Loading...
ITEM 5.2 Lennar/Lahnw 0 t§TY OF o MINNESOTA V DFPARTMFNT INFORMATION Request for City Council Action ORIGINATING DEPARTMENT: REQUESTOR: MEETING DATE: Planning City Planner Licht 14 March 2016 PRESENTER(s): REVIEWED BY: ITEM #: City Planner Licht City Administrator Johnson 5.2— Lennar/Lahn AGFNDA ITEM DETAILS RECOMMENDATION: City staff recommends approval of the applications related to the proposed Lahn Preliminary Plat. ARE YOU SEEKING APPROVAL OF A CONTRACT? IS A PUBLIC HEARING REQUIRED? No. Held by Planning Commission 7 March 2016. BACKGROUND/JUSTIFICATION: Lennar Corporation has submitted plans for development of 345 single family lots on 247 acres located abutting CSAH 36 at Randolph Avenue. The proposed development requires consideration of applications for a Zoning Map amendment, PUD-CUP related to proposed lot standards, and preliminary plat approval. A declaration regarding potential environmental effects concluding an Environmental Assessment Worksheet (EAW) process is also to be considered. A public hearing was held by the Planning Commission on 7 March 2016 at 7:OOPM. Mr. Paul Tabone of Lennar Corporation was present as the applicant. Comments were received from the public and are summarized in the attached draft meeting minutes, as is the discussion of the Planning Commission. The Planning Commission closed the public hearing and voted 7-0 to recommend approval of the applications. Findings of fact consistent with the recommendations of the Planning Commission are attached for City Council consideration and action. SUPPORTING DOCUMENTS: ❑ ATTACHED ❑ NONE A. Planning Report dated 3 March 2016 B. Engineering Review dated March 3, 2016 C. Draft minutes of the Planning Commission meeting of March 7, 2016 D. Findings of Fact re: Zoning Map amendment E. Ordinance 2016-07 F. Findings of Fact re: EAW G. Findings of Fact re: Preliminary Plat/PUD-CUP POSSIBLE MOTION Please word motion as you would like it to appear in the minutes. Motion to approve a preliminary/final plat of the Otsego City Campus 2nd Addition and Ordinance 2016- 07amending the Zoning Map. BUDGET INFORMATION FUNDING: BUDGETED: ❑ YES NA o No ACTION TAKEN ❑ APPROVED AS REQUESTED ❑ DENIED ❑ TABLED ❑ OTHER (List changes) COMMENTS: 3601 Thurston Avenue N, Suite 100 Anoka, MN 66303 Phone: 763.231.6840 Facsimile: 763.427.0520 TPCTPCgPlanningCo.com PLANNING REPORT TO: Otsego Planning Commission FROM: D. Daniel Licht, AICP DATE: 3 March 2016 ACTION DATE: 17 April 2016 RE: Otsego — Lennar/Lahn; Preliminary Plat TPC FILE: 101.02 BACKGROUND Lennar Corporation has submitted plans for development of 345 single family lots on 247 acres located abutting CSAH 36 at Randolph Avenue. The proposed development requires consideration of applications for a Zoning Map amendment, PUD-CUP related to proposed lot standards, and preliminary plat approval. A declaration regarding potential environmental effects concluding an Environmental Assessment Worksheet (EAW) process is also to be considered. A public hearing has been noticed for the Planning Commission meeting on 7 March 2016 at 7:OOPM to consider the applications. Exhibits: A. Site Location B. EAW (by reference) C. Applicant Narrative dated February 16, 2016 D. Preliminary Plat (5 pages) E. Site Plan/Utility Grading Plans (North)(18 sheets) F. Site Plan/Utility Grading Plans (South)(14 sheets) G. Building Elevations (4 sheets) ANALYSIS EAW. A mandatory EAW is required for the preliminary plat per Minnesota Rules Section 4410.4300, Sudp. 19 for a residential development with more than 250 dwelling units. An EAW was prepared and published by the Environmental Quality Board on 2 December 2015 with the required comment period ending on 20 January 2016. General comments were received from Minnesota Pollution Control Agency, Minnesota Department of Health and Minnesota DNR. Pursuant to Minnesota Rules 4410.1700, in deciding whether a project has the potential for significant environmental effects the need for an Environmental Impact Statement (EIS), the following factors are to be considered: a. Type, extent and reversibility of environmental effects. b. Cumulative potential effects of related or anticipated future projects. C. The extent to which the environmental effects are subject to mitigation by ongoing public regulatory authority. d. The extent to which environmental effects can be anticipated and controlled as a result of other environmental studies undertaken by public agencies or the project proposer, or of EISs previously prepared on similar projects. The proposed development is subject to review for compliance with the City's Comprehensive Plan, Zoning Ordinance, Subdivision Ordinance, and Engineering Manual, as well as the other agency applications outlined in Paragraph 8 of the EAW. Compliance with these policies and performance standards will mitigate any potential significant environmental effects, which are not anticipated. City staff recommends that preparation of an EIS not be required. Zoning. The subject site is zoned A-1, Agriculture Rural Service District consistent with the Interim Land Use Plan adopted as part of the Comprehensive Plan that maintains agriculture zoning on parcels until such time as application is made for development of urban land uses guided by the Future Land Use Plan. The developer is requesting the subject site be rezoned to R-5, Residential Single and Two Family District, which allows the proposed single family lots as a permitted use. The developer is also requesting consideration of a PUD-CUP to allow for flexibility from the standard lot requirements and setbacks of the R-5 District. Evaluation of the proposed Zoning Map amendment and PUD-CUP is to be based upon (but not limited to) the criteria established in Section 20-3-2.F and 20-4-2.F of the Zoning Ordinance: 1. The proposed action's consistency with the specific policies and provisions of the Otsego Comprehensive Plan. Comment: The subject site is guided for low density residential uses within the East Sewer District by the 2012 Comprehensive Plan. Areas guided for low density residential uses are intended to provide for single family lots. The proposed preliminary plat i single 2 family lots with varied minimum widths between 55and 80 feet. The land use and the variety of single family lots offered within the proposed development will ensure a range of housing options consistent with the policies of the Comprehensive Plan. 2. The proposed use's compatibility with present and future land uses of the area. Comment: The subject site is surrounded by and will be compatible with the following existing and planned land uses in the area: Direction Land Use Plan Zoning Map Existing Use North LD Residential A-1District Cultivated fields East LD Residential A-1 District Rural single family South -- -- Crow River West LD Residential R-4 District Single family Townhouse City Park City E-WWTF 3. The proposed use's conformity with all performance standards contained within the Zoning Ordinance and other provisions of the City Code. Comment: The proposed preliminary plat will comply with all applicable requirements of the Zoning Ordinance, Subdivision Ordinance, and Engineering Manual except as specifically modified by the PUD-CUP. 4. Traffic generation of the proposed use in relation to capabilities of streets serving the property. Comment: The proposed preliminary plat is accessed by CSAH 36, desginatd as a collector street by the Northeast Wright County Transportation Plan and Randolph Avenue designated as a residential collector street by the City"s Transportation Plan; each roadway will have adequate capacity to accommodate traffic generated by the development at full build -out. 5. The proposed use can be accommodated by existing public services and facilities and will not overburden the City's service capacity. Comment: The proposed preliminary plat is within the City"s East Sewer District and utility and service capacity for the proposed development is available. Access. The proposed development will have primary access from CSAH 36, which is designated as a collector street by the Northeast Wright County (NEWC) Transportation Plan and is subject to access limitations and intersection spacing as defined by Wright County. CSAH 36 has capacity for up to 12,000 vehicle trips per day in its current configuration. The 9 most recent traffic counts by MN/DoT are 850 trips per day The NEWC Transportation Plan estimates traffic on CSAH 36 in 2040 to be 8,000 trips per day based on full development of abutting properties (including the subject site). CSAH 36 has adequate capacity to serve the proposed preliminary plat. The north section of the development will have two accesses from Randolph Avenue, which is designated by the City's transportation plan as a residential collector street. Randolph Avenue is planned to extend north to 65th Street in the future upon development of the abutting parcels. The two accesses to the subject site from Randolph Avenue are aligned with existing intersections at 57th Street and 59th Street accessing the Riverplace neighborhood. A direct access to CSAH 36 from the north section of the preliminary plat is provided east of Randolph Avenue. This proposed access has been reviewed by Wright County and complies with their intersection spacing and visibility requirements. There are also two local street connections within the north section of the preliminary plat extended at the north plat line to provide for future access and neighborhood connectivity when the abutting property is developed. Road 6 will provide access to two existing developed parcels not included within the subject site on the north side of CSAH 36 for future development. The section of the preliminary plat south of CSAH 36 will initially have one direct access to CSAH 36 at Randolph Avenue. A second access to CSAH 36 east of Randolph Avenue and aligned with the intersection to the north section of the preliminary plat will be constructed when the exception parcel not included in the preliminary plat is developed. The preliminary plat includes a ghost plan illustrating extension of streets within the south section of the preliminary plat to allow for connection to this future intersection. Streets. Local streets within the preliminary plat are designed as 28 feet wide with a five foot wide sidewalk on one side within a 60 foot right-of-way consistent with the requirements of the Engineering Manual. The preliminary plat includes two cul-de-sac streets consistent with the requirements of Section 21-7-6.A of the Subdivision Ordinance to limit construction of cul-de- sacs only for areas where topography or other physical constraints warrant their use; the two cul-de-sacs within the preliminary plat meet these criteria based on wetlands. The proposed cul-de-sacs also comply with the design requirements of the Subdivision Ordinance and do not exceed a length of 500 feet and have provision of a turnaround at the termini that complies with the standards of the Engineering Manual. Lot Requirements and Setbacks. The table below outlines the lot requirements and setbacks established for lots within the R-5 District. Lot Area Lot Width Lot Depth Setbacks Front Side Rear Wetland CSAH 36/ Randolph R-5 Interior 9,OOOsf. (net) 60ft. 100ft. 35ft. 7ft. 20ft. 40ft. 65ft. Corner 90ft. Proposed Interior 7,900sf. 55ft. 110ft. 25ft. 30ft. garage 7ft. 20ft. 40ft. 65ft. Corner 70ft. The developer is proposing lot requirements based on their specific housing portfolio to be constructed. There are to be 30 lots with a minimum width of 55 feet (9% of total), 271 lots with a minimum width of 65 feet (78% of total), and 44 lots with a minimum width of 75 feet (13% of total). The mean and median area of the proposed 345 lots exceeds the larger minimum 12,000 square foot lot requirement of the R-4, Single Family Urban District. The developer is also requesting flexibility on setback requirements of 25 feet for the front yard and side yard of a corner lot measured to the principal building and 30 feet to the garage face, which the City has previously allowed for R-5 and R-6 District developments to make more efficient use of the smaller lot area in these districts. Single Family Dwellings. All 345 lots are to be developed within single family dwellings meeting the requirements for such uses established by the Zoning Ordinance, including the minimum 480 square foot area required for an attached garage. The developer does intend to offer elements of detached townhouse living in the form of HOA provided maintenance for the homes within the preliminary plat constructed on the 55 foot wide lots, but for zoning purposes these units are considered single family dwellings. The developer also notes that their NextGen housing products, which incorporate a secondary dwelling unit into the principal building (effectively a Mother -In -Law apartment), may be offered within the development. The R-5 District does allow for two-family dwelling units as permitted uses, but each of the lots is proposed to be developed with single family dwellings. Availability of the NextGen housing product is a unquie offering that expands housing choices and reflects changing demographics. City staff recommends the following standards be applied to any NextGen housing within the preliminary plat as part of the PUD-CUP: The design and construction of the principal building is not a two-family dwelling as defined by the Zoning Ordinance. 2. There shall be an interior connection between the main living area and accessory living quarters that is able to be unlocked from each side of the connection and that is not secured by a deadbolt or keyed lockset. The principal building shall be served by single municipal water, sanitary sewer, gas and/or electric utility service lines each with a single meter for the respective utility where applicable. 4. The principal building shall have one heating and air conditioning system. 5. The property shall have one postal address. 6. There shall be a minimum of three (3) garage stalls having direct exterior access (not in a tandem arrangement) attached to the principal building with a driveway access in front of each stall so as to allow direct vehicle maneuvering to each of the stalls. 5 Landscaping. No landscape plan has been submitted. A landscape plan will be required to be submitted with application for final plat approval. The landscape plan must provide for planting of a minimum of two shade trees per lot as required by Section 20-19-2.0 of the Zoning Ordinance. Additionally, Section 20-19-2.D requires berms and landscaping for a landscape buffer yard to be installed in the yards abutting CSAH 36 and Randolph Avenue. Park and Trail Dedication. Section 21-7-18 of the Subdivision Ordinance establishes requirements for park and trail dedication. Park land dedication requirements are based upon the net buildable area of the subject site, which exclude the area for rights -of -way for collector and arterial streets and wetlands. The developer is required by Section 21-7-18.H.1 of the Subdivision Ordinance to dedicate a minimum of 12 percent of the net buildable area of the subject site to the City for park purposes. The net area of the subject site and area to be dedicated to the City for the trail corridor south of CSAH 36 will need to be determined as part of the final plat application. The balance of the park and trail dedication requirements applicable to the proposed development will be satisfied as a percentage of the cash fee in lieu of land in accordance with the City's fee schedule at the time each phase of final platting is approved. The Future Parks and Trails Plan map adopted as part of the 2012 Comprehensive Plan identifies acquisition of the Crow River floodplain area within the section of the preliminary plat south of CSAH 36. The preliminary plat provides for Outlot J to encompass the entire Crow River floodplain with two connection points to Road 1 for access. A trail corridor through the section of the preliminary plat south of CSAH 36 from Outlot J to the intersection of CSAH 36 and Randolph Avenue, where there is an existing trail on the west side of Randolph Avenue north of CSAH 36, is provided for connectivity with the City's planned trail system. No park land credit will be provided for deeding Outlot J to the City due to the limitations of the floodplain. The developer will receive credits for land, as well as construction costs for the trail between Outlot J and CSAH 36. Three Rivers Parks District is currently developing plans for a Crow River Trail along the entire west boundary of Hennepin County, which may cross into Wright County in locations. The preferred route of the northern section of the proposed regional trail is a crossing of the Crow River at Outlot J, then following CSAH 36 north and CSAH 42 east into Dayton. City staff has met with Wright County staff and Three Rivers Parks District staff regarding planning for the Crow River Trail and this section of the corridor. The preliminary plat allows for development of the planned regional trail either within the floodplain area connecting directly to CSAH 36 or following the trail corridor within the neighborhood. It is emphasized that the Crow River Trail is in the planning stages only and no time line (or funding) for construction has been identified. The section north of CSAH 36 is within the service area of Frankfort Park to the east of Randolph Avenue based on distance and population served defined by the Comprehensive Plan. No additional land is to be acquired for public parks within the subject site north of CSAH 36. A trail corridor is provided between Road 12 and Road 5 within the section of the preliminary plat north of CSAH 36. This trail section is not identified on the City's Future Parks I and Trails Map and would not be dedicated to the City, but instead is to be owned and maintained by a homeowners association. Easements allowing the trail corridor (and public access) will be needed as the trail corridor is proposed within outlots containing wetlands or stormwater basins to be deeded to the City. Grading Plan. The applicant has submitted grading and drainage plans for the proposed preliminary plat, which are subject to review and approval by the City Engineer. The grading plan includes impacts to wetlands, that are subject to review by the Wetland Technical Evaluation Panel and given approval of a Wetland Impact Permit. Remaining wetlands are to be protected by a 20 foot wetland buffer required by Section 20-16-5.E.4 of the Zoning Ordinance. The wetland and wetland buffers are required to be included within an outlot and deeded to the City by Section 20-16-9.E.4.d of the Zoning Ordinance. Utility Plan. The applicant has submitted utility plans for extension of sanitary sewer and water utilities to serve the proposed single family lots. The Comprehensive Plan establishes that the City only allocates sanitary sewer capacity to approved final plats with signed development contracts to assure the City of timely development. The developer will be required to pay the Sewer Availability Charge and Water Availability Charge in effect at the time of final plat approval. All utility plans and issues are subject to review and approval of the City Engineer. Easements. Drainage and utility easements are shown to be dedicated at the perimeter of all lots as required by Section 21-7-15.A of the Subdivision Ordinance. The drainage and utility easements are widened where necessary to accommodate overland stormwater drainage or stormwater utility pipes based on the grading plan. All drainage and utility easements are subject to review and approval of the City Engineer. Outlots. The proposed preliminary plat includes the following outlots: Outlots Function Ownership A Stormwater Basin/Wetland Deed to City B Stormwater Basin/Wetland Deed to City C Stormwater Basin/Wetland Deed to City D Wetland Deed to City E Stormwater Basin/Wetland Deed to City F Stormwater Basin/Wetland Deed to City G Stormwater Basin/Wetland Deed to City H Remnant Deed to abutting property owner I Stormwater Basin/Wetland Deed to City J Floodplain Deed to City K Stormwater Basin/Trail Deed to City L Stormwater Basin/Trail Deed to City M Stormwater Basin/Wetland/Trail Deed to City VA Outlot H is a remnant that may be subdivided in the future if adjacent exception parcels are acquired and incorporated as part of the development. The layout of Road 6 provides potential access for resubdivison of two exception parcels not part of the subject site. Section 21-7-5.1 of the Subdivision Ordinance prohibits reserve strips and Section 21-7-5.0 and K of the Subdivision Ordinance requires that access be extended to adjacent properties. The one exception parcel south of Road 6 will either need to be acquired and made part of the development or Outlot H deeded to the owner of the exception parcel at the time the right-of- way for Road 6 is final platted. Phasing Plan. The developer has indicated that the proposed preliminary plat will be developed in phases. The timeline for buildout of the proposed preliminary plat will depend primarily on market factors, however the developer suggests six to 10 years is likely. A phasing plan will be required to be submitted with the final plat application. The phasing plan is not binding upon the developer, but allows the City to review street and utility connections and anticipate service needs. RECOMMENDATION The proposed preliminary plat is consistent with the Comprehensive Plan and complies with requirements of the Zoning Ordinance and Subdivision Ordinance. The flexibility requested with the PUD-CUP application regarding lot standards is appropriate for the development and consistent with the policies of the Comprehensive Plan and past practices. Our office recommends approval of the applications as outlined below. POSSIBLE MOTIONS Decision 1— Zoning Map Amendment A. Motion to recommend approval of a Zoning Map amendment rezoning the subject site from A-1 District to R-5 District based on a finding that the request is consistent with the criteria outlined in Section 20-3-2.F of the Zoning Ordinance. B. Motion to deny the application based on a finding that the request is not consistent with the criteria outlined in Section 20-3-2.F of the Zoning Ordinance. C. Motion to table. Decision 2 — EAW/Preliminary Plat/PUD-CUP A. Motion to recommend approval a preliminary plat, PUD-CUP and negative declaration on the need for an EIS, subject to the following conditions: 1. Approval of the preliminary plat shall not guarantee access to sanitary sewer service. The City shall only allocate sanitary sewer capacity to approved final plats with signed development contracts to assure the City of timely development. 2. All lots within the preliminary plat shall comply with the following setbacks: Setbacks Front Side Rear Wetland CSAH 36/ Randolph 35ft. 7ft. 20ft. 40ft. 65ft. 25ft. 30ft.garage 7ft. 20ft. 40ft. 65ft. 3. NextGen dwelling units shall be allowed subject to approval of the Zoning Administrator in compliance with the following performance standards: a. The design and construction of the principal building is not a two-family dwelling as defined by the Zoning Ordinance. b. There shall be an interior connection between the main living area and accessory living quarters that is able to be unlocked from each side of the connection and that is not secured by a deadbolt or keyed lockset. C. The principal building shall be served by single municipal water, sanitary sewer, gas and/or electric utility service lines each with a single meter for the respective utility where applicable. d. The principal building shall have one heating and air conditioning system. e. The property shall have one postal address. f. There shall be a minimum of three (3) garage stalls having direct exterior access (not in a tandem arrangement) attached to the principal building with a driveway access in front of each stall so as to allow direct vehicle maneuvering to each of the stalls. 4. A landscape plan shall be submitted with application for final plat approval and provide for plantings as required by Section 20-19-2.0 and Section 20-19-2.D of the Zoning Ordinance. 5. PID 118-802-0011300 must be made part of the development or Outlot H shall be deeded to the owner of the exception parcel at the time the right-of-way for Road 6 is final platted. 6 6. Outlots A, B, C, D, E, F, G, I, J, K, L, and M shall be deeded to the City. 7. Park and trail dedication requirements shall be satisfied as a cash fee in lieu of land at the time of final plat approval, less a percentage credit for land dedicated for the trail corridor south of CSAH 36 or financial credits any improvements installed by the developer. . 8. The developer shall provide a description for a publicly accessible/privately maintained trail to be constructed within Outlots A and B to be recorded with the appropriate final plat(s). 9. All grading, drainage and erosion control plans are subject to review and approval of the City Engineer. 10. All utility plans and issues are subject to review and approval of the City Engineer. 11. All drainage and utility easements are subject to review and approval of the City Engineer. 12. All public rights -of -ways and streets are subject to review and approval of the City Engineer. 13. Application for final plat approval shall include a phasing plan; the phasing plan is not binding upon the developer. B. Motion to recommend the application be denied based on a finding that the request is inconsistent with the Comprehensive Plan and does not comply with the Zoning Ordinance, Subdivision Ordinance, and Engineering Manual. C. Lori Johnson, City Administrator Tami Loff, City Clerk Ron Wagner, City Engineer Andy MacArthur, City Attorney Paul Tabone, Lennar Robert Molsted, Sathre-Bergquist, Inc. 10 ip rA � �`.D��//�@..[l EXhibitA Overview Legend Roads --csAHcL --rr/cL -- wuw|CL -- Pn|vYTs[L — —nwPcL Highways Interstate State Hwy -- US Hwy city/Town,hipUmhs 0c Flt ��pa,ceb LENNAIZ February 16, 2016 Mr. Daniel Licht, AICP City of Otsego RE: Lahn property preliminary plat Dear Daniel: Lennar Corporation is pleased to submit a preliminary plat application for the Lahn Property located at the intersection of Randolph Avenue and CSAH HWY 36 in Otsego, MN. As you are aware, Lennar prepared and circulated an EAW that addressed all potential environmental factors associated with development of the property. The public comment period ended on January 20th 2016. The community planned for the Lahn property consists of residential home sites varying in width from 58 feet to 80 feet. The intention is to develop the land to provide various Lennar home styles including detached townhomes and single family attached homes, as well as NextGen homes, should there be a market need. We would also request PUD flexibility to bring modified or additional home plans into the community to respond to the ever -changing marketplace. An architectural sampling of these homes is being submitted with this application. It is our intention to incorporate architectural consistency between Riverpointe and this new community regarding elevation colors, materials, and features. Lennar is implementing various goals and policies of the Growth Management, Land Use, Parks and Trails, Natural Environment, and Transportation sections of the City's Comprehensive Plan. This neighborhood includes 5,333 linear feet of trails that are interconnected with local sidewalks and 119 acres of conserved natural open spaces in the form of wetlands and a large outlot (Outlot J) along the Crow River. Outlot J consists of approximately 84 acres that will remain undisturbed along the Crow River. It is anticipated that this area can serve as a natural amenity to the community, and we would like the opportunity to discuss how we may collectively improve this area. The property is currently zoned A-1 (Agricultural) and will require a zone change in the form of a PUD to serve as the master plan of development. The PUD being requested is closest to the R-5 Zoning District and includes the following modifications from the City's Conventional Zoning Ordinance: ITEM 4_2 TPC3601 Thurston Avenue N, Suite 100 Anoka, MN 56303 Phone: 763.231.6840 Facsimile: 763.427.0520 TPCgP1anningCo.com PLANNING REPORT TO: Otsego Planning Commission FROM: D. Daniel Licht, AICP DATE: 3 March 2016 ACTION DATE: 17 April 2016 RE: Otsego — Lennar/Lahn; Preliminary Plat TPC FILE: 101.02 BACKGROUND Lennar Corporation has submitted plans for development of 345 single family lots on 247 acres located abutting CSAH 36 at Randolph Avenue. The proposed development requires consideration of applications for a Zoning Map amendment, PUD-CUP related to proposed lot standards, and preliminary plat approval. A declaration regarding potential environmental effects concluding an Environmental Assessment Worksheet (EAW) process is also to be considered. A public hearing has been noticed for the Planning Commission meeting on 7 March 2016 at 7:OOPM to consider the applications. Exhibits: A. Site Location B. EAW (by reference) C. Applicant Narrative dated February 16, 2016 D. Preliminary Plat (5 pages) E. Site Plan/Utility Grading Plans (North)(18 sheets) F. Site Plan/Utility Grading Plans (South)(14 sheets) G. Building Elevations (4 sheets) ANALYSIS EAW. A mandatory EAW is required for the preliminary plat per Minnesota Rules Section 4410.4300, Sudp. 19 for a residential development with more than 250 dwelling units. An EAW was prepared and published by the Environmental Quality Board on 2 December 2015 with the required comment period ending on 20 January 2016. General comments were received from Minnesota Pollution Control Agency, Minnesota Department of Health and Minnesota DNR. Pursuant to Minnesota Rules 4410.1700, in deciding whether a project has the potential for significant environmental effects the need for an Environmental Impact Statement (EIS), the following factors are to be considered: a. Type, extent and reversibility of environmental effects. b. Cumulative potential effects of related or anticipated future projects. C. The extent to which the environmental effects are subject to mitigation by ongoing public regulatory authority. d. The extent to which environmental effects can be anticipated and controlled as a result of other environmental studies undertaken by public agencies or the project proposer, or of EISs previously prepared on similar projects. The proposed development is subject to review for compliance with the City's Comprehensive Plan, Zoning Ordinance, Subdivision Ordinance, and Engineering Manual, as well as the other agency applications outlined in Paragraph 8 of the EAW. Compliance with these policies and performance standards will mitigate any potential significant environmental effects, which are not anticipated. City staff recommends that preparation of an EIS not be required. Zoning. The subject site is zoned A-1, Agriculture Rural Service District consistent with the Interim Land Use Plan adopted as part of the Comprehensive Plan that maintains agriculture zoning on parcels until such time as application is made for development of urban land uses guided by the Future Land Use Plan. The developer is requesting the subject site be rezoned to R-5, Residential Single and Two Family District, which allows the proposed single family lots as a permitted use. The developer is also requesting consideration of a PUD-CUP to allow for flexibility from the standard lot requirements and setbacks of the R-5 District. Evaluation of the proposed Zoning Map amendment and PUD-CUP is to be based upon (but not limited to) the criteria established in Section 20-3-2.F and 20-4-2.F of the Zoning Ordinance: 1. The proposed action's consistency with the specific policies and provisions of the Otsego Comprehensive Plan. Comment: The subject site is guided for low density residential uses within the East Sewer District by the 2012 Comprehensive Plan. Areas guided for low density residential uses are intended to provide for single family lots. The proposed preliminary plat i single 2 family lots with varied minimum widths between 55and 80 feet. The land use and the variety of single family lots offered within the proposed development will ensure a range of housing options consistent with the policies of the Comprehensive Plan. 2. The proposed use's compatibility with present and future land uses of the area. Comment: The subject site is surrounded by and will be compatible with the following existing and planned land uses in the area: Direction Land Use Plan Zoning Map Existing Use North LD Residential A-1District Cultivated fields East LD Residential A-1 District Rural single family South -- -- Crow River West LD Residential R-4 District Single family Townhouse City Park City E-W WTF 3. The proposed use's conformity with all performance standards contained within the Zoning Ordinance and other provisions of the City Code. Comment: The proposed preliminary plat will comply with all applicable requirements of the Zoning Ordinance, Subdivision Ordinance, and Engineering Manual except as specifically modified by the PUD-CUP. 4. Traffic generation of the proposed use in relation to capabilities of streets serving the property. Comment: The proposed preliminary plat is accessed by CSAH 36, desginatd as a collector street by the Northeast Wright County Transportation Plan and Randolph Avenue designated as a residential collector street by the City"s Transportation Plan; each roadway will have adequate capacity to accommodate traffic generated by the development at full build -out. 5. The proposed use can be accommodated by existing public services and facilities and will not overburden the City's service capacity. Comment: The proposed preliminary plat is within the City"s East Sewer District and utility and service capacity for the proposed development is available. Access. The proposed development will have primary access from CSAH 36, which is designated as a collector street by the Northeast Wright County (NEWC) Transportation Plan and is subject to access limitations and intersection spacing as defined by Wright County. CSAH 36 has capacity for up to 12,000 vehicle trips per day in its current configuration. The 3 most recent traffic counts by MN/DoT are 850 trips per day The NEWC Transportation Plan estimates traffic on CSAH 36 in 2040 to be 8,000 trips per day based on full development of abutting properties (including the subject site). CSAH 36 has adequate capacity to serve the proposed preliminary plat. The north section of the development will have two accesses from Randolph Avenue, which is designated by the City's transportation plan as a residential collector street. Randolph Avenue is planned to extend north to 65th Street in the future upon development of the abutting parcels. The two accesses to the subject site from Randolph Avenue are aligned with existing intersections at 57th Street and 59th Street accessing the Riverplace neighborhood. A direct access to CSAH 36 from the north section of the preliminary plat is provided east of Randolph Avenue. This proposed access has been reviewed by Wright County and complies with their intersection spacing and visibility requirements. There are also two local street connections within the north section of the preliminary plat extended at the north plat line to provide for future access and neighborhood connectivity when the abutting property is developed. Road 6 will provide access to two existing developed parcels not included within the subject site on the north side of CSAH 36 for future development. The section of the preliminary plat south of CSAH 36 will initially have one direct access to CSAH 36 at Randolph Avenue. A second access to CSAH 36 east of Randolph Avenue and aligned with the intersection to the north section of the preliminary plat will be constructed when the exception parcel not included in the preliminary plat is developed. The preliminary plat includes a ghost plan illustrating extension of streets within the south section of the preliminary plat to allow for connection to this future intersection. Streets. Local streets within the preliminary plat are designed as 28 feet wide with a five foot wide sidewalk on one side within a 60 foot right-of-way consistent with the requirements of the Engineering Manual. The preliminary plat includes two cul-de-sac streets consistent with the requirements of Section 21-7-6.A of the Subdivision Ordinance to limit construction of cul-de- sacs only for areas where topography or other physical constraints warrant their use; the two cul-de-sacs within the preliminary plat meet these criteria based on wetlands. The proposed cul-de-sacs also comply with the design requirements of the Subdivision Ordinance and do not exceed a length of 500 feet and have provision of a turnaround at the termini that complies with the standards of the Engineering Manual. Lot Requirements and Setbacks. The table below outlines the lot requirements and setbacks established for lots within the R-5 District. Lot Area Lot Width Lot Depth Setbacks Front Side Rear Wetland CSAH 36/ Randolph R-5 Interior 9,000sf. (net) 60ft. 100ft. 35ft. 7ft. 20ft. 40ft. 65ft. Corner 90ft. Proposed Interior 7,900sf. 55ft. 110ft. 25ft. 30ft.garage 7ft. 20ft. 40ft. 65ft. Corner 70ft. M The developer is proposing lot requirements based on their specific housing portfolio to be constructed. There are to be 30 lots with a minimum width of 55 feet (9% of total), 271 lots with a minimum width of 65 feet (78% of total), and 44 lots with a minimum width of 75 feet (13% of total). The mean and median area of the proposed 345 lots exceeds the larger minimum 12,000 square foot lot requirement of the R-4, Single Family Urban District. The developer is also requesting flexibility on setback requirements of 25 feet for the front yard and side yard of a corner lot measured to the principal building and 30 feet to the garage face, which the City has previously allowed for R-5 and R-6 District developments to make more efficient use of the smaller lot area in these districts. Single Family Dwellings. All 345 lots are to be developed within single family dwellings meeting the requirements for such uses established by the Zoning Ordinance, including the minimum 480 square foot area required for an attached garage. The developer does intend to offer elements of detached townhouse living in the form of HOA provided maintenance for the homes within the preliminary plat constructed on the 55 foot wide lots, but for zoning purposes these units are considered single family dwellings. The developer also notes that their NextGen housing products, which incorporate a secondary dwelling unit into the principal building (effectively a Mother -In -Law apartment), may be offered within the development. The R-5 District does allow for two-family dwelling units as permitted uses, but each of the lots is proposed to be developed with single family dwellings. Availability of the NextGen housing product is a unquie offering that expands housing choices and reflects changing demographics. City staff recommends the following standards be applied to any NextGen housing within the preliminary plat as part of the PUD-CUP: The design and construction of the principal building is not a two-family dwelling as defined by the Zoning Ordinance. 2. There shall be an interior connection between the main living area and accessory living quarters that is able to be unlocked from each side of the connection and that is not secured by a deadbolt or keyed lockset. 3. The principal building shall be served by single municipal water, sanitary sewer, gas and/or electric utility service lines each with a single meter for the respective utility where applicable. 4. The principal building shall have one heating and air conditioning system. 5. The property shall have one postal address. 6. There shall be a minimum of three (3) garage stalls having direct exterior access (not in a tandem arrangement) attached to the principal building with a driveway access in front of each stall so as to allow direct vehicle maneuvering to each of the stalls. 5 Landscaping. No landscape plan has been submitted. A landscape plan will be required to be submitted with application for final plat approval. The landscape plan must provide for planting of a minimum of two shade trees per lot as required by Section 20-19-2.0 of the Zoning Ordinance. Additionally, Section 20-19-2.D requires berms and landscaping for a landscape buffer yard to be installed in the yards abutting CSAH 36 and Randolph Avenue. Park and Trail Dedication. Section 21-7-18 of the Subdivision Ordinance establishes requirements for park and trail dedication. Park land dedication requirements are based upon the net buildable area of the subject site, which exclude the area for rights -of -way for collector and arterial streets and wetlands. The developer is required by Section 21-7-18.H.1 of the Subdivision Ordinance to dedicate a minimum of 12 percent of the net buildable area of the subject site to the City for park purposes. The net area of the subject site and area to be dedicated to the City for the trail corridor south of CSAH 36 will need to be determined as part of the final plat application. The balance of the park and trail dedication requirements applicable to the proposed development will be satisfied as a percentage of the cash fee in lieu of land in accordance with the City's fee schedule at the time each phase of final platting is approved. The Future Parks and Trails Plan map adopted as part of the 2012 Comprehensive Plan identifies acquisition of the Crow River floodplain area within the section of the preliminary plat south of CSAH 36. The preliminary plat provides for Outlot J to encompass the entire Crow River floodplain with two connection points to Road 1 for access. A trail corridor through the section of the preliminary plat south of CSAH 36 from Outlot J to the intersection of CSAH 36 and Randolph Avenue, where there is an existing trail on the west side of Randolph Avenue north of CSAH 36, is provided for connectivity with the City's planned trail system. No park land credit will be provided for deeding Outlot J to the City due to the limitations of the floodplain. The developer will receive credits for land, as well as construction costs for the trail between Outlot J and CSAH 36. Three Rivers Parks District is currently developing plans for a Crow River Trail along the entire west boundary of Hennepin County, which may cross into Wright County in locations. The preferred route of the northern section of the proposed regional trail is a crossing of the Crow River at Outlot J, then following CSAH 36 north and CSAH 42 east into Dayton. City staff has met with Wright County staff and Three Rivers Parks District staff regarding planning for the Crow River Trail and this section of the corridor. The preliminary plat allows for development of the planned regional trail either within the floodplain area connecting directly to CSAH 36 or following the trail corridor within the neighborhood. It is emphasized that the Crow River Trail is in the planning stages only and no time line (or funding) for construction has been identified. The section north of CSAH 36 is within the service area of Frankfort Park to the east of Randolph Avenue based on distance and population served defined by the Comprehensive Plan. No additional land is to be acquired for public parks within the subject site north of CSAH 36. A trail corridor is provided between Road 12 and Road 5 within the section of the preliminary plat north of CSAH 36. This trail section is not identified on the City's Future Parks and Trails Map and would not be dedicated to the City, but instead is to be owned and maintained by a homeowners association. Easements allowing the trail corridor (and public access) will be needed as the trail corridor is proposed within outlots containing wetlands or stormwater basins to be deeded to the City. Grading Plan. The applicant has submitted grading and drainage plans for the proposed preliminary plat, which are subject to review and approval by the City Engineer. The grading plan includes impacts to wetlands, that are subject to review by the Wetland Technical Evaluation Panel and given approval of a Wetland Impact Permit. Remaining wetlands are to be protected by a 20 foot wetland buffer required by Section 20-16-5.E.4 of the Zoning Ordinance. The wetland and wetland buffers are required to be included within an outlot and deeded to the City by Section 20-16-9.E.4.d of the Zoning Ordinance. Utility Plan. The applicant has submitted utility plans for extension of sanitary sewer and water utilities to serve the proposed single family lots. The Comprehensive Plan establishes that the City only allocates sanitary sewer capacity to approved final plats with signed development contracts to assure the City of timely development. The developer will be required to pay the Sewer Availability Charge and Water Availability Charge in effect at the time of final plat approval. All utility plans and issues are subject to review and approval of the City Engineer. Easements. Drainage and utility easements are shown to be dedicated at the perimeter of all lots as required by Section 21-7-15.A of the Subdivision Ordinance. The drainage and utility easements are widened where necessary to accommodate overland stormwater drainage or stormwater utility pipes based on the grading plan. All drainage and utility easements are subject to review and approval of the City Engineer. Outlots. The proposed preliminary plat includes the following outlots: Outlots Function Ownership A Stormwater Basin/Wetland Deed to City B Stormwater Basin/Wetland Deed to City C Stormwater Basin/Wetland Deed to City D Wetland Deed to City E Stormwater Basin/Wetland Deed to City F Stormwater Basin/Wetland Deed to City G Stormwater Basin/Wetland Deed to City H Remnant Deed to abutting property owner I Stormwater Basin/Wetland Deed to City J Floodplain Deed to City K Stormwater Basin/Trail Deed to City L Stormwater Basin/Trail Deed to City M Stormwater Basin/Wetland/Trail Deed to City 7 Outlot H is a remnant that may be subdivided in the future if adjacent exception parcels are acquired and incorporated as part of the development. The layout of Road 6 provides potential access for resubdivison of two exception parcels not part of the subject site. Section 21-7-5.1 of the Subdivision Ordinance prohibits reserve strips and Section 21-7-5.0 and K of the Subdivision Ordinance requires that access be extended to adjacent properties. The one exception parcel south of Road 6 will either need to be acquired and made part of the development or Outlot H deeded to the owner of the exception parcel at the time the right-of- way for Road 6 is final platted. Phasing Plan. The developer has indicated that the proposed preliminary plat will be developed in phases. The timeline for buildout of the proposed preliminary plat will depend primarily on market factors, however the developer suggests six to 10 years is likely. A phasing plan will be required to be submitted with the final plat application. The phasing plan is not binding upon the developer, but allows the City to review street and utility connections and anticipate service needs. RECOMMENDATION The proposed preliminary plat is consistent with the Comprehensive Plan and complies with requirements of the Zoning Ordinance and Subdivision Ordinance. The flexibility requested with the PUD-CUP application regarding lot standards is appropriate for the development and consistent with the policies of the Comprehensive Plan and past practices. Our office recommends approval of the applications as outlined below. POSSIBLE MOTIONS Decision 1— Zoning Map Amendment A. Motion to recommend approval of a Zoning Map amendment rezoning the subject site from A-1 District to R-5 District based on a finding that the request is consistent with the criteria outlined in Section 20-3-2.F of the Zoning Ordinance. B. Motion to deny the application based on a finding that the request is not consistent with the criteria outlined in Section 20-3-2.F of the Zoning Ordinance. C. Motion to table. Decision 2 — EAW/Preliminary Plat/PUD-CUP A. Motion to recommend approval a preliminary plat, PUD-CUP and negative declaration on the need for an EIS, subject to the following conditions: 1. Approval of the preliminary plat shall not guarantee access to sanitary sewer service. The City shall only allocate sanitary sewer capacity to approved final plats with signed development contracts to assure the City of timely development. 2. All lots within the preliminary plat shall comply with the following setbacks: Setbacks Front Side Rear Wetland CSAH 36/ Randolph 35ft. 7ft. 20ft. 40ft. 65ft. 25ft. 30ft. garage 7ft. 20ft. 40ft. 65ft. 3. NextGen dwelling units shall be allowed subject to approval of the Zoning Administrator in compliance with the following performance standards: a. The design and construction of the principal building is not a two-family dwelling as defined by the Zoning Ordinance. b. There shall be an interior connection between the main living area and accessory living quarters that is able to be unlocked from each side of the connection and that is not secured by a deadbolt or keyed lockset. C. The principal building shall be served by single municipal water, sanitary sewer, gas and/or electric utility service lines each with a single meter for the respective utility where applicable. d. The principal building shall have one heating and air conditioning system. e. The property shall have one postal address. f. There shall be a minimum of three (3) garage stalls having direct exterior access (not in a tandem arrangement) attached to the principal building with a driveway access in front of each stall so as to allow direct vehicle maneuvering to each of the stalls. 4. A landscape plan shall be submitted with application for final plat approval and provide for plantings as required by Section 20-19-2.0 and Section 20-19-2.D of the Zoning Ordinance. 5. PID 118-802-0011300 must be made part of the development or Outlot H shall be deeded to the owner of the exception parcel at the time the right-of-way for Road 6 is final platted. C7 6. Outlots A, B, C, D, E, F, G, I, J, K, L, and M shall be deeded to the City. Park and trail dedication requirements shall be satisfied as a cash fee in lieu of land at the time of final plat approval, less a percentage credit for land dedicated for the trail corridor south of CSAH 36 or financial credits any improvements installed by the developer. . 8. The developer shall provide a description for a publicly accessible/privately maintained trail to be constructed within Outlots A and B to be recorded with the appropriate final plat(s). 9. All grading, drainage and erosion control plans are subject to review and approval of the City Engineer. 10. All utility plans and issues are subject to review and approval of the City Engineer. 11. All drainage and utility easements are subject to review and approval of the City Engineer. 12. All public rights -of -ways and streets are subject to review and approval of the City Engineer. 13. Application for final plat approval shall include a phasing plan; the phasing plan is not binding upon the developer. B. Motion to recommend the application be denied based on a finding that the request is inconsistent with the Comprehensive Plan and does not comply with the Zoning Ordinance, Subdivision Ordinance, and Engineering Manual. Lori Johnson, City Administrator Tami Loff, City Clerk Ron Wagner, City Engineer Andy MacArthur, City Attorney Paul Tabone, Lennar Robert Molsted, Sathre-Bergquist, Inc. 10 Lennar/Lahn Exhibit A Overview Legend Roads — CSAHCL — CTYCL — MUNICL — PRIVATECL — TWPCL Highways Interstate — State Hwy — US Hwy City/Township Limits ❑c ❑ t QParcels LENNAIZ February 16, 2016 Mr. Daniel Licht, AICP City of Otsego RE: Lahn property preliminary plat Dear Daniel: Lennar Corporation is pleased to submit a preliminary plat application for the Lahn Property located at the intersection of Randolph Avenue and CSAH HWY 36 in Otsego, MN. As you are aware, Lennar prepared and circulated an EAW that addressed all potential environmental factors associated with development of the property. The public comment period ended on January 20th 2016. The community planned for the Lahn property consists of residential home sites varying in width from 58 feet to 80 feet. The intention is to develop the land to provide various Lennar home styles including detached townhomes and single family attached homes, as well as NextGen homes, should there be a market need. We would also request PUD flexibility to bring modified or additional home plans into the community to respond to the ever -changing marketplace. An architectural sampling of these homes is being submitted with this application. It is our intention to incorporate architectural consistency between Riverpointe and this new community regarding elevation colors, materials, and features. Lennar is implementing various goals and policies of the Growth Management, Land Use, Parks and Trails, Natural Environment, and Transportation sections of the City's Comprehensive Plan. This neighborhood includes 5,333 linear feet of trails that are interconnected with local sidewalks and 119 acres of conserved natural open spaces in the form,of wetlands and a large outlot (Outlot J) along the Crow River. Outlot 1 consists of approximately 84 acres that will remain undisturbed along the Crow River. It is anticipated that this area can serve as a natural amenity to the community, and we would like the opportunity to discuss how we may collectively improve this area. The property is currently zoned A-1 (Agricultural) and will require a zone change in the form of a PUD to serve as the master plan of development. The PUD being requested is closest to the R-5 Zoning District and includes the following modifications from the City's Conventional Zoning Ordinance: Development Regulation City Code — Existing RS Zoning District Lahn Property PUD Request Front Setback — house 35 feet 25 feet Front Setback —garage face 35 feet 30feet Rear Setback 20 feet 20 feet Side Setback 7 feet 7 feet Side Setback — Corner Lot 35 feet 25 feet* Side/Rear Setback abutting collector street 65 feet 65 feet Minimum lot area 9,000 square feet 7,900 square feet Mean Lot Area :9,000 square feet Minimum lot depth 100 feet 110 feet Minimum Lot Width 60 feet interior, 90 feet corner 55 feet interior, 70 feet corner *Same as Martin Farms Our tentative project schedule at this time is to procure Preliminary Plat, PUD, and Final Plat entitlements to we can start grading in spring of 2016, and continue construction through summer and fall. We look forward to working with the City of Otsego through the planning process in hopes of starting another Lennar Community within Otsego in 2016. Please feel free to contact me with questions. Regards, Paul J. Tabone Land Entitlement Mgr Lennar Minnesota Development Regulation City Code — Existing RS Zoning District Lahn Property PUD Request Front Setback — house 35 feet 25 feet Front Setback —garage face 35 feet 30 feet Rear Setback 20 feet 20 feet Side Setback 7 feet 7 feet Side Setback — Corner Lot 35 feet 25 feet* Side/Rear Setback abutting collector street 65 feet 65 feet Minimum lot area 9,000 square feet 7,900 square feet Mean Lot Area !9,000 square feet Minimum lot depth 100 feet 110 feet Minimum Lot Width 60 feet interior, 90 feet corner 55 feet interior, 70 feet corner -,ame as martin Farms Our tentative project schedule at this time is to procure Preliminary Plat, PUD, and Final Plat entitlements to we can start grading in spring of 2016, and continue construction through summer and fall. We look forward to working with the City of Otsego through the planning process in hopes of starting another Lennar Community within Otsego in 2016. Please feel free to contact me with questions. Regards, U Paul J. Tabone Land Entitlement Mgr Lennar Minnesota Via' ;'►� Il SIN \`�����'f�\u�' �. �/ U1s•Vc at==men / 7 �'� T i, __ ga ash}'q gg 'lli¢�`a�?i$�i § e ��� ..tea ,�• C7 Se'I'\ .�•- �C 'nlrosran.�r» %� � i/� �c*,� yd5 -__ ��i4i8a¢`SH 3$= _\0.,'•�=ri4H _ d n_ e',fiC f ] i • v(fr�.', --=C=-- $a^>�aHa. li q1lals I -4L/`' `-ream" xo. a ,f:�' 13� ' i 'al c f rfd� i'P" �" �,]A �• _ C 9�33E.M. �rtxs•x :F]�at. eli] "" xessrn•e ,aces e r �s- �C. / • 4{'"�'�___--__�Jf �- 'm.v¢m uraziW m_�� - c .a n' iY'�?:ee `i• � A J s6�'-_"___-' __ lq��gAOfl� ds 1 ssc tv ua q. xaE wiao:. § /• i..r r. 7 ri �iE F� 7i n ]}p'a*g i � z>� �� ��' �. - f •-l a[�iizz� t pA' �t" \X'n.r - --� .. `� t IE ttflrQ ft xe•. _--____ � A��s B 55� ---_- 'v„� `• `�a . � l�7 @�L.4�a'Iy '� n�vncacrl,. rRf = _- ___ R � __ _ xuen va sv. i/ara / ry ,. ,.� WSa 4i ____ __ l:o�Ff)•u Qs..cUoeoe 'Ypp 9 '\ 7, I 4V4MSEG4i. n0.0.}] "I 1j1[ ��: BA4 � - p3 - � n 1. z�] °-�I�E ':7ti I 4• ___ I¢' Fi �� •' �L U�� Ua n d• �r' III IaI� Il�I m fi_§l i I iJH c'= P� eIIIg5p31 I€I II��$ o ���+"m I Ali Elio -- / I ��CC4rQi �`e�'b ® p a till = ; g I j S Y' V, Tly BIT Uh s (: - - Ap�l m------ �� ---- /— — -- ) —p 5d RW.)!1, gig ❑s l Cc ��q e _ _ _ •� . , F,".. i. S rogT -___ ]��'\ � elf 1•��p __ -Ci�'99i - _- cn S (p o c>, a 5 > Q ' ` � o S° a" �f SATHRE-BERGQUIST, INC. ( 1aB oMBR0"DWAY WAMTAael-91 (W),TFa90a saE ,..� PRELIMINARY PLAT THE LAHN PROPERTY LENNAR psE gVatvxeG"+m]4aan1un4w, Av44q YhYA`]CEafe.wull0l+lu�)rmw(vUihsrsrtY d>aimnesAru3anwrsrusnouu]])xmea, era•arsa]]�v nsmv�]x wra�cEwam+seec assaBrmmewanroxanAwau wreuhna°°�'"'nviim`�°vu�`ir rog4uawsaw]ovcsgFaammam+]auaman:vs� aW�,a ea" I10 / —F'— �— L LE ��.�' n r -- � < via C;.::l�..=� I'iS6. 3.dhl• ����I`•5'i `?�gl I gig= bL I —r-- \ I_'r/€u �•:'��—::'.. :-; .�--�� r'ss'l �'lf�x �' "NCI a�:� I IllF-ppV IpF I u I II�FVII"xml s ll�a�° 1.%,UMl 7R, Lisn�l.' '� _I: �9A� ' •i� �rr��l 1' aIL 6'Fes"� kPbry IF �eb I �• `�$ J 1 �.5�3) � oc la _ !ate Ism J a����\ w? PZ I I �,� ��•� ; �� ICI � x,, i III U. �, �_t �I� � '��O-yI' : • ���a! k n;a SY o o qB cm Avsausar im 11 � 1fM1f8 �� 1��a ��p '!-�' �e• y—' ' ssa4 C�F�=a l0 8i �- �m;It g { \ 11 rn •td a "cl I QeN . � !: I • r `�tl .ILr�\ e9�\*a�ouui, �Ijo��m o / a-�,c ,�� s' • �;��oA� I g� ,y � iisi� � �_ 7s� • "�-»b •C-'�;�,� �'�t'.�^'�N- j�°>sl (m001 � � fT � Via°' I r'°�O r ._�� _.m �.•— c+«�'--��_m_ z: x gel pi m V Ire• "c �: .; ' gig N00.24'20'E 903.01 — — — — — I — —�.Tz ���z� �� -w. 9—�upp•24'PU'E 156� ` ' _ r• AR"OWrl�a yS�, e��J'.. � a �� I I l lX b CIO -' usEl�veunxawrmams,raxnw,A'awam�vAvcea�,wrna�rezlw.uwnmoenr oxa®n®vmnoureAenaulsxc•,w-wsxnnre+iA,Y,mx.�xrmwr�n NIMgVtARWtg1fRREl IlIYEOnWARIlEAVo eSGaNn�NG[iNt PRELIMINARY PLAT ��"Y•><.x�N,=x��,��M,�N�a,�,�„R�n,�nP,�Y��Y £a , N PONIDEC aNVGE,O N4E,p�ARa ONIEauuR� o y a 2 SATHRE-BERGQUIST. INC. Ns § ; 16050 IaROA WAYWAYIATgllN65i91(95})1i8�00 THE LAHN PROPERTY a^� cn LENNAR a�R s WR ".I'• Juld O 01 �� /- --s':l •'yy%1 gad (WO i... (.. ' 97.0E �./ b •. 30 R=7I0.00 �— 9H50L 1 �! .g w, � —wry �? �� � —rr 3•,—/ 9?fRy@E� r ��'`: �'°`.� /-aao� �ain � uf L r@m awP�I _ ; s g � � q •. - iss� pia r �e°+, J C :oo � V, ��_�,` \p. A,� � �..' vans] `I ttt-SOWWzaw V. i co o �,_ �—j i p�: / `t y.uV%d\ c�a]•L=-�_��''A/i`' J��V\Y \ • 3' "I., •20•W 427.89 P P titllC `••� I �• l l l l l t l l l l i l l l l l:.`•.�o I !?o�;:�;.oa8,.-oB93oo :lilllllt.11 a u 0 :lItlltll 2,�s =sad€I 6� tllllllllll'•? ��3j Imo. �'" g g¢51 gs��o FT in I %29 PRELIMINARY PLAT °Elq:iPE eoHuwess eaw9]e9 nesw.ramermHu�r9ueur� m SATHRE-BERGQUIST, INC. .-« �g•, S $ ; ') 15C5011RI =WAY WAY T.%W-91(851)116tG09 THE LAHN PROPERTY °^^ �, LENNAR _.. �m I �• 6 6=� 1~ J .jpy{j a —1 _ e a F— r— p. <iCllilllillllllllll�CC :-'tltlll1,1.11.1.1.1 A L-1.I. ,ll1llFzbl* yt _ $11C<iG •Y t l 1 l l �. ' ,, ,; 0 _—.�rosssSitsaw _._. \�..�• _„�+1P"`- A�` �\. \�kanl�a& ��,.rvl�x+P�,I�....I�_._I�..---h of I b / _<Pt•il1 inIm #gN'1 S i r�`r < t♦9�1a �ypS4y u`♦ \\ a$q j s�ro\,�a�_ •4 '�Agy �\ 1 C G' 1 lam c� a°m \ *•s� 1 25 6�AV 19 1 � aery � ate" a=� \ •. \ . Jr 1 1 ^ nuinxPA+amamw+Ar — wsnswy,mzr \ � , � 'y I EGG,%'` .,: `[`i'1^l`i'�"'l'���d:G6o 't:•.:'l: , kk . � J � i ���,=`'�`� • 'i �t,l l l t l' },�1 1 l l 1 ��� Ti t�1t111ti11 a �� ' ,��:;,<,e.�dg�=Gave® �� ,t'l 1 1 1 1�.�'-Yll1 I t Ill l l l.t 1 t•l l l 1ll l l l l l l I1 z \``. /; , ll>MA' :::` °-'•:lllllllllllllll `��% r' i �t!= �o�g�� lii �+rGil11:•°'' 'alltllllllllll'l :` ��, ; i�l t.l "all l l it l l l l l l lilt �� �'�� � 111;!�"• '`=l.lillllillllll. `•; ` `":1.11till 11 lilt l f: IoIII F.``':illlltllllllll ,��.. 1; s I����Illill�lt z lallllllittlitl° e€ sg ��x�s g =Q '`=llllllllilll•t:- � g_3 astaauww<nnwa,.os�nw4uaonrnrvEvu;a�arusavu,w9ar�YmnaacLerw srtagq onsnmvm:wram�am<sawcwc•.naw.x wm:wrsw =r w, PRELIMINARY PLAT ";� ;a"" N �oNm • CD = a SATHRE-BERGQUIST, INC. �� .a°"°�* aE �• �• F 1 • IMSOU111BROAUWAY WAYMMUNA Mi (M 478E000 •uxN .t °�o< �� THE LAHN PROPERTY m LENNAR � I I u6� I10 e�3 Ep Ito Sit I = 'Q2 I I I I I .-: i c't l'l 111 t l l l�l•1-l' 1 C1 t l Cl l C1 l�l-1 l l l l l I ;t't{llllil1l11L ���>U+�.�+Y �--- � .:'tl�llllll..l...� � :� .ter•-•-��-•-----,its•„�,:�,� �Il11111!' _ _ _ —�If — — — — — — t,l t'C'llll ll, t�: Ir il.l. '' ,..�`"``�`\\ ��E Fm c9 J.o V�f'44��n :) i ). l 1•.. i.,o`r°' I L dmtij i O as .: l f !.ill.}• %�q�°St r �� , ��:��*�\,:, 1e�1 q`i i3 :Y/ ;.:rem 51, + l �-I•----- � -oa > b'-w ?l l 1 } HIM :t l ) l 1'l. :�HiO < < H/��Eid 4'�i�>ae�• A a�p�_a, L ,! I I!.1) l l ++•t.,`. I " �+,. / ��'�, IPA... I�.-wv,I�,xaIF�2 /1/a=��I llllll)lt I "'k all lilillllll'i•:`, I �0wgr •`�t.11ltl)111t1�'ll'::. �`. ��� `l.l l i t l l 111 l l t . ,� � till' -• •.:.. � •` ' _. �._ ,�-� K ._. ,�q __,>�."_• _. �_ � ' ��;: :tlllthiltlll'gt'tllllllllll-°E:._'���,�` ��a�.u�', •rt•il r��=��®•��t$:.�caaam •`'-?,1111 11l l 1 l l l l l 11l l t 1 l t l l l l' � :.,,_ l l 1111 = .,,: �t�l 1111 l s����3��<���ga�4 ''°':talllllllililllilli�Rb�.l 111" °'°�t�• � 1`lllll»>�tthllllllilllll ����tg�"�o�=g�7� I •'`!:1lllllttllllllllllli t�lllllllllU�� = ;K'llllllllllll• � �Q� �=gB�� �, I•�``':llll)11�=-�Lllllllllllilillllltit��-.-�-r'Crlllltltllll•1,1:'=''''� ��=LtLlltlltllllllllllllillliillit-'''- �'-�'��'allllilllltllll.l"'- ���lrrl ggpyga�sa$ �'g���8ti64 =r PRELIMINARY PLAT PE4M=L:T. BATF58EA°OLLST.etG useH1£sTExi:irtT°Iq➢NNLLVtILAi<USatgiYM:YIFa°tY a G CD o p� SATHRE-BERGQUIST, INC.R°�� 'g'� 4Q E g ',� 1W5°Uil18Rd➢WAY WAYUT/�1/N.b659I +B.4lj4i86°W THE LAHN PROPERTY v, LENNAR aR 39•, � �9 —D•i �m K W 1m c co .0 Z Z 01m !: Dp r D rn n Z ri m � A Z �o e P o J —i i - t t`^I j ! ! teEw ! �tl _'i. 1s�' •{oti. t1 *�,`: 's\ ✓:� `II !!! j �9� !1 : i \ � o. r '~ s,%1i�6 €•�\ Sl �� FI l� � is \ s 'y��� � j� � . I! � � )!� WWI! it �• !iS I! ,. ii g r�� _ _ ,�� "�"• `\ S ,b•;/^ o r\��r/ ,,`r�ld7!!j ///! lla';§y I � �! !' �4 °' 8v✓ f 7 1' J lts ry 11 ���, ?`'��* .tit&t\l• — /% .�••. •':•.mot. i '�;�•tl.A�/'f / � j� • .� lit �il1 ; •1! ZJt T 4- ;.. ?( I Pal !! I-,:. if .-it is (i!l6i,(il - I I E!€ 1 . ,g�`K••a ;i �: r' 1! ..\ 5! � � rs •\ ` Il !�!6 . y d! t! rrtt adze^• YY / i it ,s -I• lJti*�'�Ls �. J L-J, j� '�+;\X i r��'e' If �` .. '°.'« .\,���C . ":'•A`•a '� �: a' _ erg �,�,�. -t -- ,-��:�..-'�i \ \`� .fIt _� : _ - -- _ - �• n° Ee a° th m o 9 v N V m r� ` �A_n a m a_ 3 e 6 a m m $ � O A I I I I t o .. _ -eWin a k nnn nun I I f eLG Wee"4n. o9a8 LO e8i8••'� BFb94s WO. WO. LOB LO.I:v . iz I e'a8 y , Tf881. aFPms vowl— 1 1 I I I :� m 9u BF691.a ° WQ 7F!W `=Wp. GF GF9YLn- - . BFeBBe a a WIA GF.88]A _ _ '• Y__ - [FTE 1 I I i 1 BFe893 IIM1 ` BFa919 b WO• GF901b.^ J -_ __ - _ 1 WO. eya9 BFb913 ° WQ i 1 1 I I a i�E° 1FePT3 aFe999 -- � � _ I I 1 1 I WWA 11 11 I t` WO. aFb9r9 I 1 I I Imo. \ 'R•-- E5-N V i�IF - - l ° _ -•, : �. ____eA F ¢aI O gPOI Ho 1 $ a0 t I - _ ror-ml -� I it ; .\ `_yFO�,.• �u BFe�a,� Bm o 1�•.<T�gg �,I gbO{:�'g,., { h Bf egte , t1 6 °K`�'onn p,: HUME i I,.wOo �* none" > �°, y3 No 3'i I, , ng;s�sT• 'jl : 1 l aaaPm Rig. ° pP��g 5 r�?f�'�° - ppa Y �Os tig RIBaas I ogg �s mOa \ �'p.oOe Rped N$nmiw PJ II OR I oy -,;y �yy ♦ �\ J \; N if mkN Pop Cm� Q \ g$< 9p i� =� ,tltf _:IryY l e 1. ! •�I �°,�c�� 'c m gs I ' I i ism0•'g �� >opm I-:C'bpb 9 \mil ate"' gOmGi`'. I -M<• > ' g""t9gm`<'� 09a g of s I Ei I it v D � _ ` � •�` , `a- a`q�i 63s J ,, O�� d'a m b�,f f �.� J � N 1 w�,cu •\, Y 1' �C� / a y ,f � ,fr : f 1 r,I� t, 2 extB , Bata {� u m iEEtf ) ' SI �9 P'nsi g 'a0 6P >`4h.E' \� ItgS % Ar��•e Y �a /v eislss ee [S'./ .i / </ '/ \ i�o� �•, 43 n / r�4 t$off b ` 4j"� a tF 6y.6' ° t o� / f .' vo' s'•>i ov In m I o m."° =, •/, .... \_._ \.�\ `.. � u''- Cn `i \� e ea�'�% 'ky Bfeg� TF802a �Q m4 f! D> , ',.. WO Q 9Fe9aa �`yp9 i z I ZCL = �� °• n s ��� gG� ,. m 1 :m '•, ���{. vSpBr 6 e / '/ �p�3 �� f, m ,\ m''ir,�. � rl +i.. ..1t s���i£ map / '.�` t,• d i\ ,r - ,1 r� i u�-,B , Bm,p a"\ it=. % ,• N �\� IfBtFf r_ �; �• s8r., �{ >a,g�^s��. 1�3 II 11 1I i1I I1 1I m•� .-I1 BiFFB99o91JJ A - iFeptJ +-^'d 6' WO. GW. yLbiw O 0.\ Y oEBpiA_= GF9C1A_ Fur '11 I I I I 1 I o - - — .. ��- Z osL ., • B-E�9,`1>s% \ �Fi /� r` "1's� --` I f I 1 1 I �'3`at -'g ..+" ./'' .. !i'• l., ti\�''� `` F6Ff --� Fr - / /.��,y. ''ez�'�-� �� 1 1 I I 1 1 sSFf '. nro<O I 1 1 I 1 I 8 LU® e;ir f l assb /// -_ � .....�' � , ya�dpa�• ., { � �: I 11111I .- _-- 1 I I I I I 6 ' 1, �'! af�r�`+>�° , / , �-- �� `p.�'>s F'^%� •. 1 I I I I I 1 u r° C I �� o `2r 44d �'•�q/tl l� - '�j � a \ � . i l l l 1 1 16�Gm 2 \ • i?/ `f' L v:dt�yat '� ' \ _ /I ya p I I I I I re'OR„e 1 ( 1 1 I I f• _ -. `4 1�.� t- - GF�-� -lFZ.- I I I I I I '' "•:� ��. �- Ran � Bs''VQ' iF9mJ \pJ0 � � I I 1 i 1 I t� %• t� .. R• _,\_.._ ro Rt,rp B99,Jo WO• BF e9aJyW' �p 40, WISH ,SGpOVF r �•--r- ---��:::::.\\ ,*rB�4A—'�J� �,n` --Now4 o° 110m few mo � r .•• r r r r ,; MU11 apgp Ol r — — 9 3 of `4F 65f? f!p° ,R�''°A+ ♦ r r r Sal p Phi mks"'• • �� m `\\ dyO�a,#, �: F tF •,'' z � \ '- ° � �m � r� - � . -may' \ pad +egv� / / �"- � i �\-�•i\p• •;�:•Z`"�J'y 8 °9c 111 ,0 G _�_ �'�• \ apt � ' J ooOG p � so�H set. --- — � / � m d+� 4 � �a>•. i � 1 i'u ,-•� p� o W OC� pies,.,\#' - o / THJi 4" 4p _-_-------- � � �`•� �'o^ r'..�i Fr r ` i� /�� pQ�a°sxr '` pRr'' ` �> >' x z Oo 1 +� ;ar6a gP g;)j ar �• e� ;`i:s``�#''�\•. 4t pFw'° ONO z Ar ~�RB ,�,+< '� W / h! i ; .d'8p ���` / /1. /�'•rO�O��i 4 g I S _'/ fir`•/- 4 i; tl` • / .'r / r- sm ca S �,-���•t- _ iY.�" t` `m ,.''n fhb y 10 -(-� �-� 1 . - - '+ .• epe trt tU.sl Rx lenq Ew MCI np Pa,l gx P'I•p r OF 6— , BFBHJ �9FB94A BPMI t�BFB92B eF191a A.t LOB"` "gBaeeo-.'7_•:. `�ro'. WO WO WO WO WO WO 1 y -\ iF sofa iFroz9 iF9mJ iF9otJ iFBDaa iF. B9se L t9 B99J Cp• �� %` .x 8F gBl! p., /% F�iY io8C4Boa .. ` , L J zm 0, Q - N "•, T✓'BOW -6F�A --.?+KB627--GF9etG-_ :G�apiS ._-GF9013-_ -l`.F B9ii =I byp vwfA WNW. WMN iFA9f.e iP9BiJ TFA89a D / R g. WO' WO WO WO WO LO 9 sy. BF M. BF B91J� BF69/J�TM BFB9Ja-o BFB99J pll tt 1Afi91.B _1 fUry � > w d xis pF 99fa IIU+t p I l ) PUGS P9ul a_ P91t1 `h C ' / • B!a p ((en 11 ' fu 11 IRrLW R—S ' Wf.B 1 r2 $m0. r t Trio. `f °Z CLva N\r'N \�Gov y cpeay '•'� "� � �. uiacl� �� °pd'����-��-•+-s �bea "�J ��i"'�4kb irslk 1 I I I 1 1 .ems ' \ '. \ -- � ' -,✓ i '\ �' : I I I I 1 i �I V 'I'• gcQ"'p� i i � .F \\`. ,f°�� ann/yta J to�O�h Ea \'\�,�� m„ y✓�' �� j ." \ 3fit III 1 i i _ � • � � , / {;� \ . ,\ ,�. \ . EMU I I I I I I o�" e V v •. $��:E / OFa°a°g3 e.ae . r. r<OCG 008 LO io aza °aA rv�^o�rz HMO� Huge; e; � .___ _ - � �s�ns �a s '' �b /' '��-'''(((##G#f s°!}l `C i 1 \•� \` 11 V4'i/: ! 0 ��vy�g - E -a ��€ f `� � • i '`L � \•\ E�l➢ \ \ :\" ���L°�°��a l � • a }t9t1} s �°� � \ / o }Eb.-` �� �45�� \ � tiss`♦�� ,�� ,\`�� ! GF�s � = aEwia . 1 1°I�� m r ^ \' �b � / \ , l #�{ '�Lrs4 Vv ♦ ;.� �� ems -�`\\\\\`�\� f!—��>�3� D H �5 P in a . -- •`�` §'o� y�'\ �. \ 's'F � • i$ � , - m��-.r". � i F-;. �. -O — Tez� � :ate' • �� o, , `. _I. €`,,.''.. :v a :. , LDYoee ox luo No _ � ::_•,: a �r fi' ��" 1 �_ a'4_ 1,40 - -_'^:� ,Y a�-• r 'l;��pm�g �� � I N , bpb�i ' •ITT ` I N€ �m0��� l�ae �Ft' �aa s-°�L081 e; _ isj�-• „ Cn Ca o m� i *I JU0 Ni iC W,'_,i- '�O�o� 3F' I I IjTT F. a` 3 s I og PC @CD �mmQ Kam* 'I I ryii I3[=}1. I Il :mm lT�r6m H>om �.a m�m� _ gp; I •gs ip® T -I Z m59 -Oei<+ Ibb mb E _ CCarl I, SO S • tP 1. q \ '\'a ct\ - l • �� IN, sp%rt.e fZTI fn ' o `9 iorw, \\ •`.•paO�b,. CO (mj 1 �w \ \ \, \•4&_`*w f n$y g �014M,ISg�o »„5 0 Qe��� \\ r 6♦ `• !t-oen�Q� ��' ; • .f -�_ 1, �O. \ \ E -gg. ism ,I Ic tii "gC •\ `\ , i WON, 1 ig2' aV 'ill A \ lt,�, 'W � fi•. gPx 1 � '� iA�r-5� e`c 56 Y Q \\ .• to .. //f ?'b' \ ` �- �•..,j 1 .it P o RE "i',b rt1-0 a .1 tc¢oae TFeald 1 Ru m z I I I i I mat?elo. N, �J1 .--�- I HE 1 1 1 I I .-��•� i -- i 1 - l 3���s�i� /. /' Yam» \\»�• .�l: � '=p�_ ��° nn � /ram »� I`: �_•' . _1i� ^ yy °F�gos93Ik pp obi wr� WO exesla x"syn• a \ ` '•�., , "�e��T •� \� 3— "��9•. �"• `,`` �•- '4, � 1\ . � Far , MUN ULU RP �3`O �r'� \�':\\:`J�•- / �"' i. pqe �4�.\ MEMNX O" %AY \V•l. ' �5y egD.e x , e.4.p a 3% s I o \i\ "•• LO ioesaa x a4e a ,ee"' ,�W @?_.-'�.' ' 1 '„fig °sea o� ,mil � sss .\\.�,.. •. - .� — ' aye 'l �2> iCeE • 4 t 1 " y;�o' %,' •' _ afn —��""'� 1 ' '�—_� i �:l /�• /s `:a � \Ea' EcE` i \° \ :,.'� f °+s _. I ts- ` l`' is r / .�{ * 4 � \ E6}•1�.a e�se.e eFeesa� A'Out ge - b.FIIn --,a s N p G3 j VSI I ear - `:%•X.. pm� ` 1 by r,ge . _J�� � , . S: L ��n I I +°ag'Yf�cr S . 01�+��J 1 . '• =x "� _ i ,�/' a„+• Oz:.%': a it "gOC� m N FOGg( 1 !! m I I \ -�Yls TI � r• ^ I 1! •) �r»j �r pg4' I b�Om 'r {�gl�o'A664 ��t I H. Z D i Z o Oa:s`X Pill r � Z I I of r�i.� r �grS awtl ;F W—o 4r>om m5E OeL—:�--b- a''mr L.<.tM',3 � o0 2 YN -9AV HdIOGNV8 COL II I111 rF- - 1, 1 1 �,t R 161, 0 i2o3- �i — t j'�•' +F I B t'L ` �(/t"� 'gym �' 0 n f! R CL =Z A 41� CL ze 0 PHI P2 'I S.- g6n 0- i ' des' m A - �el 3!:E la I jil, 36 X\ pq HH t- A Ila 09 CL > M ir: Cj=) alm 0 p *:3 I CL 0 r N\ k ... . ..... .. �qE����� � � P up n � 4�• • '-'a • r E�'•�98� '^�59�9 8 r ` E3B ��b 8• r i ��� $"s 8 4 r � �$� Z � a€ m fill € g aA �W fKX Y G) �p z N p z lip Q Z Z M M it D0 X igg; r �Rm 29 D E� x 0 �H Z � z = s z � a-o I i gjS a zl f k`g f { I All I yy§+ xB I- No 'igiY' ° exec .c�eecc jSij e ea 3 o r:°ur I I I I I I I I I I I I I I I I I I I I I I I I n I I I I I I ':! 1 11111 (�� Iil 111 I I I I I I I I I111I II I I I I I I I I I ,. �• j� I I I I I I I I I I I I IIIIII �'i I I I I I I IIIIII r• r N 3 _ o��c L-• Hr� R p I i `g MCA No mION h off o HIM o 'o m� ol oD g� W F C n zO Z 1 Z RomCo I; O O f D- , LEM HH HIRE lipul-n-11 119 Mj-� gig .0 ANN �P CIL N4, X'Z yyou K2 jgo 9 IT Ily L 6L P Z ►fi 04) W j S -0ML- Wua-'C -- —M-L- ID 01 'k rn B W NFF SIP ---- ------ ---- '7ff im 0 q I.. 1 (; 0 I - 0 livs. �,, —WO SIR atkw m t sn R I 4A, XZ ---------- GNP— .i ---e�eaze ��T 1 t !/ fig.. riar z� t .II •i ;�'. I�_R92�; �' ... .•".- f�• �_� - - /;37j l .�" 1 = tee!` - a � %�! .YE/��t�+•. a S � 1.�� _ ..� ".�-ii�:..l'.. 'n :k 1 1 N o o T L4 � J Cl) n I 0 a�m � I ; II 2O zm iu to rL , P \i ,. Ly 9 $I_._ 4aNa 3ivnlad a / � y ( . AI\ � � � �zl0 gV�C h xz� 1 C SOH. 3Ctysap - all 6 tryr�I To� 3'i`1'3AVHdlUaIVVN 1 a97\ 1 I 1 1 I 1 1,. � _ I >>am ' _ ! •v ,mv m N .. ° r ///t I I I 1 1 1 � 1. k i , � � ---- 'v ` , � � _ F.�r•-'- N V o ®I r- I I cl I 1 I :.t � I I rx�� m �'-j��(�/"1♦ \ _ t!✓T�'_ •- ���t, •. � ��o�I � � s � 1 mlm_ 'g � /��-68. � .�^ � S`""' � §� ''i.ar".il .xz� .-\\•: �, / • �°�3�a�� � � I mi�C I`e is r� . �Iem r 5= `s`':�:il �S :•il' 3��� oov it 1 i..la� r �-1, 1, m � �I,,' 11°+�. , ��t - . mdPe �• . �I l't� 19 �'r'�mi��° I 1111 I 1 \1 � '1 pl•.��1;':, �IJ F ` yII §'��® \ R, \�G'� ry Fno oop� III I 1 1 1" �'R•y \ '` 1/gi\79 ., \� 0 an�m Ai23�E ! - E 1 r t�' I 1 ♦ t\�` \ ♦tom iii�\ �'` _�^ m` 11q`t,_p , �Fa"' •1: �at t�q STin �z r, 1 :\ it`` DIY �` \.- --�•'` \ zi I,• ,t n �Im L l i \ t yyn'' `- ` •-x �/ t ` `�'�X''/� a/ r' - ♦ \ I\\ !�' ON 9yy2, �r / � � ; -d -„---emu. 11\ � 1_ C `•�t -�-o,�\v�t j` r\ N� .r'l r 1 C � b y ` il``\��`O' t. , tl • , d+ W m \ KW -err !! �t\ r' r �� �\ -\ ? ti\`^�:`♦ .0 , :�t lip m r- ter' '' !r - . \ r � \t `,`p` �♦ � rti �ry , N 5€ 4 cuaaexr —WAY .�_. —_ C _ _.� _ -gb y a• .�r� .1 ; k rrM: ��_ •\.��� F° y;' {'� '`,t�.�1�_,• = gc . S'� i � i . \ !'`� ��'�� ,- - �..,\ �C_f� •• g� �.• i Gt10S'x T" � '1's `'; Y .