Loading...
ITEM 3.11 SCADA ProgrammingOtSTY F 0 MINNESOTA g DEPARTMENT INFORMATION Request for City Council Action ORIGINATING DEPARTMENT: REQUESTOR: MEETING DATE: Public Works City Engineer Wagner April 11th, 2016 PRESENTER(s): REVIEWED BY: ITEM #: Consent Agenda City Administrator Johnson 3.11 Finance Director Flaherty AGENDA ITEM DETAILS RECOMMENDATION: City Staff recommends approval of SCADA programming contract with AE2S for the E-8 School Interim Lift Station and modification of this item within the E-8 School Interim Lift Station specification. ARE YOU SEEKING APPROVAL OF A CONTRACT? IS A PUBLIC HEARING REQUIRED? Yes No BACKGROUND/JUSTIFICATION: As part of the E-8 School Interim Lift Station project, AE2S will be completing SCADA programming. The City has used AE2S exclusively for all of its SCADA programming for several years and has intimate knowledge of what information the Utility department wants to see and how they want to see that information on their SCADA screens. AE2S has provided the City of Otsego with a quote to complete the programming. Attached is a contract for $19,000 to complete the necessary programming. The engineers estimate for this portion of the contract was $22,500. The only additional item for SCADA that will be left for the Lift Station contractor to complete as part of the remaining $3,500 is supplying the antenna and wiring from the antenna to the control panel. We expect that to be $3,500 or less. The entire project is being paid for by the ISD #728. Removing SCADA programming from the bidding process is intended to ensure AE2S is used for the programming and to remove the potential for mark up of AE2S's quote. SUPPORTING DOCUMENTS: X ATTACHED NONE • AE2S Contract • Highlighted Engineer's Estimate MOTION: (Please word motion as you would like it to appear in the minutes.) Motion to approve $19,000 SCADA programming contract with AE2S for the E-8 School Interim Lift Station. BUDGET INFORMATION FUNDING: I BUDGETED: X YES ISD #728 per agreement NO ACTION TAKEN ❑ APPROVED AS REQUESTED ❑ DENIED ❑ TABLED ❑ OTHER (List changes) COMMENTS: www. ae2s. cam April 4, 2016 Kurt Neidermeier Utility Manager 13400 90t" Street NE Otsego, MN 55330 RE: Letter Agreement Between Owner and Engineer E-8 School Lift Station Programming Services Agreement Otsego, MN Dear Mr. Neidermeier: Thank you for the opportunity to provide this Agreement for professional Instrumentation and Control (I&C) Services in association with the Otsego Wastewater Treatment System. As you requested, we have prepared this Agreement to provide professional services for Supervisory Control and Data Acquisition (SCADA) programming and commissioning, as further described below, for the wastewater collection system in Otsego, MN. This is an Agreement between the OWNER and ENGINEER, effective upon approval of the OWNER for the Scope of Services described herein, Scone of Services ENGINEER will perform the following professional services as authorized by OWNER. 1. 2. 3. 4. 5. 6. 7. 8. Perform PLC programming for E-8 School Lift Station PLC as more fully described by the Sequence of Operation. Perform operator interface terminal (OIT) programming within E-8 School Lift Station. Perform PLC programming within master polling Tower 2, East Wastewater Treatment Facility (WWTF), and West WWTF. Perform SCADA programming within East WWTF and West WWTF. Configure, test, and commission new lift station telemetry radio. Add associated lift station alarms to existing Win911 alarming software. Startup and commissioning. Operator training. Sequence of Operation 1. E-8 School Lift Station a. SCADA Monitoring i. Monitoring shall include pump running signals, pump runtimes, daily, pump start cycles, wetwell level, pump control setpoints, alarm setpoints, and all alarms associated with the lift station. 1. All associated alarming will be configured within the alarm paging system (Win911 software). i. Alarms will include the following: a. Communication Fail, Utility Power Fail, UPS Fail, TVSS Fail, Pump 1 Overload, Pump 1 Overtemp, Pump 1 Seal Fail, Pump 1 Call to Run Fail, Pump 2 Overload, Pump 2 Overtemp, Pump 2 Seal Fail, Pump Advanced Engineering and Environmental Services, Inc. Water Tower Place Business Center .'6901 East Fish Lake Road Suite 184 . Maple Grove, MN 55369 ® (t) 763-463-5036 9 (f) 763-463-5037 2 Call to Run Fail, Wetwell High Level, and Wetwell Low Level. b. Control i. The operation of the lift station is to be based upon a two (2) pump Lead/Lag system with an alternation control scheme. ii. The operator will have the ability of selecting automatic or manual Lead/Lag alternation. iii. In the event of Lead pump failure in automatic alternation mode, the pump in Lag status will become designated as the Lead pump. iv. Pump control and alarm setpoints may be modified both locally (OIT) and remotely (SCADA). Responsibilities of OWNER 1. Provide access to the associated sites. Proposed Professional Fees ENGINEER proposes to complete the Scope of Services within this Supplemental Agreement on an hourly and not to exceed basis. A breakdown of the estimated costs for the Scope of Services is as follows: 1. PLC programming (E-8 School Lift Station). 