Loading...
ITEM 3.2TPC3601 Thurston Avenue N, Suite 100 Anoka, MN 55303 Phone: 763,231.E5840 Facsimile: 763.427.0520 TPC@uPlanningCo.com PLANNING REPORT TO: Otsego Planning Commission FROM: D. Daniel Licht, AICP RE: Otsego — Gateway North Building 2 REPORT DATE: 26 January 2016 ACTION DATE: 29 February 2016 TPC FILE: 101.02 BACKGROUND ,TEM 3.2 Duke Realty Limited Partnership has submitted plans for development of a 270,144 square foot warehouse distribution building within the Gateway North Business Center that is to be constructed in two phases. The subject site is Lot 3, Block 1, Gateway North Fourth Addition located east of TH 101 and south of CSAH 37 abutting Queens Avenue. A preliminary plat and PUD -CUP was approved for Gateway North on 12 June 2006 and establishes that each phase of the development is to be processed subject to site and building plan review and final plat approval. The applicant is also requesting approval of a final plat to revise lot lines between Lot 1, Block 1 Gateway North Second Addition and Lot 2, Block 1 Gateway North Fourth Addition. The Planning Commission will consider these applications, which do not require a public hearing, at their meeting on 1 February 2016. Exhibits: A. Site Location B. Project Narrative C. Gateway North Master Plan D. Gateway North Business Center Bldg. No. 2 Shell Package 31 December 2015 (17 sheets) E. Final plat (2 sheets) ANALYSIS Comprehensive Plan. The 2012 Comprehensive Plan guides the subject site for industrial land uses within the east sewer district. The proposed land use is consistent with this designation and the City has adequate utility capacity available at the subject site to provide services. Zoning. The subject site is zoned 1-2, General Industrial District. Warehousing and distribution centers are a permitted use within the 1-2 District. Environmental Review. An Alternative Urban Area Review (AUAR) was prepared with the review of the initial Gateway North application and the scope of this study included overall master plan. The City Council adopted the AUAR on 7 August 2006 finding that the proposed project did not have potential for significant environmental effects. The current site and building plans are consistent with the intensity of development anticipated for this portion of Gateway North reviewed as part of the AUAR and this application requires no additional environmental review. Phasing Plan. The applicant is proposing to construct the proposed square foot building in two phases. The Phase 1 building will be 212,224 square feet in area. Phase 2 involves a 57,920 square foot expansion of the proposed building for a total area of 270,144 square feet. The current applications are being reviewed based on the planned build out of the Phase 2 structure with considerations as to site development work and improvements based on the phasing plan. Subject to compliance with the conditions of approval for the Phase 1 building and any zoning ordinances then in effect, a future site and building plan review application will not be required for the Phase 2 expansion. Building Exterior Finish. Architectural plans for the Phase 1 building are consistent with that of the other buildings within the Gateway North Business Center consisting of precast concrete panels with an exposed aggregate or sand blasted finish on all four sides of the structure with ribbed details. The proposed exterior materials comply with the requirements for the 1-2 District. The Phase 2 expansion of the proposed building will be required to match the exterior appearance of the Phase 1 structure including exterior material, texture and color as a condition of approval. Building Height. Buildings within the 1-2 District are allowed a maximum height of 48 feet; the height of the proposed building from finished floor to the top of the roof is 40 feet. The proposed height of the building complies with the height allowances of the 1-2 District. Lot Requirements. The 1-2 District requires a minimum lot area of two acres and minimum width measured at the front yard setback line of 200 feet. The subject site is currently 13.3 acres in area. The developer has submitted a final plat to revise the north lot line of the subject site to divide the semi -trailer court between the subject site and the abutting lot and to adjust the south lot north so as to include the existing drive aisle within the abutting lot to the south in compliance with required setbacks. The resulting lot for the subject site is 12.77 acres and is 2 510 feet wide (north to south). Building coverage is also limited to 50 percent of the lot area. The proposed 270,144 square foot Phase 2 building will cover 48.6 percent of the lot area. The proposed lot and site plan complies with applicable lot requirements of the 1-2 District. Setbacks. The following table indicates the required setbacks of the 1-2 District; the proposed building and parking areas shown on the site plan comply with the setback requirements. Access. The subject site is proposed to have two accesses to Queens Avenue. Queens Avenue is designated as a Commercial/Industrial Collector Street by the 2012 Comprehensive Plan. Access spacing to collector streets is required to be a minimum of 500 feet apart in accordance with Section 21-7-7.N of the Subdivision Ordinance and all of the proposed driveways comply. The width of the north driveway is 30 feet and the south driveway is 25 feet to allow semi tractor -trailer turning movements to and from Queens Avenue. The north driveway is shared with the abutting lot to the north and the developer must record an access easement at the time the final plat is recorded. Off -Street Parking/Loading. All off street parking and loading areas are paved with either asphalt or concrete surfaces and perimeter concrete curb is provided in accordance with Section 20-21-4 of the Zoning Ordinance. Note that curb must be installed along the north side of the driveaisle of Lot 1, Block 1 Gateway North Second Addition. Section 20-21-9 of the Zoning Ordinance establishes the following calculation for the number of required off street parking stalls: Use Principal Building Parking Required Stalls TH 101 Queens Ave. North South Wetland TH101 Queens Interior Ave. Required 30ft. 30ft. Oft. 40ft. 15ft. 15ft. Oft. Proposed 45ft. 30ft. NA NA 15ft. 15ft. NA Access. The subject site is proposed to have two accesses to Queens Avenue. Queens Avenue is designated as a Commercial/Industrial Collector Street by the 2012 Comprehensive Plan. Access spacing to collector streets is required to be a minimum of 500 feet apart in accordance with Section 21-7-7.N of the Subdivision Ordinance and all of the proposed driveways comply. The width of the north driveway is 30 feet and the south driveway is 25 feet to allow semi tractor -trailer turning movements to and from Queens Avenue. The north driveway is shared with the abutting lot to the north and the developer must record an access easement at the time the final plat is recorded. Off -Street Parking/Loading. All off street parking and loading areas are paved with either asphalt or concrete surfaces and perimeter concrete curb is provided in accordance with Section 20-21-4 of the Zoning Ordinance. Note that curb must be installed along the north side of the driveaisle of Lot 1, Block 1 Gateway North Second Addition. Section 20-21-9 of the Zoning Ordinance establishes the following calculation for the number of required off street parking stalls: Use Area Requirement (based on net sf) Required Stalls Office 5,400sf. 3 + 1 stall per 200sf. 28 Warehouse Phase 1 206,824sf. 1 stall / 1,000sf. 187 Phase 2 57,920 58 Total 706,904sf. 273 The site plan for the Phase lbuilding provides 118 parking stalls for passenger vehicles (dimensioned at 9 feet by 18 feet with two foot overhang) and storage for 15 semi -trailers and 19 truck docks. The cumulative total of these stalls is 152 stalls and will be adequate based on the documentation of the use provided by the applicant. Snow Storage. Section 20-21-4.H.17 of the Zoning Ordinance requires that a plan for snow storage be developed for the subject site so that required parking stalls are not utilized for this purpose. Snow may be removed from the off-street parking stalls, trailer storage and loading areas and deposited into the stormwater basins to the east and south of the proposed building as necessary to maintain the site. Landscape Plan. The developer has submitted landscape plans showing tree plantings at the emphasizing the east and west property lines of the subject site and also plantings at the southeast corner of the building, which will be the office section and primary fagade and south lot line adjacent to off-street parking stalls for passenger vehicles. Turf areas will require installation of irrigation in accordance with Section 5-7-3.13.4 of the City Code. The proposed type and size of the plantings are consistent with the requirements of Section 20-16-7.0 of the Zoning Ordinance and appropriate for the subject site. Exterior Lighting. Section 20-16-10 of the Zoning Ordinance establishes performance standards for exterior lighting limiting light cast to the property line abutting a public street to 1.0 foot- candle and at interior property line to 0.4 foot-candle. All exterior light fixtures must have a 90 degree horizontal cut-off and comply with the height limits established by Section 20-16-10.C.4 of the Zoning Ordinance. The developer has submitted a photometric lighting plan indicating the type, location and height of all exterior light sources, which complies with the requirements of the Zoning Ordinance. Signs. The submitted plans indicate one wall sign 200 square feet or less to be installed on the south elevation about the building entrance. Additional wall signs would be allowed on each of the other three elevations. The site plan also indicates as 33 square foot monument sign adjacent to the south driveway. The signs included on the submitted plans comply with Section 37 of the Zoning Ordinance for industrial uses within the Freeway Corridor District. Any other signs must comply with Section 37 of the Zoning Ordinance, and all signs require issuance of a sign permit prior to placement upon the property. Trash Storage. The proposed building will use an exterior enclosed trash compactor for storage. Any other containers must be within a secured enclosure in accordance with the requirements of Section 20-16-15.13 of the Zoning Ordinance. Grading Plan. The subject site was mass graded as part of the initial development of the subject site and included establishment of stormwater basins as well as wetland buffer and mitigation areas and the developer has submitted a grading plan for development of the subject site. The grading plan is subject to review and approval of the City Engineer. Utility Plan. The developer has submitted plans for connection of the proposed building to sanitary sewer and water utilities and stormwater system. All utility plans are subject to review and approval by the City Engineer. Chapter 6, Section 2 of the City Code establishes provisions for payment of utility availability charges at the time of final plat approval and connection charges at the time of building permit application. The development contract for Gateway North provides that the proposed building would be charged two RECs. The utility availability charge for the subject site was paid with the Gateway North Fourth Addition Final Plat. The M developer must pay the utility connection charges at the time of application for a building permit. Easements. The proposed final plat illustrates drainage and utility easements at the perimeter of the proposed lot as well as overlying existing/proposed stormwater basins as required by Section 21-7-15 of the Subdivision Ordinance. All easements are subject to review and approval by the City Engineer. Park and Trail Dedication. The initial final plat approval for Gateway North satisfied park and trail dedication requirements applicable to the entire development including future phases and outlots. As such, no park and trail dedication is required for the proposed final plat. Development Contract. The developer is required to enter into a development agreement with the City as a condition of approval for the current applications to provide for installation of required public and private improvements and payment of applicable fees. The City Attorney will draft the development contract for review and approval by the City Council concurrent with their action on the site and building plans, final plat and easement vacation applications. RECOMMENDATION The site and building plans for the proposed 270,144 square foot Building 2 and final plat of Gateway North Fifth Addition is the final building within the Gateway North Business Park and is consistent with the City's economic development goals and land use objectives outlined in the Comprehensive Plan. Furthermore, the submitted site and building plans and final plat for proposed development complies with the requirements of the Zoning Ordinance and Subdivision Ordinance. City staff recommends approval of the applications as outlined below. POSSIBLE ACTIONS A. Motion to recommend City Council approval of Gateway North Fifth Addition Final Plat, site and building plans for Gateway North Building 2, subject to the following conditions: The developer shall complete site and building improvements for for Phases 1 and 2 in accordance with the submitted plans subject to any modifications required as a condition of approval. 2. The developer shall record an access easement approved by City staff overlying the driveway shared by Lot 1 and Lot 2, Block 1 Gateway North Fifth Addition. 3. Concrete curb shall be installed along the north side of the drive aisle of Lot 1, Block 1 Gateway North Second Addition, subject to approval of the City Engineer. 