ITEM 7.2 East WWTF0 06'elf� Yo MINNESOTA DEPARTMENT INFORMATION Request for City Council Action ORIGINATING DEPARTMENT: _ REQUESTOR:— -- MEETING DATE: Administration Lori Johnson, City Administrator March 14, 2016 PRESENTER(s): REVIEWED BY: ITEM #: Scott Schaefer, Project Engineer, 7.2 AE2S AGENDA ITEM DETAILS RECOMMENDATION: Recommend proceeding with advertisement for bids for the East Wastewater Treatment Facility (WWTF) Oxidation Aeration Improvement project. ARE YOU SEEKING APPROVAL OF A CONTRACT? Engineerinl? Design Agreement IS PUBLIC NEARING REQUIRED? No BACKGROUND/JUSTIFICATION: The 2016 Capital Improvement Plan includes funding for increasing installed redundant treatment capacity at the East WWTF. The total project cost was estimated at $235,000, but as Scott Schaefer explains below, the cost estimate has risen due to changes in the scope of the project. Due to the long lead time for equipment, the recommendation is to bid the project as two separate bid packages. Below is additional information on the project as prepared by Scott Schaefer: The East WWTF solids treatment capacity was analyzed in 2015 to determine if capacity issues similar to the West WWTF might be present at the East WWTF. The findings of the solids capacity analysis have previously been presented. As part of that analysis, it was determined that the flows at the East WWTF were approaching the levels that would be above the firm capacity of the oxidation ditch (aeration) system (i.e. insufficient capacity with the largest unit out of service). To re-establish redundant capacity, installation of another large oxidation ditch was recommended and included in the 2016 CIP. This equipment installation is consistent with the intent of capacity phasing at the East WWTF. Action on this aeration equipment was on hold pending the outcome of the West WWTF project bid opening. Updated Information.: • Favorable bids on the West WWTF digester expansion have provided overall budget clarity to move forward with the East WWTF aeration equipment. • A budget estimate was prepared in 2015 based upon limited information, and additional preliminary investigation has refined the scope of the necessary equipment to operate an additional oxidation ditch. Two additional large gates are required (effluent gate and bypass/recycle gate) for an operational system as well as additional electrical work to provide power and junction boxes to the mixer equipment (already owned) at the appropriate locations. Initial budgetary information was obtained from two equipment manufacturers to further refine the opinion of cost. Probable construction cost has risen from approximately $200,000 to a range of approximately $300,000 to $350,000 with the changes in the scope of the project. Note that this is still a preliminary cost opinion without the benefit of preliminary engineering and there are many electrical unknowns of existing conditions to be confirmed. Draft Project Schedule i. The aerator equipment (specifically the gear box) is a long lead item, which drives the schedule and procurement approach. ii. Note that the equipment delivery schedule falls in early October, which is the preferred time to remove liquid digested biosolids from the existing tank to avoid multiple biosolids transfers. Draft Aerator Schedule Process Equipment General Construction Authorization to prepare bid documents March 14, 2016 March 14, 2016 Sid Advertisement March 31, 2016 April 25, 2016 Bid Opening April 21, 2016 May 16, 2016 Process Equipment Shop Drawing Prep/Review/Approval May 19, 2016 N/A Process Equipment Fabrication / Delivery October 6, 2016 NIA Substantial Completion October 31, 2016 Final Completion November 30, 2016 Recommended Procurement and Installation Approach: The following approach has been discussed with staff and is recommended: i. Pre -Selection of the process equipment through a public bidding process. This will allow for the process equipment to be released for fabrication while the installation design is being finalized. Scope will include the aerator equipment and the two large gates. ii. Public bidding of the process equipment installation and associated electrical work. The process equipment contract will be assigned to the successful prime contractor to provide single point responsibility. iii. The estimated professional services associated with the design and bidding of this approach are $38,700. SUPPORTING DOCUMENTS: ❑ ATTACHED X o NONE POSSIBLE MOTION Please word motion as you would like it to appear in the minutes. 1. Motion to direct AE2S to prepare public bid documents for the East WWTF Aerator process equipment pre -procurement and advertise for bids. 2. Motion to direct AE25 to prepare public bid documents for the East WWTF Aerator general construction and advertise for bids. BUDGET INFORMATION FUNDING: WWTF Fund ACTION TAKEN BUDGETED: X ❑ YES o NO ❑ APPROVED AS REQUESTED Q DENIED n TABLED ❑ OTHER (List changes) COMMENTS: