04-11-12 PR3601 Thurston Avenue N, Suite 100 Anoka, MN 55303 Phone: 763.231 .5840 Facsimile: 763.427.0520 TPCTPC@yPlanningCo.com MEMORANDUM TO: Parks and Recreation Commission FROM: Daniel Licht, AICP DATE: 5 April 2012 RE: Otsego — Prairie Park; Shade Structures City staff has solicited quotes for shade structures and site furniture to be installed south of the splash pad and shade structures at the baseball fields at Prairie Park. An application for a grant from the Twins Community Fund was submitted to assist in funding the shade structures at the baseball fields and a decision is expected by April 30. City staff is requesting consideration of these projects at the Parks and Recreation Commission meeting on 11 April 2012. We will forward detailed information prior to the Parks and Recreation Commission meeting via email on the proposed improvements as soon as it is finalized. C. Lori Johnson, City Administrator Tami Loff, City Clerk Brad Belair, Public Works Supervisor Ross Dumont, Parks and Recreation Manager TPC3601 Thurston Avenue N, Suite 100 Anoka, MN 55303 Phone: 763.231.5840 Facsimile: 763.427.0520 TPC� Plan ni ngCo. com MEMORANDUM TO: Otsego Parks and Recreation Commission FROM: Daniel Licht, AICP DATE: 11 April 2012 RE: Otsego — Prairie Park; Shade Structures TPC FILE: 101.01 BACKGROUND City staff has obtained cost estimates for installation of a shade structure to the south of the splash pad at Prairie Park for review at the Parks and Recreation Commission meeting on 11 April 2012. Exhibits: A. Shade structure dated April 6, 2012 B. Furniture quote dated April 6, 2012 ANALYSIS The City constructed a splash pad at Prairie Park in 2011. The project included three tables to be provided at the north side of the facility. However, spray patterns from the splash pad necessitate relocation of the tables. The Prairie Park Master Plan designates the area south of the splash pad for construction of a concrete pad for three tables and provision of fabric shade structures that provides a sitting location with a view of the splash pad and play containers. The draft Capital Improvement Plan estimated a project cost of $30,000 to be paid from the Community Facilities Fund (#208) City staff obtained two quotes. One is for a 22' x 12' rectangular shade with a hip roof design for $3,500.00. The second quote is for a structure with three sail panels over a similar area for a cost of $17,585.00. The second option provides more visual interest in the design of the structure in addition to providing shade. A decision as to the shelter option to be installed should be directed by the Parks and Recreation Commission. City staff also obtained quotes for three tables and two trash containers to be installed at the shade structure. The cost estimate for the project is outlined below: POSSIBLE ACTIONS A. Motion to recommend City Council approval of the installation of a shade structure and furniture in the amount of at Prairie Park. B. Motion to table. C. Lori Johnson, City Administrator Tami Loff, City Clerk Brad Belair, Public Works Supervisor Ross Demant, Parks and Recreation Manager 2 Rectangular Shade Sail Panel Shades Shade Structure $4,275.00 $17,585.00 Furniture $3,306.55 $3,306.55 Installation (Public Works) $2,000.00 $2,000.00 TOTAL $4,581.55 $22,891.55 POSSIBLE ACTIONS A. Motion to recommend City Council approval of the installation of a shade structure and furniture in the amount of at Prairie Park. B. Motion to table. C. Lori Johnson, City Administrator Tami Loff, City Clerk Brad Belair, Public Works Supervisor Ross Demant, Parks and Recreation Manager 2 F l a n a g a n S a l e s I n c am pi QUOTATION pzciA%- • ll Ir' %'�J44-'r To: City of Otsego Date: April 6, 2012 8899 Nashua Ave NE Otsego, MN 55330 Contact: Brad Belair Phone: 763.235.3175 Cell: Project: Sun Shade by Fax: Sun Ports Email: BBelair@ci.otsego.mn.us