5 4. All turf grass and landscape plantings within shall require installation of irrigation in accordance with Section 5-7-3.13.4 of the City Code. 5. A sign permit shall be applied for prior to placement upon the property, subject to review and approval by the Zoning Administrator. 6. Exterior storage any waste or recycling containers other than a fully enclosed trash compactor accessible from the interior of the building shall be within a secured enclosure subject to the requirements of Section 20-16-15.13 of the Zoning Ordinance. All grading, drainage and erosion control plans are subject to review and approval of the City Engineer. 8. The submitted utility plans are subject to review and approval by the City Engineer. 9. All easements are subject to review and approval by the City Engineer. 10. The final plat is subject to review and approval by the City Engineer and shall be recorded with Wright County within one hundred (100) days of City Council approval. 11. The developer shall enter into a development agreement with the City to provide for installation of required public and private improvements and payment of applicable fees, subject to review by the City Attorney and approval of the City Council. B. Motion to deny the request based on a finding that the application does not comply with the City Code. C. Motion to table. Lori Johnson, City Administrator Tami Loff, City Clerk Andy MacArthur, City Attorney Ron Wagner, City Engineer Dale Emter, Duke Realty LTD Ce 87TH ST NE 85TH ST NE $2 ; 79TH:S7.. NE a ` :78T91;ST. NE.:z � W `tet �t u - �f`S� N4 +ice 72ND ST`NE + 2 UT jH_ST NE ���.1• � � '-� r�� .. Jay _ ��,-r "' '`? rY y _ITH''ST. NE idj {�tspp!�'7 65TH ST NE c n iy, Q I z � � � Q = Qaytcin t d. Ui w St Naichaei r- Wre Xzwj 2.660 ft v, Overview Legend Roads — CSAHCL •--CTYCL — MUNICL — PRIVATECL — TWPCL Highways Interstate — State Hwy US Hwy City/Township Limits ❑ c ❑ t COParcels 1600 Utica Avenue South Suite 230 Minneapolis, MN 56416 952.543.2900 www,dukereaityxom December 31, 2015 Gateway North Business Center — Building 2 Project Narrative Existing Prope Use: The property is currently zoned I-2 General Industrial. Proposed Property Use Duke Realty is proposing a 212,224SF warehouse distribution building to the Gateway North Industrial Park. The project does include plans for potential building expansion of an additional 57,920sf. The project will be constructed in 2016 for September 2016 occupancy. The addition may be constructed if necessitated by tenant growth requirements. The property is currently zoned I-2, General Industrial District. This will be the fifth building for the Gateway North Industrial Park. Storage and Disposal of Waste The building tenant has indicated they will have external enclosed trash compactor that will be located at a truck dock location. Solid waste will be stored in the external trash compactor with periodic pick up. Cardboard will be stored for recycling within the building. Parking Reference Wagner SprayTech Corp letter dated 12/21/2015 regarding parking demand. 12/21/15 City of Otsego Attn: Building Inspections 13400 - 90th Street NE Otsego, MN 55330 To: Lori Johnson Daniel Licht Ronald Wagner Wagner SprayTech Corp. 1770 Fernbrook Lane Plymouth, Minnesota 55447, USA Mail: P.O. Box 9362 Minneapolis, Minnesota 55440, USA T 763 553-7000 F 763 553-7288 www.wa g n e r -g ro u p. c o m We at Wagner are very excited about the upcoming placement of our new distribution center in the City of Otsego, and the opportunity to work in and create employment opportunities within this growing community. It is our estimation that we will have 40-60 employees working within the facility at present, with anticipated additional growth in the years to follow as we expand our facility. Accordingly, we are planning to initially provide 60 parking spaces (to include the appropriate number of handicap spaces) in order to accommodate our employee parking needs as well as an additional 35 in order to provide for our expansion. We understand that the City of Otsego building code prescribes the number of parking spots and restroom fixtures based on occupancy calculations. Based upon those calculations, for a 210,000 sq. ft. facility, expanding to 268,000 sq. ft., we would need to employ well over 300 employees. As our facility will be primarily product storage, with picking and shipping of customer orders, our operational requirements preclude an employee base of that size. Thus, we plan on moving forward to develop parking spots and restroom facilities that will be appropriate for 60+ employees. If need be, I will be happy to discuss this in further detail and can be reached at 763-519-3567. Respectfully, Bill Fer�sj� gu/ Distribution Manager Wagner SprayTech Bill.ferguson@wagner-group.com 8 _ Q� 3 cz e V J ' /.W 17 �W V r/^' %V/^L' V L 0 f --r CN (� W p, O W �.J F DUKE REALTY GATEWAY NORTH BUSINESS CENTF-R, BUILDING NO 2 -SHELL PACKAGE sisi Queens Avenue NE, oucmo. MN 55330 LOCATION MAP °' at SiTE LOCATION e — NAe 4 m n - Iv9o+9e� 41R* xxWmY F � - Y 9 f 9dH.i "�Vi unevex— _CE rna4 - �wrt 4 DRAWING SYMBOLS HEGxrAxoxuxBER DFsrDRIEc: IECTade SYi eMGx4an W] PI -EMI -CRI -014 Anmx.da He19M: RhN EShNpar StN.] mase Gel ryN 9ltlnasRniv-aman3-p t., lo:—lml e9gl-y 101- AVamd..Sloriv 319eb'res pa'SDiA (\7/ Q REVISION REFERENCE A101 ELEVATIONTAG- INGLE VIEW ROOM NAh1E 1 m ramE) mml.Vafeml 195F�-1 OOmgReAf. R OOMTAG —OOLUMN_GRID UNE -NEW WenedegxrAroa VArlfihd lABYsRr^gaetl)pg IBL501.3 t AMvilgomAm 312224GSF 211X fixx Suldp Looe A 2W15M pda Shie E�idlg GL4 LM1eplert341 FIIRNGRED0IPEXEMs: I6LTada 10.N 11 1— I— PARrmoN TAG A101 z. MEVATIONTAG- OLr3FLEvim O WlNoavmc 0 COLUMN OR GRID IBCTade lmil i ��1^L Pmaicd Rrtt Floor MnnexN Rdaz Oap�9]15 Mxhad<M�: 9Ax.15=W.]s T14.5- UNE-EX1— E%ifA00E95' ' 31M OEfAILTAG ® E-0UIPMEMTAG MATCH UNE MATCH UNE SEE%M%X � VIEW NAME 12 ORAWINGTIRE 1m=r4r 1 SIM A101 WALLSECROIJ TAO IBL— 311 xd- DOOR TAG �� Lmnmp PeNal EgrexTmrat ]SfeM 1014.3 Gvup S-1 blaaga CBCM- rT. Rr4Rxlnanw Wgn4 0heun PNT1 sH3 VB1 sll FINISHTG- IBLLM1apla6 iWa91 6021.]09.Bantl5x9Ons Egg, ]C45.Ai09.a d1011.1 OutlEntls IBL9es9an 101]3 SIM PWXBdG [ALCUTATION. Pe iexm IlmmuemeN 0aumenh IAASRFlx CPi1 IFioORFlMaH) ALLSURFACEs Tq FOOTMG ELEVATIONI EL=96'-0--- A101 WILDING SECTIONTAG �yFy TAG u01 FINIEHTAG- h Et=100:-0•• 9�T ELEVATION �R g101 __ CPT1 Wm1E GF FlNISH6H Y NORTH NORTH RM i OwWiGED PIAN j RDEraL l REFEREIJCE CPT -01 * CPi002 FlNISH TppNgIIION GAr - IUMN x HEGxrAxoxuxBER DFsrDRIEc: IECTade SYi eMGx4an W] PI -EMI -CRI -014 Anmx.da He19M: RhN EShNpar StN.] mase Gel ryN 9ltlnasRniv-aman3-p t., lo:—lml e9gl-y 101- AVamd..Sloriv 319eb'res pa'SDiA rsAvenuein Ohpo Mx—, Buldng Np21sm an 127aaelmtaMxM ce Ne NutlA Auidngl^Na G9Nrtry Nath Busuvas Cenla.TAe WitlnA'u 212,224 NM aryare feel tlAaz291cadrg falrks, 2l xhtlehalasAvaga Wares antl551kd pmxngzPxes Avlu. Heist 90M1111xAaz(mzmgepecast Aa'gM14 Xedmum Hight 99 Net0irxAazlanAYentlPxkpaasl AeigM14 IMudvedlherpdmtlaraxsdlepefu-ag.its ule habeenshutlumd Neaoni'tlebe A<Wil5loima: 1 NlNea¢amip USI,99ptla'a leel pLLDyiABIEFLODRARE4 AP u Es. WenedegxrAroa VArlfihd lABYsRr^gaetl)pg IBL501.3 9uyM1 GIC SMI emle5Mx6uidrg Lore AMvilgomAm 312224GSF 211X fixx Suldp Looe A 2W15M pda Shie E�idlg GL4 LM1eplert341 FIIRNGRED0IPEXEMs: I6LTada 10.N 11 E �A15 Camacmd 6MyTCMeIIE <912CRASHPAE90.1I LMplm 139 OmIpNLxtlFa<Nm (DIf7. dO WmeAouse 5e IMg am � sIal4Ealeag LLd?, chN,w nn Tolil Oawpmllmd R3O h auTl IXAawnx Fxcom EDREssmorH: eeNr9 mtle 919 Natlsnd Bechicd Cat IBCTade lmil gwtix Utle. 912MrmeroN Slafequmdng Castle ��1^L Pmaicd Rrtt Floor MnnexN Rdaz Oap�9]15 Mxhad<M�: 9Ax.15=W.]s T14.5- 91 MraesaNMxAenisa Cada, LM1eple 1396 E%ifA00E95' ' 912NIax9onel AlerM1xrtx CWe XNmum IYmEeroi EAh: FUF�LNe. 915MIrmesvh Wtl Gx OaR IBLTetla 1019,1 PEOMREO PROVIDED 9121nhxagand Fug Cas Cotle Rml floor 3 10 [u-1: EdIA«essTnvdgsW<e: 25gtW IBL— 311 xd- IBLTaxe 1016.1 �� Lmnmp PeNal EgrexTmrat ]SfeM 1014.3 Gvup S-1 blaaga CBCM- rT. Rr4Rxlnanw Wgn4 0heun TYPEOf CONGR9 ISLTetl ]girt IBLLM1apla6 iWa91 6021.]09.Bantl5x9Ons Egg, ]C45.Ai09.a d1011.1 OutlEntls IBL9es9an 101]3 T �� � PWXBdG [ALCUTATION. Pe iexm IlmmuemeN 0aumenh DOCUMENT PACKAGE ISSUED: 31 DECEMBER 2015 PACKAGE: CITYSUBMITTAL/BID PACK#1 SHEETINDEX sHEETINOEq-All sheets Rnmxcs IssMEs &aM1lrNenc� SS " 1MU(WfIHSIGNATURE) 2 REVISED AND REJSSIIED(WmVSIGNATUREJ —SE 3 (JOT FORCI—MACT10N-REFERENCEONLY 4 RE-ISSUEDFROMAFRIOR BIOPACK-NOREVISIaNs SHEEP ND. NAME � 1600 U0wAenues uN SUX 24J 92I543N2gW m General GtCO COVER SHEEP 3 tO Crvll %wrre.�952995-22GY). 02110 E%ISTNlGOONORIONS 3 C2lH ITEPVW 3 Dale Emhr, Dlrvwlar4rFerndswpcn 0202 GRADINGftAIJ 3 CID3 RAN E,nag: md�er�eroanimerma.eam —SI ERO— 2D4 SION WNR20L WAN -PHASE( 3 ARCHITECT 0205 EROmION CONIROLPIAN-PHASE II 0900 EROSION CONTROL DETALLS 3 CM1 STREEIANO ITi ILfrY DETAILS 3 CM2 sTREEPANOtTi ILITYOETNLS 3 et NE Mlnn®pdis, MN 55913 E100 PF{OTOMEIRIC P,ANIFOR RFFERENCEONL ndscape Lp10� LANDSCAPE PLAN 3 Cary Mishmvwc,FPolecl Capp 120( LNJD6CAPE OETNLs 3 30 Nch4eRurai At00 ARCHRECIITALSRE PIAN 3 P200 ROD?. RAN 3 CIVIL& LANDSCAPE ENGINEERS Pz01 065 PLAN OETNLS 3 s F A202 OCf PUW 3 A000 EMEPIORELEVATIONS 3 12600 WhiRarekr Cr'rve, Suite3W� WALL6'cCUONs AMI WALL 6ECR0N5 402 WALLSECRONS Enk M, P a Engineer A500 DOOR SCHEOVLESFRAME OEPAIIS ABO( OEPALLS AW2 ROOFDEFAILS PROJECT TEAM OWNERICONTRACTOR GEOTECHNICAL ENGINEER Duhe R M1V &aM1lrNenc� 1600 U0wAenues uN SUX 24J 92I543N2gW 11001 HaenlshreAvmles WI F - 95L543.23T5 %wrre.�952995-22GY). Dale Emhr, Dlrvwlar4rFerndswpcn Ray Hadar Ermag: wle.ErMeradl«areem.aom E,nag: md�er�eroanimerma.eam ARCHITECT RSP -1m 1 et NE Mlnn®pdis, MN 55913 Plwne:6126]T-]100 Fu:61Z81i=x499 Cary Mishmvwc,FPolecl Capp PFarre: �12/6TT-1299 Erna ry.mlakomlec�raymnWm u' e` CIVIL& LANDSCAPE ENGINEERS s b lank d „ 12600 WhiRarekr Cr'rve, Suite3W� Ptwne:TG�LT4s-1621 Few ]6.T14]s8:32 `ga Enk M, P a Engineer Erreit EMIIler9?�samAa@kmm Duke REALTY ,611D U1i-zA SaNh, Suke 23D. Alinneapalis, MN 559,5 552.�43.29Ltl . b62643.29]5 (fx) FAF M� wiwsl m6 mrnsmert mm. vlz S O LLI Lo C'7 I-- Z Z UJ C) _ U�/)� P0P�-aA�� U) V/ /LLI (p O O LLFZ M Z z 2 N o �I9—y :3 m LL Q) Z Q Up Q � (1) a) W :3 I— 0 Q r- V - (ISSUANCES: DRAWING INFORNIAMON: DATE 12/31/15 CHECKEDXY.CMM —N- BP DUKEREALT—#:WAGSPA-001 --*1050.014.04 DRAWING I SHEETTITLE I COVER SHEET SHEET NUMBER: G100 RE:9S7.4 �' \ 9J5— LEGEND 0 C OescdDtlipn Date • FOUND MDNUMENi UNDAFY UNC C�3 RIPAPP d ----- -_. rTLINE --- G0.AVEL SURFAQ X FDUND4HISEl1D':K" —0— -rRiCTCD ACCL•s O BITUMINDUS SURFACE SET MONUMEM Sumo UMENT9. —p— E\YER N z z m CONCRETESU0.FACE —DD— 0D. 5., :ER r:C rARKING ARCA .GATE VALYE/HYDMM .... ,CiR:C W QS4NRARY MANHOIf —ur W,Cu�"DC C C ION[ O WORM MANHOLE m� noM1M LATCH eAsm _ _ r...Er..gaurvoraERDPnc NOEM1G Q'wM1=o E2CsernoN L' D a[F � CHAIr^VNx FENCE ®no0.M SKIMMER SCUNB RITU MCNOVb -}> FLDODL l = CC:I:.RC AFIRE CONNECTION .r_..LEYATI.,N CGROUD BxITELErH IE m E1ECINIC IN'. E rEDEnaI EB CLCCfRICMRG^ ®CA61LN cox � .chMUNlunc::s:Auls DESCRIPTION 111,3.91-1,6Ai AYNCRTH W—ADUMDN,WHghtcounty, Minnesota. —Property PROPERTY SUMMARY LSu ectproperty'sad—b 11-1­d,ns PI.P.M ldemi---number b-2830-131— Wright County online IS weesite as df ]2/09/1D351. 2 The gross area of thesohjec[pfaperty u S78,- square Feet ar 331]6 Arrzs. 3. Thesubje propertyIsxonetln2jGener4llnausirlal Diatnal LAINa PUD CUP ovvlay Per Dan Lich, Cry or 0U.Z. Planner. The si[e plan was approved by the Cry of U -S. and the property N11 conformance with the side plan. 6et1acks and Bueding RezWnlonz per the Cry of -P- ReA i,ed olmtlpn Bpnemg gaens AYe.:eDft NemN. 20 N, sPPN/wert:Drt wetland: aON. DuMg eams AYla rc Pammatera n. Imerror:ox Maximum Building Cweregc SD%. Maaimum euiitlingHelght:36 h. 4. there no buiitlingz on [hesubjeRpropeMas of 12/09/1015. mmm SURVEY NOTES III 3A0' 1. The bearing system lsb right County cpoltlrystem, NAD0311986 Aljustl. W[h an u h II��t .4 PGSf '` j ii /� asumed beanng of No h d8 CCmnutez 0a secpMs ma[efzst fpr U, P.Ah IMe of Lot 3, BI 1. GATEWAY NORTH FOURTH Rt N z 2. Th --1 datum, d N.D.. Ngo BP.CHMA- 4 `9 Top n—fhyd..t.pPl mately 2-1--tpf the n[vzeNen of Necentedmez of M•eaom A 9919 N'3� h T. e� o Pwrunrz4 PTy'I.?. Dueers Ave.14—d6ls[SLNE as shown. /lsvov9'PEl 1i YQ BeY.=93x.23 reel. DENCHMARK. O A gc�Topnu[PEnydrarrtaPPrpaima Jy 6Reetswrtneastof Ne nterseNon pf Ne centedinesN �-NDp9929Et]p.TS—�'a \'O 1. yI II. J CNo paeans Ave.NEantl61st tit NE asshwrn. §Q Erev.=9a7.3areet / N iw I j -ii onsve otax izux warm nuRNvmlP N �I t ` I I II% Top nut of hyptlrant awpPraximarelY 99 he[zouNeaz[oflhesautbwert corner of Lo[3, Blockl, y ` GATE—N RTHF 14ADC—Nassnawn. 4 �/ amass. o V I I I rT z Nev.=94].99feet / 2 Z 3 ( 1 I o a ,e 0 3. Reltl work was completed pn ]2/09/2➢15. 4. unearerm,naednazar 1 aruereelw ng: ab.ObseIrvetl eweenre o'. ted f us b h- 0-1l t k N 15 3] 064 d d 2/03/2015 B// O C K AG ph s O C.I (GSOCI4 I a w /mssr IItYI ezp N e:The e 3 pna a Im iem Pnc snP.m nerepn f n aep I f nose Tir / � I � I 3 �� o w� � pro a N nrp�alrmyaamrateaa Pf M q1e unm rsp not res Sues but mar prwWea p Plan lie of yzltal 1 location. Thesurveyer makes noguammeez that the undemrountl utilisies fiawn comprise all such 0 Pnnnesmthe area, eenermsP,Yme pr ananalnea. uelitylmermatmn snpwn nerepn,Ranr,Aa �I c z compilation of this map lnrormatlDn dna Nose visible utllitles that were loa[etl tluringNe survry Reld yds / abob work. Thesu—. Nrthertlws notvmantthatlhe,PfY UrwneutiiNes shmvn hereon, if any, are <tIlI` / � M[he edam loodon az lndin[ee, although he tloez vadfy N4U,— I azaccuratelyaz lM'/ II b �— possible From inNrmaNan available. Thesurveyorhasnot physinlly located the undvground utilities. / / n Q Pursuanttp MSR6Jl can[a¢Gopher Stare One Glla(651asa-00@I Palrw any exwvaU., surveyinci-lnformatlon elearonirally inrorporatedfrom an unissued ALT1—M IaednNe // t_� survey lasm improvements on Lot 2, elock 1, GATEWAY NORTH FOURTH ADDMDN)prepared by {I/(� I_L Samb k ( 'c1, number DUK199060], CACC tlrawmg tllted B/2L2015)ftt Cuke Realty e Um d—'IP n —Al electron �alymcorp L., 1, tBI.k surveYbase maplaz ro. NOM Q SEC A N) PlParea by lamb 1— klnc'(pmDjab[�umber OUK199D6, GYDD mtl wYi gdated Baia `.. - I x._ 9/16120 If ..hy Umited Pal Dhi0 101"t3'zd'w — _ — _ _ _ _ _ _. -- MINNESOTA DEPARTMENT OF TRANSPORTATION RIGHT-OF-WAY PLAT NO. 86-25 STATE TRUNK HIGHWAY NO. 101 VICINITY MAP Duke REALTY 16WUtiw Aven—btryS P50 ILMM pp1l, MN 55416 562549�D0.952543.29]5 j1g) 'amb&k www.sambatek.com 12800 WhtlmI OrNs, 30300 MIDDOnka, MN 55343 763.476.6010 telephone 763.476.8532.fersMlle fryNIRKKIp 181Kw14q IPw ho IBMlwenaw I herebyaFanihthat NusurveY. WIN-, e by me or imaemy aired SU -lion antl tna[ I am a aulYUazed tAN0N0.VEYCR uMVNOIRWamrceNesvae or Mlnnesoo. PRELIMINARY RCI, M. Blom rvo.21729 Das12/21/2015 zpprurmR [ISSUANCES l cm sueMlrrAL tv3wls 0 C OescdDtlipn Date W M Lo Cb-lvw. Lo EvlMe C,SV BY:— Z W Uo Z DR J02 U) co Z LLI =1 op _ cm a) � La1 z : a N z z m z O z O CD z z Q U) N W W U, ran V r [ISSUANCES l cm sueMlrrAL tv3wls rDRAWING I SHEET TITLE 1 EXISTING CONDITIONS SHEET NUMBER 0200 C OescdDtlipn Date DRAWING INFORMATION scalp: Cb-lvw. Chpckpd By: EvlMe C,SV BY:— MW Rpatiy JobR DR J02 NE Job C: I-5.119 rDRAWING I SHEET TITLE 1 EXISTING CONDITIONS SHEET NUMBER 0200 MINNESOTA DEPARTMENT OF TRANSPORTATION RIGHT -0F -WAY PLAT NO. 86-25 STATE TRUNK HIGHWAY NO. 101 ===LEGEND CD PROPOSED EFISIING PROPERtt LIMIT--� ----- .IS STANDARD DUTY ASPHALTING I vim. RETAINING mrv.