- Bike Rodeo: Set for May 20th, 10:30 - 12:30. Arrangements have been made to utilize the city hall.
Volunteers for this event are very helpful. A list of commissioners who are willing to help will be
compiled.
A variety of hand tools are also needed to be available. Jeff will submit a list of needs at a future
meeting and begin organizing.
This event is Free. Budget to cover $75
- Safety Camp: Scheduled to take place June 19 -20 from 9-3. The participants will be asked to bring
a bag lunch. We will provide the beverage and another mid-day treat. This program will have a user
fee to cover costs associated with this program. A $350 budget was planned to support this event.
The Community Recreation program will manage this event to not exceed that budget limit.
- Roving Playground: This was supported at your last commission meeting. The sub -planning
committee was asked to determine the fee options. This same program is going to take place in other
communities as well and those communities may fully support the program with no fee being requirec
by the consumer. Not all funding is yet known at this time from each specific community.
The sub planning committee suggests waiting to see what the other communities support before a
final determination is known. The sub -committee is aware that the Park Commission favors a fee
and decided that the $12-$15 range was acceptable, but is interested in seeing what other
communities offer and want to be comparable to them.
Jeff A. will be following up at a later time with fee information and ask for a final determination and
decision by the Park and Recreation Commission. The Roving Playground program will only be
introduced as a "tickler" in the summer brochure. A full marketing campaign will take place later this
spring and throughout the summer. There remain to be to many details yet outstanding to fully cover
in the Summer brochure (it goes to print April 19 )
Entertainment in the Park: It was decided that on July 1 st the Zoomobile be asked come to Otsego
Prairie Park and also that the Community Recreation program would organize and staff a variety of
"old fashioned " family type activities (balloon toss, gunny sack races, etc. The time will be
determined but would target a time that would be considerable for a family to picnic. Example: 1:00
start, which would allow the participants to picnic just prior.
Jeff A. will report on the final details when set. He is hopeful of having them arranged before the
summer brochure goes to print. The subcommittee would like to call this event the " Otsego Prairie
3/95
Roving Playground
Concept for consideration for implementation in summer'95
Objective: To eliminate the transportation barrier and enable easier access for youth to participate in
organized recreational activity.
Via bus transportation, the participants will be able to board the bus within their neighborhood and be
taken to a park setting where they will be greeted by recreation staff and participate in a multitude of
recreational activities.
General information:
The program will meet one day per week for a 2 hour time block. (5 weeks, most likely to be in
August )
The bus will have a number of pick-up locations enroute to the final destination.
The program will be staffed with qualified recreation personnel. A ratio of approx. 12 participants -1
staff will be targeted.
Targeted age group will be 5-15. Activities will be available with age appropriateness
considerations.
Cost Breakdown:
-Bus: $50 per day x 5days == $250
Staffing: $40 per day x 5 = $200
Miscellaneous supplies / Equipment = $50
Total Projected cost = $500
A. ) User fee oriented with no subsidy. Examples: a fee of $20 per participant would require 25 paid
registrants. The value of that $20 would approximate out to $2 per hour or $4 per day.
$15 fee would require 34 registrants
$10 fee would require 50 registrants
Pros: minimal risk of cost
Con: May suppress participation, lose confidence in consumer, high administrative registration
management, risk having to cancel and consumer has already made considerable arrangements and
counting on this program.
B.) Fee per time attended. Fee could range anywhere from $1 -$5 ( optimal range )
Pros: Allows flexibility on behalf of the participant, would generate some revenue to help reduce the
subsidy level.
Con: staff will have to administer fee collection, some may abuse ( Forget $, etc. )
C.) No fee. Sponsored by City, Service Organization, etc.
Pro: Likely to be well utilized, allows the consumer some flexibility
Con: Requires a funding source
0 lime .. M-.:
The City executed the grant agreement with DNR and has submitted it for
processing. We will be able to begin incurring costs eligible for grant
reimbursement immediately (subject to DNR approval).
We have been in the process of preparing bid documents for park improvements.
With federal funds, all construction contracts over $10,000 must be awarded
through competitive bid process. For the Otsego Park Improvements, we
anticipate one bid package for:
Grading/excavation 18,000 CY $31,500
Silt fence 650 LF 1,300
15" CMP w/aprons & trashguards* 25 LF 2.100
Estimate: 534,900
*Possible City forces ✓ `� `"�
Less formal "Request for Quotes" can be taken for purchase of materials. Major
purchases would include:
Playground equipment
Gametime 6221
*$15,550
(modified for HC)
Playground surfacing
135 CY
5,800
Backstops
2
4,500
Safety fence
80 LF
800
J _Ag lime
600 T
12,000
Mulch
20 T
4,600
Fertilizer
2.5 T
900
Seed
2100 LB
4,500
Timbers & rerods
59/118
1,900
2" bituminous (1580 LF)
172 T
4,300
4" Class V
432 T @ 6
2.600
$ 57,400
*Approximately $4,450 of modifications are for handicapped accessibility.