We are pleased to provide the following quotation on items supplied by See Below Qty. Item Description Unit Price Extension Option 1 1 12x20 Sun Ports 12'x 20' Fabric Sun Shade - 8' Entry Hip Roof - Includes Sealed Engineered Draw & Shipping to 55330 - Includes Tax - 6.875% Option 2 1 Sun Ports 14'x 22' Fabric Sun Shade - 8' Entry Hip Roof 14x22 - Includes Sealed Engineered Draw & Shipping to 55330 - Includes Tax - 6.875% * Footing design and engineering by others * Supply Only - Does NOT Include Installation * Site Preparation by others/owner $4,027.85 $4,275.00 Sub Total See Above Freight Included Tax 6.875% Included Total ----------------- IMPORTANT INFORMATION: ♦ Quotation is valid for: 30 Days ♦ Freight based on shipment to Otsego, MN ♦ Shipment can currently be made in 4 - 5 Weeks upon order entry ♦ Terms: 30 Days Net Invoice. Pricing based on above quantities — any changes may require a revised quotation. ♦ Orders will be placed upon receipt of a Purchase Order or your signed acceptance of this quotation. Purchase Orders should be made out to Flanagan Sales, Inc. Thank You! Flanagan Sales, Inc. sue aoefs Project Manager ACCEPTED BY: DATE: 2475 Maplewood Drive • Suite 114 . St. Paul • Minnesota • 55109 Phone: 651.633.0123 • 1.800.328.3557 • Fax: 651.633.1515 • E-mail: wecanhelp@flanagansales.com Sun Ports Shade Structure — Either 12x20 or 1422 with 8' Eave Height — Direct Bury Commercial Recreation Specialists 415 Investment Court Verona, WI 53593 Phone: 608-848-8781 Quoted to: City of Otsego 8899 Nashua Avenue NE Otsego, MN 55330 U.S.A. Attn: GaryGroen Fax: 608-848-8782 Ship to: Prairie Park 8899 Nashua Avenue NE Otsego, MN 55330 U.S.A. Quotation Quote Number: RRO12612B Quote Date: Jan 26, 2012 Page: 1 Customer ID Good Thru Payment Terms Sales Rep CITY OF OTSEGO 2/25/12 TBD Ron Romans Quantity Item Description Unit Price Extension 1.00 Custom Shade System Sail, Including (5) Columns & (3) 14,939.00 14,939.00 Canopies - Per Attached Drawing Dated 124/12, Colors: TBD 1.00 Pier -Mount Option 1,320.00 1,320.00 1.00 <DISCOUNT#SC> DISCOUNT PER RON ROMENS 1,138.00 -1,138.00 —OPTIONS *** *Minnesota Professional Engineer Sealed Drawings = $600 *Minnesota Professional Engineer Sealed Calculations= $300 *** NOTES *** 1.) Above pricing includes standard fabric and powder -coat colors. 2.) Installation, concrete supplies, anchoring hardware, and truck unloading are by others. 3.) Current lead time is approximately 4 to 6 weeks from date of order. Subtotal 15,121.00 NOTE: This quote is valid for 30 days. Please review the above information carefully. It defines your order as we understand it. If satisfactory, please sign and date below, and then fax this quote to Sales Tax 608-848-8782, or send a signed copy with your deposit to the address above. We will begin processing your order upon receipt of both your DEPOSIT AND APPROVAL SIGNATURE, per the Freight 2464.00 terms indicated on your quote above. Additional surcharges may apply depending on final delivery address, actualdelveryrequirements, and payment method. Total 17,585.00 Customer Acceptance: Date: L i N; Fir 'Eff �vIFF-c PRO R L C) RAlffi vViTH. YOU R, 10, N, �rvzs a-V� .s2� M s�ial� v�1os sa1av� a�j Vil ITEM 5.2 3601 Thurston Avenue N, Suite 100 Anoka, MN 55303 Phone: 763.231 .5840 Facsimile: 763.427.0520 TPCTPC,,, Plan ni ngCo. com MEMORANDUM TO: Parks and Recreation Commission FROM: Daniel Licht, AICP DATE: 5 April 2012 RE: Otsego — WFE Outlot A; Landscaping TPC FILE: 101.01 — 12.01 City staff has solicited quotes for landscaping and site furniture for the east side of the park parcel at Waterfront East. City staff is requesting consideration of this project at the Parks and Recreation Commission meeting on 11 April 2012. We will forward information prior to the Parks and Recreation Commission meeting via email on the proposed improvements as soon