-va A __..__........._.. Y. — WEIIANDLIMlFS "'---'"�`--- TREEUNE —CUTUNE ASPHALT PAVING CONCRETE PAYING D OR JOB SIGN T PIPEBOLI 113 1S496.09 NUMBER O..ARKING O AS PER ROW I I I I PROPOSED LOT I.I , 1 I I � __. .. __... ..... I 1 MINNESOTA DEPARTMENT OF TRANSPORTATION RIGHT -0F -WAY PLAT NO. 86-25 STATE TRUNK HIGHWAY NO. 101 ===LEGEND CD PROPOSED EFISIING PROPERtt LIMIT--� ----- .IS STANDARD DUTY ASPHALTING co vim. RETAINING mrv.-va A __..__........._.. Y. — WEIIANDLIMlFS "'---'"�`--- TREEUNE —CUTUNE ASPHALT PAVING CONCRETE PAYING D OR JOB SIGN T PIPEBOLI 113 1S496.09 NUMBER O..ARKING O AS PER ROW Z w� K NOTE O —DEVELOPMENT SUMMARY C) 0 0) cf) Z- MINIMUM LET 2 (G PROPOSED LOTE(GATEWAY NDRTN STHAOOITION) PROPOSEDLOTI(GATEWAYNORTHSTHADOM N) PROPOSED LOT3(GATEWAY NORTH 5TH ADDITION) PARLERST RP.S TRAILER DPARKING SPA[ STANDARD PARKING SPACES HANDICAP PARXING SPACESTRUC FUTURE TAN FUTURE STANDARDPAR%ING SPACES FRONT YARD R—YA 510E YARD PARKING zoNING STING ,RETS PROPOSEDZONINGBUI %XR1 UMUI�HT REQUIRED 30FEET 25 FEET TDO" 5 FEET 2A AC SIFT AC 13.BRAC _AC 51 4 1S � PROPOSED S,FEET SFEET 130PEET 15 FEET I'2 1'2 45 FT DEVELOPMENT NOTES 1. ALLDIMENSIONSAREROUNDEDTDTHE NCARESTTENTHFOOT. t AUL11-11NSSHOWNARETOTHE FACEOFCURBTOFACEOFCURBUN—CITHERWISE NOTED, CON TRACTORSHALL REVIEW PAVEMENTGRADIENTAND CONSTRUCT-GUTTEROUT' WHERE WRTER DRAINSAWAYFROMCU1 .ALLOIHERAREASSHALLBECONSTRUCTE —GUTTERIMCUR". CDDROINATE WITH GRADING CONTR4CTOR. 4. ALL AREAS ARE ROUNDED TO THE NEAREST SQUARE FOOT. 5. ALL PARKING STALLSTO BE 9'IN WIDTH ANDIB''IN LENGTH UNLESS OTHEAWISEINDICATED, 6OR SHALL REFERTO AREHITECTEIRAL PLANS FDR EXACT LOCATIONS AND DIMENSIONS OF Eo�POPCHES, RAMPS, PRECISE BUILDING DIMENSIDNSANO DWR BUILDING UDLfTY ENTRANCE LOCATIONS. 1. SEE ARCHITECTURAL PIANS FOR MONUMENT SIGN DETAILS. 8: SEEARCHITECTURAL PIANS FOR LIGHT POLE FOUNDATION DETAIL AND FOR EXACT LOCATIONS OF LIGHT POLE 9. REFER TO FINAL PIAT FOR LOT BOUNDARIES, LOT NUMBERS, LOT AREAS, AND LOT DIMENSIONS. 10 ALL ERADENTS ON SIDEWALKS ALONG THE ADA ROUTE SHALL HALVE A MAXIMUM LONGITUDINAL SLOPE OF 5%(120), E%CEPTATNRB MMP5(1:u), ANDA MAXIMUM CROSS SLDPE OF 2 D9%11.48). T MAXIMVM SLOPE IN RNY0IRECTON ON AN ADA PARKING STALLORA[CESS ISIS SHALL BF 2.0E%D:4R). 1HECONTRAROR SHALL REVIEW AND VER "FTE Y THE GRAD ENT IN FI DALONG THE Pop ROUTESPR ORTO PIAL NG CONCRETE DR BITUMINOUS NOUS PAVEMENT TH 11-1—oTIFYTHE ENG NEER IMMEDIATELY TTHERE IS A DISCREPANCY BETWEEN THE GRADIENT IN THE FIELD VERSUS THE DES GN GRAUIENTANO CODRDINATE WITH GRADING OUNTTWCTOR 31. NO PARKNG SIGNSSWILL BE PIACED ALONG ALL DRVEWAI'S AS REQUIRED BY CITY. —KEY NOTES A. BUIIDING,S OPS,STAIRS-MORDINATEWITHARCHITECTUMLANDSTRV=N PIANS. R. LOADING DOCK. C B UCNCRETENRRANDGUTTER(SEEDETAILSHEETCUO) D. CONCRETESIOEWALK BEHIND CURB. (SEE DETAILSHEETCR01) E HANDICAP SIGN WITH CONCRETE PIPE BOLLARD.(SEEDETAIL SHEET C401) F. TRANSNIONFROM INTEGRAL CURB IO ZERO CURB. (SEE DETAILSHEETC401) G. INTEGRAL CURB & SIDEWAIX SECTION. ISEE DETAIL SHEETCA01) H. BEGIN MNODT6309BCONCRETEBARRIER(BEE DETAIL5HET0401) 1 STOP SIGN. 1. MONUMENT SIGN. (ROPER To ARCHITECfMAL PLANS) K. ACCESSIBLE PARKING STIUPING,(SEE DETAIL SHEET CROS) L. HEAW DUTY CONCRETE PAVING. 15EE DETAIL SHEET GRED M. CONCRETE PIPE BDLLARO(SEE DETAIL SHEETC4D1) N. CDNNECTTO EXISTING CURS I. T-111DRMERPRD P. DIRECTIONAL SIGNAGE FOR SHIPPING AND -)NG. Q. MOTORCYCLE PARKING. R. EXARNGPROPERtt LINE i PRDPOSEDPROPERT'LINE HAD POLE ISEE LANDSCAPE PIANSFOR DETRRS. SECTION A -A N.T.S. NORTH 0 50 100 SCALE IN FEET Owuvke REALTY 1600 Utica AvenueSVIIe250 IAinrnaRB- MN MN GE L B7 SO——.8525031915 (h) Sambatek www.sambatek.com 12000 WMENIals, 0"', Sulfa 300 MI—waka, MN 55343 T63.476.6010telaphana 763.476.8532 f"1.116 FgLmalnp ISurvonp IPWnlnp IErrA-. W ,ISSUANCES CRY BUISM ITA1 17/3tl1s DRAWING INFORMATION CD (AM: LL. co vim. Drawn BY: LLJ Lc) OR JOB MEJob*: 1S496.09 Z w� z U) v w C) 0 0) cf) Z- N Z U) 0 Q =)u ED z z O o w Q w V r ,ISSUANCES CRY BUISM ITA1 17/3tl1s DRAWING INFORMATION G4ak: (AM: MOWS Ch.PRNd By vim. Drawn BY: 9AODka Realty Job R: OR JOB MEJob*: 1S496.09 DRAWING f SHEET TITLE SITE PLAN SHEET NUMBER [201 LEGEND —GRADING NOTES PROPOSED WSTiNG i. vaOrosE°.c'OrviOuasraFTD EInfvIF°.suuAa REvanON.se°z FisvanOrvsa�MiG P0.oPOSED tune °ErmE. PRO11—LIMB EUR9&GLITTEN""""" 2 TnNTRacTDaaiAilgeMEW PAVEMEM GRADIENTAND bnSMO—OTTFAOUT"wHE. waTF0. NEAwar STORM SEWER 0-11—® I4TILE i 1.11.),, ON BUILDING i. A( l (—J. RETAINING WALL-""'� -' --- -- GRaO =,A G TNFADa0. RDA TOPIPCNGCONrOaemlMN0u5. mxmACIDa SN4LL A—ND LIMBS __—_,._............ xonFY THE ENEII IMMFow—(THERE III DI—EANcr BETwEFN THE 1NADIFNT ITHE IIDVFRw9THE TREELINE DFSIGN GRanIExT.cODaDln4Tzau WOazWrtx ravwGCONTRACTDz SEOxTOUAATION 'S _ --' a Tatltfann°asxau NSNEFE55a5Y T°av°°PaOPEmv OaMpGET Es Z - °UwNGTHEronsrn MIS PROIEti roMaazTD0.wueE xFi0 s0EEi E—O NE Du0.NG ME[DNSTRucT ON PxASEs -- RIP PAP 5. S� /� OVERROW ELEV. V 9GOTL5 575 pP°Ygxa pfMjy'reic[N 1111Torvan M' E, EETY w E SOIL BORINGS aF aLLVFR50xsA FRw M4NGF DE THEwOaa. Txsazau REM DFTHEADE°uaCY SAFEttMFASuaEsn DNDaN - OFF E \ \ \ / / \ - \ -' sfALL BEREWDx51eIF EDac00avwanrvGallAE0UI0.ED SDILTESTBSAND IN .ECfw3 BL EFFTHIBE.m"IG°MIN�EEER. — — � — `- •___ _.. �_ __ / �. �' X935— — \ "._ / owNFRssD IS Fns NEER-auso LTFm GExalLescome i / _ ✓ �\ \ '�` �` �935�.-- \ AGISTFwNTALENGYNEER NGw L5AEv0RTIu5BFENNMeuiEOBY: eF93?4] X944 �9�0_ ` \ II/Ilr / 1\ \\ I \\ / i [0 MVLFTETxESITFGwiDI / / -- —wig \� I // ��•\\ �\ \ Y / Gin 9uLL E(I Eb siRutt N a`- AARIN 4�\N oN �J \ E50 Ls5HauascOm Wrtx \ OT ��/ � II / � 1 (� � "�, �r \\\\\\— ---- ���\'\�\ / l �`"2J, � .✓T f ,HEDWxFAL R MTx srr nD fa: a oomon"A°�'D9,D EEl\- - 9 \,. -- \ \ — — — — \ 9L I " wG�Gt°D a o asxALL"`DN`"o Mro o °g D ll ll 1ETAR f °ary ] REARANTARETTI—CINTRATFORNHIN1 ARE OF > FOETE11 TIFEB All 11— E*aT Drvwix NTHEP —ONEETH - EMnOHSANO SHaLL \ \ v LESSL II II gas �,.= 6 � �� _ A "m 0, --- 41 ° a w° � w�INYTO TR—U— PORTION 11TIE HA 9y \ s449] f �'`y` \\ \�r`�/ _W o�F.F AFD sn¢u�i NSE az.THEraDAErLMOs cof w ET ovFn wnxaur°nvrnon u SEElAScES BF oNslD�® DExr THE—NG coxsr vox ANO", wueF A 9 ss \ a moAR us CONS WITH RV�1" RET Ta5Na,1THINFEEENaD 11WInNSTaUETDxa ANA11aa� WHOTH TH F E III \ ! I� I `\ YI _ \ \\ as s0 •�. 9 9\\ \9*s� \\ \ m BV Txz°wnEa CTE°TDA rvaaaD E ANPSO LSM ANARUDETERMNFT111TzevT-11HFERE EIRI—All _O, DTHFa Dseals� \ \\ A-9aa`s,9 AV A iTA LL"E � NIA"v6vDA TH HA i NMPIFTE MMFNCES 011- OFFICE x srtE P ARATERRYWORN ! a 131 oFHCE 931 \ v, \ REMDYa OTPRUN. FeR a vaLTnTHESAT TAFTDxDE R III I - G944.fi3 m 4` '\ \ �\ THE N ExuvaT DN cOmR OFEH 940 44.03 y \ 111TsueFAVI510xo >?I"iEwN.-REUP uGF°euu°Dze°aln Rur AI f 4i �9a4 w9MLLN aENU oxTH MP DDTNAT B� E°a°D NGOF 9439 RI310NORpLL T' LBF �J% 9MgJ \Pr iif FOUR eaYNmY .. vEO.aLLP0on5NM-R—EREDFRDMA 1 WITH E MEEK DFNGNFawR AOvi PRVx NG er xANDRortN �?61 3.a1963� \ y' RWITH A DD 1—I.GvwAFi�h�t4u INERFI.E MOixTLOlSmucTl°x z°xzsxau BEFwOSEn Pa�Oaro r E BDBTn 11 f t\ 15 e l u ,,� / a o EEDTR�S`,a� rte. i\!y 94 B] 963 \ 11 V 14% BUILDING #2 ;i°• R ALLSn,MPREM°NaL�aLLBFUNDEaTNEDRERsuPER. axaFTXF 94JB FMATRDDTSHAn-BENrPRDPFAM�]ERFD - Rsmulnuusso n. TH FFE=945.5 212,224 S F.7 - —a THE-111nFnxw r EDREETEDBrAND 000 ----- -y` e, aFsmaamEx9uBEAvuIae�Earau EPaAATDnraND 'ONBHRM HBEFTHE, RW LLBF TR TEIANORNBETEA E. 1-11N BENE NEDWNFnfvEnaPO- R=A—NAMut ----- q - 1 f r �\ _ DETDw II NETS BA Illn� lN� DMONT TM �IaN55HALLRE5 5 I \o / I a ,\/ THE DMAREASTDBEFUATHERVHEAFNTEDORR I Na UDx TD N" m "°aa A °oF of "mAN°GPaDo Ro ow a — -s. 939. 1 JL L _. \ xfPAR dncuTAa gwxER R sm OF ABusxzO i ADEPT FAD --- ---ai 9 I wxF�NAF sio BEEsmeU9lEOT0AMUMUMDEYni DFG xcHEs EN NsmucT lxl FAuOww erMEOWN oc BN�Mci0a5HALLCD hl£TE TRFESSx°LLx FASDaEiTE00YMEENG NEER NOROEA D A DieE MaGEn ASARESDLrDFTHFFxFAvanox,uNLEss GIrvEER THIS ER nON 'p i /' o"i�i vaeovo i�sHEs°HEG°Bno EI�Fvai ou`n oslni°au eel R srl FIUE1 �.� 1HEnuAIPv cOm W TN EOVFSExcEm x FOOT 0 " Fuan snFD x HOR BEE 1AREIRI OIE I. / RR DWITHIN EBF6NFN BxFD WHAEDREFOBXaN K s'Flamu9x.'or 11 FG N,DNG, AN m nA:PDN xD ,a Ga DHpm lo, DDxBTRaEOW7HEmaa�Tl`N°�E;9oNT�Ae�ar D /; I N �' oauALaRB TERTNaNDRGNaL xDmDNDaTa FRn ! ` u u ENT.BU NGSUBGR DEFN5HEo5URFA ByM DREMANu3ti MaDE`m°'aao.BDADOTBFiDW.THEPREECRBF°ELEvTONATAN FORT wHEREMIuuREMlwri9 =5 50B3 d 93.9 'S0 I I1Pv 1 I �w DNMMERdEDauOwor uw NG suBGRaDEnx sxEosulmAFF xgrB�p�x�oio D ioBETnw,THEraFscR eFn EIFv i 945 945 I 1 f. _, f _, / EFVDR PaNONGAlFA suBD N YNI —AN M�EBovEORDiD FDDr9m a d ��45< ,•� \ 39 939:69 S ° /Iff �— e t I F RE EXPANSION I �_ ] �. >s REDURwEIFVAnDNUNLFESDm 6 x 57,9205ga.4 _ „Tyg 943.c - T5: TOPso L5xu1BEGRaDFDTD PLUsaRM N. EFNG NEEa. vE°R BEIDWMF I \ .sD °Dre uJ FTxESPECFEDTH IxNEss •� — ' v " TFnuu wrrae�FmAT�u srrE TMF � 9WSD MEENT17. �AnR"LL El LW TH CH FOR— FIN EENEHTFEHEI Acuff AND c°mPLiw WITH Al UNOTO N WH P a °u"ED BV End( Rx xG aurHORmoFFncx ROADwav cE TxDn Aea°cEDUAEsanD DATA se5 J °.>✓---/---\ \ _.. - y w4�1 �:T Sp $ _ - / � TB \ 53 x 'm \ : 9aEEi isG \ w — _- - a.s MINNESOTA DEPARTMENT OF TRANSPORTATION RIGHT-OF-WAY PLAT NO. 86-25 STATE TRUNK HIGHWAY NO. 101 NORTH 6 50 100 SGAIE IN FEET Duke REALTY 1G90 UBa Avenue 5BSUB¢ 25D MlnnxapDlls, ON MN G541fi 952S4i.2 p.5i2693.2315 (hl kWambatek 12800 Whit wrier DING, SLIM 300 MIDnelo6ks, MN 55343 753.476.601016IBphone 763.476.85321ecslmile E gllm dra ISBIM I IPImmMp IF MfmmmW ISSUANCES O [TIY SUBMITTAL 1]/36'15 coM UTTJ Lr) z LU U z Cl) co w z O a) cn N Z Q CIOO O LL Q O z Z m Q- z /< L/ W VrF� Lo co ISSUANCES [TIY SUBMITTAL 1]/36'15 tt D4s?IgIOD mm DRAWING INFORMATION —W CRIB:lmsazpl5 CSBOked Ely: DHAWT By: Duke Reply Job #: NEJob#: VIM JA DR JOB I99D6.B9 DRAWING I SHEETTITLE GRADING PLAN SHEET NUMBER C202 _.._........ _._.__ .___ .._......... --.. ............. O MH 502 - ti -__- C NNE TO IXISTNG WflINVERT I\ 6 NR YSTUe l.'-� CDNNEC OIXSTNGlz" NV FYLOCATON ANO .. RVICEYJNH I2 %e BUD R" ' G TE VALVE,&EXTE PS SHOWN _rte 18RLF@0.50% \ / \V __. ♦ � ,SSD 26 � �• \ CONNECTTGOLEUNG \ -4S 9N0 E_I G CATCH BAS / H F(CS r \ / RCP @ L50% r\ I I I Gn" E 12ca:EF I RCP ED 2lT% .1 Dl I _ E 9348 6 I CORE DRLLAND C E , CON TO EEXISTNNCATCH Ji rr Ba 1\ �r I I \ I I I I \ I I I I Pvc, U- J, I I I � I I I uan/ STILI -TS CONN DEX D BTING / PVC@150%I ­TcE -BS / 933 � \\I � EeMHi01 ^'( gE=938.54 _.. 71 \ IEE934.25 II ry I I I /I II I vstF-1s^!I I PVC[900 @ 1.00%0. TE . I GATE E --�1 It. LET J--L --- - I,- - - - - - - -- -- --J -- ----- - - DETAILVIEW=lo• R ]0"STORM SEWERSTUe 2 - " IE�33.W .. ... .�ADLF-le" CP @ I n 1 R q MX 201 e I PII F 1 ° _ I F I \ 'H RCP@35AN =-= ' IECTI EILLAND CONNERTTCH EARL , CATCH 0A5 ; -----_-_- - IE=928 , 160U 2 --��- NSW - `�-- PVC@ E_ / �\ f1E­3,j1R \ WYE \j1 WYE \ IE=93).12- IEWIE-4EG CFR @U-8"PVC 10RODE OAAINCONNECHOry 26@G50% IE-938DDSP.Ill SEWER SERVICE SD"RO DRANCONNECTIIE=92].ST IS, 1E-12 IE-9i0.0D I PYC@L50% / @ Glo 1 vvc@DSD OFFICE ZS 9L - \ \ \ \NV VASALVE GATE LAVE I \\ 1161E-15" \\ PVc@0A1% - CBMH330 EE�39.52 % E g 0.UT "P @ 0.4 v CBMH3 3 / I -942]5 / IE -939W RE=94290 15`' ROOF OIIAIN CONNECTION IRI iE-9392 .' IES40 W 1911E=939J3 2" f N T31F-1S PVC@ 100% _ H GRANT 1 6 IS VALVE � I 0x6" OUCER - ."WATEEIVALNTESF- ROOF GRAIN CONNECTION HYDATE VVALVE I f 'INDICATES NEENAH FOUNDRY CASTING NO., OR APPROVED EQUAL 19]tF ROP @ 1.50% I L IE539.W I. I I I TO EXISTING I2" STUB WITH e" // VALVE a EXTEND AS SHOWN Z LU U Z I I U covJ z o cm U O - \\ I W Z Z Z J I IWGA�TENYALVE 8x6"TEE I I I .. - \ CeMH 303 RES4353 --I 3 / FUTURE EXPANSION PaE�9a3DO \\ E93].\ IE -9558 j L_ A. ISI--_-_1���/ 57,920 S.F. EXISTING // Cp�TCH FAR,TO \ H NE \ L{ ]2 I.fl5®MH -E..601 E-929 _2 STORM SEW EA STUB f 930.0.5 / / / RABEIX SING / GRADEAND REPLACE WITH SOLD -NG RE 994.03 COREGRLL.ANO PVC@2.W% ~ CDNNECTO IXISTNG I pEy41W CATCH OASM F-, MIGETO GRADE REPJP \ G \ r (SIFE(SFi OEfpLL) I RE.E0 11141E I 30LE 12" RII -43•BEND py @ ,y� 1 CATCH BAS NTO / GAD AND REPLACE WRH SOLID CASTING -34.00 \ 25U-18" PCP @ 2A0% WITH ROUG CF.ST RE:3342 IEl B.1 \ MN qCP@2 'T, 1 e W% 1 \ I J 91131 __ I - IE539.0 STMH3W RE -94293 x \�_ 95'BENO 1--I -I Ii RCP @ 0% 208'GIPCE52_II� IN S)IE=93148 _. TEND l RAfFr / GRTE VALVE / MINNESOTA DEPARTMENT`at T_RANSPORTATIO_Nj IGHT-OF-WAY PLAT NO. 86-25 STATE TRUNK-FIJGNWAY NO. 101 �I 22U ]B \ RCP @ D.40% F£5308 J -STORM SEWER STRUCTURE SCHEDULE NUMBER' TYPE CPSTING" 17/30'15 'INDICATES NEENAH FOUNDRY CASTING NO., OR APPROVED EQUAL I I L IE539.W I. 1 CORNER WATERMAN TO EXISTING I2" STUB WITH e" GATE VALVE a EXTEND AS SHOWN Z LU U Z U covJ z o cm U O CBMH305 1 1 n RN=SA3.DT (LIE=938.60/ Is11E=93130 \\ I W Z Z Z J I IWGA�TENYALVE 8x6"TEE I I I .. m I I I 3 / G I � IN FES3S 93500 -;,/j I i TT Ra @L00% N CTTO EXIS GA TE 8 5 1 --3. WITH I AINSNH WITH B" LVE&EXTEND ASSHOWN HERO .... -34.00 \ 25U-18" PCP @ 2A0% co LEGEND P0.0POSED EXISTING 8 GUTW STD. ... M SEW ER -N-® ?. ....... .. ............: .I FOflCEMANISAN.I w��.''