- iJ .' .•'. y 1 Nat'J � / I •t / I I I I i I i I 1 1 i 1 ^� 1 i 1 I i I I 1 1 I� r lr •� 11j�71�\ - t �' 1 �E6iiL1i, I �6lIF�u.'+us ti, mi 4 _ v )' !C;1"( 3�to' �, /�'e�� 1�°'. /• `,� `I ElP= �am3ago� !j _f 8A�=� J M'o Ny ^c �•. ,/ r ✓w` t ,tL�: rY.f'!di \'�i > � a zf � v � � � �1�. '14 �����Y�l�. �� \ ! � fly JJ �'1: ` • � ['� =A- WIN _ R I P � I � �j� �^�=di :s • AIR WSJlAV ij �� �=�my h AR j ,•i ` � max. Ott � 'ice � � /-- M Eiji ,-'` w:• �. ==-,' L it >� ., flJ,g �' �.��J�f �_ r'�7f,Y"..• - ,I \r tJ� r. 7 s pig I SjFlr!11 Iz4�i ! 1s��e�; 1..16111 fj)!!�tVtd is b tict� I � .9�'�i .,,.�'1 � �3yW}R ,S:,�iLA�6l�,,. �•2L's Te' d' � .�^- 4 = m �I PF1:W.G4AItYpNR K w f m > i � I --• ---------------;-----------•------- 1� x Edge of (irer per oeriot photo - Z e _ [UNaEIIl EFFE°TNE/ Z 3 Z m 05 a c)cn R°OPNAV P °� F' gppg�H$f o m e a a y G jjmj O D Fm 0 o m a� v m. — it i t I i l I I �_�'-� - � J '1•t-- - 1 1 l i 1 1 2 le 1 j 1 1 1 1 1 1 �' � =• �; N ro N � � I I 1 I 1 I 11 1 k l l I I I I I I rngg•A_.-'i _�nn��_M_.- _�.�_,_-`_��_'-a-I�_ +_e°'9�,.. ^' o'�ami`r`0 ' av pxn lil � _ ,,,y` T, ¢ _ I�.q Y tea• m4q _ � m � � 0 { 01 'i e•Bl-0rO i l I I 1 1 I r J W[] B,,F,�,�L,M,B! apFlla] BFeif-0 eL 9Ffl)flf 4Y R)4 j�.a �o�•• _ TFaf32 tFNSA '.•)Fa.O9 WTF HO WO _SEaB� _-EWA_ _-p7M.. -°FV TFptgs. whe ay r`^irs``r ♦♦'` '_ ii �< '^iK _• CFJ-0 as z pT1° fn-HIM $o'"Ooi'z Bpi a -- - F - __ - - \•D Al. �•C� 1 ♦ v �g -fa5adib- !�. ``: •� "_ e: $ ti" "�mr�`rf�F � \♦ GFPbSt uvl.4F�a1A_ .OFa-81A-- "-"GGd6fA ---__ -r_ 4 { � 'IF1860ya' 'IFn69] TFiaLt 1Faff.3 1F6A,1881.0. _ .�.; ;` �/ "' Ocy Lit D1' ..."` BFILmeO'fnab s�wauts1a t6°FHeefaa}9fl]-0 `o\V LOBF pLFpfiaOealalOAAl 4o* HIM! kn B!ipFF!ert)nA�3 g4�v11—'a,fwVs�.•••O 6wi pI ♦ \ ,\ 6. w �y-r'- `-desA..'_ ' 6LL, "_3eetr � - 14eq e�Y^Cf ♦ \\\ � frC \ � \ �/fie Yj,,V\3 }er. F i _'-nev�gaa • EnMF > \' 3�CYr\ �\ `' .s WgegL�n l I l I ` �33� 6 g keg �,,0�.i I @" "°� 5m'Q"y �iw J+.n y `"�"•9v �'e\ \ '+`'' Y VY'; 1 41ga F.w4s Ao� !10mw04 S >z xz 0 / 'O��a �gp�pnn y3gyg rodeo 0� ,' �h •Ontizy h5�. `t'�' ��Qe\g. comma rn r meal Q = �� lelgr5 /�O�aa `eF5 r54C4 06El tx, PiFo ,E \ \-%. J/y.`\/./ - w 1E�Zo4C"N'y ailonin �,IE a/"/ {\♦\ � UP m �� spa,-cw,.* -.��� ✓.`:/ '- �-'•'i � �aeN��+ t `, .\ y :m= y-e\� .: y'`t QQ , � \ rr�+fi R'-'-�_•_ a� \ f� "3�iF s" � .J =.; y`I gtg>' WOa _pp%4�°'� �� ��� '-rt\.�04°s�y^�u•�s j x iJ I i r , i. hasps _ sEamk - j O o I •::'�_��` Ili R1 1 *., ,\ _gee- - - y�°�,ee J I I i plip eat+ .� ♦\ O.i \ _ F';c 'iA''��Y \p \ 1 ® ��i I r B� �{L3f {\ ♦'•\ FtPa ',p`'F \ I 1 g e V� ./.f\/ ,/. pF+1+` Ir ,�;.., % qs'0 � , 2a m 9: O ITT j ` ' ♦ % / eOj a !.\ `"' ♦ t\ \ N I .�I , I O y ! NN RE 6 Ell Z$ 80 ' zn<, } ---- i 1 1 r r felt , LA 9 - 11111 11111 1 illll 1 1 1 1 1 N�`aj BFR68 BFBnA 1 I I I 1 illll 1 1 I I 1 i \ s'la+ FR6A WO WQ . ``� •' - B0 B"�A�.+-' 1F B645 TF 6ei8 �OM��" 1 1 1 1 1 x 'r/ \ ai o�z ��T HN 11QCC aPz :7 % °/ 'r GFlesiP -TFA6SA- c� xz� E'e('' i,e^9' �•FF6B6.8 RFBt6d TFB o c�a�O� p Boeau �o BF >m$g�� EI \\hpp°/- / ,f fy Ly1mIF z- t IMfJ • s R1 foIF app < \ `\ � \� `.ae• z 6p"�t5� / fat -' o `tea. � a,^i^`' �� /< rg � '�+ ! wa�>� � . �. � Rs.,A , �' .�t+F. /;' q - a;'�- o s *fit• t \. F `\ b" »S 9 FKiS / �,.� •� .-'�. / ano ss. scx Mxn \ Q'>yi>2.// = -1, �4+''Q maw U BFBBIA BFe j�O V�/P r• 9/;..� ��' ����� l ` d a�Q� / q_. •-�Qf�d WQ ^< WQ ��R_C •GFfl9a.5-- __GF 4eBA_-- _ 'l! / / / R /���� °•. `: \ .; / f•^,(�d S� f� � � i ^ Mr- &�Qd If�`I AoA 3BI9- 1' koy rys �a6a �Q cc d -ajg; II pN0F RJR --_le•tq y � s, q>a4?- M"1 N � \ §Q °.o�4tao .• \� Y IB"°p--'- t aSsll I " I i. � NeeaP` f 4 �I q6Q o0w, Ix \'N la a M. k \ /- e�Og6Ja,; ;\� \\ �(vR°\pow �- / q� _l__ ` 8 v ♦ �qor \ q $ ID Sm AD¢°' a t ♦"�s+~'*emu }�1 `\ O�{t3' v '�yovoti2 1 ® N 46h5' °aQ'S9tt; .L''a.4''-� \\ \I'\,b.��i,QJ ��:@Fs'v0'$'�\\ ¢\ '•x�Qu \\ a;'� *oa'" 4`•. J�/ <Z S€ toN -� ;\\''daft �\' s•. &�G J.^ �\ \ \���J 2 ALPAl Zl�n @@ 4�� l l 1 .r ; s(tl +^ya. � \ •qb p�'*. 40� Sri'. a jjr a � 4�`2 Q m ��. I{ I � 11 /Wy•• �'-�^0 I �. moN ��'siq�''•• %, \ ' �r.°.1d i �rs>�p� to C _ - �l fig' ` 2g e{j' %°`° ?? Z CB - Q �'-- BFpa<.3 b+u / 1WF8/�O'•`��.�a �.. F[f. _.�. -- C I✓,.y� FnRo S � R VC: _� - _—•��__—_�___-___ -- •�� _- - -__..____________________ — I, I I I I i l l m 1 J`tiM400-U 2AN01.23b'NIWId Illlll � � h`dM400'Izl 1 a 3A110���31N3�2if1� �i o»g=��^=s MOM m�o€°nay < w �'.. o FPIR .. •.�, HEM yAA Lp 717 ATF 76-7 O p 6�mgtl� rJ� �je a+s g9 eft,~~ •-,��/� -....� __.._�.=' �/.�� �d - �\ e Fw0 WO 8 � � h p A� { Oho \\ �.t+-; " aBl•p„ -_p�r ;a.°Fw� >xA�Biu �'+�. \. ' l a .��8'y�l / /<°tea' �a i {La mnlV�4, 4yb L..•0 ' m € I lRp^ ��K� IC° aedV�O 1 / i, ..�• �� � / �`"sue ,�� rs� " / ..am, � rl 1-41 r, "�.� pp a�� g y Spec" 1806,q, gain II n� BFdde] e,x 1p811A �dee3 �;`a }I. 1 o A S Y 'Ga �etoS �eie�-yFs7€a �iF`� F 1 © _few to � �.� cF - o �e ^� BF pap ,P� `4T f. - R eaa�e I L � _ PWl L•� 8165 ifl�� es TzT9 LT 0- c. a �i +a\W `'�fiS • .d• J _. -'. `�Qrd�Op / '� J\ 1 J � /, �,i:{��R°GFSt�f /'.� F - � •� I ifl�nlp-0-0-*t� '� Al mq9O l u?\ GFVgo 4y pF .•. \ \`�n ^6*.'L" /'�� 1 ��� V .\ r -_ - % K ,. '.- •.. .��.a iFeIBA V� i A ifs .� •{{ ''A ' ! 4O C e' 's } •.E �s•"`' fM� Rn°9 \a;. •\ '7(ye �`✓'' i C _ _ iFBP `p •y1 t. �npg� `, \ \ i i' ��- ` %.,£ ty `/ k' q z y �.''fi1i4 Y� >`' ,<. O,�O(' gg, •. •:�Y 9� Z IN Con G) Or' ewe °p 9prOm'> , Yi ` BF as �� � \ � W�ib r'z�k,w�w��<a . \\ `F;3 '1 c�F� Kb S �s 9 �Yil I•� I 1 eiB - =.0.,�'j_ zl _... e3g e I I si 4�,<a•. Via. 1� as D o g s4 3 \ \, ------ -- Q m•- a �O —— -- -- `-- &d;0 Z L; _ �G�tl}.p :.-- _- GF AIlD -- �-GFLRO - ' -ryy WIN M� iFerzi•�y , ��� BFWed/O — —WO Barre OA ,BWeWO.1 4,0 / 8 ` rt`gfi-'^_� Baer ° Ban Bap A ac/ � N __ "tu:,b r - --•-Il�ata->-- "eras Ray 1/ C C w 6 Oi d� HM I I I I I I I I I III i I II I I 11 1 - 1 1 1 1 1 IIIII IIIII IIIII IIIII _ I I I I I S:'�@^ r o"` �ey'g> F Py^ F jai;'.• I I I I I H INN I �. i B n ��� I. g6gg6 Qw�� o ^s `3� affiy �� doe" ^���o ams=1a:=m H10.1 �81 g=g 1° A 9 A' Rid laff �tl b[ifSgg68'6$0H g sof €o C �s�. � "s< 81 _p � jig Via^ 3a 9Al{lfig oL. OUR; p �o u. 1 Io �=mpg 'a ��� s° Y �o3g 4 gb t; GAF Y € ° 1, 1=ea all h R .11wi o c �p s� ^m mu 2 R o oA aQ s o o � ;aN;iR1. g qr 6 HIE -Hp L$L HIS HIM Rig F t:F 'If rrffs $�z'sa-��e Q� �• p i 4 n AM ea Z 0 � _3 33 Z m � m p � I g; v O O Ie m sa8 M Z { O = z D Z ° �0 e O "ip !n y tla a Rc € IR Lu M A P 3II Z W Eg � I m c� �I IliMoltI�©I I 1 II�IIiII��m o m I Ioz 111111,I BE ____ ��-�L♦=` ��� -_ ^-�_- �_ _�-'�,'�u96f i �- lSRI ,. I ICI I I I I i I 1 duo' r �' '' :•'._ 11 '•• �' 1 1 i 1 1 r • , 11111 O I I i l l w 1 I I I I I 1 1 1 1 � _ FB .-,e� eFerl�-_ �•'-Mtr N C N G� ' '�"%'f /i-�i +r-rr�=T' :-7 -4 r• - Eel ----^` �- 4 ---� t �\•\ -� I f I' �lf� I I 4.[-.TF I •. %.I -O a ..I 1� 69Td i 1 TF3a63 1 r TFWS.B I. , C "e'i _ -erg 1� �4, I` - V \ g � 1 i `il ` 1 I F 3 I •/`'rt��}�/(�(�._ 'I \ \ \ x �t �pa�>s �� SAo��o is � " f�� '-�aa I�..4 > I iL l(�j;€\ \ yy I 1 _ _'--_ - \ 6 I3 —i�t, _ �aJla�/ /� ♦ ��♦\ ' I ,� � + 1 I "moan z -_-_ % _.__ __ _. _ ` � •�� �Qc/�y¢ � I 1.? � � 1 X��_�•+ _4 \`� 5 "'UHm N"gf o � T. I'fFee621 ,7aF.£afb>- -r°F �YAT n.' °F�e{d`Y.• ___ � 1. \ \ \_ \ I �'� 1 , 1 'IF 606J J L L�T,r L !A� IFlgdl i17F 81Y31 ':I��� \ 'A• ` 99. , ;HBO 1M-7-'WrT-- '\ ` ,• . _ \ t I I f `Z<rLfd !flit] 4 i r g� ��A3 e JT /.'.�'�(,'�%-,.:�Q`�,��� `` •♦ O s5x5zQfi _ �F. a ,�e.l I, 6�� ��y ' "7•� ,�t�' �I bh mAs m I m� / r� I .7°4t°'\ ♦�a in d,a 1 ,�t 'tom , ♦� ,�1-r` , �, 1 \Q♦� $ Nmmfn CO icy rt�3 i �Hy � � c° �^^\1R. �.�wi\�2 1 •!'\\ © I 1 ` -t; 1 � '� 1� i" ' ` \ \u �> ; 4}�!` i , ; � v \ 1� ' I YYYnnnsss \ I•`:. *: � 1 u, �♦ d/\\♦ ``. -or` �'�� .\ \•.�"; \T r"ayo �n �`\1�� ` 4� ♦ q�.\t¢ ,� _ � \ � E� t -_ �' II I,r my \ s �\ "t%d�' �#,, �`g�C�'-�\. S"� 1 � ��'�•1 \l-��-il _s. •�I >i `*e r+" N\� , \` -�, y - g. 1 \ \, � r gru�i _- �' `�'` �...,, < �.-' � .; j _•-- �. � `mv \ i Tf 6W5� giiT> , \ t ♦ _ � _ _ 6'I-,' ' \1 +�-4� IR / . fA I>Sglr,`' --' ," 4 \..(3 % '\ rl :,Ii,4l,i 1 o C� F�g� //' C�a r �' '.��•� r�M' Teas -._ _ 9r�FP��� \ � /' J '' I�I � �,ri . fg z OR /qq � El t r- Z as ♦ r I r r ,' > II , + q N tea- �\ �\-��7z C 1" - _ ``,-__-'__ �r `!l- `- 1 ^per M-9 -_ _ _-�-1` -l','• ,` -- ---- - , 111 ' aiFure6e�a7N 1 1 1 I I I G 1 I I 1 1 I =_�__'• -- ,.� ' ', � / ! I / 7 O _ _-Lla' ,� Fj-�Sn�-- � _�+L_ y G ��Fl9z�y�Z o �6"otiF`�� } S Z � "`'s �. 3 •. l� \ � /`\ -\4"' / F•iF101d 1•sFaeeal L e \ .. m��IQ y ��\\' ':i i, }"a' /�• .p J t� N mot ��s1 _ - O•.. _ •��\'' ', i'm. / / ,,,���jjj��" ,y'- ,i ��s�@�") g/- �r �'- m �._ / �\ O ,II+ Gp ��S�� �oCJ `T / l K�� � �y.••/� /N'�nji��r�a S\ o\ _ , Jj :� \ �--" ____- _ - -tea''-����� q`(i�-/{/�/r,�0 s ,reFFsz nN _ --C c c�'y •'' /t /,' •,/ yak '✓r \• - J �*1�.,"A; "i `"= O>, I _,�-'• 77 �:•� •fib f? `gyp, om cL 5 � ca m .4., `� � /� '®m � l 4. h/\ '`J) ''gym Iy� \ l.\•. - / \\` .i/ ._ b \jib '\i• `���'Y�� ' o < %\• �• _ ` �' '� ' �icif: rG �" off,' p♦�. y�• . �` . - \ /J \ \ Ova , �+\ Fn ip ell gRR a�� -t\ R'• a \j� 1 INaN t I t- �G .. ♦l, ._., .� -;� OS'j,' II' '.i4o\.,�'D� /``'/ i �" '� _-_'L't"�'�,, '`,� N��I� �� a` `v\ y\A♦vy Y�c/ ��;>,,'���±`. `�''£�<,'/ m rgR m Z 'G v I I I t,.I \ �Mt,`s. ,�s!/7,'l' \�m � m i!7 SO `/ `\`•y ` . • i� _ � , � •� 1 �ipae / ; R ' t3] % �' n 1�,"°Ff..•, r�___+""_Illddd- \;_,�\\ .'� •, • / . `i `' o %)\,y�i m `I ,, IS'`n ��^7 '1F•'aY,�',11 ;S 4( �S ` \ /� ;� �\�., 1,., 111 ! \ 7/ y 95 Mpn TO s /�-�'-- 1I�- IIIIII ---- ------ _—_ �lvmcloo�� 2Jfa`t7 l tl`dNIV �3T'`d�a 7 l� 1C3, - W.- 'i HUHN �'Kn��n D �S5���~� /� / i � � i -. ilf ��n._--� � �� p3__6`J . gy�V�\; .I';i ��� � 3 \i3•, _ ; pad ON L >i I ti 3� �� " IMM / � •�y�' f PIA � � t 4 ' ar / dy �— O-I r� � ��z� �T /1 f �� �/.. / _ `P�� '-v`S%` • "J �'° /y� y\ �y0`J ' >F°een��"� l�.0 � i "' ///\J/��' m � � In- •JJJ�I J ��� �. rr 1 1 b � ( m \ b `J � � JyNi/ J // JNh\ @ "\ [ 1 � I FY g\ nfiP7 PFBfiaa � � _ v b t � t' `• ' �a+'- A`. ii-PFdI�IA-� �a'etsP i. � I °; ° 'd I� 1 r �C p ` � _ _\ � !a /1/ wi / t � + m� ,:' � t' `'1'r o-�, � tf �P' � ..i� � _._— — _ -_ a'�-y��f$��� � •fag`. ( `�{. �ea :.e*'� g til i W t m I /w �a�ir- - I - .\ \,P Ufa nS I— �raP � \��•'� F °' \ ' 1 .• _,any \ ��-.. , ry \ t/ ,\1:�,�,y�. l + `/��1'• � \ ,\f0t J .ic �F°d)F �r \ '�.\ `.//y��Y`at?S9 •ty \ y PPP---� � A _ .\. /y\� �':j.Cf�F�) \- �-� H �* .q ly+W \ A7 '♦ a Bj�4�/ '��- +,� o•, & • �,i•� \ \ -' 1 \ `� ` tilt ! - n Pe+�"1 o $ n All ON ��aII /f-,��/J,`y` @ T \ to b o Ul \\ 9 \ �) ., r ` ' •�'\ • � �°j:'a i BFCpa '- _M \ \., \ m '.• 9 � a Z 06 3 ` r � ��� �\ _ •' .t � %'a �{°i'` 4�� \ '\ ereJ 1 � $9 � ; I•k- !� J ' I z Z O °Fmro. / I / �'3JE` `\. I ._ 't°�{ '�✓Q._J j�l iFBr2.l I r 1 tFeir3`l I TFnx] 1 • _ t �=C'a��J ' � '\ JF7P����_ Z o / I � `-ffnsoJJ- Ali 11 1 1 1 1 / ' / �✓�- 1,�j•/ � f` � E 3'� 3�; aGtom us PRUNE HUM Roodplain861.6 t YYY -------T— - m$T -n X\�+ r m i I ,` f Z ;Ilj;l z-- r 1 i {m f / ! : Y 11� o . Smxso� °gym?m k o� ^�9 ` O " � it`�CF •I r • t •.f `.\ ,\` '\.\ , \,\t�`` ``` Cp*' H D `_Y. \ •`� r\ \\ I P — s m �'�•'I,- � W � ' � -- _ is .,,`• 1 � t;, `'. t \�\` � g Al !1 �.� „4 20 D y ��` I V-1-1 I I I I I I �_ ��• 777 ��. — _—_ y 1 I I 1 1 1 pp1�� ,,,• `' i = \ � L G a f '•ris�'��r BMW',V�- -tom'- _'��.- r _!� � .:4..- 7 •'r��,f 'a 3a g e g �1- f>' may.. I^ti 1y'.: .•. JI TH Oil it mail '� �s " s� "` ram' � '� �•:.. • ° ti ^ (n iom€ �4 � i ��•. iR 1y' g,'�y>°��'r. ��t��'ll���'� � ��o t� r , _11 (1 9g� s � `•��� 4+ Y I ` { �� i - :� 4 yt� L� jr f . 1r. ! ��' �- 'w i"i'1 ap"rsE9 3 S_` Z V 7 E' 6x z Oi z p Oo I Dp . v m m r z {IM{ i O Z z O N -ri n n Z p g n;�-1 1„ II�xII a (A� z o MZ ;D pC z S ^`i z m n a _ z z z o m 1 m O s z 3 r m -o Z m H m _= A i i I i i i o y� r I I I I 1----------- it ^ate-__��-�` _ �� -—="--v" r• ////////����\\\\�" ,,�i=; LJ .� ,, ; , r ' - __--1-- _ _ � '- ,��`'--z-� ,I/ I 1. I '`-7•� ^� I I i � I I t ✓ '� �, S j ]r�l I —�___� , ,1.=,' ��l ..___' ill , Rif 1 I I I I 1 b � i �fi u �y �--.-� r- � , � �, it •� 'f .. � � � � ` ' TAT1 ' '�7- i pg. CL 1 f/, I I 1 I 1 I �3 EITHER r-wc j FB)FA _ .�•_ i \ , O to �,)k�' ^^�R rfFee).e .G; so �< '�` �-- .�\ `\Gel ` \ \W -I ' I��I(�'•I I I 55 H. m>iio�M mA�� 92,3 F865-7 ZiF!!)3 G�M.4 --G'f 891A' •IF M- "IFlBa] ��TFBfIN,! iFOB)] 'IFdB)] �. t o �o Q 8�5_ l;�-m ^� I e p,A Wul l _ Pltq M / : T• qg£ \�\ , II { S ( ,. .� ^gmta_S _rwtA s�'_-WLVLC '_W U_.`- =q1�M •.r ` \- l re J'P'� 1 ,1 � I I� / NEI 03 � es$^�j m$�� `a\�, .� tea /\ ; v\- •` t 11 1 � '� -- I �! I I �Q`V�`� + /�yy-,, :\,�� .`\ _.: `'II i, 1 T � ,-i mll � loy�.. �- �� . 1 '1 ;( 111 i - 3 ,•.-/ ra z, K'aar j0nl AoAo it Pq Xzk a I it `:_. ` �t ` • f ��' . �`'� iSt w 3 "'1 m � 5 Ov ,w ICI:-,,,,y��jk / •-- ,. , \ 0�1\°'� `®� \\ ` "' � tip_•--a°°`ct _ raw �I� `�'" ' / /<'` � ,, .\ � I i •, i I,{� i' o \�, - 4a1a1 { _�( pB'"Ty���- , ��•l�` f �` '�� ij1 � ,'` \'\ '•`t // � �FW�f'.y'1���" ''IF A'_A ' � J` � � �, �i`� - If 1 I I 1 , '1 H -^� ` �{ �F�, .AY�P�'-.L � I • G��- ' i � / .. ��.� �C\ , �°�S� y�I f ' I I tjI 1 .. • a .' '< Ut �� ', \ ! _ _ \� _� .'�� .1� �,�� /� �1 / r 1\- 3 —cniI fill; is €��� 8g�j �C�/� i \ I1 9�y��. l \ r ' ',dI I i• - Ia.��y` 2 O Z y MM i±€i -ram. �" r I moo. I lii . Ifs S�B H. , � \ �, , L` .��� / ism , ' •I 1 �'� Z C r- _ Z Z Oa i3$'?<ro' �i , , I i , -_• —� -'' r_ 1_1V 'ii ch •'-1 - c 4 -y .�� 1 •� � 1 i \ /1� f' r t / J' fIr `^�^i-___mil 11 rr , r \�+ I' ' � \fir •� , r $iv. �• 1 t-�,` i I i .'� f = lI ; ^_ a .- � ; :�f • ` I r I ^ 1. 1 ' ==i; '.\III . -. - - a 'y ' i 0 N 5o .'t'li 3 F P 6i ' 4. 4 _i �% �' J', ' , ' •g - '.-J I' i r _--------_ II "L :—_ r _ 1, ' I' 1 / r I — _— t -ss• \I /' 00 1 Imaf �-gF' • TFeN.d TFees.q \ 7j1X VA 1 I 1 I i I 06 bed �'� ` \\! � �•C '\+ �J. % -F-!!� � ..�a99Ba 'lFala9 iFB � ���ay�0� m'F�a"�,A \` Lo \\ � O m In. "�,Q\`� : 1`•\ ft�.w. •aF�eaisa •.. �l�' .MCA z�z H� l\'i' \\ \ '/.•: �' \ l .{. A -'-'\ - r � \ � T.-q•pgl-_ t arn•n_` =N DNST'P J. l ---o.-- .� I \ ^'y r�r / \ ••\ ",/bg( �`1N .-i- -'� . II'�/ + \ °6tz�my�6 _ _--- YY �iJ `t:-_>` ����L z�� 23 G�� �� 9 „mays I \ 9-�''\\1 +♦` �®'-'—���+Fa•'-- `�-a =�,,�j -*- r �a�'' �,p1. ^ � ` ', / `��J_�' \ •, 1 >a'az�Tba� .\ /wwaf�°�"`^1� \ WO--.�•r� ,�, \\ J \ ` j \ GLyee� �� � ����- �t'� ',�°4;. TF ema O � � � as 1F �, •; -`� `oa /�q, saa;--G}Fa9P3-_ GF---.� -/ 4r� \ / ;1i4y�..��\ / `� J •\ �� �/ JJ,q<,��'�'r�yd F1Im Ei ae-€ Mo T4y0 '^L i \ 11� O I � `, �,a5 r\�`\�,, £EE Pao �+aq—, .1� OLq �I ron %� `b' �i _ - "�'l�a,�\ GG4��•', - '' ®\' �` Ova• 1 � � � `�\ �\ W a rn/il<Osd' (+" \ (j �u ilwwwlil �` • ��`,//![X 1\t,� \ �``.4', \ O 'T,\\ "�\`'•\ s $ A��`'j��/ 20 00 o ��$gggpE� j � .y4a" '� \. , :.\ I�„ �•� \ -r9= �.f �� ,\, J' \ J f�! J Y �ja� � / (iY Q p 6- 'r�` `.1 ' z -�' ' � ` Z� _ �o o'---1 _ -' •s,,,---�`3.. � = �' -i \ � �s\A �Ja- . ` C�. ssJ��/ -. . \ , 1 ✓Y� �� �' J �-'�.. - Z. .V _ ` `� ��,iA `\ \ J%' �1 !�'�Ti'R�'' \� \( TA-�D'`wJ ro � � _/•.��Y� - �� �%f.D-^-\ �_`�—� - GF�\A�J`i OV'"� _ '^f' �g.'� 1 � e!"��q� TFFRR13.__ dal\^ `J �' `=.�'. ��y.- 4 • y �u9w-eFaaaa -- tnr Wea• �'a \-� y� , ` ' 0 IE @/i6 LLL ...- No F r:s6 p, T� V-11 1111" ZQ LZL LN' L�- VVL �. LIN, L (in -A GR Review No. 1 "�Hakanson „!Anderson ENGINEERING REVIEW Residential Subdivision for the City of Otsego by Hakanson Anderson Submitted to: Honorable Mayor and City Council cc: Lori Johnson, Administrator Tami Loff, City Clerk Dan Licht, City Planner Andy MacArthur, City Attorney Joe Jablonski, Lennar Robert Molstad, PE, Sathre-Berquist, Inc. Reviewed by: Ronald J. Wagner, P.E. Brent M. Larson, P.E. Date: March 3, 2016 Proposed Development: The Lahn Property Street Location A portion of Section 1, T120, R23. 247+ Acres, N of the Crow of Property: River and on either side of CSAH 36 (Rawlings Avenue NE). Applicant: Joe Jablonski Developer: Lennar 16305 36ty Ave. N Suite 600 Plymouth, MN 55446 Owners of Record: Lennar Purpose: The Lahn Property is a proposed 346 single family residential homes, on 247+ acres in the City of Otsego, Wright County, Minnesota. The proposed development will be served with municipal water, sanitary sewer, storm sewer, and public streets typical of an urban setting. Jurisdictional Agencies: City of Otsego, Wright County, Minnesota Department of (but not limited to) Health, Minnesota Department of Natural Resources, Minnesota Pollution Control Agency, Wright Soil and Water Conservation District. Permits Required: NPDES, Minnesota Department of Health (water), (but not limited to) Minnesota Pollution Control Agency (sanitary sewer), and Wright County INFORMATION AVAILABLE ALTA/NSPS Land Title Survey, 2/15/16, by Sathre-Berquist, Inc. Preliminary Plat of The Lahn Property, 2/15/16, by Sathre-Berquist, Inc. The Lahn Property EAW Additional Information Minnesota Rules, Chapter 4410 — EAW Requirement City of Otsego Engineering Manual City of Otsego Zoning and Subdivision Ordinances National Wetland Inventory Map PAGE 3 S:\Municipal\Aotsego23xx\2328\ot2328RVW1.doc 4. Normal water elevations and 100-year peak elevations have been labeled for all ponding areas, including wetlands, however, 2-year and 10-year peals elevations shall be labeled for each of the stormwater ponds. (Appendix C.6.0.13.) 5. Lots abutting collector streets shall have an additional 10' of width or depth to be overlaid with a drainage & utility easement for a landscape bufferyard. (20-16-7-D) 6. Lot 72 through 82 Outlot I must encompass all of Pond IW. 7. Outlot 14 must be dedicated to City. Legend must include wetland restoration, wetland, principal builder setbacks, wetland fill and wetland buffer. TRAFFICACCESS ISSUE Proposed intersection spacing along Randolph Ave. NE and within the development is appropriate. 2. Proposed access locations on CSAH 36 appear adequate pending approval of Wright County Highway Department considering the size of the development north and south of CSAH 36. An Intersection Control Evaluation (I.C.E.) may be requested by the County for the Randolph intersection. At a minimum, we would require expansion or pavement width of CSAH 36 to accommodate dedicated left hand turns. The addition of bypass waves at Road 7/CSAH6 intersection appears adequate. WETLANDS Wetlands C, D, E, and F are proposed to be disturbed wetland. Avoidance of wetlands must be attempted. If wetlands must be disturbed or filled they must be mitigated as per WCA requirements. (20-16-9.E.2.) 2. A protective buffer of natural vegetation at least 20' wide from the delineated edge shall surround all wetlands. A principal building setback of 40' from the delineated edge of all wetlands or 20' from the protective buffer easement, whichever is greater, shall be provided (20-16-9.E.). Remove protective buffer, setback, and restoration from CSAH 36 right-of-way and wetland DW near the eastern plat boundary and wetland DW near the intersection of CSAH 36 and Road 1. We recommend renaming one of the wetlands DW to something unique. SURFACE WATER MANAGEMENT The Normal, 2 yr, 10 yr, and 100 yr water elevation shall be depicted on the plans for each basin (Appendix C.6.013). The 10 yr calculations are missing from the stormwater report and plans. 2. A portion of the North Area discharges to the existing Riverplace Pond 3. We have reviewed the Stormwater report for Riverplace and this model do NOT account for the PAGE 5 S:\Municipal\Aotsego23xx\2328\ot2328RVW1.doc ENVIRONMENTAL 1. The Environmental Assessment Worksheet has been completed. It has been published in the EQB Monitor and Council has approved. OTHER CONSIDERATIONS 1. Benchmarks shall be shown on each sheet (see page 7 Section III.14 of Engineering Manual). 2. Consideration is needed regarding who owns and will maintain the trails. SUMMARY AND/OR RECOMMENDATION We recommend approval contingent on the above comments being addressed. PAGE 7 S:\Municipai\Aotsego23xx\2328\ot2328RVW1.doc OTSEGO PLANNING COMMISSION MEETING OTSEGO PRAIRIE CENTER March 7, 2016 7:00 PM Call to Order. Chair Black called the meeting to order at 7:00 PM. Roll Call: Chair Pam Black; Commissioners: David Thompson, Steve Schuck, Roger Mord, Richard Nichols, Aaron Stritesky, Jim Kolles and Alan Offerman. City Council: Vern Heidner. Staff: Daniel Licht, City Planner, Ron Wagner, City Engineer and Connie Schwecke, Administrative Assistant. 1. Annual Business: 1.1 Election of the 2016 Planning Commission Chair & Vice -Chair. Commissioner Nichols nominated Pam Black as Chair for 2016/2017. Seconded by Commissioner Stritesky. All in favor. Motion carried. Commissioner Nichols nominated Dave Thompson as Vice -Chair for 2016/2017. Seconded by Commissioner Stritesky. All in favor. Motion carried. 2. Announcements: City Planner Licht stated that provided on the dais are comments received regarding Item 4.3 on the agenda, which are to be included in the official record of the public hearing. 3. Consider the following minutes: 3.1 February 1, 2016 Planning Commission Meeting. Commissioner Schuck requested correction of item 3.2 to read Commissioner Thompson. Commissioner Thompson motioned to approve amended minutes. Seconded by Commissioner Schuck. All in favor. Motion carried. 4. Public Hearing item: 4.1 Riverpoint 6t" Addition: A. Planned Unit Development -Conditional Use Permit (PUD-CUP) allowing a lot without direct access to a public street. B. Preliminary and Final Plat for one single family lot. City Planner Licht presented the Planning Report. Jeff Busch, 12830 43d NE St Michael, who is the applicant, had no additional comments on staff report. Otsego Planning Commission March 7, 2016 Page 2 Chair Black opened the Public Hearing at 7:12 PM. Rob Lokhurst, 17021 59t" St NE Otsego, stated he owned property east of Mr. Busch's property. He had concerns of rain water run off eroding the driveway and asked what the plans for drainage would be. City Engineer Wagner stated that the driveway would be substantial with a fourteen foot wide, four inch layer of crushed aggregate, four inch, layer of class five and a two inch layer of asphalt with an eighteen inch culvert runriing� underneath. The driveway will be tipped north with water running down to culvert :and sloped away from Mr. Lokhurst's property. City Engineer Wagner also -stated that'further up the slope of the driveway a drop structure would be placed to prevent runoff Mr. Lokhurst asked who would be responsible if there was any dama-ge to his property or utility easement during development and construction. City Engineer Wagner stated that thework will be'donein the utility easement and any damaged on the property or easement would be repaired, by the applicant and not Mr. Lokhurst's responsibility. Mr. Lokhurst was ajso .concerne2.d if development Would;stop and not be completed, would it be his responsibility to return the unfinished driveway back to sod. City Planner Licht explained that the developer.would need to provide an financial security that Would -provide funding if the.developer abandons the project so that the City wou d have funds.restore ,the property. Commissioner Thompson` questioned -if development would occur to the north of the property, whe.re.would 59th Street go: City Planner Licht stated when Lennar revised Riverpointe Fifth Addition, they prepared a ghost plat where 59th Street�goes uphill to the north. Property owner to the north would be required to alloW',street access to the subject site. Commissioner Schuck asked who would be responsible to restore the abandoned driveway. City Planner stated it would be covered under private easement and required to be removed by the property owner. Mr. Lokhurst questioned who would be responsible for the removal of the driveway. Otsego Planning Commission March 7, 2016 Page 3 City Planner Licht stated it would be the owner of Riverpoint 6th Addition. Commissioner Mord question if police and fire equipment would have access to the driveway at the projected grad elevation. City Engineer Wagner stated yes, they would have the ability to access the house, with the grade elevation at 12% and there would be a flat area at the top adjacent to the garage. Commissioner Thompson commented that the fire hydrant is at the cul-de-sac and the fire hoses would run up the driveway. Chair Black closed the Public Hearing at 7:27 PM Commissioner Thompson motioned to recommend to the City Council approval of a preliminary/final plat and PUD-CUP for Riverpointe 6th Addition, subject to the ten conditionsSeconded by Commissioner Mord. All in favor. Motion carried. 4.2 Lahn: A Zoning Map �amendrrlent rezoning from A-1. District to R-5 District. Q F IY,i+ .flovolnrirooni — ('nnAi-innni I Icc Parmit (PI Ir)-('I IP) nnri City Planner Licht presented the Planning Report. Paul TaboneLennar Corporation, 16305 36th Ave N Plymouth. He thanked the City for working wlth,them through -,this process. He stated that Lennar would be developing 345 homes on, 247,,acres and. starting the first phase in late spring. He introduced three housing types; discovery home,: landmark series and patio homes. Mr. Tabone said that they agree with the recommendations in the staff report. Chair Black opened the Public Hearing at 7:51 PM. Ben Cyr, 16825 53rd St Otsego, had concerns whenWright County raised the bend on CSAH 36. He stated the traffic is extremely fast and that last year there were three accidents on his property. He also stated that he has problems with trespassers who walk to the river on his property and leave garbage. He asks the City to move his mailbox to his side of property because of the difficulty of crossing CSAH 36 due to the Otsego Planning Commission March 7, 2016 Page 4 high volume and speed of the traffic. He also asked the City to reduce the speed limit on CSAH 36. City Planner Licht stated that City staff can contact the Rogers Post Office to request a change of the post box location. City Planner Licht also stated City staff would also advise Wright County regarding speeding concerns on CSAH 36. Jason Pebul, 17396 56th NE Otsego, stated that CSAH 36 traffic lanes are not wide enough and that on a daily basis, he sees people crossing;"the traffic lanes. He also stated concerns about the odor coming from the wastewater treatment facility and said he was touring the plant next week. City Engineer Wagner explained that the treatment facility is only using 25% of capacity now and with the new development would only increase 6% to a,.3,1% capacity. Mr. Pebul asked if the City could do a study to see if the smell was coming from the treatment plant. He also asked if the City would extend. the distance of.350 feet to notify people of new development City Planner Licht stated that the City,Council is;currently involved in the wastewater treatment facility operations; issue and that staff would forward; his concerns on to them. City Planner,licht al861explained that the 350 feet,.notification is required by state law and the City,follows' 'that limit for consistency..''r Brandon Wisner, 5886 Rawlings `Ave NE Otsego, asked for clarification of wetland restorations alo`ng,CSAH 36 that may affect plans for a trail along the roadway. City Engineer Wagner stated the developer would need to maintain a corridor for the trail along CSAH 36. City Planner Licht added that all grading, drainage and eroision control issues are subject to review and, approval;;by City Engineer and these conditions give the City oversight. Mr. Wisner had concerns' -with trails being both private and public. He asked if one trail would be considered to cut down costs and questioned if the trail would loop to the corridor for better access. City Planner Licht stated theCity has planned regional connections and will work with developer to for trails from CSAH 36 to Randolph consistent with the Future Parks and Trails Plan. He also stated that all streets have sidewalks on one side. There will be additional trail connections with future development. Otsego Planning Commission March 7, 2016 Page 5 Mr. Wisner had concerns with the flood plain and flood way to the south of the development. City Engineer Wagner stated the south pond does not receive any water and the east pond, in the preliminary plan, is shown outside current flood way. Commissioner Nichols had concerns of the home on the steep river bank off of County Road 36 and questioned if there were plans to stabilize the bank. City Planner Licht stated that the City has a lift station just.to the west and would need to stabilize the bank from erosion. City Engineer Wagner agreed and stated that the bank would be piled (armored) in that area to stop erosion as part of the grading plan for development of the subject site south of CSAH 36. E.. Chair Black closed the Public Hearing at 8:17 PM. Commissioner Thompson asked to clarify if it was a thirty foot garage setback. City Planner Licht said.yes. Commissioner Thompson had concern on the proposed 55 foot wide lot sizes south of CSAH 36 where they do .not backup to a stormwater basin or wetland outlot. City Planner Licht asked, the applicant if the smaller lots had the narrow townhomes planned; as„HOA maintained detached townhomes and Mr. Tabone said yes. Commissioner Nichols motioned to recommend to the City Council approval of a Zoning Map amendment rezoning the subject site from A- 1 DistrictI R-5 District based on a finding that the request is consistent with the criteria outlined in section 20-3-2.F of the Zoning Ordinance. Seconded by Commissioner Stritesky. All in favor. Motion carried. Commissioner Nichols motioned to recommend to the City Council approval of a preliminary plat, PUD-CUP and negative declaration on the need for an EIS, subject to thirteen conditions and condition #5 amended: Otsego Planning Commission March 7, 2016 Page 6 5. PID 118-802-0011300 must be provided access to Road 6, made part of the development, or Outlot H shall be deeded to the owner of the exception parcel at the time the right-of-way for Road 6 is final platted. Seconded by Commissioner Kolles. All in favor. Motion carried. 4.3 Schulz: City Planner Licht presented the Planning Report. Mr. Richard Schulz, 19173 Zane St Elk River, applicant, thanked City staff for working with him. He stated he would work with all thechallenges and 'was looking forward to continuing with this project. Chair Black opened the Public Hearing at 8:42 PM. Rich Martin 16861 57th St NE Otsego asked the commissioners to refer to his letter. He questioned the setback variance. He believes this setback would change the character of neighborhood and asked the Commissioners not to accept this variance. City Planner Licht explained th'e, development review process and that City staff reviewed the application mate' rial,,and site plans based on our professional experience and recommends approval of a variance because of the constraints to the property. Mr. Martin stated,the house could be setback to'35 feet requirement by building retaining walls andaddipg fill.' City Planner Licht stated that construction of the retaining walls would cause site alterations which would impact the septic site, steep slopes and wetlands on the property. Mr. Martin asked the Commissioners to deny the variance. Lyn Neutgens, 16871 57th' St NE Otsego, stated that she agreed with Mr. Martin's comments and in their cul-de-sac of three homes, this proposal of the home being so close to the road would significantly impact the neighborhood and would be aesthetically unattractive. Thomas Kennedy, 16820 56th St NE Otsego, questioned why Mr. Schulz was clearing and tearing down trees. Otsego Planning Commission March 7, 2016 Page 7 City Planner Licht stated the owner has right to tear down trees at any time. Commissioner Thompson questioned where Mr. Kennedy's property is in relation to the applicant. Mr. Kennedy stated that his property is to south of Mr. Schulz. Mike Wiggins, 16860 56th St NE Otsego, stated his concern of the environmental impact of the property. Kevin Brenny 16824 57th st NE Otsego, stated that the existing homes in the area are all setback and ascetically pleasing. Mr.Brenny felt that having one house in the area so close to the road might decrease the value of the other homes and he asked the Commissioners to deny the variance. Commissioner Nichols questioned how the the request for.a twenty f66t,setback variance was determined. City Planner Licht stated it related to elevation of the garage floor one foot over the street elevation and the topography ofsite. Commissioner Nicholas1 questioned if a proposed house. pawn with footprint of 35' x 80' had been turned in with the application City Planner Licht said no.., Commissioner Nichols. asked 'Mr. Schulz if he had a house plan. Mr. Schulz stated that this, was the proposed footprint according to the surveyor and he was working with an architect to guarantee that his concept plan would meet all the City requirements.:.Mr. Schulz also said he was very conscience of the wetlands. Commissioner Nichols:asked., if Mr. Schulz would consider moving the setback five more feet. Mr. Schulz stated he would consider any option if the contractor stated it was more feasible. Commissioner Mord questioned if Mr. Schulz had talked to the architect about the 35 foot setback before he purchased the property. Mr. Schulz said yes. Otsego Planning Commission March 7, 2016 Page 8 Commissioner Stritesky asked the size of your house plan. Mr. Schulz stated it will be 1,800 square feet on the main floor with a three car attached garage. Commissioner Nichols asked Mr. Schulz if he would be agreeable to table this until he talked to his architect to come back with a plan that was further back from the road. Mr. Schulz stated he did not want to table this request because he wanted to stay on track with his project. City Planner Licht said that the Planning Commission has the option of recommending approval of a different setback with a variance or tabling the application for more information. Commissioner Kolles stated that by adding five feet to the proposed setback, he would be more comfortable with the distan`cefrom the street: Nan Martin, 16861 57th St NE Otsego, thanked, ;the Commissioners for hearing their concerns and asked the Commissioners: to please:consider denying this request. Mr. Martin reminded:'the Commissioners that'all the houses had a 35 foot setback and asked the commissioners again;to deny the request. Chair Black closed;the Public Hearing at 9.37 PM. Commissioner Nichols motioned to recommend to the City Council approval of a variance to allow a 25 foot front yard setback for Lot 16, Block'2 Autumn Woods based on a finding that the applicant has demonstrated that the request satisfies the criteria outlined by Section 20-6-3 of ithe, Zoning :Ordinance, subject to the following five conditions.`Seconded by Commissioner Kolles. All in favor. Motion carried. 5. Update on City Council actions. CM Heidner gave an update to the Commissioners on City Council actions. 6. Update on future Planning Commission Agenda items. March 21, 2016 Frankfort Application. 