as it is finalized. C. Lori Johnson, City Administrator Tami Loff, City Clerk Brad Belair, Public Works Supervisor Ross Dumont, Parks and Recreation Manager TPC3601 Thurston Avenue N, Suite 100 Anoka, MN 55303 Phone: 763.231 .5840 Facsimile: 763.427.0520 TPCa—PlanningCo.r-om MEMORANDUM TO: Otsego Parks and Recreation Commission FROM: Daniel Licht, AICP DATE: 11 April 2012 RE: Otsego — Waterfront East Outlot A; Landscaping TPC FILE: 101.01 BACKGROUND City staff has obtained cost estimates for installation of landscaping on the east side of Outlot A at Waterfront East for review at the Parks and Recreation Commission meeting on 11 April 2012. Exhibits: A. Landscape quote dated March 29, 2012 B. Furniture quote dated April 9, 2012 C. Landscape Plan ANALYSIS This parcel adjacent to the Mississippi River is now fully under City ownership and has been improved to date with construction of a regional stormwater basin and asphalt trail with one mile distance around the stormwater pond. City staff prepared an updated landscape plan for Outlot A taking into consideration aesthetic improvements and maintenance concerns. City staff is recommending proceeding with installation of the proposed overstory trees on the east side of the stormwater basin adjacent to the Mississippi River together with three benches and trash can sets. Installing the overstory trees will allow these plants to become established and being growing. The balance of the low growing shrubs and plants on the east side and all of the plants on the west side will be installed along with additional site furniture concurrent with buildout of the Waterfront East development. The cost estimate for the first phase improvement of Outlot A is outlined below: Landscaping: $17,914.00 Site Furniture $ 5,765.91 Installation (furniture): $ 2,000.00 TOTAL: $25,679.91 Midwest Landscapes Inc. will install the proposed plantings whereas the Public Works Department will install the site furniture. The City Council directed as part of it's review of the 2012 Capital Improvement Plan that the improvements of Waterfront East Outlot A be funded from the Capital Reserve Fund (and not park dedication funds) as the costs incurred by the City are the result of the settlement of a dispute related to the development agreement for Waterfront East. POSSIBLE ACTIONS A. Motion to recommend City Council approval of the quotes from Midwest Landscapes Inc. for $25,679.91for installation of plantings and furniture to be installed at Waterfront East Outlot A. B. Motion to table. C. Lori Johnson, City Administrator Tami Loff, City Clerk Brad Belair, Public Works Supervisor Ross Demant, Parks and Recreation Manager 2 QUOTE MIDIVEST LtNDSCAPESOutlot "A" East Side Plantings ' Waterfront East TO D. Daniel Licht, AICP NOTES: * Pricing includes: trere, installation, 1 year warranty March 29, 2012 DATE $252.00 The Planning Company, LLC $308.00 3601 Thurston avenue N., Suite 100 $215.00 Anoka, MN 55303 $215.00 763-231-5841 QTY SIZE DESCRIPTION 11 2.5" bb Autumn Blaze Maple 11 2.5" bb Discovery Elm 9 2.5" bb Hackberry 8 T bb Austrian Pine (sub: Ponderosa Pine) 14 6' bb Autumn Brilliance Serviceberry clump 16 6' bb Quaking Aspen clump 0 24" cont. Flamingo Willow 0 24" cont. Red Twigged Dogwood 0 24" cont. Grey Dogwood 25 24" cont. Black Chokeberry 0 18" cont. Smooth Sumac 0 18" cont. Red Snowbety 18 CY Shredded Hardwood Mulch NOTES: * Pricing includes: trere, installation, 1 year warranty March 29, 2012 DATE $252.00 $2,772.00 $308.00 $3,388.00 $215.00 $1,935.00 $215.00 $1,720.00 $171.00 $2,394.00 $235.00 $3,760.00 $37.00 $0.00 $30.00 $0.00 $31.00 $0.00 $31.00 $775.00 $34.00 $0.00 $34.00 $0.00 $65.00 $1,170.00 TOTALI $17,914.00 * Substitutions: 2.5" bb Emerald Lustre lfaple for $135.00 ea, 2.5" bb Fall Fiesta Sugar Maple for $165.00 ea — These trees can be used in place of any of the above 2.5" bb