----'...L WATERMAIN X�-I �........... ................ EASEMENT ---____ .......................... GRAINTRE GASLINE -4L- .............. _............... ELECRIC_.-__ -PHONE -VT -"-"- FUTILITY CONSTRUCTION NOTES L THE UTILITY IMPRO M WRTHIS PR03ERSHALL BE CO STRUCED IN ACCORDANCE WITH THE SANDARDIRIUTI P IFl TONSASPUBLLSHEDBTTHECITYENGINEER5ASSDOATDNOF MINNETOTM ICEAVL PT MODIFIED HEREIN CONiRACOR SHALL OBTAIN A COPY OF THESE sPEDECATE.s. 1.1. aulmun5 sHAueE consTxucrED IN acEORDarvrEwm3 cm aSnuwEMEIRTs. 13 CONTRACTO SHA NOTGPEN.TUAV OFF.INTERFERE WITH, OR ATTACH ANY PIPEOR HOSETO ORTAPW MAIN BRONGIN67D THECTIN UNLESS DULY ALUTIONSIEDTID DO BID BYTHE OLIY ANY ADVERSE CONSEGUEN ES F ANY SLOHEDDLED DR UNSCHEDULED DISRUPTIONSIF V U UCARETHE UA01lTY F[ONTf1ACOR NIMUM VERILCALSEPARATION OF 19 INCHES AND HO A ARAT1 OF BAFEET BETWEEN DUT51DE IAM RS IS REQUIPIECATPAULWATERMAINAND SEWER MAIN (BUILDING, ETCtFM ANDSN ).CROSSINGS. 2. ATIA ERIALSSHALL ECRED OFIDSTIO MODINEDHEREIN. 21 ALLM R 55 ALL M ITHTHEREQUIREMEN F ECItt 22. ALLS NNA Y SEWER TO BE PYCSDA,Xfi, UNLESS NOTED OTHERMISE. 2.21 YSEWERSFAVICESTOBUILDNGSHALLBEPVCSCH4000NFDRMNGTO A M D2665 23.eWWATERMAINTOBEDUCTIIEIRON C1 554UNLES5NOTEDOTH ISE 2.3.1 ALL WATERMA NTO WE ]5-FEBT OF COVER OVER TOP OF WATERMAIN. 23. 2 PROVIDE THRUST B WCYJNGAND MECXANICAl301Ni R6TRAINTS ON ALL WATERMAIN 1.1NTS PPB c n STA. -I. 2A. PLL STORM SEWER PIPETO BE RCP PIPE, UNIE55 NOTED DTHERWI5E. 22.1 ALLSTCEM SEWER PIPE FOR ROOF DRAIN SERVICES TO BUILOINGSHALLBE PVCSCH 40 CONFORM NG TD ASTM D2665. AA EHALLEEMI,/UCHC S3. 3. COLONDINNNEALL BUILDING SERVICE CO NNECIONLOCATDNSANDINVERTELEVATIONSWITH MECHANICAL NTRACTOR PRORTOCONSTRUCTION. 4. ALL UILDNGSERY NNECT ISTORM, SANITARY, WATER) WITH FIV ET LESS COVER ARE TO BE INSULATED FROM UIIDN PONT WHERE SFET OFC HI S. CONTRACORSHALL K LLP ECAUTT. INE-FITOAMDRIDPROPERONOMMAZETOADJACENT PROPERTES DURINGH - OTI NPH 0 THI PROER NTN aW]UB LO SOLELY RESPONSIBLE FOR A Y CAMAGESTO THEADIACENT PROPERTIES OCCURRING DURING THE CONSTRUCTION PHASES OFT' S PRI"ES"T S. SAFETYNOTICETOCCUINE FORS:INACCORDANCWITHGENEPALLYACCEPTFDCONSTRUCTDN M C5 TMRORWLL LELYANDCOMPLC SPDNSBLFORCONDITONSONTHE OCI NG SAFETY OF ALL 11FION5 AND PROPERTY DURING PERFORMANCE OF THE WORK THISREQUIREMENT w LL APPLY CONTIPUOUSLY AND NOT BE LIMITED TD NORMAL WORM NG HOURS TN TY THENG NEER OR THE DEVELFERTOCONDUCTCONSTRUCTIONREVEWOF CONTEAUCTOW PEREDEMANCE15 NOTINTEHDEDTONCLUDE REVEW DFTHEADEOUACYOF ONi O fE MEASDRSN,ONORNFARTHECONSTRURONSITF ). ALLAREAS OUT5IDETHEPROPEDY BOUNDARIES THAT ARE DISTURBED BY UTIUTY CONSTRUCTION 5HALLBE RESTORE➢ IN KIND. SODD W AREASSHALLBE RESTORED W NH 61NCHES OFTOPSDILPLACED SENEATHTHESOD. B. CONTRACTOR SHALL BE RE ONSHLE FDA PROVIDINGAND MAINTAINING TRAFFIC CONTROL DEVICES SUCH AS BARRCAOES, WARNI NG SIGNS, DIRECTIONAL SIGNS, FLAGMEN AND UGHTS TO CONT0.0LTHE MOVEMENTF PHE N50ADEPARTM ENT F TRANSPORTATION STANC WHERE NECESSARY. TRAFFIC COUNNICIL DARDS.LL00NFORMTO 9 ALL 505 TESTING SHALL BECOMPLTEDB AN INDEPENDENT I.I. ENGINEER EXCAVATION FOR THE PURPOSE OF RE MOV NG UNSTABLE OR UNSUITABLE 5 SHALL BE COMPLETED AS REQUIRED BY THE SOILLS ENGINEER— iLNY BACK 11 CONSTRUCTION SHALL COM FLY WITH THE REQUIREMENTS OF THESOLSENGINEER CON -1 SEA -1 GESIONSFULE FOR COORDINATING ALL REQUI RED SOLS TESTS AND SOIL INSPECTIONS WITH THE SGIUSENS(NEER A GEOTECHNICAL ENGINEERING REPORT HAS BEEN COMPLETED BY. COMPEN BRAUN INTEJTTEC ORESS 1826 BUERKLE RD ST PAUL, MN 55110 PHONE DATED CONTPACTUR SHALL OBTAIN ACOPY OF THIS SOILS REPORT. 1D CONTRACTOR SHALL COPIES OF SHOP DRAWINGS FOR MANHOLE AND CATCH BASIN STRUOTURES TO ENGNEER CONTRACTOR RHALLALLOW 5 WORKING DAYS FOR SHOP DRAVING REVIEW. 11. CONTACTOR AND MATERIAL SUPPLIER SHALL DETERMI NE THE MINIM UM DIAMETER REQUIRED FOR EACH STORM SEWER STRUCNRE PIAN TOPE All E0 DI ON ELEV-939.25 GASRETED,H.FXIBM WATEITGNTCONNECTUB AT ALL PIPE CONNEOTONE UNLSSG.DUTED CONNECTONISAPPROVEI THEENGINEER I—HOPE TOaNO B939.9D - HDPE OUTLET CONTROL STRUCTURE 91 N.T.S. f� NORTH D 50 1w SCALE IN FEET Duke REALTY iHW LNka Avenue Sul@25D. Minneap48KINe, MN 55Ate 5254325W • a52543.29F (hJ �8ambatek wwwsambatek.rom 12800 Whitewater Drive. Sub 300 Minnetonka, MN 55343 763.476.6010 telephone 763.476.8532 facaMlle ElohBNilp ISIBYwIna IPIBnnNp IEmNKTIRSE I -STORM SEWER STRUCTURE SCHEDULE NUMBER' TYPE CPSTING" 17/30'15 'INDICATES NEENAH FOUNDRY CASTING NO., OR APPROVED EQUAL "PROVIDE Z7 INCH ROUND OPENING IN MANHOLE SLAB COVER. NOTE: CONTRACTOR AND THEIR SUPPUERSHAS1 DETERMINE THE MINIMUM biAMLTER REQUIRED FOR EACH STORM SEWERSTRUCTURE. PIAN TOPE All E0 DI ON ELEV-939.25 GASRETED,H.FXIBM WATEITGNTCONNECTUB AT ALL PIPE CONNEOTONE UNLSSG.DUTED CONNECTONISAPPROVEI THEENGINEER I—HOPE TOaNO B939.9D - HDPE OUTLET CONTROL STRUCTURE 91 N.T.S. f� NORTH D 50 1w SCALE IN FEET Duke REALTY iHW LNka Avenue Sul@25D. Minneap48KINe, MN 55Ate 5254325W • a52543.29F (hJ �8ambatek wwwsambatek.rom 12800 Whitewater Drive. Sub 300 Minnetonka, MN 55343 763.476.6010 telephone 763.476.8532 facaMlle ElohBNilp ISIBYwIna IPIBnnNp IEmNKTIRSE I ISSUANCES CITY SUBMITTAL 17/30'15 M W L•7 Lo Z LU U Z U covJ z o cm U O N Z Q (n =�y�) rrr W Z Z Z J m J � \O C/) a) ruj V _Lo co ISSUANCES CITY SUBMITTAL 17/30'15 a Ix�HPa4n ww DRAWING INFORMATION Scale: Cate: CM1 IR,PI By: DUAP, By: Duke Really JebA AJE J.EP.. IMBUE ENMB RA DR_JOB IEGGL 9 DRAWING/ SHEET TITLE UTILITY PLAN SHEETNUMBER "203 I ,_ �-- j ♦�':— \�, �\�111�II�IIIIiIlII —, �\��� I r_'� \ ��" ih(� _ T�. I IP2 ♦ sir .,.�-.\\\�\ —._— esu — \� \ / ��'�./ - AID / I YI I wxsmucnoN ' �' s _ m — I I I OFFlDE 7.n-SF---GE---GF---SF���S�-�BG���SF��SF��y�F IRALLER I -. I I I III % \��\` \ � \\\ ♦'\ —ws— _ — _ ._—w°-� — _ — - -— s.e ��_---- ��—_--_ _ —_---- — _ MINNESOTA DEPARTMENT OF TRANSPORTATION RIGHT-OF-WAY PLAT NO. 86-25 STATE TRUNK HIGHWAY NO. 101 —BUIL ICKUJI UN / Jt UI IV] t: IN I A I IUIII LU IN 1 KL)L =LEGEND IIII PaDPasED EumNG \ f _..._...- RIP OVERFLOW ELEV. I/L)y sILTFENCE SILTDIKE LIMITSOFDISTURBANCE SOIL BORINGS =-SD--=D- �J,S l ig 2S TEMPOBARYDVER$ON DITCH _y I s t IJ q III INLETPROTECT EFVRCF2 R -Y OR- -I TEMPOPARYSTONE CONSTRUCTION ENTRANCE Lu TEM D RYSEDMGNTEARm SB. TEMPOMYSTORAGEANOPARKINGAREAT EHTN (5EU, ULCMAOR BIANKETSAS SM OUTLNEDNTHE—PP) CD Lo h IP I \ I -----'L _. IP2 9�r- _. ..._ IP1–_F.� IIP1L i... I \ I\/� W \ _ I14 III 4 11____•_ l \ $/I �1 I I meq. ./!.I!JI %•� _\�I I l/� I ILIA I I I._N / –__ ...... /�% // v / V I � 1 —ws— _ — _ ._—w°-� — _ — - -— s.e ��_---- ��—_--_ _ —_---- — _ MINNESOTA DEPARTMENT OF TRANSPORTATION RIGHT-OF-WAY PLAT NO. 86-25 STATE TRUNK HIGHWAY NO. 101 —BUIL ICKUJI UN / Jt UI IV] t: IN I A I IUIII LU IN 1 KL)L =LEGEND PaDPasED EumNG STORM SEWER-//—® -' ............. ............': f _..._...- RIP OVERFLOW ELEV. I/L)y sILTFENCE SILTDIKE LIMITSOFDISTURBANCE SOIL BORINGS =-SD--=D- �J,S l ig 2S TEMPOBARYDVER$ON DITCH _y CHECK DAM / III IJ BI4fl LL INLETPROTEC.00NDEVICEI ��P 1 INLETPROTECT EFVRCF2 R -Y OR- -I TEMPOPARYSTONE CONSTRUCTION ENTRANCE Lu TEM D RYSEDMGNTEARm SB. TEMPOMYSTORAGEANOPARKINGAREAT EHTN (5EU, ULCMAOR BIANKETSAS SM OUTLNEDNTHE—PP) CD Lo h 1' IP2 9�r- _. ..._ IP1–_F.� IIP1L i... I ....------____IP1 L_�... W \ _ I14 —ws— _ — _ ._—w°-� — _ — - -— s.e ��_---- ��—_--_ _ —_---- — _ MINNESOTA DEPARTMENT OF TRANSPORTATION RIGHT-OF-WAY PLAT NO. 86-25 STATE TRUNK HIGHWAY NO. 101 —BUIL ICKUJI UN / Jt UI IV] t: IN I A I IUIII LU IN 1 KL)L =LEGEND PaDPasED EumNG STORM SEWER-//—® -' ............. ............': -INTILE CONT -1 _..._...- RIP OVERFLOW ELEV. r sILTFENCE SILTDIKE LIMITSOFDISTURBANCE SOIL BORINGS =-SD--=D- �J,S OIRECTONOF O VER WINO FLOW D ig 2S TEMPOBARYDVER$ON DITCH _y CHECK DAM SU SASN NAGE s BI4fl LL INLETPROTEC.00NDEVICEI ��P 1 INLETPROTECT EFVRCF2 R -Y OR- -I TEMPOPARYSTONE CONSTRUCTION ENTRANCE Lu TEM D RYSEDMGNTEARm SB. TEMPOMYSTORAGEANOPARKINGAREAT EHTN (5EU, ULCMAOR BIANKETSAS SM OUTLNEDNTHE—PP) SEQUENCE OF CONSTRUCTION PHASE I: L INSTAILSTABIUZED CONSTRUCTION ENTRANCES. 2, PREPARETEMPOMBY PARKING AND STORAGE AREA. 3. CONSTRUCTTHE SILT FENCES ON THE SITE. 4. CONSTRUCTU E SEDIMENTATION AND SEDIMENT TRAP BAS N5. 5. HALTALL ACTIVITIES AND CONTACT THE CIVIL ENGINEERING CONSULTANT TOPERFORM INSPECTION OF BMPS. GENERAL CONTRACTOR SHALL SCHEDULE AND CONDUCTS— WATER PRE -CONSTRUCTION MEETING WITH ENGINEER AND ALLGROUND 03TURBING CONTRACTORS BEFORE PROCEEDING W ITH CONSTRUCTION. 6. CLEARANDGRUBTHESFTE. ]. BEGIN GRADING THE SITE. 8. START CONSTRUCTION OF BUILDING FIRE AND STRUCTURES. PHASE Il: L TEMPORARILY SEED DENUDED AREAS. 2. INSTALL UTILITIES. UNDERORAINS, STORM SEWERS. CURBS AND GUTTERS. 3. INSTALL RIP RAP AROUND OULUETSTRUMRES. 4. INSTALLINLET PROTECTION AROUND ALL STORM SEWER STRUCTURES. 5, PREPARE SUE FOR PAVING, 6. PAVE SUE. ]. INSTALL INLET PROTECTION DEVICES. B.COMPLETEGRADING AND INSTALL PERMANENTSEEOING AND PLANTING. 9. REMOVE ALLTEMPORARY EROSION AND SEDIMENT CONTROL DEVICES (ONLY IFSUE 15 STABIMD), IF REQUIRED BY THE CONTRACT mm= NOTE CONTRACTOR THE EROSION CONTROLPIAN SHE TSALONG w THTHE REST OFTHESWPPP MUST BE KEPTONSNE INTIL THENOTICEOFTERMNAT .WITH H [A ONTRACFORMUSTUPDATETHESWPPP: INCWDNG THE EROSION R N ASN YTONCLUOEAOOITIONALAEEI IREMENTS, SUCH AS ADDITIONAL OR MS DESIGNED TO ECTPROBLERDDENTIREDRFTERFIUNGTHE NOTIUOFTERMNATON PP,N= H ON CONTROLPUINSHEETS ND LL REVISIONSTOTMUSTBER MITTEDTO THEOWNER TO RE KEPTONFREINACNRCANCEWTHTHE RECORDRE ME ONRE¢ MENTSDESQ)SEOINTHESWPPPNARRATIVE. EROSION CONTROL MATERIALS QUANTITIES ITEM UNIT I QUANTITY SILT FENCE UNFAIR FEET I1,65D SILTDIKE UNFAIR FEET I0 BIO -ROLL I UNFAIR FEET 10 CONSTRUCTION ENTRANCE UNIT I1 INLET PROTECTION DEVICE (IP -1) UNIT 5 INLET PROTECTION DEVICE (IP -2) UNIT 14 =AREA SUMMARY IN ACRES PANEMENTAREA 3.5]ACs BUILDING AREA SEEDED AREA 4SSACi TOTAL DIMMED 12.ISAC+ PRE- CONSTRUCTION IMPERVIOUS 0.14 ACT POST- CONSTRUCTION IMPERVIOUS 8.44 AC3 s REFER TO SHEET 05.03 FOR GENERAL NOTES, MAI INTENANCE NOTES, LOCATION MAPS, AND STANDARD DETAILS NORTH 0 50 OO SCALE IN FEET Dwuvke REALTY IS. .,I. Avenue.—, GURe 250 MlnneaPolle, MN 55416 962.593.2900 .552:693.]9]5 Id) ambatek www.sambatek.com 12800 Wh66wBlar Brim, Sub 300 Mi R&PIEB; MN 55343 763.476.6010 talaphoae 763.476.8532 farslmlle ERjlNdM IBurvftlftm 91BMDxRCmtR1 ISSUANCES CITY SUBMITTAL 1PJBD'15 of W M Ce) Lf) r Lo Z U Z — U) U)0 Lu �.L.i _/''S LL Z m Z Q w- z Q NO�// Z an LL F- O U Z Ol U) ^ vJ L.L.. Lu LLJ CD Lo ISSUANCES CITY SUBMITTAL 1PJBD'15 IV C—PUS. Oma DRAWING INFORMATION Bella: Oak: Checked By: Drawn BY Duke Really Job A: AIEJ°b R` 1713012015 VIM JTA OR JOB 19908.09 DRAWING / SHEET TITLE EROSION CONTROL PHASE I SHEET NUMBER C204 i — 9 / ♦i \\\ ILII/ f r— Iu4�fL� \ IR\ ILII 4 j I III I II II h I II I I I �• I it I li 11++ III r i 3j lh / �i I II d/lp 1 I VIjh I f 4 Za / 1 Iff I'_ 1 ti r ♦ l g V OFFICE BUILDING #2 212,224S.F. 7 FFE=945.5 _ R T/ — — — _ - F RE EXPANSION gRA �= 2 —� 57,920 SY, 2 F_ 1 OWL 9 — ___—_ sum naa--_—_—F.P y>5�� �_ —�_� J _9Ky MINNESOTA DEPARTMENT OF TRANSPORTATION RIGHT-OF-WAY PLAT NO. 86-25 STATE TRUNK HIGHWAY NO. 101 LEGEND PROPOSED EXISTING CURBRGOIIER _---- STOftM SEW ER �11� --""'-- DMINTILE RIP PAP 90' OVEAftOW ELEV. SILTFENCE---SF---SF: SILTDIKE --SSD---SD— UMITEOFOISNRePNCE ORINGS 5 DIRECTION OF OVERIANDELOW 1EMPORARINVEASLON —y OICH CHECK DAM SuaeuwIMTISOF OPA INF GE 51— INLET PROTECTION DEVICE I @IP -1 INLETPROTECTION DEVICE TEMPORARYSTORE CONSTRULTI N ENTRANCE TEM RAY DIMENT-14 SB TEMPORARY STORAGE AND PARKING AREA TS. P,.—F.DFAFY TABWZA1 INS - .—IMULCH MA11pp') ANKFR AS SM UTL NED IN ILL SWPPPI ===SEQUENCE OF CONSTRUCTION PHASE I: 1. INSTALL STABILIZED CONSTRUCTION ENTRANCES. 2. PREPARE TEMPORARY PARK I NG AND STORAGE AREA 3. CONSTRUCTTHESILTFENCESDNTHESRE. 4. INSTALL INLET PROTECTION AROUND ALL EXISTING STORM 5TRUCTURES 5. CONSTRUCT THESE DIME NTATION AND SEDIMENTTMP BAS NS 6. HALTALLACTIVITIES AND CONTACT THE CIVIL ENGINEERING CONSULTANTTO PERFORM INSPECTION OF BMP, GENERAL CONTRACTOR SHALL SCHEDULE AND CONDUCT STORM WATER PRE -CONSTRUCTION MEETING WITH ENGINEER AND ALL GROUND DGTUAl ING CONTRACTORS BEFORE PROCEEDING WITH CONSTRUCTION. 7. 0. RAND GRUB THE SITE. 8. BEGIN GRADING THE SITE. 9. START CONSTRUCTION OF BUILDING PAD AND STRUCTURES. PHASE II: 1. TEMPORARILY SEED DENUDED AREAS. 2. INSTALL UTILEFES, UNDERDRAINS, STORM SEWERS, CURBS AND GUTTERS. 3. INSTALL RIP RAP AROUND OUTLET 5TRUCTURES. 4. INSTALL INLET PROTECTION AROUND ALLSTORM SEWER STRUCTURES. 5. PREPARESREFORPAVING. 6. PAVESEE. T INSTALLIFRETPROTECTIONDEVICES. B. COMPLETEGMDING AND INSTALL PERMANENT SEEDING AND PLANTING. 9. REMOVE ALLTEMPORARY EROSION AND SEDIM ENT CONTROL DMOES(ONLY IF SITE IS STABILIZED), IF REQUIRED BYTHE CONTRACT In==NOTE TO CONTRACTOR THE EROIREN CONTROL—N SHEETS ALONG WRHTHE RESTOTTI PPPM STBE KEPT ONAiE UNTIL THE NOTHCE OFTEEMINATRONG fLEDWEERTHE MPCFNE CONTRACTOR MUST UPDATETHESWPPP, INC SG�DINGTHEEROV N CONTROL PIAN SHEEIS A6 NECESSARYTO INCLUDE ADDITIONAL REQUIREMENTS , AS D OPO O ORRERPROBLEMS FED AFTER EUNGTHE NOTCEO TER ON THEIN EEROHON CONTROL N SHEETS,AND ALL ­ISIONSTORMIT rBO9EKEPTONFIUtNACCOMANCEWITKTHE RECORD RETENTION FROGREEMENTS DESCRIBED IN THE SWPPP NARRATIVE mmEROSION CONTROL MATERIALS QUANTITIES ITEM UNIT QUANTITY SILTFENCE LINEAR FEET 1.950 SILTDIKE JUNEARFEET I O BID -ROLL UNME, FEET D CONSTRUCTION ENTRANCE UNIT Z INLEFROTECTION DEVICE (IP -1) UNI 3 INLET PROTECTION DEVICE RP -2) UNIT 6 IIIIII SUMMARY IN ACRES PAVEMENT AREA 351 AL• BUILDING AREA 4.87AL• GFAREA 4.59AL+OLSTUBED 12.15AGEDNSTRUCTION IMPERVIOUS 9.14 ACs POST -CONSTRUCTION IMPERVIOUS B.44 ACs REFER TO SHEET C5.03 FOR GENERAL NOTES, MAINTENANCE NOTES, LOCATION MAPS, AND STANDARD DETAILS —SOIL EROSION/ SEDIMENTATION CUNI RUL UYLKAI IUN IIIVltb(-HLUULL CONSTRUCTION SEQUENCE JAN FEB MAR APR I MAY I JUN I JUL I AUG SEP TEMPORARY CONTROL MEASURES TO f� NORTH 0 SO 100 SCALE IN FEET 1690 —Avenue—h, 5Uik2`A Minneapolis, MN S541e J 952503.2900 . 