24 hours 2. Panelview programming (E-8 School Lift Station). 16 hours 3. PLC programming (Tower 2). 10 hours 4. PLC programming (East WWTF, West WWTF). 16 hours 5. SCADA programming (East WWTF, West WWTF), 16 hours 6. Telemetry radio configuration and commissioning. 4 hours 7. Alarming within Scadalarm software (East WWTF). 4 hours 8. Startup and commissioning. 24 hours 9. Operator training. 8 hours Total Professional Services $18,500.00 Reimbursables (Mileage etc.) $500.00 Combined Total $19,000.00 Anticipated Times for Rendering Service ENGINEER proposes the following timeline for performance of the above stated tasks: 1. Dependent upon E-8 School Lift Station construction schedule. Page 2 of 3 (Letter Agreement) Any delays due to equipment and/or software availability shall result in a corresponding adjustment to the proposed schedule. Acceptance Should this proposal satisfactorily establish the Scope of Services desired, and you approve the Terms and Conditions of the Agreement, please sign and date both copies of this proposal in the space provided. Retain one (1) copy for your records and return the other to AE2S. Receipt of a fully executed Agreement will serve as our Notice to Proceed. i Thank you again for the continued opportunity to provide professional services to the City of Otsego, MN. We look forward to working with you, and we are confident our experience and expertise will provide value to your facility. Sincerely, AE2S Accepted this day of 520 City of Otsego, MN Allen Dostall Title: I&C Technician, AE2S Grant L. Meyer, PE Client Program Leader, AE2S Page 3 of 3 (Letter Agreement) This is EXHIBIT A, consisting of five (S) pages, referred to in and part of the Agreement between City of Otsego, MN and AMS for, I&C Professional Services dated April 4"' 2016 Standard Terms and Condition The Agreement is amended and supplemented to include the following agreement of the parties; Standard of Care a. The standard of care for all professional services performed or fiirnished by ENGINEER under this Agreement will be the care and skill ordinarily used by members of ENGINEER's profession practicing under similar circumstances at the same time and in the same locality. ENGINEER makes no warranties, express or implied, under this Agreement or otherwise, in connection with ENGINEER's services. 2. Independent Contractor a. All duties and responsibilities undertaken pursuant to this Agreement will be for the sole and exclusive benefit of OWNER and ENGINEER and not for the benefit of any other party. Nothing contained in this Agreement shall create a contractual relationship with or a cause of action in favor of a third party against either OWNER or ENGINEER. ENGINEER's services under this Agreement are being performed solely for OWNER's benefit, and no other entity shall have any claim against ENGINEER because of this Agreement or the performance or nonperformance of services hereunder. OWNER agrees to include a provision in all contracts with contractors and other entities involved in this project to carry out the intent of this paragraph. 3. Payments to ENGINEER a. Invoices will be prepared in accordance with ENGINEER's standard invoicing practices and will be submitted to OWNER by ENGINEER monthly, unless otherwise agreed. Invoices are due and payable within 30 days of receipt. If OWNER fails to make any payment due ENGINEER for services and expenses within 30 days after receipt of ENGINEER's invoice therefore, the amounts due ENGINEER will be increased at the rate of 1.0% per month (or the maximum rate of interest permitted by law, if less) from said thirtieth day. In addition, ENGINEER may, after giving seven days written notice to OWNER, suspend services under this Agreement until ENGINEER has been paid in full all amounts due for services, expenses, and other related charges. 