7. Adjourn. Otsego Planning Commission March 7, 2016 Page 9 Commissioner Stritesky motioned to adjourn. Seconded by Commissioner Thompson. All in favor. Motion carried. Adjourned at 9:46 PM. Pam Black, Chair ENVIRONMENTAL ASSESSMENT WORKSHEET Lennar Lahn Site — Otsego, Minnesota Table of Contents 1. Project Title 2. Proposer 3. RGU 4. Reason for EAW 5. Project Location 6. Project Description 7. Cover Types 8. Permits and Approvals Required 9. Land Use 10. Geology, soils and topography/land forms 11. Water Resources 12. Contamination/Hazardous Materials/Wastes 13. Fish, wildlife, plant communities, and sensitive ecological resources (rare features) 14. Historic Properties 15. Visual 16. Air 17. Noise 18. Transportation 19. Cumulative potential effects 20. Other potential environmental effects Appendices Appendix A Figures Figure 1 Location Map Figure 2 USGS Quadrangle Map Figure 3 Site Soils Figure 4 Site Wetlands and Water Resources Figure 5 Well Locations Appendix B Lahn Site Concept Plan - Four Sheets Appendix C Wetland Reports Appendix D Select Well Logs & City of Otsego Drinking Water Supply Management Area Appendix E Natural Heritage Information System Response Appendix F State Historic Preservation Office Response Office of the State Archeologist Response Phase I Cultural Resources Inventory of the Lennar Lahn Site (Redacted) December 3, 2015 page 1 July 2013 version ENVIRONMENTAL ASSESSMENT WORKSHEET This Environmental Assessment Worksheet (EAW) form and EAW Guidelines are available at the Environmental Quality Board's website at: htta://www.ecib.state.mn.us/EnvRevGuidanceDocuments.htm. The EAW form provides information about a project that may have the potential for significant environmental effects. The EAW Guidelines provide additional detail and resources for completing the EAW form. Cumulative potential effects can either be addressed under each applicable EAW Item, or can be addresses collectively under EAW Item 19. Note to reviewers: Comments must be submitted to the RGU during the 30-day comment period following notice of the EAW in the EQB Monitor. Comments should address the accuracy and completeness of information, potential impacts that warrant further investigation and the need for an EIS. 1. Project title: Lennar Lahn Site — Otsego, Al innesota 2. Proposer: Contact person: Joe Jablonski Title: Land Development Area Manager Address: 16305 36 'Avenue North, Suite 600 City, State, ZIP: Plymouth, MN 55446 Phone: 952-249-3014 Fax: 952-249-3075 Email: joe.jablonski@lennar.com 4. Reason for EAW Preparation: Required: ❑ EIS Scoping X Mandatory EAW (check one) 3. RGU Contact person: D. Daniel Licht, AICP Title: City of Otsego - City Planner Address: 13400 90d' Street NE City, State, ZIP: Otsego, MN 55330 Phone: 763-231-5840 Fax: 763-427-0520 Email: DDL@PlanningCo.com Discretionary: ❑ Citizen petition ❑ RGU discretion ❑ Proposer initiated If EAW or EIS is mandatory give EQB rule category subpart number(s) and name(s): Minnesota Rules 4410.4300 MANDATORYEAW CATEGORIES Subpart 19 Residential Development December 3, 2015 page 2 5. Project Location: County: Wright City/Township : Otsego PLS Location ('/, '/, Section, Township, Range): N%, NE'/, Section 12, Township 120 N, Range 23 W SE'/, Section 1, T 120 N, R 23 W E'/, SW%, Section 1, T 120 N, R 23 TV NE'/, Section 1, T 120 N, R 23 W Watershed (81 major watershed scale): North Fork Crow River (07010204) Mississippi River- St. Cloud (07010203) GPS Coordinates: 45013.824' N 930 31.800' W Tax Parcel Number: 118802121100 118802014200 118802013100 118235000070 118802011301 118802011100 At a minimum attach each of the following to the EAW: • County map showing the general location of the project; • U.S. Geological Survey 7.5 minute, 1:24,000 scale map indicating project boundaries (photocopy acceptable); and • Site plans showing all significant project and natural features. Pre -construction site plan and post - construction site plan. Maps depicting the project site are included in Appendix A. A concept Plan for the proposed development is inchided in Appendix B. December 3, 2015 page 3 6, Project Description: a. Provide the brief project summary to be published in the EQB Monitor•, (approximately 50 words). The proposed project is a low density residential development consisting of approximately 344 homes and associated streets and utilities. The area of tl7e proposed development is currently zoned A-1 Agricultural - Rural Service Area and is guided for Low Density Residential in the City's Comprehensive Plan. Shoreland areas and floodways along the Crow River and on -site wetlands will be preserved. b. Give a complete description of the proposed project and related new construction, including infrastructure needs. If the project is an expansion include a description of the existing facility. Emphasize: 1) construction, operation methods and features that will cause physical manipulation of the environment or will produce wastes, 2) modifications to existing equipment or industrial processes, 3) significant demolition, removal or remodeling of existing structures, and 4) timing and duration of construction activities. The project site consists of approximately 344 single family residential dwellings. The new development will. include site grading, installation of utilities (phone, electric, cable, natural gas, storm sewer, sanitary sewer and water main extensions), and streets, all typical of a residential development. Site grading will consist of excavation for stormwater management and treatment, house foundations, and onsite roadways. Typical earth moving equipment will be utilized. The installation of utility piping for natural gas, stormwater, water and sewer will generally consist of trench excavation and baclf ll. Disturbed areas will be managed to minimize erosion under a construction stormwater management plan. Portions of the site will not be disturbed including a mostly forested buffer area along the Crow River, existing wetland areas throughout the site and the floodway located on the southern portion of the project. The project will be constructed in approximately 10 phases of approximately 30 to 35 homes per phase. Grading work is anticipated to begin in the spring of 2016 with utility work beginning in the summer of 2016. Home construction will begin in the fall of 2016, with an additional phase completed in each following year. During development, areas not involved in construction will remain as cultivated land, forest or dormant agricultural land Disturbed areas will be stabilized to prevent erosion during development. The project will be served by existing City of Otsego water and sewer utilities. An existing sanitary server lift station and force main located west of the southern project area and just south of 53'd Street NE, will convey wastewater to the City's East Wastewater Treatment Facility located just west of the northern project area. The City currently has the water supply capacity to serve the project, however, the City's long term water supply development plans may include provisions for an additional well to be located within the project area. December 3, 2015 page 4 c. Project magnitude: Total Project Acreage Approximately 240 Linear project length N/A Number and type of residential units 344 single-family detached units Commercial building area (in square feet) N/A Industrial building area (insquare feet) N/A Institutional building area in square feet) N/A Other uses — specify (insquare feet) N/A Structure height(s) 25 to 30 feet, typical of two-story single family homes d. Explain the project purpose; if the project will be carried out by a governmental unit, explain the need for the project and identify its beneficiaries. The purpose of the project is to address and meet demand for residential housing with a high quality project that is consistent with the City of Otsego Comprehensive Plan. e. Are future stages of this development including development on any other property planned or likely to happen? X Yes ❑ No If yes, briefly describe future stages, relationship to present project, timeline and plans for environmental review. Lennar may develop approximately 38 additional lots east of the project site. The current project does not include the Lahn Family Farmstead, which prevents development of this property and also prevents access to approximately 16 lots southeast of 53", Street NE. These lots are shown as the "Ghost Plat" on the concept plan. The anticipated date for potential development of these 38 additional lots is unknown. f Is this project a subsequent stage of an earlier project? ❑ Yes X No If yes, briefly describe the past development, timeline and any past environmental review. 7. Cover types: Estimate the acreage of the site with each of the following cover types before and after development: Before After Before After Wetlands 10.217 10.217 Lawn/landscaping 5.258 71.895 Deep water/streams None None Impervious surface 0.398 47.046 Wooded/forest 34.845 32.287 Stormwater Pond None 15.00 Brush/Grassland 3.27 64.063 Other (describe) None None 186.52 None -Cropland TOTAL 240.508 240.508 December 3, 2015 page 5 Wetland acres will not change as a result of the project and wetland types are also not expected to change. Based on a wetland delineation conducted as part of the project, pre-existing impacts were identified at one of the wetlands, which will be restored to its original boundaries as part of the project. A reduction in wooded area of approximately 2.5 acres is anticipated on the central portion of the southern project area. There will be no reduction in wooded acres along the Crow River. On completion of the project there will no cropland so the 186.5 acres currently under cultivation will be converted to: lawn/landscaping, impervious surface, brush/grassland and storinwater ponds. 8. Permits and approvals required: List all known local, state and federal permits, approvals, certifications and financial assistance for the project. Include modifications of any existing permits, governmental review of plans and all direct and indirect forms of public financial assistance including bond guarantees, Tax Increment Financing and infrastructure. All of these final decisions are prohibited until all appropriate environmental review has been completed! See Minnesota Rules, Chapter 4410.3100. Unit of government Type of application Status City of Otsego Zoning Map Amendment Under Review City of Otsego Planned Unit Development — Conditional Under Review Use Permit City of Otsego Preliminary Plat Application Under Review City of Otsego Final Plat Approval To be submitted City of Otsego EAW Negative Declaration Under Review City of Otsego Grading Permit To be submitted City of Otsego Building and related Permits To be submitted (Electrical, Mechanical, Plumbing) Wright County Access Permit To be submitted Wright County Right -of -Way Permit To be submitted Minnesota Department of Water Main Extension Approval To be submitted Health Minnesota Department of Public Waters Work Permit If needed Natural Resources Minnesota Department of Dewatering Permit If needed Natural Resources Minnesota Pollution NPDES/SDS General SW Permit Submit NOI Control Agency Minnesota Pollution Sanitary Sewer Extension Approval To be submitted Control Agency Minnesota Pollution Stormwater Pollution Prevention Plan To be prepared Control Agency Army Corps of Engineers Section 404 — Wetlands Determination Under Review State Historic Preservation Phase I Cultural Resources Inventory Complete Office Office of the State Phase I Cultural Resources Inventory Complete Archaeologist Cumulative potential effects may be considered and addressed in response to individual EAW Item Nos. 9-18, or the RGU can address all cumulative potential effects in response to EAW Item No. 19. December 3, 2015 page 6 If addressing cumulative effect under individual items, make sure to include information requested in EAW Item No. 19 9. Land use: a. Describe: i. Existing land use of the site as well as areas adjacent to and near the site, including parks, trails, prime or unique farmlands. The existing land use for the site is agricultural. The portion of the site north of 53'd Street NE (CSAH 36) is bordered by agricultural land use to the north and residential and institutional land use to the west. The institutional land is currently utilized for the City's East Wastewater Treatment Facility. Two rural residential properties are located north of 53'd Avenue NE (CSAH 36) on separate lots shown as exceptions on Lennar's Concept Plan. The portion of the project located south of 53'd Street NE (CSAH 36) is bordered almost entirely by the Crow River. The Lahn Family Farmstead is also located on the southern project area between the Crow River and 53'd Street NE (CSAH 36). No prime or unique farmland exists on or adjacent to the site. Adjacent parkland includes the Frankfort Park (Neighborhood Park) and an unnamed bituminous hail adjacent to Frankfort Park along Randolph Ave NE. ii. Plans. Describe planned land use as identified in comprehensive plan (if available) and any other applicable plan for land use, water, or resources management by a local, regional, state, or federal agency. Planned land use for the project location, as described in the City of Otsego Comprehensive Plan 2012, is low -density residential (LD Residential) which is defined as less than three dwelling units per acre. The proposed Lennar project has an average density of approximately 1.5 dwelling units per acre and therefore is consistent with the City's planned land use. The project lies within the City's East Sewer District and as such will be sewed by municipal sanitary sewer. Municipal water service is also available and will be provided by the City of Otsego. iii. Zoning, including special districts or overlays such as shoreland, floodplain, wild and scenic rivers, critical area, agricultural preserves, etc. Portions of the project are located within the City's Shoreland Overlay District and floodplain associated with the Crow River. The City's Shoreland Overlay District includes land within 300 feet of the high water mark but is increased to the limit of thefloodplain where the floodplain is greater than 300 feet. The project does not involve home construction on the flood plain and the proposed lot layout in the concept plan exceeds the required setback of 50 feet for severed structures. The proposed project is also in compliance with other requirements of the Shoreland Management Overlay District and once built, the property oi,mershnanagers must continue to comply with the requirements. b. Discuss the project's compatibility with nearby land uses, zoning, and plans listed in Item 9a above, concentrating on implications for environmental effects. December 3, 2015 page 7 The project will be compatible with neighboring land uses and proposed zoningfor the project site. Low density residential development, with less than 3 dwelling units per acre, is the City's planned use for the site. the proposed project has a density of approximately 1.5 dwelling units per acre which allows adequate room for preservation of existing wetlands, stormwater management and open spaces. c. Identify measures incorporated into the proposed project to mitigate any potential incompatibility as discussed in Item 9b above. There are no incompatible land uses proposed 10. Geology, soils and topography/land forms: a. Geology - Describe the geology underlying the project area and identify and map any susceptible geologic features such as sinkholes, shallow limestone formations, unconfined/shallow aquifers, or karst conditions. Discuss any limitations of these features for the project and any effects the project could have on these features. Identify any project designs or mitigation measures to address effects to geologic features. The project area is underlain by approximately 150 feet of unconsolidated glacial deposits consisting of silty clay, clay, sand and gravel. On the southern portion of the project area the floodplain associated with the Crow River is underlain by sandy flood plain alluvium. Beneath the glacial deposits, at a depth of approximately 150 feet based on area well logs, Cambrian bedrock is encountered. The Wright County Geologic Atlas suggests that the bedrock surface is somewhat uneven in this portion of Wright County so depth to bedrock will vary along with the formations encountered. Generally, in the project area the first bedrock consists of the Cambrian age sandstone and shale of the Jordan Sandstone, St. Lawrence Formation and deeper Cambrian formations. Select well logs are included in Appendix D and the well locations are shown on Figure 5. The first aquifer in the area appears to be the unconsolidated glacial deposits consisting of sand and gravel at depths of approximately 100 feet. The City of Otsego utilizes the deeper Cambrian sandstone formations for the City's high capacity water supply wells. The geologic formations at the site do not pose special limitations for the project. b. Soils and topography - Describe the soils on the site, giving NRCS (SCS) classifications and descriptions, including limitations of soils. Describe topography, any special site conditions relating to erosion potential, soil stability or other soils limitations, such as steep slopes, highly permeable soils. Provide estimated volume and acreage of soil excavation and/or grading. Discuss impacts from project activities (distinguish between construction and operational activities) related to soils and topography. Identify measures during and after project construction to address soil limitations including stabilization, soil corrections or other measures. Erosion/sedimentation control related to stormwater runoff should be addressed in response to Item 1Lb. ii. December 3, 2015 page 8 Figure 3 in Appendix A illustrates the soil types present at the property and the following table summarizes the soils properties as listed on the Natural Resource Conservation Service (MRCS) data base. map Symbol Soil Classification Sloe Drainage Flooding A dric 406 Dorset sandy -loam 0 to 2 % Well- None Not hydric drained 441 Almora loam 0 to 2 % Well- None Not hydric drained 771 Elk River fine 0 to 2 % Moderately Rare in Not hydric sandy -loam well- March to drained June 1255 Elk River fine 0 to 2 % Somewhat Occasional Not hydric sandy -loam poorly- in March drained to August 1257 Elk River-Mosford 0 to 6 % Moderately Rare in Not hydric complex (fine sandy well- March to loam) drained June 1377 B, E Dorset -Two Inlets 2 to 6 %, 20 Excessively None Not hydric complex (sandy to 35 % to well loam to loamy sand) drained 1378 Fordum loam 0 to 2 % Poorly Occasional Hydric drained in March to August 1380 A, B, C Bygland silt -loam 0 to 2 %, 2 to Moderately None Not hydric 6%,6to12 well % drained 1381 Lindaas silt loam 0 to 2 % Poorly None Hydric drained Soils on the site are silty to sandy loams, with some coarse foams and loamy sands. The topography of the site gently slopes towards the Crow River, changing elevation from approximately 890 feet at the northern edge of the project site to approximately 850 feet along the Crow River. Development is not anticipated to occur along the steeper slopes that occur close to the Crow River at some locations. Stormwater management plans will need to consider the steep slopes along the river to prevent additional erosion. The proposed project will not involve deep excavations or major alteration of the existing topography beyond that necessary for construction of basements, foundations, roads and utilities. According to the NRCS, and based on previous investigations by Braun Intertec in 2002 and 2005, the known soils beneath the site are primarily formed in glacial alluvitnn, consisting of clays underlain by poorly graded sands, silty -sands, and clayey sands. Gravel mining operations tookplace on the upland (northern) portion of the southern project area. In this area, the disturbed sanfrcial soils consist of brown sand to brown sandy loam. December 3, 2015 page 9 NOTE: For silica sand projects, the EAW must include a hydrogeologic investigation assessing the potential groundwater and surface water effects and geologic conditions that could create an increased risk of potentially significant effects on groundwater and surface water. Descriptions of water resources and potential effects from the project in EAW Item 11 must be consistent with the geology, soils and topography/land forms and potential effects described in EAW Item 10. It. Water resources: a. Describe surface water and groundwater features on or near the site in a.i. and a.ii. below. i. Surface water - lakes, streams, wetlands, intermittent channels, and county/judicial ditches. Include any special designations such as public waters, trout stream/lake, wildlife lakes, migratory waterfowl feeding/resting lake, and outstanding resource value water. Include water quality impairments or special designations listed on the current MPCA 303d Impaired Waters List that are within 1 mile of the project. Include DNR Public Waters Inventory number(s), if any. Figure 4 illustrates wetlands and public waters inventory for the project area based on the Department of Natural Resources Public Water Inventory. In addition, Liesch Associate, Inc. — Terracon Company (Liesch) conducted wetland delineations that are included on the concept plans in Appendix B. A request for wetland delineation concurrence and jurisdictional determination has been submitted to the USArmy Coups of Engineers and is included in Appendix C. Approximately 10 acres ofwetland exist within the site, with 15 individual wetland areas and two wetland ditch areas identified. Wetlands on the floodplain associated with the Crow River on the southern portion of the site were not delineated since development will not occur on the floodplain. One of the wetlands delineated as part of this project was partially filled at some point in the past and will be restored as part of the project. Other than this, no work in the wetlands is planned The Crow River borders much of the project area and the bulk of the project lies within the Crow River Watershed, MPC.4 Strewn ID Number; 07010204-502. This stretch of the Crow River is on the Impaired Waters List for aquatic life macroinvertebrate bioassessments, fishes bioassessments, dissolved oxygen, turbidity, and fecal coliform. A portion of the project site area is located within the Mississippi River — St. Cloud Watershed, MPCA Stream ID Number; 07010203-503. This stretch of the Mississippi River is on the Impaired Waters List for aquatic consumption including PCBs and Mercury in fish. The Mississippi River is designated as a MDNR Recreational River within the watershed. The proximity of the project to the impaired waters will require preparation of a stormwater pollution plan (SWPPP) for the construction phase of the project. Other than the Crow River (CR) and Mississippi River (AM) no DNR PWI-listed water bodies were located within a one -mile radius of the project site. H. Groundwater — aquifers, springs, seeps. Include: 1) depth to groundwater; 2) if project is within a MDH wellhead protection area; 3) identification of any onsite and/or nearby wells, December 3, 2015 page 10 including unique numbers and well logs if available. If there are no wells known on site or nearby, explain the methodology used to determine this. The project site is underlain by approximately 150 feet of glacial drift which may constitute an aquifer locally. Figure 5 illustrates the location of a glacial drift well with Minnesota Unique Well Number UWN 791542 located just east of the project. This well is completed in the glacial drift at a depth of 110 feet. A static water level of 45 feet below grade was reported at this well when it was drilled in 2012. The well located at the Lahn Farm, UWN 218017 was drilled in 1928 to depth of 500 feet and apparently utilizes the Mt Simon Sandstone as a source of water, however, construction details are not available for this well. The City of Otsego drilled a test hole (UWN 74 72 70) to a depth of 440feetjust west of the northern project area that was open to the Mt. Simon Sandstone. A static water level of 6 feet above grade was reported for this well in 2007. The project site is located within a wellhead protection area for City of Otsego Wells 3 and 8. A map showing the location of the Drinking Water Supply Management Area for these wells is included in Appendix D. The City of Otsego may construct an additional well on the project site as part of their longterm water supply plans. It is anticipated the proposed well will be constructed in the Mt. Simon Sandstone Aquifer. The project will be served by municipal water. b. Describe effects from project activities on water resources and measures to minimize or mitigate the effects in Item b.i. through Item b.iv. below. Wastewater - For each of the following, describe the sources, quantities and composition of all sanitary, municipal/domestic and industrial wastewater produced or treated at the site. 1) If the wastewater discharge is to a publicly owned treatment facility, identify any pretreatment measures and the ability of the facility to handle the added water and waste loadings, including any effects on, or required expansion of, municipal wastewater infiastructure. The City's Comprehensive Plan designates this property within the current sewer district and has planned for providing wastewater services within this area. The project includes a sanitary sewer collection system that will utilize an 8-inch diameter force main to connect to the City of Otsego East Wastewater Treatment Facility. The treatment facility has a capacity of I, 000, 000 gpd and has adequate treatment capacity for the proposed development without expansion. 2) If the wastewater discharge is to a subsurface sewage treatment systems (SSTS), describe the system used, the design flow, and suitability of site conditions for such a system. There is no on -site wastewater treatment proposed for this project. All wastewater will be collected and treated at the City of Otsego East Wastewater Treatment Facility. December 3, 2015 page I 1 3) If the wastewater discharge is to surface water, identify the wastewater treatment methods and identify discharge points and proposed effluent limitations to mitigate impacts. Discuss any effects to surface or groundwater from wastewater discharges. No wastewater discharge to surface water is proposed for this project. ii. Stormwater - Describe the quantity and quality of stormwater runoff at the site prior to and post construction. Include the routes and receiving water bodies for runoff from the site (major downstream water bodies as well as the immediate receiving waters). Discuss any environmental effects from stormwater discharges. Describe stormwater pollution prevention plans including temporary and permanent runoff controls and potential BMP site locations to manage or treat stormwater runoff. Identify speck erosion control, sedimentation control or stabilization measures to address soil limitations during and after project construction. There is currently minimal storm water management at the site and no storm sewer piping. Precipitation collects within the site where it infiltrates into the ground or runs off to the Crow or Mississippi River. Preferential flow paths based on topographic features are present on the southern portion of the site including shallow ravines with some erosion that discharge to the Crow River. The change in land use post -development will provide an opportunity for improved stormwater management. The project plans to utilize stormwater treatment ponds, which will reduce runoff rate and volumes and generally improve the quality of the runofffrom the site. Runoff water quality will be typical of low density residential developments with managed stormwater systems. The project will incorporate measures such as vegetated drainage swales, storm water ponds, infiltration and other best management practices (BMPs) to manage the volume, rate and quality of runoff from the site. Potential adverse effects ofrunoff volume and quality will be fw7her mitigated by the construction of approximately 5.6 acres of storm water ponds, which will be designed to reduce peak runoff rates and meet the requirements of the City of Otsego and the AeCA. A stormwater Pollution Prevention Plan with appropriate BMPs will be employed during construction to reduce erosion and sediment loading in storm water runoff. Inspection and maintenance of BIVPs during construction will be consistent with NPDESISDS General Permit requirements, including site inspection after rainfall events, perimeter sediment control maintenance, and sediment removal. Surface waters generally flow north to south towards the Crow River. A portion of the northern project area appears to drain directly to the Mississippi River. The project will be designed to maintain peak discharge rates at or below existing conditions. Post - construction drainage will follow similar pathways, with minor differences in drainage routes. iii. Water appropriation - Describe if the project proposes to appropriate surface or groundwater (including dewatering). Describe the source, quantity, duration, use and December 3, 2015 page 12 purpose of the water use and if a DNR water appropriation permit is required. Describe any well abandonment. If connecting to an existing municipal water supply, identify the wells to be used as a water source and any effects on, or required expansion of, municipal water infrastructure. Discuss environmental effects from water appropriation, including an assessment of the water resources available for appropriation. Identify any measures to avoid, minimize, or mitigate environmental effects from the water appropriation. The project does not propose to appropriate surface or groundwater and a DNR water appropriation permit is not required for the project. It is possible that temporary dewatering may be required for utility installation. This work would be conducted in accordance with the DNR requirements for dewatering under their general permit. The project will utilize the existing City of Otsego water supply and will include a water distribution system to serve the homes. The system will utilize 6-inch to 8-inch water lines per City of Otsego specifications and will connect to the existing City water main along 53' Street NE (MIH 36). The City currently has the ability to serve the project without a new or expanded water appropriation permit. However, the City's long term water supply plans call for a new water supply well in the vicinity project. iv. Surface Waters a) Wetlands - Describe any anticipated physical effects or alterations to wetland features such as draining, filling, permanent inundation, dredging and vegetative removal. Discuss direct and indirect environmental effects from physical modification of wetlands, including the anticipated effects that any proposed wetland alterations may have to the host watershed. Identify measures to avoid (e.g., available alternatives that were considered), minimize, or mitigate environmental effects to wetlands. Discuss whether any required compensatory wetland mitigation for unavoidable wetland impacts will occur in the same minor or major watershed, and identify those probable locations. Liesch evaluated the subject propertyfor wetlands and other jurisdictional water. Fifteen wetland areas and two wetland ditches were identified on the site, as depicted on the concept plan in Appendix B and on the ACOE information in Appendix C. The current conceptplan design incorporates the existing wetlands into the development plans and no net change in wetland acres is anticipated as a result of the project. Additionally, no homes will be constructed within a 40 foot buffer of the mapped wetland boundaries. Construction within wetland buffers will be limited to roads or walking paths. b) Other surface waters- Describe any anticipated physical effects or alterations to surface water features (lakes, streams, ponds, intermittent channels, county/judicial ditches) such as draining, filling, permanent inundation, dredging, diking, stream diversion, impoundment, aquatic plant removal and riparian alteration. Discuss direct and indirect environmental effects from physical modification of water features. Identify measures to avoid, minimize, or mitigate environmental effects to December 3, 2015 page 13 surface water features, including in -water Best Management Practices that are proposed to avoid or minimize turbidity/sedimentation while physically altering the water features. Discuss how the project will change the number or type of watercraft on any water body, including current and projected watercraft usage. There are no other anticipated effects or alterations to surface water features. 