95254a:29TE. �,Sambatek www.sambatek.com 12800 WhIlmaler DEIN, Sulle 300 Mlnne PIM' MN 55343 763.476.6010 telephone 763.476.8532 fmimlle Enelneding I SurvR)M9 I PIRRRIR91 ERMImm.W ��// 1..1_ 0 uj Lo Lin I Z LU z - _ Lu U I (n e I I �< 2 W N cn a_ O N O —1 �z�n W Lu Z v 1..1._ 1 O DO z Q o U) 1 0Lu 1 rujL v Lo co F RE EXPANSION gRA �= 2 —� 57,920 SY, 2 F_ 1 OWL 9 — ___—_ sum naa--_—_—F.P y>5�� �_ —�_� J _9Ky MINNESOTA DEPARTMENT OF TRANSPORTATION RIGHT-OF-WAY PLAT NO. 86-25 STATE TRUNK HIGHWAY NO. 101 LEGEND PROPOSED EXISTING CURBRGOIIER _---- STOftM SEW ER �11� --""'-- DMINTILE RIP PAP 90' OVEAftOW ELEV. SILTFENCE---SF---SF: SILTDIKE --SSD---SD— UMITEOFOISNRePNCE ORINGS 5 DIRECTION OF OVERIANDELOW 1EMPORARINVEASLON —y OICH CHECK DAM SuaeuwIMTISOF OPA INF GE 51— INLET PROTECTION DEVICE I @IP -1 INLETPROTECTION DEVICE TEMPORARYSTORE CONSTRULTI N ENTRANCE TEM RAY DIMENT-14 SB TEMPORARY STORAGE AND PARKING AREA TS. P,.—F.DFAFY TABWZA1 INS - .—IMULCH MA11pp') ANKFR AS SM UTL NED IN ILL SWPPPI ===SEQUENCE OF CONSTRUCTION PHASE I: 1. INSTALL STABILIZED CONSTRUCTION ENTRANCES. 2. PREPARE TEMPORARY PARK I NG AND STORAGE AREA 3. CONSTRUCTTHESILTFENCESDNTHESRE. 4. INSTALL INLET PROTECTION AROUND ALL EXISTING STORM 5TRUCTURES 5. CONSTRUCT THESE DIME NTATION AND SEDIMENTTMP BAS NS 6. HALTALLACTIVITIES AND CONTACT THE CIVIL ENGINEERING CONSULTANTTO PERFORM INSPECTION OF BMP, GENERAL CONTRACTOR SHALL SCHEDULE AND CONDUCT STORM WATER PRE -CONSTRUCTION MEETING WITH ENGINEER AND ALL GROUND DGTUAl ING CONTRACTORS BEFORE PROCEEDING WITH CONSTRUCTION. 7. 0. RAND GRUB THE SITE. 8. BEGIN GRADING THE SITE. 9. START CONSTRUCTION OF BUILDING PAD AND STRUCTURES. PHASE II: 1. TEMPORARILY SEED DENUDED AREAS. 2. INSTALL UTILEFES, UNDERDRAINS, STORM SEWERS, CURBS AND GUTTERS. 3. INSTALL RIP RAP AROUND OUTLET 5TRUCTURES. 4. INSTALL INLET PROTECTION AROUND ALLSTORM SEWER STRUCTURES. 5. PREPARESREFORPAVING. 6. PAVESEE. T INSTALLIFRETPROTECTIONDEVICES. B. COMPLETEGMDING AND INSTALL PERMANENT SEEDING AND PLANTING. 9. REMOVE ALLTEMPORARY EROSION AND SEDIM ENT CONTROL DMOES(ONLY IF SITE IS STABILIZED), IF REQUIRED BYTHE CONTRACT In==NOTE TO CONTRACTOR THE EROIREN CONTROL—N SHEETS ALONG WRHTHE RESTOTTI PPPM STBE KEPT ONAiE UNTIL THE NOTHCE OFTEEMINATRONG fLEDWEERTHE MPCFNE CONTRACTOR MUST UPDATETHESWPPP, INC SG�DINGTHEEROV N CONTROL PIAN SHEEIS A6 NECESSARYTO INCLUDE ADDITIONAL REQUIREMENTS , AS D OPO O ORRERPROBLEMS FED AFTER EUNGTHE NOTCEO TER ON THEIN EEROHON CONTROL N SHEETS,AND ALL ­ISIONSTORMIT rBO9EKEPTONFIUtNACCOMANCEWITKTHE RECORD RETENTION FROGREEMENTS DESCRIBED IN THE SWPPP NARRATIVE mmEROSION CONTROL MATERIALS QUANTITIES ITEM UNIT QUANTITY SILTFENCE LINEAR FEET 1.950 SILTDIKE JUNEARFEET I O BID -ROLL UNME, FEET D CONSTRUCTION ENTRANCE UNIT Z INLEFROTECTION DEVICE (IP -1) UNI 3 INLET PROTECTION DEVICE RP -2) UNIT 6 IIIIII SUMMARY IN ACRES PAVEMENT AREA 351 AL• BUILDING AREA 4.87AL• GFAREA 4.59AL+OLSTUBED 12.15AGEDNSTRUCTION IMPERVIOUS 9.14 ACs POST -CONSTRUCTION IMPERVIOUS B.44 ACs REFER TO SHEET C5.03 FOR GENERAL NOTES, MAINTENANCE NOTES, LOCATION MAPS, AND STANDARD DETAILS —SOIL EROSION/ SEDIMENTATION CUNI RUL UYLKAI IUN IIIVltb(-HLUULL CONSTRUCTION SEQUENCE JAN FEB MAR APR I MAY I JUN I JUL I AUG SEP TEMPORARY CONTROL MEASURES TO f� NORTH 0 SO 100 SCALE IN FEET 1690 —Avenue—h, 5Uik2`A Minneapolis, MN S541e J 952503.2900 . 95254a:29TE. �,Sambatek www.sambatek.com 12800 WhIlmaler DEIN, Sulle 300 Mlnne PIM' MN 55343 763.476.6010 telephone 763.476.8532 fmimlle Enelneding I SurvR)M9 I PIRRRIR91 ERMImm.W ��// 1..1_ 0 uj Lo Lin Z LU z - _ Lu U U) (n �< 2 W N cn a_ O N O —1 �z�n W Lu Z z 1..1._ O DO z Q o U) 0Lu rujL v Lo co ISSUANCES CRYSUBMnTAL IZEG'15 DRAWING INFORMATION Gale: Oats: I.W2015 Checked By: EVAIB Olavm By: Duke Beatty Jobs DR JOB AIE Job#: 19806.69 DRAWING I SHEET TITLE EROSION CONTROL PHASE II SHEET NUMBER C205 EROSION &SEDIMENTATION CONTROL NOTES & DETAILS / "SITE MAP" IN I R s r.. 9AIfT1' SBC83ffi. ', ter Y f� \ �f SITE LOCATION MAP —ROCK ENTRANCE DRIVE USGS MAP ¢T P0 GEDTxn w Alw IREACI `VNDISHIXER-11 SILT FENCE DETAIL NETTDREAHE F --t-- 11111 INER 11111*111 WAEHODTANEA M �BENmaRDu„DIE PERIm¢ER GRDurvOSURG mmvP B MAIERNt °LONCREIE $IDESiDPm FORITE WASIFOUT MEASNALL BE INSTALLED PRICA TO All COxrnEYE PLASBV EM ON SH WASHOUT ARGSHALL B IlWLRV 11 MILTHICR rGSH1 SOF, CONTROL IS REOUIRm1F ACEISTO CONCRETE WASHOUT All is 1, EGN=,1EPLAEEl­ RATPANCE,ATTHEWASHOUTAREA c¢uRYTO cIFMtY NDIPAFETHEIEIGFIDN aFTHE LIT ATE AnAND OFA FILL p,L[ONCEEsxBE F0.OMHsTmMT T _ 0 OFILFAWISE STPII—INAEMM'NRgICIFITED 8.11.1E CONCRETE WASHOUT AREA SILTHENCEMATGIAL—E wiw mmFNv��vn'inTMaEEnEs H ISI f av°D�sr vmH =.T.—CENTER lgE t^Pd 1 xs lsEExmEi1 m� sseRACE .f 75I cmRPlAFT z as woo ' f / D LY WIM GRPiEE' / . xa sTaxE E FILTER A55ENT., Re BO% OsafEITFENCE AT.1. T=NT—W. FENCE ITH..WI ITSIENENS CLISE CEVI FMi WIRE'o-Lx GCm REMN WIIx F 7DALLA rFina AslMD Wei GTFsrmmON. DEVEID�%` W is IMO GREEDAW RF NNFAvoL1;MNISCLISTEi5D i xANDTHEGEOTGTBfTOnfEWOVFN WIRE FENCE cG _WP R_%. (DPA® FEVER SITq WITH TxvFEw RETIPsoR rmxG mLSTExERs,ru.Lsexm wltxlxrxETOra °F Oxqulas OEGR�iNmuGNTxEFPeRI[, WITH GCH rUNcmRE SHE DPERATDRI—..MFwc�OA LEAS:; I CAL1'11"I NCI TMwrw°sEcrlOxs°fsTFENCE MAreRIUN ADIx EAamHER,THEYsw¢wv eEOVGPEO GIC NS CC mir"nE�OFE1oRR Fn onS lsn'I"`"mErNiTsmm mRu xw�DiTe P.nEBOADDENNEADDINERAFILICARTIFf MwDE%rIA AusluF°EFxx.EIyI`sissmiaLl"BRILL.ew SE -FORT. NEErax= —SILT FENBERECE INLET PROTECTION (IP -1) BROAD DRAIN INLET PROTECTION (IP -2) GENERAL EROSION NOTES: STANDARDs.E 1EATH...E.C.I.II.L.ENT.EELICAN.RSH—AIII. ME.EELICAN RSH—AIp FucFwsFSBElwem L°uLIURImImGNu ITIN UVN lSYmvPt u'mMPArsmvAFHISO..IS IGOSION &sNIMENIAT.N.—L—ENE 1-1, TIE STANOARODETA. TnEPun xxenpi vF. ONO HsaPPEIVO Cts, PmsTXEPFAMN A'D ALLSVBsmVEMREV _AND E_. DOCUMENTS. 1. SHALLICIBBABANDrI1ON9BLEmRmMPLEnxG&SUBMrtnNG ixEAPVUGnONRORMEMPCAGFNFAALSTDRMWATE0.PERM?fON:cON5T0.V[nON ACm/HY. ALL BANYRARDR,"CD ENTS1tI BCON1M IED1BE AT E1 vaLvsv calix WORMwPEAPOLLUFES PREVTJAIVE ,,,,E ANAm ITH THECONFINpvDFxsnwi[OF MINNFSOFP AMD INPOFs vERhlit ANO escaMEFAMIVPAwm+TnemMExrz txEsmPr ArvDAumHex RFUTEo. Des aSl I IPSO BY oNSwPPP&P sH maxrErvAN� E M DEITIES, M ttmENFmwsD crP m YmNI noNsw N°PDD NALmnroDWNER,nRDUGnDur ILLPxasEs°FmNRRucTlex. PERMN.aDDmDNUBMPssHAUB DR. RING AFFELDHERNINTS 1111 11 THE m AAARMrO FEMEAA4 srAE. Exrz PRArnCEASAVPVcnet[CDma4nOR51tALL MRFPHEMADDTONAL PLAN muSTn6RRL P¢NGTENLsiPTE WPTERCPGMTSFOR ANY mxSmUn DIKTIWTR'MPacFNGSTATEwartRs pE DSMUSFBE MaNEDIN ATAL. M CONTRAIL iEscau n l ECL=oEuin°Eni�m tea rvnEiurs srRPas�`slGus�slu fmsuvice cici°rviEH°co'mEv`Pinvm°EinSHE °eEronEwDR%AEG N£GRouPuiDMosrune xs Acnvm NET .-A LTII1THE UMTSDFDisiuRBaNa. E. wnINNERE ,lw PnnRlxc A�aF°nmarm a°Rrw—Ta nnceDnrne�ranun�r°, arF'cGrRal �nxom eE usmuTxee°uIPMFNrmnlNrwa+lanrv°elPPxixG OL ALLWAEH WAATERR fOOxCAETETRUus,�HICLECLGNINDGBSVI�EIRT OEANICNG, FTCI MUST BE LLMITm TO A DECRIED AREA IF THEsrtEAND SxgLL BE mITAINED AND ROPEA"" INEOISPam. rvO NEWW FAH AOo TO ENTER GR U11 WATER Is CONEIIRID ANIIMOOERMElELF 11. THE ILICULD AN°sDUO WASTF5 M -ST PACIVOVIDANDEOUD WCSTESMusi BEDlwvsm OC GLY AND NCENIIUANCEWmlFlfOMusTBEINSTALLEOADIACEmm OIII WASIO.1 FAnuniv INmnmmxwETEmUIPMBR OPERATORS AFFAINEICS C. FlDENT0ILANOG0.EASEABSORtl15N NVOEBALSANOfiVIniawx eooTnssluL BEmNMNNm Ox LTEOR RaFnol1vm sUFVAluet[TOmMAINPNOCIFANUP RIELOR of L PIus AVDIFA%S IB. SELLD W S ESIFE S CCEDES OIMENT. ASPIALT&cONCR1IE MIwIG£ FLDanrvG DEeRI;(APER, PU5n4 FABRIC, mxsieunlOry a DEmOIinOry OFeR¢&OTNG wasTEs MVsieENsm5m0�s.oILGgSDuuE PPINT &AM xNAm0us5uBSTAxcEsm =Rig vxvvFAly si00.m.iNClu01NGSEmNOANYmMarvMFM. iOPREv¢iTSPILL£LG%S E.REs(RICIED A[CFSSTOSTOGGBARUSMuseEPPDVIDm1O PREVENivANWUSM.STORAGE&DISPOVLLOF nA�ARO0u5wASTEMVSi REIN �OMPUANCEwDH MPG REGUTATIDNs, CE. ALLSFOAMWAT D.LEFDN PREVGTON MFASVREsvRESEM[O DN TxIsPux,PNOIxiHESwmPv,SHALLBEINmw'I£DA5500NA5.PRACTIfABLFaNO rRIORTO "AtL i Nnu "''O'T"" .—IC.—EC,—IN1ADAYSOFINACTIWN.sEEM—NALLBEIN m mwDoE :S DM"`>,x,,P=°x' M"e im GwiLD omwolN�oNTMESEASO1.1 P11111 IgE MN(°DTVEUNUTroNsscn°N-3)SEEDN°MEmoO MA/DOT IRSTICATIONSECnONPETs.B.YEMPOM RARY ULCX 9fALLeEPPPUE01NamvROaucEwnH MN/DOTSPECIRCAFION 31. ALTGNwTIv¢Y,NroGUut A ILsiaelUEER In ACCORDANCE WITH MN/DOT SPEGFlCwnOx SELTION P5T53H MAY BE USED IN Pv,CE OR TEMPORARY Mu_ . sTEWHGEmNSTPVCNON a IVIn HASPGNAN¢nl DPPMSnA DEPGMANEMLY EFABIu¢n.THEEEAREAsmA1eE­1­N AeeoADAxeE wrtx mE nmeraelE DESR18 m AflDVR REFG iO Tx E Gaw NG rLAx AND/DR IarvOrAPE v GI FDR vEGnAnvE eovER. FENCES, CHEcx Dame I Nu r rROTEL,IDn DEVICE£ EFet FD PREY ENF ERDSOx ABR�DaT xEmDOf PawORRIxGOAY, MAINTENANCE NOTES: OLPGx, PND �ry TxEs<Dxm WATER POLLun.N PREVENFR N PIAN SHALL.-- —1— N Fu¢Y FUIaIONAL REWIRmm0.gcOMPLEim PNASEOF WOAx OR FlxgL5TA91LIGTION OFTHESnETxE OESTGNATFDmNTACTPFxsvry nmsO orvixts rGN must 11 RGTGTHPx DS wcxm lx mxwRS. °coNSSO AN On NFEALL 'NERrserEx°axs°uRNGArnvE CONSTRucTIOrvaluO wlrxlxzaH.Or°iawlmrN wuowlr G i aS musrBEREPn am�REPwcm.DRsvPv�iEnlLExrEDwxENTHEx Rom axFuxcr oxaL ATxEsmnnExrxEgaEs>�zDFTnExxGxroFTxE FExcE. RES ix musrBEMADE wIrxlnzAlwuRS OFmvn Asmvn ASflEmmNOnwNsPLmwactEs. x l/C1. mYRa"I rvoium oaauncin mix.mov__REmmPUTmwITHN�z HDURs ovoismvmr oRTnsEsvon nsFlaDM xG oI,°iD"PiaswnvT"Ar�siSEEP"�Aar6 IID.OFTHE GEIEnu PERMrtt. W-TE"1111NEwDNGDAmrvASAND mxY ANS cMp Go' q °w;OP o Epp ° En °SYow�aax °" GCE WRHN SMEry RTI DAYS OVDIuvvEM UNI£5 11 IN EEA4w Earow° 0.oH aE ° o M£CO R%D a E'° REACEEVARI IFFORTISTI°BTAINAE SIFPRECLUDED, REMO ND STA_TaN NFL- FARE PLACE WITHIN SEVEN IT) EAENOAR DAVE OF OBTAINING ACCESS .c°NIRAIENIISRE,PDNSTELEFELL EC NG ALLLDIAL REGIDNA-,STATE AND FECERAL ALLINIFITTES AID RECEHVNGANT APPu PERMIT, PRIOR TDCENDUC ­ 1. BE FOR EVIDENCE OF OFRSTESEOIMEITTESEMNOONTO PAVED SURFAmm S.TRAE.SEDIMENT MUST RE 0.0MALLOFF snEPAVmsVPfR['B, WrtHEx 3axICURE OF DLSSEVERY,OR IF APVUCAe1E, WrtXIN A SHORED TIMETO CEAPLY WITH PRRT IV.cb IF THE vmmrtGENERN. S. °MP£�mRirlE Dumx omilo THECEIFmNsmUrnONwORcnTTHEENE.TNE PERMITTEEIM ADR E�iO.N .1DALnIn OTHER PENMTTEE OL(jAxc p NTH OWEN ALLANDRE OF THE SIiETHAT IwvE NOT BBEN FNALLV STANEU ORTHE SITE HAS uIDERGDxEIFNALSTAND EATION.AND A No III - 1. smiMEMmUsi BEREIHov®Ix AMCNIERAxDATAFNEDUENLV SUFRCIENTm mlR RIDE =EIMF p "�� xoMl NETREErscCOLDBEWASImIMDST°RM� REBYTIEnEATRAINANDDRPOSEAEAFEFF1AURDTODRIGOFPDRDE STREET=,' 7. INNFTRATIN�Gm MMOUSTaEIISPECIEDFO ENSIRETHaTCxOSEOIM MEM ORW N6AmO55ixEINEttINT ON pRFASRucxINGTHE INRLT0.AilON ARGaNOixESE -6, Wule REALTY 160011traA Ire SO", Bun, 250 IR'nne PDI'B, MN 55Ai6. 9525C3250O 9525Ha.2gTB lfx) 'ambatek www.sambatek.com 12800 WhIIERR r Dm, sults 300 li MlnnBlenks, MN 55343 763.476.6010telB0hene 763.475.8532 f=RElle EngIneeft ISLIvrAng IPiRrainy IFJMIaOnmbl ISSUANCES CRY SUBMmAL iy=15 DRAWING INFORMATION O 1v3p'P015 Checked By: cr_1 C1) JFA DUke Realty Jeb R: Lu Lo 19906.. I— Lo z W U z cn J Q co W 0F— cin W Uj [Y] O LL z N O Z z ! m J O z O U zz Q O 3 N CZ L.L W W U Lo CO ISSUANCES CRY SUBMmAL iy=15 DRAWING INFORMATION &ale: Wb: 1v3p'P015 Checked By: w1ma D._ BY: JFA DUke Realty Jeb R: DR JDs NEJObt: 19906.. DRAWING / SHEET TITLE EROSION CONTROL DETAILS SHEET NUMBER C400 2--777 — CONCRETE JOINT SPACING DETAIL V OONCRETEWTINS16- BITUMINOU55UgFACE 10.1DWE MESH-I0NT550O.Et 1"R VARIES 5LOPE@2W%CLASS 5 r � 1D NTS.INTEGRAL SIDEWALK CURB NOTEANYS GN FRE STANDING 1. ASPHALT PARKINGEHI IOTSHALLBE SOUNTEDAS HOWN CD PAPYJNG REID REQU ADUNDAUL a.oB E./E. DOPE OFFUEo SIDEHFDUS0 SDO UP TOp20MDFNE wi I I 6p t SPACES ImEIssGNDETAILS £ MEET) �� TYNEAA® 6°OSCH.L E PIPE-FlLL WIT.LWITHCONC „ PAVING1 � /' ROC.. FLT Kao z r ELEVATION OF RAMP NR90RCURBO HL', TRAF51T1DN F Fx(ik<I TO T:RE 1. =, dem c r�mc s. csemc O�1 02 " _ __ cmLTn+cr-oN JDurt xcT:s _ 9�,., 3 J) 1, o P NO F ' ' e le -'-`__L_. —. I .. ... _. L_ _"--1 ._._..._� � _•G�1.. E. J 'L__ _ l`. I .. J00 / r r'i ., ➢I >E.A h L---- 2--777 — CONCRETE JOINT SPACING DETAIL V OONCRETEWTINS16- BITUMINOU55UgFACE 10.1DWE MESH-I0NT550O.Et 1"R VARIES 5LOPE@2W%CLASS 5 r � 1D NTS.INTEGRAL SIDEWALK CURB NOTEANYS GN FRE STANDING 1. ASPHALT PARKINGEHI IOTSHALLBE SOUNTEDAS HOWN CD PAPYJNG REID REQU ADUNDAUL a.oB E./E. DOPE OFFUEo SIDEHFDUS0 SDO UP TOp20MDFNE wi PNDARDMNDOT 'IN SIGN NO. AT.BA CC 3MSIRE PROW DE VAN NFESSIHIT RIGHT HAND DISCHARGEPARKI.. B"x4"GTEELTUBF SPACES ImEIssGNDETAILS £ MEET) �� TYNEAA® 6°OSCH.L E PIPE-FlLL WIT.LWITHCONC „ PAVING1 � /' ROC.. FLT Kao 977 ACCESSIBLE PARKING SIGN mmmmmI CCONCRETE BARRIER W/ CURB N.T.S. NOTE: SEE STORMSEWER STRUCTURE' ESC- 5 DU lFaRruDNGrYPE Z4"X36" SIABOPENING XX" BITUMINOUS WEAR COURSE, MN/DDT 236DSPWE- FIDY CASTINOPENING 11 GT"BFIPROVIDEOSEESTORM AMETER —NO O %%" HITUMINOUSBPSE COURSE, MN/DOT2B605PNW- 5EWERSTRUC7URESCH UL FOR oMEN5.1ETRU MBAK ABTO XX ^:CRUS EDQ R0.Y POCKAtN/DOT3l3R .1-1OFSTRUCNRE \' DMENSIONFROMRA 0 X%ClAS % 1 %CATEBASCMN/CG DDT 3138 TOCENTERDFPIPE.FORA24 AB %% CNTgXA REGATE EM /DOT3130 / GRATEOPMNING. .H. 9" IN FAOMSACKO—RIB d e DIP MH 34'OBEHINO BAC OF1.R. SEAIANTIDINT *�y IIF REQUIRED BY SOIUSRENGNREEA) MN/ODT 314928 . M. H.1 W/ BACKER ROD , MN/OOTTYPE V, M-150DX (IFREDURIREDBYSOILSENGINER) APPROVEDSUBGRADE FULL BED OF MORTAR BETWEEN RINGS. AND • K R ON THE DUTSIOE OP THE RINGS " %X BITUMINOUS BASEWCARCOCOURSE, MN/OOT 23GO SPW - MINI HOLM OF 2, MACIMUM'OF B CONCRETE p D %%" BITUMINOUS BASECOURSE,.MN/DOT 3360 SPNW Ap1U5TNGRINGS PRECASTRONFORCEDCONCRETESIAB THICANES5:6" FOR 42"TO48" 010. CLASS A% CRUSHED QUARRY POCK M OOT 3130 SAT0102" DIP. XX" CIX-100%CAUSHED ROCK MN/DOT 31B 38 l2 FOAFOR HOW-TO... DA %%"CI-A5S %AGGREGATE OASE, MN/OOT3138 F9. 9 ALLIOINISINMANHC.—AVE RINGRUBDER GASKETS. *—M.T XX"SELECTGRANUTARMATERIAL,MN/COT314928PREUST[ON[RETE MANHOLESECTIONS IIF REQUIRED BY 5OII5 ENGINEER) I F REDUBE IRED BT SOIL5 ENG N ERjRAF1000% MANHOII,-O-ALU .NUM APPROVED SUBGPADE OR EQUPL,16' O.C-ALUMINUM VAR. STEPSPPPROE.A: 5.O" NOTES: LE 5 - BOTHOUSESSHALLBEGRDUTED ON I -0 1. THE PAVEMEM SECTIONS SH"STAND ND SPECICAT BOTH THEOUTSIOE PNUTHE INSICE 2%SLOPEIIYP) ACCORDANCE WITH MNDOT"STANDARD SPECIFICATION FOR CONSTRUCTION",ANDALSOTHEREQUIREMENTSOF GASXETED, FLS%IBLE WATERTIGHT CONNEC H)N THE OWNER'S GEOTECHNICALCONSU TANT. AT ALL PIPE CONNECTIONS UNLESS GROUTED_ CONTRFCTIDNJOINT AKN CONNECTION LLAPPROVED BY THE ENGINEER Z ALLTHICKNESSES, AS SPECIFIED, ARETO BECONSIDEREO 'RICHERTBIRTUMINOUS MIX OESIGN M NIMUM DEPTHS, AFTER COMPACTION SEDC GROUT BOTTOM A•CONCRETE W/BR00 REQUIREMENT ROA ED BYTHF JI F NISH BLNXroNCRETE GEOTECHNICALO ULTANT 3. MN/DOi5PEC 33520TUM NOUSTP[X COATSHALLBE IES rMNMUMSIABTH CKNES56"FOA I4 DEPTH ACAS ITYP) CVAB&GUTTER PGP NSf ETWEEN 5UCCESSIVE BINMNOUSLFTS AND / NCREASETIRDNESSIFOREACNPOFDEPTH BABUTTING CONCRETE CURB EDGES, PAVEMEM EDGE GREATERTHAN WAND REINFORCE WITH 09 END SECTION CURB & GUTTER C77 w rit -3" R' 1/ K2"Ry3"AMININROF—FCIAEGS SHALLBEPIACEDDE.