4. Insurance a. ENGINEER will maintain insurance coverage for Workers' Compensation, General Liability, and Automobile Liability and will provide certificates of insurance to OWNER upon request. 5. Indemnification and Allocation of Risk a. To the fullest extent permitted by law, ENGINEER shall indemnify and hold harmless OWNER, OWNEWs officers, directors, partners, and employees from and against costs, losses, and damages (including but not limited to reasonable fees and charges of engineers, architects, attorneys, and other professionals, and reasonable court or arbitration or other dispute resolution costs) caused solely by the negligent acts or omissions of ENGINEER or ENGINEER's officers, directors, partners, employees, and consultants in the performance of ENGINEEWs services under this Agreement. b. To the fullest extent permitted by law, OWNER shall indemnify and hold harmless ENGINEER, ENGINEER's officers, directors, partners, employees, and consultants from and against costs, losses, and damages (including but not limited to reasonable fees and charges of engineers, architects, attorneys, and other professionals, and reasonable court or arbitration or other dispute resolution costs) caused solely by the negligent acts or omissions of OWNER or OWNER's officers, directors, partners, employees, and consultants with respect to this Agreement. Page 1 of 5 (Exhibit A — Standard Terms and Conditions) This is EXHIBIT A, consisting of five (5) pages, referred to in and part of the Agreement behileen City of Otsego, MN and AE2S for I&C Professional Services dated April 4"', 2016 c. To the fullest extent permitted by law, ENGINEER's total liability to OWNER and anyone claiming by, through, or under OWNER for any injuries, losses, damages and expenses caused in part by the negligence of ENGINEER and in part by the negligence of OWNER or any other negligent entity or individual, shall not exceed the percentage share that ENGINEER's negligence bears to the total negligence of OWNER, ENGINEER, and all other negligent entities and individuals. d. In addition to the indemnity provided under Paragraph 5.b. of this Exhibit, and to the fullest extent permitted by law, OWNER shall indemnify and hold harmless ENGINEER and ENGINEER's officers, directors, partners, employees, and consultants fi•om and against injuries, losses, damages and expenses (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals, and all court or arbitration or other disputes resolution costs) caused by, arising out of, or resulting from Hazardous Environmental Condition, provided that (i) any such injuries, losses, damages and expenses are attributable to bodily injury, sickness, disease, or death, or to injury to or destruction of tangible property, including the loss of use resulting therefi•om, and (ii) nothing in this Paragraph 5.d shall obligate OWNER to indemnify any individual or entity to the extent of that individual or entity's own negligence or willfid misconduct. e. The indemnification provision of Paragraph 5.a, is subject to and limited by the provisions agreed to by OWNER and ENGINEER in Paragraph 6, "Limit of Liability," of this Agreement. 6. Limit of Liability. a. Notwithstanding any other provision of this agreement, and to the fullest extent permitted by law, the total liability, in the aggregate, of ENGINEER and ENGINEER's officers, directors, partners, employees, agents, and ENGINEER's Consultants, and any of them, to OWNER and anyone claiming by, through, or under OWNER for any and all claims, losses, costs, or damages whatsoever arising out of, resulting from, or in any way related to the Project or the Agreement from any cause or causes, including but not limited to the negligence, professional errors or omissions, strict liability or breach of contract, or warranty express or implied, of ENGINEER or ENGINEER's officers, directors, partners, employees, agents, and ENGINEER's Consultants, or any of them (hereafter "OWNER's Claims"); shall not exceed the total insurance proceeds paid on behalf of or to ENGINEER by ENGINEER's insurers in settlement or satisfaction of OWNER's Claims under the terms and conditions of the ENGINEER's insurance policies applicable thereto (excluding fees, costs and expenses of investigation, claims adjustment, defense, and appeal). 