The estimated cash expenditures for construction contract services and materials
purchases, thus, are anticipated to be in the range of $92,000. Since the grant
amount is for $50,000, the minimum cash amount expended by the City will
exceed $42,000 since engineering costs (including staking and periodic inspection)
will also be incurred.
In kind contributions through either force account or volunteer labor can make up
the remaining portion of the City's 50% share. Tasks which are contemplated for
volunteer efforts or donations are:
Soccer goals (Three Rivers)
Install playground equipment, perimeter timbers
and surfacing (200 hours)
Install sign, volleyball, picnic facilities
Tree clearing 0.05 acres 20 hr. @ $5
Remove fence 560 LF 8 hr. @ $5
Haul and spread topsoil 7300 CY 200 hrs. @ $40
Haul and spread topsoil 7300 CY 200 hrs. @ $20
Seed bed preparation 10.5A @ 16 hrs. @ $30
Seed and mulch 32 hrs. @ $40
Spread ag lime 24 hrs. @ $40
Pave 1580' trail 8 hrs. @ $40
24 hrs. @ $5
Estimated Value of Volunteer & Force Accouting Work:
$2,000
1,000
500
100
40
8,000
4,000
480
1,280
960
320
It appears, based on best "guesstimates", that volunteer and force account tasks
would be valued around $19,000 as roughly outlined above.
We need to determine:
• Scope of work in the bid package
• Scope of overall project
• Firm commitments to perform work by volunteers
• Firm commitments to perform force account work and allocate equipment
We obviously need to know who is doing what prior to putting together a final bid
package.
HaKanson
Anderson
■iii Assoc ,Inc
Aft' OkA. M n- me �[x 55303
oft/aZ7 5350
Fax k>:i:a27.3401
To.
: �o yyl.0.,
Aim
Transmittal
Date: A f A �
Project: !Ats-oz,
We are sending you:
Attuned
Separately
by Messencer
Shop Drawings
L Specifications
❑ Change Order
❑ Inspection Report
�! Prints
C Reports
❑ contracts
❑ ivlernmandurr
No. of Drawing or
Cap-ies Ref. No. Descrimion
These are transmitted as checked:
".o Fxceptions TLken iJ Moie Markings ❑ For Your us,-
Comments
szComments Attached LI As Reau_5ted
Revise & '?�e ubenit ElReview & CUmmEnt For Si gnat; re
M, —
f
Le
t r
ra
-on
Woodland Wonder Timb'R'Scape System •
Powder Coated galvanized steel pipe components and handrails.
• Rotationally molded slides.
Model No. 6221 Woodland Wonder in Pressure -Treated Pine Deck Heights: 3' (9 1 cm) 4'(1 22cm) 50 52cm) 6'(1 83cm)
Model No. R6221 Woodland Wonder in Redwood Actual equipment size: 28'0"x 31'0" (853cm x 945cm)
Minimum recommended play area: 42'0"x 5070 280em x 1524cm)
-cio 0 10 Child capacity: 30-35
Ages: 5 to 12 years
GameTime in Fort Payne, Alabama Colors: Beige Slides and Panels, Green Accents
Z
24
0JA
AP.-
of %
Z., -k
7
Z7.
ZAP,
TIC-TAC-TOE ENCLO. W/ BRAILLE
BELOW DECK
BUBBLE PANEL
PLASTIC WAVE SLID: SUNG ENCLOSURE
RUNG ENCLOSURE 5 4 1 RUNG ACCESS
'B
PLEL BARS EAM ARCH BRIDGE ARAL
BALAN- ,,
RUNG STEERING WHEEL
ENCLOSURE RUNG ENCLOSURE
LOOP LADDERPLASTIC
SLIDE
INCLINED LADDER
SHADED AREA= SAFETY MARGIN WOOD ENCLOSURE
— MOLDED
CAMERA 1/51 MAINLINERDOUBLE SLIDE
ANGLE N,
41'
•
L
:l
• ■ir-
1ms .I
.:1.
0
scioi
SMH A46 /M
3GrU WWO