trees for a significant savings 6221 Oakwood Ave. NE * Otsego, MN 55330 * 763-241-1320 ph 763-241-1340 ft PROPOSAL DATE: April 9, 2012 QUOTE: 10162.4.9 CONTACT: BRAD BELAIR PHONE: FAX: E-MAIL: SHIP TO: BILL TO: CITY OF OTSEGO Please make PO's & Contracts out to: Flagship Recreation, LLC 5607 Cedar Lake Rd S St. Louis Park MN 55416 763.550.7860 - Office 763.550.7864 - Fax Please remit payment to: Flagship Recreation, LLC 5607 Cedar Lake Rd S St. Louis Park MN 55416 We are pleased to submit this proposal to supply the following items: QTY ITEM NO. DESCRIPTION UNIT PRICE EXTENDED AMT 2 92-60 6FT BENCH WITHOUT BACK - BRONZE $810.00 $ 1,620.00 1 58-60 6FT BENCH WITH BACK - BRONZE $940.00 $ 940.00 3 TR32METRO 32 GAL TRASH RECEPTACLE WITH LID AND LINER $700.00 $ 2,100.00 SIGNATURE BELOW ACCEPTING THIS PROPOSAL WILL CONSTITUTE A PURCHASE ORDER ONLY UPON APPROVAL BY FLAGSHIP RECREATION, LLC CUSTOMER RECEIPT OF AN ORDER ACKNOWLEDGEMENT CONSTITUTES SUCH APPROVAL. Freight Subtotal Sales Tax TOTAL $ $ $735.00 5,395.00 $370.91 5,765.91 ACCEPTED BY CUSTOMER DATE KIM AVELE)SON PROPOSED BY: Terms: 50% deposit due at time order placed. Balance - Net 15 days 1.5% finance charge on remaining balance 14/AP Conifers for visual screen and sound buffer. New development to continue screen along 101 ROW. 20/SS Shrub mossing to add to screen and protect park users from IF 6/H B astory trees for shade and park delineation 6/TH— iomental trees forshade 1v/riD - Overstory trees for shade . Remove pioneer trees along edge of pond 1r i l� i Jf Preserve and Cnhance Viewshed 8/AP, 10/SS Conifer screen and shrub massing for visual screen and sound buffer. Retain pioneer willow at end for visual screen and sound buffer. - 10/RS Noturolized Shrub Massing. nch - 8/ABS Naturalized Tree Massing. X/XX Establish native grasses on slope leading to river. --`` 6/ABM Overstory Trees for shade and visual interest against willow backdrop 18/DWC Ornamental trees for shade and grove effect. 100/GFS, 100/FRG. 4fi r and to add seasonal colo 10/AE Overstory trees for shade and to delineate park edge'' 90NRS Shrub hedge for screening and to delineate park edge Picnic Tables Preserve and Enhance Viewshed Mississippi Existing Oak River Preserve and protect t41r,rstorytreeStosupflfirru•ntsxistrryy��f�fanting5_�, to draw user tgpark and to cgnrl[crfeaiures f 50/DBH Flowermp;*, ub mass mac.. 5/AE--� ° Overstorytrees forshade a d [n delineate pdrk edge ` 45NRS—• or�hedge for. screening icCt define ate park edge 35/RTD — -- t lized shrub massing \\\���s d tgdiscouroge access to outlet structure. 6/ELM Overstorytrees for shade and screening NA 1 "=200' (Approx) 35/FW Naturalized shrub massing. 6/ABS Naturalized tree massing. Dayl i ly Naturalized tree massing. Gardens 5/ABM Overstory trees for W sual interest against wooded backdrop. -- 25/BC Naturalized shrub massing. 9/HB Overstory trees for shade 10/RS Naturalized shrub massing. 11 /DE Overstory trees for shade t and grove effect. I IN 6/QA'=, Naturalized `tree mdssing. ` - 35/FW Naturalized shrub massing X/XX Establish native grosses up to trail edge Preserve and Benches Enhance Viewshed g t -- 15/GD Naturalized shrub massing. -----40/RTD Naturalized shrub massing. -- 10/QA Dayl i ly Naturalized tree massing. Gardens 5/ABM Overstory trees for W sual interest against wooded backdrop. -- 25/BC Naturalized shrub massing. 9/HB Overstory trees for shade CITY OF 0 T1"j d" 0 8899 Nashua Ave., -NF, Otse-o, M.N 55330 Rhone: 763-441-4414 1{ ax: 763-441-8823 Group Name (or Participa ITEM 7.1 PRIDE IN OUR PARKS PROGRAM Month of: N Ct-y C- LI sZc.) I "Z— Contact Z - Contact information for Responsible Individual: Name: .J c it Phoned}:2( 3•-2q 1 T U F 2 S� {e}: .Activity Report: e -mail - MONTHLY REPORT NOtesiComments: Participant: Please e-mail this report to citVh_ a!M! fl otse_go.►rrre.cts by the first Monday of each month.