12. Contamination/Hazardous Materials/Wastes: a. Pre -project site conditions - Describe existing contamination or potential environmental hazards on or in close proximity to the project site such as soil or ground water contamination, abandoned dumps, closed landfills, existing or abandoned storage tanks, and hazardous liquid or gas pipelines. Discuss any potential environmental effects from pre -project site conditions that would be caused or exacerbated by project construction and operation. Identify measures to avoid, minimize or mitigate adverse effects from existing contamination or potential environmental hazards. Include development of a Contingency Plan or Response Action Plan. Debris including concrete and used tires are located on the southeastern portion of the site, adjacent to the Lahn Family Farmstead. It appears that this debris may have been strategically placed at this location to reduce erosion in a shallow ravine. During a Phase I Environmental Site Assessment (Phase I ESA) per formed in October 2014, no visual or olfactory evidence was observed to indicate that a release to the environment occurred at this location. As such, the material located here can be handled as non -hazardous waste during removal for construction activities. As part of the Phase I ESA, a records review of federal, state and local environmental databases was performed, no releases were reported within 1, 000 feet of the project site. Additionally, no other observations of hazardous materials or contamination were noted for the project site. b. Project related generation/storage of solid wastes - Describe solid wastes generated/stored during construction and/or operation of the project. Indicate method of disposal. Discuss potential environmental effects from solid waste handling, storage and disposal. Identify measures to avoid, minimize or mitigate adverse effects from the generation/storage of solid waste including source reduction and recycling. This project will produce solid waste typical ofresidential developments and construction projects. All solid waste will be collected by private haulers and disposed as required by the City of Otsego and Wright County. During the construction phase of development, Lennar will require the General Contractor to dispose of all solid waste generated per requirements of the City of Otsego and Wright County. Project related uselstorage of hazardous materials - Describe chemicals/hazardous materials used/stored during construction and/or operation of the project including method of storage. Indicate the number, location and size of any above or below ground tanks to store petroleum or other materials. Discuss potential environmental effects from accidental spill or release of hazardous materials. Identify measures to avoid, minimize or mitigate adverse effects from the use/storage of chemicals/hazardous materials including source reduction and recycling. Include development of a spill prevention plan. December 3, 2015 page 14 Currently, there are no known hazardous wastes used or stored on the site. During the construction phase, Lennar will require that the General Contractor does not store hazardous materials on site without proper precautions for items such as fuel and construction materials. Post development, it is expected that the homes will generate typical quantities of household hazardous waste which will managed in accordance with City and County waste ordinances. d. Project related generation/storage of hazardous wastes - Describe hazardous wastes generated/stored during construction and/or operation of the project. Indicate method of disposal. Discuss potential environmental effects from hazardous waste handling, storage, and disposal. Identify measures to avoid, minimize or mitigate adverse effects fi•om the generation/storage of hazardous waste including source reduction and recycling. Currently, there are no known hazardous wastes used or stored on the site. During the construction phase, Lennar will ensure that the General Contractor does not store hazardous materials on site without proper precautions for fuel and construction materials. Post development, it is expected that the homes will generate typical quantities of household hazardous waste which will managed in accordance with City and County waste ordinances. December 3, 2015 page 15 13. Fish, wildlife, plant communities, and sensitive ecological resources (rare features): a. Describe fish and wildlife resources as well as habitats and vegetation on or near the site. Fish and wildlife resources on and near the site are consistent with species found in woodland, wetlands, and grassland Based on a review of the pre -development site, the project site is composed of the following habitat types: 10.22 acres of wetland, 34.84 acres of woodland, 3.27 acres of brush/grassland, and 186.52 acres of cropland These habitats are used by a variety of animals common to the North Central Hardwood Forests ecoregion of Minnesota. Describe rare features such as state -listed (endangered, threatened or special concern) species, native plant communities, Minnesota County Biological Survey Sites of Biodiversity Significance, and other sensitive ecological resources on or within close proximity to the site. Provide the license agreement number (LA -N/A) and/or correspondence number (ERDB #20150118) from which the data were obtained and attach the Natural Heritage letter from the DNR. Indicate if any additional habitat or species survey work has been conducted within the site and describe the results. The Minnesota DNR Natural Heritage Program conducted a database search of the Minnesota Natural Heritage Information System (NHIS) to determine if there are listed plants and animals; native plant communities; wildlife aggregations; geological features; or state rare features that are known to occur within an approximate one -mile radius of the project site. The database search did identify the following rare features within the search area. Blanding's Turtle (Emydoidea blandingii) and Black Sandshell mussel (Ligurnia recta). In addition, an animal assemblage (Colonial Waterbird Nesting Area), and Native Plant Community (Silver Maple — (Virginia Creeper) Floodplain Forest Type) were also identified within the search radius of the project site. The DNR Natural Heritage Review response letter is provided in Appendix E. During the on -site Technical Evaluation Panel review of the wetland delineations a probable eagle's nest was noted in a tree located just north of the northern project boundary. c. Discuss how the identified fish, wildlife, plant communities, rare features and ecosystems may be affected by the project. Include a discussion on introduction and spread of invasive species from the project construction and operation. Separately discuss effects to known threatened and endangered species. The project will convert 186.52 acres of cropland to brush/grassland, lawn/landscaping, impervious surface and storrnwater ponds. Species that are dependent in part on cropland may be displaced including Pheasants, turkeys and some song birds. Migratory birds that are tolerant of urban conditions such as Canada geese and mallards will likely increase in numbers due to the additional grassland and storrnwater ponding areas. Blanding's Turtles which were identified in the search area are susceptible to wetland drainage and degradation which are not planned as part of this project. Uplands at the project site are cropland and reclaimed gravel ruining areas which are being converted to brush, grassland, landscaped areas impervious surface and storrnwater ponds. Other areas, particularly along the Crow River will be left undisturbed. Rare mussels that may be found in the Crow River are vulnerable to deterioration in water quality, particularly siltation that could occur as the result of erosion dining or after construction. December 3, 2015 page 16 The suspected eagle's nesting site off the northern project boundary could potentially be disturbed during the construction season. d. Identify measures that will be taken to avoid, minimize, or mitigate adverse effects to fish, wildlife, plant communities, and sensitive ecological resources. A primacy threat to Blanding's turtle is loss of habitat which is not anticipated occur as a result of this project because most of the area is disturbed. Protection of Blanding's turtles during and after construction will include providing information to site contractors and future homeowners to help identify the turtles and ways to avoid impacts such as the proper use ofsiltfence, minimizing the time trenches are open, checking excavations prior to backfilling and other information provided by the DNR Rare mussel habitat associated with the Crow River will be protected during construction by development and implementation of an effective stormwater pollution prevention plan required under the MPCA general stormwater permit. The plan 1vill focus on effective erosion prevention and sediment control across the site but particularly in areas near the Crow River. The suspected eagle's will be verified in the field and aplan will be developed to avoid disturbance of the nest by implementing applicable US Fish and Wildlife service recommendations. 14. Historic properties: Describe any historic structures, archeological sites, and/or traditional cultural properties on or in close proximity to the site. Include: 1) historic designations, 2) known artifact areas, and 3) architectural features. Attach letter received from the State Historic Preservation Office (SHPO). Discuss any anticipated effects to historic properties during project construction and operation. Identify measures that will be taken to avoid, minimize, or mitigate adverse effects to historic properties. A request was made for a file review of the project location by the SHPO on October 7, 2014 and a response was received on October 8, 2014. This review identified two listings for the project site and two listings for adjacent areas. Based on these listings Liesch reviewed the paper file at the Minnesota State Historic Preservation Ojf ce and obtained copies of the applicable Minnesota Archeological Site Forms. Subsequently, Mey jent was hired to conduct a Phase I Cultural Resources Inventory for the project site. Portions of Mer jents's report are summarized below. 21 WRo Scattered Asti acts Merjent conducted additional survey activities at the project site and recovered two additional pre - contact archeological finds spots consisting of a small chest projectile point and a quartzite flake. Merjent concluded that the site is not eligible for listing on the National Register of Historic Places (NRHP) and that no additional investigation is warranted. 21 WRO130 Dayton quarry Burial No additional Human remains were found daring the survey and the site has been "completely destroyed as the result of gravel extraction operations ". The Office of the State Archeologist (OSA) December 3, 2015 page 17 should be consulted regarding the current status of the burial and any remaining restrictions to ground disturbing activity at the location. "In the event that additional archeological materials are identified during construction activities. Merjent recommends that construction in proximity to the discovery immediately cease and procedure be followed to notify the SIIPO and other agencies as required. Further, if hu man remains are encountered daring construction activities, all ground disturbing activity must cease and local law enforcement must be notified. MS 30Z 08, the Private Cemeteries Act, prohibits the intentional disturbance ofhuman burials. Work should not resume until all issues are resolved " Merjent's report has been submitted to the OSA for review and the OSA has concurred with Merjent's findings. Two Historic Farmsteads "Two historic farmsteads are located outside of and immediately east of the project area. Based on observations made from the right-of-way, these structures are recommended as not eligible for listing on the NRHP. " Merjent concluded that no historic properties will affected by the proposed project. Merjent stresses that if construction plans are altered to include areas that were not addressed in this Phase I survey, these locations should be examined for cultural resources. Merjent's report was submitted to the SHPO and a review letter dated September 14, 2015 was received. In the letter SHPO states "Based on the results of this survey we conclude that there are no historic properties that will be affected by this project. " The letter also recommends that the Office of the State Archeologist (OSA) be consulted regarding site 21 WR0130, the Dayton Burial Site. Merjent's report has been submitted to the OSAfor review and the OSA has concurred with Merjent's findings. Information concerning the SHPO review including the review letter, Merjent's report and the OSA review comments are included in Appendix F. 15. Visual: Describe any scenic views or vistas on or near the project site. Describe any project related visual effects such as vapor plumes or glare fi•om intense lights. Discuss the potential visual effects from the project. Identify any measures to avoid, minimize, or mitigate visual effects. The project will not create adverse visual impacts. The proposed residential uses are consistent with other established and planned uses in the area, and therefore will not create a significant change in visual aesthetics. Furthermore, along the Crow River, existing vegetation, includingforested areas and wetlands, will be preserved beyond 100 feet from the high water level. Maintaining the existing forests will preserve the current appearance along the Crow River and help to maintain the natural appearance of the area. Street lighting will be installed according to the City of Otsego Subdivision Ordinance. Artificial lighting used during the development and construction phases will be used sparingly and will be shielded from any nearby residential receptors. There are no other anticipated adverse visual impacts anticipated related to this project.- The project is consistent with City's Comprehensive Plan, including the Natural Environment Plan, and applicable lighting standards. December 3, 2015 page 18 16. Air: a. Stationary source emissions - Describe the type, sources, quantities and compositions of any emissions from stationary sources such as boilers or exhaust stacks. Include any hazardous air pollutants, criteria pollutants, and any greenhouse gases. Discuss effects to air quality including any sensitive receptors, human health or applicable regulatory criteria. Include a discussion of any methods used assess the project's effect on air quality and the results of that assessment. Identify pollution control equipment and other measures that will be taken to avoid, minimize, or mitigate adverse effects fi-om stationary source emissions. The proposed project is not anticipated to generate stationary source emissions. b. Vehicle emissions - Describe the effect of the project's traffic generation on air emissions. Discuss the project's vehicle -related emissions effect on air quality. Identify measures (e.g. traffic operational improvements, diesel idling minimization plan) that will be taken to minimize or mitigate vehicle -related emissions. The proposed project will generate an increase in carbon monoxide levels due to an increase in passenger vehicle trips. The project will not require an indirect source permit. There are no measures planned to mitigate for the vehicle related emissions being considered. The area is guided for single family home development in accordance with City's Comprehensive Plan and these low level impacts associated with vehicle emissions are anticipated through the long range planning process. c. Dust and odors - Describe sources, characteristics, duration, quantities, and intensity of dust and odors generated during project construction and operation. (Fugitive dust may be discussed under item 16a). Discuss the effect of dust and odors in the vicinity of the project including nearby sensitive receptors and quality of life. Identify measures that will be taken to minimize or mitigate the effects of dust and odors. Fugitive dust will be generated during the construction phase on the site. Contractors will be required to control dust during construction activities by providing water trucks and minimizing the areas which are disturbed. The contractor will also be limited to hours of work by state and city code noise standards. Dust generation will be short term. The project is not anticipated to generate odors. 17. Noise Describe sources, characteristics, duration, quantities, and intensity of noise generated during project construction and operation. Discuss the effect of noise in the vicinity of the project including 1) existing noise levels/sources in the area, 2) nearby sensitive receptors, 3) conformance to state noise standards, and 4) quality of life. Identify measures that will be taken to minimize or mitigate the effects of noise. December 3, 2015 page 19 The project will be constructed in accordance with the City of Otsego established noise ordinance. It is anticipated that noise levels will temporarily increase locally during project construction, but are expected to return to normal levels following project completion. Noise levels on and adjacent to the site will vai y considerably during construction depending on the pieces of construction equipment being operated simultaneously, the percent of time in operation, and the distance from the equipment to the receptors. The nearest receptors to the proposed project are the single fonily residences located east and west -adjacent along 53'd Street NE (CSAH 36). 18. Transportation a. Describe traffic -related aspects of project construction and operation. Include: 1) existing and proposed additional parking spaces, 2) estimated total average daily traffic generated, 3) estimated maximum peak hour traffic generated and time of occurrence, 4) indicate source of trip generation rates used in the estimates, and 5) availability of transit and/or other alternative transportation modes. 1) No parking spaces exist on site, and no parking spaces are proposed, apar t f •oin parking for residences at each individual property (i.e. garage space for two to three vehicles and driveway). Residential home driveway space and proposed public street widths within the project site will accommodate residential visitor parking needs. 2) Results f -om a MnDOT draft study indicate that current (2012) daily traffic generated along County State Aid Highway 36 is approximately 850 average annual daily traf e counts (ADT) between Robinson Street and Minnesota Highway 101. The project would add 3,640 ADT assuming 10 trips per day per home. 3) Peak traffic hours in and around the project area are anticipated to be the morning and evening rush hours. Morning rush hour is estimated to be f om 7: 30 to 8:30 AMand generate 273 vehicles entering and exiting the subdivision. The evening rush hour is estimated to be f •om 4: 30 to 5: 30 PM and generate 364 vehicles entering and exiting the subdivision. 4) Trip generation is estimated using the 1TE Trip Generation Handbook, 9"' Edition 5) River Rider Public Transit offers transportation service in Benton, Sherburne, and Wright Counties, Monday through Friday, 7: 00 AM to 5: 00 PM. Base fares are $1.25. 6) Light Rail transportation is available at the Elk -River Station approximately 5 miles f •om the site. b. Discuss the effect on traffic congestion on affected roads and describe any traffic improvements necessary. The analysis must discuss the project's impact on the regional transportation system. If the peak hour traffic generated exceeds 250 vehicles or the total daily trips exceeds 2,500, a tiraff c impact study must be p-epared as part of the EAW. Use the format and procedures described in the Minnesota Department of Transportation's Access Management Manual, Chapter 5 (available at: http://www.dot.state.mn.zrs/accessinanagenienth-esources.hhiio or a similar local guidance. The results of the traffic calculations indicate that the proposed project will require a t•aff c impact study. c. Identify measures that will be taken to minimize or mitigate project related transportation effects. The project will install traffic control measures as dictated by MnDOT, Wright County and City of Otsego requirements. December 3, 2015 page 20 19. Cumulative potential effects: (Preparers can leave this item blank if cumulative potential effects are addressed under the applicable EAW Items) a. Describe the geographic scales and timeframes of the project related environmental effects that could combine with other environmental effects resulting in cumulative potential effects. The proposed project is not anticipated to cause potential cumulative effects. The City's Comprehensive Plan is based upon cumulative development actions. The impacts have been evaluated and properties have been developed consistent with the City's Comprehensive Plan. This development is consistent with the City of Otsego Comprehensive Plan for low -density residential development in the project area. b. Describe any reasonably foreseeable future projects (for which a basis of expectation has been laid) that may interact with environmental effects of the proposed project within the geographic scales and timefiames identified above. In addition to the planned 344 homes, Lennar anticipates "ghost platting" approximately 38 additional lots east of the project site. The current project does not include the Lahn Family Farmstead which prevents development of this property and also prevents access to approximately 18 lots southeast of 53r`r Street NE (CSAH 36). These lots are shown on the concept plans. The potential anticipated date for development of these 38 additional lots is unknown. c. Discuss the nature of the cumulative potential effects and summarize any other available information relevant to determining whether there is potential for significant environmental effects due to these cumulative effects The City's Comprehensive Plan is based upon cumulative development actions including implementation of the project as a low density rural residential development. Significant unanticipated environmental effects are not anticipated to result from implementation of this project consistent with the City's Comprehensive Plan. 21. Other potential environmental effects: If the project may cause any additional environmental effects not addressed by items 1 to 19, describe the effects here, discuss the how the environment will be affected, and identify measures that will be taken to minimize and mitigate these effects. No other potential environmental impacts have been identified. December 3, 2015 page 21 RGU CERTIFICATION. (The Environmental Quality Board }will only accept SIGNED Environmental Assessment Worksheets for public notice in the EQB Monitor.) I hereby certify that: • The information contained in this document is accurate and complete to the best of my knowledge. • The EAW describes the complete project; there are no other projects, stages or components other than those described in this document, which are related to the project as connected actions or phased actions, as defined at Minnesota Rules, parts 4410.0200, subparts 9c and 60, respectively. • Copies of this EAW are bei sent to t entire EQB distribution list. Signature Date Title /' ' (%y'(M +� December 3, 2015 page 22 APPENDIX A 1 rerracon Location Map Nov 15 Consulting Engineers and Scientists EAW Lennar Lahn Site Figure 134CO 151H AVEN 1AINNEAPous. 1,14 55441 Otsego, MN 1 PH.(763)48931C0 FAX (783)489-3101 Ir rA0. AiP \ ,nil l ,�ifly,! l ~ N. ( n 7 L co J _ �( j\ `\, i .. -!-+I •jt�q� AYa..4a n�II 19 \ /, I 1 �,\� Bsoi%\'.+ I 24 (I t 19J+ San, �9x, j - -} • j / 1 ` �I I Golf NewW 19'1 1 19 1 SHERBURNE 1^0 1 MIS _' ;' ° Golf P�biii: AG Slp s:<<, �', a est� - •' Ctuis Gravel Pita + A!� +{ • i ( 11 0 'Al f V. 'St 011h the Ba tist rr( �� 1 ?A �1 JJJ �• ' .� '�'1 �N I1.1111' 18 �'1 'B9/. '�� ��•.� S� �1 �� /' =' J� �` !' • Site Location I Nt �� /�r�•l _--�fr r �/ I '' 1 ` it\„• :�. I. F/�� \. J�/111• `�•.l� ,'1r I '('-Lt.7 'i St JoanIr Will '� )q�l .-AVf�:Uf• i 1. Mtn ��% r,/�, 1• INo�. all I'll yet Pt 71 _ jt1 h� + Irli ,1 . .�_� `� �.• �; `�'�` (/' `' �c • I.wt+. cl ' �)�J �y, ( -. i J • ICJ '�` . IF 1 / V .. . - �\ t4]5 �Otr!�-. _ ! !Jf �7•! AVFnuF -� - j } o� Copyright:© 2013 National Geographlc;Spclety; i-cubed Source: National Geographic Society; 1-cubed / Project No. MP147329 P 0I . . 10. . . 2,000 Feet Projection: NAD83 UTM Zone 15N RI 1 rerracon USGS 7.5 Minute Quadrangle Map Nov 15 Consulting Engineers and Scientists EAW Lennar Lahn Site Figure 134CO 151H AVE N MINNEAPOLIS.1.1.4 65441 Otsego, MN 2 PH. (T63) 489.3100 FAX (763) 489-3101 Sources: Microsoft Bing Aerial Maps; USDA 0 675 Feet Protection: NAD83 UTM Zone 15N Project No. MP147329 1 1 I rerracon Consulting Engineers and Scientists 134W 15TH AVE N }dINNEAPOLIS. 611 65441 PH. (763) 489.3100 FAX (763) 469.3101 Site Soils I Nov 15 FAW Lennar Lahn Site I Figure M Otsego, N 3 µ f, r` - ) •b� 1 � _ .-�� '! -�' Ili � _ � 'v' Site Location��1, n,l A�cyl 52i fix, � % :�i' .. - _- .•,� � Ever9iem - It � � �.+� r` "'1 T. Freshwater Emergent Wetland rub Wetland Freshwater Forested/Sh Freshwater r i `�R`Rda' + >.•' - rb sy,� �,�. �. ,�'JG' "1""'lll :.—�: •-�' 1:J - �� '• � r) Imo. Isan•avc0 - �;�'- Pond .a �Lake Other Paiustrine Emergent Wetland jj. Riverine �i ' i-r-,•,. —,� -------�----- r� � . i , �`[1��Ej��� pft �.���° Source: Microsoft Bing Aerial Maps; MDH; City of Otsego Project No. MP147329 0 670 Feet pro Projection: NAD83 UTM Zone 15N 1 1 ' ' 1 rerracon Well Locations Nov 15 Consulting Engineers and Scientists EAW Lennar Lahn Site Figure 134C0 15TH AVE N NIMEAPOLIS,1.1.4 55441 Otsego, MN LJ PH. (70) 4893100 FAX (7G3)4893101 APPENDixB 1,uy, d dP6 01 or IT ly if It Jill it ii is Ii iE ;E _ is '�.-�`� �± ;F. ��''�r,,� � •.r� € o Z -},t 7.. it da it umn ii I ,F ,P f g€k 1 "OR H t. �• 7E f 1 �` •ipNN,AacIIE 4 i a=o�Eg�. ,i ! —� J� ,;�• f� _ � =�s day 1E •-'- - •':�'�_-:* 4c\Ni .`: •; ^'^='Fiy�-'�`�.\ _ `fib DiL � i i � i x �0, C� i l l• 1 W o y F Z K O J z ' o,V. DEPARTMENT OF THE ARMY ST. PAUL DISTRICT, CORPS OF ENGINEERS �.v t, 180 FIFTH STREET EAST, SUITE 700 ST. PAUL MINNESOTA 55101-1678 V. r J' 11/10/2014 REPLY TO ATTENTION OF Operations Regulatory (MVP-2014-03949-JCD) THIS IS NOT A PERMIT Warren Tuel Liesch / Terracon 13400 15th Ave. N. Plymouth, MN 55441 Dear Mr. Tuel: We have received your submittal described below. You may contact the Project Manager with questions regarding the evaluation process. The Project Manager may request additional information necessary to evaluate your submittal. File Number: MVP-2014-03949-JCD Applicant: Paul Tabone Project Name: Lennar Homes / Hahn Development Site Delineation Received Date: 11 /04/2014 Project Manager: Jessie Diaz U.S. Army Corps of Engineers Regulatory Branch 180 Fifth Street East, Suite 700 St. Paul, Minnesota 55101-1678 651-290-5975 Additional information about the St. Paul District Regulatory Program can be found on our web site at http•//www mvp usace army mil/inissioiis/regulatory. Please note that initiating work in waters of the United States prior to receiving Department of the Army authorization could constitute a violation of Federal law. If you have any questions, please contact the Project Manager. Thank you. U.S. Army Corps of Engineers St. Paul District Regulatory Branch I 7 I I�a.l US Army corps or Engineers St, Paul District Request for Corps of Engineers Wetland Delineation Review Please enter the following general information about the property under review: Name of property owner Lennar Homes Property Address (No. & Street, City, State, Zip Code) 17700 County Highway 36, Otsego, MN Lat. 45.233 ° Long. 93.527 decimal degrees) County Wright Location: East1/4 Section 1 Township 120N Range 26W Size of review area 200 acre(s) By submission of this wetland delineation report I am requesting that the U.S. Army Corps of Engineers, St. Paul District provide me with the following (check only one box): ❑✓ Wetland Delineation Concurrence. Concurrence with awetland delineation is a written notification fi-om the Corps concurring, not concurring, or corrunenting on the wetland boundaries delineated on a property. Under this request, the Corps will not address the jurisdictional status of the wetlands on the property, only the boundaries of the resources within the review area. ❑ Preliminary Jurisdictional Determination. Preliminary Jurisdictional Determination. A preliminary jurisdictional determination is a nonbinding written indication that there may be waters of the United States, including wetlands, on a parcel or indications of the approximate location(s) of waters of the United States or wetlands on a parcel. For purposes of computation of impacts and compensatory mitigation requirements a permit decision made on the basis of a preliminary jurisdictional determination will treat all waters and wetlands in the review area as if they are jurisdictional waters of the U.S. Preli ninary jurisdictional determinations are advisory in nature and may not be appealed. ✓❑ Approved Jurisdictional Determination. An approved jurisdictional determination is an official Corps determination that jurisdictional waters of the United States or navigable waters of the United States, or both, are either present or absent on the property. An approved jurisdictional determination precisely identifies the limits of those waters on the project site determined to be jurisdictional under the Clean Water Act or Rivers and Harbors Act. Approved jurisdictional determinations can be relied upon by the affected party for a period of five years. An approved jurisdictional determination may be appealed through the Corps' administrative appeal process. In order for the Corps to process your request, the wetland delineation must be prepared in accordance with the 1987 Corps of Engineers Wetland Delineation Manual, any approved Regional Supplements to the 1987 Manual, and the Guidelines for Submitting Wetland Delineations in Minnesota and Wisconsin (http://www.m/vp.Lisee.army.rul/re Ll a ly/). C '�t�t may- G�f �a ✓ t Requestori - ��= Date Name (typed) Warren Rid - Liesch Associates, Inc. a Terracon Company Project Name and/or Number: Lennar Homes - Otsego, MN PART ONE: Applicant Information If applicant is an entity (company, government entity, partnership, etc.), an authorized contact person must be identified. If the applicant is using an agent (consultant, lawyer, or other third party) and has authorized them to act on their behalf, the agent's contact information must also be provided. Applicant/Landowner Name: Mr. Paul Tabone — Lennar Homes Mailing Address: 16305 36`h Avenue North, Plymouth, MN 55446 Phone: (952) 249-3086 E-mail Address: Paul.tabone@lennar.com Authorized Contact (do not complete if same as above): Mailing Address: Phone: E-mail Address: Agent Name: Warren Tuel — Liesch/Terracon Mailing Address: 13400 15`h Avenue North, Plymouth, MN 55441 Phone: (763)489-3100 E-mail Address: Warren.tuel@Iiesch.com PART TWO: Site Location Information County: Wright City/Township: Otsego Parcel ID and/or Address: Rawlings Ave NE and Randolph Ave NE Legal Description (Section, Township, Range): Sec 1, T120N, R26W Lat/Long (decimal degrees): N45 Deg, 14' 00.0" W93 Deg 31' 40.0" Attach a map showing the location of the site in relation to local streets, roads, highways. Approximate size of site (acres) or if a linear project, length (feet): 200 Acres If you know that your proposal will require an individual Permit from the U.S. Army Corps of Engineers, you must provide the names and addresses of all property owners adjacent to the project site. This information may be provided by attaching a list to Your application or by using block 25 of the Application for Department of the Army permit which can be obtained at: http://wwav mvp usace army mil/Portals/57/does/regulatory/Rep,ulatoryDocs/engform 4345 2012oct.pdf PART THREE: General Project/Site Information If this application is related to a delineation approval, exemption determination, jurisdictional determination, or other correspondence submitted prior to this application then describe that here and provide the Corps of Engineers project number. Describe the project that is being proposed, the project purpose and need, and schedule for implementation and completion. The project description must fully describe the nature and scope of the proposed activity including a description of all project elements that effect aquatic resources (wetland, lake, tributary, etc.) and must also include plans and cross section or profile drawings showing the location, character, and dimensions of all proposed activities and aquatic resource impacts. The applicant proposes construction of a Dollar General store at the site. Grading of the site will include filling and realignment of an existing drainage channel that flows through the property in a southwest to northeast direction. Plans for the facility are in the development stage and will be submitted under separate cover once the final design and proposed impacts to aquatic resources are determined. Minnesota Interagency Water Resource Application Form February 2014 Page 3 of 11 Project Name and/or Number: Dollar General — Chisholm, MN PART FOUR: Aquatic Resource Impact' Summary If your proposed project involves a direct or indirect impact to an aquatic resource (wetland, lake, tributary, etc,) identify each impact in the table below. Include all anticipated impacts, including those expected to be temporary. Attach an overhead view map, aerial photo, and/or drawing showing all of the aquatic resources in the project area and the location(s) of the proposed Impacts. Label each aquatic resource on the map with a reference number or letter and identify the Impacts In the following table. Aquatic Resource ID (as noted on overhead view) Aquatic Resource TypeCommunity (wetland, lake, tributary etc.) Type of Impact (fill, excavate, drain, or remove vegetation) Duration of Impact Permanent (P) or Temporary , (T) Size of Impact: overall Size of Aquatic 3 Resource Existing Plant Type(s) in < Impact Area County, Major Watershed 0, and Bank Service Area A s of Impact Area llf impacts are temporary; enter the duration of the impacts In days next to the "T". For example, a project with a temporary access fill that would be removed after 220 days would be entered "T (220)". =impacts less than 0.01 acre should be reported in square feet. Impacts 0.01 acre or greater should be reported as acres and rounded to the nearest 0.01 acre. Tributary impacts must be reported in linear feet of Impact and an area of impact by Indicating first the linear feet of impact along the flowline of the stream followed by the area Impact in parentheses). For example, a project that impacts 50 feet of a stream that Is 6 feet wide would be reported as 50 ft (300 square feet). 3This is generally only applicable if you are applying for a de minimrs exemption under MN Rules 8420.0420 Subp. 8, otherwise enter "N/A". °Use Wetland Plants and Plant Community Types of Minnesota and Wisconsin 3 d Ed. as modified in MN Rules 8420.0405 Subp. 2. sRefer to Major Watershed and Bank Service Area maps In MN Rules 8420.0522 Subp. 7. If any of the above identified impacts have already occurred, identify which impacts they are and the circumstances associated with each: Impacts have not occurred at the time of this application. PART FIVE: Applicant Signature ❑ Check here if you are requesting a pre -application consultation with the Corps and LGU based on the information you have provided. Regulatory entities will not initiate a formal application review if this box is checked. By signature below, I attest that the information in this application is complete and accurate. I further attest that I possess the authority to undertake the work described herein. Signature: AA Date: /0 - - ,2J/ I hereby authorize Warren Tuel with Liesch/Terrocon to act on my behalf as my agent in the processing of this application and to furnish, upon request, supplemental information in support of this application. l 1 The term "impact" as used In this joint application form is a generic term used for disclosure purposes to identify activities that may require approval from one or more regulatory agencies. For purposes of this form it is not meant to indicate whether or not those activities may require mitigation/replacement. Minnesota Interagency Water Resource Application =orm February 2014 Page 4 of 11 Project Name and/or Number: Lennar Homes —Otsego, MN Attachment A Request for Delineation Review, Wetland Type Determination, or Jurisdictional Determination By submission of the enclosed wetland delineation report, I am requesting that the U.S. Army Corps of Engineers, St. Paul District (Corps) and/or the Wetland Conservation Act Local Government Unit (LGU) provide me with the following (check all that apply): Wetland Type Confirmation ® Delineation Concurrence. Concurrence with a delineation is a written notification from the Corps and a decision from the LGU concurring, not concurring, or commenting on the boundaries of the aquatic resources delineated on the property. Delineation concurrences are generally valid for five years unless site conditions change. Under this request alone, the Corps will not address the jurisdictional status of the aquatic resources on the property, only the boundaries of the resources within the review area (including wetlands, tributaries, lakes, etc.). Preliminary Jurisdictional Determination. A preliminary jurisdictional determination (PJD) is a non -binding written indication from the Corps that waters, including wetlands, identified on a parcel may be waters of the United States. For purposes of computation of impacts and compensatory mitigation requirements, a permit decision made on the basis of a PJD will treat all waters and wetlands in the review area as if they are jurisdictional waters of the U.S. PJDs are advisory in nature and may not be appealed. ® Approved Jurisdictional Determination. An approved jurisdictional determination (AJD) is an official Corps determination that jurisdictional waters of the United States are either present or absent on the property. AJDs can genera►ly be relied upon by the affected party for five years. An AJD may be appealed through the Corps administrative appeal process. In order for the Corps and LGU to process your request, the wetland delineation must be prepared in accordance with the 1987 Corps of Engineers Wetland Delineation Manual, any approved Regional Supplements to the 1987 Manual, and the Guidelines for Submitting Wetland Delineations in Minnesota (2013). http•//www mvp usace army.mil/Missions/Resulatory/DelineationJDGuidance.aspx Minnesota Interagency Water Resource Application Form February 2014 Page 5 of 11 1;- _�- � `_ _ a I,f+nnwolaUnl uoVloOAb, hIWIlE60TADEPARTMEN'rOPHEALTH Entry Data 0IQ312007 p� Ccunly lYrighl Y 747270 quad Rogors WELL AND BORING RECORD Update Data 0911841014 Quid lD 121A M;nnosofa Sfa(ulos Chaptsrl0l Received Data 02D220D7 Wall Name OTSEGO TVI-6 Will Depth DepthComploted Data WellComp;olad TonniNp Ringo DIr Soolion Subsections Davallon 866 R. 440 1t. 440 ft. 0111212007 120 23 W 1 ABC386 BavallonMethod 7bninubbpographfomap(a1.6fool) DrlDngblolhed)Adf lomahodaused Wall Address RANDOLPH AV OTSEGO MN 66330 Dr10ngFluid Waler WoOHydrofreoluradl ❑ Yes Q Ho From R ID Fl Use Abandoned Status Sealed CasfnOTypa Steal (black orlow carbon) Jo'nllVolded DrNeShoel Q Yes ❑tie AboVelBofoW ft. Geological Material CLAY COARSE SAND Color BROWN BROWN Hardnase SOFT SOFT From 0 10 To 10 16 Casing Diameter Wei0ht Hole Diameter COARSE SAND/GRAVEL SILTY FINE SAND GRAVEL, ROCK BROWN BROWN BROWN SOFT SOFT MED-HRD Is 60 06 00 65 70 10 In. to f01 ff. 40.46 Ibs/f . 