T (15') B.B. (66') (15.) (7') B. (7r) (16.) (8.) B.B. (81-) (1 G-) (9') B.S. (2T? (10') B.B.- (21-) I B.B. (24�� CONTAINER GROWN PLANTS CELLPACKS / PLUG; (2.5-) (2.25') CONT. (7) (5- (3.5-) CONT. (1 Or) (3") (4-) CONT. Q 1-1 (4") (4.5') CONT. (I T) (47) (6- / 1 OT.) CO 4T. (1 (#1) CONT - (11, (&') (#2) CONT - - o; � (7 -5 -T -- (#3) CONT.- 29r ::�(8115 (#5) CONT. �(30" �) (#7) CONT. (3T) (#15) CONT- (44-) (14-) (#10) CONT. (45-) (#20) CONT. (6a-) (16-) (#25) CONT. 1 (72-) (1 ) MICH. A �TOHIO IND. QUEBEC ACCEPTABLE PLANT STOCK GROWING RANGE LIMITS SOURCE: U.S.D.A. PLANT HARDINESS ZONE MAP 1. PULL MULCH BACK NO LESS THAN Y AND NO MORE THAN 6' FROM TREE TRUNKS. 2. SUBSIDING OR DETERIORATING MULCH IS ACCEPTABLE THROUGHOUT THE CONTRACT IF THE MULCH DEPTH IS MAINTAINED AT A MINIMUM 3" DEPTH. A 3. IF THE MUCH DEPTH IS LESS THAN 5* ADDITIONAL MULCH IS REQUIRED TO PROVIDE THE MINIMUM DEPTH SPECIFIED IN CHART BELOW. B Ai& 4. MULCH CONTAMINATED WITH SOIL MUST BE REMOVED AND REPLACED. "'m ft -t- --, MULCH PLACEMENT ZONE MAP ZONES LEGEND TEMPERATURE RANGE 2 -40 TO -50 3 -30 TO -40 4 -20 TO -30 FOR ALL PLANT STOCK, DOCUMENT ACCEPTABILITY FOR HARDINESS IN THE MINNESOTA ZONE WHERE THE PROJECT SITE IS LOCATED, AS FOLLOWS: A. PLANT STOCK CONTINUOUSLY GROWN FOR AT LEAST THE LAST TWO YEARS WITHIN THE ACCEPTABLE LIMITS SHOWN. OR B. PLANT STOCK, GROWN OUTSIDE THE ACCEPTABLE GROWING RANGE LIMITS, HAVING THE SEED SOURCE OR ROOT AND GRAFT STOCK ORIGINATING FROM THE ACCEPTABLE LIMITS SHOWN. TYPE OF PLANT A CENTER OF PLANT TO MULCH LINE B DEPTH OF MULCH CONIFEROUS TREES 3' MIN. 47-6" DECIDUOUS TREES 3' MIN. 47-6" CONIFEROUS SHRUBS 3' MIN. 'r-6" DECIDUOUS SHRUBS MIN. 47-6" VINES 2' M - PERENNIALS Z' SW 5�* E 4�- MACHINE-TRANSPLANTED TREES 12" BEYOND EDGE OF HOLE 47-6" Llhl4kv Consulting Group, Inc. OTSEGO ON THE G FAT RNIER ROAD I her y certify that this plan, p !cl? c ed cation or report was prepared NrMunaer my, Inect su on trl arn a n it y.Lce 99'J.pe Arch . r e laws of State of Minnesota. PRIW NAME: Timothy B. Wold SIGNATURE: DATE: May S. 2011 LUMNSE *: 42164 REVISHM NO. DATE BY CHKD APPIt DRAWN BY TW DESIGNED BY 'FW CHECKED BY KG COMM. NO. 0083521 SHEIET 8 OF 10 f[3 4-j 0 a 2 rj 0. LU M. 0 P-4 V) M jy :5 (D U1 z U') 0 0- 4- 0 U SHEIET 8 OF 10 -i z z F:jt=ll 441 H Fill Lp I To"" mul z 700 1 U u%j z 0% Lp -lad > HE -4 )w 12" S I WE I WN aii 'lei -n 0 m Eq PRAIRIE PARK SPLASH PAD City of Otsego, Minnesota MISCELLANEOUS DETAILS n 0 0 x I I A g Stretcher Units Ir Large 6" Mtdium 6" Small Approximate Dimensions' Front, 6" x 18" x 9" 6"x 12" x 9" 6" x 6" x 9" Back, 6" x 16" x 9" 6" x 10" x 9" 6" x 4" x 9" Approximate Weight* 70 lbs. 45 lbs. 20 lbs. Coverage 0.71 sq. ft. 0.46 sq. ft. 0.21 sq. ft. 'INV Stretcher Units 3" Large 3"Medium 3" Small Approximate Dimensions* Front, 3" x 18" x 91, 3" x 12" x 9" 3" x 6" x 9" Back, 3" x 16 x 9" 3" x 10" x 9" 3" x 4" x 9" Approximate Weight' 35 lbs. 23 lbs. 10 lbs. Coverage 0.35 sq. ft. 0.23 sq� ft. 0.10 sq. ft. PW , Accessory Units XL' Cap MM 3" Column Approximate Dimensions* Front, 3" x 18"x 13" 6" x 18" x 9" 3" x 18" x 9" Back, 3" x 12" x 13" 6" x 18" x 9" 3" x 18" x 9" Approximate Weight* 44 lbs. 75 lbs. 38 lbs. See anchorwall.corn for installation instructions. *Product dimensions are height by face length by depth. Actual dimensions and weights may vary from these approximate values due to variations in manufacturing processes. Specifications may change without notice. See your Anchor representative for details, color options, block dimensions and additional information. 'c) 2010 Anchor Wall Systems, Inc. The Highland Stone' wall system is manufactured under license from Anchor Wall systems, Inc. (AWS). The "Anchor Build Something Beautiful" logo, "Highland Stone" and -XL" are trademarks of AWS. The wall system blocks are covered by the AWS Limited Warranty. For a complete copy, visit your local dealer or see anchorwall.com. Coverage 1.25 lin. ft. 1.13 sq. ft. 0.56 sq. ft. Anchor Wall Systems, Inc., 5959 Baker Road, &SO810 L865 08/10 Suite 390, Minnetonka, MN 55345. KEYSTONE Distributcd By: I IF U,Lf4 I Keystone Retaining Wall Systems, Inc. A CONTECH Company 4444 West 78th Street - Minneapolis, MN 55435 (952) 897-1040 - www.keystonewalls.com We reseive the right to improve our products and make changes in the specifications and design without notice. The information contained herein has been compiled by KEYSTONE arid to the best of our lknc�e, accurately represents the KEYSTONE product use in the applications which are illustrated. Final determination of the suitability for the use contemplated and its manner of use are the sole responsibility of the user. �LIITIIT LA C2009 Keystone Retaining Wall Systems, Inc. Patents Pending VES-TF09 KEYSTONI rffln Unmatched Strength, Stabl lity & Rugged Appeal 7