-THE NR0 AERN -M -N ROMATCATCH BASINS 2D FEET IN LENGTH, CENTERED ON THE STRUCTURE 1/2"R IS3^R sLDPE314^PEa FT R iL S n 32" —PON roRCING RODS AT— BASINS 2C FEETNLENGTH,CEMEREDDNTHESTRU.CNRE TIP OUT SLO]/2"R PE 1/4" PER FT. CLASS 5 BASE 0612CONC. RB6 LS—RADE GUTTER (ALONG 5 DEWALK) -0 N.TS.B612 CONCRETE CURB & GUTTER (.:8>Nas. CATCH BASIN MANHOLE 07 CONCRETE SIDEWALK PAVEMENT SECTIONS "T'S' SECTION BEHIND CURB & GUTTER 0S%OF FO MET£R N SIOEWAUE RDANUA NRB 0 SEDETAIL C \ pF51PED MN MUM TD.. UMITG OF S/\\\\\ 2P N� CONCRETE WILLK • ' A _ � A'•- �p4 � DOMESECfION --4 2' I � IRP W -9' HNNWHITE / K zB PLAN VIEW OF ADA PARKING STANNEWRDACCESS STANDARD ALL AMSTAUL ISLE STALL SECTION A -A 6" TRANSITION INTEGRAL PAVEMENTTO FLUSH SIDEWALK [URB WITH SIOEWALK SEE DETAIL RAL 51 ALK NPB D SEED NL 5EC110N B-8 03 t7 ADA PARKING N.T.S. SB S'88'8L21'80F3i� FR NTFACE.GFCLHB- A—J CD PLAN VIEW OF RAMP ADUNDAUL a.oB E./E. DOPE OFFUEo SIDEHFDUS0 SDO SLOPED INTERSECTIONS NCAA FI/FT Al..... NOF, F/FTTIN LLJ oa- IJI �I vl--'aa-ls 4-,1F d [IJ r I v .•�OGEifiRA_uTlfSx �� TYNEAA® - TYPE A TYPE A STFP z r ELEVATION OF RAMP NR90RCURBO U�-) co VJ LU M ED Z - O TRAF51T1DN F Fx(ik<I TO T:RE 1. =, dem c r�mc s. csemc O�1 02 " _ __ cmLTn+cr-oN JDurt xcT:s _ 9�,., 3 J) W �W�-�// L -L o co CCONCRETE BARRIER W/ CURB N.T.S. NOTE: SEE STORMSEWER STRUCTURE' ESC- 5 DU lFaRruDNGrYPE Z4"X36" SIABOPENING XX" BITUMINOUS WEAR COURSE, MN/DDT 236DSPWE- FIDY CASTINOPENING 11 GT"BFIPROVIDEOSEESTORM AMETER —NO O %%" HITUMINOUSBPSE COURSE, MN/DOT2B605PNW- 5EWERSTRUC7URESCH UL FOR oMEN5.1ETRU MBAK ABTO XX ^:CRUS EDQ R0.Y POCKAtN/DOT3l3R .1-1OFSTRUCNRE \' DMENSIONFROMRA 0 X%ClAS % 1 %CATEBASCMN/CG DDT 3138 TOCENTERDFPIPE.FORA24 AB %% CNTgXA REGATE EM /DOT3130 / GRATEOPMNING. .H. 9" IN FAOMSACKO—RIB d e DIP MH 34'OBEHINO BAC OF1.R. SEAIANTIDINT *�y IIF REQUIRED BY SOIUSRENGNREEA) MN/ODT 314928 . M. H.1 W/ BACKER ROD , MN/OOTTYPE V, M-150DX (IFREDURIREDBYSOILSENGINER) APPROVEDSUBGRADE FULL BED OF MORTAR BETWEEN RINGS. AND • K R ON THE DUTSIOE OP THE RINGS " %X BITUMINOUS BASEWCARCOCOURSE, MN/OOT 23GO SPW - MINI HOLM OF 2, MACIMUM'OF B CONCRETE p D %%" BITUMINOUS BASECOURSE,.MN/DOT 3360 SPNW Ap1U5TNGRINGS PRECASTRONFORCEDCONCRETESIAB THICANES5:6" FOR 42"TO48" 010. CLASS A% CRUSHED QUARRY POCK M OOT 3130 SAT0102" DIP. XX" CIX-100%CAUSHED ROCK MN/DOT 31B 38 l2 FOAFOR HOW-TO... DA %%"CI-A5S %AGGREGATE OASE, MN/OOT3138 F9. 9 ALLIOINISINMANHC.—AVE RINGRUBDER GASKETS. *—M.T XX"SELECTGRANUTARMATERIAL,MN/COT314928PREUST[ON[RETE MANHOLESECTIONS IIF REQUIRED BY 5OII5 ENGINEER) I F REDUBE IRED BT SOIL5 ENG N ERjRAF1000% MANHOII,-O-ALU .NUM APPROVED SUBGPADE OR EQUPL,16' O.C-ALUMINUM VAR. STEPSPPPROE.A: 5.O" NOTES: LE 5 - BOTHOUSESSHALLBEGRDUTED ON I -0 1. THE PAVEMEM SECTIONS SH"STAND ND SPECICAT BOTH THEOUTSIOE PNUTHE INSICE 2%SLOPEIIYP) ACCORDANCE WITH MNDOT"STANDARD SPECIFICATION FOR CONSTRUCTION",ANDALSOTHEREQUIREMENTSOF GASXETED, FLS%IBLE WATERTIGHT CONNEC H)N THE OWNER'S GEOTECHNICALCONSU TANT. AT ALL PIPE CONNECTIONS UNLESS GROUTED_ CONTRFCTIDNJOINT AKN CONNECTION LLAPPROVED BY THE ENGINEER Z ALLTHICKNESSES, AS SPECIFIED, ARETO BECONSIDEREO 'RICHERTBIRTUMINOUS MIX OESIGN M NIMUM DEPTHS, AFTER COMPACTION SEDC GROUT BOTTOM A•CONCRETE W/BR00 REQUIREMENT ROA ED BYTHF JI F NISH BLNXroNCRETE GEOTECHNICALO ULTANT 3. MN/DOi5PEC 33520TUM NOUSTP[X COATSHALLBE IES rMNMUMSIABTH CKNES56"FOA I4 DEPTH ACAS ITYP) CVAB&GUTTER PGP NSf ETWEEN 5UCCESSIVE BINMNOUSLFTS AND / NCREASETIRDNESSIFOREACNPOFDEPTH BABUTTING CONCRETE CURB EDGES, PAVEMEM EDGE GREATERTHAN WAND REINFORCE WITH 09 END SECTION CURB & GUTTER C77 w rit -3" R' 1/ K2"Ry3"AMININROF—FCIAEGS SHALLBEPIACEDDE.-THE NR0 AERN -M -N ROMATCATCH BASINS 2D FEET IN LENGTH, CENTERED ON THE STRUCTURE 1/2"R IS3^R sLDPE314^PEa FT R iL S n 32" —PON roRCING RODS AT— BASINS 2C FEETNLENGTH,CEMEREDDNTHESTRU.CNRE TIP OUT SLO]/2"R PE 1/4" PER FT. CLASS 5 BASE 0612CONC. RB6 LS—RADE GUTTER (ALONG 5 DEWALK) -0 N.TS.B612 CONCRETE CURB & GUTTER (.:8>Nas. CATCH BASIN MANHOLE 07 CONCRETE SIDEWALK PAVEMENT SECTIONS "T'S' SECTION BEHIND CURB & GUTTER 0S%OF FO MET£R N SIOEWAUE RDANUA NRB 0 SEDETAIL C \ pF51PED MN MUM TD.. UMITG OF S/\\\\\ 2P N� CONCRETE WILLK • ' A _ � A'•- �p4 � DOMESECfION --4 2' I � IRP W -9' HNNWHITE / K zB PLAN VIEW OF ADA PARKING STANNEWRDACCESS STANDARD ALL AMSTAUL ISLE STALL SECTION A -A 6" TRANSITION INTEGRAL PAVEMENTTO FLUSH SIDEWALK [URB WITH SIOEWALK SEE DETAIL RAL 51 ALK NPB D SEED NL 5EC110N B-8 03 t7 ADA PARKING N.T.S. SB S'88'8L21'80F3i� FR NTFACE.GFCLHB- A—J CD PLAN VIEW OF RAMP ADUNDAUL a.oB E./E. DOPE OFFUEo SIDEHFDUS0 SDO SLOPED INTERSECTIONS NCAA FI/FT Al..... NOF, F/FTTIN LLJ Lo B• Lo z r ELEVATION OF RAMP NR90RCURBO U�-) co VJ LU M ED Z - O AND.GU— pAFUTFFA Cj d Af Z J m cDNCAETEwnu 1 SECTION A -A 02 " T1 . q L ° o IS/16°(TP)- -•- /e MIN ry5/B"MIN DDME5PACING ro ERY ) NOTE. THE CURB ANO CURB TRANSITION ONTHE RAMP WILL BEPAID FORAS UIREPS FEET OF CONCRETE NAB DR CONCAMCUAIANDGLITTER.THERAM AREAWILLBEPAIDASSQUAREF OFCONCRETEWAIICUNLF_55 5PECFEDOTHERWI5ETHETRUN TEDDOMEAREAWILLBECON4lDEREf IN.DENTAL C 1/21NCHPREFORMED JGINTRLLFRMATERWL,PASHTDM213. 2O. VARIESWRHNRBHEIGHT. EXAMPIESHOWNIEFORWOLFBHEIGHT. 3O 6"TOB"15THEAEOUIREDDFFSETOFTHEDETECTABLEWARNINGW/ UNCATEDOOME AREATROMTHE FRONT FACE OF CURB.OR PLACETHE DETECTABLE WARNINGS ATTHE BACK DF NPS. OB. ADAREQUIRNTRUNCATEDDOMEARFA SHALL BE 2'0"MIN.IN OWERION OFTMVEAND SHNIEKIENO THE FULL W LOTH 13.0" OP 4' 0•"I C"'NRB RAMP: THIS 2' D' BY 3' 0" DRB' P' WIDTH MP,) TRU TEO EA ALLCONTRASf WTNTHEADJACEMWALKNGSUAFFCE THEENNRE TRUN TEO M HALL OE A UGHF LPI GHTGRAT, WHITE O0. YEUOWI WHEN THEADIACENT SIDEWALK PRKCCNORL THE ENTIRETR NCATED DOME AREA SHALL BEADARK COLOR(RED, 0—, DARK GRAY, OR BRIGHTYELIOW)WHEN THEADJACENTADEWALK IS 4——CA OR L GHT GRATCEMENT COLOR. THE TRUNCATED DOME AREA MAYBE EITHER GRANITE PANEL OR STAMPED CONCRETE INEIALLED IN STRICTACCORDPNCE WITH MANUFACTURES RECOMMENDATIONS: GRANITE PANELSSHALL BEV" N NALTHtEKNE55 WITH SANDEDTEXTUPED FINI5H, FREE OFANY CRACKS, CHIPS OR COLOR DEFORMATIONS. STAMPED CONCPETESHAILMEET REQUIREMENTS DF RA36 CONCRETEMIXAND HAVE INTEGRATED HOMOGENEOUS COLORING. G61. 4'0"FOR NEWCONTAUClION.3-G-ALLOWED FORRETROFTTSOR PR6ERVATION11ROJECTS- C WHEN POSS BLE PROW DEA PATH 01 WIDE BEHIND THE PEOESTR AN RAMP. A REIADVEY FIAT(2%MA%.MUMSLOPE)4X4.ANONGWILLALLOWWHEELC ARSTONAVIGATEAROUNDTHE .—IN RAMP PEDESTRIAN CURB RAMP T.S. Rl-ED W/CONC WITH TOPROUNDED 4 2 D" MASMER AAD FINIS E 4' OVER d OVER FOOTNG 5 CO POST m A P51 EE P.0 GO PSI £w CONCRETE MI G 3 MINIMUM Q f ALLPIPESSHALLBE NTEOTRAFRC YELLOW C. ')NMT 7 CONCRETE PIPE BOLLARD duke REALTY t6W ULIaA nue SoutN,Swle 240 IAn�re Polk 543.2 M-, T 952900 • 9625435 6K) C>Sambatek WWW.fiambatek.com 12300 Whhexater OINK, Sub 300 MIDR.-wRkL MN 55343 763.476.60101BIB9hane 763.476,5532f-1.110 EnBIn3N11IO ISLIDISR no IPI IRIIn0IE161—lal ISSUANCES CITY SUBMITTAL 12130'15 . L RPOP, oee DRAWING INFORMATION Smle: Data: 1=2015 Checketl By: EVIMB .harm By. JTA Duke Really Job R DR JOB AIE Job Y: IMSI9 rDRAWING /SHEET TITLE 1 STREET AND UTILITY DETAILS SHEETNUMBER C401 CD L. co LLJ Lo Lo z z VJLIJ^^ J U�-) co VJ LU M ED Z - O O O Ld z � CL) Cj d Af Z J m W J_ Q z LU I— J) W �W�-�// L -L o co ISSUANCES CITY SUBMITTAL 12130'15 . L RPOP, oee DRAWING INFORMATION Smle: Data: 1=2015 Checketl By: EVIMB .harm By. JTA Duke Really Job R DR JOB AIE Job Y: IMSI9 rDRAWING /SHEET TITLE 1 STREET AND UTILITY DETAILS SHEETNUMBER C401 i CENTERPOINT ENERGY TYPICAL SERVICE LIKE SLEEVE TO r.D.rD wx Pusrx x 13- YiN l' THICK E9xG 7E OaERImi>; WffT i0 BE Z' FP1N1 115 SURFACE TYPICAL RESILIENT WEDGE VALVE & BOX INSTALLATION 10 & UNDER WATERM IN ot"NO —E STANDAR205D PLATE NO. e .6 , 41, A SECTION 'H SEC" 'A AT9EM0 �• TB DAT SFP.FNGIN OF > P"m 'AA' PmTEiFttEbE 202 STANDARD PLATE NO. Nom -ALL VALVES - . - - - -- �L THE OPERATING - T. 12S= 2' MIA VIC -F/CL TYPICAL BUTTERFLY VALVE & BOX INSTALLATION 12' & OVER WATERMAIN NO —LE STANDARD KATE NO. N #4 W& 1 206 STANDAR308 D PLATE NO. utgiio 1 1 WnE 2z* — — NOYINAE I F -F FU CFJOC OFOL M. IWX PACER TRAFFIC FLANGE HYDRANT (OR APFRMTfD I NO -UE STANDARD PLATE NO. 203 w-, 7�-7-t L r A SANITARY SEWER STANDARD MANHOLE D 7 -To Qt -NDARI 300PLATE NO. C) S Of m cy) LLI Lx) so, I-- = LIJ C) U) co Lu Z m Lo Z 0 CM a) U) 0 LLf z PROFILE cf) < 1--- Lu INSULATION FOR WATER & SANITARY SEWER PIPE & SERVICES NO SCA E O10 STANDARD PLATE NO. 30,4 _Sn 41, A SECTION 'H SEC" 'A AT9EM0 �• TB DAT SFP.FNGIN OF > P"m 'AA' PmTEiFttEbE 202 STANDARD PLATE NO. Nom -ALL VALVES - . - - - -- �L THE OPERATING - T. 12S= 2' MIA VIC -F/CL TYPICAL BUTTERFLY VALVE & BOX INSTALLATION 12' & OVER WATERMAIN NO —LE STANDARD KATE NO. N #4 W& 1 206 STANDAR308 D PLATE NO. utgiio 1 1 WnE 2z* — — NOYINAE I F -F FU CFJOC OFOL M. IWX PACER TRAFFIC FLANGE HYDRANT (OR APFRMTfD I NO -UE STANDARD PLATE NO. 203 w-, 7�-7-t L r A SANITARY SEWER STANDARD MANHOLE D 7 -To Qt -NDARI 300PLATE NO. TYPICAL WATER TIGHT SEALS STANDARD PLATE NO. 0 ao .30 p siiI I OF CONCRETE SHALL CUas ANO GUTTER SECTION AA A ow -DOM XIW- A aJ CONCRETE CURD -D GUTTER TYPICAL CROSS GUTTER 21 STANDARD 02 PLATE NO. 7 Duke REALTY 9!!:2.503.2900-932503.2975Ih) ,Sa , " www.sambatek.rommb&k 12800Whftr.t.,D,ta,SM a00 Mlu&ft, MN 55343 763.476.6010 telephone 763.476.6532 facsimile EngInudW (Su;vWkV [P],nft IBM—Dd C) S Of m cy) LLI Lx) so, I-- = LIJ C) U) co Lu Z m Lo Z 0 CM a) U) 0 LLf z 2 cf) < 1--- Lu Lu a) (3) Lu Lu cf) J - (D Lo CD Lit, RE STAN DARD PLATE 311 Nq TYPICAL WATER TIGHT SEALS STANDARD PLATE NO. 0 ao .30 p siiI I OF CONCRETE SHALL CUas ANO GUTTER SECTION AA A ow -DOM XIW- A aJ CONCRETE CURD -D GUTTER TYPICAL CROSS GUTTER 21 STANDARD 02 PLATE NO. 7 Duke REALTY 9!!:2.503.2900-932503.2975Ih) ,Sa , " www.sambatek.rommb&k 12800Whftr.t.,D,ta,SM a00 Mlu&ft, MN 55343 763.476.6010 telephone 763.476.6532 facsimile EngInudW (Su;vWkV [P],nft IBM—Dd ISSUANCES C[Ff SUBMITTAL 1-15 ,-k.' - DRAWING INFORMATION Date: iTYfp2015 Checked By Ms — -1:— Duke Ready Job A: DR JOB 19906.09 DRAWING I SHEET TITLE STREET AND UTILITY DETAILS SHEETNUMBER 0402 C) Of m cy) LLI Lx) I-- = LIJ C) U) co Lu Z m Lo Z 0 CM a) U) 0 LLf z 2 cf) < 1--- Lu Lu a) (3) Lu Lu cf) (D Lo CD ISSUANCES C[Ff SUBMITTAL 1-15 ,-k.' - DRAWING INFORMATION Date: iTYfp2015 Checked By Ms — -1:— Duke Ready Job A: DR JOB 19906.09 DRAWING I SHEET TITLE STREET AND UTILITY DETAILS SHEETNUMBER 0402 HL \ l Y _ - -_---- - -- - _ - _ NORTH D 50 IOD SCALE IN FEET PLANT SCHEDULE SmN: DON: l2w2015 Checked By: TREES BOTANICAL NAME I COMMON NAME COM CAL SIZE Cr" WS BBWN FvpyrHem'Whkesplre'/Whftspire W.h 988 Z-1 B OP B,WNpRaphylN Faf9o'TM/DakoN Pinnacle Birch B88 2"Cal 3 HL GI.Sbia bNra-'SkylinW / Skyline Honey L.n BSB 2.SCal 4 SD QUemus blwlvr/ Svemp MR. Oak B d B ZSCaI 7 HE L4mus amaI2ane'Prinal,n'I American Elm age 2.5'Cal 9 C) m Z Q CONIFERS BOTAMCALNAWE/COMMONNAME CONT CAL SITE OTY VyP %nuns -I Wh1w M. BdB IF 18 oQFY MRN. TREES BOTANICAL NAME I COMMON NAME CONT I CAL I SRE QTY Be Amelanch , canedenais'AWumn Srillmn IA,Wmn BditN SaT ki Ry 9 d B 2"Cal 2 GROUNOCOVERS BOTANICALNAMEICOMMONNAME QTY T0-Hii9hl,nd Sod I Sod 11,DDDs/ T,d.Hydmse,d l Shod W, is Mu 186,058,E 'YELLOW FALLCOLOR 'YELLOW FALL COLOR 'YELLOW FALL COLOR 'YELLOW FALL COLOR NOTES GENERAL NOTES: 1. THECONTRACTORSHALL INSPECTTHE SHE AND BECOME FAMILIARWITH THE EXISTING CONDITIONS RELATING TO THE NATURE AND SCOPE OFTHE WORK 2. THE CONTRACTOR SHALL VERIFY PIAN LAYOUTAND BRING TO THEATTENTION OF THE LANDSCAPE ARCHIEECT DISCREPANCIES WHICH MAY COMPROMISE THE DESIGN OR INTENT OF THE LAYOUT. 3.THECONTRACTOR SHALL BE RESPONSIBLE FOR COMPLYING WITH ALLAPPUCABLE CODES, REGULATIONS, AND PERMITS GOVERNING THE WORK. 4. THECONTFACTOR SHALL PROTECT EXISTING ROADS.CURBS/GUTTERS, TRA, IUS, TREES, FAWNS AND 5ITE ELEMENTS DURING CONSTRUCTION. DAMAGE TO SAME SHALL BE REPAIRED AND/OR REPLACED AT NO ADDITIONAL COST TOTHE OWNER. 5. LOCATE AND VERIFY ALL UTILITIES, INCLUDING IRRIGATION LINES, WITH THE OWNER FOR PROPRIETARY UTILITIES AND GOPHER STATE ONE CALL 48 HOURS BEFORE DIGGING. CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROTECTION AND REPAIR OF ANY DAMAGES TO SAME. NOTRYTHEIANDSCAPEARCHITECT OF ANY CONFLICTS M FAULTTATE PLANT RELOCATION. S. THE LANDSCAPE CONTRACTOR SHALL COOROINATETHE PHASES OF CONSTRUCTION AND PLANTING INSTALLATION WITH OTHER MINTRARORS WORKING ONSITE ]. THE GENERAL CONTRACTOR TO EXCAVATE TO A DEPTH OF 24 INCHES IN ALL PARKING LOT ISLANDS. REMOVED SOIL TO BE DISPOSED OF OFF -SRT PRIOR TO PLANTING. 8. THECONTRACTORSHALLREVIEW THE 5ITE FOR DEFICIENCIES IN SITE CONDITIONS WHICH MIGHT NEGATIVELYAFRECT PLANT ESTABUSHMEW,, SURVIVAL OR WARRANTY. UNDESIRABLE 5ITE CONDITIONS SHALL BE BROUGHT TO THE ATTENTION OF THE LANDSCAPE ARCHITECT PRIOR TO BEGINNING OF WORK 9. THE PLAN TAKES PRECEDENCE OVER THE LANDSCAPE LEGEND IF DISCREPANCIES EXIST. QUANTITIES SHOWN IN THE PANTING SCHEDULE ARE FORTHE CONTRACTOR'S CONVENIENCE. CONTRACTOR TO VERIFY QUANTITIES SHOW N ON THE PAN. M. THE 5PECIFICATIONS TAKE PRECEDENCE OVER THE PLANTING NOTES AND GEN MAL NOTES. IL EXISTING TREES AN D SH RU BS TO REMAI N SHALL BE PROTECTED TO THE DRI P UNE FROM ALL CONSTRUCTION TRAFFIC STORAGE OF MATERIALS ETC WITH 4'W. ORANGE PLASTIC SAFETY FENCING ADEQUATELY SUPPORTED BY STEEL FENCE POSTS G' OUT. MAXIMUM SPACING: 12. LONG-TERM STORAG E OF MATERIALS OR SUPPLIES ON-SITE WILL NOT BE ALLOWED. 13. CONTRACTOR SHALL REQUEST IN WRITING, A FINAL ACCEPTANCE INSPECTION. PLANTING NOTES: 1. NOP[AW5 SHRLL BE INSTALLED UNTIL FINAL GRADING AND CONSTRUCTION HAS BEEN COMPLETED IN THE IM MEDIATE AREA. 2. AGRANULARPRE-EMERGENT HERBICIDE SHALL BE APPLIED TO ALL PLANT BEDS AT THE MANUFACTURERS RECOMMENDED RATE PRIOR TO PLANT INSTAUATION. 