7. Dispute Resolution. Not Used. 8. Termination of Contract a. Either party may at any time, upon seven days prior written notice to the other party, terminate this Agreement. Upon such termination, OWNER shall pay to ENGINEER all amounts owing to ENGINEER under this Agreement, for all work performed up to the effective date of termination, plus reasonable termination costs. Page 2 of 5 (Exhibit A — Standard Terms and Conditions) This is EXHIBITA, consisting offrve (5) pages, referred to in w7d part of the Agreement between City of Otsego, 1kM and AE2S for I&C Professional Services dated April 4"', 2016 9. Access a. OWNER shall arrange for safe access to and make all provisions for ENGINEER and ENGINEER's Consultants to enter upon public and private property as required for ENGINEER to perform services under this Agreement. 10. Hazardous Environmental Conditions a. It is acknowledged by both parties that ENGINEER's scope of services does not include any services related to a "Hazardous Environmental Condition," i.e. the presence at the site of asbestos, PCBs, petroleum, hazardous waste, or radioactive materials in such quantities or circumstances that may present a substantial danger to persons or property exposed thereto in connection with the Assignment. In the event ENGINEER or any other party encounters a Hazardous Environmental Condition, ENGINEER may, at its option and without liability for consequential or any other damages, suspend performance of services on the portion of the Assignment affected thereby until OWNER; (i) retains appropriate specialist consultant(s) or contractor(s) to identify and, as appropriate, abate, remediate, or remove the Hazardous Environmental Condition; and (ii) warrants that the site is in Rill compliance with applicable laws and regulations. OWNER acknowledges that ENGINEER is performing professional services for OWNER and that ENGINEER is not and shall not be required to become an "arranger," "operator," "generator," or "transporter" of hazardous substances, as defined in the Comprehensive Environmental Response, Compensation, and Liability Act of 1990 (CERCLA), which are or may be encountered at or near the site in connection with ENGINEER's activities under this Agreement. 11. Patents a. ENGINEER shall not conduct patent searches in connection with its services under this Agreement and assumes no responsibility for any patent or copyright infringement arising therefrom. Nothing in this Agreement shall be construed as a warranty or representation that anything made, used, or sold arising out of the services performed under this Agreement will be free from infringement of patents or copyrights. 12. Ownership and Reuse of Documents a. All documents prepared or furnished by ENGINEER pursuant to this Agreement are the property of the CLIENT. Reuse of any such documents by CLIENT shall be at CLIENT's sole risk; and CLIENT agrees to indemnify, and hold ENGINEER harmless from all claims, damages, and expenses including attorney's fees arising out of such reuse of documents by CLIENT or by others acting through CLIENT. 13. Use of Electronic Media a. Copies of Documents that may be relied upon by CLIENT are limited to the printed copies (also known as hard copies) that are signed or sealed by the ENGINEER. Files in electronic media format of text, data, graphics, or of other types that are furnished by ENGINEER to CLIENT are only for convenience of CLIENT. Any conclusion or information obtained or derived from such electronic files will be at the user's sole risk. b. When transferring documents in electronic media format, ENGINEER makes no representations as to long-term compatibility, usability, or readability of documents resulting from the use of software application packages, operating systems, or computer hardware differing from those used by ENGINEER at the beginning of this Assignment. c. If there is a discrepancy between the electronic files and the hard copies, the hard copies govern. Page 3 of 5 (Exhibit A — Standard Terms and Conditions) This is EXHIBIT A, consisting of five (5) pages, referred to in and part of the Agreement behi een City of Otsego, AN and AE2S for I&C Professional Services dated April 4"' 2016 d. Because data stored in electronic media format can deteriorate or be modified inadvertently or otherwise without authorization of the data's creator, the party receiving electronic files agrees that it will perform acceptance tests or procedures within 60 days, after which the receiving party shall be deemed to have accepted the data thus transferred. Any errors detected within the 60-day acceptance period will be corrected by the party delivering the electronic files. ENGINEER shall not be responsible to maintain documents stored in electronic media format after acceptance by OWNER, 14. Opinions of Total Project Costs a, Total Project Costs are the sum of the probable evaluation cost, allowances for contingencies, the estimated total costs of services of ENGINEER or other design professionals and consultants, cost of land, rights -of -way, or compensation for damages to properties, and OWNER's costs for legal, accounting, insurance counseling or auditing services, and interest and financing charges incurred in connection with a proposed project, and the cost of other services to be provided by others to OWNER pursuant to this Agreement, b. ENGINEER assumes no responsibility for the accuracy of opinions of Total Project Costs. 