10 1n. to 101 ft. 6 In. to 376 It. 18.97 Iba/16 6 In. to 376 fL OponHofo 0om376 R to 440 A GRAVEL, ROCK CLAY LENSES BROWN MED•HRD 70 75 SoroonNO Make Type GRAVEL, ROCK BROWN MED-HRO 75 100 SHALE, GRAVEL GRWBRN SOFT 100 105 SHALE, SANDSTONE GRN/GRY/BLU/TAN SANDSTONE, S14ALE GRYIRED(BLU/GRN VARIED VARIED MEDIUM MEDIUM 106 126 125 160 Diameter SIoUGauza Length Sat Between SHALE GREEN MEDIUM 150 200 SHALE, SANDSTONE GRN/GRYITANIGRY BLACK SOFT 200 202 SHALE, SANDSTONE GRN/GRY/TAWGRY VARIED SOFT 202 225 SANDSTONE TAN SOFT 226 245 Ratio Water Laval -6 1. pomLandsudaoa DabLbowrnd 01/9/2007 SANDSTONE& SHALE SANDSTONE d SHALE SHALE, SANDSTONE, GRAVEL LENSES SANDSTONE, SHALE SHALE, SANDSTONE GRN/GRY/TAN TAWGRN TAWGRN VARIED TAWGRN VARIED MEDIUM MEDIUM MEDIUM MEDIUM MEDIUM 246 248 270 2110 265 2.48 270 • 260 2S6 300 PIIMPINGLEVR(belowlandswfeca) 2156 2 after 5b brapunping 300 m SHALE, SANDSTONE GRWFAN MEDIUM 300 323 SHALE, SANDSTONE GRWrAN MEDIUM 323 370 WalileadCompiollon SANDSTONE TAN SFr•MEO 370 432 Rtessadiplarmenufa 4for hbdel SANDSTONE RED HARD 432 440 ❑Caringl'rokcton [L��AA =1121n.e6aw grade ❑ Al -grade LwArorumnial Wells and lkringsONLY) REMARKS Grouthglnfornrelbn Wel Groulad7 A Yes ❑ Ho ❑ Nolspedtad 1.10,9N0.4663, GA'AVALOGGED 1-12-2007. L000ED BY IMTRAEN. SEALED 0741.2008 BY f 404; PREVIOUS USETW GmutMaladel: Neal Cement from to 375 R. 8.6 yrds. Localadby:hinnosolaGeologlcalSurvoy Method: DlgiTaalon(Saoen)-Mep(124,000) Unlqua Numbar Vorilloalkn' InfeUPsrromdatasourca Input Osta: 0123fM7 Naaroet Known Source ofConlaminallon S/eiom: U71144 03,7=16.1folera X 450229 Y: 6009322 fool _dpoclon _We Welldfs'n(ected ncoopleson7 ❑ Yes ❑ No Punip ❑ Natlnilalled Dalalnsaled Manufacturar'snalm tkdelounber— HP_ t4116 LongtholdrapFira E Capadlij.pnn Igo Meleriel Abandoned Ylob Baas proporty hate anynol In use and nolsealod xroV(c)7 ❑ Yes © No Variance Was a valance panled fromfne t✓flll forNswelq ❑ Yes © Ab Wan Contractor CerBlkalfon Cullings Yes Dorabolo Geophysics Yes Rrit0odrock Tunnel GTy Group Aquifer hLSLmn MsrkJTfautWBlla.lnc 1404 SAROBI E Las161ral HncHeySandsbne DeplhtoBodroak 105 ff. License DishanNan Uc.OrRog.No, HarreofDdllar Countwell Index Online Report y p 747270 Printed i t/3/201A HB01205-07 thnnowla Un7 uo IV"' 0. County Wright MINNESOTADEPARRIFNTOFHEILTH Entry Dale 0411711980 218017 Ouad wRr MLL AND BORING RECORD update Date 00110.2014 Quad lD 121A h9Anosob SfalaW Chapter 103) Received Oda Wag Name CRCAVR•FAIVAPAWill Wo1IDoplh Depth Comploted No WallComp!olod Townshfp Range Dir Section SubsooUans EHvaUon 892 IL 6C0 ft. 69DrL 030011920 120 23 W 1 DLV.BDA ElavrdlouMethod 75m'nutebpographbrmp(+1.61eal) WWII Hethod OobloToo] WallAUdross Orh4 Fldd WeBHydrofmc(umdl ❑ Yoa ❑ No DAYTON MN 66327 — From R b Fl Uae Donasle Casing Typo Joint NohfermaSon Drive Shoo? ❑ Yes ❑ 140 Ab0va4Telow IL Geological Material Color Hardness From To TOP SOIL, SANDY LOAM 0 1 SAND, CLAY & GRAVEL, MIXED 1 6 Casing Diameter Weight Hole Diameter OPOnHolo from R to IL YELLOWCLAY 6 11 CLEAN SAND 11 61 FINE SAND & CLAY 61 91 Screen (Jake Type WATER -BEARING SAND & GRAVEL 91 140 HEAVY GRAVEL & STONES 140 160 Diameter 61oUGauzo Length sot Bepvuen HARD LT. BRN SNDS VERY BRITTLE< ISO 100 ST. PETER SANDROCK 180 ISO VARI-COLORED SHALE 190 350 JORDAN SANDSTONE 350 400 RED SHALE 400 408 BLUE SHALE (VERY GUMMY) 406 460 GRAY SANDSTONE TRACE OF WHITE SH 450 460 DRESBACH OR COARSE -GRAINED SNDS 460 600 S6110Water Level 32 R homLendwrlaw DakfAMwfed 03d0011928 PURPINGLEVEL(bobwlend emlace) IL agar hm.puffirbg lipm. Wog Hoad Comp!ogon Rfessadaptof manufacturer I&del ❑ Cadngftwem ❑ 121n.abowgrado ❑ A gradePAronmenblWelsandVwfngsD;ILY) REMARKS WATER LEVELATADEPTHCF300FT.WAS39FT.0,11. (SURFACE Oraul hghlaet rmbn WeIlGtoumd7 El Yes ❑ No Q Nol✓�ped6od WATER LEVEL ATA DEPTH CF 176 Fr. WAS60 FT, BROW SURFACE, WATER LEVELATA DEPTH OF 600 Fr.IVAS32 FT. BBAW SURFACE Locatsdby; MnnawtaGeeiog!calSurvay blathod: Dlgllted-sca!o124,000orlarger(DiglfzingTabb) UrYquo Humbor Vadlballon: Inkralfa110omn111ghbor hpnlDde: 04/1211995 hyeroalKnown Source ofContaminalbn jaet_direction _ype byatem:IRM-Abd03,Zone 16,Afelare X458506 Y:5006700 Waldislnfededupon wnpletm7 ❑ Yes ❑ Na Pump ❑ HollnsWlod Datelnslalled l&nufacWreraname NWalnueber_ HP_ Wits Len hofdry Fl e 0 Capadyjpa Type kAbrlat AbandanadWoOa Doaspr0 to haw any not In use andnolwalodnol a)7 ❑ Yes ❑ Ho VArknc@YlasevarlancogranLdkomlhahDHlxhlswoU2 ❑ Yes ❑ No Wog Contractor Cortlicatlon FhalOndroek Jordan Sandstone Aquifer Renner Max Wei Co. 27248 Lasl$ual htSirmn Sandstoono Doplhto Dodrock 160 fL Lloanse Audnew Name LIo. Or Rag. No. Naeeol Ddler County Well Index Online Report 218017 Pdnled U14 HE-0120�01206-07 MfnnesotnUnl ue1'110PRo. Cobmly 1vr:0ht M11!IINE&DTAOEPARTSIElIf OF fIEALTrI Ehlry Oelo 0302013 791542 Quid Rogers WELL AND BORING RECORD UpdateDtle 07292013 QuadlD 121A Mhneao(aSlalu(asChap(orloV RocabodDalo 01117/1013 Wag Wine 0UIK11.DfLL V/alooplh DepUbCompleted Data WallComploled Townehlp Range Dlr Soollon Subsections Elovallon 092 if. 110 (1. 110(L 00222012 120 23 W 1 ACOOBA Elevation Method CaoOomNED(Na1F1oY.Da1awI.30nj Drllln thiliodHen edfalRota ry "'all Address 1768655THST NE OTSEGO MN 65374 Drllln HuU ni BanbNH From FL oiraofured7 ❑ Yes Q Ab From FL to Ft Use gamic Caeingrype Flaslo Join[Glted Drive Shop? ❑ Yea Q No AbovolBalow It. Geologlcalfdatertal Color Hardness From TO CLAY/GRAVEL VARIED MEDIUM D 93 SANOIGRAVEL VARIED SOFT 03 110 casing Diameter Weight Holo Diameter 4 In. to 100 R. 1.9 lba/R. 6.76 In. to 110 R. OpqnHole Yom 6 to It. ScroonYES Make B'.GFOOT Typo plas5o Diameter 910110auac Length Bet Between 4 10 10 100 R. and 110 R. Stalk Walor Level 46IL BomLandsurface DohlMaoured FUMPIIIO LEVEL (below land surface) T00 R albr 2 hmpunIng 100 p m Wall Head Completion 'Il'la1ssadeplarmanuladuisr ACUASEAL Model 4 I 11CadnaProlecdon [ 12fn,abomgrado ❑ Al-grade(FnY.ronrmnte(Walsand Bwing%Q%Y) NO REMARKS Oroullopinfotntallan Wa1Gou(nd7 © Yea ❑ He ❑ 1105pedted GroulMatedal: Cultinge from 60 to IGO R. Locatadby: SlnnesotaDeparlTentolllealtr blo0bod:G?SSA00(averaged) Grout Material: Bentonito from to 60 ft. 3 bags UnIquONumberVorlDaallan: hIaMf(amdalascurco lopulDate: 10242012 Nearest Known Source of Contamination ,sleet g_dlreclon Sewer typo Syatem:0F81-Nad03,Zone 16,Mehrs X:450401 Y:6000040 Weldldnk*dupon w lofonl ❑ Yes ❑ Ito Pump ❑ Nothsbled Dalelnslalled092,1 012 Nanufafter'snama U7 Sbdolnunborl2T-5 HPIS Wont q Len floldruP ofLfL Capadly_g. m Typo§0ffjAM Mabdal AbandouedWal'e Does properyhaveany ratio utoand nolsaaledwal'(s)7�I❑ Yes R He Varlenoe Was a valence granted 4om6eADH for Ibis welt? [I Yes Q 110 Wall Contractor CotlS'nollon Flrit Bodrook Aquifer JAEbafoino Well Drit4bo.lno ) 352 ILCALF111EJ, LesIsteat DaplhtoBedrock ft, LlcamoRWrossliane LIaOrReg.No. Namolpfler County Well Index Online Report 791542 Printed 11/312014 HE01205.07 z� zF� gz n. W zw o c� f-)z wa o� } as pd uQl J w Ifi (� O z N Z z Q APPENIDIX E Minnesota Department of Natural Resources Division of Ecological and Water Resources, Box 25 500 Lafayette Road St. Paul, Minnesota 55155-4025 MNDNR Phone: (651) 259-5109 E-mail: lisa.joyal@state.mn.us December 9, 2014 Correspondence # ERDB 20150118 Mr. Jim de Lambert Liesch Associates 13400 15th Avenue North, Suite A Plymouth, MN 55441 RE: Natural Heritage Review of the proposed Otsego Lennar Residential Development, T120N R23W Section 1 & 12; Wright County Dear Mr. de Lambert, As requested, the Minnesota Natural Heritage Information System has been queried to determine if any rare species or other significant natural features are known to occur within an approximate one -mile radius of the proposed project. Based on this query, rare features have been documented within the search area (for details, see the enclosed database reports; please visit the Rare Species Guide at http://www.dnr.state.mn.us/rsg/index.html for more information on the biology, habitat use, and conservation measures of these rare species). Please note that the following rare features may be adversely affected by the proposed project: • Blanding's turtles (Emydoidea blandingii), a state -listed threatened species, have been reported from the vicinity of the proposed project. Although we have no records from directly within the project site, turtles may use the site if it contains suitable habitat. Blanding's turtles use upland areas up to and over a mile distant from wetlands, as well as wetlands. Uplands are used for nesting, basking, periods of dormancy, and traveling between wetlands. Because of the tendency to travel long distances over land, Blanding's turtles regularly travel across roads and are therefore susceptible to collisions with vehicles. Any added mortality can be detrimental to populations of Blanding's turtles, as these turtles have a low reproduction rate that depends upon a high survival rate to maintain population levels. Other factors believed to contribute to the decline of this species include wetland drainage and degradation, and the development of upland habitat. For your information, I have attached a Blanding's turtle fact sheet that describes the habitat use and life history of this species. The fact sheet also provides two lists of recommendations for avoiding and minimizing impacts to this rare turtle. Please refer to the first list of recommendations for your project. If greater protection for turtles is desired, the second list of additional recommendations can also be implemented. For further assistance regarding the Blanding's turtle, please contact Erica Hoaglund, DNR Regional Nongame Specialist, at 651-259-5772. The attached flyer should be given to all contractors working in the area. If Blanding's turtles are encountered on site, please remember that state law and rules prohibit the www.nindnr.gov AN EQUAL OPPORTUNITY EMPLOYER destruction of threatened or endangered species, except under certain prescribed conditions. If turtles are in imminent danger they should be moved by hand out of harm's way, otherwise they should be left undisturbed. The Environmental Assessment Worksheet should clearly discuss potential impacts to Blanding's turtles, and identify any measures (e.g., fact sheet recommendations) that will be implemented to avoid, minimize, or mitigate disturbance. Several rare mussels have been documented in the Crow River in the vicinity of the proposed project. As mussels are particularly vulnerable to deterioration in water quality, especially increased siltation, it is important that effective erosion prevention and sediment control practices be implemented and maintained near the river and incorporated into any stormwater management plan. • The Environmental Assessment Worksheet should address whether the proposed project has the potential to adversely affect the above rare features and, if so, it should identify specific avoidance or mitigation measures that will be implemented. Please include a copy of this letter in any DNR license or permit application. The Natural Heritage Information System (NHIS), a collection of databases that contains information about Minnesota's rare natural features, is maintained by the Division of Ecological and Water Resources, Department of Natural Resources. The NHIS is continually updated as new information becomes available, and is the most complete source of data on Minnesota's rare or otherwise significant species, native plant communities, and other natural features. However, the NHIS is not an exhaustive inventory and thus does not represent all of the occurrences of rare features within the state. Therefore, ecologically significant features for which we have no records may exist within the project area. If additional information becomes available regarding rare features in the vicinity of the project, further review may be necessary. The enclosed results include an Index Report of records in the Rare Features Database, the main database of the NHIS. To control the release of specific location data, the report is copyrighted and only provides rare features locations to the nearest section. The Index Report may be reprinted, unaltered, in any environmental review document (e.g., EAW or EIS), municipal natural resource plan, or report compiled by your company for the project listed above. If you wish to reproduce the Index Report for any other purpose, please contact me to request written permission. For environmental review purposes, the results of this Natural Heritage Review are valid for one year; the results are only valid for the project location (noted above) and the project description provided on the NHIS Data Request Form. Please contact me if project details change or for an updated review if construction has not occurred within one year. The Natural Heritage Review does not constitute review or approval by the Department of Natural Resources as a whole. Instead, it identifies issues regarding known occurrences of rare features and potential effects to these rare features. To determine whether there are other natural resource concerns associated with the proposed project, please contact your DNR Regional Environmental Assessment Ecologist (contact information available at http://www.dnr.state.mn.us/eco/ereview/erp region contacts. htm1). Please be aware that additional site assessments or review may be required. Thank you for consulting us on this matter, and for your interest in preserving Minnesota's rare natural resources. An invoice will be mailed to you under separate cover. Page 2 of 3 Sincerely, Lisa Joyal Endangered Species Review Coordinator enc. Rare Features Database: Index Report Blanding's Turtle Flyer and Fact Sheet Wildlife Friendly Erosion Control cc: Brooke Haworth Erica Hoaglund Page 3 of 3 N � w O ti v° w a y O CA a �x oaC7 b1 C ra H U cn y C _ y 1C4 Cq S A� a r O ° y rA H �-dN a}i� "l a),F 2'0U R N d�aa O z O 0 H d � ^O :It W w _ a u o °� cMci N U O 4. ci m Q 4)42 A a 0 o y c°e z .� �. di b> ca aQ w Y. E a N � `N a, ri a o ^ C1, 0 Cn �o Cl) ID a a p O a O o o O�Cd CD G N 0 N 0 N ° bD N Y q G7 y � 3 °v V] M Cl) G L7 n rn o G U U o 00 d) a 0 C7 E G - b (�] •-'�^ C o G .�E 67 ts v d v N bb C m T N �O U cd cd om a .x bu (� i4 O 0 N b0 ooNv z o oy aAi G o aai U U id o 0 N a� oo .� N u ul cn as 3 cn �( Hy �"• bll N O p. Ch � N cli Ci) a a a Icq 3 G M z o N C N a� o m F G ° F o G 5n O " zm N bo N ry N m b cRyr U H (x W G N M p o� -, v N o u zbi F N F E vC "I E oo UC d c cd n Q' . o U U) 7 '� H N 3 c N G •C .o climax! ;; a a .� cq � .�� d M C •C N � OOJ cCD M P4 b M � F ,Q Q O O F ld z .N-i iin F G,I a y P+ U 4. G S o O U o 0 OC abi o F N O N 3 y w o� 0 U G U � O w~ � � U y � G � � v H A N c U .d b YL G id cd al F+ o G bz F 0 d a w d) o .� y � � •U G N O •� 00 O-r vj G II o v a o C01 O P. N btl 0 a� N w •� II a W ob +-' U to a� v o zw �U b�^b N Fyy J 0 ° >' G O �z aFi o � N o � •d. z W - c U G N to a � 3 N U N G cd cy O or, dq � H E� oa F, cV o II Cd o En �gqzoo b per, II o o .0 T id ,�A o o v 'd, O p p y cOi .� w 0 'O Ip o n o o y a q W a o > a�i O Ow a II b w o av abi w w w o p c� o d) p N V vi p '� O ,p N N O 4) > P a j ;3 °A yo II N II v >C m `� aCi o cy13 Na w Cd3 o C7 b � II W II � � a. o � •� 3 II � a� q a 0 0 0 x 8 y o bo G f 0� cad Q cd N N aJ o q ce N n a i o w" y p id R' q ai a> C A 42 N v� II abi p O cg c°qq�i ^ �7 cd H R11.-i.�� v] CD > o O 7 O coi z ,� t (d i'' � N N pp �• 0 O W ,��, °� Q o o 0 0 .o 3 0 U AaaNcd'w N o°�A o A 0 o aoq wo i 0o d O .V �NNN �� �Oo �00 �a3 a� a�ocna�Nb N o z v v a b X w oCD ZC oo q a� bjD q cOi o T v o 0, w , •� Sao b�oMo� N 'O cd S O M2 o Z > R a N O q� a 3 N o aoi w a N W oC 0 w ta v' o q •c7 011' N �d acp• n '� w o WA CU ~O O N ~O U .N o w m c�Nd 'd a-, �td O O y a4. o or- o, p o tO c`d aoi aCi oo �qw O-a N aCi a N a a a .. N P. °'4. N o R P. o N vOi >'cd O O4. ,C w C a o `� c� o G a) v '� O a� o Q ti w m C N o • a0i `� o a`di o .n o {� b y II n o" 0 3 a`i p cd coi o a)yo �bA O .flz O �' }d F. bA >o ro °' R C7 � abi Pal a� o b y a�i v >> °J a Py cxod En a c3 Pa " - .- � `� � f�- A sue• o N td Z y -b y N P. p O 4. "d d • U" c07 T U C c'd v I� oo A. o N 3 .7 00 a3 0b q u o oa a °w w W Environmental Review Fact Sheet Series 1 EJu(langeled,'1111-catened, nond Ponvern Species 01,11)(innesota 3ha.nd"' I ''S Tarde (mill 1jt1oid(,a, blamdiiI ,rrl l) Minnesota Status: Threatened State Rank': S2 Federal Status: none Global Rank': G4 HABITAT USE Blanding's turtles need both wetland and upland habitats to complete their life cycle. The types of wetlands used include ponds, marshes, shrub swamps, bogs, and ditches and streams with slow -moving water. In Minnesota, Blanding's turtles are primarily marsh and pond inhabitants. Calm, shallow water bodies (Type 1-3 wetlands) with mud bottoms and abundant aquatic vegetation (e.g., cattails, water lilies) are preferred, and extensive marshes bordering rivers provide excellent habitat. Small temporary wetlands (those that dry up in the late summer or fall) are frequently used in spring and summer -- these fishless pools are amphibian and invertebrate breeding habitat, which provides an important food source for Blanding's turtles. Also, the warmer water of these shallower areas probably aids in the development of eggs within the female turtle. Nesting occurs in open (grassy or brushy) sandy uplands, often some distance from water bodies. Frequently, nesting occurs in traditional nesting grounds on undeveloped land. Blanding's turtles have also been known to nest successfully on residential property (especially in low density housing situations), and to utilize disturbed areas such as farm fields, gardens, under power lines, and road shoulders (especially of dirt roads). Although Blanding's turtles may travel through woodlots during their seasonal movements, shady areas (including forests and lawns with shade trees) are not used for nesting. Wetlands with deeper water are needed in times of drought, and during the winter. Blanding's turtles overwinter in the muddy bottoms of deeper marshes and ponds, or other water bodies where they are protected from freezing. LIFE HISTORY Individuals emerge from overwintering and begin basking in late March or early April on warm, sunny days. The increase in body temperature which occurs during basking is necessary for egg development within the female turtle. Nesting in Minnesota typically occurs during June, and females are most active in late afternoon and at dusk. Nesting can occur as much as a mile from wetlands. The nest is dug by the female in an open sandy area and 6-15 eggs are laid. The female turtle returns to the marsh within 24 hours of laying eggs. After a development period of approximately two months, hatchlings leave the nest fiom mid -August through early -October. Nesting females and hatchlings are often at risk of being killed while crossing roads between wetlands and nesting areas. In addition to movements associated with nesting, all ages and both sexes move between wetlands from April through November. These movements peak in June and July and again in September and October as turtles move to and from overwintering sites. In late autumn (typically November), Blanding' s turtles bury themselves in the substrate (the mud at the bottom) of deeper wetlands to overwinter. IMPACTS / THREATS / CAUSES OF DECLINE • loss of wetland habitat through drainage or flooding (converting wetlands into ponds or lakes) • loss of upland habitat through development or conversion to agriculture • human disturbance, including collection for the pet trade* and road kills during seasonal movements • increase in predator populations (skunks, raccoons, etc.) which prey on nests and young *It is illegal to possess this threatened species. Minnesota DNR Division or Ecological Resources Environmental Review Fact Slice( Series. Blanding' s Turtle. 2 RECOMMENDATIONS FOR AVOIDING AND MINIMIZING IMPACTS These recommendations apply to typical construction projects and general land use within Blanding's turtle habitat, and are provided to help local govermnents, developers, contractors, and homeowners minimize or avoid detrimental impacts to Blanding's turtle populations. List I describes minimum measures which we recommend to prevent harm to Blanding's turtles during construction or other work within Blanding's turtle habitat. List 2 contains recommendations which offer even greater protection for Blanding's turtles populations; this list should be used in addition to the first list in areas which are known to be of state-wide importance to Blanding's turtles (contact the DNR's Natural Heritage and Nongame Research Program if you wish to determine if your project or home is in one of these areas), or in any other area where greater protection for Blanding's turtles is desired. List 1. Recommendations for all areas inhabited by List 2. Additional recommendations for areas known to Blanding's turtles. be of state-wide importance to Blanding's turtles. GENERAL A flyer with an illustration of a Blanding's turtle should be Turtle crossing signs can be installed adjacent to road - given to all contractors working in the area. Homeowners crossing areas used by Blanding's turtles to increase public should also be informed of the presence of Blanding's awareness and reduce road kills. turtles in the area. Turtles which are in imminent danger should be moved, by Workers in the area should be aware that Blanding' s hand, out of harms way. Turtles which are not in turtles nest in June, generally after 4pm, and should be imminent danger should be left undisturbed. advised to minimize disturbance if turtles are seen. If a Blanding's turtle nests in your yard, do not disturb the If you would like to provide more protection for• a nest. Blanding's turtle nest on your property, see "Protecting Blanding's Turtle Nests" on page 3 of this fact sheet. Silt fencing should be set up to keep turtles out of Construction in potential nesting areas should be limited to construction areas. It is critical that silt fencing be the period between September 15 and June 1 (this is the removed after the area has been revegetated. time when activity of adults and hatchlings in upland areas is at a minimum). WETLANDS Small, vegetated temporary wetlands (Types 2 & 3) should Shallow portions of wetlands should not be disturbed not be dredged, deepened, filled, or converted to storm during prime basking time (mid morning to mid- afternoon water retention basins (these wetlands provide important habitat during in May and June). A wide buffer should be left along the to human spring and summer). shore minimize activity near wetlands (basking Blanding's turtles are more easily disturbed than other turtle species). Wetlands should be protected from pollution; use of Wetlands should be protected from road, lawn, and other fertilizers and pesticides should be avoided, and run-off chemical run-off by a vegetated buffer strip at least 50' from lawns and streets should be controlled. Erosion wide. This area should be left unmoved and in a natural should be prevented to keep sediment from reaching condition. wetlands and lakes. ROADS Roads should be kept to minimum standards on widths and Tunnels should be considered in areas with concentrations lanes (this reduces road kills by slowing traffic and of turtle crossings (more than 10 turtles per year per 100 reducing the distance turtles need to cross). meters of road), and in areas of lower density if the level of road use would make a safe crossing impossible for turtles. Contact your DNR Regional Nongame Specialist for further information on wildlife tunnels. Roads should be ditched, not curbed or below grade. If Roads should be ditched, not curbed or below grade. curbs must be used, 4 inch high curbs at a 3:1 slope are preferred (Blanding's turtles have great difficulty climbing traditional curbs; curbs and below grade roads trap turtles on the road and can cause road kills), Minnesota DNR Division of Ecological Resources Environmental Review fact Sheet Series. Blanding' s Turtle ROADS cont. Culverts between wetland areas, or between wetland areas and nesting areas, should be 36 inches or greater in diameter, and elliptical or flat-bottomed. Wetland crossings should be bridged, or include raised roadways with culverts which are 36 in or greater in diameter and flat-bottomed or elliptical (raised roadways discourage turtles from leaving the wetland to bask on roads). Culverts under roads crossing streams should be oversized (at least twice as wide as the normal width of open water) and flat-bottomed or elliptical. Road placement should avoid separating wetlands from adjacent upland nesting sites, or these roads should be fenced to prevent turtles fi•om attempting to cross them (contact your DNR Nongame Specialist for details). Road placement should avoid bisecting wetlands, or these roads should be fenced to prevent turtles from attempting to cross them (contact your DNR Nongame Specialist for details). This is especially important for roads with more than 2 lanes. Roads crossing streams should be bridged. UTILITIES Utility access and maintenance roads should be kept to a minimum (this reduces road -kill potential). Because trenches can trap turtles, trenches should be checked for turtles prior to being backfilled and the sites should be returned to original grade. LANDSCAPING AND VEGETATION MANAGEMENT Terrain should be left with as much natural contour as possible. Graded areas should be revegetated with native grasses and forbs (some non -natives form dense patches through which it is difficult for turtles to travel). Vegetation management in infi•equently mowed areas -- such as in ditches, along utility access roads, and under power lines -- should be done mechanically (chemicals should not be used). Work should occur fall through spring (after October I` and before June V ) As much natural landscape as possible should be preserved (installation of sod or wood chips, paving, and planting of trees within nesting habitat can make that habitat unusable to nesting Blanding's turtles). Open space should include some areas at higher elevations for nesting. These areas should be retained in native vegetation, and should be connected to wetlands by a wide corridor of native vegetation. Ditches and utility access roads should not be mowed or managed through use of chemicals. If vegetation management is required, it should be done mechanically, as infrequently as possible, and fall through spring (mowing can kill turtles present during mowing, and makes it easier for predators to locate turtles crossing roads). Protecting Blanding's Turtle Nests: Most predation on turtle nests occurs within 48 hours after the eggs are laid. After this time, the scent is gone from the nest and it is more difficult for predators to locate the nest. Nests more than a week old probably do not need additional protection, unless they are in a particularly vulnerable spot, such as a yard where pets may disturb the nest. Turtle nests can be protected from predators and other disturbance by covering them with a piece of wire fencing (such as chicken wire), secured to the ground with stakes or rocks. The piece of fencing should measure at least 2 ft. x 2 ft., and should be of medium sized mesh (openings should be about 2 in. x 2 in.). It is very important that the fencing be removed before August W so the young turtles can escape from the nest when they hatch! REFERENCES 'Association for Biodiversity Information. "Heritage Status: Global, National, and Subnational Conservation Status Ranks." NatureServe. Version 1.3 (9 April 2001). http:Hxvww.natureserve.org/ranking.htm (15 April 2001). Coffin, B., and L. Pfannmuller. 1988. Minnesota's Endangered Flora and Fauna. University of Minnesota Press, Minneapolis, 473 pp. Minnesota DNR Division of Ecological Resources Environmental Review Pact Sheet Series. Blanding's Turtle. 4 REFERENCES (cont.) Moriarty, J. J., and M. Linck. 1994. Suggested guidelines for projects occurring in Blanding's turtle habitat. Unpublished report to the Minnesota DNR. 8 pp. Oldfield, B., and J. J. Moriarty. 1994. Amphibians and Reptiles Native to Minnesota. University of Minnesota Press, Minneapolis, 237 pp. Sajwaj, T. D., and J. W. Lang. 2000. Thermal ecology of Blanding' s turtle in central Minnesota. Chelonian Conservation and Biology 3(4):626-636. Compiled by the Afinnesota Departntent of Natural Resources Division gfEcological Resources, Updated Afarch 2005 Endangered Species Environmental Review Coordinalm, 500 L*yette Rd, Box 25, St. Paul, LILY 55155 / 651-259-5109 CAUTION BLANDING'S TURTLES MAY BE ENCOUNTERED IN THIS AREA The unique and rare Blanding's turtle has been found in this area. Blanding's turtles are state -listed as Threatened and are protected under Minnesota Statute 84.095, Protection of Threatened and Endangered Species. Please be careful of turtles on roads and in construction sites. For additional information on turtles, or to report a Blanding's turtle sighting, contact the DNR Nongame Specialist nearest you: Bemidji (218-308-2653); Grand Rapids (218-327-4518); New Ulm (507-359-6033); Rochester (507-206-2820); or St. Paul (651-259-5772). DESCRIPTION: The Blanding's turtle is a medium to large turtle (5 to 10 inches) with a black or dark blue, dome -shaped shell with muted yellow spots and bars. The bottom of the shell is hinged across the front third, enabling the turtle to pull the front edge of the lower shell firmly against the top shell to provide additional protection when threatened. The head, legs, and tail are dark brown or blue -gray with small dots of light brown or yellow. A distinctive field mark is the bright yellow chin and neck. BLANDING'S TURTLES DO NOT MAKE GOOD PETS IT IS ILLEGAL TO KEEP THIS THREATENED SPECIES IN CAPTIVITY SUMMARY OF RECOMMENDATIONS FOR AVOIDING AND MINIMIZING IMPACTS TO BLANDING'S TURTLE POPULATIONS (see Blanding's Turtle Fact Sheet for fill recommendations) • This flyer should be given to all contractors working in the area. Homeowners should also be informed of the presence of Blanding's turtles in the area. • Turtles that are in imminent danger should be moved, by hand, out of harm's way. Turtles that are not in imminent danger should be left undisturbed to continue their travel among wetlands and/or nest sites. • If a Blanding's turtle nests in your yard, do not disturb the nest and do not allow pets near the nest. • Silt fencing should be set up to keep turtles out of construction areas. It is critical that silt fencing be removed after the area has been revegetated. • Small, vegetated temporary wetlands should not be dredged, deepened, or filled. • All wetlands should be protected from pollution; use of fertilizers and pesticides should be avoided, and run-off from lawns and streets should be controlled. Erosion should be prevented to keep sediment from reaching wetlands and lakes. • Roads should be kept to minimum standards on widths and lanes. • Roads should be ditched, not curbed or below grade. If curbs must be used, 4" high curbs at a 3:1 slope are preferred. • Culverts under roads crossing wetland areas, between wetland areas, or between wetland and nesting areas should be at least 36 in. diameter and flat-bottomed or elliptical. • Culverts under roads crossing streams should be oversized (at least twice as wide as the normal width of open water) and flat-bottomed or elliptical. • Utility access and maintenance roads should be kept to a minimum. • Because trenches can trap turtles, trenches should be checked for turtles prior to being backfilled and the sites should be returned to original grade. • Terrain should be left with as much natural contour as possible. • Graded areas should be revegetated with native grasses and forbs. • Vegetation management in infrequently mowed areas -- such as in ditches, along utility access roads, and under power lines -- should be done mechanically (chemicals should not be used). Work should occur fall through spring (after October lst and before June I") Compiled Gv the Alinnesola Del m7ment ol'A'atural Resources Division of Ecological and lVater Resources, Updated august 2012 Endangered Species Review Coordinator, 500 LgfQvelle Rd, Box 25 St. Paul, AIN 55155 / 651-259-5109 Wildlife Friendly Erosion Control Wildlife entanglement in, and death from, plastic netting and other man-made plastic materials has been documented in birds (Johnson, 1990; Fuller-Perrine and Tobin, 1993), fish (Johnson, 1990), mammals (Der aik, 2002), and reptiles (Barton and Kinkead, 2005; Kapfer and Paloski, 2011). Yet the use of these materials continues in many cases, without consideration for wildlife impacts. Plastic netting is frequently used for erosion control during construction and landscape projects and can negatively impact terrestrial and aquatic wildlife populations as well as snag in maintenance machinery resulting in costly repairs and delays. However, wildlife friendly erosion control materials do exist, and are sold by several large erosion control material companies. Below are a few key considerations before starting a project. Know Your Options • Remember to consult with local natural resource authorities (DNR, USFWS, etc.) before starting a project. They can help you identify sensitive areas and rare species. • When erosion control is necessary, select products with biodegradable netting (natural fiber, biodegradable polyesters, etc.). • DO NOT use products that require UV -light to biodegrade (also called, "photodegradable"). These do not biodegrade properly when shaded by vegetation. • Use netting with rectangular shaped mesh (not square mesh). • Use netting with flexible (non -welded) mesh. Know the Landscape • It is especially important to use wildlife friendly erosion control around: o Areas with threatened or endangered species. o Wetlands, rivers, lakes, and other watercourses. o Habitat transition zones (prairie — woodland edges, rocky outcrop — woodland edges, steep rocky slopes, etc.). o Areas with tlu-eatened or endangered species. Use erosion mesh wisely, not all areas with disturbed ground necessitate its use. Do not use plastic mesh unless it is specifically required. Other erosion control options exist (open weave textile (OWT), rolled erosion control products (RECPs) with woven natural fiber netting). C. f }'. '11 /� JI ' 4 U1 _0 Woven 100% natural fiber erosion control materials being utilized along a central Minnesota stream. ©MN DNR, Nick Proulx WFEC Fact -sheet —MN DNR Protect Wildlife • Avoid photodegradable erosion control materials where possible. • Use only biodegradable materials (typically made from natural fibers), preferably those that will biodegrade under a variety of conditions. • Wildlife friendly erosion control material costs are often similar to conventional plastic netting. IlMinnesota DEPARTMENT OF NATURAL RESOURCES Literature Referenced Barton, C. and K. Kinkead. 2005. Do erosion control and snakes mesh? Soil and Water Conservation Society 60:33A-35A. Derraik, J.G.B. 2002. The pollution of the marine enviromnent by plastic debris: a aeview. Marine Pollution Bulletin 44:842-852. Fuller-Perrine, L.D., and M.E. Tobin. 1993. A method for applying and removing bird -exclusion netting in commercial vineyards. Wildlife Society Bulletin 21:47-51. Johnson, S.W. 1990. Distribution, abundance, and source of entanglement debris and other plastics on Alaskan beaches, 1982-1988. Proceedings of the Second International Conference on Marine Debris 331-348. Kapfer, J. M., and R. A. Paloski. 2011. On the threat to snakes of mesh deployed for erosion control and wildlife exclusion. Herpetological Conservation and Biology 6:1-9. WFEC Fact -sheet — MN DNR 2013 (acc. APPENDIX F REDACTED FROM THE ORIGINAL — PRIVILEGED INFORMATION ABOUT ARCHAEOLOGICAL SITES REMOVED 11/20/2015 Lennar Lahn Project Phase I Cultural Resources Inventory of the Lennar Lahn Project near Otsego MN PREPARED BY Merjent, Inc. 800 Washington Avenue North, Suite 315 Minneapolis, Minnesota 55401 Dean T. Sather, M.A., R.P.A, Principal Investigator Daniel Born, M.S Allison Lange Mueller, M.A, R.P.A Under Contract to Terracon Consultants, Inc. May 2015 rherjent TABLE OF CONTENTS 1.0 INTRODUCTION AND PROJECT DESCRIPTION..........................................................1 2.0 SCOPE OF WORK AND METHODOLOGY.....................................................................1 2.1 SCOPE OF WORK..............................................................................I...............1.1 2.2 METHODOLOGY..................................................................................................1 3.0 RESULTS OF INVESTIGATIONS....................................................................................4 3.1 ENVIRONMENTAL BACKGROUND.....................................................................4 3.2 PRE -CONTACT OVERVIEW................................................................................4 3.2.1 Early Paleo-Indian Period (11200 to 10500 BC)........................................4 3.2.2 Late Paleo-Indian/ Early Eastern Archaic (10500 to 7500 BC)..................4 3.2.3 Middle Archaic (7500 to 3000 BC).............................................................5 3.2.4 Late Archaic (3000 to 200 BC).................................................................. 