3. ALLPIANTI NG STOCK SHALL CONFORM TO THE"AMERICAN STANDARD FOR. NURSERY STOCK"ANSI-ZW, IATEST EDITION, OF THE AMERICAN ASSOCIATION OF NURSERYMEN, INC. AND SHALL CONSTITUTE MINIMUM QUAUTY REQUIREMENTS FOR PLANT MATERIALS. 4. 0 FESTORY TREES SHALL BEGIN BRANCHING NO LOWER THAN VABOVE PAVED SURFACES. 5. ALL PLANTS MUST BE HEALTHY, VIGOROUS MATERIAL FREE OF PESTS AND DISEASE AND BE CONTAINER GROWN OR SALLED AND SURLAPPED AS INDICATEDW THE LANDSCAPE LEG IN D. 6. PLAN TMATERIALSTOBEINSTALLEDPERPLAMINGDETAIIS. T.ALL TREES MUMS STRAIGHTTRUNKED AND FULL HEADED AND MEET ALL REQUIREMENTS SPECIFIED. 8.THEIANDSCAPEARCHITECT RESERVES THE RIGHT TO REJECT ANY PLANTS WHICH ARE DEEMED UNSATISFACTORY BEFORE, DURING, OR AFTER INSTALLATION. 9.NO SUBSTITUTIONS OF PANT MATERIAL SHALL BEACCEPUB UNLESS APPROVED IN WRITING BY THE IANDSCAPEARCHMCT. 10. ALLPANEMATERIAL QUANTITIES, SHAPES OF BEDS AND LOCATIONS SHOWN ARE APPROXIMATE. CONTRACTORSHALLBERESPDNSIBLEFORCOMPLETE COVERAGE OF ALL PW NTING BEDS AT SPACING SHOWN AND ADJUSTED TO CONFOR14 TO THE EXACT CONDITIONS OF THE SM. THE LANDSCAPE ARCHITECT 5HALL APPROVE THE STAKING LOCATION OF ALL PLANT MATERIALS PRIOR TO INSTALLATION. 11ALL PLANTING AREAS MUST BE COMPLETELY MULCHED AS SPECIFIED. 1Z MULCH: SHREDDED HARDWOOD MULCH, CLAN AND FREE OF NOXIOUS WEEDS OR OTHER DELETERIOUS MATERIAL IN ALL MASS PLANTING BEDS AND FOR TREES, UNLES5 INDICATED AS ROCK MULCH ON DRAWINGS. SUBMIT SAMPLE TO LANDSCAPE ARCHITECT PRIOR TO DEUVERY ON-SITE FOR APPROVAL DELIVER MULCH ON DAY OF INSTALLATION. USE 4" FOR SHRUB BEDS, AND 3" FOR PERENNIAL/GROUND COVER BEDS, UNLESS OTHERWISE DIRECTED. 13.THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL M ULCHES AND PLANTING SOIL QUANTITIES TO COMPLETE THE WORK SHOWN ON THE PLAN. 14. USE ANTFDFSICCANT(WILTPRU FOR APPROVED EQUAL) ON DEQDOOUS PLANTS MOVED IN- LEAF AND FOR EVE KGREE HIS MOVED ANYTIME. APPLY AS PER MANUFACTURER'S INSTRUCTION. ALL EVERGREENS SHALL BE SPRAYED IN THE LATE FALL FOR WINTER PROTECTION DURING WARRANTY PERIOD. ]5. PLANTING SOIL FOR TREES, SHRU B5 AND GROUND COVERS: FERTILE FRIABLE LOAM CONTAINING A USEFUL AMOUNT OF HUMUS AND CAPABLE OF SUSTAINING VIGOROUS PLANT GROWTH. SHALLCOMPLY WITH MNDOT SPECIFICATION 3977 TYPE B SELECT TOPSOIL MIXTURE SHALL BE FREE FROM HAROPACK SUBSOIL STONES, CHEMICALS, NOXIOUS WEEDS, ETC. SOIL MIXTURE SHALL HAVE A PH BETWEEN 6.1 AND 7.5 AND 1 0 FE0.BUZER AT THE RATE OF 3 POUNDS PER CUBIC YARD. IN PAWING BEDS INCORPORATE Ali" AYER OF THIS MIXTURE THROUGHOUTTHE ENTIRE BED BY ROTO -TILLING IT INTO THE TOP 12" OF SOIL @ A 1:1 RATLO. SOILTO TCHTHE SPECIFICATION ABOVE Ili. AREASWHERECONCRETE ISREMOVED YOFD DINSTALLATION DEELEDI AN WATERDUNTI (NST AMENDEDMA 1]. ANY PLANTSTOCK NOTPLANTEO ON DAY OF DELIVERY SHALL BE HEELED IN AND WATEREOUWILINSTALLATION. PANTS NOT MAINTAINED IN THIS MANNER WILL ES SHMREJECTED. 18. CALL OV AHE SHALL BEG F RE PLACEMENT TWOCOMPLETETABOR OWINGSEASON(APRIL(-NOVEMBER l), UNLLSSQMERWLSESPFOFIED. THE GUARANTEE SHALL. COVER THE FULL MST OF REPLACEMENT INCLUDING LABOR AND PLANTS. 10. CONTRACTOR SHALL 24 HO THERSI ADVANCE OF BEGINNING LLAST3 INSTALLATION. IS. PLANNED DEUVERY.TIIE CONTRARO((SHALL NORFYTHE LANDSCAPE ARCHITECTAT LEAST 24 HOURS IN ADVANCE R BEGINNING PANT INSTALLATION. 2D, SEASONS/TIME DECANTING AND SEEDING: NOTE: THE CONTRACTOR MAY ELECT TO PANT IN OFF-SASON ENTIRELY AT HIS/HER RISK DECIDUOUS 20.1. DEODuoANTS: 4/1-6/1:9/21-11/1 2032 DECIDUOUS POTTED 4/1-6/1;9/21-11/3 2DA. EVERGREEN POTTED PLANTS: 4/1-6/1;9/23-31/1 20.4. EVERGREEN BEE: 4/1-5/1;9/21-11/1 20.5. TUAT/UkWN SEEDING 4/1-6/207/20-9/20 20.6. NATIVEMIX SEEDING: 4/1-]/20;9/20-SD/ZO 21. MAINTENANCE SHALL9EGIN IMMEDIATELYAFTER EACH PORTION OF THE WORK IS IN PLACE. PLANT MATERIALS- BE PROTECTED AND MAINTAINED UNTIL THE INSTALLATION OF THE PANTS RIC OMPLETE, INSPECTION HAS BEEN MADE, AND PLANTINGS ARE ACCEPTED EXCLUSIVE OF THE GUARANTEE MAINTENANCE SHALL INCLUDE WATERING, CULTIVATING, MULCHING, REMOVAL OF DEAD MATERIALS, RE -SETTING PANTS TO PROPER GRADE AND KEEPING PANTS INA PLUMB POSITION. AFTERACCEPTANCE,THE OWNER SHALLASSUME MAINTE NANCE RESPONSIBILITIES. HOWEVER; THE CONTRACTOR SHALL CONTINUE TO BE RESPONSIBLE FOR KEEPING THE TREES PLUMB THROUGHOUTTHE GUARANTEE PERIOD. 22 ANY PANT MATERIAL WHICH DIES, TURNS BROWN, OR DEFOLIATES(PRIOR TO TOTALACCEPTANCE OF THE WORK) SHALL BE PROMPTLY REMOVED FROM THE SITE AND REF ACED WITH MATERIAL OF THE SAME SPECIES, QUANTITY, AND SIZE AND MEETING ALL LANDSCAPE LEGEND SPECIFICATIONS. 23. WATERING: MAINTAIN A WATERING SCHEDULE WHICH WILLTHOROUGHLY WATER ALL PLANTS ONCE A WEEK IN EXTREMELY HOT, DRY WATHER, WATER. MORE OFTEN AS REQUIRED BY INDICATIONS OF HEATSTRFSS SUCH AS W ILTING LAVES. CHECK MOISTURE UNDER MULCH PRIOR TO WATERING TO DETAM INE NEED. CONTRACTOR SHALL MAKE THE NECESSARYARRANGEMENTS FOR WATER. NRF NOTES: NRF ESTABLISHMENT SHALL SE ACCOMPLISHED IN ACCORDANCE WITH THE PROVISIONS OF THE MN/OOT 2105 AND 2575 EXCEPT AS MODIFIED BELOW: i. ALL AREAS TO RECEIVE SOD SHALL ALSO RECEIVE BE OF TOPSOIL PRIOR TO INSTALLING SOO. TOPSOIL SHALL BE FREE OF TREE ROOTS, STUMPS, BUILDING MATERIAL, AND TRASH.AND SHALLBE FREEOF STONES LARGER TWIN 1 1- INCHES INANY DIMENSION. ZWHERESODABUTSPAVEDSURFACES, FINISHED GRACEEO CF MOISESHALL BE HELD I' BELOW SURFACE ELEVATION OF TRAIL SLAB: CURB, ETC. 3. SOD SHALL BE AID PARALLEL TO THE CONTOURS AND SHALL HAVE STAGGERED JOINTS. ON SLOPES STEEPER THAN 3:1 OR IN DRAINAGE SWALES, SODS HALLBE STAKED SECURELY. 4. ALLOTHERAREASDISTIIRBEO BY CONSTRUCTION SHALL BE RESTORED BY SEEDING, MULCHING AND FERTILIZING. PRAIRIE RESTORATION SHORT MMIC GRASS MIX OR APPROVED EQUAL SHALL BE SPREAD AT THE RECOMMENDED RATE FROM THE SUPPLIER. SEED MIX IS AS FOLLOWS: 46Y LETTL SLUESTEM 34Y SIDE OATSGRAMA 9%- BWEGRAMAGRASS 4Y. PDVERTT OATGRASS 4Y )ONE GRASS 2Y SAND DROMEEO 2Y. PRAIRIE DROPSEED 7. FOR SLOPES STEEPER THAN 3:1 ORIN DRAINAGE SWALES INSTALL EROSION CONTROL ELANKET IRRIGATION NOTES; 1. ALL AREASWHERESOOISPLACEDSHALLRECFJVESPRAYIRRIGATION. 2. ALL PLANTING BEDS ARE TO RECEIVE DRIP TUBE TYPE IRRIGATION. 3. I -AN SCAPEARCHRECTMUSTAPPROVE SHOP DRAWING OF PROPOSED IRRIGATION SYSTEM PRIOR TO INSTALATION. 4.. IRRIGATION CONTRACTOR TO CONFIRM FLOW RATE, LOCATIONS OF CONTROL EQUIPMENT.AND IRRIGATION SNS/ VACUUM BREAKER WITH GENERAL CONTRACTOR PRFORTO SUBMITTING SHOP DRAWINGS. �u ke REALTY 1600 OR. Avenue-,, A- 250 .-WI s, MN 95416 J 992.5..2900 .95Z54129]51N) Sambatek www.samhatak.00m 12800 WhL,, .'r DIIPB, S.b 300 MI-lanlls, MN 55343 763.476.5010 Wephons 763.476.8532 5- 1.11. En9Neerkq 18wv4W IPIBmIl19 I ERImnm,I W ISSUANCES CITY SUBMITTAL 1713Q'is DRAWING INFORMATION SmN: DON: l2w2015 Checked By: �,�co L1_// c j .DA Duk, Really,109. LU Lo 19906:09 Lo Z W U Z: _ VJ co Lu O CD U)ffz^ O N m Lu z z O > C) m Z Q iii (1) Lu � oQFY ISSUANCES CITY SUBMITTAL 1713Q'is DRAWING INFORMATION SmN: DON: l2w2015 Checked By: VMS Dm- BY .DA Duk, Really,109. DRIL _ AE Job p: 19906:09 DRAVNNG/SHEET TITLE LANDSCAPE PLAN SHEETNUMBER L200 PLANT SCHEDULE / PLACE NG AIJLGH IN CONTACTWTNTPEETKINK MULCH 13/ 9' DRESSEfl TRAP ROCK W/ O SHRUBS BOTANICAL NAMEICONIMONNAME BALL COM PmGHEARTHBAUCERBEYONOED0E0FR00TINLt II f^ OT' GG FNrsyNIAx'COedaOeur IGold:ClusWIFersylht NOTE: 5ge1 DOMPALRIRSHALL AWIMANTNE£SINAPW�POSmON1HRDIlGHdJr1HE WARMmYPEPIW. WRAPTHEEIPUNKS CNLY UPONAPPROYAL BY uugsrAPEu+rNmv.-r. 25 UNOImuRBEO ���_. i 511BGPAOE GRASSES BOTAMCAL NAME/COMMON NAME EGICATDNS.CCMAEMB59:DFAV.YDRYUNRWEIGHT cow I QTY KFG CnWmagms5s x acus—m' d FoeMer I Feather Reed Gmss 1ga1 C/) ZD m I O Z z P. IDP EEPINGTIll YIAVEROF IAIhCX,DONOTFIACEIN CGYTALTWI SHRUBSTFM PERENNIALS BOTANICALNAMEICOMMONNAME APPLYPREEME0.GEMPHEABILDE EOGECANOmO T.AS FOGFR, PEFERTO IFN PNO SPECIFlUTOV CONT OTY BEG I RU—Ift FUlglda'GOIdsLmm l Black Eyed Susan ll[ Bi _ Z3 C3 GROUND COVERS BOTANICAL NAME I. COMMON NAME QTY Tl Eod Hghlaed 1,111,1 11,000sf Tad.Hydroseed l Shad MRsk Mk 186,056 sf -BLOOMS YELLOW -BLOOMS YELLOW LANDSCAPE LEGEND / PLACE NG AIJLGH IN CONTACTWTNTPEETKINK MULCH 13/ 9' DRESSEfl TRAP ROCK W/ O R9AOVEBUPIPP,TWINE,ROPEABOWIREFROMT0PHMFDFRDDT WEED BARRIEfl13°DEPTH . WEE BALL O2 ---- STEELED— PmGHEARTHBAUCERBEYONOED0E0FR00TINLt II f^ O3 —� 2 50JED.ULE40 PVESLEEVE ` EDGEcaxomSNvo-RIEs FENEE-SEE OETAILON SHEETO01 NOTE: L � ti J PIACEPOOTBNI ON UNOIBNRBED IXtLOAIPACIEDSOIL DOMPALRIRSHALL AWIMANTNE£SINAPW�POSmON1HRDIlGHdJr1HE WARMmYPEPIW. WRAPTHEEIPUNKS CNLY UPONAPPROYAL BY uugsrAPEu+rNmv.-r. PROVDESINSTNLRODENTPROTECBON.,- Al lR CLOIHAIFSH LYUMER.-W ORGRFATFRXE6HET. sLAaE IN—E- wsFALLTREEWIMRODTFIAREVISIBLEATTOPOFTHER00TLN1. REkDVESOLiNLEVELNANNERFli0MTOPOFR00T&llT0EC DEEISTD' 0RIARGOAWNOfmEARO0TIFNE® SETROOT& N'NXAWN OROERROOT I'ABOVEAOIALEVFGPAOE. DONOTLOVEATOP OF ROOT EALLWI—I ")' / PLACE NG AIJLGH IN CONTACTWTNTPEETKINK DIN SUBMITTAL R9AOVEBUPIPP,TWINE,ROPEABOWIREFROMT0PHMFDFRDDT BALL PmGHEARTHBAUCERBEYONOED0E0FR00TINLt II f^ BFRADIUGMULcxRND II ` EDGEcaxomSNvo-RIEs L � ti J PIACEPOOTBNI ON UNOIBNRBED IXtLOAIPACIEDSOIL Lo l t f UNOImuRBEO ���_. i 511BGPAOE Z �� URIPV G1060FTi.EPDY:fm $PP1iEBY HANDTOBINO YIRHPREPAREO EGICATDNS.CCMAEMB59:DFAV.YDRYUNRWEIGHT DIGPIAMINGPR a•TO6'J DEEPERTNAN FOOT ORLL MCOROMGTOA6�iMOO TMIPSULARQUNDE0DTWJBABEFIRA1LY Wml FDDTPREBSURESOTHATR00T84LL DOES NOT BHIF7 TREE PLANTING DETAIL C/) ZD m L201 SCALE: 1/2"=1'-0" O Z z P. IDP EEPINGTIll YIAVEROF IAIhCX,DONOTFIACEIN CGYTALTWI SHRUBSTFM � — - APPLYPREEME0.GEMPHEABILDE EOGECANOmO T.AS FOGFR, PEFERTO IFN PNO SPECIFlUTOV lOGSENROOTEOFCOMNNERGROIVNPIANTS �CAVATE PIAM .10IN.POEEPERT—RWT6VLNGT. _ Z3 C3 UN I6NRBEOSUB PAGE PUYRNG BFll WRH 6PA0E SHRUB PLANTING DETAIL SCALE: 1/2"=1'-0" �J J �J dIf 1 v �L .sTAMvauic�in -.LT .ws[c Kik`. ~ %i DO RP6-ICE 4B•xELCHT w�Y r��i3 f ,13 ALUMINUM FENCE DETAIL 6 Duke REALTY I60O LJdca AYenue SOIM, — 25D Mime 11,, MN 59916 J L 952593.2900.952593.29751&) Kambatek www.sambatek.com 12300 Whl6wdfir Dda, Sub 360 MWat.1.4 MN 66343 763.476.6010 t"IllnB 763.476,6632 fe¢Imlle Enpl—tig ISuNWM lPlarVM IElrAmflm mW ISSUANCES O DIN SUBMITTAL 1213m1s M CM Lo F- Lo Z W U Z _ (n U) W O t) 1v3D^m1s EVIMe — DR_JOB 19906.09 N C/) ZD m LV Z O Z z _ O � o 0=0 a) L1J Z3 C3 V Lo ISSUANCES DIN SUBMITTAL 1213m1s k Descdplion Dak DRAWING INFORMATION Bcale: Date: Checked By: 0— By: Duke Realty Job#: AIEJOb#: 1v3D^m1s EVIMe — DR_JOB 19906.09 DRAW NIS / SHEET TITLE LANDSCAPE DETAILS SHEET NUMBER L201 I I ------------ T I � I \------------------------------- - FUTURE EXPANSION 57,920 SF COORDINATE ALL SITE ELEMENTS WTIH CIVIL 1 al BUILDING NO.2 212,224 SF COORDINATE ALL SITE ELEMENTS WTIH CIVIL ` SITE PLAN I I I I I I I I I I� Mike REALTY 1— Utica Avenue SONM1, Suite 250 Minneapolis, l4N 55415 952.543.2909 . 952:A329i5 (fx) Goy N C) w Lo Ln Z Z w� U U) o U) Lu Z N o LLJ ED Z z � o Z c: ca OQ cn Q � a� w Z3 Q r Lo Z Lu H U) J H U Lu U D_ a DRAWING INFORMATION: oA1E 12/31/15 Hecice W CMM M_a BP Dune aea�r roe cWAGSPA-001 ae Boa x-..1050.014.04 DRAWING I SHEET TITLE 3 ARCHITECUTAL SITE PLAN xe „ SHEET NUMBER: A100 I I I I I I ti I it I I I I I I � ';r /57 r j� N S� Mike REALTY 1— Utica Avenue SONM1, Suite 250 Minneapolis, l4N 55415 952.543.2909 . 952:A329i5 (fx) Goy N C) w Lo Ln Z Z w� U U) o U) Lu Z N o LLJ ED Z z � o Z c: ca OQ cn Q � a� w Z3 Q r Lo Z Lu H U) J H U Lu U D_ a DRAWING INFORMATION: oA1E 12/31/15 Hecice W CMM M_a BP Dune aea�r roe cWAGSPA-001 ae Boa x-..1050.014.04 DRAWING I SHEET TITLE 3 ARCHITECUTAL SITE PLAN xe „ SHEET NUMBER: A100 O Duke 8, REALITY Ism aria avem�e fim0h style 25a Minreapo0s, 5A3.T9m 2. 16 962 . es].54eT9�5lfx) r 1'-P 5a' -p 54'-P 59'-P 5q' -P 51'-P 57'-P 54'-P 5T -D' $P -P 5!•P - 1'-P b �^--------� 12-P 1 -S 1T -P 66 -SP _ I I P D _ 4 O _ - U __ — ___ ___ ___ ___ ___ ___ ___ ___I_ il+ ' tT __ — - _. __ ..... ......_� _...... _.. ...._. __— _......— - — - .. .. ......... ..._..._ ... --. - I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I O ...--- -- -- --'-- — -- -- --._. - _..— — — -I -..__.._.... .........._ -- '---- — -_ -- —-----..... -_---- .._---..__..._ ----d-...............................a....._.-- -----e ---- a.... O o I I I I I I I 1 I � m W Lo W z f WoE z� z m W z m z z � I 0 I I I I I I I I J o J j L I I z Q LLI I� Lo 1 I I I I I I I I I — --— a _ i I I I e ISSUANCES: I I I I I I orFlee � y I ONP, Oats Description Ij b l I I I I I I I i I P I cera Inc -P DRAWING INFORMATION: ATE 17/31/15 d c,IxliEoel'CMM n D ---;A uthor O L. �..J �/ �./ D O O € oua�aeun.roee:WAGSPA-001 I uE.roex1060.014.04 ,� .FLOOR PLAN DRAWINGISHEEf TITLE FLOOR PLAN i� �m B SHEET NUMBER A200 F w vurtsrro j(�j�I���yy�i���Ir .0/ TEfNNiiOFURNSHANp ,,-.• 7LJ:L1� S6I319GEATMOMMiLUEM9GN SWREGa5TT0 PPt-RN—DDMGNTBD. - PNECI3TTOM4rC l - 2pF£PPEVEPSE _ CAftVNEIaLUMINUM lE[iEe6-FlNI$NEp \\ WNiE N't�a' •s `RUSNSIW MWNIEO liquill v DPPE ASTWWL - NEAipW FW(ING NEaipW iDDillG MONUMENT SIGN PLAN NY�1'X 20 � MONUMENT SIGN ELEVATION MONUMENT SIGN SECTION 1% 12=1'Jl 12=1'd 0 MECHANICAL ROOM PLAN W=11 ®®u ke REALFY i6pp ul- venue 6oNh 6uHe 2.p MI po4s, MN 55916 8525932W0. 95259329:611*) FA M:�nne wLdIB]Iot9p mmroc.hmm C) ry co W Lr) h Lo Z Z W U U) o C/5 0) W Fo O o Z) W z m Z z 2 N o N z cn W QCY (i Lo r J W Z Q J a_ ry O J LL NORTH ? g S ISSUANCES: ND. Data Description 9 nnns PxoNOmvm DRAWING INFORMATION: mF : 12/31/15 cHEDNEo cmm DRAWNM BP D–�wT OWAGSPA-001 —.1060.014.04 DRAWING/SHEEfTITLE: FLOOR PLAN DETAILS SHEETNUMBER: A201 ROOF PLAN Duke REALTY ,6W IItIm Pvenue soon s�neTso Mlnrreapolls, MN 55x,6 9525A329W . 952.543.2925 (M) O Lo Lo zz w� U U) o �0) w ?� M z mzZ z Q) �- z:; O Q U) W W =3 rn� f V Lo z a - LL O Of DPT 12/31/15 cHEcuEDDrcmm --WNW BP € DUREREu —WAGSPA-001 J 1---1060.014.04 DRAWING/SHEETnTLE' e' ROU PLAN NORTH I SHEET NUMBER: JI A202 o 0 4'-0'Wx B'IT OV GET. SCUPPER -SEEDETAIL,TIP20.2 ROOFDRPIN-TP SEE f)ETAIL T/A292 0 0 NOTE: TAPERED ' INSULATION AT 0,ER—,VN,-ttR -PPER ONLY- 0 i 0 OVERxB'T SEED SCUPPER I -SEE DEFPIL 1NAp2 -SEED BEE DEfAIL21A292 0 I 0 I 0 I 9'-0"rex B'T OVERFLOW SCUFPR -SEEDETPIL,JATOT SEE-- 0 I 5L_E _ 1 sLO=E sLOPE� i I I SLOPE I SLOFESLOPE I I I I I ITCH- I . REEETAIROOF sEEOLarA20z EiPI I 2'-1Y'xTU'.'CONG PA VERS ovERFERTR I I w -sEE OETPIL,AILl vAzoz ...