16 Force Majeure a. ENGINEER shall not be liable for any loss or damage due to failure or delay in rendering any service called for under this Agreement resulting from any cause beyond ENGINEER's reasonable control. 17. Assignment a, Neither party shall assign its rights, interests or obligations under this Agreement without the express written consent of the other party. 18, Binding Effect a. This Agreement shall bind, and the benefits thereof shall inure to the respective parties hereto, their legal representatives, executors, administrators, successors, and assigns. 19. Severability and Waiver of Provisions a. Any provision or part of the Agreement held to be void or unenforceable tinder any laws or regulations shall be deemed stricken, and all remaining provisions shall continue to be valid and binding upon OWNER and ENGINEER, who agree that the Agreement shall be reformed to replace such stricken provision or part thereof with a valid and enforceable provision that comes as close as possible to expressing the intention of the stricken provision. Non -enforcement of any provision by either party shall not constitute a waiver of that provision, nor shall it affect the enforceability of that provision or of the remainder of this Agreement. 20. Survival a. All express representations, indemnifications, or limitations of liability included in this Agreement will survive its completion or termination for any reason. 21. Headings a. The headings used in this Agreement are for general reference only and do not have special significance. 22. Controlling Law a. This Agreement is to be governed by the law of the State of Minnesota. Page 4 of 5 (Exhibit A — Standard Terms and Conditions) This is EXHIBIT A, consisting of five (5) pages, referred to in and part of the tgreement between City of Otsego, MN and AE2S for I&C Professional Services dated tlpril 4`I', 2016 23. Notices a, Any notice required under this Agreement will be in writing, addressed to the appropriate party at its address on the signature page and given personally, or by registered or certified mail postage prepaid, or by a commercial courier service. All notices shall be effective upon the date of receipt. Page 5 of 5 (Exhibit A— Standard Terms and Conditions) This is EXHIBIT B, consisting of hvo (2) pages, referred to in and part of the Agreement behveen the City of Otsego, MN and AE28for I&C Professional Services dated April 4th, 2016 ADVANCED ENGINEERING AND ENVIRONMENTAL SERVICES, INC. 2016 HOURLY FEE AND EXPENSE SCHEDULE Labor Rates* I&C Technician I $91.00 Administrative 1 $55.00 I&C Technician 11 $103.00 Administrative 11 $67.00 I&C Technician 111 $118.00 Administrative III $80.00 I&C Technician IV $128.00 Administrative N $92.00 I&C Technician V $141.00 Communications Specialist $82.00 I&C Specialist I&C Senior Specialist $152.00 $160.00 Communications Specialist II $94.00 I&C Manager $170.00 Communications Specialist 111 $108.00 Communications Specialist IV $131.00 IT 1 $92.00 Communications Specialist V $144.00 IT 11 $113.00 III $128.00 uction Services Manager I Construction $125.00 ITN $128 Construction Services Manager 11 $135.00 ITV $1.0044.00 Construction Services Manager ILI $152.00 IT VI $169.00 Construction Services Manager IV $169.00 IT Manager $186.00 Construction Services Manager V $185.00 Construction Services Rep 1 $77.00 Land Surveyor I Land Surveyor II $91.00 $111.00 Construction Services Rep II $92.00 Land Surveyor 111 $121.00 Construction Services Rep 111 $108.00 Land Surveyor IV $135.00 Engineer I $fig O0 98.00 Land Surveyor V Land Surveyor VI $149.00 $158.00 Engineer lI $ Engineer 1I1 $144.00 Land Title Agent 1 $77.00 Engineer IV $164.00 Land Title Agent 11 $92.00 Engineer V $179.00 Land Title Agent III $103.00 Engineer VI $202.00 Land Title Agent IV $128.00 Engineer VII $215.00 Engineer VIII $225.00 Marketing Consultant 1 $77.00 Engineering Technician 1 $62.00 Marketing Consultant II Marketing Consultant III $97.00 $118.00 Engineering Technician 11 Engineering Technician