3.2.5 Woodland: Initial, Terminal (500 BC to AD 1200)......................................6 3.2.6 Oneota Tradition (AD 1200 to 1650)..........................................................7 3.3 CONTACT AND POST -CONTACT OVERVIEW...................................................7 3.3.1 Contact Period (1650 to 1837 CE).............................................................7 3.3.2 Eastern Dakota.......................................................................................... 7 3.3.3 British.........................................................................................................8 3.3.4 Initial United States....................................................................................8 3.3.5 Post -contact Period (1837 to 1960 CE)..................................................... 8 3.3.6 Early Agriculture & River Settlement (1840 to 1870).................................9 3.3.7 Railroads & Agricultural Development (1870 to 1940)...............................9 3.4 BACKGROUND LITERATURE REVIEW..............................................................9 3.4.1 Previously Identified Archaeological Sites...............................................10 3.4.2 21 WRO146...............................................................................................10 3.4.3 21WRO125...............................................................................................10 3.4.4 21 WR0027...............................................................................................11 3.4.5 21 WR0043...............................................................................................11 3.4.6 21 HE0090................................................................................................11 3.4.7 21 WRo.....................................................................................................11 3.4.8 21WRO130...............................................................................................11 3.4.9 Previously Recorded Standing Historic Structures..................................11 4.0 FIELD INVESTIGATION.................................................................................................12 4.1 HISTORIC FARMSTEADS..................................................................................17 5.0 RECOMMENDATIONS ...................................................................................................17 6.0 REFERENCES CITED....................................................................................................18 LIST OF TABLES Table 3.2-1 Pre -Contact Archaeological Periods in Southern Minnesota.................................4 Table 3.4.1-1 Previously Recorded Archaeological Sites within One -Mile of the Lennar Lahn ProjectArea.........................................................................................................10 Table 3.4.9-2 Previously Recorded Historic/Architectural Sites within 1-Mile of the Lennar Lahn ProjectArea.........................................................................................................12 LIST OF FIGURES Figure 1 Lennar Lahn Project Area Topographic Map with Previously Recorded Cultural Sites, Wright County, Minnesota REDACTED Figure 2 Lennar Lahn Project Survey Coverage Map with Previously Recorded Cultural Sites and 2015 Recorded Sites, Wright County, Minnesota REDACTED Figure 3 Lennar Lahn Project, Location of Gravel Pit in 2004 Figure 4 Lennar Lahn Project, 21 WR0130 Site Location, View to the North Figure 5 Lennar Lahn Project, MRJ-LP-01 Chert Projectile Point and Quartzite Flake LIST OF APPENDICES Appendix A Deep Testing Report 1.0 INTRODUCTION AND PROJECT DESCRIPTION Terracon Consultants, Inc. (Terracon), contracted with Merjent, Inc. (Merjent) to conduct a Phase I cultural resources inventory for the proposed Lennar Lahn Project (Project), a residential housing development situated on an approximately 190-acre site in Sections 1 and 12 of T120N, R23W in Wright County. The Project area is predominantly active agricultural field owned and operated by a private land owner (Figure 1). Archaeological survey of the Project is being requested due to the presence of previously documented cultural resource sites within and near the perimeter of the defined Project boundaries, in compliance with the Minnesota Field Archaeology Act (MN 138.31-42). In April 2015, Merjent Senior Cultural Resource Specialist Dean T. Sather examined site files maintained at the Office of the State Archaeologist (OSA) and the Minnesota State Historic Preservation Office (SHPO) in St. Paul. Merjent staff inventoried previously executed cultural resource investigations for the townships included in the Project area and the greater Wright County region. A total of one previously documented archaeological site and one site lead were located within the defined Project area. On May 5th, 2015, Merjent cultural resource staff conducted a Phase I Archaeological Reconnaissance Survey of the Project area. The survey identified cultural material in the form of two flakes and a single projectile point in the southern portion of the project area. Two historic farmsteads were observed immediately outside of the Project area. Background research indicated that a burial recorded by the OSA within the Project boundaries was heavily disturbed through previous quarrying operations. Following clearance by the OSA concerning the burial, Merjent recommends that no recorded archaeological or historic sites with eligibility potential for listing on the National Register of Historic Places (NRHP) will be adversely affected by the proposed construction. In addition to Dean T. Sather, who served as the Principal Investigator, Dan Born assisted with the field survey and reporting. Allison Lange -Mueller contributed the Post -Contact Period portion of the cultural background overview. 2.0 SCOPE OF WORK AND METHODOLOGY 2.1 SCOPE OF WORK The Phase I Archaeological Reconnaissance Survey was conducted to determine if archaeological resources were present within the proposed Project's area of Potential Effect (APE). The APE for this Project included all surface and subsurface locations that would potentially experience direct physical disturbance as a result of the construction within the defined Project area (Figure 1). 2.2 METHODOLOGY Field investigations for the current Phase I Survey were conducted according to guidelines prepared by the Minnesota State Historic Preservation Office (Anfinson, 2005). A literature review was conducted to determine the scope and results of previous archaeological and historic property inventories conducted in the region. Data files maintained by both the SHPO and the OSA provided information regarding recorded cultural resources and previous survey activities within the defined Project area. Previously published synthesis reports provided a majority of the background information regarding regional cultural contexts and environmental history. The environmental background and historic contexts were examined to assess the probability of sites and what types of sites might be identified. Field investigations executed during a Phase I Archaeological Reconnaissance provide a means of determining if cultural deposits exist within the defined Project area and to assess the vertical and horizontal boundaries of any discovered deposits. Investigative techniques for Phase I survey may include pedestrian survey, shovel testing, and deep testing. Pedestrian survey consists of controlled visual inspection of the ground surface. Visual inspection is conducted on ground surfaces exhibiting exposed soils such as cultivated fields. Field personnel conducting pedestrian surveys are spaced 10 to 15 meters (m) apart and traverse the field in parallel transects inspecting the exposed surface for evidence of cultural deposits. Positive findings consists of historic or prehistoric artifact concentrations and/or evidence of larger, intact cultural features such as structural remains or earthworks. Generally, pedestrian survey is not recommended for areas where surface visibility is less than 25 percent. Shovel testing, when required, consists of a hand dug excavation units between 30 and 40 centimeters (cm) in diameter at 15 m intervals along linear transects where feasible. The depth of the excavated shovel test varies depending the depth of the subsurface deposits and the presence or absence of intact cultural material. Shovel tests are generally excavated to a depth where intact subsoil horizons are exposed. In locations where subsurface deposits extend beyond the capabilities of hand excavated shovel tests, deep testing may be applied. All materials excavated from shovel tests or deep tests are screened through one -quarter inch hardware mesh. Detailed field notes are recorded during field investigations for both positive and negative results. With regard to potentially deeply buried sites, a desktop review is first conducted to identify the landforms and soils present in the Project area. If there is the potential for deeply buried living surfaces that might contain archaeological materials, field testing such as auger coring or mechanical trenching is done. K Page Redacted — Privileged Information 3.0 RESULTS OF INVESTIGATIONS 3.1 ENVIRONMENTAL BACKGROUND The Project is located in the Deciduous Lakes Region of central Minnesota. Historic vegetation densities in the area consisted of Big Woods species like elm, maple, and basswood with incursions of prairie and oak woods. Historically, bison and elk were game animals found in the area with white-tailed deer still prominent on the landscape. The following discussion of pre -contact archaeological periods follows Gibbon 2012 unless otherwise noted. 3.2 PRE -CONTACT OVERVIEW Pre -contact cultural traditions and development are defined primarily by the material culture present at a site and the subsistence patterns being utilized at that time. Material culture includes artifacts and features, and subsistence patterns include hunting/gathering and horticulture. Further, within pre -contact periods there are often subdivisions based on geographical location, projectile point typologies, and ceramic typologies. Gibbon divides Pre -contact cultures in southern Minnesota into six cultural periods: Early Paleo-Indian (11200 to 10500 BC), Late Paleo-Indian/ Early Eastern Archaic (10500 to 7500 BC), Middle Archaic (7500 to 3000 BC), Late Archaic (3000 to 200 BC), Woodland (500 BC to AD 1200), and Oneota Tradition (AD 1200 to AD 1650). Table 3.2-1 Pre -Contact Archaeological Periods in Southern Minnesota Periods Year Early Paleo-Indian 11200 to 10500 BC Late Paleo-Indian/ Early Eastern Archaic 10500 to 7500 BC Middle Archaic 7500 to 3000 BC Late Archaic 3000 to 500 BC Woodland: Initial, Terminal 500 BC to AD 1200 Oneota Tradition AD 1200 to AD 1650 3.2.1 Early Paleo-Indian Period (11200 to 10500 BC) Paleo-Indians were likely the first people to populate the North American continent. Communities were comprised of small bands of highly nomadic hunter -gathers primarily focused on the exploitation of mega -fauna including mammoths and mastodons. Paleo-Indian sites tend to be small and are commonly identified by the recovery of large, distinctive lanceolate projectile points. 3.2.2 Late Paleo-Indian/ Early Eastern Archaic (10500 to 7500 BC) The transition from the Early Paleo-Indian to Late Paleo-Indian in the Upper Mississippi River Region is evidenced in the archaeological record by the replacement of fluted points with stemmed points and some heavy stone tool construction. Tool types of Late Paleo-Indian/Early Eastern Archaic peoples occur in much greater numbers than those of their predecessors, the Early Paleo-Indians. Tool characteristic of this period show a high quality of workmanship and include projectile points with a lanceolate shape, lack of fluting, ground and thin edges, and fine oblique or collateral flaking across the blade face. Types of Late Paleo-Indians identified in 4 Minnesota include Agate Basin, Alberta, Angostura, Browns Valley, Eden, Frederick, Hell Gap, Midland, Plainview, and Scottsbluff. Early Eastern Archaic points are notched or stemmed forms, often constructed of heavily reworked lanceolate points with a concave base, basal ears, and fluting on some specimens. Although the point types differ from those of Late Paleo-Indians, the Early Eastern Archaic was contemporary in part with the Late Paleo-Indian period, sharing a nomadic, animal hunting lifeway. The majority of identified Late Paleo-Indian Sites in Minnesota occur along lake edges and rivers, with most lake edge sites located along smaller, non -glacial lakes. Sites identified from this period are typically find spots of points, lithic workshops, and temporary camps. Long term habitation sites, burial locations, and kill sites are rare and underrepresented in the archaeological record. 3.2.3 Middle Archaic (7500 to 3000 BC) Middle Archaic projectile points typically are smaller and less well made than during the preceding phases and suggest a general decline in high quality stone working outside of the Paleo-Indian tradition. Characteristics of Archaic points that separate themselves from Paleo-Indian projectile points include smaller size and beveled and resharpened edges designed for cutting and penetration. An expansion of tool technology begins to appear during the late Middle Archaic with a new suite of ground stone tools including banner stones, plummets, and grooved axes. The utilization of copper artifacts also appear for the first time. Known Middle Archaic sites in central Minnesota remain sparse, typically consisting of surface scatters of stone artifacts in small, shallow components with minimal midden buildup. Site types include short term camps, kill sites, lithic workshops, quarries, and burials. The features and minimal number of artifacts suggest a small population of highly mobile hunters and foragers with single use to short term habitation sites. 3.2.4 Late Archaic (3000 to 200 BC) The expansion of tool technology that starts to appear in the Middle Archaic period flourishes in the Late Archaic. New sets of side stemmed and side -notched projectile points, ground stone tools, and the first clearly identifiable fishing implements in the archaeological record of Minnesota originate in the Late Archaic. The utilization of raw materials like native copper and marine shell and creation of unusual artifacts like birdstones, gorgets, and Turkey Tail bifaces are defining characteristics of the period, as well as communal burial sites and the continuing absence of pottery from the archaeological record. Late Archaic sites in Minnesota are mostly characterized by the presence of hammered copper artifacts, as well as ground and polished stone artifacts. The lithic tool assemblage located at the Fish Lake West site near Duluth consists mostly of choppers, adzes, and bifaces; tools adapted to working in an environment dominated by timber. The lithic styles and hammered copper artifacts found at the Fish Lake West site are also present in Late Archaic sites farther south at sites like the Petaga Point site near Lake Mille Lacs. 5 3.2.5 Woodland: Initial, Terminal (500 BC to AD 1200) Gibbon (2012) separates the archaeological record of Initial Woodland period in South Eastern Minnesota (a resource region that coincides with the portion of the state located south and east of the City of Saint Cloud) into three periods: the Early Woodland (500 to 200 BC), Middle Woodland (200 BC to AD 200), and Late Middle Woodland (AD 200 to 500). Pottery remains are the most representative artifacts from the Initial Woodland tradition. Pottery styles from the period are usually typified by a thick walled jar with cordage markings on both the exterior and interior faces of the pottery. The construction and shape of the pottery typically consist of strait rims, slightly constricted necks, somewhat rounded shoulders, and subconoidal bottoms resembling varieties of pottery from the Havana -Hopewell complexes in Illinois. Lithic assemblages show continuity with earlier Archaic and Woodland assemblages typical of highly mobile groups of hunters and foragers. The greatest artifact concentration in the region appears in the rivers, lakes, wetlands, and wet prairies of southern Minnesota. In addition to the presence of pottery in the archaeological record, Woodland sites from this period are also exemplified by the presence of conical shaped burial mounds (Gibbon 2012). By the Late Middle Woodland phase of the Initial Woodland tradition, cultural practices of the Late Middle Woodland people seem less elaborate than during the previous phases. Burial mounds became simpler, often lacking diagnostic grave goods. Pottery styles at this later stage are described by more globular bodies, thinner walls, and finer temper with more complex rim profiles. The transformation from Initial Woodland complexes to Terminal Woodland complexes after AD 500 remains poorly understood (Gibbon, 2012). What is clear is that the Terminal Woodland period represents a time of technological and cultural change. The bow and arrow replaced the atlatl, earlier pottery traits disappeared, and elaborate mortuary rituals associated with large earthwork construction began. Long distance acquisition of materials, ritual pipe smoking, and possibly the presence of socially ranked societies were descriptive of cultures with a great reliance on domesticated plants and larger populations within groups. Known Late Woodland sites, while evident in some areas of southwestern Wisconsin and eastern Iowa, are sparse in southeastern Minnesota. One reason may be that the lack of real sites as large scale surveys in the region have failed to identify a strong Late Woodland presence suggesting a population density much lower than those areas farther south and east (Gibbon 2012). Because of sparse number of Late Woodland sites in the region, examples must be borrowed from the surrounding states of Iowa and Wisconsin. Initial Late Woodland (AD 500 to 700) in southwestern Wisconsin and northeastern Iowa consist of components most recognized by the presence of Lane Farm Cord -Impressed pottery, a jar with a somewhat rounded base and constricted neck. The small and corner notched projectile points of the period may represent the first arrow head points in the region. Small conical and elongated linear mounds containing limited grave goods and primary flexed burials are evident. Defined by Gibbon (2012) as the Mature Late (Terminal) Woodland period in the Upper Mississippi River Valley, AD 700 to 1000 represents the time period defined by the Effigy Mound Complex, specifically that area of the region located south of Minneapolis and St. Paul, though within close geographic proximity to the Project location. Effigy Mound people constructed earthen conical and linear mounds similar to previous cultural phases as well as mounds designed in the shape of wildlife, including avian, mammalian, and reptile. Grave goods are typically utilitarian objects such as ceramic vessels and projectile points. Material culture of the Effigy culture includes the near absence on non -utilitarian "luxury" items intended for the elite, simple unnotched triangular points, thinner and finer tempered ceramics with more complex ON shapes, and a shared cultural identity that covered a large geographic region for over 600 years. Mound building would disappear from the archaeological record during the Final Late (Terminal) Woodland period from AD 100 to 1200. Pure Late Woodland sites become rare and are replaced with stockade sites exhibiting both Late Woodland and Middle Mississippian characteristics. Ceramics from this period belong to the Grant Series with design features including grit tempering, cord roughened jars that may have squared orifices, prominent castellations, and special rim treatment that raises the height of the rim. Decorations, when present, generally consist of single cord impressions forming zigzag and chevrons over plain or cord roughened rim surfaces. Lithic technology from this period includes simple unnotched Maddison triangular arrow pints and Cahokia Site Notched cluster points. 3.2.6 Oneota Tradition (AD 1200 to 1650) The transition from the Woodland dominated cultural landscape to the Upper Mississippian contexts in southern Minnesota saw a shift from long established lifeways of Woodland peoples to the appearance of societies with new material cultures, settlement patterns, social organization, and ideology. Groups of people were less mobile and more dependent on the cultivation of maize, living within more permanent and often fortified settlements. The construction and artistic techniques used to produce ceramics evolved to vessels with shoulder decorated rims, smoothed rather than cordmarked exterior surfaces, shell temper rather than grit temper, and handles in place of collars or castellations. Oneota Sites are distributed throughout the forests and prairie of southern Minnesota with regional variations of Oneota pottery identified in the northeastern prairie region and in the north woods. Oneota village sites are located along several rivers within southern Minnesota, specifically the Mississippi River near Red Wing, along the St. Croix north of Stillwater, the Blue Earth River and along the Upper Minnesota River. Oneota Pottery is also present in the upper layer of many sites as far west as the South Dakota Border. Ceramics are shell tempered, round bottomed globular jars with high straight to slightly curving rims ranging in size from 0.5 to 5 gallons. Stone tools identified at Oneota village sites consist of unnotched triangular points, scrapers, knives, drills, wedges, choppers, and expedient flake tools. 3.3 CONTACT AND POST -CONTACT OVERVIEW 3.3.1 Contact Period (1650 to 1837 CE) The Contact Period (1650 to 1837) includes American Indian and Euro-American contexts. The Minnesota OSA (MN OSA) subdivides the American Indian context into "Indeterminate" or "Eastern Dakota", and the Euro-American context into "Indeterminate", "French", "British", and "Initial US" (MN OSA, 2009). 3.3.2 Eastern Dakota The Eastern Dakota, along with the Western Dakota and the Lakota, comprises the ethnic group of the Sioux people. The Eastern Dakota lived in "village -centered tribal world societies" throughout Minnesota during the 17th century and were in an alliance with French fur traders and merchants (Gibbon, 2012). The Dakota War of 1862 resulted in numerous attacks on settlements and trading posts along the Minnesota River and culminated in the mass hanging of 38 Eastern Dakota (MNHS, 2015). After the war, many families relocated to the 7 western territories and Canada. There are currently four reservations in Minnesota inhabited by descendants of the Eastern Dakota people. 3.3.3 British After the Treaty of Paris in 1763, the British quickly set up fur trading posts throughout Minnesota. The British fur trading economy was centered at Grand Portage, where traders would bring their furs and leave with other valuable trade goods. After the Revolutionary War of 1776, competition between the United States and British companies intensified throughout Minnesota. In 1803, the Louisiana land purchase established United States lands extending from the Atlantic to the Rocky Mountains. The War of 1812 saw a demise in the British fur traders due to the United States denying business licenses to British traders. 3.3.4 Initial United States Early Americans conducted the first fully documented land survey of Minnesota in the mid-18th century and early 19th century. Jonathon Carver explored the upper Mississippi River in the 1760s, and by 1806 Zebulon Pike had explored portions of the river. Missionaries began to arrive in the early 19th century, primarily along the Minnesota River. The American Fur Company was founded by John Jacob Astor in 1811, after which numerous fur trading posts were quickly established throughout the state. At the confluence of the Minnesota and Mississippi River, Fort Snelling was constructed in 1819 to protect the new United States investments in the area. Large-scale fur trade resulted in a major decline in the native beaver populations, and by 1842 the fur trade in Minnesota came to an end when the American Fur Company came to its demise (Dobbs, 1989). After the passing of the fur trading industry, land was opened up to Euro-American settlers. 3.3.5 Post -contact Period (1837 to 1960 CE) MN OSA subdivides the post -contact period into eight categories based on social and economic issues pertaining to different geographical locations and time frames (MN OSA, 2009): • Indian Communities & Reservations (1837 to 1934) • Early Agriculture & River Settlement (1840 to 1870) • Northern MN Lumbering (1870 to 1930s) • Tourism & Recreation (1870 to 1945) • St. Croix Triangle Lumbering (1830s to 1900s) Railroads & Agricultural Development (1870 to 1940) • Iron Ore Industry (1880s to 1945) • Urban Centers (1870 to 1940) Additionally, Euro-American Farms in Minnesota (1820 to 1960) have been divided into eight development periods (Terrell, 2006): • Early Settlement (1820 to 1870) • Development of a Wheat Monoculture (1860 to 1885) • Diversification and the Rise of Dairying (1875 to 1900) • Industrialization and Prosperity (1900 to 1920) • Developing the Cutover (1900 to 1940) • Development of Livestock Industries (1900 to 1940) • Depression and the Interwar Period (1920 to 1940) • World War II and the Postwar Period (1940 to 1960) 3.3.6 Early Agriculture & River Settlement (1840 to 1870) This category is defined by subsistence farming and the transition to wheat monoculture. It is primarily focused on the southeastern portion of the state. Farmsteads within this context are represented by farm buildings and other types of structures, such as, dugouts, soddies, and "claim shacks" (Terrell, 2006). The Preemption Act of 1854 and the Homestead Act of 1862 brought many settlers to Minnesota and the railroads quickly followed. Many towns arose along major transportation routes and along important rivers. The large influx of settlers created ethnic communities that were centered on churches and schools. As the farms and towns grew, so did industries associated with agricultural activities (Terrell, 2006). This, in turn, gave rise to the next historical context: Railroads & Agricultural Development. 3.3.7 Railroads & Agricultural Development (1870 to 1940) This category is characterized by larger and more diverse farms, primarily in the southern and western portions of the state. Farmsteads within this context also include subsistence farming and large scale bonanza farms (Terrell, 2006). As the earlier, smaller communities continued to grow, railroads were expanding to accommodate the full-scale agricultural commerce. Towns located along railroad lines quickly became important to the local economies for the ease of transporting agricultural goods, as well as bringing in needed goods for the local populations. As the modern industrial era continued to expand and change, so did the local historical landscapes of the railroad towns. Urban sprawl, along with new technologies, industries, and railroads all led to changes within these communities that can still be seen today (Terrell, 2006). 3.4 BACKGROUND LITERATURE REVIEW The objective in reviewing cultural resources background literature is to identify previously recorded cultural resource sites and assess the potential for unrecorded sites to be located within the Project Area. The standard for considering a cultural property significant is whether it meets the criteria for listing on the NRHP. The initial criterion for such listing is an age of 50 or more years. Beyond age, a property must retain integrity and be associated with significant historic trends, historic persons, building styles and craftsmanship, or the property must have the potential to provide significant information about the past. Merjent reviewed and followed the published guidelines for conducting cultural resources literature reviews in Minnesota. The SHPO, located in the Minnesota History Center in St. Paul, is the record keeper for the state's prehistoric and historic archaeological site files, historic standing structure inventory files, and field survey reports. The OSA, located at Fort Snelling History Center in St. Paul, maintains the records for burial sites within the State. In May 2015, Merjent Senior Cultural Resource Specialist Dean T. Sather examined site files maintained at the OSA and the SHPO. Merjent staff inventoried previously executed cultural resource investigations for the locations included in the Project area and the greater Wright County region. E Merjent examined the current topographic and aerial photo -based maps to understand the modern land use of the study area and to provide a baseline for examining the historic maps and documents. Several online resources were used to gather information. Merjent staff collected general information online about Wright County and surrounding areas. They also examined primary sources that have been digitized and made available online, such as the original land survey maps and the original land patent records. 3.4.1 Previously Identified Archaeological Sites An examination of cultural resource investigations conducted within the defined project area and a prescribed one -mile buffer yielded information regarding seven previously recorded archaeological sites. Archaeological sites 21 WRo and 21 WR0130 are located in the southern portion of the project area on terraces above the Crow River (Figure 1). The remaining five (5) sites are located within one mile of the Project but external to the defined Project area. A summary of the previously documented sites is provided in Table 1. Table 3.4.1-1 Previously Recorded Archaeological Sites within One -Mile of the Lennar Lahn Project Area. Site Number/Site Name/Site County, Location Site Location Relative to Type (TRS) Significance Project Area 21 WR0146: Pre Contact Artifact Unknown West of Project Area Scatter/Habitation Site 21WR0125: Pre Contact Artifact Unknown West of Project Area Scatter 21 WR0027: Pre Contact Unknown West of Project Area Mortuary/Burial Site 21 WR0043: Pre Contact Artifact Unknown North of Project Area Scatter 21 HE0090: The Dayton Mound Group — Six Prehistoric Burial Unknown East of Project Area Mounds 21 WRo: Pre Contact Artifact Unknown Within Project Area Scatter — Unverified Site Lead 21WR0130: Dayton Unknown Within Project Area Mounds/Cemetery/MortuaryMounds/Cemetery/Mortuary Site 3.4.2 21 WR0146 Site 21 WRO146 is a pre -contact lithic scatter. According to the site form, the site has been heavily disturbed. The site is located external to the Project area and will not be impacted by the proposed development. 3.4.3 21WRO125 Site 21 WRO125 is a multi -component artifact scatter containing both pre -contact and historic debris. According to the site form, the site has been heavily disturbed. The site is located external to the Project area and will not be impacted by the proposed development. 10 3.4.4 21WR0027 Site 21 WR0027 is a single earthwork site containing one burial mound. It is a pre -contact age site, estimated to be of the Woodland period. An undefined amount of lithic debitage is recorded to have been recovered in association with this site. According to the site form, the site has been very heavily disturbed and has been virtually destroyed. The site is located external to the Project area and will not be impacted by the proposed development. 3.4.6 21WR0043 Site 21 WR0043 is a pre -contact artifact scatter. The site is located external to the Project area and will not be impacted by the proposed development. 3.4.6 21 HE0090 Site 21 HE0090, the Dayton Mounds Site, is an earthwork site containing six burial mounds. It is a pre -contact age site, estimated to be of the Woodland period. An undefined amount of lithic debitage is recorded to have been recovered in association with this site. According to the site form, the site has been very heavily disturbed and have been virtually destroyed. The site is located external to the Project area and will not be impacted by the proposed development. 3.4.7 21 WRo Site 21WRo is a documented site lead that has not been professionally verified as an archaeological site. The site, which was originally recorded as occupying the entire oxbow area, is the reported location of a large stone hammerhead and copper projectile point that was collected in an agricultural field located on the Lahn family farm. The artifacts were donated to the Wright County Historical Society in 1978. The site file does not identify the specific location where the artifacts were recovered and does not include a photographic record or detailed description of the artifacts. 3.4.8 21 W R0130 Site 21WR130, the Dayton Quarry Burial, is located in the NE'/4, NE'/4, SE'/4 of Section 1, T120N, R23W in the southeast portion of the Project area (Figure 1). The reported site is located on a terrace overlooking the Crow River. The burial was initially reported in 1999 as a collection of unidentified human faunal items. These items were found exposed in a spoil pile in an active gravel pit. Damage caused by excavation and an undetermined amount of exposure had caused the remains to be too fragmentary to identify age, sex, cultural affiliation, or temporal affiliation. 3.4.9 Previously Recorded Standing Historic Structures A review of records at the MN SHPO indicated that no historic/architectural resources have been previously inventoried within the Project area. Fourteen historic/architectural resources have been previously inventoried within the associated 1-mile buffer (Figure 1). None of these resources have been evaluated for listing on the NRHP. The list of previously documented Historic/Architectural resources is summarized in Table 3.4.9-2. 11 Table 3.4.9-2 Previously Recorded Historic/Architectural Sites within 1-Mile of the Lennar Lahn Project Area Site Number/Site Type Location (TRS) Site Significance Location Relative to Project HE-DYC-002: Bank Unevaluated In the City of Dayton, north and east of Project HE-DYC-003: Residence Unevaluated In the City of Dayton, north and east of Project HE-DYC-004: Residence Unevaluated In the City of Dayton, north and east of Project HE-DYC-005: School Unevaluated In the City of Dayton, north and east of Project HE-DYC-006: St. John the Baptist Unevaluated In the City of Dayton, north and Church east of Project HE-DYC-007: Commercial Unevaluated In the City of Dayton, north and Building east of Project HE-DYC-008: Residence Unevaluated In the City of Dayton, north and east of Project HE-DYC-009: Residence Unevaluated In the City of Dayton, north and east of Project HE-DYC-010: Residence Unevaluated In the City of Dayton, north and east of Project HE-DYC-011: Residence Unevaluated In the City of Dayton, north and east of Project HE-DYC-012: Residence Unevaluated In the City of Dayton, north and east of Project HE-DYC-013: Residence Unevaluated In the City of Dayton, north and east of Project HE-DYC-014: NcNeil Building Unevaluated In the City of Dayton, north and east of Project HE-DYC-015: Dayton Post Office Unevaluated In the City of Dayton, north and east of Project These structures were inventoried during previous surveys. The integrity of these structures is not defined, and none of them have been evaluated for NRHP eligibility. None of these structures will be impacted by the Project. 