--- ._. ........... ... ........... .. ....._I ... _— — --_ _ .. I ROOFONLV— BEECETAIL2A20T D I I I I I I I I -- I I I I I I I I sLDPEva'=rn^ �J I L - .. I :. I I I I I I v GRAIN ROOFAT PLL AREA5, NO TAPERED INSULATIPY U.N.O. ` �' I I I I I I 4'-0'wx a"n I I I I OVER -111 UPP 2 -sEEDETPIN2fA202 ROOFDRAIN-ttP I I I I I I I I I I SEEDETAIL—.2 — sLropE I I I I I I I 9 I PE I SLOPE 3lCPE _ � SLOPE I SppE __ I I I I I I I I I I I I B ROOFDRAIN-ttP ROOFDRa1J-ilP ROOF DRAIN-ttP BEE OETAIL2A292 SEEDETAILT/A22 SEEDETAILZA292 OVE OVERROW OVER OVERFLOW SCUPPER OVERFLOW SCUPPER I I scuv�R-SEE DETAIL I I I .SEE OEraL,vP2oz I -sEEDEraLivPToz I Ivnzo2 I I � B'-o-ax,s-0'wx,sn FURURECPNCPY ROOF PLAN Duke REALTY ,6W IItIm Pvenue soon s�neTso Mlnrreapolls, MN 55x,6 9525A329W . 952.543.2925 (M) O Lo Lo zz w� U U) o �0) w ?� M z mzZ z Q) �- z:; O Q U) W W =3 rn� f V Lo z a - LL O Of DPT 12/31/15 cHEcuEDDrcmm --WNW BP € DUREREu —WAGSPA-001 J 1---1060.014.04 DRAWING/SHEETnTLE' e' ROU PLAN NORTH I SHEET NUMBER: JI A202 T:O, P.4 FRNEL FIR6T FLOOR 100-0" � sourH ELEvanoN zPa TO P'C. PANEL IR9i FLOOR Z EAST ELEVATION ara �R) IuuxIH4TmalGxaxiwnut. 1 0 0 4 0 6 0 0 TO PC PANEL— - 140 1 ..... .. ...: x �. - �. '' :..- ��.� .. a PCZ PGt _ TO ENtRY PC PRNEL 144 0' • .. ! '. ... � JOI6T 2EARING' /OIGT 6ERRING" t3T-%' T O. ENtRY P.0 PANEL 144• 0" ENTRY ELEVATION OPTION 2 l r=sva n n n n Duke REALTY ifi00 UGm Avenue 6oN1A.9ttl@ 250 A1lmrepvfls, AW 55916 952.5432950 . 4*%543.49I51p) C) M w Lo H Lo Z z w� U rn o co rn LU °u; ON Dwz mzz _ (D O I..L z Q � N a) w QO t L'�V T Lo rT^ W ISSUANCES: No. Date Descri tion DRAWING INFORMATION: DATE: 17/31/16 cHEc—:CMM 8 [MAWNEY: BP -- REa-1 J --WAG S PA -001 A/E —1060.014.04 s J DRAWING/SHEET TITLE' EXTERIOR ELEVATIONS n� s .e ? SHEET NUMBER: A300 EXTERIOR FINISH SCHEDULE STYLE/MO KEYNOTE DEL # MANUFACTURER COLOR NUMBER FINISH MATERIAL DESCIPTION AL -1 BRUSHED ALUMINUM ALUMINUM ALUMINUM STOREFRONT SYSTEM W/1" INSULATED TINTED GLAZING MP -1 FIRESTONE METAL PRODUMS BRUSHED ALUMINUM UCSOO FLUSH PANELS METAL SOFFIT PANEL MT -1 FIRESTONE METAL PRODUCTS BRUSHED ALUMINUM ALUMINUM PREFINISHED METAL FASCIA(IRIM PC -1 1031 EXPOSED AGGREGATE, GRAY CEMENT #1031 EXPOSEDAGGREGATE W/ PRECAST INSULATED WALL PANELS -ALTERNATE 1030 EXPOSED 3/4, REVEALS 4'-D" OC AGGREGATE, 004 GRAY MANUFACTURED SAND, 100% GRAY CEMENT, OYSTER PIGMENT PC -2 - 1031 EXPOSED AGGREGATE, GRAY CEMENT, WHERE NOTED ON ELEVATIONS #1 D31 UNIFORM LOW -RIBBED PRECAST INSULATED WALL PANELS -ALTERNATE 1030 EXPOSED EXPOSED AGGREGATE AGGREGATE, 004 GRAY MANUFACTURED SAND, I DO% GRAY CEMENT, OYSTER PIGMENT PG3 - 1031 AGGREGATE,GRAY CEMENT, MEDIUM. SAND BLAST FINISH #1031 FORM SIDE WI MEDIUM PRECAST INSULATED WAIL PANELS SANDBLAST & 3/4" REVEALS 4' OC PG4 1031 AGGREGATE, GRAY CEMENT, MEDIUM SAND BLAST WITH PAINT FINISH #1031 FORM SIDE Wt MEDIUM PRECAST INSULATED WALL PANELS WHERE NOTED SANDBLAST& 3/4" REVEALS. 4' OC PNTI PT-1ENTRY FINISH OPTION -YELLOW PAINT TO MATCH TENANT SPECIFICATIONS EXTERIOR FLAT PAINT PT -2 SIL VER TO MATCH BRUSHED ALUMINUM EXTERIOR FLAT PAIN' Duke REALTY ifi00 UGm Avenue 6oN1A.9ttl@ 250 A1lmrepvfls, AW 55916 952.5432950 . 4*%543.49I51p) C) M w Lo H Lo Z z w� U rn o co rn LU °u; ON Dwz mzz _ (D O I..L z Q � N a) w QO t L'�V T Lo rT^ W ISSUANCES: No. Date Descri tion DRAWING INFORMATION: DATE: 17/31/16 cHEc—:CMM 8 [MAWNEY: BP -- REa-1 J --WAG S PA -001 A/E —1060.014.04 s J DRAWING/SHEET TITLE' EXTERIOR ELEVATIONS n� s .e ? SHEET NUMBER: A300 GATEWAY NORTH FIFTH ADDITION KNOW ALL PERSONS BY THESE PRESENTS: That Duke Realty Limited Partnership, an Indiana limited partnership, fee owner, of I, Rick M. Blom, do hereby certify thatthis plat was prepared by me or under my direct supervision; that I am a duly Licensed the following described property situated in the County of Wright, State of Minnesota, to wit: Land Surveyor in the State of Minnesota; that this plat is a correct representation of the boundary survey; that all mathematical data and labels are correctly designated on this plat; that all monuments depicted on this plat have been, or will Lot 2, Block 1, GATEWAY NORTH FOURTH ADDITION be correctly set within one year; that all water boundaries and wet lands, as defined in Minnesota Statutes, Section 505.01, TORRENS PROPERTY Subd. 3, as ofthe date of this certificate are shown and labeled on this plat; and all public ways are shown and labeled on this plat AND Dated this day of , 20 Lot L Block 1, GATEWAY NORTH SECOND ADDMON And that Wagner SprayTech Corporation,a corporation, fee owner, of the following described property situated in the County of Wright, State of Minnesota, to wit: Lot 3, Block 1, GATEWAY NORTH FOURTH ADDITION TORRENS PROPERTY Have caused the same to be surveyed and platted as GATEWAY NORTH FIFTH ADDITION and do hereby dedicate to the public for public use the drainage and utility easements as created bythis plat. In witness whereof said Duke Realty Limited Partnership, an Indiana limited partnership, has caused these presents to be signed by its proper officer this day of 20_ SIGNED: Duke Realty Limited Partnership, an Indiana limited partnership BY: Duke Realty Corporation, an Indiana corporation, its general partner By: Steven Schnur, as Regional Executive Vice President STATE OF COUNTY OF This instrument was acknowledged before me this day of 20� by Steven Schnur, as Regional Executive Vice President of Duke Realty Corporation, an Indiana corporation, the general partner of Duke Realty Limited Partnership, an Indiana limited partnership, on behalf ofthe partnership. Rick M. Blom, Licensed Land Surveyor, Minnesota License No. 21729 STATE OF MINNESOTA COUNTY OF The foregoing Surveyor's Certificate was acknowledged before me this day of , 20_ by Rick M. Blom, a Land Surveyor, Minnesota License No. 21729 Signature Notary Printed Name Notary Public, County, Minnesota My Commission Expires CITY COUNCIL, CITY OF OTSEGO, MINNESOTA This plat of GATEWAY NORTH FIFTH ADDITION was approved and accepted bythe City Councilofthe City of Otsego, Minnesota, at a regular meeting thereof held this day of 20. and said plat is In compliance with the provisions of Minnesota Statutes, Section 505.03, Subd. 2. Wright County Registrar of Title. WRIGHT COUNTY RECORDER I hereby certify that ibis instrument was filed in the office of the County Recorder for record on this _ day of 20� at o'clock _.M, and was duly recorded in Cabinet No. Sleeve , as Document No. Wright County Recorder SAMBATEK, INC. ENGINEERING, PLANNING AND LAND SURVEYING tdittI 1 VFL�)H ttl�. By: Signature Notary Printed Name Mayor Notary Public, County, My Commission Expires By. Clerk WRIGHT COUNTY SURVEYOR In witness whereof said Wagner SprayTech Corporation, a corporation, has caused these presents to be signed by its proper officers this day of 20_ I hereby certify that in accordance with Minnesota Statutes, Section 505.021, Subd. 11, this plat has been reviewed and approved this day of 20_. SIGNED: Wagner SprayTech Corporation Wright County Surveyor By: , as Printed Title WRIGHT COUNTY AUDITOR Printed Signature Pursuant to Minnesota Statutes, Section 272.12, there are no delinquent taxes on the land hereinbefore described on this plat and transfer entered this day of 20_ By: as Printed Title Wright County Auditor Deputy Printed Signature WRIGHT COUNTY TREASURER STATE OF MINNESOTA Pursuant to Minnesota Statutes, Section 505.021, Subd. 9, taxes payable for the year 20. on the land COUNTY OF hereinbefore described have been paid this day of 20_. The foregoing instrument was acknowledged before me this day of 20- by By: as and , as of Wagner SprayTech Wright County Treasurer Deputy Corporation, a corporation, on behalf ofthe corporation. WRIGHT COUNTY REGISTRAR OF TITLES Certificate. Number Notary Public, County, Minnesota Notary Printed Name I hereby certify that this instrument was filed in the office ofthe Registrar of Titles for record on this day of My Commission Expires 20� at_ o'clock _.M, and was duly recorded in Cabinet No. Sleeve , as Document No. Wright County Registrar of Title. WRIGHT COUNTY RECORDER I hereby certify that ibis instrument was filed in the office of the County Recorder for record on this _ day of 20� at o'clock _.M, and was duly recorded in Cabinet No. Sleeve , as Document No. Wright County Recorder SAMBATEK, INC. ENGINEERING, PLANNING AND LAND SURVEYING tdittI 1 VFL�)H ttl�. 11 21 ................................................. DETAIL A �IaN I at Iqi NORTH NO SCALE N 0 r' [ �i0 rn i 1-I '1 z ^ 01 Irll m I I 1 a I Za o IIOIiDII m 56.00 �SGO110'38"W i 'I n N DRAINAGE & ITDI m o p1 U7 1TY EASEMENT II II 2 m DRAINAGE & U7W EASEMENT PER GATEWAY NORTH FOURTH% 1, ADDIAON [ o h D42'04'W 1 i Ion - 4,66.41 L_ � � T --- 1 , 64674 � -X624.01 -r'- 2121 y soab2 o4:W 630.93 39.29 -`im I -196. LS 21729 681,35+ A" t S00 33'26"W 1613.45 _Ls GATEWAY NORTH FIFTH ADDITION A •.A .a 1ENS.. t_t_, ... Y, `i'[:I`i Lii= ,.•._ ZW Q \ a\ ♦ 1 rJ C N00*08'06"E 745.11 E6 -6i 91,`+Iy LS 24552 \ '598.0041147.11-ry�IL-------- 32.64`r _560'_"E5752 N0D%D'3BE 454.56 - DRAINAGE & U71UTY EAS'ETNENT PER �' 62.67 <- 1 1 , I ry y h l ' GA 7EN'A Y NORTH FOURTH AZ77GV . 500%038-w/ 113,,-1 / l" E%L:I L_:: Q v ! �_--------- 1 5950 L' 1 1,- \4 \,. ! AS \\� ' NGD.%0T3E 233 BB 2 a: phry p .\ oD SOO"08'17"E�o �° 390 ^°» l I \ I ` \ \ 1n 320.69 C� A�`�O- ��i LS 21726 -i - .----__---.t -.�--� -1 Tf� r' _ soD476'17E N50 nIN I� I .'i U• hl I'3 >=31II 00 I 4N00%2'48E \J`p Iry��o`�gIIWI I \ 1y I sn� 2, a 10 8l Igaoegl hl CTD "I I" 2, T. 120, 23-_ �I IZxW&�llrl � I I I NI I 2W� Il�ml M IIIN cR I;• I °W2 IIS I III L8 1 0, I I N I I „ 1 3 1 N I I N0072'48 E 35.39 LuL» },•'• N ,q J ISO-D�-Ds -Jm0 Ia I �936"hWLS; y. L70, t-89.65 �ry 11 LI --__ SOo-,og- W4/266 --___-- j lah i ml IN �omW '---N-------------------N--y 25.54 NO010"9 E 470.75 1 W O 56354 o - 10 +.I 10 I r o IN p z W wo z Iy 1N1 e,q �°i 141 I I�1 01�: 2 III i Fr\`'Io`I I2 S�{� 10 1 .• .` MID `9.71 4 1 m20 >e 56.00 NGO%2'4B'E 3I mo m :S00'1 0'38"W v IZ� 8g \ �i �ti, LS 24552 'k6510 DRAINAGE & U7UrY EASEMENT Ili _ � . ` _ .00 PER GATEWAY NORTH FOURTH ADOIT/ON 3 I i +I I 4o3¢, 4aS4, - N 1/4 CORNER OF SEC. '-� _y_ 2, T. 120, 23-_ I �. NTR WRIGHT COUY CAST IRON MONUMENT � I onl I I II\� .365�.. 4%03" ;::.C.....0 ,...] k I i SD04J0'O7',E, 5.56 2 57.47 to1 /D 1I Go 0 C K j� 0 w / 2 DRAINAGE & Unum - .^� , EASEVENr '../ 5444922E .� 61.01 too. 15 SOO102'04'W 450.41 624.01 �` DRAGE & U7UTY EASEMENT PERSOOV2'04"W 646.74 DRAINAGE & U77Urr i .598.01 GATEWAY NORTH FORTH ADOINGN :39,29 _, �` �. 1/�. 630.93 EA•5af6yr PER GA7EWAY . -- } _ 117.14 SEE S00"33'26"W 1613.45 DETAIL A 3 j p , o-74226' ` NOOiS'55"E -� of O� -_ L=7191 391.60 W q III q G3 �I75115 1 A& \ a _ = 5170b0'00 E- gp I DRAINAGE & UM17Y `- ORA/NAGE & U7U7Y EASEMIENT `\5.00 P N I EASEMENT PER GATEWAY NORTH m I o PER GATEWAY NORTH I v SD0470'00 E N004)O'0o'W o Z J I% SECOND A091772N r o 197.97 I 1 376.02 �� -1 I N 1 I 270 - T M' 1 - To-Y€iD JzsD-rzso -f 7b16 1 L � 16.75- e ��I I w �z��,� NI' oro_ om om 1 a i•-- '__ IhI I m ml°` Qg 2 aN aN 3 aN waa� I - Ip 02 ='3M I ZI'"" 0 - 1.., , Ll J'I L: L1. 1 1111`1 R-60.00 I/ _ �ORA/NAGE & UflUTY EASEMENT -,;�_ Av L-43.36 J. - __ PER GATEWAY NORTH ---� �I EA=41"24'35" SECOND AU9170V l SOO47024"W 677.93 -�'--_- �� - -_ r 50047024"W 709.70 L I _�y ..� 0 27769 356 - :1 - o 175-` ..- za r 1 i s -� 41.36__ ----1--- :,]J_ 1_ , SEE-- ......... '.'VHA/NAGE&U7UTYEASEMENT DETAIL B 9 PER OA IEwAYNom TA, I , TRAIN- .,It ,,,,,.,,•-•,1 -,i V,, , PLAT 00 MN DOT ROW PLAT cL=376.11 66.241 Ili n I L=43.11 No. 86-25 R=3720.28 N90°00'00"E 6=41°10'17" MONUMENT NO. B17 A=5j°47'33" A=3720.28 L=60.55 SW CORNER OF SEC. 35, T. 121, R 23 ' WRIGHT COUNTY CAST IRON MONUMENT- I ................................................ DETAIL B LINE TABLE VICINITY MAP 1 W k�oQ� NORTH UNE LENGTH BEARING - - - - I a Up J,,,3R N09CALE u 2547 1 ss9.3e'43"E I� 0�� L2 69.x3 :39'38'43"E TII NORTH ej '1 b o ti e 0 'A:02 I Yip 11'33"W-; NO SCALE 'O r� I ""'i 2 20 •'.2 L4 65.21 547'05'51"E on NORTH IS 37.0 soD•n'za"w Iz� o I,i1 L6 26.83 500.17'28"W �x G 0 0 gl ; I t o 2m 0 100 200 _ ° y 36 L7 26.83 500'10'38"W Fa Ir Z Z AI ""I 155 21,uF^'�` L8 37.40 N00'10'38"E•-- �lh I I� p�$o SCALE IN FEET C9 S4.ae N89 39'13 r DRAINAGE �4-�-I I2 . N e 1INCH -100 FEET 11 50.36 100113aE F - - - � 0 y - - EASEMENT 16.231a-I-� I ul 50.12 5001038 W - LJ? 1 L21 ' O DENOTES 1/2 BY 141NCH IRON MONUMENTSET uz 56:a �' ORA/NAGE & U7RITY EAS''MENT L. !1 3 J _ ui I\ I I ``�• I j--- PER GATEWAY NCP7H AND MARKED BY LICENSE NO. 21729. 1.. 544°F922E 5`5 m I 1 / L23 J + SECOND ADOrr70.V "' - - - MND TRUNK 100.15 / - LIS '.3.3 - - HWY 101 v \�F ; , I r % • DEN f -. MONUMENT FOI1N:: .?6 � [[9 I 1x7 i2. / SL -0 _ I --OD'D72r',v 6'1.93 X DENOTES FOUND CHISELED "X" - I__.---__-- LIP 2C'kT: ,9C'00'00"YV L19 - _ _ -c-- DENOTES CONTROLLED ACCESS _ 11.z, sao•a0'oo°E _ _ _ ' - - 500024" 709.70 -� - - L20 19.69 532.59'51"E ' --14'W 646.747 _ , •' 1,' • n I'' "'/-- 121 23.30 SOD'DO'00"E SECTION 35, TOWNSHIP 1:1 N, PANGE 23 W. 1 _ �- 277.68--� 1 G BEARING ORENTATION: L22 2000 N90'00'00"Y,r WRIGHT COUNTY, MINNESOTA 630.93 I E3: _== r� --Lh,, 358.51 THE`OLRH LINE Or LOT 3, BLOCK I, GATEWAY NORTH DRA IIALW & U74ITY I _ j _ - y\ - .' I L23 73.30 500'00'00"E - :• EASEMENT PER CA.'ENFY-'----- I , ,' _ _ r FOURTH ADDITION, WRIGHT COUNTY, MINNESOTA, IS L2a 18.17 S90•cJov e __ - _ NORTH FOURTH AD017ON ` v,:'_ _ 75.69 I / - - - - �' -- ASSUMED TO BEAR NORTH 90 DEGREES 00 MINUTES us 22.77 N17 f- 68/.35 - �' 00 SECONDS WEST. u6 20M 334.09 -� S00*33'26"W 1613.45 - Ls 2assz D D p A� L28 34 3 - _- __ L _ DRAINAGE & UTTUrY EASEMENT PER GATEWAY NORTH TATS c. ;A` = ;,3 °E T SAM.BATEK,INC. ........................................................................................... 131 31.10 ___--_.,-9'S4,4p.E ENGINEERING, PLANNING AND LAND SURVEYING SHEET 2 OF 2 SHEETS