III $80.00 $94.00 Marketing Consultant IV $135.00 Engineering Technician IV $110.00 Marketing Consultant V $152.00 Engineering Technician Engineering Technician VI $125.00 $140.00 Operations SpecialistI 00 $92.00 Engineering Technician VII $152.00 Operations Specialist II Operations Specialist III $15.00 $1 Engineering Technician VIII $162.00 Operations Specialist IV $13131.00 Financial Analyst $82.00 Operations Specialist V $152.00 Financial Analyst 11 Financial Analyst III $97.00 $l 13.00 Program Coordinator I $164.00 Financial Analyst IV$1.00 Program Coordinator II Program Coordinator III $175.00 $185.00 Financial Analyst V $144.00 Financial Analyst VI Financial Analyst VII $164.00 $179.00 Project Coordinator I .00 $90.00 Financial Analyst VIII $195.00 Project Coordinator II Project Coordinator III $1 $12525.00 GIS Specialist I $80.00 Project Coordinator IV $140.00 GIS Specialist II GIS Specialist III $97.00 $115.00 ProjectManagerl $154.00 GIS Specialist IV $130.00 .00 Project Manager 11 Project Manager III $169.00 $185.00 GIS Specialist V GIS Specialist VI $1 $164.00 Project Manager IV $200.00 (EXHIBIT B - 2016 AE2S Fee Schedule) This is EXHIBIT B, consisting of Npo (2) pages, referred to in and part of the Agreement behveen the City of Otsego, MN and AE28for MC Professional Services dated April 4th, 2016 ** Includes laboratory testing, architectural and Senior Designer $175.00 engineering consultants, surveying, etc. Senior Consultant $215.00 *** Includes toll telephone, shipping, postage, Technical Expert I $230.00 subsistence, technical literature, equipment rental, etc. Technical Expert H $250,00 Technical Expert III Negotiable These rates are subject to adjustment each year on January 1. Reimbursable Expense Rates Transportation $0.65/mile Survey Vehicle $0.70/mile B&W Photocopies 8'/z" xl 1" $0.10/copy B&W Laser Printouts 8%2" x11" $0.20/page Color Laser Printouts/Copies 8'/2' xI1" $0.68/page Plots - Color Bond $1.25/s.£ Plots - Monochrome BondNellum $0.75/s.E Plots - Film/Photo High Gloss $2.00/s.f. Total Station -Robotic $35.00/hour Pro-XR GPS $15.00/hour Fast Static/RTK GPS $50.00/hour Sonar Mite $50.00/day All -Terrain Vehicle/Boat $100.00/day Air Transportation - Pilatus $1,600/hour Air Transportation - Cirrus $700/hour Survey Monument $5.00/each Fence Posts $8.00/each Survey Lath $35.00/bundle Survey Stakes/Hubs $23.00/bundle 3D Laser Scanner $100.00/hour Hydrant Pressure Recorders $10.00/day Pump Station Monitor $24.00/day Area Velocity Module $30.00/day Rain Gauge $12.00/day Lab Testing Equipment $500.00/day Odor Logger $25.00/day I&C Supplies $10.00/unit Thermal Imaging Camera $300.00/day Power Quality Analyzer $500.00/week Process Calibration Instrument $200.00/day Portable Oscilloscope $125.00/day Antenna Watt -Meter $50.00/day Radio Equipment Rental $50.00/day Cellular Modem $75.00/month AircFlash Hazard Label $3.00/1abel Locator Equipment $20/hour Nuclear Moisture/Density Testing Equip $200/day Concrete Test Hammer $10.00/day Web Hosting $19.95/month In-house Lodging $150.00/day Legal Services Reimbursement $206.00/hour Outside Services** cost *1.15 Out of Pocket Expenses* ** cost* 1.15 Rental Car cost*1.20 * Position titles are for labor rate grade purposes only. (EXHIBIT B - 2016 AE2S Fee Schedule) City of Otsego INTERIM LIFT STATION FOR ISD #728 E-8 SCHOOL ENGINEER'S COST ESTIMATE MIA Qrhnrinln "A" - Infnrim I iff Afnfinn Item No. Spec. Ref Description Unit Estimated Quantity Unit Price Total Estimated Extension 1 Connect To Existing Gravity Sewer LS 1 $1 750.00 $1,750 2 Connect To Existing Forcemain LS 1 $1 750.00 $1 750 3 Forcemain DIP Fittings LBS 148 $5.00 $740 4 72" Diameter Liftstaion Manhole 0- 8 feet EACH 1 $5,000.00 $5,000 5 72" Diameter Manhole - Additional Depth VF 13 $250.00 $3,250 6 5 HP Pumps EACH 2 $10,000.00 $20 000 7 Electrical Enclosure EACH 1 $5,000.00 $5,000 8 Phase 3 Power LS 1 $1,500.00 $1,500 9 SCADA LS 1 $22,500.00 $22,500 10 Lift Station Appurtances LS 1 $10,000.00 $10 000 11 CL 5 Ton 340 $20.00 12 4" HDPE Forcemain DR11 AWWA C906 LF 55 $50.00 13 Grading LS 1 $3,000.00 M$2,750 14 8" Sanita Sewer Main LF 14 $50.00 15 60" Diameter Valve Manhole 0- 8 feet EACH 1 $2,500.00 16 60" Diameter Manhole - Additional Depth VF 2 $200.00 Total - Bid Schedule "A" ipor,v-+v Total - Bid Schedule "A" - Interim Lift Station $87,640 TOTAL CONSTRUCTION COST $87,640 25% Administration, Legal, & Engineering $21,910 TOTAL ESTIMATED PROJECT COST $109,550 C:\Users\Tami.OTSEGO\AppDala\Local\Microsoft\WindowsVNetCache\Content.Outlook\1HD3FVW1\OT639 EngEsl (3-10-16) Page 1 of 1