Loading...
ITEM 4.2 Trail connectionP Otsezo MINNESOTA DEPARTMENT INFORMATION Request for City Council Action ORIGINATING DEPARTMENT: REQUESTOR: MEETING DATE: Public Works City Engineer Wagner March 28, 2016 PRESENTER(s): REVIEWED BY: ITEM #: City Engineer Wagner City Administrator Johnson 4.2 Finance Director Flaherty AGENDA ITEM DETAILS RECOMMENDATION: Staff recommends ordering the preparation of plans and specifications for the construction of a bituminous trail along 70th Street between 72d St and Queens Avenue. ARE YOU SEEKING APPROVAL OF A CONTRACT? IS A PUBLIC HEARING REQUIRED? No No BACKGROUND/JUSTIFICATION: A short connection of off street trail is needed to provide safe connectivity to the trail system. The trail is approximately 800' long and proposed to be located on the south side of CSAH 37 in front of Anoka Equine property within County right of way. Current trails that it would provide connection to are the Quaday Avenue trail located east of TH101 and north of CSAH 37, the 72rid Street trail, which extends to the new Northwood Park and Kwik Trip, and Queens Avenue trail, which is adjacent to the Gateway North Industrial Park. The trail would cross CSAH 37 at the TH101 east side ramp/72"d St/CSAH 37 signalized intersection to provide a safer crossing. The project was included in the 2016 CIP with an estimated project cost of $43,000. SUPPORTING DOCUMENTS: ❑ ATTACHED NONE • Engineers Project Cost Estimate • Location Map POSSIBLE MOTION Please word motion as you would like it to appear in the minutes. Motion to approve Ordering the Preparation of Plans and Specification for the construction of a bituminous trail along 70th Street between 72nd St and Queens Avenue. BUDGET INFORMATION FUNDING: BUDGETED: X YES Park Development Fund - 203 ❑ NO ACTION TAKEN ❑ APPROVED AS REQUESTED ❑ DENIED ❑ TABLED ❑ OTHER (List changes) COMMENTS: ENGINEER'S COST ESTIMATE Bid Schedule A - Trail Construction CSAH 37 STREET TRAIL ENGINEER'S COST ESTIMATE CITY OF OTSEGO 6-26-2015 ITEM NO. DESCRIPTION ESTIMATED QUANTITY UNIT UNIT COST TOTAL COST 1 MOBILIZATION 1 LUMP SUM $ 7,500.00 $ 7,500 2 SALVAGE TOPSOIL 195 CU YD $ 4.50 $ 878 3 SAWING BITUMINOUS PAVEMENT(FULL DEPTH 125 LIN FT $ 5.00 $ 625 4 SUBGRADE PREPARATION 8 TRAIL STA $ 175.00 $ 1,400 5 COMMON EXCAVATION CV 70 CU YD $ 5.00 $ 350 6 AGGREGATE BASE CLASS 5 P 305 TON $ 20.00 $ 6,160 7 TYPE LV WEARING COURSE MIXTURE 4,B 85 TON $ 100.00 $ 8,500 8 6" CONCRETE WALK 400 SQ FT $ 7.50 $ 3,000 9 CROSSWALK MARKING 3'X6" BLOCKS - PAINT 175 LF $ 2.00 $ 350 10 TRUNCATED DOMES 40 SQ FT $ 50.00 $ 2,000 11 SILT FENCE 500 LIN FT $ 3.00 $ 1,500 12 TURF RESTORATION 1 LUMP SUM $ 1,500.00 $ 1,500 13 RELOCATE UTILITY PEDESTAL. 1 LUMP SUM $ 250.00 $ 250 .14 RELOCATE POLE 1 LUMP SUM $ 250.00 $ 250 SCHEDULE "A" -Trail Construction $ 34,203 Bid Schedule B - Easement ITEM NO. I ITEM DESCRIPTION ESTIMATED QUANTITY UNIT UNIT COST I TOTAL COST 15 EASEMENT* 0.05 ACRES $ 30,000.00 $ 1,500 SCHEDULE "A!'- ROW Easement $ 1,600 'Private Appraisal Cost- Minimum Purchase Price Schedule "A" TRAIL CONSTRUCTION $34,203.00 Schedule "B" EASEMENT $1,500.00 Engineering and Construction Administration (20%,) $7,140.60 TOTAL ALL SCHEDULES $42,843.60 E k I U., r,. K+• P i /. , s I, M.a CITY OF 0 tSe O HakanAnd( Civil Engineersrs and Land 3601 Thurston Ave., Anoka, MI M I N N E SOTA 763-427-5860 FAX 763 www.hakanson—andersc _ CC-'d CCCF iaa a ioo 200 SCALE IN Fr. nVM[