4.0 FIELD INVESTIGATION Field work was conducted May 5, 2015. Field Director was Merjent Senior Cultural Resource Specialist Dean Sather. Assisting with field work was Cultural Resource Specialist Dan Born. The Project area was considered high potential for prehistoric archaeological deposits due to the proximity of the project area to water resources and the reports of previously documented cultural resources within the Project area (21 WR0130 and 21 WRo). The Phase I Archaeological Reconnaissance Survey was conducted to locate the recorded cultural resources, and determine if unrecorded cultural resources were present within the proposed Project's APE. Cultural resources could include archaeological sites or historic/architectural resources. The APE considered all locations that would potentially have direct physical disturbance. The field reconnaissance for the Project consisted of pedestrian survey. Pedestrian survey involves controlled visual inspection of the ground surface. Field personnel conducting pedestrian surveys are spaced a maximum of 15 m apart and traverse the field in parallel transects inspecting the exposed surface for evidence of cultural deposits. The majority of the 12 land surface investigated had excellent ground surface visibility of 90 percent or better. In locations where artifacts were observed on the surface, an intensive pedestrian survey was conducted in transects of 1 m over the landform or within a 50 m radius of the initial find. Because the Project area is in an alluvial environment, it was examined for the possibly of deeply buried living surfaces that might contain archaeological material. Geologists from Liesch Associates (a Terracon Company) (Liesch) conducted subsurface inspections at locations across the Project area at the same time Merjent was doing their field survey. Following desktop review, and communication regarding the subsurface probes, Merjent concludes that the proposed Project is situated on an upland terrace external to the floodplain and that there is little potential for deeply buried cultural bearing sites within the proposed Project area (see Appendix A). During the field survey, the Project area was separated into northern and southern sections that were separated by County Road 36 which bisects the Project (Figure 2). The northern portion of the Project area consisted of an approximately 95-acre parcel of plowed agricultural field containing several small wetland areas. Surface visibility exceeded 90 percent throughout the northern portion of the Project area. Pedestrian transects were conducted in 15 m intervals across the project area in an east to west orientation. The southern portion of the Project area consisted of a comparable size parcel of approximately 95 acres. The southern portion of the Project area was separated into two separate sections based on vegetation cover. The northern section consisted of an approximately 45 acre area planted in wheat where surface visibility did not exceed 50 percent. Archival research of historic aerial photos of this area indicated that the majority of northern half of the southern portion of the Project area had been significantly disturbed by previous gravel extraction operations. Gravel operations conducted in the late 1990s exposed human remains near the northeastern corner of the gravel operation (Figure 2). This exposure was reported to the Minnesota OSA and Mark Dudzik, the State Archaeologist at the time, who visited the site, inspected the remains, and officially documented the site (21 WR0130) (Figures 3 and 4). According to the site form, the original provenience of the remains was not identified and the site was considered to have been completely destroyed. Further, the fragmentary nature of the exposed remains were insufficient to provide adequate determination of age, or cultural affiliation. The potential significance of the human remains were associated with the reported collection of a large stone hammerhead and a copper projectile point in the area, which had been previously documented as site lead 21 WRo. 13 Page Redacted — Privileged Information Figure 3. Lennar Lahn Project, Location of Gravel Pit in 2004. Source: Google Earth Concerted effort was made to adequately survey the area immediately surrounding the location of the reported human remains. Tight interval (2 to 3 meters) pedestrian survey was conducted across the reported location of the site. The ground surface in the vicinity of the reported site was planted in wheat and afforded approximately 50 percent visibility. The exposed ground surface exhibited little or no intact top -soil and had the appearance of exposed, unsorted gravels. As mentioned above, this area had been subjected to extensive gravel extraction operations which, in the early 2000s, had been extended to the north and east to include the reported site area and abutted the private farmstead property occupying the extreme northeast corner of the parcel (Figure 2). A scatter of modern trash has been placed into a drainage ravine cutting through the site to retard erosion. It is unlikely that any portion of the original site remains. No additional human remains were recovered and no pre -contact archaeological materials were identified during the current investigation conducted within or near the recorded boundaries for site 21 WR0130. 15 Figure 4. Lennar Lahn Project, 21 WR130 Site Location, View to the North The southern section of the southern portion of the Project area consisted of an approximately 50 acre parcel of plowed agricultural field and a small wooded area immediately adjacent to the floodplain. Surface visibility in the cultivated area of the southern section was in excess of 90 percent while the visibility in the wooded area was approximately 60 percent. The entire southern portion of the Project area had been defined as site lead 21 WRo by the Minnesota OSA. In 1978, a large hammer stone and a single copper spear point were reported to have been collected from the southern portion of the Project area. In 1990, an artifact scatter had been reported on a low terrace near the southern edge of the oxbow. This referenced collection of artifacts was not provided a separate site number nor was it relocated during the current investigation. Pedestrian transects were conducted in 15 m intervals across the cultivated portion of the Project area in a general west to east direction. Surface collection intervals were reduced to 5 m upon the identification of cultural artifacts. A visual inspection of the wooded portion of the Project Area indicated that the ground surface is uneven and sloping southward towards the floodplain. The exposed ground surface of a series of intersecting trails crossing the wooded portion were inspected. Two isolated artifact find spots were recorded as the result of the pedestrian survey of the southern section of the southern Project area. MRJ-LP-01 consisted of a small chert projectile point and quartzite flake (Figure 5). These items were recovered near the base of a shallow slope near the eastern edge of the Project area (Figure 3). Tight interval (2-3 m) pedestrian survey was conducted across the location of MRJ-LP-01. No additional pre -contact 16 archaeological materials were identified during the close interval reconnaissance near the find spot. W MANAGING MMING'S HERITAGE RESOURCES IPA Figure 5. Lennar Lahn Project, MRJ-LP-01 Chert Projectile Point and Quartzite Flake. MRJ-LP-02 consisted of a single quartz flake. This item was recovered near the crest of a small terrace near the southern edge of the Project area (Figure 3). Tight interval (2-3 m) pedestrian survey was conducted across the location of the find spot site. No additional pre - contact archaeological materials were identified at MRJ-LP-02. Merjent will complete a Minnesota Archaeological Site Form and submit it to the OSA in order to add to the state's permanent record. The artifacts were not collected but were photographed and described in the field. 4.1 HISTORIC FARMSTEADS Two farmsteads are located immediately east of the Project area along County Road 36. An examination of styles and construction material presented in Terrell's 2006 study of farm houses in Minnesota suggests that they were constructed from the 1880s to the early 20th century (Terrell, 2006). Both homes feature major alterations to the original structure including new windows, new roofing material, and the addition of several new extensions to the homes in the form of attached garages, porches, and other additional living areas. The caliber and scope of the alterations of the structures significantly limits the integrity of the structures and makes it unlikely that they would be considered eligible for the NRHP. 5.0 RECOMMENDATIONS The previously recorded site lead 21 WRo was surveyed and yielded 3 artifacts in two find spots. No other historic or pre -contact archaeological sites were documented as the result of the current Phase I Archaeological Reconnaissance Survey. In addition to 21 WRo, the recorded location of site 21 WRO130 was visited and surveyed. Archaeological site 21 WR0130, the Dayton Burial Site, was not relocated during the survey. A scatter of modern items and animal bones processed with modern cutting tools were 17 found at the recorded location of the site. It is unlikely that any portion of the original site remains. No additional human remains were recovered and no pre -contact archaeological materials were identified during the current investigation. The findings suggest that this site has been completely destroyed as the result of gravel extraction operations. Merjent recommends consultation with the OSA regarding the current status of the burial and any remaining restrictions to ground disturbing activity at the location. Unplatted burials are protected under the Private Cemeteries Act and implementing Minnesota Statute (MS) 307.08 and assessed by the OSA. Archaeological site lead 21WRo was redefined as two individual pre -contact archaeological find spots. MRJ-LP-01 consisted of a small chert projectile point and quartzite flake recovered near the base of a shallow slope near the eastern edge of the Project area. Tight interval pedestrian survey did not recover additional pre -contact archaeological materials. Merjent recommends that this site is not eligible for listing on the NRHP and that no additional investigation is warranted. MRJ-LP-02 consisted of a single quartz flake recovered near the crest of a small terrace near the southern edge of the Project area. Tight interval pedestrian survey did not recover additional pre -contact archaeological materials. Merjent recommends that this site is not eligible for listing on the NRHP and that no additional investigation is warranted. Two historic farmsteads are located outside of and immediately east of the Project area. Based on observations made from the public right-of-way, these structures are recommended as not eligible for listing on the NRHP. Following a literature review, and field survey using methods defined by the Minnesota SHPO guidelines, including deep testing, no properties potentially eligible for listing on the NRHP were identified. Merjent recommends that no historic properties will be affected by the proposed Project. Merjent stresses that if any construction plans are altered to include areas that were not addressed in this Phase I survey, these locations should be examined for cultural resources. In the event that additional archaeological materials are identified during construction activities, Merjent recommends that construction in proximity to the discovery immediately cease and procedures be followed to notify the MN SHPO and other agencies, as required. Further, if human remains are encountered during construction activities, all ground disturbing activity must cease and local law enforcement must be notified. MS 307.08, the Private Cemeteries Act, prohibits the intentional disturbance of human burials. Work should not resume until all issues are resolved. 6.0 REFERENCES CITED Anfinson, Scott. 2005. SHPO Manual for Archaeological Projects in Minnesota. Minnesota Historical Society of Minnesota. State Historic Preservation Office. Dobbs, C.A. 1989. Historic Context Outlines: The Contact Period Contexts (ca. 1630 A.D. — 1820 A.D.). Draft. Reports of Investigations No. 39. Institute for Minnesota Archaeology. Submitted to the State Historic Preservation Office, Minnesota Historical Society. Iff Gibbon, Guy. 2012. Archaeology of Minnesota, the Prehistory of the Upper Mississippi River Region. University of Minnesota Press. Minnesota Historical Society (MNHS). 2015. U.S.-Dakota War of 1862. Electronic Document. htti)://www.historicfor-tsnelling.org/history/us-dakota-war. Minnesota Office of the State Archaeologist ("MN OSA"). 2009. Minnesota Archaeological Site Form. Terrell, Michelle. 2006. Historical Archaeology of Minnesota Farmsteads: Volume 4, Historic Context Study of Minnesota Farmsteads, 1820-1960. Two Pines Resource Group, LLC, Shafer, Minnesota. 19 Appendix A Deep Testing Report May 29, 2015 Merjent, Inc. 800 Washington Avenue North Minneapolis, MN 55401 Attn: Peg Bodin E: pboden ccDmerient.com P: 612.746.3663 1rerracon Re: Lennar Lahn Project, Otsego, MN — Phase I Cultural Resources Inventory Dear Ms. Boden: Attached please find a map of the Lennar Lahn site in Otsego, MN that illustrates some of the features of the site that we have recently discussed. The map, provided as Figure A, Illustrates the site boundaries on an air photo base together with the Wright County Soils information obtained from USDA - Natural Resource Conservation Service (NRCS). The figure also includes the "Floodway" and "Flood Fringe" areas as depicted by Sathre-Berquist, Inc. on page 1 of 4 the Lahn Site Concept Plan 102914 prepared for Lennar Homes (also attached). The floodway generally corresponds with the area where homes will be built at the proposed development. The map also depicts a gravel mining area on the southern portion of the site where the native soils have been disturbed. This area is based on analysis of aerial photos, in addition to conditions observed in the field. On the morning of May 5, 2015, while the Merjent field crew was at the site, Terracon representatives Jim de Lambert and Warren Tuel, reviewed the southern portion of the project area and conducted 12 shallow soil probes to verify the area of soils disturbed during gravel mining operations and to confirm general soil types depicted on the Wright County Soils Atlas. The soil probes were advanced to depths of approximately 18 inches at the locations illustrated on Figure A. Soils in the former gravel mining area appear to consist of brown sand to brown loamy sand. Soil test ST-8 is located outside of the gravel mining area but also appears to be located in disturbed soils consisting of dark grey loamy sand with gravel and cobbles. The remaining soil probes appeared to generally correlate with the mapped units in the NRCS Wright County soils atlas. Please feel free to contact me if you have any questions concerning this information. Liesch Associales, Inc. - A Terracon Company 13400 1511i Avenue North Minneapolis. MN 55441 P [763] 489 3100 F [7631 489 3101 liesch.com lerracon.com Lennar Lahn Project Irerracan Phase I Cultural Resources Inventory , Otsego, Minnesota May 29, 2015 Terracon Project No. MP147329A Sincerely, Terracon Consulta ts, Inc. r li i de Lambert, PG Senior Hydrogeologist Copy: Dean Sather, Merjent Attachments: - Figures A — Site Map REDACTED - Concept Plan 102914 — Lahn Site, 1 Of 4 REDACTED Prepared by Sather-Berquist, Inc. Responsive Resourceful Reliable Page Redacted — Privileged Information Page Redacted — Privileged Information Minnesota Using the Power of History to Transform Lives Historical Society PRESFRVING SHARING CON%5C71NG STATE HISTORIC PRESERVATION OFFICE September 14, 2015 Mr. Paul Tabone Lennar 16305 36`h Avenue N, Suite 600 Plymouth, MN 55446 RE: Lennar Lahn Project — residential development Otsego, Wright County SHPO Number: 2015-0650 Dear Mr. Tabone: Thank you for continuing consultation with our office during the preparation of an Environmental Assessment Worksheet for the above referenced project. We have reviewed the Phase I Survey report entitled Lennar Cahn Project, Phase I Cultural Resources Inventory of the Lennar Lahti Project near Otsego, MN (May 2015) prepared by your consultant, Merjent, Inc. Based on the results of this survey we conclude that there are no historic properties that will be affected by this project. However, we recommend that you consult with the Minnesota Office of the State Archaeologist regarding site 21WR0130, the Dayton Burial Site. Please note that this comment letter does not address the requirements of Section 106 of the National Historic Preservation Act of 1966 and 36CFR800, procedures of the Advisory Council on Historic Preservation for the protection of historic properties. If this project is considered for federal assistance, or requires a federal license or permit, it should be submitted to our office by the responsible federal agency. Please contact our Compliance Unit at (651) 259-3455 if you have any questions regarding our comments on this project. Sincerely, On 110-R — Otow"A Sarah J. Beimers, Manager Government Programs and Compliance cc: Dean Sather, Merjent, Inc. r•linnesota Historical Society, 345 Kellogg Boulevard West, Saint Paul, Minnesota 55102 651-259-3000 • 888-727-8386 • ", vw.mnhs.ora From: Anfinson, Scott (ADM)[mailto:scott.anfinson@state.mn.us] Sent: Tuesday, November 10, 2015 11:49 AM To: Dean Sather <dsather6a merlent.com> Cc: Koenen, Bruce (ADM) <Bruce.Koenen(aDstate.mn.us>; sarah.beimers(@-rnnhs.org Subject: RE: Lennar Development and 21WR0130 Letter I have reviewed the Phase 1 survey report on this project and concur that no eligible archaeological sites and no recorded burials will be affected by the development if the development is restricted to the area within the red line shown on Figure A in the Deep Testing portion of the report. This development area does not include the farmstead south of County Road 38 and east of the old gravel pit. Should the farmstead be included in future development, as suggested by the concept sketch in the report, it should be archaeologically surveyed. With regard to the burial site known as 21WR130, the exact location where the burial came from could not be determined by the State Archaeologist in 1999. There is the possibility of additional burials being present along the northeast face of the former borrow pit immediately adjacent to the above mentioned farmstead. Should any cutting be done in this immediate area, an archaeologist should monitor the work and all excavation should immediately cease if any potential human remains are encountered. An archaeological site form needs to be completed and submitted to OSA that should include MRJ-LP-01 and MRJ-LP-02 as well as alpha site 21WRo. Scott Anfinson State Archaeologist 0tCITY F o MINNESOTA V APPLICANT: Lennar Corporation 8 March 2016 FINDINGS & DECISION ZONING MAP AMENDMENT APPLICATION: Request for approval of a Zoning Map amendment for land included within the Lahn Preliminary Plat. CITY COUNCIL MEETING: 14 March 2016 FINDINGS: Based upon review of the application and evidence received, the Otsego City Council now makes the following findings of fact: A. The legal description of the property is attached as Exhibit A. B. The property lies within the East Sewer District and is guided for low density residential land uses by the 2012 Otsego Comprehensive Plan, as amended. C. The property is zoned A-1, Agriculture Rural Service District; the applicant is requesting a rezoning to R-5, Residential Single and Two Family District to allow for development of 345 single family lots. D. The Planning Commission and City Council must take into consideration the possible effects of the request with their judgment based upon (but not limited to) the criteria outlined in Section 20-3-21 of the Zoning Ordinance: The proposed action's consistency with the specific policies and provisions of the Otsego Comprehensive Plan. Finding: The subject site is guided for low density residential uses within the East Sewer District by the 2012 Comprehensive Plan. Areas guided for low density residential uses are intended to provide for single family lots. The proposed preliminary plat i single family lots with varied minimum widths between 55 and 80 feet. The land use and the variety of single family lots offered within the proposed development will ensure a range of housing options consistent with the policies of the Comprehensive Plan. 2. The proposed use's compatibility with present and future land uses of the area. Finding: The subject site is surrounded by and will be compatible with the following existing and planned land uses in the area: Direction Land Use Plan Zoning Map Existing Use North LD Residential A-1 District Cultivated fields East LD Residential A-1 District Rural single family South -- -- Crow River West LD Residential R-4 District Single family Townhouse City Park City E-WWTF 3. The proposed use's conformity with all performance standards contained within the Zoning Ordinance and other provisions of the City Code. Finding: The proposed preliminary plat will comply with all applicable requirements of the Zoning Ordinance, Subdivision Ordinance, and Engineering Manual except as specifically modified by the PUD-CUP. 4. Traffic generation of the proposed use in relation to capabilities of streets serving the property. Finding: The proposed preliminary plat is accessed by CSAH 36, designated as a collector street by the Northeast Wright County Transportation Plan and Randolph Avenue designated as a residential collector street by the City's Transportation Plan; each roadway will have adequate capacity to accommodate traffic generated by the development at full build -out. 5. The proposed use can be accommodated by existing public services and facilities and will not overburden the City's service capacity. Finding: The proposed preliminary plat is within the City's East Sewer District and utility and service capacity for the proposed development is available. E. The planning report dated 3 March 2016 prepared by the City Planner, The Planning Company LLC., is incorporated herein. F. The Engineering Review dated March 3, 2016 prepared by the City Engineer, Hakanson Anderson Associates, Inc., is incorporated herein. G. The Otsego Planning Commission held a public hearing at their regular meeting on 7 March 2016 to consider the application, preceded by published and mailed notice. Based upon review of the application and evidence received, the Otsego Planning Commission closed the public hearing and recommended by a 7-0 vote that the City Council approve the request based on the aforementioned findings. DECISION: Based on the foregoing information and applicable ordinances, the request is hereby APPROVED. MOTION BY: SECOND BY: ALL IN FAVOR: THOSE OPPOSED: 2 ADOPTED by the City Council of the City of Otsego this 14th day of March, 2016. CITY OF OTSEGO By: Jessica L. Stockamp, Mayor Attest: Tami Loff, City Clerk 0tsF e o MINNESOTA V APPLICANT: Lennar Corporation 8 March 2016 FINDINGS & DECISION PRELIMINARY PLAT/PUD-CUP APPLICATION: Request for approval of a preliminary plat and PUD-CUP for development of 345 single family lots. CITY COUNCIL MEETING: 14 March 2016 FINDINGS: Based upon review of the application and evidence received, the Otsego City Council now makes the following findings of fact: A. The legal description of the property is attached as Exhibit A. B. The property lies within the East Sewer District and is guided for low density residential land uses by the 2012 Otsego Comprehensive Plan, as amended. C. The property is zoned R-5, Residential Single and Two Family District; Single family dwellings are a permitted use within the R-5 District. C. The project requires preparation of a mandatory EAW pursuant to Minnesota Rules 4410.4300 Subp. 19. D. The EAW was approved by the Zoning Administrator for distribution and was published in the Environmental Quality Board Monitor on 2 December 2015; the 30 day comment period ended 20 January 2016. E. The City Council is to base its decision on the need for an Environmental Impact Statement (EIS) and the proposed scope of an EIS on the information gathered during the EAW process and on the comments received on the EAW; pursuant to Minnesota Rules 4410.1700, in deciding whether a project has the potential for significant environmental effects, the following factors shall be considered: a. Type, extent and reversibility of environmental effects. b. Cumulative potential effects of related or anticipated future projects. C. The extent to which the environmental effects are subject to mitigation by ongoing public regulatory authority. d. The extent to which environmental effects can be anticipated and controlled as a result of other environmental studies undertaken by public agencies or the project proposer, or of EISs previously prepared on similar projects. F. The EAW dated 4 December 2015 is incorporated herein. G. The following comments were received during the 30 day comment period and are incorporated herein: 1 1. Minnesota Department of Transportation e-mail dated January 12, 2016. 2. Minnesota Pollution Control Agency letter dated January 15, 2016 3. Department of Natural Resources letter dated January 20, 2016. 4. Minnesota Department of Health letter dated January 20, 2016. H. The Otsego Planning Commission conducted a public hearing at their regular meeting on 7 March 2016 to consider the application, preceded by published and mailed notice. Upon review of the application and evidence received, the Otsego Planning Commission closed the public hearing and recommended by a 7-0 vote that the City Council make a finding that the request does not have the potential for significant environmental effects and preparation of an EIS is not necessary based on the aforementioned findings. I. The planning report dated 3 March 2016 prepared by the City Planner, The Planning Company LLC., is incorporated herein. J. The Engineering Review dated March 3, 2016 prepared by the City Engineer, Hakanson Anderson Associates, Inc., is incorporated herein. K. The proposed development is consistent with the City's Comprehensive Plan and complies with the Zoning Ordinance, Subdivision Ordinance, and Engineering Manual. The development is also subject review for to compliance with the other agency applications outlined in Paragraph 8 of the EAW. Compliance with these policies and performance standards will mitigate any potential significant environmental effects and allow any potential environmental effects to be anticipated and controlled. No significant environmental effects are anticipated. DECISION: In consideration of the foregoing information and applicable ordinances, the proposed Lahn Preliminary Plat does not have potential for significant environmental effects and that preparation of an EIS is not to be required. MOTION BY: SECOND BY: ALL IN FAVOR: THOSE OPPOSED: ADOPTED by the City Council of the City of Otsego this 14th day of March, 2016. CITY OF OTSEGO By: Jessica L. Stockamp, Mayor Attest: Tami Loff, City Clerk CITY ot-�go F MINNESOT 8 March 2016 FINDINGS & DECISION PRELIMINARY PLAT/PUD-CUP APPLICANT: Lennar Corporation APPLICATION: Request for approval of a preliminary plat and PUD-CUP for development of 345 single family lots. CITY COUNCIL MEETING: 14 March 2016 FINDINGS: Based upon review of the application and evidence received, the Otsego City Council now makes the following findings of fact: A. The legal description of the property is attached as Exhibit A. B. The property lies within the East Sewer District and is guided for low density residential land uses by the 2012 Otsego Comprehensive Plan, as amended. C. The property is zoned R-5, Residential Single and Two Family District; Single family dwellings are a permitted use within the R-5 District. D. The applicant has requested approval of a preliminary plat of 345 single family lots subject to lot requirements and performance standards established under a Planned Unit Development Conditional Use Permit (PUD-CUP). E. The Planning Commission and City Council must take into consideration the possible effects of the request with their judgment based upon (but not limited to) the criteria outlined in Section 20-4-25 of the Zoning Ordinance: 1. The proposed action's consistency with the specific policies and provisions of the Otsego Comprehensive Plan. Finding: The subject site is guided for low density residential uses within the East Sewer District by the 2012 Comprehensive Plan. Areas guided for low density residential uses are intended to provide for single family lots. The proposed preliminary plat i single family lots with varied minimum widths between 55and 80 feet. The land use and the variety of single family lots offered within the proposed development will ensure a range of housing options consistent with the policies of the Comprehensive Plan. 2. The proposed use's compatibility with present and future land uses of the area. Finding: The subject site is surrounded by and will be compatible with the following existing and planned land uses in the area: Direction Land Use Plan Zoning Map Existing Use North LID Residential A-1 District Cultivated fields East LD Residential A-1 District Rural single family South -- -- Crow River West LID Residential R-4 District Single family Townhouse City Park City E-WWTF 3. The proposed use's conformity with all performance standards contained within the Zoning Ordinance and other provisions of the City Code. Finding: The proposed preliminary plat will comply with all applicable requirements of the Zoning Ordinance, Subdivision Ordinance, and Engineering Manual except as specifically modified by the PUD-CUP. 4. Traffic generation of the proposed use in relation to capabilities of streets serving the property, Finding: The proposed preliminary plat is accessed by CSAH 36, desginatd as a collector street by the Northeast Wright County Transportation Plan and Randolph Avenue designated as a residential collector street by the City's Transportation Plan; each roadway will have adequate capacity to accommodate traffic generated by the development at full build -out. 5. The proposed use can be accommodated by existing public services and facilities and will not overburden the City's service capacity. Finding: . The proposed preliminary plat is within the City's East Sewer District and utility and service capacity for the proposed development is available. F. The planning report dated 3 March 2016 prepared by the City Planner, The Planning Company LLC., is incorporated herein. G. The Engineering Review dated March 3, 2016 prepared by the City Engineer, Hakanson Anderson Associates, Inc., is incorporated herein. H. The Otsego Planning Commission held a public hearing at their regular meeting on 7 March 2016 to consider the application, preceded by published and mailed notice. Based upon review of the application and evidence received, the Otsego Planning Commission closed the public hearing and recommended by a 7-0 vote that the City Council approve the request based on the aforementioned findings. DECISION: Based on the foregoing information and applicable ordinances, the request is hereby APPROVED, subject to the following conditions: Approval of the preliminary plat shall not guarantee access to sanitary sewer service. The City shall only allocate sanitary sewer capacity to approved final plats with signed development contracts to assure the City of timely development. 2. All lots within the preliminary plat shall comply with the following setbacks: Front Side Rear Wetland CSAH 36/ Randolph 35ft. 7ft. 20ft. 40ft. 65ft. 25ft. 7ft. 20ft. 40ft. 65ft. 30ft. garage 2 3. NextGen dwelling units shall be allowed subject to approval of the Zoning Administrator in compliance with the following performance standards: a. The design and construction of the principal building is not a two-family dwelling as defined by the Zoning Ordinance. b. There shall be an interior connection between the main living area and accessory living quarters that is able to be unlocked from each side of the connection and that is not secured by a deadbolt or keyed lockset. C. The principal building shall be served by single municipal water, sanitary sewer, gas and/or electric utility service lines each with a single meter for the respective utility where applicable. d. The principal building shall have one heating and air conditioning system. e. The property shall have one postal address. f. There shall be a minimum of three (3) garage stalls having direct exterior access (not in a tandem arrangement) attached to the principal building with a driveway access in front of each stall so as to allow direct vehicle maneuvering to each of the stalls. 4. A landscape plan shall be submitted with application for final plat approval and provide for plantings as required by Section 20-19-2.0 and Section 20-19-2.D of the Zoning Ordinance. 5. PID 118-802-0011300 must be provided access to Road 6, made part of the development, or Outlot H shall be deeded to the owner of the exception parcel at the time the right-of-way for Road 6 is final platted. 6. Outlots A, B, C, D, E, F, G, I, J, K, L, and M shall be deeded to the City. 7. Park and trail dedication requirements shall be satisfied as a cash fee in lieu of land at the time of final plat approval, less a percentage credit for land dedicated for the trail corridor south of CSAH 36 or financial credits any improvements installed by the developer. 8. The developer shall provide a description for a publicly accessible/privately maintained trail to be constructed within Outlots A and B to be recorded with the appropriate final plat(s). 9. All grading, drainage and erosion control plans are subject to review and approval of the City Engineer. 10. All utility plans and issues are subject to review and approval of the City Engineer. 11. All drainage and utility easements are subject to review and approval of the City Engineer. 12. All public rights -of -ways and streets are subject to review and approval of the City Engineer. 13. Application for final plat approval shall include a phasing plan; the phasing plan is not binding upon the developer. 3 MOTION BY: SECOND BY: ALL IN FAVOR: THOSE OPPOSED: i AI ADOPTED by the City Council of the City of'Otsego this 141" day of March, 2016. Tami Loff, City Clerk CITY OF OTSEGO By: Jessica L. Stockamp, Mayor 4 ORDINANCE NO.: 2016-07 CITY OF OTSEGO COUNTY OF WRIGHT, MINNESOTA AN ORDINANCE AMENDING THE ZONING ORDINANCE OF THE CITY OF OTSEGO TO PROVIDE FOR A CHANGE IN ZONING CLASSIFICATION FOR LAND WITHIN THE LAHN PRELIMINARY PLAT. THE CITY COUNCIL OF THE CITY OF OTSEGO DOES HEREBY ORDAIN: Section 1. The official Zoning Map of the Otsego Zoning Ordinance is hereby amended to change the zoning classification of the property legally by Exhibit A. Section 2. The property is hereby rezoned from an A-1, Agricultural Rural Service District designation to R-5, Residential Single and Two Family District designation. Section 3. The Zoning Map of the City of Otsego shall not be republished to show the aforesaid rezoning, but the Zoning Administrator shall appropriately mark the Zoning Map on file at City Hall for the purpose of indicating the rezoning hereinabove provided for in this Ordinance, and all of the notations, references and other information shown thereon are hereby incorporated by reference and made part of this Ordinance. Section 4. This Ordinance shall become effective immediately upon its passage and publication according to Law. MOTION BY: SECOND BY: ALL IN FAVOR: THOSE OPPOSED: ADOPTED by the City Council of the City of Otsego this 14t" day of March, 2016. CITY OF OTSEGO C� Jessica L. Stockamp, Mayor ATTEST: Tami Loff, City Clerk ATTACH LEGAL DESCRIPTION HERE EXHIBIT A